Cities Index.
Attachment 4- Longevity & Performance Overview

Rialto City Council
May 26, 2026

Document
Attachment 4- Longevity & Performance Overview
Meeting
May 26, 2026
Body
Rialto City Council
Original file
13.1 MB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

Modular Office Unit Longevity & Performance Overview

1. Executive Summary
This report provides an overview of the lifespan, durability, and long-term performance of modular office units. Modular office solutions are designed to deliver immediate functionality while providing decades of reliable service across a wide range of applications.

2. Typical Lifespan
Relocatable Office Trailers:
 Typical lifespan: 20–30 years
 Expected performance: 25–35+ years with maintenance
Permanent Modular Buildings:
 Typical lifespan: 40–60+ years
 Structural life: ~60 years or more

3. Construction & Durability
Built with steel framing, weather-resistant materials, and manufactured in controlled environments to ensure consistent quality and long-term performance.

4. Lifecycle Performance
Routine maintenance such as HVAC servicing, roof inspections, and general upkeep helps extend the lifespan. With proper care, modular offices can meet or exceed expected service ranges.

5. Key Advantages
 Long-term durability (20–60+ years)
 Fast deployment and immediate occupancy
 Flexible and scalable workspace solutions
 Reusable across multiple projects

6. Contact Information
Mario Duran
11420 Mission Blvd,
Mira Loma, CA 91752
(951) 360-5115
[email protected]

Modular Design
(All drawings and specifications are nominal)
11450 Mission Blvd, Mira Loma, CA 91752

Mario Duran | 951.282.4253 | [email protected]

144X60:

+/- 12'-9"

EXTERIOR ELECTRICAL PANELS

AND HVAC UNITS
7' WIDE X 3' DEEP CANOPY
+/- 8' FROM FINISHED FLOOR

STOREFRONT DOOR
WITH TRANSOM (96" HEIGHT)

HARDIE ARCHITECTURAL PANELS
GROOVED STUCCO FINISH 4X10 PANELS
4'-0"
DWN BY:

REP:

DATE
REV# SCALE:CAD FILE:SHEET #
Approved by:

Company:

Date:

As Is:

As Noted:

Revise/Resubmit:

MOBILE MODULAR
WWW.MOBILEMODULAR.COM

PROJECT NAME
1/4" = 1'-0"
A2
MM2026-0021 MARIO DURAN

JAMES VILLA

THIS DRAWING IS FOR EXCLUSIVE AND CONFIDENTIAL USE BY CUSTOMER

AND IS THE PROPERTY OF MOBILE MODULAR AND NOT TO BE DISTRIBUTED OR COPIED WITHOUT WRITTEN AUTHORIZATION BY MOBILE MODULAR.

PRELIMINARY ELEVATIONS & 3D VIEW

← All documents from this meeting