Cities Index.
Attachment 2 – Revised Proposed Master Fee Schedule.pdf

Richmond City Council
March 1, 2022

Document
Attachment 2 – Revised Proposed Master Fee Schedule.pdf
Meeting
March 1, 2022
Body
Richmond City Council
Original file
2.0 MB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.

Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

Residential, single-family development, per
dwelling unit (DU), allocated as follows: 16,804.00 17,670.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 15.08.400-2, RMC

15.08.400-8, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
- Park/open space 6,609.00 1.052 6,950.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 3,447.00 1.052 3,625.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 1,872.00 1.052 1,968.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers 1,585.00 1.052 1,667.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 675.00 1.052 710.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 1,791.00 1.052 1,883.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 372.00 1.052 391.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 453.00 1.052 476.00 Residential, multi-family development, per
dwelling unit (DU), allocated as follows:
13,540.00 14,238.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space 5,427.00 1.052 5,707.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 2,790.00 1.052 2,934.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 1,496.00 1.052 1,573.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers 1,301.00 1.052 1,368.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 367.00 1.052 386.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 1,791.00 1.052 1,883.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 198.00 1.052 208.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 170.00 1.052 179.00 Commercial development, per 1,000 square
feet, allocated as follows:
9,507.00 9,997.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space - 1.052 - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 3,143.00 1.052 3,305.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 4,648.00 1.052 4,888.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers - 1.052 - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 940.00 1.052 988.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 239.00 1.052 251.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 286.00 1.052 301.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 251.00 1.052 264.00 ECI
Factor
ECI Index for
proposed
increase

DEVELOPER FEES
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Public Facility Impact Fees (The fees pay for major infrastructure improvements in each area required as a result of new development, for example off-site roads, traffic signals, fire and police facilities and park and recreation facilities.) Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase
Master Fee Schedule
1 Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

ECI
Factor
ECI Index for
proposed
increase
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase
Office development, per 1,000 square feet,
allocated as follows: 7,946.00 8,355.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space - 1.052 - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 2,205.00 1.052 2,319.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 4,101.00 1.052 4,312.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers - 1.052 - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 706.00 1.052 742.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 397.00 1.052 417.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 286.00 1.052 301.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 251.00 1.052 264.00 Industrial development, per 1,000 square feet,
allocated as follows: 3,788.00 3,984.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space - 1.052 - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 1,086.00 1.052 1,142.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 1,498.00 1.052 1,575.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers - 1.052 - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 749.00 1.052 788.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 169.00 1.052 178.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 108.00 1.052 114.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 178.00 1.052 187.00 Warehousing space, per 1,000 square feet,
allocated as follows: 3,670.00 3,860.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space - 1.052 - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 1,086.00 1.052 1,142.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 1,498.00 1.052 1,575.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers - 1.052 - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 749.00 1.052 788.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 51.00 1.052 54.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 108.00 1.052 114.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 178.00 1.052 187.00 Mitigation Administrative Fee
Not applicable N/A Not applicable N/A N/A
Section 66000 CA Govt Code;
Reso. 6-04; RMC 2.34.040, Ord.
3-04
Mitigation Administrative Fee -- 3% of the total
project impact fees (for Building Regulations
included in Impact Fees administered by Finance) 3.0% N/A 3.0%

INCLUSIONARY HOUSING IN-LIEU FEES
Inclusionary Housing Fees
Master Fee Schedule
2 Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

ECI
Factor
ECI Index for
proposed
increase
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 In Lieu Fees -- per non-inclusionary unit (unit is a dwelling, live/work or multi-family unit)
7% of cost of construction of
habitable space N/A
7% of cost of construction of
habitable space
Type of Project

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Rental Residential Development N/A N/A $12 per square foot

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Ownership Residential Development N/A N/A May not pay in-lieu fee

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 0 - 370 N/A N/A -

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 371 - 74 N/A N/A 3.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 742 - 1,111 N/A N/A 6.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 1,112 - 1,482 N/A N/A 9.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 More than 1,482 N/A N/A 12.00 Park Land Dedication Fees Calculated on a Per Unit Basis

N/A N/A N/A N/A N/A
RMC 6.02.180; RMC 2.34.040,
Ord. 3-04 Single Family dwelling unit, detached or
townhouse, fee per unit 432.00 N/A 432.00 N/A N/A N/A N/A N/A RMC 6.02.180; RMC 2.34.040,
Ord. 3-04 Duplex, medium low 372.00 N/A 372.00 N/A N/A N/A N/A N/A RMC 6.02.180; RMC 2.34.040,
Ord. 3-04 Condominiums and Clusters 300.00 N/A 300.00 N/A N/A N/A N/A N/A RMC 6.02.180; RMC 2.34.040,
Ord. 3-04 Apartments (7 units or more) 216.00 N/A 216.00 Other Mandated Building Permit Fees
STMP, CBSC and SMIP FEES are collected by,
but not set by the City
Subregional Transportation Mitigation Program (STMP) Fees 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Single family residential, fee per dwelling unit 5,744.00 1.023 5,881.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Multi-family Residential, fee per dwelling unit 2,829.00 1.023 2,897.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Senior Housing, fee per dwelling unit 1,551.00 1.023 1,588.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Commercial hotel per room 3,676.00 1.023 3,764.00 RESIDENTIAL DEVELOPMENT PROJECTS PROPOSED SOUTH OF I-580 AND ON THE POINT SAN

PABLO PENINSULA

OTHER RESIDENTIAL DEVELOPMENT PROJECTS
Building Permits for Number of Residential Units Issued after the Resolution's Effective Date
Applicable Fee per Square Foot of Net
New Residential Floor Area
Master Fee Schedule
3 Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

ECI
Factor
ECI Index for
proposed
increase
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Commercial Retail, fee per square feet 6.96 1.023 7.13 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Office, fee per square feet 9.21 1.023 9.43 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Industrial, fee per square feet 5.87 1.023 6.01 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Mini Storage Space, fee per square fee 0.80 1.023 0.82 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Other Fee per dwelling unit (Per AM pk hr trip) 7,762.00 1.023 x` California Building Standards Commission (CBSC) Fees

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 $1 - 25,000 Permit Valuation 1.00 N/A 1.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 $25,001 - 50,000 2.00 N/A 2.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 $50,000 - 75,000 3.00 N/A 3.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 $75,000 - 100 000 4.00 N/A 4.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Every $25,000 or fraction thereof above $100,000 Add $1 N/A Add $1 Strong-Motion Instrumentation & Seismic Hazard Mapping Fees

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 1 to 3 story Residential .00013 * Project Valuation Min Fee $.50 N/A .00013 * Project Valuation
Min Fee $.50

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Commercial and over 3 story Residential .00028 * Project Valuation Min Fee $.50 N/A .00028 * Project Valuation
Min Fee $.50
Public Art Fee

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 All new commercial structures; all new industrial structures; all new residential projects of ten or
more dwelling units; and all construction of
building additions, and/or renovations and/or
tenant improvements exceeding $500,000.00 in
building development costs shall contribute an
amount equal to one percent of the total
development cost to be set aside for public art.
1% of Building
Development Cost N/A 1% of Building
Development Cost

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 All City capital improvement projects, including all City bond measure projects and all other City
capital projects funded from outside granting
authorities, shall contribute an amount equal to
one and one-half percent of the total development
costs of the City capital improvement project, to
be set aside for public art.

1.5% of Building
D
evelopment Cost N/A 1.5% of Building
Development Cost
Master Fee Schedule
4 Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

ECI
Factor
ECI Index for
proposed
increase
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase
Note: for detail Building Development Cost - Refer to Chapter 6.50 PUBLIC ART PROGRAM Master Fee Schedule
5 Building Regulatns, Misc. Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Miscellaneous Fees

1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.40.170-1, RMC

2.34.040-42c, RMC 6.02.180,
Reso. 142-86
Registration Fee 87.00 1.023 89.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.40.170-2, RMC

2.34.040-42c, RMC 6.02.180,
Reso. 142-86
Initial Inspection Fee -- Per Unit 174.00 1.023 178.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.40.170-2, RMC

2.34.040-42c, RMC 6.02.180,
Reso. 142-86
RRIP/Re-Inspection 74.00 1.023 76.00 Contra Costa County Drainage Area No. 73
Uknown N/A Not applicable N/A N/A
RMC 6.02.180; RMC 2.34.040,
Ord. 3-04 County’s Drainage Area No. 73 (El Sobrante
Valley) -- Varies based on lot size Varies N/A Varies Point Richmond Parking District Fee
Uknown N/A Not applicable N/A N/A
RMC 6.02.180; RMC 2.34.040,
Ord. 3-04 Applies to the Point Richmond downtown
commercial area (Public Works)--Varies based on
numerous factors
Varies N/A Varies
Code Compliance Inspection Fees
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 3-04 This fee is the same as the "Inspection and Notice" fee in the Code Enforcement portion of
the Master Fee Schedule
294.00 1.023 301.00
Uknown N/A Not applicable N/A N/A
RMC 12.52.060; RMC

2.34.040, Ord. 3-04 Alquist Priolo Geological Study Filing Fee -- Cost (staff time billed at approximately $80 - $100/hour
and consultant time charged at actual cost) Cost N/A Cost UBC Regulations used to factor fee amounts.

RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220

MISCELLANEOUS
Buidling Regulations uses the Uniform Building Code (UBC) valuation schedules.

Refer to attached "Schedule of Fees for Permits" for a complete valuataion schedule.

Residential Rental Dwelling Unit Inspection and Maintenance Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
Master Fee Schedule
6 Bldng Regulatns, Permits
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Permit Fees

BUILDING PERMIT FEES
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Filing 132.00 1.023 135.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Filing - Two or more permits - Minor Res.

Remodel / Improvement
185.00 1.023 189.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Filing - Two or more permits - Residential Additions and All Other
317.00 1.023 324.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Dupicate Permit Card 79.00 1.023 81.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
2nd time Permit Extension 158.00 1.023 162.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Change of Contractor 336.00 1.023 344.00 N/A 139.7 N/A 139.7 1.027
Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Permit Transfer
10%*Original Permt
including Plan Check N/A 10%*Original Permt
including Plan Check
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Certificate of Occupancy (requested separate from orig. permit)
108.00 1.023 110.00 N/A 139.7 N/A 139.7 1.028
Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Occupancy Program Fee
10%*Building Permit
Fees N/A 10%*Building Permit Fees
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Third Plan Checking Submittal(Response to Plan Check Comments)
368.00 1.023 376.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Change of Address-Min 2hrs 423.00 1.023 433.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Release of Record 167.00 1.023 171.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Expedited Plan Review Fee - Min 2hrs 1,105.00 1.023 1,130.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Property File/Plan Retrieval per Address 264.00 1.023 270.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Fax Permit per Address 148.00 1.023 151.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Technology Fee .1875* Project Valuation N/A .1875* Project Valuation 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Re-Inspection Fee Per Address 167.00 1.023 171.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Over-Time Inspection Min 2 hrs 915.00 1.023 936.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 3 plan check engineer hours on an approved fabricator application
1,105.00 1.023 1,130.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Fabricator application renewal Min 2hrs
737.00 1.023 754.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 3 hours on a new special inspection agency application
914.00 1.023 935.00 Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
UBC Regulations used to factor fee amounts.

RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Master Fee Schedule
7 Bldng Regulatns, Permits
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Permit Fees
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
UBC Regulations used to factor fee amounts.

RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 2 hours on a special inspection agency application renewal
610.00 1.023 624.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Sewer Connection Fee
2,950.00 1.023 3,018.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Plan check consultation fee-30 minutes
minimum (Non-refundable/non-transferable)
185.00 1.023 189.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
BP - $0 - $3000 154.00 1.023 158.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
BP - $3001 - $25,000 288.00 1.023 295.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
BP - $25,001 - $50,000 942.00 1.023 964.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
BP - $50,001 - $100,000 1,443.00 1.023 1,476.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
BP - $100,001 - $500,000 2,854.00 1.023 2,920.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
BP - $500,000 - $1,000,000 7,592.00 1.023 7,767.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
BP - >$1,000,001
$11,353 for the first
$1,000,000 plus $5.00 for
each additional $1000 or
fraction thereof.

1.023
$11,614 for the first
$1,000,000 plus $5.00 for
each additional $1000 or
fraction thereof.
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Business License Inspection 109.00 1.023 112.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Code Compliance Permit and Inspection 505.00 1.023 517.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Investigation Fee for Work Done Without Permits (in addition to the permit fee)
3 times the permit
fee New 3 times the permit fee
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Solar Structure - Residential System 450.00 1.023 450.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Solar Structure - Commercial System 2,057.00 1.023 Deleted 1-Jul-20 143.6 1-Jul-21 146.9 1.023 Reso. 142-86, RMC 6.02.180; RMC 2.34.040, Ord. 3-04 Photovoltaic systems up to 50kW 1,000.00 NA 1,000.00 1-Jul-20 143.6 1-Jul-21 146.9 1.023 Reso. 142-86, RMC 6.02.180; RMC 2.34.040, Ord. 3-04
1,000.00 NA 1,000.00
1-Jul-20 143.6 1-Jul-21 146.9 1.023 Reso. 142-86, RMC 6.02.180; RMC 2.34.040, Ord. 3-04
7 NA 7
Photovoltaic systems between 51 kW and 250 kW:
1000.00 for first 50kW +$7per kW for each kW
between 51 kW and 250 kW
Commercial Solar Energy System
Master Fee Schedule
8 Bldng Regulatns, Permits
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Permit Fees
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
UBC Regulations used to factor fee amounts.

RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 1-Jul-20 143.6 1-Jul-21 146.9 1.023 Reso. 142-86, RMC 6.02.180; RMC 2.34.040, Ord. 3-04 Photovoltaic systems above 250 kW: 1,000.00 NA 1,000.00 1-Jul-20 143.6 1-Jul-21 146.9 1.023 Reso. 142-86, RMC 6.02.180; RMC 2.34.040, Ord. 3-04
1,000.00 for first 50kW +$7 per kW for each kW
between 51 kW and 250 kW and +$5 per kW for each
kW above 250 kW

7.00 5.00 NA 7.00

5.00 1-Jul-20 143.6 1-Jul-21 146.9 1.023 Reso. 142-86, RMC 6.02.180; RMC 2.34.040, Ord. 3-04
Thermal systems up to 30kWth 1,000.00 NA 1,000.00
1-Jul-20 143.6 1-Jul-21 146.9 1.023 Reso. 142-86, RMC 6.02.180; RMC 2.34.040, Ord. 3-04
Thermal systems between 31 kWth and 260 kWth: 1,000.00 NA 1,000.00 1-Jul-20 143.6 1-Jul-21 146.9 1.023 Reso. 142-86, RMC 6.02.180; RMC 2.34.040, Ord. 3-04
1,000.00 for first 30kWth +$7 per kWth for each kWth
between 31kWth and 260 kWth 7 NA 7
1-Jul-20 143.6 1-Jul-21 146.9 1.023 Reso. 142-86, RMC 6.02.180; RMC 2.34.040, Ord. 3-04
Thermal systems above 260 kWth: 1,000.00 NA 1,000.00
1-Jul-20 143.6 1-Jul-21 146.9 1.023 Reso. 142-86, RMC 6.02.180; RMC 2.34.040, Ord. 3-04
1,000.00 for first 30kWth +$7 per kWth for each kWth
between 31 kWth and 260 kWth and +$5 per kWth for
each kWth above 260 kWth

7.00 5.00 NA

7.00 5.00
Application Surcharges

NA NA NA NA NA
RMC 2.40.110, RMC

2.34.040.32d Comprehensive Planning Fee (Surcharge on all Building Permit Applications)

0.1875 x Project
Valuation NA 0.1875 x Project Valuation

PLAN CHECKING FEES
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
PC 1&2 FAM - $0 - $3000 281.00 1.023 287.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
PC 1&2 FAM - $3001 - $25,000 633.00 1.023 648.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
PC 1&2 FAM - $25,001 - $50,000 1,030.00 1.023 1,054.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
PC 1&2 FAM - $50,001 - $100,000 1,553.00 1.023 1,589.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
PC 1&2 FAM - $100,001 - $500,000 2,683.00 1.023 2,745.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
PC 1&2 FAM - $500,000 - $1,000,000 4,127.00 1.023 4,222.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
PC 1&2 FAM - >$1,000,001
$7,374 for the first
$1,000,000 plus $5.00 for
each additional $1000 or
fraction thereof.

1.023
$7,543 for the first
$1,000,000 plus $5.00 for
each additional $1000 or
fraction thereof.
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
PC ALL OTHER - $0 - $3000 292.00 1.023 299.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
PC ALL OTHER - $3001 - $25,000 426.00 1.023 436.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
PC ALL OTHER - $25,001 - $50,000 773.00 1.023 791.00 Master Fee Schedule
9 Bldng Regulatns, Permits
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Permit Fees
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
UBC Regulations used to factor fee amounts.

RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
PC ALL OTHER - $50,001 - $100,000 1,306.00 1.023 1,336.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
PC ALL OTHER - $100,001 - $500,000 2,753.00 1.023 2,816.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
PC ALL OTHER - $500,000 - $1,000,000 4,898.00 1.023 5,011.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
PC ALL OTHER - >$1,000,001
$8,699 for the first
$1,000,000 plus $5.00 for
each additional $1000 or
fraction thereof.

1.023
$8,899 for the first
$1,000,000 plus $5.00 for
each additional $1000 or
fraction thereof.
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 OTC Plan Check Revision per 30 minutes / Deferred Submittals
185.00 1.023 189.00 Grading Permit Plan Review Fee
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Complex Grading/Changes to Apprd Plans

COST N/A COST
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Grading Plan Review 0 to 50 CY 477.00 1.023 488.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Grading Plan Review 51 to 1000 CY 960.00 1.023 982.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Grading Plan Review 1001 to 10k CY 1,440.00 1.023 1,473.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Grading Plan Review 10,001 CY and Above
$2,397 for the first
10,001 CY plus $5.00 for
each additional 1000 CY
or fraction thereof.

1.023
$2,452 for the first 10,001 CY
plus $5.00 for each additional
1000 CY or fraction thereof.

Grading Inspection/Permit Fee
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Grading Inspection fee, fixed portion, $200 448.00 1.023 458.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Grading Inspection <= 50 cubic yards 503.00 1.023 515.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Grading Inspection >51 cubic yards < 100 cubic yards 517.00 1.023 529.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 500.00 1.023 512.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 19.00 1.023 19.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 670.00 1.023 685.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 15.00 1.023 15.00 Grading Insp >1001 cubic yards < 10,000 cubic
yards, + $15.00 per 1,000 cubic yards
Grading Insp >101 cubic yards < 1,000 cubic yards,
+$19.00 per 100 cubic yards above the
Master Fee Schedule
10 Bldng Regulatns, Permits
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Permit Fees
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
UBC Regulations used to factor fee amounts.

RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 872.00 1.023 892.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 74.00 1.023 76.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Encroachment Agreement -- Private right of way fee (see Engineering section for "Encroachment
Agreement -- Public right of way fee")
915.00 1.023 936.00 N/A 139.7 N/A 139.7 1.028
Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Quarterly Fees (C.I.P.) VARIES N/A VARIES

ELECTRICAL PERMIT FEES
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
E - NEW CONST - $0 - $3000 33.00 1.023 34.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
E - NEW CONST - $3001 - $25,000 41.00 1.023 42.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
E - NEW CONST - $25,001 - $50,000 109.00 1.023 112.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
E - NEW CONST - $50,001 - $100,000 230.00 1.023 235.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
E - NEW CONST - $100,001 - $500,000 369.00 1.023 377.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
E - NEW CONST - $500,000 - $1,000,000 1,895.00 1.023 1,939.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
E - NEW CONST - >$1,000,001
$3,007 for the first
$1,000,000 plus $2.50 for
each additional $1000 or
fraction thereof.

1.023
$3,076 for the first
$1,000,000 plus $2.50 for
each additional $1000 or
fraction thereof.
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
E - ALL OTHER - $0 - $3000 186.00 1.023 190.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
E - ALL OTHER - $3001 - $25,000 210.00 1.023 215.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
E - ALL OTHER - $25,001 - $50,000 344.00 1.023 352.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
E - ALL OTHER - $50,001 - $100,000 571.00 1.023 584.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
E - ALL OTHER - $100,001 - $500,000 786.00 1.023 804.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
E - ALL OTHER - $500,000 - $1,000,000 1,895.00 1.023 1,939.00 Grading Insp >10,001 cubic yards yards, + $76.00 per
10,000 cubic yards
Master Fee Schedule
11 Bldng Regulatns, Permits
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Permit Fees
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
UBC Regulations used to factor fee amounts.

RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
E - ALL OTHER - >$1,000,001
$2,474 for the first
$1,000,000 plus $2.50 for
each additional $1000 or
fraction thereof.

1.023
$2,530 for the first
$1,000,000 plus $2.50 for
each additional $1000 or
fraction thereof.

PLUMBING PERMIT FEES
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
P - NEW CONST - $0 - $3000 33.00 1.023 34.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
P - NEW CONST - $3001 - $25,000 35.00 1.023 36.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
P - NEW CONST - $25,001 - $50,000 94.00 1.023 96.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
P - NEW CONST - $50,001 - $100,000 184.00 1.023 188.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
P - NEW CONST - $100,001 - $500,000 309.00 1.023 316.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
P - NEW CONST - $500,000 - $1,000,000 2,816.00 1.023 2,881.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
P - NEW CONST - >$1,000,001
$3,674 for the first
$1,000,000 plus $2.50 for
each additional $1000 or
fraction thereof.

1.023
$3,758 for the first
$1,000,000 plus $2.50 for
each additional $1000 or
fraction thereof.
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
P - ALL OTHER - $0 - $3000 180.00 1.023 184.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
P - ALL OTHER - $3001 - $25,000 188.00 1.023 192.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
P - ALL OTHER - $25,001 - $50,000 276.00 1.023 282.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
P - ALL OTHER - $50,001 - $100,000 436.00 1.023 446.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
P - ALL OTHER - $100,001 - $500,000 600.00 1.023 614.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
P - ALL OTHER - $500,000 - $1,000,000 3,078.00 1.023 3,149.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
P - ALL OTHER - >$1,000,001
$4,010 for the first
$1,000,000 plus $2.50 for
each additional $1000 or
fraction thereof.

1.023
$4,102 for the first
$1,000,000 plus $2.50 for
each additional $1000 or
fraction thereof.

MECHANICAL PERMIT FEES
Master Fee Schedule
12 Bldng Regulatns, Permits
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Permit Fees
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
UBC Regulations used to factor fee amounts.

RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
M - NEW CONST - $0 - $3000 15.00 1.023 15.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
M - NEW CONST - $3001 - $25,000 35.00 1.023 36.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
M - NEW CONST - $25,001 - $50,000 64.00 1.023 65.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
M - NEW CONST - $50,001 - $100,000 171.00 1.023 175.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
M - NEW CONST - $100,001 - $500,000 236.00 1.023 241.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
M - NEW CONST - $500,000 - $1,000,000
1,383.00 1.023 1,415.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
M - NEW CONST - >$1,000,001
$2,083 for the first
$1,000,000 plus $2.50 for
each additional $1000 or
fraction thereof.

1.023
$2,131 for the first
$1,000,000 plus $2.50 for
each additional $1000 or
fraction thereof.
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
M - ALL OTHER - $0 - $3000 180.00 1.023 184.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
M - ALL OTHER - $3001 - $25,000 188.00 1.023 192.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
M - ALL OTHER - $25,001 - $50,000 257.00 1.023 263.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
M - ALL OTHER - $50,001 - $100,000 436.00 1.023 446.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
M - ALL OTHER - $100,001 - $500,000 639.00 1.023 654.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
M - ALL OTHER - $500,000 - $1,000,000 3,078.00 1.023 3,149.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
M - ALL OTHER - >$1,000,001
$4,792 for the first
$1,000,000 plus $2.50 for
each additional $1000 or
fraction thereof.

1.023
$4,902 for the first
$1,000,000 plus $2.50 for
each additional $1000 or
fraction thereof.

FULL COST RECOVERY HOURLY RATES
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Building Inspector 305.00 1.023 312.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Plan Check 368.00 1.023 376.00 Master Fee Schedule
13 Bldng Regulatns, Permits
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Permit Fees
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
UBC Regulations used to factor fee amounts.

RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Permit Technician 205.00 1.023 210.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
Admin / Clerical 192.00 1.023 196.00 Refunds
Cancelled permits are eligible for an 80% refund, upon approval by the Building Official. 20% of the fee is retained to recover the estimated average costs of the City’s administrative and technical efforts required to initiate and facilitate the permitting process.

Plan Check Review fees are non-refundable.

Master Fee Schedule
14 Planning
CURRENT FEE Factor PROPOSED FEE
PLANNING (Fee Legend: (D) = Deposit fee, (F) = Flat fee Hourly Rates
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Planning Division Hourly Rate 231.00 1.023 236.00 Environmental (CEQA) Review
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Preliminary CEQA Review (F) 206.00 1.023 211.00

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Negative Declaration/Mitigated Negative Declaration (City Administration of Contractor) (F) 30% of total contract cost N/A 30% of total contract cost

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Environmental Impact Report (City Administration of Contractor) (F) 30% of total contract cost N/A 30% of total contract cost

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Consultant Environmental Work (D) Actual Cost - Initial Deposit of $11,000 N/A Actual Cost - Initial Deposit of
$11,000

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Consultant Technical Studies (City Administration of Contractor) (D)
Actual Cost - Initial Deposit
of $2,700 N/A Actual Cost - Initial Deposit of
$2,700

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Mitigation Monitoring - First year (D) Actual Cost - Initial Deposit of $13,700 N/A Actual Cost - Initial Deposit of
$13,700

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Mitigation Monitoring - each subsq year (D) Actual Cost - Initial Deposit of $11,000 N/A Actual Cost - Initial Deposit of
$11,000

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Mitigation Monitoring - Large Projects (City administration of Contractor) (D)
Actual Cost - Initial Deposit
of $20,000 N/A Actual Cost - Initial Deposit of
$20,000

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Notice of Determination (Neg Dec & MND) (F) As Set by State N/A As Set by State

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Notice of Determination EIR (F) As Set by State N/A As Set by State

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d County Documentation Handling Fee (F) As Set by County N/A As Set by County Legislative Actions

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d General Plan Amendment or Zoning Amendment (each) (D)
Actual Cost - Initial Deposit
of $13,000 N/A Actual Cost - Initial Deposit of
$13,000

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Specific Plan Amendment (D) Actual Cost - Initial Deposit of $13,000 N/A Actual Cost - Initial Deposit of
$13,000

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Development Agreements (D) Actual Cost - Initial Deposit of $14,000 N/A Actual Cost - Initial Deposit of
$14,000
Variance Review

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Variance - Residential (D) Actual Cost - Initial Deposit of $3,500 N/A Actual Cost - Initial Deposit of
$3,500

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Variance - Non-Residential (D) Actual Cost - Initial Deposit of $5,500 N/A Actual Cost - Initial Deposit of
$5,500
Letters
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Zoning Verification/Rebuild Letters (F) 464.00 1.023 475.00 Waiver Review

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d
Waiver Review (D) Actual Cost - Initial Deposit
of $3,500 N/A Actual Cost - Initial Deposit of
$3,500
Subdivision Review
Last increase
implemented
ECI Index for
last increase
Index Effective date for
proposed increase
ECI Index for
proposed increase
ECI
Factor
Municipal Code or Other
Code
City of Richmond
Master Fee Schedule
Description
Master Fee Schedule
15 Planning
CURRENT FEE Factor PROPOSED FEE
Last increase
implemented
ECI Index for
last increase
Index Effective date for
proposed increase
ECI Index for
proposed increase
ECI
Factor
Municipal Code or Other
Code
City of Richmond
Master Fee Schedule
Description

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Lot Line Adjustment or Parcel Merger (D) Actual Cost - Initial Deposit of $5,000 N/A Actual Cost - Initial Deposit of
$5,000

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Tentative Parcel Map (0 to 4 lots) (D) Actual Cost - Initial Deposit of $6,500 N/A Actual Cost - Initial Deposit of
$6,500

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Tentative Subdivision Map (5 to 25 lots) (D) Actual Cost - Initial Deposit of $7,500 N/A Actual Cost - Initial Deposit of
$7,500

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Tentative Subdivision Map (26 to 100 lots) (D) Actual Cost - Initial Deposit of $9,500 N/A Actual Cost - Initial Deposit of
$9,500

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Tentative Subdivision Map (101 to 200 lots) (D) Actual Cost - Initial Deposit of $14,000 N/A Actual Cost - Initial Deposit of
$14,000

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Tentative Subdivision Map (201+ lots) (D) Actual Cost - Initial Deposit of $18,000 N/A Actual Cost - Initial Deposit of
$18,000

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Preliminary Plan (D) Actual Cost - Initial Deposit of $4,000 N/A Actual Cost - Initial Deposit of
$4,000

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Certificate of Compliance (D) Actual Cost - Initial Deposit of $4,000 N/A Actual Cost - Initial Deposit of
$4,000
Zoning Compliance Review
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d
Accessory Dwelling Unit (attached/detached) (F) 1,159.00 1.023 1,186.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Accessory Dwelling Unit (conversion) (F) 926.00 1.023 947.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Junior Accessory Dwelling Unit (F) 695.00 1.023 711.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Non-residential Fence (F) 231.00 1.023 236.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Residential Fence (4 feet or less - Front) (F) 58.00 1.023 59.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Business License -Zoning Clearance (F)/HOP 58.00 1.023 59.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Sign-Change of Copy (F) 58.00 1.023 59.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d
Business License/Home Occupation Permit (F) 58.00 1.023 59.00 Historic Resource Review

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d
Certificate of Appropriateness - Minor (D) Actual Cost - Initial Deposit of $2,500 N/A Actual Cost - Initial Deposit of
$2,500

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d
Certificate of Appropriateness - Major (D) Actual Cost - Initial Deposit of $3,500 N/A Actual Cost - Initial Deposit of
$3,500

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d
Mills Act Contract (D) Actual Cost - Initial Deposit
of $5,000 N/A Actual Cost - Initial Deposit of
$5,000

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d
Landmark Designation(D) Actual Cost - Initial Deposit
of $2,500 N/A Actual Cost - Initial Deposit of
$2,500
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Demolition Permit Review (F) 370.00 1.023 379.00 Use Permit Review
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Administrative Use Permit (F) 2,112.00 1.023 2,161.00

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Temporary Use Permit (D) Actual Cost - Initial Deposit of $1,500 N/A Actual Cost - Initial Deposit of
$1,500
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Conditional Use Permit - Wireless Facility (CUP Renewal & Minor modifications) (F) 5,789.00 1.023 5,922.00 Master Fee Schedule
16 Planning
CURRENT FEE Factor PROPOSED FEE
Last increase
implemented
ECI Index for
last increase
Index Effective date for
proposed increase
ECI Index for
proposed increase
ECI
Factor
Municipal Code or Other
Code
City of Richmond
Master Fee Schedule
Description
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Conditional Use Permit - Wireless Facility (New) (F) 8,105.00 1.023 8,291.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Conditional Use Permit - Small Cell Site Node (F) 5,789.00 N/A 4,948.75 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Conditional Use Permit - Eating Establishment w/ ABC License (Beer & Wine Only) (F) 2,112.00 1.023 2,161.00

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Conditional Use Permit - Eating Establishment w/ ABC License (Beer, Wine & Spirits) (D)
Actual Cost - Initial Deposit
of $3,000 N/A Actual Cost - Initial Deposit of
$3,000

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Conditional Use Permit - All Other Uses (D) Actual Cost - Initial Deposit of $5,000 N/A Actual Cost - Initial Deposit of
$5,000

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Conditional Use Permit - Amendment (D) Actual Cost - Initial Deposit of $3,000 N/A Actual Cost - Initial Deposit of
$3,000

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Conditional Use Permit - Compliance Review (D) Actual Cost - Initial Deposit of $5,000 N/A Actual Cost - Initial Deposit of
$5,000
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Conditional Use Permit - Commercial Cannabis Activity (F) 6,335.00 1.023 6,481.00

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Revocation Review (D) Actual Cost - Initial Deposit of $5,000 N/A Actual Cost - Initial Deposit of
$5,000

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Note: additional fees, see Police - Cannabis Design Review (Residential Projects) - Over the Counter 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Design Review - Over the Counter - Accessory Structure (250 sf or less) (F) 347.00 1.023 355.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Design Review - Over the Counter - Small Addition (500 sf or less, under 15 ft height) (F) 579.00 1.023 592.00 Design Review (Residential Projects) - Minor/Administrative 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Residential Design Review - Administrative - Fence (over basic height) (F) 396.00 1.023 405.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Residential Design Review - Administrative - Medium Addition (501 - 1200 sf, under 15 ft
height) (F)
1,266.00 1.023 1,295.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Residential Design Review - Administrative - Single Family/Duplex (501 - 1200 sf, under 15 ft
height) (F)
2,376.00 1.023 2,431.00 Design Review (Residential Projects) - Major Design Review (Design Review Board)

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Residential Design Review - Design Review Board - Accessory Structure (251 sf or more) (D) Actual Cost - Initial Deposit of $1,250 N/A Actual Cost - Initial Deposit of
$1,250

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Residential Design Review - Design Review Board - Medium Addition (501 - 1200 sf, over 15
ft height) (D)
Actual Cost - Initial Deposit
of $1,650 N/A Actual Cost - Initial Deposit of
$1,650

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Residential Design Review - Design Review Board - Large addition (1200 sf or more) (D)
Actual Cost - Initial Deposit
of $2,350 N/A Actual Cost - Initial Deposit of
$2,350

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Residential Design Review - Design Review Board - Single-family/Duplex (1200 sf or more)
(D)
Actual Cost - Initial Deposit
of $4,400 N/A Actual Cost - Initial Deposit of
$4,400
Master Fee Schedule
17 Planning
CURRENT FEE Factor PROPOSED FEE
Last increase
implemented
ECI Index for
last increase
Index Effective date for
proposed increase
ECI Index for
proposed increase
ECI
Factor
Municipal Code or Other
Code
City of Richmond
Master Fee Schedule
Description

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Residential Design Review - Design Review Board - Multifamily (3-10 units) (D)
Actual Cost - Initial Deposit
of $8,500 N/A Actual Cost - Initial Deposit of
$8,500

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Residential Design Review - Design Review Board - Multifamily (10-25 units) (D)
Actual Cost - Initial Deposit
of $10,500 N/A Actual Cost - Initial Deposit of
$10,500

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Residential Design Review - Design Review Board - Multifamily (26-100 units) (D)
Actual Cost - Initial Deposit
of $12,500 N/A Actual Cost - Initial Deposit of
$12,500

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Residential Design Review - Design Review Board - Multifamily (100+ units) (D)
Actual Cost - Initial Deposit
of $15,500 N/A Actual Cost - Initial Deposit of
$15,500
Design Review (Commercial/Industrial Projects) - Over the Counter 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Non-residential Design Review - Over the Counter - Solar Panel Install (F) 464.00 1.023 475.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Non-residential Design Review - Over the Counter - Small Addition or Improvement (1000 sf
or less) (F)
926.00 1.023 947.00 Design Review (Commercial/Industrial Projects) - Minor Design Review (Administrative) 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Non-residential Design Review - Alteration or addition (<30% of existing floor area) (F) 2,779.00 1.023 2,843.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Non-residential Design Review - Small New Construction (2000 sf or less) (F) 3,705.00 1.023 3,790.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Non-residential Design Review - Temporary Structure(s) (F) 4,631.00 1.023 4,738.00 Design Review (Commercial/Industrial Projects) - Major Design Review (Design Review Board)

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Non-residential Design Review - Design Review Board - Medium Addition or improvement (2,001
sf -4,999 sf) (D)
Actual Cost - Initial Deposit
of $6,500 N/A Actual Cost - Initial Deposit of
$6,500

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Non-residential Design Review - Design Review Board - Large Addition or Improvement (5,000 sf
or more) (D)
Actual Cost - Initial Deposit
of $8,500 N/A Actual Cost - Initial Deposit of
$8,500

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Non-residential Design Review - Design Review Board - Large New Construction (5,001 sf or
more) (D)
Actual Cost - Initial Deposit
of $10,500 N/A Actual Cost - Initial Deposit of
$10,500
Sign Permits

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Non-residential Design Review - Administrative - Master Sign Program (D)
Actual Cost - Initial Deposit
of $3,500 N/A Actual Cost - Initial Deposit of
$3,500

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Non-residential Design Review - Design Review Board-Sign Variance (D)
Actual Cost - Initial Deposit
of $1,650 N/A Actual Cost - Initial Deposit of
$1,650
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Non-residential Design Review - Administrative - Window, Blade or Awning Sign (F) 369.00 1.023 377.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Non-residential Design Review - Administrative - Wall Sign (F) 369.00 1.023 377.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Non-residential Design Review - Administrative - Free Standing Sign (F) 2,376.00 1.023 2,431.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Non-residential Design Review - Administrative - Multiple Temporary Sign (F) 264.00 1.023 270.00 Appeals
Master Fee Schedule
18 Planning
CURRENT FEE Factor PROPOSED FEE
Last increase
implemented
ECI Index for
last increase
Index Effective date for
proposed increase
ECI Index for
proposed increase
ECI
Factor
Municipal Code or Other
Code
City of Richmond
Master Fee Schedule
Description

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Appeals - ZA (F)
$350 or $150 if appealed by
the corresponding
Neighborhood Council
N/A
$350 or $150 if appealed by the
corresponding Neighborhood
Council

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Appeals - DRB (F)
$350 or $150 if appealed by
the corresponding
Neighborhood Council
N/A
$350 or $150 if appealed by the
corresponding Neighborhood
Council

N/A N/A N/A N/A N/A
RMC 2.40.110, RMC 2.34.040.32d Appeals - PC (F)
$500 or $150 if appealed by
the corresponding
Neighborhood Council
N/A
$500 or $150 if appealed by the
corresponding Neighborhood
Council
Other Requests
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Off site Plan / File Retrieval (F) 54.00 1.023 55.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Administrative Permit Time Extension (F) 1,157.00 1.023 1,184.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Photocopying, per page (F) 0.10 1.023 0.10 Planning Documents, documents denoted by an asterisk are also available online, free of charge,
on the Planning Department's website
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d * Zoning Ordinance (F) 52.00 1.023 53.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d * General Plan 2030 105.00 1.023 107.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d * Pedestrian Master Plan 30.00 1.023 31.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d * Bicycle Master Plan 30.00 1.023 31.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d * City Center Specific Plan (F) 30.00 1.023 31.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d * Richmond Bay Specific Plan (F) 40.00 1.023 41.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d * Tiscornia Estates Specific Plan (F) 30.00 1.023 31.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d * North Shoreline Specific Plan (F) 30.00 1.023 31.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Form-based Code 30.00 1.023 31.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Other Requests - Zoning Map 28.00 1.023 29.00 Engineering Improvement Plan Review - City Planning Administrative Fee 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $0 - $3,000 (F) 464.00 1.023 475.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $3,001 - $25,000 (F) 926.00 1.023 947.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $25,001 - $50,000 (F) 1,852.00 1.023 1,895.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $50,001 - $100,000 (F) 2,547.00 1.023 2,606.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $100,001 - $500,000 (F) 3,474.00 1.023 3,554.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $500,001 - $1,000,000 (F) 5,326.00 1.023 5,448.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $1,000,001 - $5,000,000 (F) 6,947.00 1.023 7,107.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $5,000,001 - $10,000,000 (F) 8,336.00 1.023 8,528.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $10,000,001 - $20,000,000 (F) 10,421.00 1.023 10,661.00 Note: Fee is for Planning's facilitation of non-
structural Engineering projects. Fee is based on
the value of non-structural engineering
improvements. Contractor expenses will be
passed through on top of the administrative fee.

Landscape Plan Check - City Planning Administrative Fee 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $0 - $3,000 (F) 464.00 1.023 475.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $3,001 - $25,000 (F) 926.00 1.023 947.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $25,001 - $50,000 (F) 1,390.00 1.023 1,422.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $50,001 - $100,000 (F) 1,852.00 1.023 1,895.00 Master Fee Schedule
19 Planning
CURRENT FEE Factor PROPOSED FEE
Last increase
implemented
ECI Index for
last increase
Index Effective date for
proposed increase
ECI Index for
proposed increase
ECI
Factor
Municipal Code or Other
Code
City of Richmond
Master Fee Schedule
Description
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $100,001 - $500,000 (F) 2,779.00 1.023 2,843.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $500,001 - $1,000,000 (F) 3,705.00 1.023 3,790.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $1,000,001 - $5,000,000 (F) 4,631.00 1.023 4,738.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $5,000,001 - $10,000,000 (F) 5,789.00 1.023 5,922.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d $10,000,001 - $20,000,000 (F) 6,947.00 1.023 7,107.00 Note: Fee is for Planning's facilitation of
Landscape Plan Check. Fee is based on value of
landscape improvements. Contractor expenses
will be passed through on top of the
administrative fee.

Subdivisions - Parcel and Tentative Maps
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Engineering Review - Parcel Map (0-5 lots) (F) 1,852.00 1.023 1,895.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Engineering Review - Final Map (6-25 lots) (F) 4,169.00 1.023 4,265.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Engineering Review - Final Map (26-100 lots) (F) 5,789.00 1.023 5,922.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC 2.34.040.32d Engineering Review - Final Map (101+ lots) (F) 9,263.00 1.023 9,476.00

FINAL MAP & IMPROVEMENT PLAN REVIEW & INSPECTION
N/A N/A N/A N/A N/A RMC 2.34.040-39, RMC 15.08.480-5,
RMC 6.02.180, EO 90-039
- Per Major Subdivision Review, 5 or more
parcels, (Deposit)

2.5% of construction cost or $8,000, whichever is
greater

2.5% of bond est. for imp,
$8485 min
N/A 2.5% of bond est. for imp,
$8485 min
N/A N/A N/A N/A N/A RMC 2.34.040-39, RMC 15.08.480-5,
RMC 6.02.180, EO 90-039
- Per Minor Subdivision Review, 4 or fewer
parcels, (Deposit)

2.5% of construction cost or $6,000, whichever is
greater

2.5% of bond est. for imp,
$6498 min
N/A 2.5% of bond est. for imp,
$6498 min
New lot fee

N/A N/A N/A N/A N/A
New lot fee, actual cost of County fee ($50 as of 1
July 2007) 50.00 N/A 50.00 Final Subdivision Inspection Fee (Deposit)

N/A N/A N/A N/A N/A
RMC 15.08.420-2e - Per Major Subdivision Review, 5 or more parcels, (Deposit)
3% of construction cost or $7,000, whichever is
greater
3% of bond est. for imp,
$7580 min
N/A 3% of bond est. for imp, $7580
min

N/A N/A N/A N/A N/A
RMC 15.08.420-2e - Per Minor Subdivision Review, 4 or fewer parcels, (Deposit)
3% of construction cost or $3,000, whichever is
greater
3% of bond est. for imp,
$3249 min
N/A 3% of bond est. for imp, $3249
min
Final Subdivision Map and Improvement Plan Review Fee (Deposit) Plan review services are provided on an actual cost basis. Refund of balance will be made after project acceptance; additional charges may also apply.

Master Fee Schedule
20 Housing Division
CURRENT FEE Factor PROPOSED FEE
Richmond Community Development Department

1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.40.170-1, RMC

2.34.040-42c, RMC 6.02.180,
Reso. 142-86
Single Family/Condo/Townhouse N/A New 500.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.40.170-2, RMC

2.34.040-42c, RMC 6.02.180,
Reso. 142-86
Multi-Family (Developer) Property less than 10
years old N/A New 960.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.40.170-2, RMC

2.34.040-42c, RMC 6.02.180,
Reso. 142-86
Multi-Family (Developer) Property 10+ years old N/A New 1,260.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.40.170-2, RMC

2.34.040-42c, RMC 6.02.180,
Reso. 142-86
Redraw Fee (Revisions) Single
Family/Condo/Townhouse N/A New 75.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.40.170-2, RMC

2.34.040-42c, RMC 6.02.180,
Reso. 142-86
Redraw Fee (revisions) Multi-Family (Developer) N/A New 225.00 Demand Statement
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.40.170-2, RMC

2.34.040-42c, RMC 6.02.180,
Reso. 142-86
Demand Statement N/A New 155.00 Re-conveyance Fee
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.40.170-2, RMC

2.34.040-42c, RMC 6.02.180,
Reso. 142-86
Property less than 10 years old N/A New 155.00 Uknown N/A Not applicable N/A N/A RMC 6.02.180; RMC 2.34.040, Ord. 3-04
Property 10+ years old N/A New 235.00 Recording Fee
Uknown N/A Not applicable N/A N/A RMC 6.02.180; RMC 2.34.040, Ord. 3-04
Recording Fee per property N/A New Per County Recorder Schedule Notary Fee
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 3-04 Notary Fee per property N/A New Fees set by State Subordination Processing Fee
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.40.170-1, RMC

2.34.040-42c, RMC 6.02.180,
Reso. 142-86
Single Family/Condo/Townhouse N/A New 500.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.40.170-2, RMC

2.34.040-42c, RMC 6.02.180,
Reso. 142-86
Redraw Fee (Revisions) Single
Family/Condo/Townhouse N/A New 75.00 Demand Statement
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.40.170-2, RMC

2.34.040-42c, RMC 6.02.180,
Reso. 142-86
Demand Statement N/A New 155.00 Re-conveyance Fee
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.40.170-2, RMC

2.34.040-42c, RMC 6.02.180,
Reso. 142-86
Property less than 10 years old N/A New 155.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
Property 10+ years old N/A New 235.00 Other Fees
Fees by external department/agencies N/A actual
cost
Actual cost as set by external
dept/agency
Legal Review Fees N/A actual
cost
Actual cost as set by external
dept/agency
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
Housing Division Fees/Portfolio Management
Subordination Processing Fee
Marina Shores Property Management
Master Fee Schedule
21 Cannabis Fees
CURRENT FEE Factor PROPOSED FEE

CANNABIS FEES
1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.40.110, RMC

2.34.040.32d Conditional Use Permit - Commercial Cannabis Activity (F) 6,335.00 1.023 6,481.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11
Application Completeness Review - Per Application 831.00 1.023 850.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11 Complete Application Review -Per Application 15,138.00 1.023 15,486.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11 Cannabis Business Permit - (Annually) 2,553.00 1.023 2,612.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11 Competitive Selection Process - Per Application 4,706.00 1.023 4,814.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11 Annual Regulation and Inspection/Per Quarter See Fee Below N/A See Fee Below 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11 Retail (Storefront & Non-Storefront) - Per Permit Annually, See Note 2 below 21,127.00 1.023 21,613.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11
Distribution - Per Permit Annually, See Note 2 below 21,127.00 1.023 21,613.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11 Manufacturing - Per Permit Annually, See Note 2 below 24,309.00 1.023 24,868.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11 Cultivation (up to 5,000 sqft) - Per Permit Annually, See Note 2 below 24,309.00 1.023 24,868.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11 Cultivation (5,001 to 10,000 sqft) - Per Permit Annually, See Note 2 below 25,900.00 1.023 26,496.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11 Cultivation (10,001 to 22,000 sqft) - Per Permit Annually, See Note 2 below 27,490.00 1.023 28,122.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11 Cultivation (22,001 sqft and up) - Per Permit Annually, See Note 2 below 30,672.00 1.023 31,377.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11 Nursery - Per Permit Annually - Per Permit Annually, See Note 2 below 22,718.00 1.023 23,241.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11 Testing - Per Permit Annually, See Note 2 below 24,309.00 1.023 24,868.00 1-Jul-2020 143.6 1-Jul-2021 146.9 1.023 RMC 2.34.040, Ord. 09-11 Reinspection Fee - Per Inspection 1,193.00 1.023 1,220.00 Notes:
1 - Proposed fees are rounded to the nearest dollar
2 - Each additional permit for the same business at the same location shall be charged 50% of the applicable fee. The highest activity use fee shall be the first base fee.

Cost Index (Bureau of Labor Statistics)
City of Richmond
Master Fee Schedule
Description
Last increase
implemented
ECI Index for
last increase
Index Effective
date for proposed
increase
ECI Index for
proposed
increase ECI Factor
Municipal Code or
Other Code
Master Fee Schedule
22 City Clerk_Attorney_Manager
Old Fee Factor CURRENT FEE

CITY ATTORNEY
Not applicable N/A Not applicable N/A N/A
COR1/40907, RMC 2.40.110,
RMC 2.34.040.32d Photocopying, per page (8-1/2" x 11") 0.10 N/A 0.10

CITY CLERK
1-Oct-2006 N/A Not applicable N/A N/A RMC 2.34.040.32a, Ord. 2-03, E.O. 03-03 Appeal Filing Fees -- appeal a decision to a City Board 150.00 N/A 150.00 Not applicable N/A Not applicable N/A N/A RMC 2.40.110, RMC

2.34.040.32d Photocopying, per page (8-1/2" x 11") 0.10 N/A 0.10 1-Oct-2006 N/A Not applicable N/A N/A RMC 1.04.070, Reso. 6-04; RMC 2.34.040, Ord. 3-04 Richmond Municipal Code Full Copy 250.00 N/A 250.00 1-Oct-2006 N/A Not applicable N/A N/A RMC 1.04.070, Reso. 6-04; RMC 2.34.040, Ord. 3-04 Richmond Municipal Code Supplements 40.00 N/A 40.00

CITY MANAGER
Not applicable N/A Not applicable N/A N/A
COR1/40907, RMC 2.40.110,
RMC 2.34.040.32d Photocopying, per page (8-1/2" x 11") 0.10 N/A 0.10 ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
Last increase
implemented
City of Richmond
Master Fee Schedule
Description
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
Master Fee Schedule
23 Code Enforcement
Old Fee Factor CURRENT FEE

INFRASTRUCTURE & MAINTENANCE OPERATIONS

CODE ENFORCEMENT
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040.43a, Ord. 2-03,
RMC 6.40.170, 9.48.080,

9.50, 11.76, 11.78, E.O. 03-04
Inspection and Notice
286.00 1.052 301.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040.43c, Ord. 2-03, E.O. 03-04 Inspection Warrant 417.00 1.052 439.00 Not applicable N/A Not applicable N/A N/A
RMC 2.34.040.43d, Ord. 2-03,
E.O. 03-04 Appeal to Hearing Officer COST OF

CITATION N/A COST OF CITATION
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 Appeal to Public Safety Committee or Council 534.00 1.052 562.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040.43f, Ord. 2-03,
E.O. 03-04, RMC 11.76.060 Administrative fee for site clean-up 195.00 1.052 205.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040.43f, Ord. 2-03,
E.O. 03-04, RMC 11.76.060 Administrative fee for board up 195.00 1.052 205.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040.43e, Ord. 2-03, E.O. 03-04 Re-Inspection 91.00 1.052 96.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040.43g, Ord. 2-03, E.O. 03-04 Abatement Warrant 187.00 1.052 197.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 E.O. 03-04; RMC 2.34.040, Ord. 3-04 Lien and Special Assessment 239.00 1.052 251.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 E.O. 03-04; RMC 2.34.040, Ord. 3-04 Release of Recordation Processing Fee 166.00 1.052 175.00 Vacant Dwellings or Buildings
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.38.115 Vacant Property Registration 166.00 1.052 175.00 Not applicable N/A Not applicable N/A N/A
RMC 2.34.040.43i, Ord. 2-03,
RMC 6.38.100-E, E.O. 03-04 Permit to secure the building, calculated based on building valuation and square footage Calculate based
on valuation
N/A Calculate based on
valuation
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.38.115 Per month fee to cover the staff time and cost to monitor our chronically vacant property inventory 81.00 1.052 85.00 City of Richmond
Master Fee Schedule
Description
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Municipal Code or
Other Code
Master Fee Schedule
24 Employment & Training
Old Fee Factor CURRENT FEE

EMPLOYMENT & TRAINING
Not applicable N/A Not applicable N/A N/A
Reso. 6-04; RMC 2.34.040,
Ord. 3-04 1700 EZ Hiring Tax Credit Voucher--Per
voucher/verification ($15 goes to the State) 90.00 N/A 90.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 Reso. 6-04; RMC 2.34.040,
Ord. 3-04 1700 EZ Hiring Tax Credit Voucher Expediting
Fee 24.00 1.052 25.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 Reso. 6-04; RMC 2.34.040,
Ord. 3-04 1700 EZ Hiring Tax Credit Voucher Look-Up Fee 28.00 1.052 29.00

VOUCHER PROGRAM
City of Richmond
Master Fee Schedule
Description
ECI
Factor
Index Effective
date for
proposed
increase
Last increase
implemented
Municipal Code or
Other Code
ECI Index for
last increase
ECI Index for
proposed
increase
Master Fee Schedule
25 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
MVI

PREVENTION SERVICES DIVISION
SECTION I – OCCUPANCY

GROUP AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES
A one (1) time fee is based on size of occupancy.

Aerial Pre-Plan:
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 APP – 1 Small (elementary school size or smaller) 714.00 1.052 751.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
APP – 2 Medium (middle school size or smaller) 825.00 1.052 868.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
APP – 3 Larger (high school size or smaller) 935.00 1.052 983.00 APP - 4 Extra Large (cost will vary depending on overall size) General Aerial preplans shall comply with the following requirements:

Please review section RMC 8.16.040 Fire Prevention Code & Section 404 of CFC (California Fire Code) for complete requirements.

Where Required Occupancies:

1. Group A (Assembly) - An aerial pre-plan is required for assembly occupancies having an occupant load of 300 or more and larger than 5,000 square feet. If occupancy is attached to commercial complex larger than 10,000 square feet than an aerial pre-plan is required.

Exception: Other than Group A occupancy used exclusively for the purpose of religious worship having an occupant load less than 2,000

1. Group B (Business) – Occupant load of 500 or more persons

2. Group E (Educational) – Schools

3. Group F (Factory) – Occupant load of 500 or more persons

4. Group H (High Hazards) – Including any facility in the Contra Costa Health Services Hazardous Material Program

5. Group I (Institutional) – Hospitals, nursing homes, Jails, etc…)

6. Group R – 1, Hotels & motels (transient) – 20 or more sleeping units

7. Group R – 2, Apartments, hotels & motels (non-transient), Live/work units

8. Group R – 4, Licensed Care Facilities (referrer to

9. High-rise buildings

10. Group M (mercantile) buildings i.e. Department stores, markets, retail or wholesales stores having an occupant load of 500 or more person

11. Covered malls exceeding 50,000 square feet

12. Open malls exceeding 50,000 square feet

13. Underground buildings

14. Buildings with atrium and having an occupancy in Group A, E or M Aerial pre-plans shall include but not be limited to the following:

1. Knox Box location

2. Fire Alarm Control Panel (FACP)

3. Emergency vehicle access

4. Post Indicator Valve (PIV)

5. OS&Y valve

6. Location of hazardous Materials

7. Sprinkler riser

8. Gas Valve

9. Electrical main valve

10. Fire Department Connection (FDC)
City of Richmond
Master Fee Schedule
Master Fee Schedule
26 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule

11. Hydrant location

12. Elevator equipment room
SECTION I – OCCUPANCY
GROUP LICENSED CARE FACILITIES – 24 HOUR
***Occupant Load Greater than six (6) - up to six (6) Nonambulatory*** ***Occupant Load less than seven (7)***
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 LCF – 1 Base Fee: 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
LCF – 2 Plus each additional unit/occupant 5.00 1.052 5.00 Infant-care facility for children 2 ½ years of age and younger 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
LCF – 3 Base Fee: 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
LCF – 4 Plus each additional unit/occupant 5.00 1.052 5.00 (a) Permit to operate a licensed care facility such as: Rehabilitation facility, Assisted Living, Halfway Houses, Community Correction Centers, Re-entry Centers, Treatment Programs, Work Furlough, Alcoholism or Drug Abuse Recover and/or Treatment Facility, Congregate Living Health Facility, Group Homes, Immediate Care Facility, Infant Care Facilities, Residential Care Facilities (RCF’s), and Residential Care Facility for the Elderly (RCFE’s).

GROUP LICENSED CARE FACILITIES – LESS 24 HOUR
***OCCUPANT LOAD GREATER THAN SIX (6) OR MORE ***
Adult or Day Care Facility (Nonambulatory Person)
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 LCF – 5 Base Fee: 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
LCF – 6 Plus per unit/occupant 5.00 1.052 5.00 Adult or Child Large Family Day Care
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
LCF – 7 Base Fee: 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
LCF – 8 Plus per unit/occupant 5.00 1.052 5.00 Adult or Child Day Care Center
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
LCF – 9 Base Fee: 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
LCF – 10 Plus per unit/occupant 5.00 1.052 5.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
LCF – 11 Licensed Clinic 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
LCF – 12 Pre – Inspection Fees – 850 Form 251.00 1.052 264.00 (a) Permit to operate a licensed care facility such as: Adult Day Care, Adult Day Support Center, Child Day Care, Infant Day Care, and Large Family Day Care Home.

Non-ambulatory Persons – Persons unable to leave a building unassisted under emergency conditions. It includes, but is not limited to, persons who depend on mechanical aids such as crutches, walkers and wheelchairs and any person who is unable to physically and mentally respond to a sensory signal approved by the State Fire Marshall or an oral instruction relating to fire danger.

Master Fee Schedule
27 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
The determination of ambulatory or non-ambulatory status of persons with developmental disabilities shall be made by the Director of Social Services or his or her designated representative, in consultation with the Director of Developmental Services or his or her designated representative. The determination of ambulatory or non-ambulatory status of all other disabled persons placed after January 1, 1984, who are not developmentally disabled, shall be made by the Director of Social Services or his or her designated representative.

SECTION I – OCCUPANCY

GROUP EDUCATIONAL (PRIVATE SCHOOL) OCCUPANCY
To operate and maintain a school
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 EDU – 1 Occupant load less than 50 312.00 1.052 328.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
EDU – 2 Occupant load 50-149 438.00 1.052 461.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
EDU – 3 Occupant load 150-499 519.00 1.052 546.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
EDU – 4 Occupant load 500 or more 624.00 1.052 656.00

GROUP INSTITUTIONAL OCCUPANCIES
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
INS – 1 HOSPITAL (medical, surgical & psychiatric) and Nursing Homes 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
INS – 1.1 Plus $5.00 per patient/bed 5.00 1.052 5.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
INS – 2 Out Patient Clinics greater than 5 patients 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
INS – 2.1 Plus $5.00 per patient/bed 5.00 1.052 5.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
Inspection of Police Services facilities (holding cells) & DOJ Review 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
INS – 3 (Includes the approval of Evacuation & Life Safety Procedures). 250.00 1.052 263.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
INS – 4 Inspection of adult and/or juvenile detention facilities 937.00 1.052 985.00

GROUP RESIDENTIAL OCCUPANCIES
HOTEL/MOTEL OR APARTMENT/CONDOMINIUM HOUSE:
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
RES – 1 *250 or more units 880.00 1.052 925.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
RES – 2 *100 249 units 529.00 1.052 556.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
RES – 3 *15 99 units 264.00 1.052 278.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
RES – 4 *6 14 units 216.00 1.052 227.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
RES – 5 *5 or Less units 118.00 1.052 124.00 *Fees applied per building
Residential Occupancies with 20 or more complexes will have the following:

1. An annual inspection

2. A mid-year review inspection

3. *One (1) fire safety training session (12:00 p.m. – 4: p.m. on a scheduled Saturday) i.e.
a. Fire extinguisher training
b. Smoke alarm & carbon monoxide education
Master Fee Schedule
28 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
c. Cooking in the home safety
d. E.D.I.T.H. (Exit Drills In The Home) Training
*Appointments for fire safety training session need to be made 30 days in advance.

SECTION I – OCCUPANCY

GROUP BUSINESS OCCUPANCIES
MULTI-BUSINESS OCCUPANCIES :
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 BUS – 1 35 or more Suites 433.00 1.052 455.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
BUS – 2 25 34 Suites 372.00 1.052 391.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
BUS – 3 15 24 Suites 310.00 1.052 326.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
BUS – 4 6 14 Suites 248.00 1.052 261.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
BUS – 5 5 or Less Suites 186.00 1.052 196.00

GROUP HIGH RISE
High Rise
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
HR – 1 To inspect a Hi-Rise building (State certification inspection) - Pre 1974 2,132.00 1.052 2,242.00 High Rise - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
HR – 2 To inspect a Hi-Rise building (State certification inspection) - Post 1974 546.00 1.052 574.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
HR - 2.1 - ($ .005 per square foot) $ .005 sq. ft. $ .005 sq. ft.

Mid-Rise
To inspect and test life safety systems (i.e. smoke management) and where such systems are installed in lieu of fire department access or when required for the mitigation of other life safety issues or requirements.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
HR – 3 Life safety system test 546.00 1.052 574.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
HR - 3.1 ($ .05 per square foot) $ .05 sq. ft. n/a $ .05 sq. ft.

Low-Rise – One to Two Floors(s)
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
MLB-3 To Inspect and test life safety systems (i.e. fire alarm, sprinkler, smoke control) with a minimum 4 hours inspection time (includes re-inspection) 979.00 1.052 1,029.00 GROUP REFINERY/BULK PLANT or TERMINAL/BULK TRANSFER/PROCESS TRANSFER REF/BULK Bulk Plant/Terminal Rate (Section III plan review, Section IV Permit to Operate 21.10 & 21 11) Permit to Operate a Bulk Plant or Terminal facility where flammable or combustible liquids are received by tank vessel, pipelines, tank car or tank vehicle and are stored or blended in bulk for the purpose of distributing such liquids by tank vessel, pipeline, tank car, tank vehicle, portable tank or container.

Bulk Transfer Rate (Section III Plan Review, Section IV Permit to Operate 21.12 & 21.13) Permit to Operate a Bulk Transfer facility where loading or unloading of flammable or combustible liquids from or between tank vehicles, tank cards or storage tanks.

Process Transfer Rate (Section III Plan Review, Section IV Permit to Operate 21.14 & 21.15) Permit to Operate a Process Transfer facility where the transfer of flammable or combustible liquids between tank vehicles or tank cars and process operations. Process operations may include containers, tanks, piping and equipment.

SECTION II –SPECIAL SERVICES
Master Fee Schedule
29 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule

GROUP SPECIAL SERVICE TASK
Callback, Third, and/or Additional Inspection:
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 SST - 1 Callback or Third (3rd) follow-up or subsequent inspection. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 1.1 Additional inspection time during normal business hours - $125.00 per half hour. 125.00 1.052 131.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 1.2 Additional inspection time after normal business hours - $ 251.00 per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 1.3 Overtime and weekend inspections: Three-hour $ 753.00 minimum fee. 753.00 1.052 792.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 1.4 Fire Company Mercantile Inspection 123.00 1.052 129.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST - 1.5 Annual Commercial Warehouse Fire Inspection – Greater than 3,000 square feet. 244.00 1.052 257.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 2 Consultation: 1/2 hour minimum 125.00 1.052 131.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 3 Per hour 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 4 Copying: Per Page 0.20 1.052 0.20 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
False Alarms: Initial notice to correct any malfunctions with alarm system No Charge 1.052 No Charge 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 5 For 1st (within six-month period – Jan 1st – Jun 30th or Jul 1st – Dec 31st) 280.00 1.052 294.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 6 2nd – (within six-month period - Jan 1st – Jun 30th or Jul 1st – Dec 31st) 562.00 1.052 591.00 3rd – and/or each occurrence thereafter (within six-month period – 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 7 Jan 1st – Jun 30th or Jul 1st – Dec 31st) 1,124.00 1.052 1,182.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 8 Fire Hydrant Flow Test 501.00 1.052 527.00 Fire Protection System Signaling Service
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 9 Registration and 1st Year service fee 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 9.1 Annual Service Fee 44.00 1.052 46.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 10 High Rise Certification 3,258.00 1.052 3,426.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 11 Halon Concentration Test 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 12 Knox Box Service 42.00 1.052 44.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 13 Standby: Single person per hour 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST-13.1 Fire Engine Company per hour 753.00 1.052 792.00 Training/Instructional Services
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 14 Minimum instructional fee. 501.00 1.052 527.00 Fees include two (2) hours of training/instruction during normal working hours.

Master Fee Schedule
30 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 SST - 14.1 Each additional hour. 251.00 1.052 264.00 Fire File Review
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST – 15
To Gain access to any fire file to review including but not limited to the following; incident reports including California Fire Incident Report System, property history, inspection history, and facility system history.

29.00 1.052 30.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 SST – 16 Business License Inspection 125.00 1.052 131.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST - 17 Failure to obtain operational permit 548.00 1.052 576.00 Extended Period of Use
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
SST - 18 Permit to extend the use of a permit for an additional 180 days 251.00 1.052 264.00 SECTION III – PLAN REVIEW
GROUP PRELIMINARY PLAN REVIEW – CONSULTATIONS/MEETING
In office design review/preliminary plan consultation meetings. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 1 Per half hour. 125.00 1.052 131.00 Out of office design and/or consultation meetings.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 1.2 ($ 251.00 Per hour two hour minimum) 501.00 1.052 527.00 Review of fire & life safety measures for building(s)
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR - 1.3 Fees include (1) hours plan review and one (1) site inspection. 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR - 21 Additional plan review time or inspection, per half hour 128.00 1.052 135.00 GROUP SUBDIVISION – PLAN REVIEW
Major Subdivision Plan Review (5 or More Lots/Parcels) (See PR 11.1) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 2 Review of subdivision for access, hydrant placement. 753.00 1.052 792.00 Fees include two (2) hours plan review and one (1) visual inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 2.1 Each additional site inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Minor Subdivision Plan Review (1 to 4 Lots/Parcels) (See PR 11.1) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 2.2 Review of subdivision for access, hydrant placement. 376.00 1.052 395.00 Fees include ½ hour plan review and one (1) visual inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 2.2.1 Each additional inspection. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Single Family Home Review – access & water supply
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 2.3 Review of plans for access and water supply. 376.00 1.052 395.00 Master Fee Schedule
31 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR – 2.3.1 Single Family Home Review –Tenant Improvement for additions and Modifications 251.00 1.052 264.00 Fees include ½ hour plan review and one (1) visual inspection. (Does not include review of fire sprinkler systems – see Sec PR 5.4) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 2.4 Each additional inspection. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 GROUP BUILDING CONSTRUCTION – NEW BUILDINGS & TENANT IMPROVEMENTS New Construction or Building Additions Plan Review (See PR 11.1) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR – 3 Minimum plan review base fee. 753.00 1.052 792.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 3.1 Plus $.08 per square foot in excess of 2,000 sq. ft. $ .08 sq. ft. $ .08 sq. ft.

Fee includes two (2) hours of plan review and one (1) field inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 3.1.2 Additional inspections per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Tenant Improvement Plan Review (for building additions see PR 3.1) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 3.2 Minimum plan review base fee. 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 3.2.1 Plus $.08 per square foot in excess of 2,000 sq. ft. $ .08 sq. ft. $ .08 sq. ft.

Fee includes one (1) hour plan review and one (1) field inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 3.2.2 Additional inspections per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour 125.00 1.052 131.00 SECTION III – PLAN REVIEW
GROUP WATER SUPPLY – FIRE SERVICE MAINS – FIRE HYDRANTS Fire Service – Emergency Repair
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 4 Review of underground piping, placement, and size. 501.00 1.052 527.00 Fees include one (1) hour plan review and one (1) visual inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 4.1 Each additional inspection. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 17 Additional plan review time, per half hour. 125.00 1.052 131.00 Install, Repair Private Fire Service Hydrants and/or Piping to Firewater Lines 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 4.2 Minimum plan review base fee of system. 501.00 1.052 527.00 Fees include one (1) hour plan review and one (1) visual inspection.

Master Fee Schedule
32 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR – 4.2.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Fire service main installation also requires hydro and flush. See 4.3 & 4.4 Flush - Private Fire Service System
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 4.3 Minimum inspection base fee. 251.00 1.052 264.00 Fee includes one (1) hour onsite inspection time.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 4.3.1 Each additional inspection per hour. 251.00 1.052 264.00 Hydrostatic Test - Private Fire Service System
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 4.4 Minimum inspection/test base fee. 501.00 1.052 527.00 Fee includes one (1) hour onsite test time.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 4.4.1 Each additional inspection per hour. 251.00 1.052 264.00 Water Flow Information Field Test
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 4.5 Minimum field test base fee. 501.00 1.052 527.00 (Fee includes field testing for available fire flow for Hydrant and Fire Sprinkler Systems) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 4.5.1 Additional or multiple flow tests per ½ hour. 125.00 1.052 131.00 SECTION III – PLAN REVIEW

GROUP FIRE PROTECTION SYSTEMS
Tenant Improvement Fire Sprinklers (without calculations) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5 Minimum plan review base fee. 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5.1.1 Plus $1.00 per head in excess of 10 heads. 1.00 1.052 1.00 Fee includes one (1) hour of plan review and one (1) field inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5.1.2 Additional inspections per hour (i.e. weld-o-let, hydro, visual, etc…) 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Tenant Improvement Fire Sprinklers (with calculations)
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5.2 Minimum plan review base fee. 624.00 1.052 656.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.2.1 Plus $1.00 per head in excess of 10 heads. 1.00 1.052 1.00 Fee includes 1.5 hours of plan review and one (1) field inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.2.2 Each additional inspection per hour (i.e. weld-o-let, hydro, visual, etc…) 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 New Commercial Fire Sprinkler System (13, 13R, & 15 systems) Master Fee Schedule
33 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR – 5.3 Minimum plan review base fee per riser. 1,002.00 1.052 1,054.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.3.1 Plus $1.00 per sprinkler head. 1.00 1.052 1.00 Fee includes two (2) hours plan review and two (2) field inspections. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.3.2 Each additional inspection per hour (i.e. weld-o-let, hydro, visual, etc…) 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Residential Fire Sprinkler System (single family home)
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5.4 Minimum plan review base fee. 564.00 1.052 593.00 Fee includes one (1) hour of plan review and 1 water service flush, 1 overhead hydro & 1 final.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.4.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Residential Fire Sprinkler System (multiple homes)
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5.5 Minimum plan review base fee per model. 624.00 1.052 656.00 For model only - fee includes one (1) hour of plan review and 1 water service flush, 1 overhead hydro & 1 final.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.5.1 Each additional lot (flush, hydrostatic test and final) 376.00 1.052 395.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.5.2 Each Additional inspection per hour (i.e. models, individual homes) 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 SECTION III – PLAN REVIEW

GROUP FIRE PROTECTION SYSTEMS
Standpipe System
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5.6 Minimum plan review base fee. 753.00 1.052 792.00 Fee includes plan review and one (1) field inspection.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.6.1 Each additional inspection per hour (i.e. hydro, flush, flow test, etc…) 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Spray Booth (includes booth and fire extinguishing system) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5.7 Minimum plan review base fee. 753.00 1.052 792.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
Fee includes two (2) hours plan review and one (1) field inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.7.1 Each additional inspection per hour. 251.00 1.052 264.00 Master Fee Schedule
34 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Pre-Action Fire Suppression System
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5.8 Minimum plan review base fee. 753.00 1.052 792.00 Fee includes one (1) hours plan review and two (2) field inspection. *(Fire alarm review (6.1) not included)
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.8.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Fixed Fire Suppression System – (wet/dry chem., water mist, etc…) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5.9 Minimum plan review base fee. 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.9.1 Each additional separate system at same location. 251.00 1.052 264.00 Fee Includes plan review and one (1) field inspection.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.9.2 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 SECTION III – PLAN REVIEW

GROUP FIRE PROTECTION SYSTEMS
Clean Agent Fire Suppression System
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5.10 Minimum plan review base fee. 1,002.00 1.052 1,054.00 Fee includes one (1) hour plan review and up to 3 hours of inspection time. *(does not include fire alarm plan review – see Sec. PR 6.1) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.10.1 Each Additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Fire Pump Installation
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5.11 Minimum plan review base fee. 1,754.00 1.052 1,844.00 Fee includes two (2) hours plan review and up to five (5) hours field inspection time. *(does not include review of generator or separate fuel storage tank) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.11.1 Each Additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Master Fee Schedule
35 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
Commercial Cooking (Hood and Duct) Fire Suppression System 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR – 5.12 Minimum plan review base fee. 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.12.1 Each additional system review $251.00 each. 251.00 1.052 264.00 Fee includes one (1) hour plan review and one (1) hour of inspection time. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.12.2 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Smoke & Heat Vents
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5.13 Minimum plan review base fee. 501.00 1.052 527.00 Fee includes one (1) hour plan review and one (1) hour of inspection time. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR –5.13.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Smoke Management/Control System
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5.14 Minimum plan review base fee. 1,754.00 1.052 1,844.00 Fee includes two (3) hours plan review and up to four (4) hours field inspection time. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.14.1 Each Additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Explosion Control (includes: vents, dust collection, etc…) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 5.15 Minimum plan review base fee. 1,002.00 1.052 1,054.00 Fee includes two (2) hours plan review & up to two (2) hours field inspection time. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–5.15.1 Each Additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 SECTION III – PLAN REVIEW

GROUP FIRE ALARM SYSTEM
Fire Alarm System
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 6 Minimum plan review base fee. 624.00 1.052 656.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 6.1 Plus $ 11.00 per initiating & notification device. 11.00 1.052 12.00 Master Fee Schedule
36 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
Fee includes two (2) hours plan review and up to one (1) hour field inspection time. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR – 6.1.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 6.1.2 Pre-wire inspections assessed at $ 251.00 per hour. 251.00 1.052 264.00 Dedicated Function Fire Alarm System (i.e. sprinkler monitoring, elevator recall, etc…) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 6.2 Minimum plan review base fee. 501.00 1.052 527.00 Fee includes one (1) hour plan review and one (1) hour of field inspection time. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–6.2.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Fire Alarm Panel Replacement Only
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 6.3 Minimum plan review base fee. 501.00 1.052 527.00 Fee includes one (1) hour plan review and up to one (1) hour field inspection time. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 6.3.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 High-Rise Fire Alarm (new and/or system upgrade)
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR - 6.4 Minimum plan review base fee. 2,005.00 1.052 2,108.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR - 6.4.1 Plus $ 11.00 per initiating device & notification device. 11.00 1.052 12.00 Fee includes four (4) hours plan review and
up to four (4) hours field inspection time.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR - 6.4.2 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 6.4.3 Each per-wire inspection where required. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour 125.00 1.052 131.00 SECTION III – PLAN REVIEW

GROUP FLAMMABLE & COMBUSTIBLE LIQUIDS (TANKS- PIPING & DISPENSING) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 Install Underground Tanks
Master Fee Schedule
37 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR – 7 Minimum plan review base fee. 501.00 1.052 527.00 Fee includes one (1) hour of plan review of tank location and One (1) hour of site inspection time.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Remove (Repair, Modify, Extend Piping) Underground Tank 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 7.1 Minimum plan review base fee. 753.00 1.052 792.00 Fee includes one (1) hour plan review and two (2) hours of inspection/site time. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-7.1.1 Each additional inspection/stand-by time per hour. 251.00 1.052 264.00 Install (Repair, Modify, Extend Piping) Aboveground Tank 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 7.2 Minimum plan review base fee. 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 7.2.1 Each additional tank. 251.00 1.052 264.00 Fee includes one (1) hour plan review and one (1) hour of inspection/site time. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 7.2.2 Each additional inspection. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Abandon Underground Tank in Place
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 7.3 Minimum plan review base fee. 753.00 1.052 792.00 Fee includes one (1) hour plan review and two (2) hours of inspection/site time. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 7.3.1 Each additional inspection/stand-by time per hour. 251.00 1.052 264.00 Environmental Upgrade (vapor recovery and processing systems, spill control, secondary containment and environmental agency requirements) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR – 7.4 Minimum plan review base fee. 501.00 1.052 527.00 Fee includes one (1) hour plan review and one (1) hour of inspection time. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 7.4.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Apply Interior Coating to Flammable Liquid Tanks
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 7.5 Minimum plan review base fee. 753.00 1.052 792.00 Fee includes one (1) hour plan review and two (2) hours of inspection/site time. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 7.5.1 Each additional inspection/stand-by time per hour. 251.00 1.052 264.00 Master Fee Schedule
38 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
SECTION III – PLAN REVIEW
GROUP COMPRESED GAS SYSTEMS: LPG /CNG/MEDICAL/CRYOGENICS Container Exchange Programs; LPG Tank Installation Without Dispensing 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR – 8 Minimum plan review base fee. 501.00 1.052 527.00 Fee includes one (1) hour of plan review and one (1) site inspection time. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 8.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Install, Modify, Repair LPG – CNG – Hydrogen (Tank Install and/or Dispensing) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 8.2 Minimum plan review base fee. 877.00 1.052 922.00 Fee includes 1½ hours of plan review and two (2) hours site inspection time. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 8.2.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Install, Modify, Repair Medical or Compressed Gas Systems 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 8.3 Minimum plan review base fee. 877.00 1.052 922.00 Fee includes 1 ½ hours of plan review and two (2) site inspections. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 8.3.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Install, Modify, Repair Cryogenics Fixed Installation
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 8.4 Minimum plan review base fee. 877.00 1.052 922.00 Fee includes 1½ hours of plan review and two (2) site inspections. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 8.4.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Install, Modify, Repair Compressed Gas Storage
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 8.5 Minimum plan review base fee. 501.00 1.052 527.00 Fee includes one (1) hour of plan review and one (1) field inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 8.5.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 Master Fee Schedule
39 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 SECTION III – PLAN REVIEW
GROUP SPECIAL HAZARDS – HAZARDOUS
Battery Systems
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 9 Minimum plan review base fee. 501.00 1.052 527.00 Fee includes one (1) hour of plan review and one (1) field inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 9.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Dust Collection Systems
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 9.2 Minimum plan review base fee. 624.00 1.052 656.00 Fee includes one (1) hour of plan review and two (2) site inspections. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 9.2.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Explosives Storage
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 9.3 Minimum plan review base fee. 1,002.00 1.052 1,054.00 Fee includes two (2) hours of plan review and two (2) site inspections. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 9.3.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 16 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 21 Additional plan review time, per half hour. 125.00 1.052 131.00 Hazardous Materials Compliance Review
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 9.4 Minimum review of MSDS, HMMP and/or HMIS submittals. 251.00 1.052 264.00 Fees include one (1) hour of review time.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 9.4.1 Additional plan review time, per half hour. 125.00 1.052 131.00 Hazardous Materials – Storage /Dispensing – Open/Closed Systems 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 9.5 Minimum plan review base fee. 1,002.00 1.052 1,054.00 Fee includes two (2) hours of plan review and two (2) site inspections. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 9.5.1 Each additional system minimum two (2) hours of plan review. 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 9.5.2 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 Master Fee Schedule
40 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Install, Modify, Repair Mechanical Refrigeration Systems 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 9.6 Minimum plan review base fee. 753.00 1.052 792.00 Fee includes one (1) hour of plan review and two (2) site inspections. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 9.6.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 SECTION III – PLAN REVIEW

GROUP HIGH PILE RACK STORAGE SYSTEMS
High-Pile or Rack Storage
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 10 Minimum plan review base fee. 753.00 1.052 792.00 Fee includes 1½ hours of plan review and 1½ hours site inspections. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–10.1 Field inspection time will be charged per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Temporary Access Roads & Water Supply
Install a Temporary Access Road – Residential and Commercial 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 11 Minimum plan review base fee for one and two homes. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–11.1 Minimum plan review for large developments and commercial projects. 501.00 1.052 527.00 Fee includes one (1) hour of plan review and one (1) field inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–11.1.2 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Install a Temporary Water Supply System
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 12 Minimum plan review base fee. 501.00 1.052 527.00 Fee includes one (1) hour plan review and one (1) hour field inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–12.1 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Miscellaneous Submittals - Alternative Means and Methods Miscellaneous Submittals or Plans Review
Plans or submittals not described elsewhere.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 13 Minimum plan review base fees up to two hours. 501.00 1.052 527.00 Master Fee Schedule
41 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR–13.1 Additional plan review time will be charged on hourly basis. 251.00 1.052 264.00 Fee includes one (1) hour of plan review and one (1) field inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–13.1.2 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 Alternative Means and Methods Requests or Code Interpretation Review 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 13.2 Minimum review base fee. 501.00 1.052 527.00 Fee includes 2 hours of plan review/consultation time.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-21 Additional plan review time, per half hour. 125.00 1.052 131.00 SECTION III – PLAN REVIEW

GROUP EXPEDITE PLAN REVIEW REQUEST & ADDITIONAL CHARGES/INSPECTION TIME Reviews Expedited as a Result of Working without Approved Plans Working without approved plans - Minimum plan review fees (overtime) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR – 14 Three (3) hours - plus applicable plan review fees. 753.00 1.052 792.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–14.1 (Additional plan review time, $ 251.00 per hour) 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–14.2 Expedited Plans - reviewed after normal business hours, three-hour minimum. 753.00 1.052 792.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR –14.3 (Additional plan review time, $ 251.00 per hour) 251.00 1.052 264.00 All revisions will be performed on an expedited/overtime basis at $ 251.00 per hour with a three hour minimum.

Total fees assessed will be the sum of all applicable plan review fees including expedite/overtime fees.

Demolition Permit pursuant to Chapter 33, CFC
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 15 Fees include ½ hour plan review and ½ hour site review 251.00 1.052 264.00 If cutting & welding is being done during demo PTO 12.1 ($251.00) needs to be added *PTO 12.1 separate fee

GROUP BULK/TERMINAL/BULK TRANSER/PROCESS TRANSFER MAINTENANCE REVIEW Fees will be based on construction permit required for routine maintenance/repair work which conducted within these facilities.

Install, Modify, Repair, Replace Fireproofing
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 16 Minimum plan review base fees up to two hours. 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-16.1 Additional plan review time will be charged on hourly basis. 251.00 1.052 264.00 Fee includes one (1) hour of plan review and one (1) field inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-16.2 Each additional inspection per hour. 251.00 1.052 264.00 Master Fee Schedule
42 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR –20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR - 21 Additional plan review time, per half hour. 125.00 1.052 131.00 Install, Modify, Repair and/or Replace Hydrant, Pipeline For Firewater Systems 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 17 Minimum plan review base fees up to two hours. 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-17.1 Additional plan review time will be charged on hourly basis. 251.00 1.052 264.00 Fee includes one (1) hour of plan review and one (1) field inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR-17.2 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR –20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 21 Additional plan review time, per half hour. 125.00 1.052 131.00 Install, Modify, Repair, Replace Piping for Systems Containing Hazardous Materials 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 18 Minimum plan review base fees up to two hours.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–18.1 Additional plan review time will be charged on hourly basis. 501.00 1.052 527.00 Fee includes one (1) hour of plan review and one (1) field inspection. - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–18.2 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR –20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 21 Additional plan review time, per half hour. 125.00 1.052 131.00 SECTION III – PLAN REVIEW

GROUP BULK/TERMINAL/BULK TRANSER/PROCESS TRANSFER MAINTENANCE REVIEW Install, Modify, Repair Pump Installed In Hazardous Material Process System 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PR – 19 Minimum plan review base fees up to two hours. 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–19.1 Additional plan review time will be charged on hourly basis. 251.00 1.052 264.00 Fee includes one (1) hour of plan review and one (1) field inspection. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR–19.2 Each additional inspection per hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR –20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR - 21 Additional plan review time, per half hour. 125.00 1.052 131.00 Additional Charges and Inspection Time
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR - 20 Re-submittals or revisions. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PR – 21 Additional plan review time, $ 125.00 per half hour. 125.00 1.052 131.00 · Minimum review and inspection fees are based on $ 251.00 per hour during normal business hours, unless otherwise noted. · Normal business hours are between 0830hrs and 1700hrs, Monday - Friday. · All overtime fees are assessed at $ 753.00 for a three hours minimum, unless otherwise noted. · Overtime rates apply to weekends, holidays, and all times outside normal business hours.

Master Fee Schedule
43 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
· Expedited plan reviews are conducted after normal business hours. · Total fees assessed will be the sum of all applicable plan review fees including expedite/overtime fees.

Authority
Health & Safety:
§§ 13114, 13131.5, 13143.2 (b, c, d, e), 13145, 13147, 13143.9, 13146 (a) (1) (b), (d), e), 17921, 17951, 17962
Government Code
§ 6103.7, 6253(b)
Prevention Code Ordinance: No. 25-13, updated fee schedule Ordinance No. 15-14, updated resolution 78-15 Title 19, CCR:
§ 1.12(a) & 3.28
California Fire Code: § 101.1, 101.2, 105.1, 105.4
SECTION IV – PERMIT TO OPERATE - SPECIAL USES/ACTIVITIES/OPERATIONS

GROUP PERMIT TO OPERATE - SPECIAL USE/ACTIVITY/OPERATIONS Aerosol Products
Permit to store, manufacture or handle an aggregate quantity of Level 2 or Level 3 aerosol products in excess of 500 pounds net weight.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PTO – 1 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO - 2 Amusement Buildings - Permit to operate a special amusement building. 251.00 1.052 264.00 Aviation Facilities – Required to use a group H or S occupancy for aircraft servicing or repair and aircraft fuel-servicing vehicles.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO - 3 (Does not include permit for hot work, flammable/combustible spraying operations or hazardous materials).
438.00 1.052 461.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO - 4
Carbon Dioxide Systems used in Beverage Dispensing Application – Permit is required for carbon dioxide systems used in beverage dispensing applications having more than 100 pounds of carbon dioxide.
251.00 1.052 264.00
Carnivals and Fairs – Permit is required to conduct a carnival or fair. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 5.0 Inspections conducted during normal work hours – (1.25 hours) 312.00 1.052 328.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 5.1 Additional inspection time during normal business hours per ½ hour. 125.00 1.052 131.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 5.2 After hours inspection time per ½ hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 5.3 Overtime & Weekend inspections - three (3) hours minimum. 753.00 1.052 792.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 5.4 Float, Parade: Per Float 125.00 1.052 131.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 6 Cellulose Nitrate Film – Permit for the storage, use and handling in public assembly. 376.00 1.052 395.00 Combustible Dust-Producing Operations/Refinishing
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 7 Permit to operate facility with combustible dust operations – i.e. cabinet shops, milling & fiberglass cutting, forming operations, paper shredding. 312.00 1.052 328.00
Less than 5,000 square feet
Revisions to previously submitted plans, including plans requiring re-submittal and/or client generated changes, will be assessed $ 251.00 for each hour of plan review.

Reviews conducted and requiring more than one hour of plan review time during normal business hours will be assessed $125.00 per half hour.

Master Fee Schedule
44 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PTO – 7.1 Each additional 5,000 square feet or fraction thereof 251.00 1.052 264.00 Combustible Fibers/Material Storage
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 8 Permit to storage/handling of combustible fibers in excess of 100 cubic feet. 438.00 1.052 461.00 Compressed Flammable Gases (In Excess of amounts in Table 105.6.9 CFC) Each 200 cubic feet of flammable gas or
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 9 Each 1,000 cubic feet of inert or simple asphyxiant 312.00 1.052 328.00 Highly toxic – Any Amount
Oxidizing (including oxygen – 504 cubic feet)
Compressed/Liquefied Gas Plant:
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 9.1 5,000 square feet or less 565.00 1.052 594.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 9.2 Each additional 5,000 sq. feet or fraction thereof 565.00 1.052 594.00 Covered & Open Mall Buildings
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 10
Permit for the placement/installation of displays, concession equipment, displays of highly combustible goods, liquid or gas-fired equipment and the use of open flame equipment in the mall (i.e. auto displays, etc…)
312.00 1.052 328.00
SECTION IV – PERMIT TO OPERATE - SPECIAL USES/ACTIVITIES/OPERATIONS

GROUP PERMIT TO OPERATE - SPECIAL USE/ACTIVITY/OPERATIONS Cryogenic Fluids
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PTO – 11 Permit to produce, store, transport on site, handle or dispense amounts in excess of Table 105.6.11. CFC - California Fire Code
312.00 1.052 328.00
Cutting & Welding (fixed facility operations)
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 12 Permit to conduct welding, cutting & similar operations using electric or gas equipment. 312.00 1.052 328.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 12.1 Single Operation (Permit is valid for 180 days) 251.00 1.052 264.00 Dry Cleaning
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 13 Permit to operate is dry cleaning operations or to change to a more hazardous cleaning solvent in existing equipment.
312.00 1.052 328.00
Dry Cleaning Plant
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 13.1 Permit to operate a dry cleaning plant operation . 312.00 1.052 328.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 14 Exhibits & Trade Shows - Permit is required to operate exhibits and trade shows. 251.00 1.052 264.00 Explosives or Blasting Agent: Storage, Use or Transportation 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 15 Permit is required for the manufacturing storage, handling, sales or use of any quantity of explosives, explosive materials 100 lbs. or less 438.00 1.052 461.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 15.1 Over 100 lbs. 753.00 1.052 792.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO - 15.2 Ammonium Nitrate Storage 438.00 1.052 461.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 15.3 Gunpowder Sales - 100 lbs. or less 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 15.4 Gunpowder Sales – Over 100 lbs. 501.00 1.052 527.00 Fire Hydrants and Valves – Private
Master Fee Schedule
45 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 16 Permit to remove from service or the operation of a private fire hydrant and valves. A change to existing hydrant systems requires plan review and approval. 251.00 1.052 264.00
(Refer to Plan Review – Private Fire Service System Page 8, PR 4.2) Flammable & Combustible Liquids: Storage or Use
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 17 Repair, Modification or Extension of Piping 251.00 1.052 264.00 (Plus $251/hour over specified field time)
Flammable/Combustible Liquids – Storage or Use
Permit to store, handle or the use of (includes installation of new tank):
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 17.1 Class I liquids in excess of 5 gallons – Inside 312.00 1.052 328.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 17.2 Class I liquids in excess of 10 gallons – Outside 438.00 1.052 461.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 17.3 Class II or Class III A liquids in excess of 25 gallons - Inside 312.00 1.052 328.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 17.4 Class II or Class III A liquids in excess of 60 gallons – Outside 438.00 1.052 461.00 Flammable/Combustible Liquids – (removal)
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 17.5 Permit to remove flammable or Class II combustible liquids from underground or above ground tank by means other than an approved fixed pump. 312.00 1.052 328.00 SECTION IV – PERMIT TO OPERATE - SPECIAL USES/ACTIVITIES/OPERATIONS

GROUP SPECIAL USE/ACTIVITY/OPERATIONS
Flammable/Combustible Liquids - Plants/Warehouse - loading & unloading Permit to operate tank vehicles, wells, fuel-dispensing stations, small refineries, breweries, distilleries and similar facilities where flammable and combustible liquids are: produced, processed, transported, stored, or used.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PTO – 17.6 5,000 square feet or less 438.00 1.052 461.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 17.7 Each additional 5,000 square feet or fraction of 438.00 1.052 461.00 Flammable/Combustible Liquids – Out of Service Tank
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 17.8 Permit to place temporarily out of service (for more than 90 days) an underground, protected above-ground (vaulted) or aboveground flammable or combustible liquid tank. 624.00 1.052 656.00 Flammable/Combustible Liquids – Change of Contents
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PTO – 17.9 Permit to change contents stored in a flammable or combustible liquid tank which poses a greater hazard.
312.00 1.052 328.00
Flammable/Combustible Liquids - Manufacture
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO–17.10 Permit to manufacture, process, blend, or refine flammable or combustible liquids. 438.00 1.052 461.00 Printing Plant or Shop
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO-17.11 Permit to print items using flammable/combustible liquids 251.00 1.052 264.00 Highly Combustible Storage
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO–17.12 5,000 square feet or less 496.00 1.052 522.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO-17.13 Each additional 5,000 square feet or fraction thereof 312.00 1.052 328.00 Floor Finishing’s
Master Fee Schedule
46 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PTO – 18 Permit to use Class I or Class II liquids for the refinishing of flooring in excess of 350 square feet.
312.00 1.052 328.00
Fruit & Crop Ripening
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 19 Permit to operate a fruit or crop ripening facility or conduct a fruit ripening process using ethylene gas.
251.00 1.052 264.00
Fumigation & Insecticidal Fogging
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 20 Permit to operate a business of fumigation or thermal insecticidal fogging and to maintain a room, vault or chamber in which a toxic or flammable fumigant is used. N/C N/A N/C Hazardous Materials
Permit to store, transport on site, dispense, use or handle hazardous materials in amounts in excess of Table 105.6.21 CFC – California Fire Code
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 21 1 – 5 Products 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 21.1 5 – 10 Products 624.00 1.052 656.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 21.2 11 or more Products 1,253.00 1.052 1,318.00 Chemical Plant
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 21.3 5,000 square feet or less 565.00 1.052 594.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 21.4 Each additional 5,000 square feet or fraction thereof 565.00 1.052 594.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 21.5 Radioactive Material (any amount) 501.00 1.052 527.00 SECTION IV – PERMIT TO OPERATE - SPECIAL USES/ACTIVITIES/OPERATIONS

GROUP SPECIAL USE/ACTIVITY/OPERATIONS
Chemical Warehouse
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 21.6 5,000 square feet or less 312.00 1.052 328.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 21.7 Each additional 5,000 square feet or fraction thereof 312.00 1.052 328.00 Laboratory
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 21.8 5,000 square feet or less 565.00 1.052 594.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 21.9 Each additional 5,000 square feet or fraction thereof 565.00 1.052 594.00 Bulk Plant/Terminal
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO–21.10 10 acres or less 2,729.00 1.052 2,870.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO–21.11 Each additional 10 acres or fraction thereof 2,729.00 1.052 2,870.00 Bulk Transfer
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO-21.12 10 acres or less 2,729.00 1.052 2,870.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO-21.13 Each additional 10 acres or fraction thereof 2,729.00 1.052 2,870.00 Process Transfer
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO-21.14 10 acres or less 2,729.00 1.052 2,870.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO-21.15 Each additional 10 acres or fraction thereof 2,729.00 1.052 2,870.00 HPM (Hazardous Production Material) Facilities - Semiconductor manufacturer Master Fee Schedule
47 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PTO – 22 Permit to store, handle or use hazardous production materials. 1,253.00 1.052 1,318.00 High Pile Storage (Permit for the use of a building or portion thereof) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 23 In excess of 500 square feet – less than 5,000 square feet 702.00 1.052 738.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 23.1 Each additional 5,000 square feet or fraction thereof 501.00 1.052 527.00 PTO – 24 Hot Work Operations
Permit for hot work including, but not limited to the following:

1. Public exhibitions/demos.

2. Inside a building not tied to construction permit.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15

3. Welding booths (fixed site location).

4. Within a wildfire risk area.
251.00 1.052 -

5. Application of roof coverings with the use of an open flame device.

6. Where approved, the fire code official shall issue a permit to carry out a hot work program.

Refer to CFC 105.6.24 #6 for the remaining information.

Hot Work Operations - Marine single use
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 24.1 Inspections conducted during normal work hours – (1.25 hours) 312.00 1.052 328.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 24.2 Additional inspection time during normal business hours per ½ hour. 125.00 1.052 131.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 24.3 After hours inspection time per ½ hour. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 24.4 Overtime & Weekend inspections - three (3) hours minimum. 753.00 1.052 792.00 Industrial Ovens
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 25 Permit to operate an industrial oven 438.00 1.052 461.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 25.1 Commercial Incinerators 438.00 1.052 461.00 Lumber Yard & Woodworking Plants
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 26 Permit for the storage or the processing of lumber exceeding 100,000 board feet 501.00 1.052 527.00 Liquid or Gas Fueled vehicles or Equipment in Assembly Buildings 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 27 Permit to display, operate or demonstrate liquid or gas fueled vehicles or equipment in assembly buildings.
251.00 1.052 264.00
SECTION IV – PERMIT TO OPERATE - SPECIAL USES/ACTIVITIES/OPERATIONS

GROUP SPECIAL USE/ACTIVITY/OPERATIONS
Liquid Propane (LP) Gas – Per Tank
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 28 Permit for exchange of cylinders only – no refilling. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 28.1 Permit to dispense, store, install and use LPG. (less than 2K gallons) 312.00 1.052 328.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 28.2 Permit to dispense, store, install and use LPG. (more than 2K gallons) 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 28.3 To operate a plant/facility 5,000 square feet or less 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 28.4 Each additional 5,000 square feet or fraction thereof 501.00 1.052 527.00 Magnesium
Master Fee Schedule
48 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PTO – 29 Permit to melt, cast, heat treat or grind more than 10 pounds. 376.00 1.052 395.00 Miscellaneous Combustible Storage
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 30
Permit to store in any building or upon any premises in excess of 2,500 cubic feet gross volume of combustible empty packing cases, boxes, barrels or similar containers, rubber tires, rubber, cork, wood or plastic pallets or similar combustible materials. 501.00 1.052 527.00
Motor Fuel-Dispensing Facilities
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO - 31 Permit is required for the operations of automobile (service stations), marine and fleet motor fuel-dispensing facilities.
438.00 1.052 461.00
Tank Vehicle Dispensing
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 31.1
Permit is required the fueling of motor vehicles at approved locations from a tank vehicle. Also includes the limited or temporary fueling operations for special events (i.e. fueling or watercraft from shore, piers, floats, or barges)
251.00 1.052 264.00
Open Burning
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 32 Permit is required for the kindling or maintaining of an open fire or fire on any public street, alley, road, or other public or private ground. 251.00 1.052 264.00 Exception: Recreational
Open Flames & Torches
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 33 Permit is required to remove paint with a torch; or to use a torch or open flame device 251.00 1.052 264.00 Open Flames & Candles
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 34 Permit for the use of open flames inside restaurants, public assemblies and/or drinking establishments.
251.00 1.052 264.00
Organic Coatings
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 35 Permit for organic-coating manufacturing operation producing more than 1 gallon of an organic coating in one day.
251.00 1.052 264.00
SECTION IV – PERMIT TO OPERATE - SPECIAL USES/ACTIVITIES/OPERATIONS

GROUP SPECIAL USE/ACTIVITY/OPERATIONS
Places of Assembly
Exception: Other than Group A occupancy used exclusively for the purpose of religious worship having an occupant load less than 2,000 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 36 *ASSEMBLY: With stage, 1,000 or more occupant load 624.00 1.052 656.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 36.1 *ASSEMBLY: With stage, less than 1,000 occupant load 624.00 1.052 656.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 36.2 *ASSEMBLY: Without stage, 300 or more occupant load 519.00 1.052 546.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 36.3 ASSEMBLY: Without stage, 201-299 occupant load 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 36.4 Without stage, 101-200 occupant load 449.00 1.052 472.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 36.5 Without stage, 50-100 occupant load 312.00 1.052 328.00 Private Fire Hydrants
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 37 Permit is required for the removal from service, use or operation of private fire hydrants 251.00 1.052 264.00 Pyrotechnic Special Effects Material
Permit to use fireworks, pyrotechnics inside.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 38 Inspections during normal work hours – (2 hours) 501.00 1.052 527.00 Master Fee Schedule
49 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PTO – 38.1 Additional inspection time during normal business hours @ $125.00 per ½ hour 125.00 1.052 131.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 38.2 Additional inspection time after normal business hours @ $251.00 per hour 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 38.3 Overtime and weekend inspections: Three hour minimum fee - $ 753.00. 753.00 1.052 792.00 Pyroxylin Plastics
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 39 Permit for storage and handling of more than 25 lbs. of cellulose nitrate (pyroxylin) 251.00 1.052 264.00 Refrigeration Operation Equipment
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 40 Permit to operate a mechanical refrigeration unit or system 376.00 1.052 395.00 Repair Garages
Permit for operation of repair garages
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 41 1 – 4 repair bays 312.00 1.052 328.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 41.1 5 – 8 repair bays 376.00 1.052 395.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 41.2 Greater than 8 repair bays 438.00 1.052 461.00 Rooftop Heliports
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 42 Permit to operate a rooftop heliport. 251.00 1.052 264.00 Spraying or Dipping – Finish Application
Permit to conduct spraying or dipping operations utilizing flammable or combustible liquids or the application of combustible powders.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 43 5000 square feet or less 496.00 1.052 522.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 43.1 Each additional 5,000 square feet or fraction thereof 312.00 1.052 328.00 Storage of Scrap Tires & Tire Byproducts
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 44
Permit to establish, conduct or maintain storage of scrap tires and tire byproducts that exceeds 2,500 cubic feet of total volume of scrap tires, and for indoor storage of tires and tire byproducts.
438.00 1.052 461.00
SECTION IV – PERMIT TO OPERATE - SPECIAL USES/ACTIVITIES/OPERATIONS

GROUP SPECIAL USE/ACTIVITY/OPERATIONS
Temporary Membrane Structures & Tents
Permit to operate an air-supported or temporary membrane structure Including tents and canopies:
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 45 399 - 699 square feet 125.00 1.052 131.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 45.1 699 - 4,199 square feet 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 45.2 Greater than 5,000 square feet 376.00 1.052 395.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 45.3 Additional inspection time during normal business hours @ $125.00 per ½ hour 125.00 1.052 131.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 45.4 Additional inspection time after normal business hours @ $251.00 per hour 251.00 1.052 264.00 Overtime and weekend Inspections:
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 45.5 Three-hour minimum fee - $753.00 753.00 1.052 792.00 Extended Period of Use
Master Fee Schedule
50 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 45.6 Permit to extend the use of a tent, canopy or air supported structure for an additional 180 days. (1 Extension of use per structure)
251.00 1.052 264.00
Tire-Rebuilding Plants
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 46 Permit to operate and maintain a tire rebuilding plant 438.00 1.052 461.00 Waste Handling
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 47 Permit to operation of wrecking yards, junk yards and waste material-handling facilities 468.00 1.052 492.00 Wood Products
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 48 Permit is required to store chips, hogged material, wood or other combustible pallets, lumber or plywood in excess of 200 cubic feet (6 m3). 438.00 1.052 461.00 Additional Permits
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 49 1. Production Facilities – Change use or occupancy or allow the attendance of a live audience, or for wrap parties.
501.00 1.052 527.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 49.1 2. Pyrotechnics & Special Effects – Use of pyrotechnics special effects for the use of motion picture, television and commercial production.
501.00 1.052 527.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 49.2 3. Live Audiences – Install seating for live audiences (production studios & sound stages) 251.00 1.052 264.00 SECTION IV – PERMIT TO OPERATE - SPECIAL USES/ACTIVITIES/OPERATIONS

GROUP SPECIAL USE/ACTIVITY/OPERATIONS
PTO – 50
Temporary Assembly - Permit is required 10 days prior to conduct an event that will assemble more than 1,000 people. Any event that has more than 3,000 people shall require two personnel from the Fire Prevention Division for the duration of the event to ensure compliance of all codes are adhered to.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PTO – 50.1 Fees include one (1) hour site plan review and one (1) hour site inspection 484.00 1.052 509.00 A floor plan outlining but not limited to the following is required.

1. Number of people expected to attend

2. Number of exits

3. Location of fire extinguishers

4. Location of tables & chairs

5. Location of stage

6. Location of tents
requires separate permit – PTO – 45

7. Location of cooking area(s)

8. Location of any open flames used for cooking or decorating 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 51 Christmas Tree Sales – Permit to operate a Christmas Tree lot. 251.00 1.052 264.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 52 Asbestos Removal – Permit to conduct asbestos removal operations. 251.00 1.052 264.00 Battery System Storage
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 53 Permit to operate stationary lead-acid battery systems having liquid capacity of more than 50 gallons
251.00 1.052 264.00
Firework Aerial Display
Permit to use fireworks, pyrotechnics outside.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 54 Inspections during normal work hours – (2.5 hours) 1,487.00 1.052 1,564.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO-54.1 Additional inspection time during normal business hours @ $125.00 per ½ hour 125.00 1.052 131.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO-54.2 Additional inspection time after normal business hours @ $251.00 per hour 251.00 1.052 264.00 Master Fee Schedule
51 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 PTO-54.3 Overtime and weekend inspections: Three hour minimum fee - $ 753.00. 753.00 1.052 792.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO -54.4 Set Piece Display 501.00 1.052 527.00 Model Rocket
Permit to operate/launch motorized rockets
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 55 (fees include ½ hour site inspection) 376.00 1.052 395.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO –55.1 Retail Sale 125.00 1.052 131.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 55.2 Youth Scouts/Troops 29.00 1.052 30.00 Temporary Water Supply
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 56 Permit is required to use a temporary water supply for construction of residential projects. 251.00 1.052 264.00 Tire Storage & Scrap Tires
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 57 Permit to store tires in excess of 1,000 cubic feet inside buildings (per Ch. 25 – CFC) 312.00 1.052 328.00 Change of Occupancy/Site Inspection or Miscellaneous Inspection 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PTO – 58
A permit is required for a requested inspection for the change of occupancy including, but not limited to: Inspections conducted when required by Building Official, Planning, or other Governmental agency and where not elsewhere listed.
305.00 1.052 321.00
SECTION V – NOTES

GROUP NOTES
Permits are non-transferrable and fees are non-refundable.

Failure to pay invoice fees within 30 days shall result in a 20 percent late payment charge.

In the case of multiple annual permits, permits may be issued for shorter periods and prorated on the basis of a 1/12th charge for each month and portion thereof.

SECTION VI – REIMBURSEMENT FOR FIRE DEPARTMENT RESPONSE

GROUP MOTOR VEHICLE INCIDENT
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
MVI – 1
Provide hazardous materials assessment and scene stabilization. This will be the most common "invoice level." This occurs almost every time a RFD apparatus responds to an accident/incident involving a driving under the influence (DUI). 420.00 1.052 442.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 MVI – 2
Includes MVI 1 services as well as clean up and material used (absorbents) for hazardous fluid clean up and disposal. Invoiced at this level if the RFD unit has to clean up any gasoline or other automotive fluids that are spilled as a result of the accident/incident. 447.00 1.052 470.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
MVI - 3
(Vehicle Fire) Provide scene safety, fire suppression, breathing air, rescue tools, hand tools, hose, tip use, foam, structure protection, and clean up gasoline or other automotive fluids that are spilled as a result of the accident/incident.
472.00 1.052 496.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
MVI - 4
Includes MVI 1 & 2 services as well as extrication (heavy rescue tools, ropes, airbags, cribbing etc.). Invoiced at this level when RFD unit has to extricate anyone from the vehicle(s) using any equipment. No invoice if the patient is simply unconscious and an RFD unit is able to open the door to access the patient. This level is to be invoiced only if equipment is deployed. 1,891.00 1.052 1,988.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
MVI – 5 Includes MVI 1, 2, & 4 services as well as multi RFD unit response 2,100.00 1.052 2,208.00

GROUP HAZARDOUS MATERIAL INCIDENT
Master Fee Schedule
52 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
HZM-1
Basic Response: Invoice will include engine response, first responder assignment, and certified hazmat team and appropriate equipment, perimeter establishment, evacuations, set- up and command.
735.00 1.052 773.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
HZM – 2
Intermediate Response: Invoice will include engine response, first responder assignment, certified hazmat team and appropriate equipment, perimeter establishment, evacuations, set- up and command, Level A or B suit donning, breathing air and detection equipment. Set-up and removal of decontamination center.
2,625.00 1.052 2,760.00
SECTION VI – REIMBURSEMENT FOR FIRE DEPARTMENT RESPONSE

GROUP HAZARDOUS MATERIAL INCIDENT
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
HZM – 3
Advanced Response: Invoice will include engine response, first responder assignment, hazmat certified team and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command, Level A or B suit donning, breathing air and detection equipment and robot deployment. Set-up and removal of decontamination center, detection equipment, recovery and identification of material. Disposal and environment clean up.

Includes above in addition to any disposal fees of material and contaminated equipment and material used at scene. Includes 3 hours of on scene time. 6,196.00 1.052 6,515.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 HZM–3.1 Each additional hour @$315.00 per hazardous material team. 315.00 1.052 331.00 GROUP PIPELINE INCIDENTS/POWER LINE INCIDENTS not Limited to Gas, Sewer, & Water 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PLI – 1 Basic Response: Invoice will include engine response and first responder assignment, perimeter establishment, evacuations, first responder set-up and command. 420.00 1.052 442.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PLI – 2
Intermediate Response: Invoice will include engine response, first responder assignment, and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command. May include HAZMAT team, Level A or B suit donning, breathing air and detection equipment.
1,051.00 1.052 1,105.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
PLI - 3
Advanced Response: Invoice will include engine response, first responder assignment, and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command. May include HAZMAT team, Level A or B suit donning, breathing air and detection equipment. Supervise and/or assist pipeline repair of intermediate to major pipeline damage.

May include set-up and removal of decontamination center, detection, recovery and identification of material. Disposal and environment clean up.

GROUP FIRE INVESTIGATOR RESPONSE
Includes the following: Scene Investigation, Investigation Report, Scene Documentation based on per hour.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 INV – 1 The claim begins when the Fire Investigator responds to the incident and is billed for logged time only.
251.00 1.052 264.00
SECTION VI – REIMBURSEMENT FOR FIRE DEPARTMENT RESPONSE

GROUP WATER INCIDENT RESPONSE
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
WIR - 1
Basic Response: Invoice will include engine response, first responder assignment, perimeter establishment, evacuations, first responder set-up and command, scene safety and investigation (including possible patient contact, hazard control). This will be the most common "billing level." This occurs almost every time RFD Victory responds to a water incident. 420.00 1.052 442.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 WIR – 1.1 *Plus $52.00 per hour, per rescue person (minimum 3 fire personnel) $52.00 1.052 55.00 Master Fee Schedule
53 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
WIR – 2
Intermediate Response: Includes WIR 1 services as well as clean up and material used (sorbents), minor hazardous clean up and disposal. Invoiced at this level if the RFD has to clean up small amounts of gasoline or other fluids that are spilled as a result of the incident. 840.00 1.052 883.00
Billed at $840.00 plus $52.00 per hour, per rescue person. 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 WIR – 2.1 *Plus $52.00 per hour, per rescue person (minimum 3 fire personnel) 52.00 1.052 55.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
WIR – 3
Advanced Response: Includes WIR 1 and WIR 2 services, including HAZMAT team, set up and removal of decontamination center, detection equipment, recovery and identification of material. Disposal and environment clean up. Includes above in addition to any disposal fees of material and contaminated equipment and material used at scene. 2,100.00 1.052 2,208.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 WIR-3.1 *Plus $52 per hour, per rescue person (minimum 3 fire personnel) 840.00 1.052 883.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
WIR-3.2 *Plus $105 per hour, per HAZMAT team member 105.00 1.052 110.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
WIR – 4
RFD reserves the right to invoice for individual event with customized mitigation rates including itemized, per person, at various response levels and for itemized products and equipment used.

GROUP FIRE INCIDENT RESPONSE
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 FIR – 1 Per engine response, per hour (includes captain, engineer and firefighter) 420.00 1.052 442.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
FIR – 2 Breathing Support Unit, per hour (includes captain, engineer and firefighter) 420.00 1.052 442.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
FIR – 3 Per truck response, per hour (includes captain, engineer and firefighter) 525.00 1.052 552.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
FIR – 4 Miscellaneous equipment billed 315.00 1.052 331.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 FIR – 5
RFD reserves the right to invoice for individual event with customized mitigation rates including itemized, per person, at various response levels and for itemized products and equipment used.

SECTION VI – REIMBURSEMENT FOR FIRE DEPARTMENT RESPONSE

GROUP FIRE INCIDENT RESPONSE CHIEF LEVEL RESPONSE
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15 CLR – 1 Chief of Department, per hour 197.00 1.052 207.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
CLR – 2 Deputy Fire Chief, per hour 176.00 1.052 185.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
CLR – 3 Battalion Chief, per hour 107.00 1.052 113.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
CLR – 4 Fire Marshal, per hour 131.00 1.052 138.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.40.110, RMC

2.34.040.32d, Ord. No.
15-14 & Reso No. 75-15
CLR – 5 Deputy Fire Marshal, per hour 108.00 1.052 114.00

MITIGATIO
N RATE The
mitigation
These average mitigation rates were determined by itemizing costs for a typical run (from the time a fire apparatus leaves the station until it returns to the station) and are based on the actual costs, using amortized schedules for apparatus (including useful life, equipment, repairs, and maintenance) and department's "actual personnel expense.” The actual personnel expense includes costs such as total salary & benefits.

Master Fee Schedule
54 Fire
Last increase
implemented
ECI Index for last
increase
Index Effective
date for proposed
ECI Index for
proposed ECI Factor
Municipal Code
or Other Code
Description Old Fee Factor CURRENT FEE
City of Richmond
Master Fee Schedule
Notes:

Plan reviews or inspections requested after normal working hours, on weekends, or during holidays, will be charged at the hourly rate of $251.00. A four hour minimum fee will apply and additional 15 minute increments (15 minutes - $63.00, 30 minutes -$125.00, 45 minutes - $188.00) thereafter, in addition to the total initial fee.

Expedite Plan Review minimum $251.00, minimum three (3) hours – $753.00 After Hour Inspection minimum $251.00, minimum three (3) hours – $753.00 All fees shall be based on a $251.00 hourly rate and rounded up to the next whole dollar.

Any Fire Code Permit(s) issued or other request for use(s) not shown in this schedule will be charged at the hourly rate of $251.00. A one (1) hour minimum fee will apply and additional 15 minute increments (15 minutes - $63.00, 30 minutes -$125.00, 45 minutes - $188.00) thereafter.

Master Fee Schedule
55 Library
Description Current Fee Factor Proposed Fee

LIBRARY AND CULTURAL SERVICES
Library Fees
(for Library Impact Fee, see Building Regulatns, Impact Fees)

0.20 N/A ZERO

5.00 N/A ZERO

0.10 N/A ZERO

2.50 N/A ZERO
Not available N/A Not available N/A N/A
RMC 2.34.040-84 Replacement Charge per item for lost, damaged, and unreturned materials.

Cost, plus
Processing Fee N/A Cost, plus
processing fee
1-03-2004 N/A Not available N/A N/A Reso. 6-04; RMC 2.34.040, Ord. 3-04 Rental: Library Community Room (Madeline F. Whittlesey Room), Charge per hour--Will add a separate Rental section

12.50 N/A 12.50
Not available N/A Not available N/A N/A RMC 2.34.040-84 Public Printing/Copies Black & White per page 0.10 N/A 0.15 Not available N/A Not available N/A N/A RMC 2.34.040-84 Public Printing/Copies, Color per page 0.40 N/A 0.50 Overdue fine for Link+ materials borrowed from other libraries: Set by Link+ consortium daily per item 1.00 N/A 1.00 Maximum fine for Link+ materials, borrowed from other libraries:

Set by Link+ consortium per item

15.00 N/A 15.00
Lost, damaged, and unreturned Link+ materials, borrowed from other libraries will be billed for replacement per subsection "Fees for Lost and Damaged Materials owned by other libraries". 115.00 N/A Varies Not available N/A Not available N/A N/A
RMC 2.34.040-84 Processing charge per item for lost, damaged, and unreturned books and media.

10.00 N/A 10.00
() Fees for Lost and Damaged Materials Owned by Other Libraries.

City of Richmond
Master Fee Schedule
1-03-2003 N/A Not available N/A N/A
RMC 2.34.040, Ord. 3-04 Overdue fine, adult materials daily/item Last increase
implemented
ECI Index for last
increase
Index Effective date
for proposed increase
ECI Index for
proposed increase ECI Factor
Reso. 23-03; RMC 2.34.040, Ord. 3-04
Municipal Code or
Other Code
Overdue fine, juvenile materials*, daily/item
maximum fine per item1-03-2003 N/A Not available N/A N/A The Library is hereby authorized to collect fees for lost, damaged and unreturned materials that its patrons have borrowed from another library via interlibrary loan (ILL) in accordance with the following:
(i) in the case of lost or damaged materials borrowed from a member library of the LINK+ library consortium, the Library may collect the replacement fee set by LINK+ provided that the Library shall collect only the actual replacement cost of theitem when authorized to do so by the lending library. The fees authorized by this subsection shall be collected for the sole purpose of forwarding them to the lending
library from which the lost or damaged item(s) was borrowed.

Link+ Fees
*Bookmobile materials currently exempt
Note: Deposit and 2 hr. minimum are new requirements.

Master Fee Schedule
56 Public Works
Old Fee Factor CURRENT FEE
Infrastructure Maintenance & Operations

SECTION 1 - ENCROACHMENT PERMITS
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040.12a, Ord. 21-03, E.O. 90-012; Reso. 6-04
Encroachment Agreement -- Public right of way
fee (see Building Regulations section for
"Encroachment Agreement -- Private right of way
fee")
909.00 1.052 956.00

Sidewalk Dining
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 11.040.040, 12.38.340,

12.28.365, 15.04.910.080(I)(2),
Ord. 25-10
Encroachment Permit Application Review for
outdoor service on public sidewalks, minimum
non-refundable
828.00 1.052 871.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 11.040.040, 12.38.340,

12.28.365, 15.04.910.080(I)(2),
Ord. 25-10
New Encroachment Permit for outdoor service on
public sidewalks (first year, annual fee) 577.00 1.052 607.00 not applicable na not applicable na na
RMC 11.040.040, 12.38.340,

12.28.365, 15.04.910.080(I)(2),
Ord. 25-10
- plus additional fees for in-ground improvements
within the public ROW
(0-100 SF)
500.00 NA 500.00
not applicable na not applicable na na
RMC 11.040.040, 12.38.340,

12.28.365, 15.04.910.080(I)(2),
Ord. 25-10
- plus in-ground improvements for square footage
thereafter (over 100 SF) $2.00/SF NA $2.00/SF
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 11.040.040, 12.38.340,

12.28.365, 15.04.910.080(I)(2),
Ord. 25-10
Renew Encroachment Permit for outdoor service
on public sidewalks (annual fee) 370.00 1.052 389.00 not applicable na not applicable na na
RMC 11.040.040, 12.38.340,

12.28.365, 15.04.910.080(I)(2),
Ord. 25-10
- plus additional fees for in-ground improvements
within the public ROW
(0-100 SF)
500.00 NA 500.00
not applicable na not applicable na na
RMC 11.040.040, 12.38.340,

12.28.365, 15.04.910.080(I)(2),
Ord. 25-10
- plus in-ground improvements for square footage
thereafter (over 100 SF) $2.00/SF NA $2.00/SF
SECTION 2 -TRANSPORTATION PERMITS
Oversized Load (Transportation Permit/Wide-
Load Permit)

16.00 NA 16.00
Annual Permit - Per Vehicle (Transportation
Permit/Wide-Load Permit)

90.00 NA 90.00

SECTION 3 - FINAL MAP & IMPROVEMENT PLAN REVIEW & INSPECTION 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040-39, RMC

15.08.480-5, RMC 6.02.180,
EO 90-039
- Per Major Subdivision Review, 5 or more
parcels, (Deposit)

2.5% of construction cost or $8,000, whichever is
greater

2.5% of bond est.
for imp, $8485
min

1.052 2.5% of bond est. for
imp, $8485 min
Description
not applicable na not applicable
ECI
Factor
na
Municipal Code or
Other Code
Last increase
implemented
ECI Index for
last increase
Index Effective
date for proposed
increase
ECI Index for
proposed
increase
City of Richmond
Description
RMC 2.34.040.8na
Final Subdivision Map and Improvement Plan
Review Fee (Deposit)
Plan review services are provided on an actual
cost basis. Refund of balance will be made after
project acceptance; additional charges may also
apply.

Master Fee Schedule
57 Public Works
Old Fee Factor CURRENT FEE
Infrastructure Maintenance & Operations
Description
ECI
Factor
Municipal Code or
Other Code
Last increase
implemented
ECI Index for
last increase
Index Effective
date for proposed
increase
ECI Index for
proposed
increase
City of Richmond
Description
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040-39, RMC

15.08.480-5, RMC 6.02.180,
EO 90-039
- Per Minor Subdivision Review, 4 or fewer
parcels, (Deposit)

2.5% of construction cost or $6,000, whichever is
greater

2.5% of bond est.
for imp, $6498
min

1.052 2.5% of bond est. for
imp, $6498 min
New lot fee
1-Jul-2018 136.0 1-Jul-2019 139.7 1.027 New lot fee, actual cost of County fee ($50 as of 1 July 2007)

50.00 NA 50.00
Final Subdivision Inspection Fee (Deposit)
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 15.08.420-2e - Per Major Subdivision Review, 5 or more parcels, (Deposit)
3% of construction cost or $7,000, whichever is
greater
3% of bond est.
for imp, $7580
min

1.052 3% of bond est. for
imp, $7580 min
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 15.08.420-2e - Per Minor Subdivision Review, 4 or fewer parcels, (Deposit)
3% of construction cost or $3,000, whichever is
greater
3% of bond est.
for imp, $3249
min

1.052 3% of bond est. for
imp, $3249 min

SECTION 4 - PROJECT ACCEPTANCE
Major Subdivision Map ( 5 or more parcels)
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 15.08.650 Acceptance of improvements and dedications
(Fee)
4,010.00 1.052 4,219.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 Amendment of subdivision agreement 2,340.00 1.052 2,462.00 Minor Subdivision Map (4 or fewer parcels)
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 15.08.650 Acceptance of improvements and dedications
(Fee)
1,503.00 1.052 1,581.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 Amendment of subdivision agreement 836.00 1.052 879.00

SECTION 5 - GRADING PLAN REVIEW
Grading Permit Plan Review
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 (Review and Inspection: RMC

2.34.040-5&6), RMC 12.44.030-
j, Reso. 142-86, UBC Sec. 70,
RMC 6.02.180, EO 90-005, EO
90-006, RMC 12.44.030(j).
0 to 50 CY 458.00 1.052 482.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 (Review and Inspection: RMC

2.34.040-5&6), RMC 12.44.030-
j, Reso. 142-86, UBC Sec. 70,
RMC 6.02.180, EO 90-005, EO
90-006, RMC 12.44.030(j).
51 to 1,000 CY 955.00 1.052 1,005.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 (Review and Inspection: RMC

2.34.040-5&6), RMC 12.44.030-
j, Reso. 142-86, UBC Sec. 70,
RMC 6.02.180, EO 90-005, EO
90-006, RMC 12.44.030(j).
1,001 to 10,000 CY 1,433.00 1.052 1,508.00 Grading permit plan review (flat fee). Includes
stormwater compliance review. Does not include
grading associated with Major and Minor Subdivision
improvements:

Master Fee Schedule
58 Public Works
Old Fee Factor CURRENT FEE
Infrastructure Maintenance & Operations
Description
ECI
Factor
Municipal Code or
Other Code
Last increase
implemented
ECI Index for
last increase
Index Effective
date for proposed
increase
ECI Index for
proposed
increase
City of Richmond
Description
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 (Review and Inspection: RMC

2.34.040-5&6), RMC 12.44.030-
j, Reso. 142-86, UBC Sec. 70,
RMC 6.02.180, EO 90-005, EO
90-006, RMC 12.44.030(j).
10,001 CY and above (Deposit) 2,386.00 1.052 2,510.00 n/a n/a n/a n/a n/a
(Review and Inspection: RMC

2.34.040-5&6), RMC 12.44.030-
j, Reso. 142-86, UBC Sec. 70,
RMC 6.02.180, EO 90-005, EO
90-006, RMC 12.44.030(j).

Additional plan review for complex grading, and
changes, additions or revisions to approved plans cost n/a cost SECTION 6 - OTHER ENGINEERING PERMITS
not applicable na not applicable na na RMC 2.34 Traffic Control Plan Review cost NA cost 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 15.08.235, RMC 2.34 Certificate of Correction Review 836.00 1.052 879.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 City-installed Traffic Controlled Devices (Stop signs, Yield, speed undulations, etc.) 669.00 1.052 704.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 City-installed street light 500.00 1.052 526.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Letter of Map Revision / Amendment 836.00 1.052 879.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Easement Dedication (utility) 1,002.00 1.052 1,054.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.08.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Watercourse Permit Fee, Fixed fee, … 501.00 1.052 527.00 not applicable na not applicable na na
RMC 12.08.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
… plus 5% of construction cost within the public
right of way (Deposit)
5% of
construction cost NA 5% of construction
cost
not applicable na not applicable na na
RMC 2.34 Consultant Services Actual Cost +
10% NA Actual Cost + 10%
SECTION 7 - REVIEW OF PLANNING APPLICATION
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Initial Engineering Review 120.00 1.052 126.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Lot Line Adjustment or Parcel Merge 716.00 1.052 753.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Tentative Parcel Map (0-4 lots) 3,008.00 1.052 3,164.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040-37, RMC

15.08.220-9, RMC 15.08.310-
7, RMC 6.02.180, EO 90-037;
RMC 2.34.040, Ord. 3-04
Certificate of Compliance
836.00 1.052 879.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Tentative Subdivision Map (5 to 25 lots) 2,673.00 1.052 2,812.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Tentative Subdivision Map (26 to 100 lots) 3,341.00 1.052 3,515.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Tentative Subdivision Map (101 to 200 lots) 4,010.00 1.052 4,219.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Tentative Subdivision Map (201+ lots) 5,347.00 1.052 5,625.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Preliminary Plan 716.00 1.052 753.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Development Plan 716.00 1.052 753.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Street Vacation 955.00 1.052 1,005.00 SECTION 8 - HOURLY RATES
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 City Engineer 333.00 1.052 350.00 Fees for Work Performed by City Staff - Includes
work performed in excess of the standard fees
listed or for services not otherwise listed.

Master Fee Schedule
59 Public Works
Old Fee Factor CURRENT FEE
Infrastructure Maintenance & Operations
Description
ECI
Factor
Municipal Code or
Other Code
Last increase
implemented
ECI Index for
last increase
Index Effective
date for proposed
increase
ECI Index for
proposed
increase
City of Richmond
Description
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Capital Projects Manager 300.00 1.052 316.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Senior Civil Engineer 253.00 1.052 266.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Associate Civil Engineer 237.00 1.052 249.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Engineer II 191.00 1.052 201.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Engineer I 167.00 1.052 176.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Engineering Infrastructure Admin 232.00 1.052 244.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Construction Inspector II 191.00 1.052 201.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Construction Inspector I 167.00 1.052 176.00 SECTION 9 - FEES FOR DUPLICATION
not applicable 35.00 NA 35.00
not applicable 60.00 NA 60.00
SECTION 10 - FEES FOR REPORTS
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Report and/or invoice preparation 262.00 1.052 276.00 na RMC 2.34.040.123a, Ord. 21-
03; Reso. 6-04
Fee used to charge for DIMO's time in preparing
the paperwork for reports and/or invoices to
insurance agencies for damage to city property or
other cities that are invoiced for work performed
by the Public Works Department.

Sale of Plans and Specifications for Construction
Jobs--From $35 (hardcopy) - $55.00 (cost for
printing and mailing)
na not applicable na
Master Fee Schedule
60 Engineering
Description Old Fee Factor CURRENT FEE

1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.28.130, RMC

2.34.040.12b, Ord. 21-03;
Reso. 6-04
Encroachment Permit/Digging up and Disturbance of Roadways, etc.-/Maintenance and Construction, Monitoring of Wells Additional expenses for services and field time over alloted time will be charged at cost. If encroachment refund is requested, once verified work was not done, refund will be made to applicant less 20%.
488.00 1.052 488.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.28.130, RMC

2.34.040.12b, Ord. 21-03;
Reso. 6-04
Monitoring/Boring Wells 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.28.130, RMC

2.34.040.12b, Ord. 21-03;
Reso. 6-04
Facility Placement (Pods, debris boxes), up to 10 days. 200.00 1.000 200.00 Concrete Permit - curb, gutter, sidewalk, and driveway
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.36.060, RMC

12.36.170-a, RMC 12.36.170-b,
RMC 2.34.040.40a(1), RMC

2.34.040.40a(2), Ord. 21-03;
Reso. 6-04
Concrete Permit
195.00 1.052 205.00
not applicable na not applicable na na RMC 2.34 Traffic Control Plan Review 240.00 per hour na 240.00 per hour 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Plumbing Permit Fee 178.00 1.052 178.00 not applicable na not applicable na na
RMC 2.34 Document retrieval fee (reproduction costs only - see fees for duplication) cost NA cost
not applicable na not applicable na na
RMC 2.34 Consultant Services Actual Cost +
10% NA Actual Cost + 10%
Violation of Job Completion Without Permit
Work Excavation without permit or violation of job completion without permit will result in a fee of double the toal cost.

Double fee of
total cost of job
NA Double fee of total
cost of job
SECTION 3 - HOURLY RATES
Fees for Work Performed by City Staff - Includes work
performed in excess of the standard fees listed or for
services not otherwise listed.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 City Engineer 333.00 1.052 350.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Capital Projects Manager 300.00 1.052 316.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Senior Civil Engineer 253.00 1.052 266.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Associate Civil Engineer 237.00 1.052 249.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Engineer II 191.00 1.052 201.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Engineer I 167.00 1.052 176.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Engineer Asset Administrator 232.00 1.052 244.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Construction Inspector II 191.00 1.052 201.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Construction Inspector I 167.00 1.052 176.00 SECTION 4 - FEES FOR DUPLICATION
not applicable 35.00 NA 35.00
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Description
ECI Index for
last increase

Sale of Plans and Specifications for Construction Jobs--From $35

UTILITIES
ECI Index for
proposed
increase
ECI
Factor
SECTION 1 - PERMITS
SECTION 2 - OTHER ENGINEERING FEE RELATED TO

PERMITS
Master Fee Schedule
61 Engineering
Description Old Fee Factor CURRENT FEE
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Description
ECI Index for
last increase

UTILITIES
ECI Index for
proposed
increase
ECI
Factor

not applicable 55.00 NA 55.00
not applicable na not applicable na na RMC 2.34.040.123b, Ord. 21- 03, RMC 2.40.110 Photocopying, per page (8-1/2 x 11) 0.10 NA 0.10 not applicable na not applicable na na RMC 2.34.040.123d, Ord. 21- 03; Reso. 6-04 Plan size (24"x36"), per page 9.00 NA 9.00 not applicable na not applicable na na Reso. 6-04; RMC 2.34.040, Ord. 3-04
Plotting - Refer to GIS fees for Custom Maps and Predefined Maps cost NA cost
not applicable na not applicable na na Digital Imaging Fee - Parcel Map, Tract Map or Improvement Plans, plus 25.00 NA 25.00 not applicable na not applicable na na Per sheet to be imaged 2.00 NA 2.00

MISCELLANEOUS FEES
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040.123b, Ord. 21- 03, RMC 2.40.110
Bike plan Check - Per hour 227.00 1.052 239.00 Refunds for Permit Cancellations Fees
not applicable na
p
(hardcopy) - $55.00 (cost for printing and mailing)na RMC 2.34.040.123a, Ord. 21- 03; Reso. 6-04na
Cancelled permits are eligible for an 80% refund, upon approval by the Public Works Director. 20% of the fee is retained to recover the estimated average costs of the City’s administrative and technical efforts required to initiate and facilitate the permitting process.

Plan Check Review fees are non-refundable.

Master Fee Schedule
62 R-Transit
Description Old Fee Factor CURRENT FEE
Not applicable N/A Not applicable N/A N/A
RMC 2.34.040-103; RMC

2.34.040, Ord. 3-04 Special Purpose Group Trip (Includes one driver with one vehicle) -- $100/hour 100.00 N/A 100.00 Not applicable N/A Not applicable N/A N/A RMC 2.34.040-103; RMC

2.34.040, Ord. 3-04 Transit Service -- Book of Coupons = $20 20.00 N/A 20.00 Not applicable N/A Not applicable N/A N/A
RMC 2.34.040-103; RMC

2.34.040, Ord. 3-04 One Way –
Advance Reservation (one to ten days in advance)

4.00 N/A 4.00
Not applicable N/A Not applicable N/A N/A
RMC 2.34.040-103; RMC

2.34.040, Ord. 3-04 One Way –
Same Day Reservation
(Reservation is same day)

5.00 N/A 5.00
Not applicable N/A Not applicable N/A N/A
RMC 2.34.040-103; RMC

2.34.040, Ord. 3-04 One Way Trip –
Late Cancellation (Cancellation one hour before
pick up) or No show (Client is not at pick up
location, is not ready, cancels trip at the door, or
refuses to take trip) Fee. {The fee is the cost of
booked trip}

4.00 to 7.00 N/A 4.00 to 7.00
NOTES
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase

R-TRANSIT SERVICES
(Fees are supplemented by grant funding; therefore, they are not adjusted based on ECI) With the new Measure J funding allocation voted on by WCCTAC, the City of Richmond could be getting more funding. If there is a substantial amount of funding, it would be used to provide later, after hours, and weekend service which has been a request by the community. The proposed farebox fee would prepare Paratransit in the event there is more funding.

Municipal Code or
Other Code
City of Richmond
Description
ECI
Factor
Master Fee Schedule
63 Transportation-Parking
Old Fee Factor CURRENT FEE

TRANSPORTATION - PARKING MANAGEMENT SERVICES
Neighborhood Parking Permits

N/A N/A N/A N/A N/A
RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Neighborhood Parking Permit -Residential Annual #N/A N/A $20 (2 vehicle limit)

N/A N/A N/A N/A N/A
RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Neighborhood Parking Permit -Residential Visitor Hang tag -Annual #N/A N/A 10.00

N/A N/A N/A N/A N/A
RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Neighborhood Parking Permit- Residential Replacement #N/A N/A 15.00

N/A N/A N/A N/A N/A
RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Neighborhood Parking Permit -Merchant Annual #N/A N/A 70.00

N/A N/A N/A N/A N/A
RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Neighborhood Parking Permit - Merchant Part Time Employee -Quarterly #N/A N/A 17.00

N/A N/A N/A N/A N/A
RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Neighborhood Parking Permit- Merchant Visitor Pass booklet (set of 10) #N/A N/A 10.00 Electric Vehicle Charging

N/A N/A N/A N/A N/A
RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Electric Vehicle Charging Station- Rapid Charger $7/hr-$1/min. N/A $7/hr-$1/min.

N/A N/A N/A N/A N/A
RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Electric Vehicle Charging Station- Slow Charger $1 /hr 1-4 hrs then $5/Hr.
$1 /hr 1-4 hrs then
$5/Hr.

Parking Lots
N/A N/A N/A N/A N/A RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Metered Parking Rates (paid stalls) $1/hr N/A $1/hr

N/A N/A N/A N/A N/A
RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Metered Parking Rates (paid stalls)- Special Event
Daily rate for ea.
stall removed from
service
N/A Daily rate for ea. stall
removed from service

N/A N/A N/A N/A N/A
RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Marina Way Lot $1/hr, $3/Day,
$45/Mthly 1.333 $1/hr, $4/Day,
$45/Mthly

N/A N/A N/A N/A N/A
RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Other Surface Lots, and 12th Street Garage $1/hr, $4/day,$45/Mthly N/A $1/hr,
$4/day,$45/Mthly
Parklets
N/A N/A N/A N/A N/A RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Parklet Permits (per space) -special event 78.00 N/A 78.00

N/A N/A N/A N/A N/A
RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Parklet or Bike Corral Permit - 1 Year and renewals 112.00 N/A 112.00 Lot Leases
N/A N/A N/A N/A N/A RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Metered Surface Lot Lease Daily rate N/A Daily rate

N/A N/A N/A N/A N/A
RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Other Surface Lot Lease Based on lease terms N/A Based on lease terms
Parking Rental Fees

N/A N/A N/A N/A N/A
RMC 2.34.040, Ord. 09-11
RMC 14.46 and 14.56 Parking Rental Fees Based on lease terms N/A Based on lease terms
City of Richmond
Master Fee Schedule
Description
Last increase
implemented
ECI Index for
last increase
Index Effective
date for
proposed
increase
ECI Index for
proposed
increase
ECI
Factor
Municipal Code or
Other Code
Master Fee Schedule
64 Stormwater
Old Fee Factor CURRENT FEE

STORMWATER
Within West County Wastewater District or Stege
Sanitary District not less than $32 per SSU. 32.00 na 32.00 Within the Richmond Municipal Sewer District No.
1, commercial and industrial, $3.32 per IWU
(based on annual water usage), but not less than
$32 per SSU.

Commercial Stormwater Annual Permit Fee
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.20.050; RMC

2.34.040, Ord. 3-04,
Ord. 07-10 NS
Commercial Stormwater Annual Permit Fee 702.00 1.052 739.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.20.050; RMC

2.34.040, Ord. 3-04,
Ord. 07-10 NS
Industrial Stormwater Annual Permit Fee 1,275.00 1.052 1,341.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.20.050b; RMC

2.34.040, Ord. 3-04
Ord. 07-10 NS
Follow Up Inspection 574.00 1.052 604.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.20.050b; RMC

2.34.040, Ord. 3-04
Ord. 07-10 NS
One time discharge inspection 574.00 1.052 604.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.20.050(b.3), Reso. 6-
04; RMC 2.34.040, Ord. 3-04
Ord. 07-10 NS
Monitoring, sampling or testing fee
716.00 1.052 753.00
not applicable na not applicable na na
RMC 12.20.050(b.4), Reso. 6-
04; RMC 2.34.040,
Ord. 3-04, Ord. 07-10 NS
Laboratory analysis cost and rental equipment
charges, cost plus 10%, as needed cost + 10% na cost + 10% 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.44.030-kIB, Reso. 142-
86, RMC 6.02.180; RMC

2.34.040, Ord. 3-04
C.3 Stormwater Control Plan Review (SWCP) 7,487.00 1.052 7,876.00 Stormwater Collection System Service Fee, Stormwater Collection System Collection Fee (See Building Regulations, this fee is collected by Building Regulations) Stormwater Management Program Charge, for commercial and industrial, annual Municipal Code or
Other Code
Site Inspection Fee
Industrial Stormwater Annual Permit Fee
Last increase
implemented
Index Effective
date for
proposed
increase
Master Fee Schedule
ECI Index for
last increase
not applicable
ECI
Factor
na RMC 12.20.050; RMC

2.34.040, Ord. 3-04
City of Richmond
na
C.3 Fees for projects which create or replace more
than 10,000 square feet of impervious surface or
5,000 square feet for auto service, retail gas
stations, restaurants, uncovered parkinglots, (fee
is not applicable when a Subdivision plan check
fee is collected covering these fees as applicable)
na not applicable
Description
ECI Index for
proposed
increase
Master Fee Schedule
65 Stormwater
Old Fee Factor CURRENT FEE

STORMWATER
Stormwater Collection System Service Fee, Stormwater Collection System Collection Fee (See Building Regulations, this fee is collected by Building Regulations)

Municipal Code or
Other Code
Last increase
implemented
Index Effective
date for
proposed
increase
Master Fee Schedule
ECI Index for
last increase
ECI
Factor
City of Richmond
Description
ECI Index for
proposed
increase
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.44.030-kIB, Reso. 142-
86, RMC 6.02.180; RMC

2.34.040, Ord. 3-04
Low impact development annual inspections (bio-
swales infiltration planters)
Low impact development installation/construction
inspection fee (for every 5 bio-swales, inflow
planters, tree wells or other devices)
574.00 1.052 604.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.44.030-kIB, Reso. 142-
86, RMC 6.02.180; RMC

2.34.040, Ord. 3-04
C.6 SWPPP Monthly Inspection & Compliance
(Monthly fee to be multiplied by # months
planned duration of construction)
402.00 1.052 423.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.44.030-kIB, Reso. 142-
86, RMC 6.02.180; RMC

2.34.040, Ord. 3-04
Monthly Inspection ( monthly fee to be multiplied
by # months planned duration of construction) 286.00 1.052 301.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.44.030-kIB, Reso. 142-
86, RMC 6.02.180; RMC

2.34.040, Ord. 3-04
Plan review fee (1 hour) 191.00 1.052 201.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.17.070 Stormwater Encroachment Permit 492.00 1.052 518.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.08.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Watercourse Permit Fee, Fixed fee, … 501.00 1.052 527.00

HOURLY RATES
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10

DEPARTMENT DIRECTOR
370.00 1.052 389.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10

ENVIRONMENTAL SERVICES MANAGER
313.00 1.052 329.00
Fees for Work Performed by City Staff - Includes work
performed in excess of the standard fees listed or for
services not otherwise listed.

STORMWATER PERMIT FEES
Stormwater Plan Review for projects not required
to submit a SWCP
C.6 Construction sites less than 1 acre or
determined not to be a significant threat to water
quality
C.6 Construction sites greater than 1 acre or
determined to be a significant threat to water
quality
Master Fee Schedule
66 Stormwater
Old Fee Factor CURRENT FEE

STORMWATER
Stormwater Collection System Service Fee, Stormwater Collection System Collection Fee (See Building Regulations, this fee is collected by Building Regulations)

Municipal Code or
Other Code
Last increase
implemented
Index Effective
date for
proposed
increase
Master Fee Schedule
ECI Index for
last increase
ECI
Factor
City of Richmond
Description
ECI Index for
proposed
increase
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10

PROJECT COORDINATOR
252.00 1.052 265.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10

ADMINISTRATIVE SERVICES ANALYST
199.00 1.052 209.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10

ADMINISTRATIVE AIDE
154.00 1.052 162.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
SR ENV. COMP. INSP
257.00 1.052 270.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
ENV. COMP. INSP.
214.00 1.052 225.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10

ENGINEER ASSET ADMIN
264.00 1.052 278.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10

WASTEWATER CONTRACT/CONSULTANT
193.00 1.052 203.00
Master Fee Schedule
67 Wastewater
Old Fee Factor CURRENT FEE

WASTEWATER
not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10 - FY 11-12, per SSU 574.00 NA 574.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10 - FY 12-13, per SSU 603.00 NA 603.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10 - FY 13-14, per SSU 633.00 NA 633.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10
- FY 15-16, per SSU 676.00 NA 676.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10 - FY 16-17, per SSU 722.00 NA 722.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10
- FY 17-18, per SSU 771.00 NA 771.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10
- FY 18-19, per SSU 824.00 NA 824.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10 - FY 19-20, per SSU 880.00 NA 880.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10 - FY 11-12, per SSU 461.00 NA 461.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10
- FY 12-13, per SSU 484.00 NA 484.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10
- FY 13-14, per SSU 509.00 NA 509.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10 - FY 15-16, per SSU 544.00 NA 544.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10
- FY 16-17, per SSU 581.00 NA 581.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10
- FY 17-18, per SSU 620.00 NA 620.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10 - FY 18-19, per SSU 662.00 NA 662.00 not applicable na not applicable na na RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10
- FY 19-20, per SSU 707.00 NA 707.00 not applicable na not applicable na na
RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10, ORD. 50-
15 - FY 11-12 $41.65 per IWU, $0.885 per lbs BOD
and $0.408 per lbs TSS, but not less than $344,
based on water usage
344.00 NA 344.00
not applicable na not applicable na na
RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10, ORD. 50-
15 - FY 12-13 $43.73 per IWU, $0.929 per lbs BOD
and $0.429 per lbs TSS, but not less than $361,
based on water usage
361.00 NA 361.00
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
Sewer Service Fees, Richmond Municipal Sewer District, Sanitary Sewer Connection Fee (See Building Regulations, this fee is collected by Building Regulations) Sanitary System Sewer Charges
Richmond Municipal Sewer District No. 1, single unit residential, annual Richmond Municipal Sewer District No. 1,
commercial and industrial, annual
Richmond Municipal Sewer District No. 1, multi-unit
residential, annual
Master Fee Schedule
68 Wastewater
Old Fee Factor CURRENT FEE

WASTEWATER
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
Sewer Service Fees, Richmond Municipal Sewer District, Sanitary Sewer Connection Fee (See Building Regulations, this fee is collected by Building Regulations) not applicable na not applicable na na
RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10, ORD. 50-
15 - FY 13-14 $45.92 per IWU, $0.975 per lbs BOD
and $0.450 per lbs TSS, but not less than $379
based on water usage
379.00 NA 379.00
not applicable na not applicable na na
RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10, ORD. 50-
15 - FY 15-16 $49.04 per IWU, $1.04 per lbs BOD
and $0.480 per lbs TSS, but not less than
$404.77 based on water usage
405.00 NA 405.00
not applicable na not applicable na na
RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10, ORD. 50-
15 - FY 16-17 $52.38 per IWU, $1.11 per lbs BOD
and $0.51 per lbs TSS, but not less than $432
based on water usage
432.00 NA 432.00
not applicable na not applicable na na
RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10, ORD. 50-
15 - FY 17-18 $55.94 per IWU, $1.19 per lbs BOD
and $0.550 per lbs TSS, but not less than $462
based on water usage
462.00 NA 462.00
not applicable na not applicable na na
RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10, ORD. 50-
15 - FY 18-19 $59.74 per IWU, $1.27 per lbs BOD
and $0.590 per lbs TSS, but not less than $493
based on water usage
493.00 NA 493.00
not applicable na not applicable na na
RMC 12.20.050(d); RMC

2.34.040, Ord. 22-10, ORD. 50-
15 - FY 19-20 $63.81 per IWU, $1.350 per lbs BOD
and $0.630 per lbs TSS, but not less than $527
based on water usage
527.00 NA 527.00
Wastewater Discharge Permitting Program
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
Annual Permit fee, Class I A (Categorical
Industrial Users as defined in 40 CFR Chapter I
Subchapter N) discharging more than 25,000
gallons of wastewater per day
3,609.00 1.052 3,797.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
Annual Permit fee, Class I B (Categorical
Industrial Users as defined in 40 CFR Chapter I
Subchapter N) discharging less than 25,000
gallons of wastewater per day
3,168.00 1.052 3,333.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
Annual Permit fee, Class II A (Significant
Industrial User as defined in 40 CFR 403.3(t) -
discharging more than 25,000 gallons of
wastewater per day)
3,123.00 1.052 3,285.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
Annual Permit fee, Class II B (Significant
Industrial User as defined in 40 CFR 403.3(t) -
discharging less than 25,000 gallons of
wastewater per day)
2,896.00 1.052 3,047.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
Annual Permit fee, Class III (Industrial User as
determined by the Control Authority) 1,258.00 1.052 1,323.00 Master Fee Schedule
69 Wastewater
Old Fee Factor CURRENT FEE

WASTEWATER
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
Sewer Service Fees, Richmond Municipal Sewer District, Sanitary Sewer Connection Fee (See Building Regulations, this fee is collected by Building Regulations) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
Annual Permit fee, Class IV (Commercial Facility
as determined by the Control Authority) 770.00 1.052 810.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
Annual Permit fee, Class VI (one-time discharger,
discharging less than 60,000 gallons) 906.00 1.052 953.00 not applicable na na na na
RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
Baseline Monitoring Report Review for New
Categorical Dischargers as defined in 40 CFR
Chapter I, Subchapter N) charged at cost plus
overhead
cost NA cost
Wastewater Inspection Program
not applicable na na na na
RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
Additional Site Inspection fee charged at cost
plus overhead cost NA cost
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
Violation Site Visit Inspection Charge, per site
265.00 1.052 279.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 RMC

12.20.050(b.2), Reso. 6-04;
Ord 8-06, Ord. 22-10
Violation Site Visit Inspection Charge, per site,
when site includes monitoring, sampling or testing 858.00 1.052 903.00 not applicable na not applicable na na
RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 RMC

12.20.050(b.2), Reso. 6-04;
Ord 8-06, Ord. 22-10
Violation Laboratory Charges, cost plus 10%, as
needed cost + 10% NA cost + 10%
Fats Oils and Grease Program Fees
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(H.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
Annual Permit fee, Class V (Commercial Facility
classified as a Fats, Oils and Grease "FOG" as
determined by the Control Authority)
291.00 1.052 306.00
not applicable na not applicable na na
RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(H.3) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
Additional Site Inspection fee charged at cost
plus overhead cost NA cost
not applicable na not applicable na na
RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
Food Handling Facilities with Grinders and no
treatment system - 10% surcharge will be added
to the annual sewer service fees
fee + 10% NA fee + 10%
not applicable na not applicable na na
RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 (M.1) with
RMC 12.18.100.13, Reso. 6-
04; Ord 8-06, Ord. 22-10, Ord.
09-18
First Violation
250.00 NA 250.00
Master Fee Schedule
70 Wastewater
Old Fee Factor CURRENT FEE

WASTEWATER
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
Sewer Service Fees, Richmond Municipal Sewer District, Sanitary Sewer Connection Fee (See Building Regulations, this fee is collected by Building Regulations) not applicable na not applicable na na
RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 (M.1) with
RMC 12.18.100.13, Reso. 6-
04; Ord 8-06, Ord. 22-10, Ord.
09-18
Second Violation
500.00 NA 500.00
not applicable na not applicable na na
RMC 2.34.040 RMC 6.02.180
RMC 12.18.140 (M.1) with
RMC 12.18.100.13, Reso. 6-
04; Ord 8-06, Ord. 22-10, Ord.
09-18
Third Violation
1,000.00 NA 1,000.00
Wastewater Plan Review Fee
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 R.M.C. 12.18.140 1N Sewer connection plan review fee (<1 hour) 191.00 1.052 201.00 not applicable na not applicable na na
R.M.C. 12.18.140 1N Additional Staff time for Plan Review charged at cost plus overhead cost NA cost
Wastewater Treatment System Plan Review Fee,
position times hours
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 R.M.C. 12.18.140 1N Expedited Plan Review Fee - Min 2hrs 1,109.00 1.052 1,167.00 Certificate of Lateral Compliance
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.17.070 Issuance of Certificate of Lateral Compliance after sewer line repairs are complete and
inspected
175.00 1.052 184.00

WASTEWATER PERMIT FEES
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.17.070 Wastewater Encroachment Permit 501.00 1.052 527.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.17.070 Sewer Connection Fee (RMC §12.20) 2,870.00 1.052 3,019.00 Miscellaneous
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Pre & post sewer lateral video review 103.00 1.052 108.00

HOURLY RATES
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10

DEPARTMENT DIRECTOR
370.00 1.052 389.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10

ENVIRONMENTAL SERVICES MANAGER
313.00 1.052 329.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10

PROJECT COORDINATOR
252.00 1.052 265.00
Fees for Work Performed by City Staff - Includes work
performed in excess of the standard fees listed or for
services not otherwise listed.

Master Fee Schedule
71 Wastewater
Old Fee Factor CURRENT FEE

WASTEWATER
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
Description
ECI Index for
last increase
ECI Index for
proposed
increase
ECI
Factor
Sewer Service Fees, Richmond Municipal Sewer District, Sanitary Sewer Connection Fee (See Building Regulations, this fee is collected by Building Regulations) 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10

ADMINISTRATIVE SERVICES ANALYST
199.00 1.052 209.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10

ADMINISTRATIVE AIDE
154.00 1.052 162.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
SR ENV. COMP. INSP
257.00 1.052 270.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10
ENV. COMP. INSP.
214.00 1.052 225.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10

ENGINEER ASSET ADMIN
264.00 1.052 278.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040 RMC 6.02.180
RMC 12.18.140(M.1) RMC

12.20.050(b.1), Reso. 6-04;
Ord 8-06, Ord. 22-10

WASTEWATER CONTRACT/CONSULTANT
193.00 1.052 203.00
Master Fee Schedule
72 ECI
from: http://www.bls.gov/data/
Series Id: CIU3010000000000I
Not seasonally adjusted
Series Title:

Ownership: State and local government workers
Component: Total compensation
Occupation: All workers
Industry: All workers
Subcategory: All workers
Area: United States (National)
Periodicity: Index number

NOT SEASONALLY ADJUSTED
Year Qtr1 Qtr2 Qtr3 Qtr4
2005 96.9 97.2 99.1 100.0
2006 100.5 100.9 103.2 104.1
2007 105.1 105.7 107.6 108.4
2008 108.9 109.4 111.3 111.6
2009 113.2 112.8 113.9 114.2
2010 114.5 114.7 115.9 116.2
2011 117.2 117.1 117.2 117.7
2012 118.3 118.6 119.7 119.9
2013 120.5 120.7 121.7 122.2
2014 122.8 123.1 124.2 124.7
2015 125.4 125.7 126.8 127.8
2016 128.5 128.8 129.9 130.9
2017 131.6 131.9 133.0 134.2
2018 134.6 134.9 136.0 137.7
2019 138.3 138.6 139.7 141.7
2020 142.2 142.5 143.6 144.9
2020 145.4 145.8 146.9
Difference 3.3
% Change 2.3%
Appendix A: Employment Cost Index
Total compensation for State and local
government workers in All industries
and occupations, Index
User Fees Updated in
2020
Master Fee Schedule
73 Cable
# Description
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Telecommunications Registration & Review Fee 90.00 NA NA $90.00 $0 2 Videodisks -- charged at cost for time and materials. Average approximate cost begins at $25 for one tape, $40 for two tapes (same footage) (materials and man hours)
Actual Cost NA NA Actual Cost $0
Master Fee Schedule
74 Finance
# Description
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Charges for Bad Checks/Returned Check Processing $35.00 NA NA $35.00 $0 2 Mitigation Administrative Fee -- 3% of the total project mitigation fees (collected by Building Regulations; administered by Finance) 2% NA NA 2% $0 3 Form W-2 Replacement Fee $5.00 $28.14 64% $10.00 $5
4 2% Processing fee for all refunds originally paid with credit card but refund paid via check
2% NA NA 2% $0
5 2% Processing fee for all credit card payments 2% NA NA 2% $0 6 New Business Registration 25% NA NA 25% $0
Master Fee Schedule
75 Community Services
# Description Current Fee/Charge Unit Notes Fee Type
City Dept/Gov't
Discount
Richmond Non-
Profit
1 Cancellation more than 30 days prior to event, all fees and deposit will be refunded less the administrative costs associated with the reservation and event planning. 100% 50% 25% 2 Cancellation 30 days or less prior to event, no refund of deposit $0.00 3 Richmond Convention Center
4 5 Set up and Break down Fee (Only applies to Aud-Complex, Aud-Main Floor and Bermuda plus Catalina rentals), hourly $205.00 City Discretion N/A N/A
6 Deposit--$3000 minimum (may be higher) $3,081.00 Deposit N/A N/A 7 Deposit--Concerts $5000 minimum (may be higher) Fees to be determined $5,135.00 Deposit N/A N/A 8 Friday – Sunday, hourly $1,061.00 City Discretion $530.50 $795.75 9 Monday – Thursday, hourly $848.00 City Discretion $424.00 $636.00 10 Rental: Memorial Auditorium Main Floor
11 Deposit--$3000 minimum (may be higher) $3,081.00 Deposit N/A N/A 12 Friday – Sunday, hourly (Whole Main Floor) $642.00 City Discretion $321.00 $481.50 13 Monday – Thursday, hourly (Whole Main Floor) $514.00 City Discretion $257.00 $385.50 14 Bingo, 8-hour max., daily $2,054.00 City Discretion
15 Rental: Bermuda/Catalina
16 Deposit--$500 minimum (may be higher) $514.00 Deposit N/A N/A 17 Friday – Sunday, hourly $313.00 City Discretion $156.50 $234.75 18 Monday – Thursday, hourly $251.00 City Discretion $125.50 $188.25 19 Rental: Terrace Rooms (C/D/E/F/G/H)
20 Deposit--$250 minimum (may be higher) $257.00 Deposit N/A N/A 21 First Room Monday - Thursday Hourly $124.00 City Discretion $62.00 $93.00 22 Additional Terrace Room Monday - Thursday, hourly $52.00 City Discretion $26.00 $39.00 23 First Room Friday - Sunday Hourly $155.00 City Discretion $77.50 $116.25 24 Additional Terrace Room Friday - Sunday, hourly $66.00 City Discretion $33.00 $49.50 25 Rental: Convention Center Lobby
26 Deposit--$500 minimum (may be higher) $514.00 Deposit N/A N/A 27 Monday – Thursday, hourly $251.00 City Discretion $125.50 $188.25 28 Friday – Sunday, hourly $313.00 City Discretion $156.50 $234.75 29 Rental: Convention Center Kitchen and Dressing Rooms, Ticket Booth 30 Shared use Monday - Thursday, daily (with event booking) $106.00 City Discretion N/A N/A 31 Shared use Friday - Sunday, daily (with event booking) $132.00 City Discretion N/A N/A 32 Sole use Monday - Thursday, daily (with event booking) $165.00 City Discretion N/A N/A 33 Sole use Friday - Sunday, daily (with event booking) $206.00 City Discretion N/A N/A 34 Sole use Monday - Thursday, flat fee, 6 hours max. (without event booking) $514.00 City Discretion N/A N/A 35 Sole use Friday - Sunday, flat fee, 6 hours max. (without event booking) $642.00 City Discretion N/A N/A Rental fees includes 2 contracted attendants & janitorial supplies. Minimum of four (4) hours rental.

Rental fees includes 1 contracted attendant & janitorial supplies. Minimum of three (3) hours rental.

Rental fees includes 2 contracted attendants & janitorial supplies. Minimum of four (4) hours rental.

Rental: Convention Center Complex: Includes the Main Floor, Lobby , Bermuda Room and Terrace Rooms (C/D/E/F/G/H). Excludes the Kitchen and Dressing Rooms which may be rented separately.

Rental fees includes 3 contracted attendants & janitorial supplies. Additional attendants fee maybe charged as needed per Convention Center Staff's assessment. Minimum of four (4) hours rental.

Master Fee Schedule
76 Community Services
# Description Current Fee/Charge Unit Notes Fee Type
City Dept/Gov't
Discount
Richmond Non-
Profit
36 Deposit for sole use, without event booking $514.00 City Discretion N/A N/A 37 Dressing Room-Band/Chorus Room Monday to Thursday, daily (w/event booking) $65.00 City Discretion N/A N/A 38 Dressing Room--Band/Chorus Room Friday to Sunday, daily (w/event booking) $81.00 City Discretion N/A N/A 39 Individual Dressing Room, upstairs, Monday to Thursday, daily (w/event booking) $34.00 City Discretion N/A N/A 40 Individual Dressing Room, upstairs, Friday to Sunday, daily (w/event booking) $42.00 City Discretion N/A N/A 41 Ticket Booth, Monday to Thursday, daily $52.00 City Discretion N/A N/A 42 Ticket Booth, Friday to Sunday, daily $66.00 City Discretion N/A N/A 43 Community Center Rooms
44 45 Deposit--$500 minimum (may be higher) $514.00 Deposit N/A N/A 46 Social Hall - hourly (RRC) $158.00 City Discretion $79.00 $118.50 47 Deposit--$500 minimum (may be higher) $514.00 Deposit N/A N/A 48 Social Hall - hourly (NEVIN) $139.00 City Discretion $69.50 $104.25 49 Deposit--$500 minimum (may be higher) $514.00 Deposit N/A N/A 50 Social Hall - hourly (PARCHESTER, SHIELDS REID) $119.00 City Discretion $59.50 $89.25 51 52 Deposit--$250 minimum (may be higher) $257.00 Deposit N/A N/A 53 Multi Purpose Room - hourly (BTA, NEVIN, SRCC & PT. RICHMOND) $104.00 City Discretion $52.00 $78.00 54 55 Deposit--$250 minimum (may be higher) $257.00 Deposit N/A N/A 56 Conference Room - hourly (NCC,BTA,PCC,PRCC,SRCC) $83.00 City Discretion $41.50 $62.25 57 Field Permits
58 Non League Deposit--$100 minimum (may be higher) $103.00 Deposit N/A N/A 59 League Deposit--$300 minimum (may be higher) $308.00 City Discretion N/A N/A 60 Youth Sports, hourly $28.00 City Discretion N/A N/A
61 Adult Sports, hourly (Excluding Adult Baseball) $41.00 City Discretion N/A N/A 62 Adult Baseball, hourly $73.00 City Discretion N/A N/A 63 Tennis Courts
64 Deposit--$100 minimum (may be higher) $103.00 Deposit N/A N/A 65 Tennis Courts, hourly $16.00 City Discretion N/A N/A 66 MLK Artificial Turf Field
67 Non League Deposit--$100 minimum (may be higher) $103.00 Deposit N/A N/A 68 League Deposit--$300 minimum (may be higher) $308.00 City Discretion N/A N/A 69 Youth Sports, hourly $41.00 City Discretion N/A N/A
70 Adult Sports, hourly $51.00 City Discretion N/A N/A
71 Track - Youth, hourly $31.00 City Discretion N/A N/A 72 Track - Adult, hourly $41.00 City Discretion N/A N/A 73 Gymnasiums
74 Deposit--$250 minimum (may be higher) $257.00 Deposit N/A N/A Rental fees includes 1 contracted attendants & janitorial supplies.

Rental fees includes 1 trash can and maintenance fee.

Rental fees includes 1 trash can and maintenance fee.

Social Hall for 75 to 190 attendees. Rental fees includes 1 contracted attendant & janitorial supplies, available chairs and tables. Minimum of two (2) hours rental.

Multi Purpose Room- Maximum 50 attendees. Rental fees includes 1 contracted attendant & janitorial supplies, available chairs and tables. Minimum of two (2) hours rental.

Conference Room for 20 to 30 attendees. Rental fees includes 1 contracted attendant & janitorial supplies, available chairs and tables. Minimum of two (2) hours rental.

Master Fee Schedule
77 Community Services
# Description Current Fee/Charge Unit Notes Fee Type
City Dept/Gov't
Discount
Richmond Non-
Profit
75 Gymnasium, hourly (BTA, RRC & Sports Events) $152.00 City Discretion $76.00 $114.00 76 Deposit--$500 minimum (may be higher) $514.00 City Discretion N/A N/A 77 Gymnasium, as Social Hall, hourly (BTA, RRC & Social Events) $259.00 City Discretion $129.50 $194.25 78 Park Reservations
79 Deposit--$100 minimum (may be higher) $103.00 Deposit N/A N/A 80 Groups of 50 or less participants, for general use, hourly (Includes 2 Trash Cans) $31.00 City Discretion $15.50 N/A 81 Deposit--$150 minimum (may be higher) $154.00 Deposit N/A N/A 82 Groups of 51 to 100 participants, for general or fundraiser/commercial use, hourly (Includes 4 Trash Cans) $63.00 City Discretion $31.50 N/A
83 Deposit--$150 minimum (may be higher) $154.00 Deposit N/A N/A 84 Groups of 101 to 199 participants, for general or fundraiser/commercial use, hourly (Includes 8 Trash Cans) $83.00 City Discretion $41.50 N/A
85 Deposit--$150 minimum (may be higher) $154.00 Deposit N/A N/A 86 Groups of 200+ participants, for festivals and/or major celebrations, hourly (Includes 12 Trash Cans) $124.00 City Discretion $62.00 N/A 87 Civic Center Plaza
88 Deposit--$1000 minimum (may be higher) $1,027.00 Deposit N/A N/A 89 Rental fee, hourly $205.00 City Discretion $102.50 N/A 90 Picnic Areas
91 Deposit--$100 for 50 and under, minimum (may be higher) $103.00 Deposit N/A N/A 92 Deposit--$150 for 51 and over, minimum (may be higher) $154.00 Deposit N/A N/A 93 Nicholl, Country Club Vista, Barbara & Jay Vincent - Picnic Area, hourly ( three (3) hours minimum rental), Includes 2 Trash Cans $39.00 City Discretion $19.50 N/A 94 Marina Bay Park, Shimada Park - Picnic Table, per day. Park standard fees will apply $27.00 City Discretion $13.50 N/A 95 Aquatic Fees - Commercial use by special arrangement 96 Deposit--$250 minimum (may be higher) $257.00 Deposit N/A N/A 97 Pool Rental , Monday to Thursday, hourly $154.00 City Discretion $77.00 $115.50 98 Pool Rental , Friday to Sunday, hourly $193.00 City Discretion $96.50 $144.75 99 Pool Lane Rental, Monday to Thursday, hourly $47.00 City Discretion $23.50 $35.25 100 Pool Lane Rental, Friday to Sunday, hourly $60.00 City Discretion $30.00 $45.00 101 RSC Outdoor Picnic Area Only (No Pool), Monday to Thursday, rental only during Recreation Swim Session, maximum of 50 guests, seating for 36 at picnic tables. $92.00 City Discretion N/A N/A 102 RSC Outdoor Picnic Area Only (No Pool), Friday to Sunday, rental only during Recreation Swim Session, maximum of 50 guests, seating for 36 at picnic tables. $116.00 City Discretion N/A N/A Standard Fees Reservation of Nicholl, Country Club
Vista, Marina Bay, Barbara & Jay Vincent, and Shimada is limited to the picnic areas, except by special
arrangement. Permission is required for amplified
sound at all parks. All rental reservation requires a
General Liability Insurance Coverage. Special Event
Permit application must be completed.

The hourly rental fee includes pool lifeguards for up to 25 guests but additional lifeguards maybe required due
to risk involved as determined by the pool coordinator.

Parties larger than 25 guests will be charged additional fees to cover the cost of additional lifeguards.

Master Fee Schedule
78 Community Services
# Description Current Fee/Charge Unit Notes Fee Type
City Dept/Gov't
Discount
Richmond Non-
Profit
103 RSC Outside Pool plus Picnic Area, Monday to Thursday, hourly -two (2) hours minimum rental $154.00 City Discretion N/A N/A 104 RSC Outside Pool plus Picnic Area, Friday to Sunday, hourly -two (2) hours minimum rental $193.00 City Discretion N/A N/A 105 Rental Extra Fees, All fees are each/ per day unless stated otherwise 106 Alcohol Sales Permit $132.00 Suggested N/A N/A
107 Alcohol Service Only $67.00 Suggested N/A N/A
108 Chairs $1.00 City Discretion N/A N/A
109 Convention Center Major Events Cleaning Fee, Per Rental $514.00 City Discretion N/A N/A 110 Contracted Attendant Fee ( Per Hour) $31.00 Suggested N/A N/A 111 Convention Center Holiday Decoration Per Rental $205.00 City Discretion N/A N/A 112 Field Drag & line, Per Request $103.00 City Discretion N/A N/A 113 Field Light (Per Hour) $21.00 City Discretion N/A N/A 114 Field Maintenance Fee - Long Range, Per Rental (10-12 months rentals) $205.00 City Discretion N/A N/A 115 Field Maintenance Fee, Per Use (Monthly Rentals) $21.00 City Discretion N/A N/A 116 Field Soccer Goal Equipment Setup, Per Request $62.00 City Discretion N/A N/A 117 Jumper Permit $41.00 City Discretion N/A N/A
118 Kitchen use-Community Center $51.00 City Discretion N/A N/A 119 Kitchen use-Senior Center $106.00 City Discretion N/A N/A 120 Lifeguard, Per Hour $31.00 Suggested N/A N/A
121 Microphone - Cordless $59.00 City Discretion N/A N/A 122 Piano - Baby Grand $65.00 City Discretion N/A N/A
123 Piano - Grand $126.00 City Discretion N/A N/A
124 Podium with sound $99.00 City Discretion N/A N/A
125 Podium without sound $36.00 City Discretion N/A N/A 126 Projector $51.00 City Discretion N/A N/A
127 Projector Screen $31.00 City Discretion N/A N/A
128 Riser $21.00 City Discretion N/A N/A
129 Scoreboard Equipment $15.00 City Discretion N/A N/A 130 Sound Permit $27.00 City Discretion N/A N/A
131 Tables- Rectangle/ Round $4.00 City Discretion N/A N/A 132 Trash Can $10.00 City Discretion N/A N/A
133 Wet Bar-Fixed $103.00 City Discretion N/A N/A
134 Wet Bar-Portable $51.00 City Discretion N/A N/A
135 Administrative Fees
136 Application Fee - Rentals $31.00 City Discretion N/A N/A 137 Application Short Notice Fee (Application fee must be received 30 days prior to event) $26.00 City Discretion N/A N/A 138 Gross Concessions-Alcohol (Per Assessed Number of Attendee) $1.00 City Discretion N/A N/A 139 Gross Concessions-all sales excluding alcohol (Per Assessed Number of Attendee) $1.00 City Discretion N/A N/A 140 Gross Ticket Sale (Per Assessed Number of Attendee) $1.00 City Discretion N/A N/A 141 Marquee weekly rental $51.00 City Discretion N/A N/A 142 Rental Amendment Fee (any changes on approved contract) $26.00 City Discretion N/A N/A 143 Rental Event Date Change Fee $31.00 City Discretion N/A N/A 144 Film Permits
145 Still Photography, daily $51.00 City Discretion N/A N/A 146 Music Videos, Industrial, Web Content, daily $103.00 City Discretion N/A N/A 147 Commercial, Corporate, Short Films, Featur, Television, daily $154.00 City Discretion N/A N/A 148 BOOTHS AND FESTIVALS, EACH/PER DAY
149 Non-profit information/crafts $56.00 City Discretion N/A N/A Fees are waived for Student Project but requires an
applicable school letter confirming project. If filming at the City of Richmond facilities, rental fees will apply in addition to film permit fees.

Master Fee Schedule
79 Community Services
# Description Current Fee/Charge Unit Notes Fee Type
City Dept/Gov't
Discount
Richmond Non-
Profit
150 Non-profit food vendor (includes permit) $243.00 City Discretion N/A N/A 151 Commercial food vendor (includes permit) $359.00 City Discretion N/A N/A 152 Commercial merchandise $113.00 City Discretion N/A N/A 153 SPECIAL EVENT PERMIT FEES, All fees are per rental unless stated otherwise 154 Application Fee $31.00 City Discretion N/A N/A
155 Application Short Notice Fee (Application fee must be received 30 days prior to event) $26.00 City Discretion N/A N/A 156 Alcohol Sales Permit $132.00 Suggested N/A N/A
157 Alcohol Service Only $67.00 Suggested N/A N/A
158 Barricades - A Frame $2.00 material cost N/A N/A
159 Barricades - Cone $1.00 material cost N/A N/A
160 Barricades - Crowd Control $10.00 material cost N/A N/A 161 Barricades - Directional Signs $1.00 material cost N/A N/A 162 Barricades - No Parking Signs $1.00 material cost N/A N/A 163 Barricades - Delivery Fees $51.00 Suggested N/A N/A 164 Jumper Permit $41.00 Suggested N/A N/A
165 Parade Floats Permit $75.00 Suggested N/A N/A
166 Sound Permit $27.00 Suggested N/A N/A
167 Trash Can, Per Day $10.00 material cost N/A N/A
Master Fee Schedule
80 Geographic Information Systems (GIS)
# Description
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 General Services
2 Labor--Chargeable on any service listed under GIS when the project takes more than one hour (custom map), any customization is required (predefined map, mapping series), or any other GIS-related customer service is requested. The rate is hourly-based ($72) and is chargeable by quarter- hour increments ($18).
$104.00 $157.73 18% $130.00 $26
3 Custom Map
4 Plotter
5 17" x 22" (ANSI-C) $66.00 $98.58 17% $82.00 $16
6 - Additional prints (per print) (max. 5) $30.00 $39.43 11% $35.00 $5 7 - With orthophotos $72.00 $98.58 15% $84.00 $12
8 - With orthophotos, additional prints (per print) (max. 5) $32.00 $39.43 6% $37.00 $5 9 22" x 34" (ANSI-D) $84.00 $118.29 11% $105.00 $21
10 - Additional prints (per print) (max. 5) $32.00 $39.43 9% $36.00 $4 11 - With orthophotos $86.00 $118.29 10% $107.00 $21
12 - With orthophotos, additional prints (per print) (max. 5) $35.00 $39.43 4% $38.00 $3 13 34" x 44" (ANSI-E) $85.00 $118.29 10% $106.00 $21
14 - Additional prints (per print) (max. 5) $35.00 $39.43 6% $37.00 $2 15 - With orthophotos $88.00 $118.29 7% $110.00 $22
16 - With orthophotos, additional prints (per print) (max. 5) $38.00 $39.43 1% $39.00 $1 17 All scales, electronic format copies (e.g., pdf) on CD/ftp (per copy) $13.00 $15.77 5% $15.00 $2 18 Printer
19 8-1/2" x 11" color $52.00 $78.92 18% $65.00 $13
20 - Additional prints (per print) (max. 5) $2.00 $15.83 81% $3.00 $1 21 - With orthophotos $55.00 $78.92 13% $69.00 $14
22 - With orthophotos, additional prints (per print) (max. 5) $3.00 $15.83 75% $4.00 $1 23 11" x 17" $52.00 $79.26 18% $65.00 $13
24 - Additional prints (per print) (max. 5) $3.00 $16.17 75% $4.00 $1 25 - With orthophotos $55.00 $79.26 13% $69.00 $14
26 - With orthophotos, additional prints (per print) (max. 5) $5.00 $16.17 63% $6.00 $1 27 All scales, electronic format copies (e.g., pdf) on CD/ftp (per copy) $13.00 $15.77 5% $15.00 $2 28 Electronic Map (Note: The default format for electronic maps is pdf) 29 Electronic--all scales, stand-alone (ie., w/out hardcopy map) $50.00 $78.86 21% $62.00 $12 30 Electronic--additional copies (per copy or delivery) $13.00 $15.77 5% $15.00 $2 31 PREDEFINED MAP
32 Plotter
33 17" x 22" (ANSI-C) $30.00 $39.43 11% $35.00 $5
34 - Additional prints (max. 5) $30.00 $39.43 11% $35.00 $5 35 - With orthophotos $32.00 $39.43 6% $37.00 $5
36 - With orthophotos, additional prints (max. 5) $32.00 $39.43 6% $37.00 $5 37 22" x 34" (ANSI-D) $32.00 $39.43 9% $36.00 $4
38 - Additional prints (max. 5) $32.00 $39.43 9% $36.00 $4 39 - With orthophotos $35.00 $39.43 4% $38.00 $3
40 - With orthophotos, additional prints (max. 5) $35.00 $39.43 4% $38.00 $3 41 34" x 44" (ANSI-E) $35.00 $39.43 6% $37.00 $2
42 - Additional prints (max. 5) $35.00 $39.43 6% $37.00 $2 43 - With orthophotos $38.00 $39.43 1% $39.00 $1
44 - With orthophotos, additional prints (max. 5) $38.00 $39.43 1% $39.00 $1 45 All scales, electronic format copies (e.g., pdf) on CD/ftp (per copy) $13.00 $15.77 5% $15.00 $2 46 Print
Master Fee Schedule
81 Geographic Information Systems (GIS)
# Description
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 47 8-1/2" x 11" color $30.00 $39.49 14% $34.00 $4
48 - Additional prints (max. 5) $2.00 $15.83 81% $3.00 $1 49 - With orthophotos $32.00 $39.49 9% $36.00 $4
50 - With orthophotos, additional prints (max. 5) $3.00 $15.83 75% $4.00 $1 51 11" x 17" $30.00 $39.83 15% $34.00 $4
52 - Additional prints (max. 5) $3.00 $16.17 75% $4.00 $1 53 - With orthophotos $32.00 $39.83 10% $36.00 $4
54 - With orthophotos, additional prints (max. 5) $5.00 $16.17 63% $6.00 $1 55 Electronic Map (Note: The default format for electronic maps is pdf) 56 Electronic--all scales, stand-alone (ie., w/out hardcopy map) $29.00 $39.43 9% $36.00 $7 57 Electronic--additional copies (per copy or delivery) $12.00 $15.77 5% $15.00 $3 Master Fee Schedule
82 Police
# Description
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Photocopying, per page (8-1/2" x 11") $0.10 NA NA $0.10 $0 2 Traffic Accident/Police Report (federal, state, county, municipalities, districts, and other political subdivisions exempt), per report $21.00 $9.03 0% $9.03 -$12 3 Booking Fees (passed through to County) $215.00 Paid at County rate. NA NA Actual Cost NA 4 Traffic Violations--In accordance with California Penal Code Section 19 Refer to Vehicle Code NA NA Refer to Vehicle
Code $0
5 Non-resident Ticket Sign-off New $81.09 88% $10.00 NA 6 Fingerprinting (also see "Concealed Weapons Permit")
7 Resident, first card $34.00 $45.13 7% $42.00 $8
8 Resident, additional card $13.00 $45.13 65% $16.00 $3 9 Non-resident, first card $37.00 $45.13 0% $45.00 $8
10 Non-resident, additional card $31.00 $45.13 16% $38.00 $7 11 Livescan fingerprinting service, resident $71.00 $45.13 0% $45.00 -$26 12 Livescan fingerprinting service, non-resident $71.00 $45.13 0% $45.00 -$26 13 Prisoner Medical Transport (cost) Cost NA NA Cost NA 14 Police Clearances/Records Check $29.00 $45.13 20% $36.00 $7 15 Taxi Permits (Scripts Only)
16 New driver $263.00 $196.18 0% $196.00 -$67
17 Annual renewal $157.00 $130.78 1% $130.00 -$27
18 Special Event/Parade Permit $54.00 per hour $242.20 72% $67.00 $13 19 Sound Permit $17.00 per hour $121.10 83% $21.00 $4
20 CAD Printouts $17.00 $9.03 0% $9.00 -$8
21 Communications Dispatch Recordings, each $77.00 $316.16 70% $96.00 $19 22 Copy of Interview Audio/Video Recordings each $86.00 $18.05 0% $18.00 -$68 23 Vehicle Tow Fees
24 Vehicle removal (non rental) from highway or public land for 5 or more unpaid parking violations (CVC 22651(i)(1) $172.00 $121.37 0% $121.00 -$51 25 Vehicle removal from highway, public or private land $172.00 $269.97 20% $215.00 $43 26 Vehicle found in private or public land with registration expired in excess of 6 months $172.00 $269.97 20% $215.00 $43
27 Vehicle parked or left standing on highway for more than 72 hours $172.00 $269.97 20% $215.00 $43 28 Vehicle parked on street or alley for more than 72 hours $172.00 $269.97 20% $215.00 $43 29 First vehicle abandoned, wrecked, dismantled that is a public nuisance or reduces property values $435.00 $269.97 0% $269.00 -$166 30 Each additional vehicle abandoned, wrecked, dismantled that is a public nuisance or reduces property values $0.00 $269.97 100% $0.00 $0 31 Tow Truck Permit
32 New driver--annually $35.00 $112.16 62% $43.00 $8
33 Renewal--annually $17.00 $112.16 81% $21.00 $4
34 Peddlers & Solicitors Police Permit
35 Initial permit (plus Business License permit; paid at Business License Unit) $15.00 NA NA $15.00 $0 36 Permit renewal (plus Business License permit; paid at Business License Unit) $7.00 NA NA $7.00 $0 37 Community Noise Ordinance Violation--Cost for administrative enforcement and noise testing cost NA NA Cost $0
38 Mechanical or Electronic Amusement Device Permit, per device/per calendar year (prorated for calendar quarters; paid at Business License Unit) $84.00 NA NA $84.00 $0 39 Concealed Weapons Permit
40 Original permit application filing fee $100.00 NA NA $100.00 $0 Master Fee Schedule
83 Police
# Description
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 41 Fingerprint fee $71.00 NA NA $71.00 $0
42 Permit renewal fee $25.00 NA NA $25.00 $0
43 Permit amendment fee $10.00 NA NA $10.00 $0
44 ALCOHOL AND TOBACCO RETAIL INSPECTIONS
45 Cost per business of compliance inspection $973.00 $829.86 0% $829.00 -$144 46 Cost per business of decoy operation $630.00 $829.86 5% $787.00 $157 47 Total cost per business for compliance inspection and decoy operation $1,602.00 $829.86 0% $829.00 -$773 48 Compliance inspection of alcohol and/or tobacco retailer $973.00 $829.86 0% $829.00 -$144 49 Combined inspection of alcohol and tobacco retailer $1,025.00 $1,270.94 0% $1,270.00 $245 50 Re-inspection of alcohol and/or tobacco retailer $172.00 $829.86 74% $215.00 $43 51 Underage sales investigation of alcohol and/or tobacco retailer $630.00 $1,140.15 31% $787.00 $157 Master Fee Schedule
84 Transportation - Parking Management Services
# Description
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Neighborhood Parking Permits
2 Neighborhood Parking Permit -Residential Annual (2 vehicle limit) 3 In Person $20.00 $102.41 61% $40.00 $20
4 Online New $68.28 49% $35.00 NA
5 Neighborhood Parking Permit -Residential Visitor Hang tag -Annual 6 In Person $10.00 $102.41 61% $40.00 $30
7 Online New $68.28 49% $35.00 NA
8 Neighborhood Parking Permit- Residential Replacement
9 In Person $15.00 $102.41 61% $40.00 $25
10 Online New $68.28 49% $35.00 NA
11 Neighborhood Parking Permit -Merchant Annual
12 In Person $70.00 $102.41 61% $40.00 -$30
13 Online New $68.28 49% $35.00 NA
14 Neighborhood Parking Permit - Merchant Part Time Employee -Quarterly 15 In Person $17.00 $102.41 61% $40.00 $23
16 Online New $68.28 49% $35.00 NA
17 Neighborhood Parking Permit- Merchant Visitor Pass booklet (set of 10) 18 In Person $10.00 $102.41 61% $40.00 $30
19 Online New $68.28 49% $35.00 NA
20 Electric Vehicle Charging
21 Electric Vehicle Charging Station- Rapid Charger $7/hr-$1/min. NA NA $7/hr-$1/min. $0 22 Electric Vehicle Charging Station- Slow Charger $1 /hr 1-4 hrs then $5/Hr. NA NA $1 /hr 1-4 hrs
then $5/Hr. $0
23 Paid Parking
24 Metered Parking Rates (paid stalls) $1/hr $1/hr or demand based fee NA NA $1/hr $0 25 Metered Parking Rates (paid stalls)- Special Event
Daily rate for ea.
stall removed
from service
NA NA
Daily rate for
ea. stall
removed from
service
$0
26 Marina Way Lot $1/hr, $4/Day,
$45/Mthly
NA NA $1/hr, $4/Day,
$45/Mthly
$0
27 Other Surface Lots, and 12th Street Garage
$1/hr,
$4/day,$45/Mthl
y
NA NA
$1/hr,
$4/day,$45/Mth
ly
$0
28 Parklets/Curbs
29 Parklet Permits (per space) -special event $78.00 $409.65 81% $78.00 $0 30 Parklet or Bike Corral Permit - 1 Year and renewals $112.00 $1,024.14 78% $224.00 $112 Master Fee Schedule
85 Transportation - Parking Management Services
# Description
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 31 Lot Leases
32 Metered Surface Lot Lease Daily rate NA NA Daily Rate x 2.5 NA 33 Other Surface Lot Lease Based on lease
terms NA NA Based on lease te $0
34 Parking Rental Fees
35 Parking Rental Fees Based on lease
terms NA NA Based on lease te $0
36 Shared Mobility Services
37 Dedicated Public Parking Stalls - Mobility Operators 38 Gas vehicles with dedicated parking public parking stalls New Annual *Metered / **Time Zones NA NA Determined
upon
application
based on Actual
Cost
NA
39 ZEV (zero emission vehicles) with dedicated public parking New Annual Metered / Time Zones - 25% NA NA Determined
upon
application
based on Actual
Cost
NA
40 Free Floating Car Share Vehicle Permits
41 Gas Vehicles (1 to 10 vehicles) New per Vehicle Annual $204.83 15% $174.00 NA 42 Gas Vehicles (More than 10 vehicles) New per Vehicle Annual $204.83 0% $204.00 NA 43 ZEV (1 to 10 vehicles) New per Vehicle Annual $204.83 36% $130.50 NA 44 ZEV (More than 10 vehicles) New per Vehicle Annual $204.83 25% $153.00 NA 45 Dedicated Car Share Vehicle Permits
46 Gas Vehicles - Operating from private property (1 to 10 vehicles) New per Vehicle Annual $512.07 37% $325.00 NA 47 Gas Vehicles - Operating from private property (More than 10 vehicles) New per Vehicle Annual $512.07 17% $425.00 NA 48 Gas vehicles - Parked/stored on public streets New per Vehicle Annual NA NA Parking Stall
Revenue
Calculations
applied minus
25% clean air
discount
NA
Master Fee Schedule
86 Transportation - Parking Management Services
# Description
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 49 ZEV (1 to 10 vehicles) New per Vehicle Annual NA NA Based on
calculations
related to
annual revenue
loss from the
indentified
space(s) minus
25% clean air
discount
NA
50 ZEV (More than 10 vehicles) New per Vehicle Annual NA NA Based on
calculations
related to
annual revenue
loss from the
indentified
space(s) minus
25% clean air
discount
NA
51 Bike Share/Scooter Providers (non grant funded)
52 Permit Application Fee (staff costs to review permit) New Non refundable $2,048.27 25% $1,536.00 NA 53 Annual Permit Fee New
per docking station
(physical and
geofenced)
$102.41 0% $102.00 NA
54 Public Property Repair and Maintenance Endowment fee New Per year of contract, with initial payment due at permit issuance
NA NA $2,500.00 NA
55 Private Shuttle Providers
56 Permit to Operate
57 Gas Vehicles New per vehicle $204.83 0% $204.00 NA
58 ZEV New per vehicle $204.83 25% $153.00 NA
59 Special Event transportation New per vehicle/per day $102.41 0% $102.00 NA 60 Dedicated Right of Way loading zones New Annual NA NA Determined
upon
application
based on Actual
Cost
NA
61 On Street Metered (Paid) Parking
Master Fee Schedule
87 Transportation - Parking Management Services
# Description
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 62 Public parking stalls New Max. time limit TBD NA NA Determined
upon
application
based on Actual
Cost
NA
Commuter Benefit Ordinance
* The annual base flat permit fee for a metered space is calculated as the average gross revenue per meter during the most recent completed fiscal year.
**The annual base flat permit fee for vehicles at a time zone(non-metered) space is $40 multiplied by 12 months.

The annual base flat permit fee of a dedicated space for a gas-powered car share vehicle is the annual base permit fee for metered spaces and annual base permit fee for time zone (non-metered) space, when parked at thos respective spaces.

The annual permit fee of a dedicated space for a zero emission powered (ZEV) car share vehicle is based on a 25% discount off the annual base permit free for metered spaces and a 25% discount off th annual base fee for time zone (non-metered) spaces (i.e., equla to 75% of the annual base permit fee).

Master Fee Schedule
88 City of Richmond - User Fee
Fully Burdened Hourly Rate Calculation
Department Position
Fully Burdened
Hourly Rate
Position Rates
0001: ACCOUNTING ACCOUN - ACCOUNTANT I 92.53
0001: ACCOUNTING ACCOUN - ACCOUNTANT II 100.03
0001: ACCOUNTING ACCOUN - ACCOUNTING ASST II 68.62
0001: ACCOUNTING ACCOUN - ACCOUNTING MANAGER 126.18
0001: ACCOUNTING ACCOUN - SENIOR ACCOUNTANT 104.57
0001: BDGT/OPERATING BDGT/O - BUDGET ADMINISTRATOR 122.46 0001: BDGT/OPERATING BDGT/O - BUDGET ANALYST I 90.54
0001: BDGT/OPERATING BDGT/O - BUDGET ANALYST II 95.23
0001: BDGT/OPERATING BDGT/O - SR BUDGET ANLYST 114.42
5005: CAD DISPATCH SYSTEM CAD DI - COMM DISPATCHER I 82.83 5005: CAD DISPATCH SYSTEM CAD DI - COMM DISPATCHER II 105.39 5005: CAD DISPATCH SYSTEM CAD DI - COMM SFT SUPV 107.70 5005: CAD DISPATCH SYSTEM CAD DI - COMM. CENTER MGR 134.12 5005: CAD DISPATCH SYSTEM CAD DI - COMMUNICA CALL TAKER 65.71 5005: CAD DISPATCH SYSTEM CAD DI - NET & SYS SPEC II 126.00 5005: CAD DISPATCH SYSTEM CAD DI - SYSTM ADMINISTRATOR 128.84 0001: CAPITAL IMPROVEMENT CAPITA - ADMINISTRATIVE AIDE 173.98 0001: CAPITAL IMPROVEMENT CAPITA - CONSTN & MAINT SUPV 214.54 0001: CAPITAL IMPROVEMENT CAPITA - ELECTRICAL SUPERV 237.75 0001: CAPITAL IMPROVEMENT CAPITA - ELECTRICIAN 217.23
0001: CAPITAL IMPROVEMENT CAPITA - EXEC SECRETARY II 208.23 0001: CAPITAL IMPROVEMENT CAPITA - OFFICE ASSISTANT II 84.09 0001: CAPITAL IMPROVEMENT CAPITA - PW ADMIN MANAGER 254.64 0001: CAPITAL IMPROVEMENT CAPITA - PW MAINT &OPERNS DIR 408.98 0001: CAPITAL IMPROVEMENT CAPITA - PW STRTS MAINT SUPER 262.15 0001: CITY ATTORNEY CITY A - ASST CITY ATTORNEY 165.66 Master Fee Schedule
89 Department Position
Fully Burdened
Hourly Rate
0001: CITY ATTORNEY CITY A - CITY ATTORNEY 231.75
0001: CITY ATTORNEY CITY A - EXEC SECRETARY II 96.89
0001: CITY ATTORNEY CITY A - OFFICE SPECIALIST 61.32
0001: CITY ATTORNEY CITY A - SRASST CITY ATTONEY 180.94 0001: CITY ATTORNEY CITY A - SRASST CITY ATTORNEY 187.53 0001: CITY ATTORNEY CITY A - SUPERVISING OFF ASST 63.89 0001: CITY CLERK CITY C - ASSISTANT CITY CLERK 107.83
0001: CITY CLERK CITY C - CITY CLERK 147.12
0001: CITY CLERK CITY C - CITY CLERK TECH 65.15
0001: CITY COUNCIL CITY C - COUNCILMEMBER 27.40
0001: CITY COUNCIL CITY C - SR ADMIN ANALYST 116.34
0001: CITY MANAGER'S OFFICE CITY M - ADMNISTRATIVE CHIEF 139.34 0001: CITY MANAGER'S OFFICE CITY M - ASST ADMIN ANALYST 89.07 0001: CITY MANAGER'S OFFICE CITY M - CITY MANAGER 287.02 0001: CITY MANAGER'S OFFICE CITY M - COM&ECONOMIC DEV DIR 193.55 0001: CITY MANAGER'S OFFICE CITY M - DEV PROJ MGR II 134.27 0001: CITY MANAGER'S OFFICE CITY M - ECONOMIC DEV ADMIN 136.23 0001: CITY MANAGER'S OFFICE CITY M - ENV SRVCS MANAGER 135.22 0001: CITY MANAGER'S OFFICE CITY M - EXE AST TO CITY MGR 91.84 0001: CITY MANAGER'S OFFICE CITY M - MANAGEMENT ANALYST I 56.95 0001: CITY MANAGER'S OFFICE CITY M - MANAGEMENT ANALYST II 98.56 0001: CITY MANAGER'S OFFICE CITY M - MANAGEMENT ANLYST I 78.70 0001: CITY MANAGER'S OFFICE CITY M - PROJECT MANAGER I 135.32 0001: CITY MANAGER'S OFFICE CITY M - PROJECT MANAGER II 141.59 0001: COMMUNITY SERVICES COMMUN - ACCOUNTANT II 137.16 0001: COMMUNITY SERVICES COMMUN - ADMINISTRATIVE AID 94.29 0001: COMMUNITY SERVICES COMMUN - ADMINISTRATIVE AIDE 116.42 0001: COMMUNITY SERVICES COMMUN - ASSOC. ADMIN ANALYST 69.12 0001: COMMUNITY SERVICES COMMUN - COMM SERV DIRECTOR 198.28 0001: COMMUNITY SERVICES COMMUN - COMM SERVICE ADM MGR 151.24 0001: COMMUNITY SERVICES COMMUN - DEV PROJ MGR II 141.12 0001: COMMUNITY SERVICES COMMUN - EXEC SECRETARY II 102.11 Master Fee Schedule
90 Department Position
Fully Burdened
Hourly Rate
0001: COMMUNITY SERVICES COMMUN - FINANCE MANAGER II 130.23 0001: COMMUNITY SERVICES COMMUN - OFFICE SPECIALIST 102.61 0001: COMMUNITY SERVICES COMMUN - REC PGM COORDINATOR 103.15 0001: COMMUNITY SERVICES COMMUN - RECREATION SUPV 128.27 1051: CR-ENGINEERING CR-ENG - DEV PROJ MGR II 252.65
1051: CR-ENGINEERING CR-ENG - SR CIVIL ENGINEER 265.14 1050: CR-PLANNING & BUILDING CR-PLA - ACCOUNTANT II 147.76 1050: CR-PLANNING & BUILDING CR-PLA - ASSOC ADMIN ANALYST 145.29 1050: CR-PLANNING & BUILDING CR-PLA - BLDG INSP SUPV 170.34 1050: CR-PLANNING & BUILDING CR-PLA - BUILDING OFFICIAL 215.07 1050: CR-PLANNING & BUILDING CR-PLA - PERMIT TECHNICIAN I 91.13 1050: CR-PLANNING & BUILDING CR-PLA - PERMIT TECHNICIAN II 115.22 1050: CR-PLANNING & BUILDING CR-PLA - PLAN CHECKING ENGR 157.52 1050: CR-PLANNING & BUILDING CR-PLA - PLANNER I 98.32
1050: CR-PLANNING & BUILDING CR-PLA - PLANNER II 147.37 1050: CR-PLANNING & BUILDING CR-PLA - PLANNING DIRECTOR 288.19 1050: CR-PLANNING & BUILDING CR-PLA - SENIOR PLANNER 154.22 1050: CR-PLANNING & BUILDING CR-PLA - SR BLDG INSP 160.77 1050: CR-PLANNING & BUILDING CR-PLA - SR. ADMIN ANALYST 162.20 1205: EMPLOYMENT & TRAINING EMPLOY - ADMINISTRATIVE AIDE 128.02 1205: EMPLOYMENT & TRAINING EMPLOY - ADMN SERV ANLYST 138.42 1205: EMPLOYMENT & TRAINING EMPLOY - EMPL & TRAINING DIR 246.93 1205: EMPLOYMENT & TRAINING EMPLOY - EMPLOYMENT PGM MGR 134.94 1205: EMPLOYMENT & TRAINING EMPLOY - EMPLOYMNT PGMSPEC I 104.59 1205: EMPLOYMENT & TRAINING EMPLOY - EMPLOYMNT PGMSPEC II 116.13 1205: EMPLOYMENT & TRAINING EMPLOY - FINANCE MANAGER 186.34 1205: EMPLOYMENT & TRAINING EMPLOY - OFFICE ASSISTANT II 90.00 1205: EMPLOYMENT & TRAINING EMPLOY - PROJECT COORDINATOR 168.59 1205: EMPLOYMENT & TRAINING EMPLOY - SR EMPLOYMNT PGM SPC 112.86 1055: ENCROACHMENT SVCS ENCROA - CONSTR INSPECTOR I 152.51 1055: ENCROACHMENT SVCS ENCROA - ENG INFRASTR ADMNSTR 185.18 1055: ENCROACHMENT SVCS ENCROA - OFFICE ASSISTANT II 110.83 Master Fee Schedule
91 Department Position
Fully Burdened
Hourly Rate
0001: FINANCE ADMIN FINANC - ACCOUNTING ASST II 112.55 0001: FINANCE ADMIN FINANC - ADMN SERV ANLYST 153.51
0001: FINANCE ADMIN FINANC - BUD&FINSERVAGENCYDIR 269.73 0001: FIRE FIRE - ADMINISTRATIVE AIDE 94.96
0001: FIRE FIRE - BATTALION CHIEF 240.05
0001: FIRE FIRE - DEPUTY FIRE CHIEF 276.67
0001: FIRE FIRE - EMERGENCY SERV MGR 136.96
0001: FIRE FIRE - EXEC SECRETARY II 99.78
0001: FIRE FIRE - FIRE CAPTAIN 224.39
0001: FIRE FIRE - FIRE CHIEF 311.19
0001: FIRE FIRE - FIRE ENGINEER 198.00
0001: FIRE FIRE - FIRE FIGHTER 195.07
0001: FIRE FIRE - FIRE INSPECTOR I 216.54
0001: FIRE FIRE - FIRE INSPECTOR II 234.38
0001: FIRE FIRE - FIRE MARSHALL 249.55
0001: FIRE FIRE - PROJECT MANAGER I 139.57
1012: HILLTOP LANDSCAPE MAINT DIST HILLTO - GROUNDSKEEPER/GARDNR 74.99 1012: HILLTOP LANDSCAPE MAINT DIST HILLTO - GROUNDSKEEPER/GRDNR 97.06 1012: HILLTOP LANDSCAPE MAINT DIST HILLTO - PARK CONT&MAINT WKR 98.37 1012: HILLTOP LANDSCAPE MAINT DIST HILLTO - PARKS SUPERVISOR 123.71 1200: HOUSING ADMINISTRATION HOUSIN - DEV PROJ MGR II 174.79 1200: HOUSING ADMINISTRATION HOUSIN - SENIOR ACCOUNTANT 161.30 1200: HOUSING ADMINISTRATION HOUSIN - SR ADMIN ANALYST 187.32 0001: HUMAN RESOURCES HUMAN - HR MGMT DIRECTOR 260.72 0001: HUMAN RESOURCES HUMAN - HR PERSONEL OFFICER 215.37 0001: HUMAN RESOURCES HUMAN - HR PERSONNEL OFFICER 227.48 0001: HUMAN RESOURCES HUMAN - HR TECHNICIAN II 100.63 0001: HUMAN RESOURCES HUMAN - LBR RELATONS/TRG MGR 197.83 0001: HUMAN RESOURCES HUMAN - PERSONNEL ANALYST II 123.30 0001: HUMAN RESOURCES HUMAN - PRINC PERSONN ANLYST 159.83 0001: HUMAN RESOURCES HUMAN - PRINCIPAL PER ALYST 164.10 0001: HUMAN RESOURCES HUMAN - SR PERSONNEL ANLYST 137.09 Master Fee Schedule
92 Department Position
Fully Burdened
Hourly Rate
0001: INFORMATION TECHNOLOGY ADMIN INFORM - CBLTV ENG SUP ASST 77.81 0001: INFORMATION TECHNOLOGY ADMIN INFORM - I T TECH ASSISTANT 98.98 0001: INFORMATION TECHNOLOGY ADMIN INFORM - IT DIRECTOR 193.06 0001: INFORMATION TECHNOLOGY ADMIN INFORM - NWORK & SYS SPEC II 128.00 0001: INFORMATION TECHNOLOGY ADMIN INFORM - NWRK & SYS MGR/PROV 158.81 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - ADMINISTRATIVE AIDE 140.78 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - ASSOC. ADMIN ANALYST 83.69 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - ASST ADMIN ANALYST 147.16 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - BLDG TRADES WKR I 123.32 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - BLDG TRADES WKR II 151.02 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - BLDG TRADES WRKR III 84.51 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - BUILD TRADES WRKR II 136.74 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - CARPENTER 145.21 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - CODE ENF OFFICER I 134.85 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - CODE ENF OFFICER II 143.66 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - CODE ENFORC. OFF. II 146.50 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - CODE ENFORC. SUPT 172.86 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - COMB. EQUIP MECHANIC 135.63 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - COMBO EQUIP MECHANIC 145.21 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - CONSTN & MAINT SUPV 175.73 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - CUSTODIAL MAINT SUPV 144.33 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - DIRECTOR INFR & MTNC 284.59 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - EQUIP MECHANIC III 132.14 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - EQUIP MECHANIC IV 137.82 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - EQUIP SERV SUPERINT 194.10 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - EQUIPMENT OPERATOR 132.14 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - EQUIPMENT PARTS SPEC 145.21 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - EQUIPMENT PARTS STOREKEEPER 132.78 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - EQUIPMENT SUPERVISOR 176.79 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - GARDENER 131.89 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - GROUNDSKEEPER/GRDNR 121.98 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - MAINT LEAD WKR 143.64 Master Fee Schedule
93 Department Position
Fully Burdened
Hourly Rate
0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - MAINT WKR II 115.67 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - MAINTENANCE WORKER I 106.26 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - PAINTER 151.29 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - PARK CONT&MAINT WKR 138.25 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - PARKS SUPERVISOR 146.47 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - PRKS & LDSCAPE SUPER 194.92 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - PW FACIL MAINT SUPER 194.06 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - STATIONARY ENGINEER 151.02 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - STATIONARY ENGR SUPV 163.96 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - TREE LEADWORKER 143.19 0001: INFRASTRURE MAINTENANCE AND OPERATIONS INFRAS - UTILITY WORKER II 116.23 5001: INSURANCE RESERVES INSURA - HR MGMT DIRECTOR 216.35 5001: INSURANCE RESERVES INSURA - HR PERSONEL OFFICER 178.72 5001: INSURANCE RESERVES INSURA - HR TECHNICIAN II 73.46 5001: INSURANCE RESERVES INSURA - PERSONNEL ANALYST I 92.64 5001: INSURANCE RESERVES INSURA - PRIN PERSONNEL ANALY 132.38 5001: INSURANCE RESERVES INSURA - PRINCIPAL PER ALYST 136.17 5001: INSURANCE RESERVES INSURA - PROJECT MANAGER I 143.07 5001: INSURANCE RESERVES INSURA - RISK MANAGER 170.44
5001: INSURANCE RESERVES INSURA - SRASST CITY ATTORNEY 188.77 0001: IT/ERP&APP IT/ERP - BUSINESS SYSS MGR 140.20
0001: IT/ERP&APP IT/ERP - SR PGMMER ANLYST 116.15
0001: IT/GIS IT/GIS - GIS ADMINISTRATOR 157.73
0001: IT/MAILRM & DUP IT/MAI - DUPL MAIL ASST II 102.51 0001: IT/TELECOMMS IT/TEL - TELEPHONE RADIO SPEC 310.49 4008: KCRT - CABLE TELEVIS KCRT - - BUSINESS SYSS MGR 177.82 4008: KCRT - CABLE TELEVIS KCRT - - CABLE TV PGMNG COORD 117.00 4008: KCRT - CABLE TELEVIS KCRT - - CBLTV ENG SUP ASST 84.77 4008: KCRT - CABLE TELEVIS KCRT - - CBLTV PROD SUPT ASST 75.52 4008: KCRT - CABLE TELEVIS KCRT - - IT DIRECTOR 210.32 4008: KCRT - CABLE TELEVIS KCRT - - SRCABLE TV PROD ASST 91.98 0001: LIBRARY AND CULTURAL SERVICES LIBRAR - ADMN LIBRARIAN 163.17 Master Fee Schedule
94 Department Position
Fully Burdened
Hourly Rate
0001: LIBRARY AND CULTURAL SERVICES LIBRAR - ARTS AND CULTURE MGR 138.97 0001: LIBRARY AND CULTURAL SERVICES LIBRAR - ASST ADMIN ANALYST 130.23 0001: LIBRARY AND CULTURAL SERVICES LIBRAR - EXEC SECRETARY II 130.65 0001: LIBRARY AND CULTURAL SERVICES LIBRAR - FAMILY LITERACY SPEC 123.03 0001: LIBRARY AND CULTURAL SERVICES LIBRAR - LIB INF SYS SPT TECH 111.52 0001: LIBRARY AND CULTURAL SERVICES LIBRAR - LIBRARIAN II 133.47 0001: LIBRARY AND CULTURAL SERVICES LIBRAR - LIBRARY ASSISTANT I 81.13 0001: LIBRARY AND CULTURAL SERVICES LIBRAR - LIBRARY ASSISTANT II 105.94 0001: LIBRARY AND CULTURAL SERVICES LIBRAR - LIBRARY ASSOCIATE 130.63 0001: LIBRARY AND CULTURAL SERVICES LIBRAR - LIBRY&COM SERV DIR 259.58 0001: LIBRARY AND CULTURAL SERVICES LIBRAR - LITERACY PGM MGR 150.37 0001: LIBRARY AND CULTURAL SERVICES LIBRAR - OFFICE ASST II/PT 96.48 0001: LIBRARY AND CULTURAL SERVICES LIBRAR - SR LIBRARY ASST 125.17 0001: LIBRARY AND CULTURAL SERVICES LIBRAR - VOL TUTR/LNR COORD 130.26 1015: MARINA BAY LNDSCP & LIGHT DIST MARINA - ELECTRICIAN 135.37 1015: MARINA BAY LNDSCP & LIGHT DIST MARINA - GARDENER 120.98 1015: MARINA BAY LNDSCP & LIGHT DIST MARINA - GROUNDSKEEPER/GRDNR 109.82 1015: MARINA BAY LNDSCP & LIGHT DIST MARINA - PARK CONT&MAINT WKR 124.47 1015: MARINA BAY LNDSCP & LIGHT DIST MARINA - PARKS SUPERVISOR 131.87 0001: OFFICE OF THE MAYOR OFFICE - ASST ADMIN ANALYST 88.60 0001: OFFICE OF THE MAYOR OFFICE - MANAGEMENT ANALYST II 90.70 0001: OFFICE OF THE MAYOR OFFICE - MAYOR 69.19
0001: OFFICE OF NEIGHBORHOOD SAFETY OFFICE - NEIGHBRHD CHNGE AGNT 93.37 0001: OFFICE OF NEIGHBORHOOD SAFETY OFFICE - ONS PROGRAM MANAGER 147.24 0001: OFFICE OF NEIGHBORHOOD SAFETY OFFICE - PROJECT COORDINATOR 143.45 0001: OFFICE OF NEIGHBORHOOD SAFETY OFFICE - REC PGM COORDINATOR 108.02 0001: PAYROLL PAYROL - PAYROLL COORDINATOR 93.02
0001: POLICE POLICE - ADMINISTRATIVE AIDE 110.95
0001: POLICE POLICE - ADMN SERVICES ANALYS 128.96
0001: POLICE POLICE - ADMN TRAINEE 91.79
0001: POLICE COMMISSION POLICE - ASST ADMIN ANALYST 84.45 0001: POLICE POLICE - ASST POLICE PROPTECH 100.60
Master Fee Schedule
95 Department Position
Fully Burdened
Hourly Rate
0001: POLICE POLICE - ASST. POLICE CHIEF 303.19
0001: POLICE POLICE - CCTV WIRELESS&SYS SP 140.01
0001: POLICE POLICE - CODE ENF OFFICER II 130.78
0001: POLICE POLICE - CRIME ANALYSIS TECH 85.64
0001: POLICE POLICE - CRIME ANALYST 109.96
0001: POLICE POLICE - CRIME PREVENTION MGR 131.98
0001: POLICE POLICE - CRIME PREVENTION SPC 88.97
0001: POLICE POLICE - CRIME SCENE TECH 95.01
0001: POLICE POLICE - JAILER 94.58
0001: POLICE POLICE - NETWORK & SYS SPEC I 119.73
0001: POLICE POLICE - OFFICE ASSISTANT II 85.61
0001: POLICE POLICE - PARKING ENF REP 101.64
0001: POLICE POLICE - POLICE CAPTAIN 272.39
0001: POLICE POLICE - POLICE CHIEF 328.77
0001: POLICE POLICE - POLICE LIEUTENANT 242.20
0001: POLICE POLICE - POLICE OFFC TRAINEE 74.27
0001: POLICE POLICE - POLICE OFFICER 198.13
0001: POLICE POLICE - POLICE PROPERTY TECH 105.42
0001: POLICE POLICE - POLICE RECORDS SPEC 90.27
0001: POLICE POLICE - POLICE RECORDS SUPV 125.64
0001: POLICE POLICE - POLICE SERGEANT 224.32
0001: POLICE POLICE - PROJECT MANAGER II 233.33
0001: POLICE POLICE - PUB SAFTY TECH SUPVR 166.21
0001: POLICE POLICE - PUBLIC INFO OFFICER 126.99
0001: POLICE POLICE - SENIOR ACCOUNTANT 144.32
4001: PORT OF RICHMOND PORT O - ADMN SERV ANLYST 166.32 4001: PORT OF RICHMOND PORT O - PORT DIRECTOR 324.68
4001: PORT OF RICHMOND PORT O - PORT MKTG/OPRTNS MGR 207.82 0001: PURCHASING PURCHA - BUYER II 94.48
0001: PURCHASING PURCHA - SENIOR BUYER 114.52
1018: RENT CONTROL RENT C - ADMINISTRATIVE AIDE 111.30 1018: RENT CONTROL RENT C - ASSISTANT ADMIN ANALYST 114.41 Master Fee Schedule
96 Department Position
Fully Burdened
Hourly Rate
1018: RENT CONTROL RENT C - DEPUTY DIRECTOR 130.21
1018: RENT CONTROL RENT C - EXECUTIVE DIRECTOR 189.50
1018: RENT CONTROL RENT C - HEARING EXAMINER 177.36
1018: RENT CONTROL RENT C - RENT PRG ANALYST I 102.21
1018: RENT CONTROL RENT C - RENT PRG ANALYST II 108.92 1018: RENT CONTROL RENT C - STAFF CITY ATTORNEY 169.33 0001: REV COLLECTION REV CO - ACCOUNTING ASST II 63.65 0001: REV COLLECTION REV CO - ACCOUNTING MANAGER 121.65 0001: REV COLLECTION REV CO - BUS LICENSE SPEC 82.36
4404: RHA-NEVIN PLAZA RHA-NE - EXEC DIR HOUSNG AUTH 415.56 4404: RHA-NEVIN PLAZA RHA-NE - OFFICE ASSISTANT I 99.78 4404: RHA-NEVIN PLAZA RHA-NE - RESIDENT HOUSING MGR 154.63 4405: RHA-NYSTROM VILLAGE RHA-NY - RESIDENT HOUSING MGR 145.72 5006: RMS RECORDS SERVICES RMS RE - NET & SYS SPEC II 122.30 5006: RMS RECORDS SERVICES RMS RE - SYSTM ADMINISTRATOR 125.06 4006: STORMWATER STORMW - DIR WATER RES RECOV 285.77
4006: STORMWATER STORMW - ENG INFRASTR ADMNSTR 195.77
4006: STORMWATER STORMW - ENV COMP INSPC 177.11
4006: STORMWATER STORMW - ENV SRVCS MANAGER 217.71
4006: STORMWATER STORMW - SR. ENV COMP INSPC 196.44
1003: TRANSPORTATION OPERATION TRANSP - PARATRAN DRVR LDWKR 154.65 1003: TRANSPORTATION OPERATION TRANSP - PARATRANSIT DRIVER 127.26 1003: TRANSPORTATION OPERATION TRANSP - PROJECT MANAGER I 204.83 1003: TRANSPORTATION OPERATION TRANSP - PROJECT MANAGER II 256.06 0001: TREASUREY/CASH MGMT TREASU - ACCOUNTANT II 82.50 0001: TREASUREY/CASH MGMT TREASU - ACCOUNTING ASST II 68.23 4003: WASTEWATER WASTEW - ADMINISTRATIVE AIDE 166.38
4003: WASTEWATER WASTEW - ADMN SERV ANLYST 202.97
4003: WASTEWATER WASTEW - DIR WATER RES RECOV 376.57
4003: WASTEWATER WASTEW - ENG INFRASTR ADMNSTR 257.97
4003: WASTEWATER WASTEW - ENV COMP INSPC 233.39
4003: WASTEWATER WASTEW - ENV SRVCS MANAGER 286.88
Master Fee Schedule
97 Department Position
Fully Burdened
Hourly Rate
4003: WASTEWATER WASTEW - PROJECT COORDINATOR 249.95
4003: WASTEWATER WASTEW - PROJECT MANAGER I 279.32
4003: WASTEWATER WASTEW - SR. ENV COMP INSPC 258.85
4003: WASTEWATER WASTEW - SRASST CITY ATTORNEY 395.79
0001: WATER RESOURCE RECOVERY WATER - EQUIPMENT OPERATOR 101.96 0001: WATER RESOURCE RECOVERY WATER - MAINT LEAD WKR 106.12 0001: WATER RESOURCE RECOVERY WATER - MAINT WKR II 78.61 Wastewater Consultant 220.00
Select Position or input Contract Employee
Master Fee Schedule
98

← All documents from this meeting