Cities Index.
Agenda

Richmond City Council
May 3, 2022

Document
Agenda
Meeting
May 3, 2022
Body
Richmond City Council
Pages
1,303
Original file
98.8 MB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.
Page 1 of 2 ends

April 19, 2022

Public Works

DATE: May 3, 2022
TO: Mayor Butt and Members of the City Council
FROM:

Joe Leach, PE, Director of Public Works
Patrick Phelan, Infrastructure Administrator
Subject:

Transportation Development Act (TDA) Grant Contracts
with Bike East Bay and SOS! Richmond
FINANCIAL IMPACT: Funding is provided by an award from the TDA grant program totaling $25,000 for Bike East Bay (Account
string:15436431-400201-23023)

PREVIOUS COUNCIL
ACTION:

February 16, 2021 – City Council adopted a resolution
authorizing the grant application and accepted and
appropriated the funds

STATEMENT OF THE
ISSUE:

The Department of Public Works is requesting City
Council approval to award a contract to Bike East Bay for bicycle safety education.

RECOMMENDED ACTION:

APPROVE a Transportation Development Act (TDA)
grant-funded contract with Bike East Bay to provide two years of bicycle safety education, in an amount not to
exceed $25,000. Contract will have a term starting May
3, 2022, and ending May 3, 2024 – Public Works (Joe
Leach/Patrick Phelan 307-8111).

AGENDA
REPORT

Page 966 of 1303 ends
Page 2 of 2 ends

April 19, 2022
DISCUSSION:

In November 2020, City staff collaborated with the Richmond Bicycle/Pedestrian Advisory Committee to propose a project application for the 2021-22 Transportation Development Act Article 3 (TDA 3) fund. The project includes a 2-year bicycle safety education program with Bike East Bay. Contract start date is May 3, 2022, and end date is May 3, 2024.

In February 2021, City Council adopted a resolution authorizing a request to the Metropolitan Transportation Commission for the allocation of fiscal year 2021-22 TDA 3 pedestrian/bicycle project funding, and accepted and appropriated the grant funds for the successful application.

Bike East Bay collaborates with the City of Richmond in many ways and is a logical partner as their award-winning education program has provided free classes to tens of thousands of adults, youth, and families in multiple languages over two decades. This contract will bring important programming to Richmond, providing one-on-one support and encouragement for residents to take advantage of the investments being made by the City in active transportation infrastructure. Having programming tailored to the City’s needs will go a long way to encourage more local residents to try out bike lanes and paths, especially new or less-confident bike riders. The proposed program includes four (4) one (1)-hour workshops, one (1) adult learn-to-ride class, and four (4) family cycling workshops.

DOCUMENTS ATTACHED:

Attachment 1 – Contract with Bike East Bay
Attachment 2 – Minutes from Feb 16, 2021, Council Meeting Attachment 3 – Resolution 5-21 authorizing funding allocation Attachment 4 – County Resolution
Attachment 5 – Email Notice to Proceed

Page 967 of 1303 ends

CITY OF RICHMOND

STANDARD CONTRACT

Department: Project Manager:

Project Manager E-mail:

Project Manager Phone No:

PR No: Vendor No: P.O./Contract No:

Description of Services:

The parties to this STANDARD CONTRACT do mutually agree and promise as follows:

1. Parties. The parties to this Contract are the City of Richmond (herein referred to as the “City”) and the following named Contractor:

Company Name:

Street Address:

City, State, Zip Code:

Contact Person:

Telephone: Email:

Business License No: / Expiration Date:

A California [ ] corporation, [ ] limited liability corporation [ ] general partnership, [ ] limited partnership, [ ] individual, [ ] non-profit corporation, [ ] individual dba as [specify:] , [ ] other [specify:]

2. Term. The effective date of this Contract is and it terminates unless terminated as provided herein.

3. Payment Limit. City’s total payments to Contractor under this Contract shall not exceed $ . City shall not pay for services that exceed the Contract Payment Limit unless a contract amendment has been approved by the City Council or City Manager.

4. Contractor’s Obligations. Contractor shall provide those services and carry out that work described in the Service Plan (Exhibit A) which is attached hereto and is incorporated herein by reference, subject to all the terms and conditions contained or incorporated herein.

5. City's Obligations. City shall make to the Contractor those payments described in the Payment Provisions (Exhibit B) which are attached hereto and are incorporated herein by reference, subject to all the terms and conditions contained or incorporated herein.

Page 968 of 1303 ends

6. Authorized Representatives and Notices. This Contract is subject to the Authorized Representatives and Notices Provisions (Exhibit C) which are attached hereto and are incorporated herein by reference.

7. General Conditions. This Contract is subject to the General Conditions (Exhibit D) which are attached hereto and are incorporated herein by reference, subject to all the terms and conditions contained or incorporated herein.

8. Special Conditions. This Contract is subject to the Special Conditions (Exhibit E) (if any) which are attached hereto and are incorporated herein by reference, subject to all the terms and conditions contained or incorporated herein. (Note:
other than Public Works contracts, the City will agree to Special Conditions only in unusual circumstances.)

9. Insurance Provisions. This Contract is subject to the Insurance Provisions (Exhibit F) which are attached hereto and are incorporated herein by reference.

10. Signatures. These signatures attest the parties' Contract hereto:

CITY OF RICHMOND CONTRACTOR:
a municipal corporation

By:
(* The Corporation Chairperson of the Board,
President or Vice President should sign below)

Title: By:

I hereby certify that this Contract Title:
has been approved by City Council.

Date Signed:

B y :

City Clerk
(* The Corporation Chief Financial Officer,
Secretary or Assistant Secretary should sign below)
Approved as to form:

B y :

B y : T i t l e :

City Attorney
Date Signed:

(NOTE: Pursuant to California Corporations
Code Section 313, if Contractor is a corporation
or nonprofit organization, this Contract (1) must
be signed by (a) the Chairperson of the Board,
President or Vice-President
and (b) the
Secretary any Assistant Secretary, the Chief
Financial Officer or any Assistant Treasurer.

LIST OF ATTACHMENTS:

Service Plan Exhibit A
Payment Provisions Exhibit B
Authorized Representatives and Notices Exhibit C
General Conditions Exhibit D
Special Conditions Exhibit E
Insurance Provisions Exhibit F
Standard Contract/EJ/TE 9-26-07

Page 969 of 1303 ends

For the Contract between the City of
Richmond and

EXHIBIT A

SERVICE PLAN

Contractor shall, to the satisfaction of the , perform the following services and be compensated as outlined below:

Page 970 of 1303 ends

SCOPE OF WORK
Bicycle Safety Education

City of Richmond will contract with Bike East Bay for a two‐year bicycle safety education program consisting of four 1‐hour workshops, one adult learn‐to‐ride class, and four family cycling workshops.

1‐Hour Workshop: These sessions go in‐depth with a certified instructor on a specific topic such as avoiding bike theft, riding after dark, bike‐friendly driver classes, or basic bike mechanics. 1‐hour, classroom or virtual webinar workshop. Average attendance: 10. Instruction hours: 1. Number of Instructors: 1

Learn‐to‐Ride for Adults: For adults or teens who have either not yet learned how to ride a bike, or did a long time ago but want a refresher on the basics of balancing, pedaling and steering. Our instructors are friendly, patient, and will help everyone get off to a great start in a secure, non‐judgmental environment. 3‐hour, outdoor workshop for adults and teens, bike and helmet required. Bikes are provided for a rental fee to participants who need them. Average attendance: Normally 12, or 8 under covid protocols. Instruction hours: 3. Number of Instructors: Normally 4; under covid protocols: 3.

Family Cycling Workshop: This event is for kids who are able to ride a bike and ready to take to the roads and pathways with their parents.  The class includes a day of fun games, skills building, and a neighborhood ride. Parents and kids attend together. Outdoor session for adults and youth in grades 2‐6 (approx.). Can be provided as a standalone class with attendees bringing their own bikes and helmets (Family Cycling Workshop) or as part of a community festival or other event with youth loaner bikes and helmets provided (Family Cycling Rodeo). Average attendance: Normally 25; under covid protocols: 15.

Instruction hours: 3. Number of Instructors: Normally 4; under covid protocols: 3.

Page 971 of 1303 ends

BUDGET ‐ Bike East Bay
Richmond Greenway Rehabilitation Bicycle Safety Education Project

ITEM UNIT COST UNITS TOTAL
1‐Hour Workshop class 600 $          4 2,400 $
Adult Learn‐to‐Ride class 5,800 $       1 5,800 $
Family Cycling class 4,200 $       4 16,800 $
25,000$        Subtotal Bicycle Safety Education Program Bicycle Safety Education Program

Page 972 of 1303 ends

For the Contract between the City of
Richmond and

EXHIBIT B

PAYMENT PROVISIONS

{PLEASE NOTE THAT THE CITY OF RICHMOND SHALL NOT PAY FOR SERVICES

THAT EXCEED THE CONTRACT PA YMENT LIMIT UNLESS A CONTRACT

AMENDMENT HAS BEEN APPROVED BY THE CITY COUNCIL OR THE CITY MANAGER}

1. Provided Contractor is not in default under this Contract, Contractor shall be compensated as provided below.

2. Any and all payments made pursuant to this Contract shall be subject to the Contract Payment Limit. The Payment Limit includes expenses (phones, photo copying, meals and travel etc). Invoices, shall be adequately detailed, based on accurate records, and be in a form reasonably satisfactory to the City. Contractor may be required to provide back-up material upon request.

3. Contractor shall submit timely invoices to the following address:

Attention: City of Richmond, Finance Department - Accounts Payable Project Manager: Department:

PO Box 4046
Richmond, CA 94804-0046

4. All invoices that are submitted by Contra ctor shall be subject to the approval of the City’s Project Manager, before payments shall be authorized.

5. The City will pay invoice(s) within 45 days a fter completion of services to the City’s satisfaction. The City shall not pay late fees or interest.

6. A Richmond business license shall be obtained before any payment under this Contract shall be authorized and the business license must be kept current during the term of this Contract for payments to continue to be authorized.

7. All insurance coverage required by this Contract shall be provided by the Contractor before this Contract shall be executed by the City. The insurance coverage must be kept current during the term of this Contract for payments to continue to be authorized.

Page 973 of 1303 ends

For the Contract between the City of
Richmond and

EXHIBIT C

AUTHORIZED REPRESENTATIVES AND NOTICES

1. Notices
. All notices, demands, statements, or communications provided for by this Contract shall be in writing and may be delivered by deposit in the United States mail, postage prepaid. Notices to the City shall be addressed to the Department Head and (as delineated below in section 1.1) to the project manager responsible for the administration of or the supervision of the scope of work under this Contract. Notices to the Contractor shall be addressed to the party designated by Contractor (as delineated below in section 1.2). Notice shall be deemed delivered (a) upon personal delivery; (b) as of the fifth business day after mailing by United States certified mail, postage prepaid, addressed to the proper party; or (c) as of 12:00 p.m. on the second business day immediately after the day it is deposited with and accepted by Federal Express, or a similar overnight courier service, addressed to the proper party and marked for next business day morning delivery. For the purposes of this Contract, a "business day" means any day Monday through Friday that is not a holiday recognized by the federal government or the State of California.

1. 1 CITY hereby designates as its Authorized Representative the Project Manager whose name and address are as follows:

City of Richmond

Richmond, CA 94804-0046

1. 2 CONTRACTOR hereby designates as its Authorized Representative the Project Manager whose name and address are as follows:

Page 974 of 1303 ends

General Conditions/EJ/TE 01-19-11 1 of 13

EXHIBIT D

GENERAL CONDITIONS

1. Independent Contractor . Contractor acknowledges, represents and warrants that Contractor is not a regular or temporary employee, joint venturer or partner of the City, but rather an independent Contractor. This Contract shall not be construed to create an agency, servant, employee, partnership, or joint venture relationship. As an independent Contractor, Contractor shall have no authority to bind City to any obligation or to act as City's agent except as expressly provided herein. Due to the independent Contractor relationship created by this Contract, City shall not withhold state or federal income taxes, the reporting of which shall be Contractor's sole responsibility.

2. Brokers . Contractor acknowledges, represents and warrants that Contractor has not hired, retained or agreed to pay any entity or person any fee, commission, percentage, gift, or any other consideration, contingent upon or resulting from the award or making of this Contract.

3. City Property . The rights to applicable plans, drawings, reports, calculations, data, specifications, videos, graphics or other materials prepared for or obtained pursuant to this Contract, which, upon request, are to be delivered to City within a reasonable time, shall be deemed assigned to City. If applicable, Contractor shall prepare check prints upon request. Notwithstanding the foregoing, Contractor shall not be obligated to provide to City proprietary software or data which Contractor has developed or had developed for Contractor's own use; provided, however, that Contractor shall, pursuant to Section 15 below, indemnify, defend and hold harmless City from and against any discovery or Public Records Act request seeking the disclosure of such proprietary software or data.

4. Patents, Trademarks, C opyrights and Rights in Data
. Contractor shall not
publish or transfer any materials, discoveries, developments, concepts, designs, ideas, know how, improvements, inventions and/or original works of authorship resulting from activities supported by this Contract without the express prior written consent of the City Manager. If anything resulting from activities supported by this Contract is patentable, trademarkable, copyrightable or otherwise legally protectable, City reserves the exclusive right to seek such intellectual property rights. Notwithstanding the foregoing, Contractor may, after receiving City's prior written consent, seek patent, trademark, copyright or other intellectual property rights on anything resulting from activities supported by this Contract. However, City reserves, and Contractor irrevocably grants, a nonexclusive, fully paid-up, royalty-free, assumable, perpetual, worldwide license, with the right to transfer, sublicense, practice and exploit said license and the right to make, have made, copy, modify, make derivative works of, use, sell,

Page 975 of 1303 ends

General Conditions/EJ/TE 01-19-11 2 of 13

import, and otherwise distribute under all applicable intellectual properties without restriction of any kind said license.

Contractor further agrees to assist City, at City's expense, in every proper way to secure the City’s rights in any patents, trademarks, copyrights or other intellectual property rights relating thereto, including the disclosure to City of all pertinent information and data with respect thereto. Contractor shall also assist City in the execution of all applications, specifications, oaths, assignments, recordations, and all other instruments which City shall deem necessary in order to apply for, obtain, maintain and transfer such rights, or if not transferable, to waive such rights. Contractor shall further assist City in the execution of all applications, specifications, oaths, assignments, recordations and all other instruments which City shall deem necessary in order to assign and convey to City, and any assigns and nominees the sole and exclusive right, title and interest in and to any patents, trademarks, copyrights or other intellectual property rights relating thereto. Contractor further agrees that its obligation to execute or cause to be executed, when it is in Contractor's power to do so, any such instruments or papers shall continue during and at all times after the end of Contractor's services and until the expiration of the last such intellectual property right. Contractor hereby irrevocably designates and appoints City, and its duly authorized officers, agents and servants, as its agent and attorney-in-fact, to act for and in its behalf and stead to execute and file any such applications and to do all other lawfully permitted acts to further the application for, prosecution, issuance, maintenance or transfer of letters of patents, copyright and other registrations. This power of attorney is coupled with an interest and shall not be affected by Contractor's subsequent incapacity.

5. Inspection
. Contractor's performance, place of business and records pertaining to this Contract are subject to monitoring, inspection, review and audit by authorized representatives of the CITY, the State of California, and the United States Government.

If the project or services set forth in Exhibit A shall be performed on City or other public property, City shall have the right to inspect such work without notice. If such project or services shall not be performed on City or other public property, City shall have the right to inspect such work upon reasonable notice.

6. Services
. The project or services set forth in Exhibit A shall be performed to the full satisfaction and approval of City. In the event that the project or services set forth in Exhibit A are also itemized by price, City, in its sole discretion, may, upon notice to Contractor, delete certain items or services set forth in Exhibit A, in which case there shall be a corresponding reduction in the amount of compensation paid to Contractor.

Page 976 of 1303 ends

General Conditions/EJ/TE 01-19-11 3 of 13

Contractor shall, at its own cost and expense, furnish all facilities and equipment necessary for Contractor to complete the project or perform the services required herein, unless otherwise provided in Exhibit A.

7. Records
. Contractor shall keep and make available for inspection and copying by authorized representatives of the City, the State of California, and the United States Government, the Contractor's regular business records and such additional records pertaining to this Contract as may be required by the City.

Contractor shall retain all documents pertaining to this Contract for a period of five (5) years after this C ontract's termination (or for any further period that is required by law) and until all Fede ral or State audits are complete and exceptions resolved for this contract's funding period. Upon request, CONTRACTOR shall make thes e records available to authorized representatives of the CITY, the State of California, and the United States Government.

Contractor shall keep full and detailed accounts, maintain records, and exercise such controls as may be necessary for proper financial management under this Contract. The Contractor’s accounting and control systems shall be satisfactory to City. Contractor's accounting systems shall conform to generally accepted accounting principles and all records shall provide a breakdown of total costs charged under this Contract, including properly executed payrolls, time records, utility bills, invoices and vouchers. The City shall be afforded prompt access to Contractor's records, books, and Contractor shall preserve such project records for a period of at least five (5 years after the termination of this Contract , or for such longer period as may be required by law.

Contractor shall permit City and its authorized representatives and accountants to inspect, examine and copy Contractor's books, records, accounts, correspondence, instructions, drawings, receipts, subcontracts, purchase orders, vouchers, memoranda and other data relating to the project or services set forth in Exhibit A, and any and all data relevant to this Contract at any reasonable time for the purpose of auditing and verifying statements, invoices, or bills submitted by Contractor pursuant to this Contract and shall provide such assistance as may be reasonably required in the course of such inspection. Contractor shall also allow City access to the record keeping and accounting personnel of Contractor.

City further reserves the right to examine and re-examine said books, records, accounts, and data during the five (5 year period following the termination of this Contract; and Contractor shall in no event dispose of, destroy, alter, or mutilate said books, records, accounts, and data in any manner whatever for five (5 years after the termination of this Contract.

Page 977 of 1303 ends

General Conditions/EJ/TE 01-19-11 4 of 13

Pursuant to California Government Code § 10527, the parties to this Contract shall be subject to the examination and audit of representatives of the Auditor General of the State of California for a period of three (3) years after final payment under this Contract. The examination and audit shall be confined to those matters connected with the performance of this Contract including, but not limited to, the cost of administering this Contract.

8. Changes and Extra Work . All changes and/or extra work under this Contract shall be performed and paid for in accordance with the following:

Only the City Council or the City Manager may authorize extra and/or changed work. Contractor expressly recognizes that other City personnel are without authorization to either order extra and/or changed work or waive contract requirements. Failure of Contractor to secure the authorization for such extra and/or changed work shall constitute a waiver of any and all right to adjustment in contract price due to such unauthorized work and Contractor thereafter shall be entitled to no compensation whatsoever for performance of such extra and/or changed work.

If Contractor is of the opinion that any work which Contractor has been directed to perform is beyond the scope of this Contract and constitutes extra work, Contractor shall promptly notify City of the fact. The City shall make a determination as to whether or not such work is, in fact, beyond the scope of this Contract and constitutes extra work. In the event that City determines that such work does constitute extra work, City shall provide extra compensation to Contractor on a fair and equitable basis. A change order or Contract Amendment providing for such compensation for extra work shall be negotiated between City and Contractor and executed by Contractor and the appropriate City official.

In the event City determines that such work does not constitute extra work, Contractor shall not be paid extra compensation above that provided herein and if such determination is made by City staff, said determination may be appealed to the City Council; provided, however, a written appeal must be submitted to the City Manager within five (5) days after the staff's determination is sent to Contractor. Said written appeal shall include a description of each and every ground upon which Contractor challenges the staff's determination.

9. Additional Assistance
. If this Contract requires Contractor to prepare
plans and specifications, Contractor shall provide assistance as necessary to resolve any questions regarding such plans and specifications that may arise during the period of advertising for bids, and Contractor shall issue

Page 978 of 1303 ends

General Conditions/EJ/TE 01-19-11 5 of 13

any necessary addenda to the plans and specifications as requested. In the event Contractor is of the opinion that City's requests for addenda and assistance is outside the scope of normal services, the parties shall proceed in accordance with the changes and extra work provisions of Section 8 of these General Conditions.

10. Professional Ability. Contractor acknowledges, represents and warrants that Contractor and its employees are skilled and able to competently provide the services hereunder, and possess all professional licenses, certifications, and approvals necessary to engage in their occupations.

City has relied upon the professional ability and training of Contractor as a material inducement to enter into this Contract. Contractor shall perform in accordance with generally accepted professional practices and standards of Contractor's profession. In the event that City, in its sole discretion, desires the removal of any person employed or retained by Contractor to perform services hereunder, such person shall be removed immediately upon receiving notice from City.

11. Business License
. Contractor shall obtain a Richmond Business License
before performing any services required under this Contract. The failure to so obtain such license shall be a material breach of this Contract and grounds for immediate termination by City; provided, however, that City may waive the business license requirement in writing under unusual or extraordinary circumstances without necessitating any modification of this Contract to reflect such waiver.

12. Termination Without Default. Notwithstanding any provision herein to the contrary, City may, in its sole and absolute discretion and without cause, terminate this Contract at any time prior to completion by Contractor of the project or services hereunder, immediately upon written notice to Contractor. Contractor may terminate this Contract at any time in its sole and absolute discretion and without cause upon 30 days' written notice to City. In the event of termination by either party, Contractor shall be compensated for: (1) all authorized work satisfactorily performed prior to the effective date of termination; (2) necessary materials or services of others ordered by Contractor for this Contract, prior to receipt of notice of termination, irrespective of whether such materials or services of others have actually been delivered, provided that Contractor is not able to cancel such orders. Compensation for Contractor in such event shall be determined by City in accordance with the percentage of the project or services completed by Contractor; and all of Contractor's finished or unfinished work product through the time of the City's last payment shall be transferred and assigned to City. Additionally, in the event of such termination, the City may proceed with the work in any reasonable manner it chooses.

Page 979 of 1303 ends

General Conditions/EJ/TE 01-19-11 6 of 13

13. Termination in the Event of Default. Should Contractor fail to perform any of its obligations hereunder, within the time and in the manner provided or otherwise violate any of the terms of this Contract, City may immediately terminate this Contract by giving written notice of such termination, stating the reasons for such termination. Contractor shall be compensated as provided in Section 12 of these General Conditions; provided, however, there shall be deducted from such amount the amount of damage, including attorney's fees, expert witness fees and costs, if any, sustained by City by virtue of Contractor's breach of this Contract. Additionally, in the event of such termination, the City may proceed with the work in any reasonable manner it chooses.

14. Conflict of Interest. Contractor acknowledges, represents and warrants that Contractor shall avoid all conflicts of interest (as defined under any federal, state or local statute, rule or regulation, or at common law) with respect to this Contract. Contractor further acknowledges, represents and warrants that no City official or employee has any economic interest, as defined in Title 2, California Code of Regulations §§ 18703.1 through 18703.5, with Contractor that would invalidate this Contract. Contractor acknowledges that in the event that Contractor shall be found by any judicial or administrative body to have any conflict of interest (as defined above) with respect to this Contract, all consideration received under this Contract shall be forfeited and returned to City forthwith. This provision shall survive the termination of this Contract for one (1) year.

15. Indemnification.

(a) If this Contract is a contract for design professional services subject to California Civil Code Section 2782.8(a) and Contractor is a design professional, as defined in California Civil Code Section 2782.8(b)(2), Contractor shall hold harmless, defend and indemnify the City, its officers, agents, employees, and volunteers from and against any and all claims, damages, losses, and expenses including attorneys’ fees arising out of, or pertaining to, or relating to the negligence, recklessness, or willful misconduct of the Contractor, except where caused by the active negligence, sole negligence, or willful misconduct of the City. To the fullest extent permitted by law, Contractor shall immediately defend and indemnify the City and its officers, agents, employees, and volunteers from and against any and all liabilities, regardless of nature or type, that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor, or its employees, agents, or subcontractors.

Liabilities subject to the duties to defend and indemnify include, without limitation, any and all claims, losses, damages, penalties, fines, and judgments; associated investigation and administrative expenses; defense costs, including but not limited to reasonable attorneys’ fees; court costs; and costs of alternative dispute resolution. Contractor’s obligation to

Page 980 of 1303 ends

General Conditions/EJ/TE 01-19-11 7 of 13

indemnify applies unless it is finally adjudicated that the liability was caused by the sole active negligence or sole willful misconduct of an indemnified party.
(b) If this Contract is not a contract for design professional services subject to California Civil Code Section 2782.8(a) or Contractor is not a design professional as defined in California Civil Code Section 2782.8(b)(2), Contractor shall indemnify, defend, and hold harmless the City, its officers, agents, employees and volunteers from any and all claims, suits, or actions of every name, kind and description, brought forth on account of injuries to or death of any person or damage to property arising from or connected with the willful misconduct, negligent acts, errors or omissions, ultra-hazardous activities, activities giving rise to strict liability, or defects in design by Contractor or any person directly or indirectly employed by, or acting as, the agent for Contractor in the performance of this Contract, including the concurrent or successive passive negligence of the City, its officers, agents, employees or volunteers.
(c) It is understood that the duty of Contractor to indemnify and hold harmless includes the duty to defend as set forth in Section 2778 of the California Civil Code. Contractor shall be obligated to defend, in all legal, equitable, administrative, or special proceedings, with counsel approved by the City, the City and its officers, agents, employees, and volunteers, immediately upon tender to Contractor of the claim in any form or at any stage of an action or proceeding, whether or not liability is established. An allegation or determination that persons other than Contractor are responsible for the claim does not relieve Contractor from its separate and distinct obligation to defend under this Section 15. The obligation to defend extends through final judgment, including exhaustion of any appeals. The defense obligation includes an obligation to provide independent counsel if Contractor asserts that liability is caused in whole, or in part, by the negligence or willful misconduct of an indemnified party. (d) The review, acceptance or approval of the Contractor’s work or work product by any indemnified party shall not affect, relieve or reduce the Contractor’s indemnification or defense obligations. This Section 15 survives completion of the services or the termination of this Contract.

The provisions of this Section 15 are not limited by, and do not affect, the provisions of this Contract relating to insurance.
(e) Acceptance of insurance certificates and endorsements required under this Contract does not relieve Contractor from liability under this Section

15. This Section 15 shall apply whether or not such insurance policies are determined to be applicable to any such damages or claims for damages.

16. Safety
. Contractor acknowledges that the City is committed to the highest standards of workplace safety. Contractor shall perform all work hereunder in full compliance with applicable local, state and federal safety requirements including but not limited to Occupational Safety and Health Administration requirements, and shall assume sole and complete

Page 981 of 1303 ends

General Conditions/EJ/TE 01-19-11 8 of 13

responsibility for the safety of Contractor's employees and any subContractor's employees. If a death, serious personal injury or substantial property damage occurs in connection with the performance of this Contract, Contractor shall immediately notify the City by telephone.

17. Insurance. Insurance requirements are set forth in Exhibit F to this Contract. Contractor shall abide by the insurance requirements set forth in said Exhibit F.

18. Non-Liability of Officials and Employees of the City. No official or employee of the City shall be personally liable for any default or liability under this Contract.

19. Compliance with Laws. Contractor shall comply with all federal, state and local laws, statutes, ordinances, rules and regulations, and the orders and decrees of any courts or administrative bodies or tribunals, with respect to this Contract, including without limitation environmental laws, employment discrimination laws and prevailing wage laws. Compliance under this provision includes compliance with all provisions of the Richmond Municipal Code ("Municipal Code"), including Chapters 2.50, 2.52, 2.56, and 2.60, if applicable.

Contractor acknowledges that under § 2.60.070 of the Municipal Code ("Living Wage Ordinance"), Contractor shall promptly provide to City documents and information verifying its compliance with the Living Wage Ordinance. Also as prescribed in § 2.60.070, Contractor shall notify each of its affected employees with regards to the wages that are required to be paid pursuant to the Living Wage Ordinance.

Contractor shall comply with § 2.28.030 of the Municipal Code, obligating every Contractor or subcontractor under a contract or subcontract with the City for public work or for goods or for services to refrain from discriminatory employment or subcontracting practices on the basis of race, color, sex, sexual orientation, religious creed, national origin or ancestry of any employee, any applicant for employment or any potential subcontractor.

Contractor acknowledges that the City’s Drug Free Workplace Policy, Violence in the Workplace Policy and the Policy Against Workplace Harassment, are available on the City’s website at
http://www.ci.richmond.ca.us/workplacepolicies
. Contractor agrees to
abide by the terms and conditions of said policies.

20. Limitations upon Subcontracting and Assignment. This Contract binds the heirs, successors, assigns and representatives of Contractor. The Contractor shall not enter into subcontracts for any work contemplated

Page 982 of 1303 ends

General Conditions/EJ/TE 01-19-11 9 of 13

under this Contract and shall not assign this Contract, nor any portion hereof or monies due or to become due, without the prior written consent of the City Council or its designee.

Contractor acknowledges that the services which Contractor shall provide under this Contract are unique, personal services which, except as otherwise provided herein, Contractor shall not assign or sublet to any other party without the prior written approval of City, which approval may be withheld in City's sole and absolute discretion. In the event that City, in writing, approves any assignment or subletting of this Contract or the retention of subcontractors by Contractor, Contractor shall provide to City upon request copies of each and every subcontract contract prior to the execution thereof by Contractor and subcontractor. Any assignment by Contractor of any or all of its rights under this Contract without first obtaining City's prior written consent shall be a default under this Contract.

The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Contractor (if applicable), or of the interest of any general partner or joint venturer or syndicate member if Contractor is a partnership or joint-venture or syndicate, which shall result in a change of control of Contractor, shall be deemed an assignment. For this purpose, control shall mean fifty percent or more of the voting power or twenty-five percent or more of the assets of the corporation, partnership or joint-venture.

21. Integration
. This Contract constitutes the entire agreement between the parties concerning the subject matter hereof and supersedes any previous oral or written agreement; provided, however, that correspondence or documents exchanged between Contractor and City may be used to assist in the interpretation of the Exhibits to this Contract.

22. Modifications and Amendments. This Contract may be modified or amended only by a change order or Contract Amendment executed by both parties and approved as to form by the City Attorney.

23. Conflicting Provisions. In the event of a conflict between these General Conditions and those of any Exhibit or attachment hereto, these General Conditions shall prevail; provided, however, that any Special Conditions as set forth in Exhibit E shall prevail over these General Conditions. In the event of a conflict between the terms and conditions of any two or more Exhibits or attachments hereto, those prepared by City shall prevail over those prepared by the Contractor, and the terms and conditions preferred by the City shall prevail over those preferred by the Contractor.

24. Non-exclusivity. Notwithstanding any provision herein to the contrary, the services provided by Contractor hereunder shall be non-exclusive, and

Page 983 of 1303 ends

General Conditions/EJ/TE 01-19-11 10 of 13

City reserves the right to employ other Contractors in connection with the project.

25. Exhibits. All Exhibits hereto are made a part hereof and incorporated herein by reference; provided, however, that any language in Exhibit A which does not pertain to the project description, proposal, scope of services, or method of compensation (as applicable) , or any corresponding responsibilities of City, shall be deemed extraneous to, and not a part of, this Contract.

26. Force Majeure. Neither party hereto shall be considered in default in the performance of its obligations hereunder to the extent that the performance of such an obligation is prevented or delayed by reason of acts of God, strikes, boycotts, lock-outs, inability to procure materials not related to the price thereof, failure of power, restrictive governmental laws and regulations enacted after the date of this Contract, riots, civil unrest, acts of terrorism, insurrection, war, declaration of a state or national emergency or other reasons of a like nature not within the reasonable control of such party.

27. Time of the Essence. Time is of the essence of this Contract. Contractor and City agree that any time period set forth in Exhibit A represents their best estimates with respect to completion dates and both Contractor and City acknowledge that departures from the schedule may occur.

Therefore, both Contractor and City will use reasonable efforts to notify one another of changes to the schedule. Contractor shall not be responsible for performance delays caused by others, or delays beyond Contractor's control, and such delays shall extend the times for performance of Contractor's work.

28. Confidentiality. Contractor agrees to comply with, and to require its employees, agents and partners to comply with, all applicable State or Federal statutes or regulations respecting confidentially, including but not limited to, the identity of persons served under this Contract, their records, or services provided them, and assures that:

All applications and records concerning any individual made or kept by Contractor or any public officer or agency in connection with the administration of or relating to services provided under this Contract will be confidential, and will not be open to examination for any purposes not directly connected with the administration of such service.

No person will publish or disclose or permit or cause to be published or disclosed, any list of persons receiving services, except as may be required in the administration of such service.

Page 984 of 1303 ends

General Conditions/EJ/TE 01-19-11 11 of 13

29. Third Parties. Nothing herein shall be interpreted as creating any rights or benefits in any third parties. For purposes hereof, transferees or assignees as permitted under this Contract shall not be considered "third parties."

30. Governing Law. This Contract shall be construed in accordance with the law of the State of California without regard to principles of conflicts of law.

This Contract is made in Contra Costa County, California, and any action relating to this Contract shall be instituted and prosecuted in the courts of Contra Costa County, California.

31. Nonrenewal. Contractor understands and agrees that there is no representation, implication, or understanding that the services provided by Contractor under this Contract will be purchased or renewed by the City under a new contract following expiration or termination of this Contract, and waives all rights or claims to notice or hearing respecting any failure by City to continue the purchase of all or any failure to continue purchase of all or any such services from Contractor.

32. Claims. Any claim by Contractor against City hereunder shall be subject to Government Code §§ 800 et seq. The claims presentation provisions of said Act are hereby modified such that the presentation of all claims hereunder to the City shall be waived if not made within six months after accrual of the cause of action.

33. Interpretation. This Contract shall be interpreted as if drafted by both parties.

34. Warranty. In the event that any product shall be provided to the City as part of this Contract, Contractor warrants as follows: Contractor possesses good title to the product and the right to transfer the product to City; the product shall be delivered to the City free from any security interest or other lien; the product meets any specifications contained herein; the product shall be free from material defects in materials and workmanship under normal use for a period of one (1) year from the date of delivery; and the product shall be fit for its intended purpose(s). Notwithstanding the foregoing, consumable and maintenance items (such as light bulbs and batteries) shall be warranted for a period of one hundred and eighty (180) days from the date of delivery. All repairs during the warranty period shall be promptly performed by Contractor, at Contractor's expense, including shipping.

35. Severability. In the event that any of the provisions or portions or applications thereof of this Contract are held to be unenforceable or invalid by any court of competent jurisdiction, City and Contractor shall negotiate an equitable adjustment in the provisions of the Contract with a view

Page 985 of 1303 ends

General Conditions/EJ/TE 01-19-11 12 of 13

toward effecting the purpose of this Contract, and the validity and enforceability of the remaining provisions or portions or applications thereof, shall not be affected thereby.

36. Authority. City warrants and represents that the signatory hereto (the Mayor of the City of Richmond or the City Manager) is duly authorized to enter into and execute this Contract on behalf of City. The party signing on behalf of Contractor warrants and represents that he or she is duly authorized to enter into and execute this Contract on behalf of Contractor, and shall be personally liable to City if he or she is not duly authorized to enter into and execute this Contract on behalf of Contractor.

37. Waiver. The waiver by City of any breach of any term or provision of this Contract shall not be construed as a waiver of any subsequent breach.

Inspections or approvals, or statements by any officer, agent or employee of the City relating to the Contractor’s performance, or payments therefore, or any combination of these acts, shall not relieve the Contractor’s obligation to fulfill this Contract as prescribed; nor shall the City be thereby stopped from bringing any action for damages or enforcement arising from any failure to comply with any of the terms and conditions of this Contract.

38. Possessory Interest. If this Contract results in the Contractor having possession of, claim to or right to the possession of land or improvements, but does not vest ownership of the land or improvements in the same person, or if this Contract results in the placement of taxable improvements on tax exempt land (Revenue and Taxation Code 107), such interest or improvements may represent a possessory interest subject to property tax, and Contractor may be subject to the payment of property taxes levied on such interest.

39. Performance and Final Acceptance.

Contractor represents that it is experienced, qualified, registered, licensed, equipped, organized and financed to perform the services under this Contract.

Contractor shall perform the services under this Contract with that degree of skill and judgment normally exercised by professional firms performing services of a similar nature in the State of California, and shall be responsible for the professional quality, technical accuracy and coordination of the services it performs under this Contract. In addition to the other rights and remedies which City may have, Contractor shall, at its own expense, correct any services which fail to meet the above standard.

Page 986 of 1303 ends

General Conditions/EJ/TE 01-19-11 13 of 13

City shall provide Contractor an opportunity to cure errors and omission which may be disclosed during the review of submittals, with no increase in the authorized Contract Payment Limit. Should Contractor fail to make necessary corrections in a timely manner, such corrections shall be made by the City and the cost thereof shall be charged to Contractor.

If warranted, City shall determine, and Contractor may request such determination, that Contractor has satisfactorily completed performance of this Contract. Upon such determination, City shall issue to Contractor a written Notice of Final Acceptance, after which Contractor shall not incur further costs under this Contract. Contractor shall respond to such Notice of Final Acceptance by executing and submitting to City a Release and Certificate of Final Payment.

40. Survival
. The rights and obligations of the parties which by their nature survive termination or completion of the services covered by this Contract shall remain in full force and effect after termination or completion.

Page 987 of 1303 ends

For the Contract between the City of
Richmond and

EXHIBIT E

SPECIAL CONDITIONS

The General Conditions are hereby amended to include the following modifications and/or provisions (if applicable):

Page 988 of 1303 ends

For the Contract between the City of
Richmond and

EXHIBIT F

INSURANCE PROVISIONS

During the entire term of this Contract and any extension or modification thereof, the CONTRACTOR shall keep in effect insurance policies meeting the insurance requirements specified in the insurance provisions which are attached hereto and incorporated herein by this reference.

Page 989 of 1303 ends

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

INSURER(S) AFFORDING COVERAGE
INSURER F :

INSURER E :

INSURER D :

INSURER C :

INSURER B :

INSURER A :

NAIC #
NAME:

CONTACT
(A/C, No):

FAX
E-MAIL
ADDRESS:

PRODUCER
(A/C, No, Ext):

PHONE

INSURED
REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $
$
$PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)

COMBINED SINGLE LIMIT

AUTOS ONLY

AUTOSAUTOS ONLY

NON-OWNED

SCHEDULEDOWNED

ANY AUTO

AUTOMOBILE LIABILITY
Y / N

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under

ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-

STATUTE
PER

LIMITS(MM/DD/YYYY)

POLICY EXP
(MM/DD/YYYY)

POLICY EFF

POLICY NUMBERTYPE OF INSURANCELTR
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

EXCESS LIAB
UMBRELLA LIAB $EACH OCCURRENCE
$AGGREGATE
$
OCCUR

CLAIMS-MADE
DED RETENTION $
$PRODUCTS - COMP/OP AGG
$GENERAL AGGREGATE
$PERSONAL & ADV INJURY
$MED EXP (Any one person)
$EACH OCCURRENCE

DAMAGE TO RENTED
$PREMISES (Ea occurrence)

COMMERCIAL GENERAL LIABILITY

CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:

POLICY PRO-

JECT LOC

CERTIFICATE OF LIABILITY INSURANCE

DATE (MM/DD/YYYY)

CANCELLATION

AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED

AUTOS ONLY
12/15/2021
Pacific Diversified Insurance Services
363 Civic Dr. Suite 100
Pleasant Hill CA 94523
Certificate Department
925-686-2860
925-686-6118
[email protected]
License#: 0K07568
Ohio Security Insurance Company
24082
Nonprofits Insurance Alliance of California
East Bay Bicycle Coalition
PO Box 1736
Oakland CA 94604
1702823894
B
X
1,000,000
X
1,000,000
20,000
1,000,000
2,000,000
X
Y
2021-29948
4/19/2021
4/19/2022
2,000,000
Liquor Liabilit
Included
B
1,000,000
X
X
2021-29948
4/19/2021
4/19/2022
B
X
X
3,000,000
2021-29948-UMB
4/19/2021
4/19/2022
3,000,000
A
X
XWS62732258
2/16/2021
2/16/2022
1,000,000
1,000,000
1,000,000
B
Professional Liability
2021-29948
4/19/2021
4/19/2022
Limit
1,000,000
As required by written contract, the following endorsements apply to the Certificate Holder and/or any other entity named in this section: General Liability Additional Insured CG2026 12-19, CG2010 12-19. Primary and Non-Contributory NIAC E02 01-17, Waiver of Subrogation NIAC E26 11-17. Business Auto Additional Insured NIAC A1 03 91 and Waiver of Subrogation CA0444 10-13. Workers' Compensation Waiver of Subrogation WC990679 01-13.

The City of Richmond, its officers, officials, employees, agents and volunteers.

City of Richmond
6 - 13th Street
Richmond, CA 94804-0000

Page 990 of 1303 ends

/i255
/i255
/i255/i255
/1/2/3/4/i255/3/6/i255/7/8/i255/9/6/i255/i255 /10/11/12/13/i255/6/i255/14/15/i255/6/i255/i255 /i255
/i255
/i255
/16/17/2/18/i255/19/1/20/21/22/18/19/23/19/1/16/i255/4/17/3/1/24/19/18/i255/16/17/19/i255/10/21/25/2/4/26/27/i255/i255/10/25/19/3/18/19/i255/22/19/3/20/i255/2/16/i255/4/3/22/19/28/29/25/25/26/27/i255 /i255
/30/31/31/32/33/32/34/35/30/36/i255/32/35/38/39/40/41/31/i255/41/35/31/34/40/38/41/42/41/35/33/i255 /i255
/16/43/44/45/i255/13/46/47/14/48/45/13/49/13/46/50/i255/49/14/47/44/15/44/13/45/i255/44/46/45/51/48/11/46/52/13/i255/53/48/14/54/44/47/13/47/i255/51/46/47/13/48/i255/50/43/13/i255/15/14/55/55/14/56/44/46/12/57/i255 /i255
/i255/i255/i255/i255/58/29/18/2/1/19/18/18/i255/3/29/16/21/i255/4/21/59/19/22/3/24/19/i255/21/1/25/26/i255 /i255
/i255
/2/46/i255/52/14/46/45/44/47/13/48/11/50/44/14/46/i255/14/15/i255/50/43/13/i255/53/48/13/49/44/51/49/i255/52/43/11/48/12/13/47/60/i255/44/50/i255/44/45/i255/51/46/47/13/48/45/50/14/14/47/i255/11/46/47/i255/11/12/48/13/13/47/i255/50/43/11/50/i255/50/43/13/i255/15/14/55/55/14/56/44/46/12/i255/44/45/i255/11/47/47/13/47/i255/11/45/i255/11/46/i255/11/47/47/44/50/44/14/46/11/55/i255 /44/46/45/51/48/13/47/57/i255
/i255
/i255
/i255
/i255
/i255
/i255
/61/2/15/i255/46/14/i255/13/46/50/48/62/i255/11/53/53/13/11/48/45/i255/11/63/14/54/13/60/i255/44/46/15/14/48/49/11/50/44/14/46/i255/48/13/64/51/44/48/13/47/i255/50/14/i255/52/14/49/53/55/13/50/13/i255/50/43/44/45/i255/13/46/47/14/48/45/13/49/13/46/50/i255/56/44/55/55 /i255/63/13/i255/45/43/14/56/46/i255/44/46/i255/50/43/13/i255/20/13/52/55/11/48/11/50/44/14/46/45/i255/11/45/i255 /11/53/53/55/44/52/11/63/55/13/i255/50/14/i255/50/43/44/45/i255/13/46/47/14/48/45/13/49/13/46/50/27/65/i255 /i255
/58/51/50/i255/14/46/55/62/i255/11/45/i255/48/13/45/53/13/52/50/45/i255/11/i255/55/13/12/11/55/55/62/i255/13/46/15/14/48 /52/13/11/63/55/13/i255/52/14/46/50/48/11/52/50/51/11/55/i255/11/12/48/13/13/49/13/46/50/i255/56/44/50/43/i255/50/43/13/i255/1/11/49/13/47/i255/2/46/45/51/48/13/47/i255/11/46/47/i255/14/46/55/62/i255/15/14/48/i255/55/44/11/63/44/55/44/50/62/i255/11/48/44/45/44/46/12/i255 /14/51/50/i255/14/15/i255/50/43/13/i255/1/11/49/13/47/i255/2/46/45/51/48/13/47/66/45/i255/46/13/12/55/44/12/13/46/52/13/i255/11/46/47/i255/14/46/55/62/i255/15/14/48/i255/14/52/52/51/48/48/13/46/52/13/45/i255/14/15/i255/52/14/54/13/48/11/12/13/45/i255/46/14/50/i255/14/50/43/13/48/56/44/45/13/i255/13/67/52/55/51/47/13/47/i255/44/46/i255/50/43/13/i255/53/14/55/44/52/62/i255/50/14/i255 /56/43/44/52/43/i255/50/43/44/45/i255/13/46/47/14/48/45/13/49/13/46/50/i255/11/53/53/55/44/13/45/27/i255 /i255
/2/50/i255/44/45/i255/15/51/48/50/43/13/48/i255/51/46/47/13/48/45/50/14/14/47/i255/11/46/47/i255/11/12/48/13/13/47/i255/50/43/11/50/i255/44/48/48/13/45/53/13/52/50/44/54/13/i255/14/15/i255/50/43/13/i255/46/51/49/63/13/48/i255/14/15/i255/13/46/50/44/50/44/13/45/i255/46/11/49/13/47/i255/11/45/i255/44/46/45/51/48/13/47/45/i255/51/46/47/13/48/i255/50/43/44/45/i255/53/14/55/44/52/62/60/i255/44/46/i255 /46/14/i255/13/54/13/46/50/i255/45/43/11/55/55/i255/50/43/13/i255/52/14/49/53/11/46/62/66/45/i255/55/44/49/44/50/45/i255/14/15/i255/55/44/11/63/44/55/44/50/62/i255/13/67/52/13/13/47/i255/50/43/13/i255/14/52/52/51/48/48/13/46/52/13/i255/14/48/i255/11/12/12/48/13/12/11/50/13/i255/55/44/49/44/50/45/i255/11/45/i255/11/53/53/55/44/52/11/63/55/13/i255/63/62/i255/53/14/55/44/52/62/i255 /47/13/15/44/46/44/50/44/14/46/i255/14/48/i255/13/46/47/14/48/45/13/49/13/46/50/27/i255

Page 991 of 1303 ends

/0/1/2/3/4/5/2/2/i255/7/1/8/9/i255/10/9/11/5/12/7/13/5
/7/14/14/3/8/3/9/4/7/15/i255/3/4/2/1/12/5/14/16/15/9/2/2/i255/17/7/18/5/5/i255/5/19/8/5/4/2/3/9/4 /2/20/21/22/23/24/25/22/i255/7/3
/26/17/27/28/22
/17/9/15/3/10/18/i255/4/1/29/0/5/12/30
/4/7/29/5/i255/9/31/i255/3/4/2/1/12/5/14/30
/32/33/32/26/34/32/35/35/36/37/34/4/17/9
/7/14/14/3/8/3/9/4/7/15/i255/3/4/2/1/12/5/14/2/i255/16/i255 /15/9/2/2/i255/17/7/18/5/5
/38/39/40/41/i255/43/39/44/i255/43/45/46/44/46/47/48/i255/49/50/39/47/45/41/45/50/51/i255/52/53/39/54/i255/43/45/55/48/i255/38/39/40/41/i255/43/39/44 /56/52/52/45/41/45/50/51/39/47/i255/57/51/40/58/59/48/52/i255/60/i255/61/57/56/49/i255/56/62 /49/45/41/44/i255/50/63/i255/64/39/63/39/44/48/41/41/48/65/i255/41/66/48/i255/49/45/41/44/i255/49/50/58/51/46/45/47/i255/39/51/52/i255/48/39/46/66/i255/67/48/67/53/48/59/i255/50/63/i255/41/66/48/i255 /49/45/41/44/i255/49/50/58/51/46/45/47/65/i255/45/41/40/i255/50/63/63/45/46/48/59/40/65/i255/48/67/68/47/50/44/48/48/40/65/i255/39/69/48/51/41/40/i255/39/51/52/i255/49/45/41/44/i255 /52/48/40/45/69/51/39/41/48/52/i255/70/50/47/58/51/41/48/48/59/40 /71/72/73/74/i255/75/41/76/i255/77/45/39/53/47/50/i255/43/47/70/52/76/65/i255/78/79/62/80 /64/39/63/39/44/48/41/41/48/65/i255/49/56/i255/81/82/74/82/81 /61/83/56/56/40/i255/59/48/40/68/48/46/41/40/i255/70/48/66/45/46/47/48/84/40/85/54 /56/52/52/45/41/45/50/51/39/47/i255/57/51/40/58/59/48/52/i255/60/i255/61/57/56/49/i255/56/62 /49/45/41/44/i255/86/63/i255/87/39/51/i255/64/48/39/51/52/59/50/88/i255/56/41/41/51/54/i255/89/45/51/39/51/46/48/i255/77/48/68/39/59/41/67/48/51/41 /90/71/74/i255/38/39/40/41/i255/62/82/41/66/i255/87/41/76/65/i255/79/51/52/i255/89/47/76 /87/39/51/i255/64/48/39/51/52/59/50/65/i255/49/56/i255/81/82/74/73/73 /61/83/56/56/40/i255/59/48/40/68/48/46/41/40/i255/70/48/66/45/46/47/48/84/40/85/54 /56/52/52/45/41/45/50/51/39/47/i255/57/51/40/58/59/48/52/i255/60/i255/61/57/56/49/i255/56/62 /87/39/51/i255/89/59/39/51/46/45/40/46/50/i255/43/39/44/i255/56/59/48/39/i255/91/39/68/45/52/i255/92/59/39/51/40/45/41/i255/i255/77/45/40/41/59/45/46/41/65/i255/45/41/40/i255/50/63/63/45/46/48/59/40/65/i255 /59/48/68/59/48/40/48/51/41/39/41/45/70/48/40/65/i255/39/69/48/51/41/40/i255/39/51/52/i255/48/67/68/47/50/44/48/48/40/76 /93/86/i255/43/50/94/i255/62/79/72/90/90
/86/39/55/47/39/51/52/65/i255/49/56/i255/81/82/72/80/82/60/79/72/90/90 /61/83/56/56/40/i255/59/48/40/68/48/46/41/40/i255/70/48/66/45/46/47/48/84/40/85/54 /49/86/95/61/92/38/91/87/57/96/61/38/77/54/43 /97
/84/56/95/92/98/86/91/57/99/38/77/i255/91/38/93/91/38/87/38/61/92/56/92/57/100/38/85 /4/3/7/10/i255/34/i255/2/10/101/5/14/1/15/5/i255/7/3/34/i255/4/17/9 /71/83/62/90/83/79/80/79/62

Page 992 of 1303 ends

/0/1/2/3/4/5/i255/7/8/9/10/11/12/13/i255/14 /15/16/16/17/18/14/19/20/21/i255/20/23/24/15 /i255 /14/20/i255/25/26/i255/26/26/i255/27/25/i255/27/28 /i255
/24/29/19/30/i255/17/31/32/15/18/30/17/16/17/31/24/i255/14/29/20/31/33/17/30/i255/24/29/17/i255/34/15/21/19/14/35/36/i255/i255/34/21/17/20/30/17/i255/18/17/20/32/i255/19/24/i255/14/20/18/17/37/23/21/21/35/36/i255 /i255
/14/20/i255/25/26/i255/26/26/i255/27/25/i255/27/28/i255/38 /i255/3/39/40/41/42/43/39/44/45/i255/46/45/42/47/48/44/45/40/i255/1/49/49/48/44/45/50/i255/3/39/44/51/50/52/53/54/54/34 /55/56/57/i255/27/58/59/i255/27 /i255
/60/20/19/61/17/18/i255/15/37/i255/24/18/20/31/30/37/17/18/i255/15/37/i255/18/19/33/29/24/30/i255/15/37/i255/18/17/14/15/61/17/18/35/i255/i255 /20/33/20/19/31/30/24/i255/15/24/29/17/18/30/i255/24/15/i255/23/30/i255/62/60/20/19/61/17/18/i255/15/37/i255/30/23/63/18/15/33/20/24/19/15/31/64/i255 /i255
/65/66/48/40/i255/45/39/67/68/42/40/45/69/45/39/70/i255/69/68/67/48/49/48/45/40/i255/48/39/40/41/42/43/39/44/45/i255/71/42/68/47/48/67/45/67/i255/41/39/67/45/42/i255/70/66/45/i255/49/68/72/72/68/73/48/39/74/13/i255/i255 /i255
/75/8/65/1/i255/76/11/75/2/11/12/46/i255/4/1/77/11/12/75/78/11/i255/79/1/12/9/i255 /10/8/46/3/7/11/46/46/i255/75/8/65/1/i255/4/1/77/11/12/75/78/11/i255/79/1/12/9/i255 /9/1/65/1/12/i255/4/75/12/12/3/11/12/i255/4/1/77/11/12/75/78/11/i255/79/1/12/9/i255 /i255
/80/48/70/66/i255/42/45/40/71/45/44/70/i255/70/68/i255/44/68/47/45/42/43/74/45/i255/71/42/68/47/48/67/45/67/i255/81/82/i255/70/66/48/40/i255/45/39/67/68/42/40/45/69/45/39/70/50/i255/70/66/45/i255/71/42/68/47/48/40/48/68/39/40/i255/68/49/i255/70/66/45/i255/4/68/47/45/42/43/74/45/i255/79/68/42/69/i255/43/71/71/72/82/i255/41/39/72/45/40/40/i255 /69/68/67/48/49/48/45/67/i255/81/82/i255/70/66/45/i255/45/39/67/68/42/40/45/69/45/39/70/51/i255/i255 /65/66/48/40/i255/45/39/67/68/42/40/45/69/45/39/70/i255/44/66/43/39/74/45/40/i255/70/66/45/i255/71/68/72/48/44/82/i255/45/49/49/45/44/70/48/47/45/i255/68/39/i255/70/66/45/i255/48/39/44/45/71/70/48/68/39/i255/67/43/70/45/i255/68/49/i255/70/66/45/i255/71/68/72/48/44/82/i255/41/39/72/45/40/40/i255/43/39/68/70/66/45/42/i255/67/43/70/45/i255/48/40/i255/48/39/67/48/44/43/70/45/67/i255 /81/45/72/68/73/51/i255/i255
/i255
/31/55/83/57/84/i255/19/85/86/87/88/57/84/89/i255/i255
/17/85/84/58/88/86/57/83/57/85/90/i255/17/59/59/57/91/90/92/93/57/i255/32/55/90/57/89/i255/i255 /i255
/30/14/29/17/32/23/21/17/i255
/i255
/31/55/83/57/62/86/64/i255/15/59/i255/34/57/88/86/58/85/62/86/64/i255/15/88/i255/15/88/56/55/85/92/94/55/90/92/58/85/62/86/64/89/i255 /i255
/75/39/82/i255/71/45/42/40/68/39/i255/68/42/i255/68/42/74/43/39/48/95/43/70/48/68/39/i255/73/48/70/66/i255/73/66/68/69/i255/82/68/41/i255/66/43/47/45/i255/43/i255/73/42/48/70/70/45/39/i255/44/68/39/70/42/43/44/70/i255/44/41/42/42/45/39/70/72/82/i255/48/39/i255/45/49/49/45/44/70/i255/68/42/i255/81/45/44/68/69/48/39/74/i255/45/49/49/45/44/70/48/47/45/i255 /67/41/42/48/39/74/i255/70/66/45/i255/70/45/42/69/i255/68/49/i255/70/66/48/40/i255/71/68/72/48/44/82/51/i255/i255/i255/i255 /i255
/3/39/49/68/42/69/43/70/48/68/39/i255/42/45/96/41/48/42/45/67/i255/70/68/i255/44/68/69/71/72/45/70/45/i255/70/66/48/40/i255/46/44/66/45/67/41/72/45/50/i255/48/49/i255/39/68/70/i255/40/66/68/73/39/i255/43/81/68/47/45/50/i255/73/48/72/72/i255/81/45/i255/40/66/68/73/39/i255/48/39/i255/70/66/45/i255/76/45/44/72/43/42/43/70/48/68/39/40/51 /i255
/65/66/45/i255/24/88/55/85/86/59/57/88/i255/15/59/i255/18/92/56/97/90/86/i255/15/59/i255/18/57/91/58/93/57/88/98/i255/20/56/55/92/85/86/90/i255 /15/90/97/57/88/86/i255/24/58/i255/23/86/i255/44/68/39/67/48/70/48/68/39/i255/67/68/45/40/i255/39/68/70/i255/43/71/71/72/82/i255/70/68/i255/70/66/45/i255 /71/45/42/40/68/39/99/40/100/i255/68/42/i255/68/42/74/43/39/48/95/43/70/48/68/39/99/40/100/i255/40/66/68/73/39/i255/48/39/i255/70/66/45/i255/46/44/66/45/67/41/72/45/50/i255 /81/41/70/i255/68/39/72/82/i255/70/68/i255/70/66/45/i255/45/101/70/45/39/70/i255/70/66/43/70/i255/40/41/81/42/68/74/43/70/48/68/39/i255/48/40/i255/73/43/48/47/45/67/i255/71/42/48/68/42/i255 /70/68/i255/70/66/45/i255/102/43/44/44/48/67/45/39/70/102/i255/68/42/i255/70/66/45/i255/102/72/68/40/40/102/i255/41/39/67/45/42/i255/43/i255/44/68/39/70/42/43/44/70/i255/73/48/70/66/i255 /70/66/43/70/i255/71/45/42/40/68/39/i255/68/42/i255/68/42/74/43/39/48/95/43/70/48/68/39/51/i255 /i255
/i255
2021-29948

Page 993 of 1303 ends

/0/1/2/3/4/5/i255/7/8/9/10/11/12/13/4 /1/9/9/11/12/4/3/14/2/i255/15/11/7/11/12/14/2/i255/2/3/14/10/3/2/3/16/5 /16/17/3/18/i255/11/7/19/1/12/18/11/9/11/7/16/i255/4/17/14/7/15/11/18/i255/16/17/11/i255/0/1/2/3/4/5/20/i255/i255/0/2/11/14/18/11/i255/12/11/14/19/i255/3/16/i255/4/14/12/11/21/8/2/2/5/20 /22/23/23/24/25/24/26/27/22/28/i255/24/27/30/31/32/33/23/i255/34/i255/23/33/30/24/35/27/22/25/33/23/i255 /36/33/32/30/26/27/i255/26/32/i255/26/32/35/22/27/24/37/22/25/24/26/27 /4/15/i255/38/39/i255/38/40/i255/41/38/i255/41/42
/38/39/38/41/43/38/42/42/44/45
/7/46/47/48/49/i255/3/50/51/52/53/48/49/13/11/46/51/54/i255/10/46/55/i255/10/56/57/55/57/58/48/i255/4/59/46/58/56/54/56/59/50/i255/49/60/46/13/i255/10/56/61/48/i255/11/46/51/54/i255/10/46/55 /14/50/55/i255/62/48/53/51/59/50/i255/59/53/i255/59/53/63/46/50/56/64/46/54/56/59/50/i255/54/65/46/54/i255/55/59/52/i255/46/53/48/i255/53/48/66/52/56/53/48/49/i255/54/59/i255/46/49/49/i255/46/51/i255/46/50/i255/46/49/49/56/54/56/59/50/46/58/i255/56/50/51/52/53/48/49/i255/59/50/i255/54/65/56/51/i255/62/59/58/56/57/55/67/i255/52/50/49/48/53/i255/46/i255/68/53/56/54/54/48/50/i255 /57/59/50/54/53/46/57/54/i255/59/53/i255/46/63/53/48/48/47/48/50/54/i255/57/52/53/53/48/50/54/58/55/i255/56/50/i255/48/69/69/48/57/54/67/i255/59/53/i255/60/48/57/59/47/56/50/63/i255/48/69/69/48/57/54/56/70/48/i255/49/52/53/56/50/63/i255/54/65/48/i255/54/48/53/47/i255/59/69/i255/54/65/56/51/i255/62/59/58/56/57/55/20/i255/16/65/48/i255/46/49/49/56/54/56/59/50/46/58/i255 /56/50/51/52/53/48/49/i255/51/54/46/54/52/51/i255/68/56/58/58/i255/50/59/54/i255/60/48/i255/46/69/69/59/53/49/48/49/i255/68/56/54/65/i255/53/48/51/62/48/57/54/i255/54/59/i255/58/56/46/60/56/58/56/54/55/i255/46/53/56/51/56/50/63/i255/59/52/54/i255/59/69/i255/59/53/i255/53/48/58/46/54/48/49/i255/54/59/i255/55/59/52/53/i255/46/57/54/56/70/56/54/56/48/51/i255/46/51/i255/46/i255/53/48/46/58/i255 /48/51/54/46/54/48/i255/47/46/50/46/63/48/53/i255/69/59/53/i255/54/65/46/54/i255/62/48/53/51/59/50/i255/59/53/i255/59/53/63/46/50/56/64/46/54/56/59/50/20 /27/71/72/73/i255/26/74/i255/22/75/75/76/77/76/78/79/71/80/i255/24/79/81/82/83/73/75/i255/36/73/83/81/78/79/84/81/85/i255/26/83/i255/26/83/86/71/79/76/87/71/77/76/78/79/84/81/85/88 /30/89/90/33/23/31/28/33
/4/1/9/9/11/12/4/3/14/2/i255/15/11/7/11/12/14/2/i255/2/3/14/10/3/2/3/16/5/i255/4/1/91/11/12/14/15/11/i255/0/14/12/16 /16/65/56/51/i255/48/50/49/59/53/51/48/47/48/50/54/i255/47/59/49/56/69/56/48/51/i255/56/50/51/52/53/46/50/57/48/i255/62/53/59/70/56/49/48/49/i255/52/50/49/48/53/i255/54/65/48/i255/69/59/58/58/59/68/56/50/63/13 /3/50/69/59/53/47/46/54/56/59/50/i255/53/48/66/52/56/53/48/49/i255/54/59/i255/57/59/47/62/58/48/54/48/i255/54/65/56/51/i255/18/57/65/48/49/52/58/48/67/i255/56/69/i255/50/59/54/i255/51/65/59/68/50/i255/46/60/59/70/48/67/i255/68/56/58/58/i255/60/48/i255/51/65/59/68/50/i255/56/50/i255/54/65/48/i255/19/48/57/58/46/53/46/54/56/59/50/51/20/i255 /30/73/92/77/76/78/79/i255/24/24/i255/34/i255/93/94/78/i255/24/81/i255/22/79/i255/24/79/81/82/83/73/75/i255/56/51/i255/46/47/48/50/49/48/49/i255/54/59/i255 /56/50/57/58/52/49/48/i255/46/51/i255/46/50/i255/46/49/49/56/54/56/59/50/46/58/i255/56/50/51/52/53/48/49/i255/54/65/48/i255/62/48/53/51/59/50/95/51/96/i255/59/53/i255 /59/53/63/46/50/56/64/46/54/56/59/50/95/51/96/i255/51/65/59/68/50/i255/56/50/i255/54/65/48/i255/18/57/65/48/49/52/58/48/67/i255/60/52/54/i255/59/50/58/55/i255 /68/56/54/65/i255/53/48/51/62/48/57/54/i255/54/59/i255/58/56/46/60/56/58/56/54/55/i255/69/59/53/i255/97/60/59/49/56/58/55/i255/56/50/98/52/53/55/97/67/i255/97/62/53/59/62/48/53/54/55/i255 /49/46/47/46/63/48/97/i255/59/53/i255/97/62/48/53/51/59/50/46/58/i255/46/50/49/i255/46/49/70/48/53/54/56/51/56/50/63/i255/56/50/98/52/53/55/97/i255 /57/46/52/51/48/49/67/i255/56/50/i255/68/65/59/58/48/i255/59/53/i255/56/50/i255/62/46/53/54/67/i255/60/55/i255/55/59/52/53/i255/46/57/54/51/i255/59/53/i255 /59/47/56/51/51/56/59/50/51/i255/59/53/i255/54/65/48/i255/46/57/54/51/i255/59/53/i255/59/47/56/51/51/56/59/50/51/i255/59/69/i255/54/65/59/51/48/i255/46/57/54/56/50/63/i255 /59/50/i255/55/59/52/53/i255/60/48/65/46/58/69/13
/99/100/i255/3/50/i255/54/65/48/i255/62/48/53/69/59/53/47/46/50/57/48/i255/59/69/i255/55/59/52/53/i255/59/50/63/59/56/50/63/i255/59/62/48/53/46/54/56/59/50/51/101/i255 /i255/59/53/i255
/102/100/i255/3/50/i255/57/59/50/50/48/57/54/56/59/50/i255/68/56/54/65/i255/55/59/52/53/i255/62/53/48/47/56/51/48/51/i255/59/68/50/48/49/i255/60/55/i255/59/53/i255 /i255/53/48/50/54/48/49/i255/54/59/i255/55/59/52/20/i255 /17/59/68/48/70/48/53/13/i255
/99/100/i255/16/65/48/i255/56/50/51/52/53/46/50/57/48/i255/46/69/69/59/53/49/48/49/i255/54/59/i255/51/52/57/65/i255/46/49/49/56/54/56/59/50/46/58/i255 /i255/56/50/51/52/53/48/49/i255/59/50/58/55/i255/46/62/62/58/56/48/51/i255/54/59/i255/54/65/48/i255/48/103/54/48/50/54/i255/62/48/53/47/56/54/54/48/49/i255/60/55/i255 /i255/58/46/68/101/i255/46/50/49
/102/100/i255/3/69/i255/57/59/70/48/53/46/63/48/i255/62/53/59/70/56/49/48/49/i255/54/59/i255/54/65/48/i255/46/49/49/56/54/56/59/50/46/58/i255/56/50/51/52/53/48/49/i255/56/51/i255 /i255/53/48/66/52/56/53/48/49/i255/60/55/i255/46/i255/57/59/50/54/53/46/57/54/i255/59/53/i255/46/63/53/48/48/47/48/50/54/67/i255/54/65/48/i255 /i255/56/50/51/52/53/46/50/57/48/i255/46/69/69/59/53/49/48/49/i255/54/59/i255/51/52/57/65/i255/46/49/49/56/54/56/59/50/46/58/i255/56/50/51/52/53/48/49/i255 /i255/68/56/58/58/i255/50/59/54/i255/60/48/i255/60/53/59/46/49/48/53/i255/54/65/46/50/i255/54/65/46/54/i255/68/65/56/57/65/i255/55/59/52/i255/46/53/48/i255 /i255/53/48/66/52/56/53/48/49/i255/60/55/i255/54/65/48/i255/57/59/50/54/53/46/57/54/i255/59/53/i255/46/63/53/48/48/47/48/50/54/i255/54/59/i255 /i255/62/53/59/70/56/49/48/i255/69/59/53/i255/51/52/57/65/i255/46/49/49/56/54/56/59/50/46/58/i255/56/50/51/52/53/48/49/20 /22/100/104 /100/105/56/54/65/i255/53/48/51/62/48/57/54/i255/54/59/i255/54/65/48/i255/56/50/51/52/53/46/50/57/48/i255/46/69/69/59/53/49/48/49/i255/54/59/i255/54/65/48/51/48/i255 /46/49/49/56/54/56/59/50/46/58/i255/56/50/51/52/53/48/49/51/67/i255/54/65/48/i255/69/59/58/58/59/68/56/50/63/i255/56/51/i255/46/49/49/48/49/i255/54/59/i255 /30/73/92/77/76/78/79/i255/24/24/24/i255/34/i255/28/76/72/76/77/81/i255/26/74/i255/24/79/81/82/83/71/79/92/73/88 /3/69/i255/57/59/70/48/53/46/63/48/i255/62/53/59/70/56/49/48/49/i255/54/59/i255/54/65/48/i255/46/49/49/56/54/56/59/50/46/58/i255/56/50/51/52/53/48/49/i255/56/51/i255 /53/48/66/52/56/53/48/49/i255/60/55/i255/46/i255/57/59/50/54/53/46/57/54/i255/59/53/i255/46/63/53/48/48/47/48/50/54/67/i255/54/65/48/i255/47/59/51/54/i255/68/48/i255 /68/56/58/58/i255/62/46/55/i255/59/50/i255/60/48/65/46/58/69/i255/59/69/i255/54/65/48/i255/46/49/49/56/54/56/59/50/46/58/i255/56/50/51/52/53/48/49/i255/56/51/i255/54/65/48/i255 /46/47/59/52/50/54/i255/59/69/i255/56/50/51/52/53/46/50/57/48/13 /99/100/i255/12/48/66/52/56/53/48/49/i255/60/55/i255/54/65/48/i255/57/59/50/54/53/46/57/54/i255/59/53/i255/46/63/53/48/48/47/48/50/54/101/i255/59/53/i255 /102/100/i255/14/70/46/56/58/46/60/58/48/i255/52/50/49/48/53/i255/54/65/48/i255/46/62/62/58/56/57/46/60/58/48/i255/2/56/47/56/54/51/i255/59/69/i255 /i255/3/50/51/52/53/46/50/57/48/i255/51/65/59/68/50/i255/56/50/i255/54/65/48/i255/19/48/57/58/46/53/46/54/56/59/50/51/101/i255 /i255/68/65/56/57/65/48/70/48/53/i255/56/51/i255/58/48/51/51/20 /16/65/56/51/i255/48/50/49/59/53/51/48/47/48/50/54/i255/51/65/46/58/58/i255/50/59/54/i255/56/50/57/53/48/46/51/48/i255/54/65/48/i255 /46/62/62/58/56/57/46/60/58/48/i255/2/56/47/56/54/51/i255/59/69/i255/3/50/51/52/53/46/50/57/48/i255/51/65/59/68/50/i255/56/50/i255/54/65/48/i255 /19/48/57/58/46/53/46/54/56/59/50/51/20
/106/i255/3/50/51/52/53/46/50/57/48/i255/18/48/53/70/56/57/48/51/i255/1/69/69/56/57/48/67/i255/3/50/57/20/67/i255/38/39/41/38/0 /46/63/48/i255/41/i255/59/69/i255/41/4/15/i255/38/39/i255/38/40/i255/41/38/i255/41/42

Page 994 of 1303 ends

/0/1/2/3/4/5/i255/7/8/9/10/11/12/13/4 /1/9/9/11/12/4/3/14/2/i255/15/11/7/11/12/14/2/i255/2/3/14/10/3/2/3/16/5 /16/17/3/18/i255/11/7/19/1/12/18/11/9/11/7/16/i255/4/17/14/7/15/11/18/i255/16/17/11/i255/0/1/2/3/4/5/20/i255/i255/0/2/11/14/18/11/i255/12/11/14/19/i255/3/16/i255/4/14/12/11/21/8/2/2/5/20 /22/23/23/24/25/24/26/27/22/28/i255/24/27/30/31/32/33/23/i255/34/i255/26/35 /27/33/32/30/36/i255/28/33/30/30/33/33/30/i255/26/32/i255 /37/26/27/25/32/22/37/25/26/32/30/i255/34/i255/30/37/38/33/23/31/28/33/23/i255/39/33/32/30/26/27/i255/26/32/i255 /26/32/40/22/27/24/41/22/25/24/26/27
/4/15/i255/42/43/i255/44/43/i255/44/42/i255/44/45
/42/43/42/44/46/42/45/45/47/48
/7/49/50/51/52/i255/3/53/54/55/56/51/52/13/11/49/54/57/i255/10/49/58/i255/10/59/60/58/60/61/51/i255/4/62/49/61/59/57/59/62/53/i255/52/63/49/13/i255/10/59/64/51/i255/11/49/54/57/i255/10/49/58 /14/53/58/i255/65/51/56/54/62/53/i255/62/56/i255/62/56/66/49/53/59/67/49/57/59/62/53/i255/57/68/49/57/i255/58/62/55/i255/49/56/51/i255/56/51/69/55/59/56/51/52/i255/57/62/i255 /49/52/52/i255/49/54/i255/49/53/i255/49/52/52/59/57/59/62/53/49/61/i255/59/53/54/55/56/51/52/i255/62/53/i255/57/68/59/54/i255/65/62/61/59/60/58/70/i255/55/53/52/51/56/i255/49/i255 /71/56/59/57/57/51/53/i255/60/62/53/57/56/49/60/57/i255/62/56/i255/49/66/56/51/51/50/51/53/57/i255/60/55/56/56/51/53/57/61/58/i255/59/53/i255/51/72/72/51/60/57/70/i255/62/56/i255 /63/51/60/62/50/59/53/66/i255/51/72/72/51/60/57/59/73/51/i255/52/55/56/59/53/66/i255/57/68/51/i255/57/51/56/50/i255/62/72/i255/57/68/59/54/i255/65/62/61/59/60/58/20/i255/16/68/51/i255 /49/52/52/59/57/59/62/53/49/61/i255/59/53/54/55/56/51/52/i255/54/57/49/57/55/54/i255/71/59/61/61/i255/53/62/57/i255/63/51/i255/49/72/72/62/56/52/51/52/i255/71/59/57/68/i255 /56/51/54/65/51/60/57/i255/57/62/i255/61/59/49/63/59/61/59/57/58/i255/49/56/59/54/59/53/66/i255/62/55/57/i255/62/72/i255/62/56/i255/56/51/61/49/57/51/52/i255/57/62/i255/58/62/55/56/i255 /49/60/57/59/73/59/57/59/51/54/i255/49/54/i255/49/i255/56/51/49/61/i255/51/54/57/49/57/51/i255/50/49/53/49/66/51/56/i255/72/62/56/i255/57/68/49/57/i255/65/51/56/54/62/53/i255/62/56/i255 /62/56/66/49/53/59/67/49/57/59/62/53/20
/14/61/61/i255/59/53/54/55/56/51/52/i255/65/56/51/50/59/54/51/54/i255/49/53/52/i255/62/65/51/56/49/57/59/62/53/54/20 /28/74/75/76/77/78/74/79/80/81/82/i255/26/83/i255/37/74/84/85/86/85/87/i255/26/88/85/86/76/77/78/74/79/81 /27/76/89/85/i255/26/83/i255/22/87/87/78/77/78/74/79/76/90/i255/24/79/81/91/86/85/87/i255/39/85/86/81/74/79/80/81/82 /26/86/i255/26/86/92/76/79/78/93/76/77/78/74/79/80/81/82 /30/37/38/33/23/31/28/33
/4/1/9/9/11/12/4/3/14/2/i255/15/11/7/11/12/14/2/i255/2/3/14/10/3/2/3/16/5/i255/4/1/94/11/12/14/15/11/i255/0/14/12/16 /16/68/59/54/i255/51/53/52/62/56/54/51/50/51/53/57/i255/50/62/52/59/72/59/51/54/i255/59/53/54/55/56/49/53/60/51/i255/65/56/62/73/59/52/51/52/i255/55/53/52/51/56/i255/57/68/51/i255/72/62/61/61/62/71/59/53/66/13 /3/53/72/62/56/50/49/57/59/62/53/i255/56/51/69/55/59/56/51/52/i255/57/62/i255/60/62/50/65/61/51/57/51/i255/57/68/59/54/i255/18/60/68/51/52/55/61/51/70/i255/59/72/i255/53/62/57/i255/54/68/62/71/53/i255/49/63/62/73/51/70/i255/71/59/61/61/i255/63/51/i255/54/68/62/71/53/i255/59/53/i255/57/68/51/i255/19/51/60/61/49/56/49/57/59/62/53/54/20/i255 /30/85/75/77/78/74/79/i255/24/24/i255/34/i255/35/95/74/i255/24/81/i255/22/79/i255/24/79/81/91/86/85/87/i255/59/54/i255/49/50/51/53/52/51/52/i255/57/62/i255 /59/53/60/61/55/52/51/i255/49/54/i255/49/53/i255/49/52/52/59/57/59/62/53/49/61/i255/59/53/54/55/56/51/52/i255/57/68/51/i255/65/51/56/54/62/53/96/54/97/i255/62/56/i255 /62/56/66/49/53/59/67/49/57/59/62/53/96/54/97/i255/54/68/62/71/53/i255/59/53/i255/57/68/51/i255/18/60/68/51/52/55/61/51/70/i255/63/55/57/i255/62/53/61/58/i255 /71/59/57/68/i255/56/51/54/65/51/60/57/i255/57/62/i255/61/59/49/63/59/61/59/57/58/i255/72/62/56/i255/98/63/62/52/59/61/58/i255/59/53/99/55/56/58/98/70/i255/98/65/56/62/65/51/56/57/58/i255 /52/49/50/49/66/51/98/i255/62/56/i255/98/65/51/56/54/62/53/49/61/i255/49/53/52/i255/49/52/73/51/56/57/59/54/59/53/66/i255/59/53/99/55/56/58/98/i255 /60/49/55/54/51/52/70/i255/59/53/i255/71/68/62/61/51/i255/62/56/i255/59/53/i255/65/49/56/57/70/i255/63/58/13 /100/101/i255/5/62/55/56/i255/49/60/57/54/i255/62/56/i255/62/50/59/54/54/59/62/53/54/102/i255/62/56 /103/101/i255/16/68/51/i255/49/60/57/54/i255/62/56/i255/62/50/59/54/54/59/62/53/54/i255/62/72/i255/57/68/62/54/51/i255/49/60/57/59/53/66/i255/62/53/i255/58/62/55/56/i255 /i255/63/51/68/49/61/72/102
/59/53/i255/57/68/51/i255/65/51/56/72/62/56/50/49/53/60/51/i255/62/72/i255/58/62/55/56/i255/62/53/66/62/59/53/66/i255/62/65/51/56/49/57/59/62/53/54/i255/72/62/56/i255 /57/68/51/i255/49/52/52/59/57/59/62/53/49/61/i255/59/53/54/55/56/51/52/96/54/97/i255/49/57/i255/57/68/51/i255/61/62/60/49/57/59/62/53/96/54/97/i255 /52/51/54/59/66/53/49/57/51/52/i255/49/63/62/73/51/20
/17/62/71/51/73/51/56/13
/100/101/i255/16/68/51/i255/59/53/54/55/56/49/53/60/51/i255/49/72/72/62/56/52/51/52/i255/57/62/i255/54/55/60/68/i255/49/52/52/59/57/59/62/53/49/61/i255 /i255/59/53/54/55/56/51/52/i255/62/53/61/58/i255/49/65/65/61/59/51/54/i255/57/62/i255/57/68/51/i255/51/104/57/51/53/57/i255/65/51/56/50/59/57/57/51/52/i255 /i255/63/58/i255/61/49/71/102/i255/49/53/52
/22/101
/105/101/106/59/57/68/i255/56/51/54/65/51/60/57/i255/57/62/i255/57/68/51/i255/59/53/54/55/56/49/53/60/51/i255/49/72/72/62/56/52/51/52/i255/57/62/i255/57/68/51/54/51/i255 /49/52/52/59/57/59/62/53/49/61/i255/59/53/54/55/56/51/52/54/70/i255/57/68/51/i255/72/62/61/61/62/71/59/53/66/i255/49/52/52/59/57/59/62/53/49/61/i255 /51/104/60/61/55/54/59/62/53/54/i255/49/65/65/61/58/13
/16/68/59/54/i255/59/53/54/55/56/49/53/60/51/i255/52/62/51/54/i255/53/62/57/i255/49/65/65/61/58/i255/57/62/i255/98/63/62/52/59/61/58/i255/59/53/99/55/56/58/98/i255/62/56/i255 /98/65/56/62/65/51/56/57/58/i255/52/49/50/49/66/51/98/i255/62/60/60/55/56/56/59/53/66/i255/49/72/57/51/56/13 /100/101/i255/14/61/61/i255/71/62/56/64/70/i255/59/53/60/61/55/52/59/53/66/i255/50/49/57/51/56/59/49/61/54/70/i255/65/49/56/57/54/i255/62/56/i255 /i255/51/69/55/59/65/50/51/53/57/i255/72/55/56/53/59/54/68/51/52/i255/59/53/i255/60/62/53/53/51/60/57/59/62/53/i255/71/59/57/68/i255/54/55/60/68/i255 /i255/71/62/56/64/70/i255/62/53/i255/57/68/51/i255/65/56/62/99/51/60/57/i255/96/62/57/68/51/56/i255/57/68/49/53/i255/54/51/56/73/59/60/51/70/i255 /i255/50 /49/59/53/57/51/53/49/53/60/51/i255/62/56/i255/56/51/65/49/59/56/54/97/i255/57/62/i255/63/51/i255/65/51/56/72/62/56/50/51/52/i255/63/58/i255 /i255/62/56/i255/62/53/i255/63/51/68/49/61/72/i255/62/72/i255/57/68/51/i255/49/52/52/59/57/59/62/53/49/61/i255/59/53/54/55/56/51/52/96/54/97/i255/49/57/i255/57/68/51/i255 /i255/61/62/60/49/57/59/62/53/i255/62/72/i255/57/68/51/i255/60/62/73/51/56/51/52/i255/62/65/51/56/49/57/59/62/53/54/i255/68/49/54/i255/63/51/51/53/i255 /i255/60/62/50/65/61/51/57/51/52/102/i255/62/56
/103/101/i255/3/72/i255/60/62/73/51/56/49/66/51/i255/65/56/62/73/59/52/51/52/i255/57/62/i255/57/68/51/i255/49/52/52/59/57/59/62/53/49/61/i255/59/53/54/55/56/51/52/i255 /i255/59/54/i255/56/51/69/55/59/56/51/52/i255/63/58/i255/49/i255/60/62/53/57/56/49/60/57/i255/62/56/i255/49/66/56/51/51/50/51/53/57/70/i255/57/68/51/i255 /i255/59/53/54/55/56/49/53/60/51/i255/49/72/72/62/56/52/51/52/i255/57/62/i255/54/55/60/68/i255/49/52/52/59/57/59/62/53/49/61/i255/59/53/54/55/56/51/52/i255 /i255/71/59/61/61/i255/53/62/57/i255/63/51/i255/63/56/62/49/52/51/56/i255/57/68/49/53/i255/57/68/49/57/i255/71/68/59/60/68/i255/58/62/55/i255/49/56/51/i255 /i255/56/51/69/55/59/56/51/52/i255/63/58/i255/57/68/51/i255/60/62/53/57/56/49/60/57/i255/62/56/i255/49/66/56/51/51/50/51/53/57/i255/57/62/i255 /i255/65/56/62/73/59/52/51/i255/72/62/56/i255/54/55/60/68/i255/49/52/52/59/57/59/62/53/49/61/i255/59/53/54/55/56/51/52/20 /107/i255/3/53/54/55/56/49/53/60/51/i255/18/51/56/73/59/60/51/54/i255/1/72/72/59/60/51/70/i255/3/53/60/20/70/i255/42/43/44/42/0 /49/66/51/i255/44/i255/62/72/i255/42/4/15/i255/42/43/i255/44/43/i255/44/42/i255/44/45

Page 995 of 1303 ends

/0/1/i255/3/4/5/6/i255/7/8/9/6/10/8/11/i255/8/12/i255/13/14/8/15/9/i255/16/8/9/17/13/i255/8/15/6/i255/8/12/i255/16/4/10/18/4/i255/6/4/19/i255 /i255/10/11/20/15/9/14/i255/8/9/i255/21/5/22/5/23/19/i255/5/9/10/24/19/24/i255/4/5/24/i255/25/19/19/11/i255/7/15/6/i255/6/8/i255/10/6/24/i255 /i255/10/11/6/19/11/21/19/21/i255/15/24/19/i255/25/14/i255/5/11/14/i255/7/19/9/24/8/11/i255/8/9/i255/8/9/23/5/11/10/26/5/6/10/8/11/i255 /i255/8/6/4/19/9/i255/6/4/5/11/i255/5/11/8/6/4/19/9/i255/18/8/11/6/9/5/18/6/8/9/i255/8/9/i255/24/15/25/18/8/11/6/9/5/18/6/8/9/i255 /i255/19/11/23/5/23/19/21/i255/10/11/i255/7/19/9/12/8/9/22/10/11/23/i255/8/7/19/9/5/6/10/8/11/24/i255/12/8/9/i255/5/i255 /i255/7/9/10/11/18/10/7/5/27/i255/5/24/i255/5/i255/7/5/9/6/i255/8/12/i255/6/4/19/i255/24/5/22/19/i255/7/9/8/20/19/18/6/28/i255 /29/1/30/10/6/4/i255/9/19/24/7/19/18/6/i255/6/8/i255/6/4/19/i255/10/11/24/15/9/5/11/18/19/i255/5/12/12/8/9/21/19/21/i255/6/8/i255/6/4/19/24/19/i255 /5/21/21/10/6/10/8/11/5/27/i255/10/11/24/15/9/19/21/24/31/i255/6/4/19/i255/12/8/27/27/8/16/10/11/23/i255/10/24/i255/5/21/21/19/21/i255/6/8/i255 /32/33/34/35/36/37/38/i255/40/40/40/i255/41/i255/42/36/43/36/35/44/i255/45/46/i255/40/38/44/47/48/49/38/34/33/50/i255 /51/12/i255/18/8/52/19/9/5/23/19/i255/7/9/8/52/10/21/19/21/i255/6/8/i255/6/4/19/i255/5/21/21/10/6/10/8/11/5/27/i255/10/11/24/15/9/19/21/i255/10/24/i255 /9/19/53/15/10/9/19/21/i255/25/14/i255/5/i255/18/8/11/6/9/5/18/6/i255/8/9/i255/5/23/9/19/19/22/19/11/6/31/i255/6/4/19/i255/22/8/24/6/i255/16/19/i255 /16/10/27/27/i255/7/5/14/i255/8/11/i255/25/19/4/5/27/12/i255/8/12/i255/6/4/19/i255/5/21/21/10/6/10/8/11/5/27/i255/10/11/24/15/9/19/21/i255/10/24/i255/6/4/19/i255 /5/22/8/15/11/6/i255/8/12/i255/10/11/24/15/9/5/11/18/19/50 /54/1/i255/55/19/53/15/10/9/19/21/i255/25/14/i255/6/4/19/i255/18/8/11/6/9/5/18/6/i255/8/9/i255/5/23/9/19/19/22/19/11/6/56/i255/8/9 /0/28/i255/57/52/5/10/27/5/25/27/19/i255/15/11/21/19/9/i255/6/4/19/i255/5/7/7/27/10/18/5/25/27/19/i255/58/10/22/10/6/24/i255/8/12/i255 /i255/51/11/24/15/9/5/11/18/19/i255/24/4/8/16/11/i255/10/11/i255/6/4/19/i255/59/19/18/27/5/9/5/6/10/8/11/24/56/i255 /i255/16/4/10/18/4/19/52/19/9/i255/10/24/i255/27/19/24/24/28 /3/4/10/24/i255/19/11/21/8/9/24/19/22/19/11/6/i255/24/4/5/27/27/i255/11/8/6/i255/10/11/18/9/19/5/24/19/i255/6/4/19/i255 /5/7/7/27/10/18/5/25/27/19/i255/58/10/22/10/6/24/i255/8/12/i255/51/11/24/15/9/5/11/18/19/i255/24/4/8/16/11/i255/10/11/i255/6/4/19/i255 /59/19/18/27/5/9/5/6/10/8/11/24/28
/60/i255/51/11/24/15/9/5/11/18/19/i255/61/19/9/52/10/18/19/24/i255/62/12/12/10/18/19/31/i255/51/11/18/28/31/i255/63/64/65/63/66 /5/23/19/i255/63/i255/8/12/i255/63/67/68/i255/63/64/i255/65/64/i255/65/63/i255/65/69

Page 996 of 1303 ends

/i255
/1 /2 /3 /4 /i255 /6 /7 /8 /i255 /7 /9 /i255 /9 /10 /i255 /11 /12 /13 /14 /i255 /9 /i255 /15 /16 /i255 /9 /i255 /i255
/i255
/i255 /i255
/i255
/18 /19 /2 /20 /i255 /6 /1 /21/22/23/20 /6/24/6/1 /18 /i255 /4 /19 /3 /1/25/6/20 /i255 /18 /19 /6 /i255 /11/22/26/2 /4 /27 /28 /i255 /i255 /11 /26 /6 /3 /20 /6 /i255 /23 /6 /3 /21 /i255 /2 /18 /i255 /4 /3 /23 /6 /29 /30 /26 /26 /27 /28 /i255 /i255
/32 /33 /33 /34 /35 /34/36/37/32 /38 /i255 /34 /37 /39 /40 /41 /42 /33 /i255 /43 /i255 /44 /41 /34/45/32/41 /46 /i255 /32 /37 /33 /i255 /37/36/37/47 /48/36/37/35 /41 /34 /49 /40 /35/36/41/46 /i255 /47 /i255 /i255 /50/36/41/i255 /33 /42 /39 /34/51/37/32 /35 /42 /33 /i255 /44 /42 /41 /39/36/37/i255/36/41/i255/36/41/51/32/37 /34 /52 /32 /35 /34/36/37/i255 /i255
/18 /53 /54 /55 /i255 /14 /56 /57 /15 /58 /55 /14/59/14/56 /60 /i255/59/15/57 /54 /16 /54 /14 /55 /i255 /54 /56 /55 /61 /58 /12 /56 /62 /14 /i255 /63 /58 /15 /64 /54 /57 /14 /57 /i255 /61 /56 /57 /14 /58 /i255 /60 /53 /14 /i255 /16 /15 /65 /65 /15 /66 /54 /56 /13 /67 /i255 /20/22/4/2 /3 /26 /i255 /20 /6 /23 /68 /2 /4 /6 /i255 /11 /23/22/29/6 /20 /20 /2/22/1/3 /26 /i255 /26 /2 /3 /69 /2 /26 /2 /18 /27 /i255 /4/22/68/6 /23 /3/25/6/i255 /29/22/23/24/i255 /i255
/i255
/20/4/19/6/21/30/26/6 /i255
/1/12/59/14/i255/22/16/i255 /3 /57 /57 /54 /60 /54 /15 /56 /12 /65 /i255 /2 /56 /55 /61 /58 /14 /57 /i255 /11 /14 /58 /55 /15 /56 /70 /55 /71 /i255/22/58/i255/22/58/13 /12 /56 /54 /72 /12 /60 /54 /15 /56 /70 /55 /71 /67 /i255 /3 /56 /73 /i255 /63 /14 /58 /55 /15 /56 /i255 /15 /58 /i255 /15 /58 /13 /12 /56 /54 /72 /12 /60 /54 /15 /56 /i255 /60 /53 /12 /60 /i255 /73 /15 /61 /i255 /12 /58 /14 /i255 /58 /14 /74 /61 /54 /58 /14 /57 /i255 /60 /15 /i255 /12 /57 /57 /i255 /12 /55 /i255 /12 /56 /i255 /12 /57 /57 /54 /60 /54 /15 /56 /12 /65 /i255 /54 /56 /55 /61 /58 /14 /57 /i255 /15 /56 /i255 /60 /53 /54 /55 /i255 /63 /15 /65 /54 /62 /73 /75 /i255 /61 /56 /57 /14 /58 /i255 /i255 /i255 /i255 /12 /i255/66/58/54 /60 /60 /14 /56 /i255 /62 /15 /56 /60 /58 /12 /62 /60 /i255 /15 /58 /i255 /12 /13 /58 /14 /14/59/14/56 /60 /i255 /62 /61 /58 /58 /14 /56 /60 /65 /73 /i255 /54 /56 /i255 /14 /16 /16 /14 /62 /60 /75 /i255 /15 /58 /i255 /76 /14 /62 /15/59/54/56 /13 /i255 /14 /16 /16 /14 /62 /60 /54 /64 /14 /i255 /57 /61 /58 /54 /56 /13 /i255 /60 /53 /14 /i255 /60 /14 /58/59/i255/15 /16 /i255 /60 /53 /54 /55 /i255 /63 /15 /65 /54 /62 /73 /28 /i255 /18 /53 /14 /i255 /12 /57 /57 /54 /60 /54 /15 /56 /12 /65 /i255 /54 /56 /55 /61 /58 /14 /57 /i255 /55 /60 /12 /60 /61 /55 /i255/66/54/65 /65 /i255 /56 /15 /60 /i255 /76 /14 /i255 /12 /16 /16 /15 /58 /57 /14 /57 /i255/66/54/60 /53 /i255 /58 /14 /55 /63 /14 /62 /60 /i255 /60 /15 /i255 /65 /54 /12 /76 /54 /65 /54 /60 /73 /i255 /12 /58 /54 /55 /54 /56 /13 /i255 /15 /61 /60 /i255 /15 /16 /i255 /15 /58 /i255 /58 /14 /65 /12 /60 /14 /57 /i255 /60 /15 /i255 /73 /15 /61 /58 /i255 /12 /62 /60 /54 /64 /54 /60 /54 /14 /55 /i255 /12 /55 /i255 /12 /i255 /58 /14 /12 /65 /i255 /14 /55 /60 /12 /60 /14 /i255/59/12/56 /12 /13 /14 /58 /i255 /16 /15 /58 /i255 /60 /53 /12 /60 /i255 /63 /14 /58 /55 /15 /56 /i255 /15 /58 /i255 /15 /58 /13 /12 /56 /54 /72 /12 /60 /54 /15 /56 /28 /i255 /i255
/20 /14 /62 /60 /54 /15 /56 /i255 /2 /2 /i255/77/i255/78/53/15 /i255 /2 /55 /i255 /3 /56 /i255 /2 /56 /55 /61 /58 /14 /57 /i255 /54 /55 /i255 /12/59/14/56 /57 /14 /57 /i255 /60 /15 /i255 /54 /56 /62 /65 /61 /57 /14 /i255 /12 /55 /i255 /12 /56 /i255 /12 /57 /57 /54 /60 /54 /15 /56 /12 /65 /i255 /54 /56 /55 /61 /58 /14 /57 /i255 /60 /53 /14 /i255 /63 /14 /58 /55 /15 /56 /70 /55 /71 /i255 /15 /58 /i255 /15 /58 /13 /12 /56 /54 /72 /12 /60 /54 /15 /56 /70 /55 /71 /i255 /55 /53 /15 /66 /56 /i255 /54 /56 /i255 /60 /53 /14 /i255 /20 /62 /53 /14 /57 /61 /65 /14 /75 /i255 /76 /61 /60 /i255 /15 /56 /65 /73 /i255 /66 /54 /60 /53 /i255 /58 /14 /55 /63 /14 /62 /60 /i255 /60 /15 /i255 /65 /54 /12 /76 /54 /65 /54 /60 /73 /i255 /16 /15 /58 /i255 /79 /57 /12/59/12/13 /14 /55 /80 /i255 /62 /12 /61 /55 /14 /57 /75 /i255 /54 /56 /i255 /66 /53 /15 /65 /14 /i255 /15 /58 /i255 /54 /56 /i255 /63 /12 /58 /60 /75 /i255 /76 /73 /i255 /73 /15 /61 /58 /i255 /12 /62 /60 /55 /i255 /15 /58 /i255 /15/59/54/55 /55 /54 /15 /56 /55 /i255 /15 /58 /i255 /60 /53 /14 /i255 /12 /62 /60 /55 /i255 /15 /58 /i255 /15/59/54/55 /55 /54 /15 /56 /55 /i255 /15 /16 /i255 /60 /53 /15 /55 /14 /i255 /12 /62 /60 /54 /56 /13 /i255 /15 /56 /i255 /73 /15 /61 /58 /i255 /76 /14 /53 /12 /65 /16 /i255 /54 /56 /i255 /60 /53 /14 /i255 /63 /14 /58 /16 /15 /58/59/12/56 /62 /14 /i255 /15 /16 /i255 /73 /15 /61 /58 /i255 /15 /56 /13 /15 /54 /56 /13 /i255 /15 /63 /14 /58 /12 /60 /54 /15 /56 /55 /28 /i255 /i255
/18 /53 /14 /i255 /54 /56 /55 /61 /58 /12 /56 /62 /14 /i255 /14 /81 /60 /14 /56 /57 /14 /57 /i255 /76 /73 /i255 /60 /53 /54 /55 /i255 /14 /56 /57 /15 /58 /55 /14/59/14/56 /60 /i255 /54 /55 /i255 /63 /58 /54/59/12/58 /73 /i255 /62 /15 /64 /14 /58 /12 /13 /14 /i255 /66 /53 /14 /56 /i255 /73 /15 /61 /i255 /53 /12 /64 /14 /i255 /55 /15 /i255 /12 /13 /58 /14 /14 /57 /i255 /54 /56 /i255 /12 /i255 /66 /58 /54 /60 /60 /14 /56 /i255 /62 /15 /56 /60 /58 /12 /62 /60 /i255 /15 /58 /i255 /12 /13 /58 /14 /14/59/14/56 /60 /i255 /12 /56 /57 /i255 /66 /54 /65 /65 /i255 /76 /14 /i255 /62 /15 /56 /55 /54 /57 /14 /58 /14 /57 /i255 /56 /15 /56 /82 /62 /15 /56 /60 /58 /54 /76 /61 /60 /15 /58 /73 /i255 /66 /54 /60 /53 /i255 /60 /53 /14 /i255 /12 /57 /57 /54 /60 /54 /15 /56 /12 /65 /i255 /54 /56 /55 /61 /58 /14 /57 /70 /55 /71 /i255 /15 /66 /56 /i255 /54 /56 /55 /61 /58 /12 /56 /62 /14 /28 /i255 /i255
/i255
/i255
/i255
POLICY NUMBER: 2021-29948

Page 997 of 1303 ends

/0/1/2/3/i255/5/1/6/i255/5/7/8/6/8/9/10/i255/11/12/1/9/7/3/7/12/13/i255/14/15/1/16/i255/5/7/17/10/i255/0/1/2/3/i255/5/1/6/18/19/20/0/21/i255/22/18/23/24/25/0/21/16/i255 /26/27/25/20/16/i255/18/22/19/11/28/0/29/30/i255/31/31/i255/31/32/i255/33/27/34/22/11/35/i255/18/24/20/5/0/25/16/i255/29/36/29/31/28/29/37/37/38/39 /40/41/22/23/i255/0/18/21/27/25/23/0/20/0/18/40/i255/11/41/19/18/42/0/23/i255/40/41/0/i255/33/27/34/22/11/35/43/i255/i255/33/34/0/19/23/0/i255/25/0/19/21/i255/22/40/i255/11/19/25/0/26/24/34/34/35/43 /44/45/46/47/48/49/i255/51/52/i255/53/49/45/54/55/52/48/49/i255/51/52/i255/49/46/56/57/53/55/i255/51/52/i255/49/48/58/51/47/48/49/59 /45/56/45/46/54/55/53/i255/51/53/57/48/49/55/i255/60/44/45/46/47/48/49/i255/51/52/i255/55/61/62/49/51/56/45/53/46/51/54/63 /11/27/20/20/0/25/11/22/19/34/i255/42/0/18/0/25/19/34/i255/34/22/19/5/22/34/22/40/35/i255/11/27/64/0/25/19/42/0/i255/33/19/25/40 /23/27/11/22/19/34/i255/23/0/25/64/22/11/0/i255/33/25/27/26/0/23/23/22/27/18/19/34/i255/34/22/19/5/22/34/22/40/35/i255/11/27/64/0/25/19/42/0/i255/26/27/25/20 /40/65/7/2/i255/10/13/14/12/66/2/10/67/10/13/3/i255/67/12/14/7/68/7/10/2/i255/7/13/2/69/66/1/13/8/10/i255/70/66/12/71/7/14/10/14/i255/69/13/14/10/66/i255/3/65/10/i255/68/12/9/9/12/72/7/13/73/16 /54/74/75/76/i255/77/78/i255/79/76/80/81/77/82/i255/77/80/i255/51/80/83/74/82/84/85/74/86/84/77/82/87 /55/58/57/48/88/61/89/48
/90/65/10/66/10/i255/6/12/69/i255/1/66/10/i255/2/12/i255/66/10/91/69/7/66/10/14/i255/7/13/i255/1/i255/72/66/7/3/3/10/13/i255/8/12/13/3/66/1/8/3/i255/12/66/i255/1/73/66/10/10/67/10/13/3/i255/8/69/66/66/10/13/3/9/6/i255/7/13/i255/10/68/68/10/8/3/i255/12/66/i255/15/10/8/12/67/7/13/73/i255/10/68/68/10/8/3/7/71/10/i255/14/69/66/7/13/73/i255/3/65/10/i255 /3/10/66/67/i255/12/68/i255/3/65/7/2/i255/70/12/9/7/8/6/92/i255/72/10/i255/72/1/7/71/10/i255/1/13/6/i255/66/7/73/65/3/i255/12/68/i255/66/10/8/12/71/10/66/6/i255/72/10/i255/67/1/6/i255/65/1/71/10/i255/1/73/1/7/13/2/3/i255/3/65/1/3/i255/70/10/66/2/12/13/i255/12/66/i255/12/66/73/1/13/7/93/1/3/7/12/13/92/i255/72/65/12/i255/67/1/6/i255/15/10/i255 /13/1/67/10/14/i255/7/13/i255/3/65/10/i255/2/8/65/10/14/69/9/10/i255/1/15/12/71/10/92/i255/15/10/8/1/69/2/10/i255/12/68/i255/70/1/6/67/10/13/3/2/i255/72/10/i255/67/1/17/10/i255/68/12/66/i255/7/13/94/69/66/6/i255/12/66/i255/14/1/67/1/73/10/43 /33/1/73/10/i255/31/i255/12/68/i255/31/18/22/19/11/28/0/29/30/i255/31/31/i255/31/32 Any person or organization that you are required to add as an additional insured on this policy, under a written contract or agreement currently in effect, or becoming effective during the term of this policy. The additional insured status will not be afforded with respect to liability arising out of or related to your activities as a real estate manager for that person or organization.

Page 998 of 1303 ends

23 24 of
62732258003237270
250
"Where required by contract or written agreement
prior to loss and allowed by law."
02/16/2021 0002
02/16/2021 See Sched
XWS (22) 62 73 22 58

EAST BAY BICYCLE COALITION
Ohio Security Insurance Company 19291
WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 99 06 79 (Ed. 01-13)

WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT
- CALIFORNIA
WC 99 06 79
(Ed. 01-13)
2013 Liberty Mutual Insurance
Includes copyrighted material of WCIRB, with its permission.

We have the right to recover our payments from anyone liable for an injury co vered by this policy. We will not enforce our right against the person or organization named in the Sched ule. (This agreement applies only to the extent that you perform work under a written contract that requi res you to obtain this agreement from us.)
You must maintain payroll records accurately segregating the remunerati on of your employees while en- gaged in the work described in the Schedule.

The additional premium for this endorsement is $ .

Schedule
Person or Organization
Job Description
This endorsement changes the policy to which it is attached and is effectiv e on the date issued unless otherwise stated.
(The information below is required only when this endorsement is issued su bsequent to preparation of the policy.)
Endorsement Effective Endorsement No.

Policy Effective Premium
State
Policy No.

Insured
Insurance Company
Countersigned by ___________________

Page 999 of 1303 ends

/0/0/1/2/3/4/5/6/7/6/1/i255
/9/10/11/4/i255/12/i255/13/14/i255/15/i255
/17/18/19/20/21/0/i255
/i255/22 /23/6/24/i255/25/26/27/i255/28/29/30/30/27/31/i255/30/32/i255/33/34/30/31/32/35/36/37/27/i255/29/34/i255/32/31/35/33/34/29/34/37/27/i255/38/39/33/31/40/30/i255/31/27/29/35/33/34/41/42/i255 /29/28/27/34/35/33/34/41/i255/43/44/45/i255/37/26/29/46/30/27/31/i255/47/48/49/48/50/i255/51/27/33/41/26/52/32/31/26/32/32/35/i255/53/29/31/54/33/34/41/i255/43/27/41/36/55/29/30/33/32/34/40/56/i255 /40/27/37/30/33/32/34/i255/47/48/49/48/50/49/57/57/58/i255/59/27/39/33/34/33/30/33/32/34/40/56/i255/40/27/37/30/33/32/34/i255/47/48/49/48/50/49/57/47/57/i255/38/29/42/i255/51/27/33/41/26/52/32/31/26/32/32/35/i255 /46/29/31/54/33/34/41/i255/60/32/34/27/40/56/i255/40/27/37/30/33/32/34/i255/47/48/49/48/50/49/57/47/57/i255/38/52/42/i255/61/55/27/37/30/31/33/37/i255/62/27/26/33/37/55/27/i255/45/26/29/31/41/33/34/41/56/i255 /40/27/37/30/33/32/34/i255/47/48/49/48/50/49/57/47/57/i255/38/37/42/i255/45/29/31/i255/63/26/29/31/27/56/i255/40/27/37/30/33/32/34/i255/47/48/49/48/50/49/57/64/57/i255/65/34/40/30/29/55/55/29/30/33/32/34/i255/29/34/35/i255 /28/29/33/34/30/27/34/29/34/37/27/i255/32/39/i255/46/29/31/54/33/34/41/i255/31/27/66/27/34/36/27/i255/27/67/36/33/46/28/27/34/30/56/i255/40/27/37/30/33/32/34/i255/47/48/49/48/50/49/57/68/57/i255 /45/36/31/52/40/56/i255/40/30/31/27/27/30/i255/55/33/34/27/40/56/i255/28/29/31/54/33/34/41/40/i255/29/34/35/i255/46/29/31/54/55/27/30/40/56/i255/40/27/37/30/33/32/34/i255/47/48/49/48/50/49/57/58/57/i255 /69/34/55/29/70/39/36/55/i255/46/29/31/54/33/34/41/i255/33/34/i255/32/34/71/40/30/31/27/27/30/i255/46/29/31/54/33/34/41/i255/40/46/29/37/27/40/56/i255/40/27/37/30/33/32/34/i255/47/48/49/48/50/49/57/72/57/i255 /69/34/55/29/70/39/36/55/i255/46/29/31/54/33/34/41/i255/33/34/i255/32/39/39/71/40/30/31/27/27/30/i255/46/29/31/54/33/34/41/i255/40/46/29/37/27/40/56/i255/40/27/37/30/33/32/34/i255/47/48/49/48/50/49/57/68/57/56/i255 /47/48/49/48/50/49/47/57/57/i255/43/29/30/27/40/i255/37/26/29/31/41/27/35/i255/39/32/31/i255/36/40/27/i255/32/39/i255/46/29/31/54/33/34/41/i255/40/46/29/37/27/40/56/i255/47/48/49/48/50/49/47/68/57/i255 /51/32/30/33/37/27/i255/32/39/i255/46/29/31/54/33/34/41/i255/66/33/32/55/29/30/33/32/34/i255/29/34/35/i255/66/27/26/33/37/55/27/i255/31/27/28/32/66/29/55/56/i255/40/27/37/30/33/32/34/i255/47/48/49/48/50/49/47/48/57/i255 /59/33/40/46/32/40/33/30/33/32/34/i255/29/34/35/i255/36/40/27/i255/32/39/i255/31/27/66/27/34/36/27/56/i255/47/48/49/58/50/i255/51/27/33/41/26/52/32/31/26/32/32/35/i255/53/27/31/28/33/30/i255 /53/29/31/54/33/34/41/56/i255/40/27/37/30/33/32/34/i255/47/48/49/58/50/49/57/64/57/i255/38/29/42/i255/73/27/41/33/40/55/29/30/33/66/27/i255/74/33/34/35/33/34/41/40/56/i255/40/27/37/30/33/32/34/i255/38/52/42/i255 /63/46/27/37/33/39/33/37/i255/74/33/34/35/33/34/41/40/56/i255/40/27/37/30/33/32/34/i255/47/48/49/58/50/49/57/68/57/i255/38/54/42/i255/59/27/39/33/34/33/30/33/32/34/40/56/i255/40/27/37/30/33/32/34/i255 /47/48/49/58/50/49/57/50/57/i255/38/52/42/i255/59/27/40/33/41/34/29/30/33/32/34/i255/46/31/32/37/27/40/40/i255/32/39/i255/29/i255/34/27/33/41/26/52/32/31/26/32/32/35/i255/46/27/31/28/33/30/i255 /46/29/31/54/33/34/41/i255/29/31/27/29/56/i255/40/27/37/30/33/32/34/i255/47/48/49/58/50/49/57/75/57/i255/38/52/42/38/68/42/i255/65/40/40/36/29/34/37/27/i255/32/39/i255/66/27/26/33/37/55/27/i255/46/29/31/54/33/34/41/i255 /46/27/31/28/33/30/40/56/i255/40/27/37/30/33/32/34/i255/47/48/49/58/50/49/57/76/57/i255/62/33/40/33/30/32/31/i255/46/27/31/28/33/30/40/56/i255/40/27/37/30/33/32/34/i255/47/48/49/58/50/49/47/58/57/i255 /43/27/66/32/37/29/30/33/32/34/i255/32/39/i255/46/27/31/28/33/30/40/56/i255/40/27/37/30/33/32/34/i255/47/48/49/58/50/49/47/72/57/i255/38/52/42/i255/59/27/55/27/30/33/32/34/i255/32/39/i255/40/30/31/27/27/30/40/i255 /39/31/32/28/i255/34/27/33/41/26/52/32/31/26/32/32/35/i255/46/27/31/28/33/30/i255/46/29/31/54/33/34/41/i255/29/31/27/29/40/56/i255/40/27/37/30/33/32/34/i255/47/48/49/48/48/i255/63/30/32/46/46/33/34/41/56/i255 /63/30/29/34/35/33/34/41/56/i255/32/31/i255/53/29/31/54/33/34/41/i255/43/27/40/30/31/33/37/30/27/35/i255/32/31/i255/53/31/32/26/33/52/33/30/27/35/i255/32/34/i255/45/27/31/30/29/33/34/i255/63/30/31/27/27/30/40/56/i255 /40/27/37/30/33/32/34/i255/47/48/49/48/57/49/47/58/57/i255/53/29/31/54/33/34/41/i255/33/34/i255/37/33/30/77/71/32/70/34/27/35/i255/32/31/i255/32/46/27/31/29/30/27/35/i255/55/32/30/40/56/i255/40/27/37/30/33/32/34/i255 /47/48/49/48/57/49/64/47/57/i255/53/29/31/54/33/34/41/i255/29/31/27/29/40/i255/39/32/31/i255/27/55/27/37/30/31/33/37/i255/32/31/i255/55/32/70/i255/27/28/33/40/40/33/32/34/i255/66/27/26/33/37/55/27/40/56/i255 /40/27/37/30/33/32/34/i255/47/48/49/57/75/i255/25/31/29/39/39/33/37/i255/78/35/28/33/34/33/40/30/31/29/30/33/32/34/56/i255/29/34/35/i255/40/27/37/30/33/32/34/i255/64/49/50/64/i255 /78/35/28/33/34/33/40/30/31/29/30/33/66/27/i255/45/33/30/29/30/33/32/34/40/i255/70/29/40/i255/33/34/30/31/32/35/36/37/27/35/i255/52/77/i255/25/31/29/34/40/46/32/31/30/29/30/33/32/34/i255/53/31/32/79/27/37/30/i255 /44/29/34/29/41/27/31/i255/59/27/34/27/27/i255/61/66/29/34/40/49/i255/i255/44/40/49/i255/61/66/29/34/40/i255/37/32/34/39/33/31/28/27/35/i255/30/26/29/30/i255/30/26/27/i255/36/34/26/32/36/40/27/35/i255 /46/29/31/54/27/35/i255/29/55/32/34/41/i255/43/77/35/33/34/i255/80/29/77/i255/70/32/36/55/35/i255/34/32/30/i255/52/27/i255/35/33/40/46/55/29/37/27/35/i255/52/27/39/32/31/27/i255/30/26/27/i255/45/33/30/77/i255/32/39/i255 /43/33/37/26/28/32/34/35/i255/26/29/35/i255/29/i255/63/29/39/27/i255/53/29/31/54/33/34/41/i255/53/33/55/32/30/i255/53/31/32/41/31/29/28/i255/33/34/i255/46/55/29/37/27/49/i255/i255/59/33/40/37/36/40/40/33/32/34/i255 /27/34/40/36/27/35/49/i255/i255/78/i255/28/32/30/33/32/34/i255/70/29/40/i255/28/29/35/27/i255/52/77/i255/45/32/36/34/37/33/55/28/27/28/52/27/31/i255/80/33/55/55/33/40/56/i255/40/27/37/32/34/35/27/35/i255 /52/77/i255/45/32/36/34/37/33/55/28/27/28/52/27/31/i255/44/37/73/29/36/41/26/55/33/34/56/i255/30/32/i255/31/27/37/27/33/66/27/i255/30/26/27/i255/39/33/31/40/30/i255/31/27/29/35/33/34/41/i255/32/39/i255/30/26/27/i255 /40/29/33/35/i255/32/31/35/33/34/29/34/37/27/49/i255/i255/78/i255/40/36/52/40/30/33/30/36/30/27/i255/28/32/30/33/32/34/i255/28/29/35/27/i255/52/77/i255/45/32/36/34/37/33/55/28/27/28/52/27/31/i255 /44/29/31/30/33/34/27/60/i255/30/32/i255/46/32/40/30/46/32/34/27/i255/30/26/27/i255/28/29/30/30/27/31/i255/39/32/31/i255/39/36/31/30/26/27/31/i255/35/33/40/37/36/40/40/33/32/34/i255/35/33/27/35/i255/39/32/31/i255/30/26/27/i255 /55/29/37/54/i255/32/39/i255/29/i255/40/27/37/32/34/35/49/i255/i255/25/26/27/i255/40/29/33/35/i255/32/31/35/33/34/29/34/37/27/i255/31/27/37/27/33/66/27/35/i255/30/26/27/i255/39/33/31/40/30/i255/31/27/29/35/33/34/41/i255/29/34/35/i255 /70/29/40/i255/55/29/33/35/i255/32/66/27/31/i255/39/32/31/i255/30/70/32/i255/70/27/27/54/40/i255/30/32/i255/31/27/37/27/33/66/27/i255/30/26/27/i255/40/27/37/32/34/35/i255/31/27/29/35/33/34/41/i255/52/77/i255/30/26/27/i255 /39/32/55/55/32/70/33/34/41/i255/66/32/30/27/49/i255/i255/81/82/4/17/83/i255/i255/45/32/36/34/37/33/55/28/27/28/52/27/31/40/i255/84/33/28/27/34/27/60/56/i255/44/37/73/29/36/41/26/55/33/34/56/i255 /80/33/55/55/33/40/56/i255/62/33/37/27/i255/44/29/77/32/31/i255/84/32/26/34/40/32/34/i255/65/65/65/56/i255/29/34/35/i255/44/29/77/32/31/i255/85/36/30/30/49/i255/i255/86/13/4/17/83/i255/i255 /45/32/36/34/37/33/55/28/27/28/52/27/31/i255/44/29/31/30/33/34/27/60/49/i255/i255/81/5/17/87/10/88/89/4/90/83/i255/i255/51/32/34/27/49/i255/i255/81/5/17/4/89/87/83/i255/i255 /45/32/36/34/37/33/55/28/27/28/52/27/31/i255/85/29/30/27/40/49/i255 /i255
/i255/91/22/23/92/24/i255/78/35/32/46/30/27/35/i255/93/4/17/13/18/94/87/88/13/89/i255/86/13/24/i255/1/92/23/6/1/i255/29/35/32/46/30/33/34/41/i255/30/26/27/i255/74/27/31/31/77/i255 /30/32/i255/85/31/33/35/41/27/i255/30/32/i255/95/31/27/27/34/70/29/77/i255/45/32/28/46/55/27/30/27/i255/63/30/31/27/27/30/40/i255/53/55/29/34/49/i255 /i255
/i255/96/22/23/97/24/i255/78/35/32/46/30/27/35/i255/93/4/17/13/18/94/87/88/13/89/i255/86/13/24/i255/1/97/23/6/1/i255/29/36/30/26/32/31/33/60/33/34/41/i255/30/26/27/i255 /27/98/27/37/36/30/33/32/34/i255/32/39/i255/29/i255/37/32/34/40/30/31/36/37/30 /33/32/34/i255/37/32/34/30/31/29/37/30/i255/70/33/30/26/i255/95/26/33/55/32/30/30/33/i255/85/31/32/40/49/56/i255/65/34/37/49/56/i255/39/32/31/i255 /37/32/34/40/30/31/36/37/30/33/32/34/i255/32/39/i255/30/26/27/i255/44/29/37/35/32/34/29/55/35/i255/78/66/27/34/36/27/i255/29/34/35/i255/68/68/31/35/i255/63/30/31/27/27/30/i255/65/34/30/27/31/40/27/37/30/33/32/34/i255 /53/31/32/79/27/37/30/i255/33/34/i255/29/34/i255/29/28/32/36/34/30/i255/34/32/30/i255/30/32/i255/27/98/37/27/27/35/i255/99/72/76/57/56/50/58/48/49/72/57/56/i255/33/34/37/55/36/35/33/34/41/i255/29/i255/47/57/100/i255 /37/32/34/30/33/34/41/27/34/37/77/i255/38/99/72/47/56/75/72/72/49/72/57/42/49/i255/i255 /i255
/91/22/23/12/24/i255/78/35/32/46/30/27/35/i255/93/4/17/13/18/94/87/88/13/89/i255/86/13/24/i255/1/12/23/6/1/i255/29/36/30/26/32/31/33/60/33/34/41/i255/29/i255 /31/27/67/36/27/40/30/i255/30/32/i255/30/26/27/i255/44/27/30/31/32/46/32/55/33/30/29/34/i255/25/31/29/34/40/46/32/31/30/29/30/33/32/34/i255/45/32/28/28/33/40/40/33/32/34/i255/39/32/31/i255/30/26/27/i255 /29/55/55/32/37/29/30/33/32/34/i255/32/39/i255/74/33/40/37/29/55/i255/101/27/29/31/i255/64/57/64/47/71/64/64/i255/25/31/29/34/40/46/32/31/30/29/30/33/32/34/i255/59/27/66/27/55/32/46/28/27/34/30/i255/78/37/30/i255 /78/31/30/33/37/55/27/i255/68/i255/46/27/35/27/40/30/31/33/29/34/102/52/33/37/77/37/55/27/i255/46/31/32/79/27/37/30/i255/39/36/34/35/33/34/41/103/i255/29/34/35/i255/29/37/37/27/46/30/33/34/41/i255/29/34/35/i255 /29/46/46/31/32/46/31/33/29/30/33/34/41/i255/30/26/27/i255/39/36/34/35/40/i255/40/26/32/36/55/35/i255/30/26/27/i255/41/31/29/34/30/i255/52/27/i255/29/70/29/31/35/27/35/49/i255 /i255
/91/22/23/2/24/i255/78/35/32/46/30/27/35/i255/93/4/17/13/18/94/87/88/13/89/i255/86/13/24/i255/1/2/23/6/1/i255/29/46/46/31/32/46/31/33/29/30/33/34/41/i255/39/36/34/35/40/i255 /39/31/32/28/i255/30/26/27/i255/64/57/47/76/78/i255/80/29/40/30/27/70/29/30/27/31/i255/85/32/34/35/i255/46/31/32/37/27/27/35/40/i255/29/34/35/i255/29/46/46/31/32/66/33/34/41/i255/62/27/32/55/33/29/i255 /80/29/30/27/31/i255/30/32/i255/28/29/34/29/41/27/i255/29/34/35/i255/29/70/29/31/35/i255/37/32/34/30/31/29/37/30/40/i255/39/32/31/i255/30/26/27/i255/74/33/31/40/30/i255/63/30/31/27/27/30/i255/80/27/30/i255 /80/27/29/30/26/27/31/i255/65/28/46/31/32/66/27/28/27/34/30/i255/46/31/32/79/27/37/30/i255/30/32/i255/59/104/78/31/37/77/i255/29/34/35/i255/105/29/31/30/77/i255/45/32/34/40/30/31/36/37/30/33/32/34/i255 /29/34/35/i255/106/36/27/40/30/29/i255/61/34/41/33/34/27/27/31/33/34/41/i255/38/30/27/40/30/33/34/41/i255/29/34/35/i255/33/34/40/46/27/37/30/33/32/34/42/i255/39/32/31/i255/29/34/i255/29/28/32/36/34/30/i255/34/32/30/i255 /30/32/i255/27/98/37/27/27/35/i255/99/64/56/72/47/76/56/48/64/64/i255/107/46/31/32/79/27/37/30/i255/37/32/40/30/i255/32/39/i255/99/64/56/64/76/57/56/72/50/48/i255/46/55/36/40/i255/29/i255/64/57/100/i255 /37/32/34/30/33/34/41/27/34/37/77/i255/37/32/40/30/i255/32/39/i255/99/48/64/75/56/50/58/75/108/49/i255 /i255

Page 1000 of 1303 ends
Page 1001 of 1303 ends
Page 1002 of 1303 ends
Page 1003 of 1303 ends
Page 1004 of 1303 ends
Page 1005 of 1303 ends
Page 1006 of 1303 ends
Page 1007 of 1303 ends

1 Angela Walton
From: Patrick Phelan
Sent: Monday, August 16, 2021 3:23 PM
To: Angela Walton; Noni Thomas
Subject: FW: TDA, Article 3 2021-2022 County Claim
Attachments: TDA 2021-2022 Resolution No 2021-175.pdf
Follow Up Flag: Follow up
Flag Status: Completed
This email below from the grant administrator says we may get started. Also, see attached

Patrick Phelan
Infrastructure Administrator
pride and purpose
Tel: 510-307-8111 | Email: [email protected] Water Resource Recovery www.ci.richmond.ca.us/wrr Engineering & Capital Improvement Projects www.ci.richmond.ca.us/engineering
450 Civic Center Plaza | Richmond, CA 94804

-----Original Message-----
From: Cheryl Chi <[email protected]>
Sent: Monday, August 2, 2021 6:16 PM
To: Patrick Phelan <[email protected]>
Subject: RE: TDA, Article 3 2021-2022 County Claim

Patrick,

The allocation of $100,000 to Richmond is being circulated for approval. Eligible expenditures can begin starting July 1, 2021. You may get started on the project.

Regards,
Cheryl Chi, AICP
Transit Funding Manager
MTC, Funding Policy and Programs
(415) 778-5339 | [email protected]

BAY AREA METRO |
https://linkprotect.cudasvc.com/url?a=https%3a%2f%2fBayAreaMetro.gov&c=E,1,Tj4Q s_3Mzll-lGxVhUSLpeUoSbwftSsc7iNuLhKN4jD5SibAD-
DzgeFl6cKpqhlZj5MYmhWlrGcySF8lHcmLxUbmQ_l_VyQYKGgd4MHfSWiamTZwYFJ VMgA,&typo=1

Page 1008 of 1303 ends

2 Association of Bay Area Governments | Metropolitan Transportation Commission

Bay Area Metro Center | 375 Beale Street | Suite 800 | San Francisco, CA 94105 | (415) 778-6700

-----Original Message-----
From: Patrick Phelan <[email protected]> Sent: Monday, August 2, 2021 5:37 PM
To: Cheryl Chi <[email protected]>
Subject: FW: TDA, Article 3 2021-2022 County Claim

*External Email*

Hi Cheryl,
We are looking forward to getting started on our TDA grant project. Has the project been given the green light, can we start setting up contracts with the project partners?

Please let me know if you need anything from me or if you have any direction for me.

Thank you,

Patrick Phelan
Infrastructure Administrator
pride and purpose
Tel: 510-307-8111 | Email: [email protected] Water Resource Recovery
https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.ci.richmond .ca.us%2Fwrr&amp;data=04%7C01%7Ccchi%40bayareametro.gov%7C245f6914c402 4ade07d108d95616d966%7Cb084c4a0bb194142b70382ea65a5eeb2%7C0%7C0%7 C637635478760273584%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiL CJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&amp;sdata=wmydTc TfKLBI3VN0f%2Bp%2BPfqv%2B6whyEBt2Fe%2Fno9YmHc%3D&amp;reserved=0 Engineering & Capital Improvement Projects
https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.ci.richmond .ca.us%2Fengineering&amp;data=04%7C01%7Ccchi%40bayareametro.gov%7C245f6 914c4024ade07d108d95616d966%7Cb084c4a0bb194142b70382ea65a5eeb2%7C0% 7C0%7C637635478760273584%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjA wMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&amp;sdata= rkvS2oAGotuZXWgC6kA3V8%2FCsBopOmxgc5OpOkJeJxo%3D&amp;reserved=0 450 Civic Center Plaza | Richmond, CA 94804

-----Original Message-----
From: Jerry Fahy <[email protected]>
Sent: Wednesday, June 16, 2021 3:35 PM

Page 1009 of 1303 ends

3 To: Cheryl Chi ([email protected]) <[email protected]> Cc: Steve Kowalewski <[email protected]>; Patrick Phelan <[email protected]>; '[email protected]' <[email protected]> Subject: TDA, Article 3 2021-2022 County Claim

Good afternoon Cheryl,

Please see attached documents for the County's Coordinated Claim for TDA, Article 3 Funds for Fiscal Year 2021/2022.

If you have any questions, please feel free to call me at (925) 313-2276.

Sincerely,

Jerry Fahy
Transportation Engineering
Contra Costa County Public Works

Page 1010 of 1303 ends
Page 1 of 2 ends

May 3, 2022

Public Works

DATE: May 3, 2022
TO: Mayor Butt and Members of the City Council
FROM:

Joe Leach, PE, Director of Public Works
Dee Karnes, Fleet Maintenance Superintendent

Subject:

Approve a Contract for Repairs to a Loader
FINANCIAL IMPACT: The funds are available in the Public Works Fleet Maintenance Fiscal Year 2021-2022 budget –
01235031-400501

PREVIOUS COUNCIL
ACTION:

November 2, 2021

STATEMENT OF THE
ISSUE:

The Department of Public Works is requesting City
Council approval to contract with Pape Machinery, Inc., for repairs to a loader.

RECOMMENDED ACTION:

APPROVE a contract with Pape Machinery, Inc., for
repairs to a John Deere loader (VIN ending 17154), in an amount not to exceed $25,000 – Public Works (Joe
Leach 620-5478).

DISCUSSION:

The Fleet Maintenance Division requires repairs be made to a John Deere loader used by the Streets division that cannot be completed by Fleet Maintenance staff.

AGENDA
REPORT

Page 1011 of 1303 ends
Page 2 of 2 ends

May 3, 2022
Pape Machinery, Inc., is the only authorized dealer in Northern California for parts and repairs to John Deere equipment. A Sole Source Justification Form has been approved.

A Standard Contract for the required repairs was previously approved by City Council on November 2, 2021; however, counsel for Pape Machinery, Inc., did not agree to various terms in the Standard Contract. The approved term expired before counsels could agree on the proposed redactions. Agreed upon redactions and edits are now included in a new Standard Contract as Exhibit E – Special Conditions.

DOCUMENTS ATTACHED:

Attachment 1 – Standard Contract
Attachment 2 – Approved Sole Source & Estimate

Page 1012 of 1303 ends

ATTACHMENT 1

Page 1013 of 1303 ends
Page 1014 of 1303 ends
Page 1015 of 1303 ends
Page 1016 of 1303 ends
Page 1017 of 1303 ends
Page 1018 of 1303 ends
Page 1019 of 1303 ends
Page 1020 of 1303 ends
Page 1021 of 1303 ends
Page 1022 of 1303 ends
Page 1023 of 1303 ends
Page 1024 of 1303 ends
Page 1025 of 1303 ends
Page 1026 of 1303 ends
Page 1027 of 1303 ends
Page 1028 of 1303 ends
Page 1029 of 1303 ends
Page 1030 of 1303 ends
Page 1031 of 1303 ends
Page 1032 of 1303 ends
Page 1033 of 1303 ends
Page 1034 of 1303 ends
Page 1035 of 1303 ends
Page 1036 of 1303 ends
Page 1037 of 1303 ends
Page 1038 of 1303 ends

ATTACHMENT 2

Page 1039 of 1303 ends
Page 1040 of 1303 ends
Page 1041 of 1303 ends
Page 1042 of 1303 ends
Page 1043 of 1303 ends
Page 1 of 2 ends

May 3, 2022

Public Works

DATE: May 3, 2022
TO: Mayor Butt and Members of the City Council
FROM:

Joe Leach, PE, Director of Public Works
Subject:

Action Necessary Related to the Vacation and Dedication of a Public Storm Drain Easement Related to the Pinole
Point Phase 3 Development
FINANCIAL IMPACT: None. There is no financial impact to the City of Richmond for adopting said resolution. The developer
pays fees for the processing of the easement vacation
and dedication and is required to record said documents with the County Recorder’s office.

PREVIOUS COUNCIL
ACTION:

None.

STATEMENT OF THE
ISSUE:

Adopt a resolution to both abandon an existing 10’ and
15’ unusable storm drain easement (SDE) and dedicate a
new storm drain easement as it relates to the Pinole
Point Phase 3 development.

RECOMMENDED ACTION:

ADOPT a resolution to abandon an old, unusable 10’ and
15’ storm drain easement (SDE) owned by the City of
Richmond on the property of 6065 Giant Road in the City of Richmond, California in the County of Contra Costa;
AUTHORIZE to quitclaim said easement; and ACCEPT
the grant of new storm drain easement to be recorded
within the same property – Public Works (Joe Leach 620- 5478).

AGENDA
REPORT

Page 1044 of 1303 ends
Page 2 of 2 ends

May 3, 2022

DISCUSSION:

The property located at 6065 Giant Road, a parcel of 6.715 acres (Assessor’s Parcel Number 405-030-060 & 61) has been developed (or approved for development) into several warehouses in the City of Richmond.

During the development of Pinole Point Phase 3, the project’s applicant, Ridgeline Property Group, determined that an existing storm drain easement depicted on Parcel Map MS 755-04 filed in Book 202 of Parcel Maps page 13 did not best serve the development of the property (Attachment 1). City staff reviewed the proposed alignment of the new easement with the applicant and determined it better served the development and the City’s mission and obligation to effectively manage storm water runoff. The applicant prepared the necessary Quitclaim document (Attachment 2).

The applicant prepared two Grants of Easement that illustrates the proposed location of the new 15’ storm drain easement (Attachment 3).

Upon adoption of the noted resolution (Attachment 4) and execution of referenced documents, the applicant will proceed to record the documents with the Contra Costa County Recorder’s office.

DOCUMENTS ATTACHED:

Attachment 1 – Subdivision Map MS 755-04 with easement highlighted Attachment 2 – Quitclaim document
Attachment 3 – Grant of Easement documents
Attachment 4 – Resolution

Page 1045 of 1303 ends

ATTACHMENT 2

Page 1046 of 1303 ends

ATTACHMENT 2

Page 1047 of 1303 ends

ATTACHMENT 2

Page 1048 of 1303 ends

ATTACHMENT 2

Page 1049 of 1303 ends

ATTACHMENT 1

Page 1050 of 1303 ends

ATTACHMENT 3

Page 1051 of 1303 ends

ATTACHMENT 3

Page 1052 of 1303 ends

ATTACHMENT 3

Page 1053 of 1303 ends

ATTACHMENT 3

Page 1054 of 1303 ends

ATTACHMENT 3

Page 1055 of 1303 ends

ATTACHMENT 3

Page 1056 of 1303 ends

ATTACHMENT 3

Page 1057 of 1303 ends

ATTACHMENT 3

Page 1058 of 1303 ends

ATTACHMENT 3

Page 1059 of 1303 ends

ATTACHMENT 3

Page 1060 of 1303 ends

ATTACHMENT 3

Page 1061 of 1303 ends

ATTACHMENT 3

Page 1062 of 1303 ends

ATTACHMENT 3

Page 1063 of 1303 ends

ATTACHMENT 3

Page 1064 of 1303 ends

ATTACHMENT 3

Page 1065 of 1303 ends

Reso. No. XX-22

Page 1 of 4 ends

RESOLUTION NO. XX-XX

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RICHMOND,

CALIFORNIA, TO ABANDON AN OLD, UNUSABLE STORM DRAIN EASEMENT

OWNED BY THE CITY OF RICHMOND ON THE PROPERTY OF XXXX GIANT

HIGHWAY IN THE CITY OF RICHMOND, CONTRA COSTA COUNTY,

CALIFORNIA AND AUTHORIZE QUITCLAIM OF SAID EASEMENT
AND

ACCEPT THE GRANT OF A NEW STORM DRAIN EASEMENT TO BE RECORDED

WITHIN THE SAME PROPERTY

WHEREAS, the City received notice that action is necessary related to the vacation and dedication of a public storm drain easement related to the Pinole Point Phase 3 development; and
WHEREAS, the City will adopt this resolution to abandon an old, unusable storm drain easement owned by the City of Richmond on 6065 Giant Road, a parcel of 6.715 acres (Assessor’s Parcel Number 405-030-060 & 061) in the City of Richmond, Contra Costa County, California as depicted in Attachment 1; and
WHEREAS, the City is providing authorization to quitclaim (Attachment 2) said easement in addition to accepting the grant of a new storm drain easement to be recorded within the same property; and
WHEREAS, City staff has reviewed and determined that there is no financial impact to the City of Richmond for adopting this resolution and the developer shall pay fees for processing the easement vacation and dedication and is required to record said documents with the County Recorder’s office.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Richmond hereby abandons the title to the above-referenced easements.

BE IT FURTHER RESOLVED that the City Council of the City of Richmond hereby accepts the new fifteen-foot (15’) storm drain easement as delineated by Attachment 3 and authorizes the property owner to proceed with the storm drain easement recordation.

*********************

I certify that the foregoing resolution was passed and adopted by the City Council of the City of Richmond at a regular meeting thereof held May 3, 2022, by the following vote:

AYES:

NOES:

ABSTENTIONS:

ABSENT:

CLERK OF THE CITY OF RICHMOND
(SEAL)
Approved:

Mayor

Page 1066 of 1303 ends

Reso. No. XX-22

Page 2 of 4 ends

Approved as to form:

City Attorney

Page 1067 of 1303 ends

Reso. No. XX-22

Page 3 of 4 ends

State of California }
County of Contra Costa : ss.

City of Richmond }

I certify that the foregoing is a true copy of Resolution No. XX-XX, finally passed and adopted by the City Council of the City of Richmond at a regular meeting held on May 3, 2022

Pamela Christian, Clerk of the City of Richmond

Page 1068 of 1303 ends

Reso. No. XX-22

Page 4 of 4 ends

CLERK’S

CERTIFICATE

I, Pamela Christian, City Clerk of the City of Richmond, do hereby certify as follows:

The foregoing resolution is a full, true and correct copy of Resolution No. XX-22 duly adopted at a regular meeting of the City Council of said City duly and regularly held at the regular meeting place thereof on the 3rd day of May 2022, of which meeting all the members of said City Council had due notice and at which a majority thereof were present; and that at said meeting said resolution was adopted by the following vote:

AYES:

NOES:

ABSTENTIONS:

ABSENT:

An agenda of said meeting was posted before said meeting at City Hall, 450 Civic Center Plaza in the City of Richmond, California, a location freely accessible to members of the public, and a brief description of said resolution appeared on said agenda.

Such agenda was further posted, and such meeting was conducted in accordance with and pursuant to Executive Order N-29-20, signed by the Governor of the State of California on March 17, 2020, and Executive Order N-35-20, signed by the Governor of the State of California on March 21, 2020.

I have carefully compared the foregoing with the original on file and of record in my office, and the foregoing is a full, true and correct copy of the original resolution adopted at said meeting.

Said resolution h as not b een amended, modified, or rescinded s ince the d ate of its adoption and the same is now in full force and effect.

Dated: , 2022.

City Clerk of the City of Richmond

[SEAL]

Page 1069 of 1303 ends
Page 1 of 2 ends

May 3, 2022

Public Works

DATE: May 3, 2022
TO: Mayor Butt and Members of the City Council
FROM:

Joe Leach, PE, Director of Public Works
Dee Karnes, Fleet Maintenance Superintendent

Subject:

Approval of Contract for Repairs to a Sweeper
FINANCIAL IMPACT: The funds are available in the Public Works Fleet Maintenance Fiscal year 2021-2022 budget –
01235031-400501

PREVIOUS COUNCIL
ACTION:

STATEMENT OF THE
ISSUE:

The Department of Public Works is requesting City
Council approval to contract with Owen Equipment for
repairs to a street sweeper.

RECOMMENDED ACTION:

Approve a contract with Owen Equipment for repairs to
an Elgin sweeper (VIN ending H3506), in an amount not
to exceed $15,000 – Public Works (Joe Leach 620-
5478).

AGENDA
REPORT

Page 1070 of 1303 ends
Page 2 of 2 ends

May 3, 2022
DISCUSSION:

The Fleet Maintenance Division requires repairs be made to a Elgin sweeper used by the Streets division that cannot be completed by Fleet Maintenance staff. The sweeper has damage to the rear broom area and is currently inoperable. The timeline for repairs is approximately one week after receiving a completed purchase order.

Owen Equipment is the only authorized dealer in Northern California for parts and service repairs to Vactor/Elgin equipment. A Sole Source Justification Form has previously been approved by the Finance Department.

DOCUMENTS ATTACHED:

Attachment 1 – Original Contract
Attachment 2 – Approved Sole Source

Page 1071 of 1303 ends

May 5, 2022

Page 1072 of 1303 ends
Page 1073 of 1303 ends
Page 1074 of 1303 ends
Page 1075 of 1303 ends
Page 1076 of 1303 ends
Page 1077 of 1303 ends
Page 1078 of 1303 ends

RUSSELL KNIGHT

Page 1079 of 1303 ends
Page 1080 of 1303 ends
Page 1081 of 1303 ends
Page 1082 of 1303 ends
Page 1083 of 1303 ends
Page 1084 of 1303 ends
Page 1085 of 1303 ends
Page 1086 of 1303 ends
Page 1087 of 1303 ends
Page 1088 of 1303 ends
Page 1089 of 1303 ends
Page 1090 of 1303 ends
Page 1091 of 1303 ends
Page 1092 of 1303 ends
Page 1093 of 1303 ends
Page 1094 of 1303 ends
Page 1095 of 1303 ends
Page 1096 of 1303 ends
Page 1097 of 1303 ends

ATTACHMENT 2

Page 1098 of 1303 ends
Page 1099 of 1303 ends
Page 1100 of 1303 ends
Page 1101 of 1303 ends
Page 1102 of 1303 ends
Page 1 of 3 ends

May 3, 2022

Public Works

DATE: May 3, 2022
TO: Mayor Butt and Members of the City Council
FROM:

Joe Leach, PE, Director of Public Works

Subject:

Large Lot Final Map for the Point Molate Development
Area
FINANCIAL IMPACT: Costs associated with the development of said map have been paid by Winehaven Legacy LLC, and costs
associated with its recordation are subject to recovery through the Development Agreement

PREVIOUS COUNCIL
ACTION:

1. Approvals on September 8, 2020:
a. Subsequent Environmental Impact Report
(SEIR)
b. Mitigation Monitoring and Reporting
Program
c. California Environmental Quality Act
(CEQA) Findings of Fact
d. Statement of Overriding Considerations
e. General Plan Map and Text Amendments
f. Master Planned Area Plan
g. Development Agreement
h. Vesting Tentative Tract Map
i. Conditional Use Permit
j. Major Design Review for the Point Molate
Mixed Use Development Project (P LN 20-
057)

AGENDA
REPORT

Page 1103 of 1303 ends
Page 2 of 3 ends

May 3, 2022

2. Approval on September 14, 2020:
a. Rezoning of the area to a Point Molate Planned
Area District (PM -PAD) with –H, Historic District
Overlay for the Winehaven Historic District
b. Disposition and Development Agreement

STATEMENT OF THE
ISSUE:

Recordation of a large lot final map is a requirement of the Disposition and Development Agreement between
the City of Richmond and Winehaven Legacy, LLC
RECOMMENDED ACTION:

AUTHORIZE the Mayor to sign, and staff to record the
large lot final map for the Point Molate Development –
Public Works (Joe Leach 620-5478).

BACKGROUND:

Winehaven Legacy, LLC (the “Subdivider” and “Developer”) has prepared their final map and subdivision improvement drawings for the Point Molate Development Subdivision, a mixed-use community including residential, commercial, open space, and public facilities. This final map does not create the individual parcels of land for homes and businesses; rather, it creates large lots for transfer to other parties.

This map creates 55 lots designated as follows: lot numbers 1 to 44; Parcels M1 to M3; Parcels A to G; and Parcels W1 to and W2. The lots range in size from less than 1 acre to more than 90 acres.

The Vesting Tentative Subdivision Parcel Map (PLN20-057) for the Point Molate Development Subdivision was approved by the City Council with reference to Resolution No. 97-20 on September 8, 2020. In addition, City Council approved a development agreement with the Subdivider in Ordinance Number 23-20 N.S. as well as rezoning of the site in Ordinance Number 22-20 N.S. on September 15, 2021.

DISCUSSION:

Developer has complied with the conditions set forth by the City Council, the Subdivision Ordinance of the City of Richmond and all other applicable State and local laws and regulations to create parcels for development consistent with the previous planning effort. The land is currently owned by the City and the transfer of ownership between the City and the Developer will occur in accordance with the Disposition and Development Agreement.

The lots created by the large lot final map are not intended for development of individual residential or commercial units. These lots will be further subdivided in a future final map process. The lots as shown on the final map are generally designated as to their use. For reference, lots with a numerical value (1, 2, 3, 4, etc.)

Page 1104 of 1303 ends
Page 3 of 3 ends

May 3, 2022
are intended to be transferred to the Developer to be developed consistent with the approved plan. Lots with an alphabetical letter (A, B, etc.) are intended to be open space. Parcels W1 and W2 are water parcels.

The delineation of Point Molate Development Subdivision as shown in the attached map was prepared by the Developer. The large lot final map is being finalized and shall conform to all applicable regulations in advance of recordation.

Construction of streets, sidewalks, drainage facilities, water services, joint trench, lighting system and landscaping are to be completed and included in the developer’s project. Detailed construction drawings for the backbone infrastructure and the in-tract subdivision improvements are currently under review by the City. The City will not allow infrastructure construction to commence until the following have occurred: the improvement plans are completed to the satisfaction of the City Engineer; the Developer enters into an infrastructure improvement agreement (or subdivision improvement agreement) with the City; and the Developer posts the required bonds for the cash value of the improvements.

The Developer now seeks approval of the large lot final map consistent with the requirements of the approved Disposition and Development Agreement.

DOCUMENTS ATTACHED:

Attachment 1 – Resolution
Attachment 2 – Large Lot Final Map for Point Molate Subdivision (“DRAFT” as of April 28, 2022)

Page 1105 of 1303 ends

Attachment 1

RESOLUTION NO. _____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RICHMOND

APPROVING THE LARGE LOT FINAL MAP FOR THE POINT MOLATE

DEVELOPMENT, DIRECTING THE RECORDING THEREOF

WHEREAS, on September 8, 2020, the City Council of the City of Richmond approved the Vesting Tentative Map for Point Molate Subdivision and related entitlements; and

WHEREAS, the developer, Winehaven Legacy LLC, has complied with any and all terms and conditions set forth by the Planning Commission, the Subdivision Ordinance of the City of Richmond and any other applicable state and local law or regulations; and

WHEREAS, recordation of said subdivision map is a contractual obligation between the City and Winehaven Legacy, LLC in the Disposition and Development section Agreement, dated September 30, 2020, Section 2.3.7; and

WHEREAS, prior to the commencement of any const ruction of improvements related to the development, the developer shall enter into the necessary improvement agreements (i.e. Infrastructure Im provement Agreement or Subdivision Improvement Agreement) and provide the requisite bonds for the construction of streets, sidewalks, drainage facilities, water service, joint trench, and landscaping; and

WHEREAS, the developer has requested the City of Richmond to approve said Final Map on behalf of the City, the property owner.

NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Richmond that based on all evidence in the administrative record of proceedings, it hereby finds that the Final Map for Subdivision # TBD conforms to all the requirements of the Subdivision Map Act of the State of California and Chapter

15.04.705 of the Municipal Code of the City of Richmond applicable at the time of conditional approval of said Subdivision and directs the City Clerk of the City of Richmond to execute the Final Map and transmit said Final Map to the Office of the Recorder of Contra Costa County, California for recordation.

*****************************

Page 1106 of 1303 ends

I certify that the foregoing resolution was passed and adopted by the City Council of the City of Richmond at a regular meeting held on May 3 , 2022 by the following vote:

AYES:

NOES:

ABSTENTIONS:

ABSENT:

Clerk of the City of Richmond

Approved:
(SEAL)

Mayor
Approved as to form:

City Attorney

Page 1107 of 1303 ends

OWNER'S STATEMENT:

THE UNDERSIGNED, CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA, DOES

HEREBY STATE THAT THEY ARE THE OWNERS OF ALL THE LAND DELINEATED UPON AND EMBRACED WITHIN THE EXTERIOR SUBDIVISION BOUNDARY LINES OF THE HEREIN EMBODIED MAP ENTITLED "SUBDIVISION MAP 9611", CONSISTING OF SEVENTEEN (17) SHEETS, THIS STATEMENT BEING ON SHEET ONE (1) THEREOF:

THAT SAID CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA, ACQUIRED TITLE BY VIRTUE OF THE GRANT DEEDS RECORDED SEPTEMBER 30, 2003, DOC NO. 2003-0489200, AND MARCH 29, 2010, DOC NO. 2010-0060367 OFFICIAL RECORDS OF CONTRA COSTA COUNTY; AND DO HEREBY CONSENT TO THE PREPARATION AND FILING OF THIS MAP.

THE UNDERSIGNED DOES HEREBY STATE THAT THE REAL PROPERTY DESCRIBED BELOW IS RESERVED AND DEDICATED IN FEE FOR PUBLIC PURPOSES: THOSE STRIPS OF LAND DESIGNATED HEREIN AS PARCEL M1, PARCEL M2, AND PARCEL M3 AS EMBRACED WITHIN THE BOUNDARY OF THE HEREIN EMBODIED MAP, FOR THE USES AND PURPOSES OF PUBLIC STREETS.

THE UNDERSIGNED ALSO DOES HEREBY STATE THAT THE REAL PROPERTY DESCRIBED BELOW IS RESERVED AND DEDICATED AS AN EASEMENT FOR PUBLIC PURPOSES: THE AREA DESIGNATED AS A PUBLIC ACCESS

AND UTILITY EASEMENT (PAUE) FOR THE PURPOSES OF VEHICULAR INGRESS AND EGRESS, PEDESTRIAN INGRESS AND EGRESS, AND UTILITIES.

THE UNDERSIGNED ALSO DOES HEREBY STATE THAT THE REAL PROPERTY DESCRIBED BELOW IS RESERVED AND DEDICATED AS AN EASEMENT FOR PUBLIC PURPOSES: THE AREA DESIGNATED AS A PUBLIC ACCESS

EASEMENT (PAE) FOR THE PURPOSES OF VEHICULAR INGRESS AND EGRESS, PEDESTRIAN INGRESS AND EGRESS.

THE UNDERSIGNED DOES HEREBY STATE THAT THE REAL PROPERTY DESCRIBED BELOW IS RESERVED AND DEDICATED IN FEE FOR PUBLIC PURPOSES: THOSE PARCELS OF LAND DESIGNATED HEREIN AS PARCEL A, PARCEL C, PARCEL D, PARCEL E, PARCEL F, PARCEL G, PARCEL W1 AND PARCEL W2 AS EMBRACED WITHIN THE BOUNDARY OF THE HEREIN EMBODIED MAP, FOR THE USES AND PURPOSES OF PUBLIC OPEN SPACE.

IN WITNESS THEREOF, I HAVE CAUSED THIS STATEMENT TO BE EXECUTED THE DATE HEREUNDER WRITTEN.

OWNER: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA BY:     DATE:

PRINTED NAME:

TITLE:

OWNER'S ACKNOWLEDGMENT:

A NOTARY PUBLIC OR OTHER OFFICER COMPLETING THIS CERTIFICATE VERIFIES ONLY THE IDENTITY OF THE

INDIVIDUAL WHO SIGNED THE DOCUMENT TO WHICH THIS CERTIFICATE IS ATTACHED, AND NOT THE TRUTHFULNESS, ACCURACY, OR VALIDITY OF THAT DOCUMENT.

STATE OF CALIFORNIA )
) SS.

COUNTY OF     )
ON    , 2022, BEFORE ME    , A NOTARY PUBLIC, PERSONALLY APPEARED     WHO PROVED TO ME ON THE BASIS OF SATISFACTORY

EVIDENCE TO BE THE PERSON(S) WHOSE NAME(S) IS/ARE SUBSCRIBED TO THE WITHIN INSTRUMENT AND

ACKNOWLEDGED TO ME THAT HE/SHE/THEY EXECUTED THE SAME IN HIS/HER/THEIR AUTHORIZED

CAPACITY(IES) AND THAT BY HIS/HER/THEIR SIGNATURE(S) ON THE INSTRUMENT THE PERSON(S) OR THE ENTITY UPON BEHALF OF WHICH THE PERSON(S) ACTED, EXECUTED THE INSTRUMENT.

I CERTIFY UNDER PENALTY OF PERJURY UNDER THE LAWS OF THE STATE OF CALIFORNIA THAT THE FOREGOING PARAGRAPH IS TRUE AND CORRECT.

WITNESS MY HAND.

SIGNATURE:

NOTARY PUBLIC IN AND FOR PRINTED NAME

SAID COUNTY AND STATE
PRINCIPAL PLACE OF BUSINESS:

COMMISSION EXPIRES:

COMMISSION NUMBER:

CITY CLERK'S STATEMENT:

I, PAMELA CHRISTIAN, CITY CLERK AND EX-OFFICIO OF THE CITY COUNCIL OF THE CITY OF RICHMOND,

COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, DO HEREBY STATE THAT THE ABOVE AND FOREGOING MAP ENTITLED "SUBDIVISION MAP 9611", WAS PRESENTED TO SAID CITY COUNCIL, AS PROVIDED BY LAW, AT A REGULAR MEETING THEREOF, HELD ON THE     DAY OF , 2022, AND THAT

SAID CITY COUNCIL DID THEREUPON, BY RESOLUTION DULY PASSED AND ADOPTED AT SAID MEETING,

APPROVE SAID MAP, AND ACCEPTED ON BEHALF OF THE PUBLIC THE FOLLOWING PARCELS OF LAND, RIGHTS OF WAY, AND EASEMENTS: PARCEL M1, PARCEL M2, PARCEL M3, PARCEL A, PARCEL B, PARCEL C,

PARCEL D, PARCEL E, PARCEL F, PARCEL G, PUBLIC ACCESS AND UTILITY EASEMENT (PAUE), AND PUBLIC

ACCESS EASEMENT (PAE), OFFERED FOR DEDICATION TO THE PUBLIC FOR USE IN CONFORMITY WITH THE

TERMS OF THE OFFERS OF DEDICATION WHICH RESERVATION, DEDICATION AND ACCEPTANCE SHALL SURVIVE CONVEYANCE OF THE PROPERTY.

PURSUANT TO SECTIONS 66434(g) AND 66499.20.2 OF THE CALIFORNIA SUBDIVISION MAP ACT, THE FOLLOWING EASEMENTS ARE HEREBY ABANDONED AND NOT SHOWN HEREON: AN EASEMENT FOR A PUBLIC ROAD, RECORDED AUGUST 6, 1986, IN BOOK 13044 AT PAGE 945 OF OFFICIAL RECORDS OF CONTRA COSTA COUNTY.

IN WITNESS WHEREOF, I HAVE HEREUNTO SET MY HAND THIS DAY OF , 2022.

PAMELA CHRISTIAN, CITY CLERK

OF THE CITY OF RICHMOND,

COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA
COUNTY RECORDER'S STATEMENT:

THIS MAP ENTITLED, "SUBDIVISION MAP 9611", IS HEREBY ACCEPTED FOR RECORDATION SHOWING A CLEAR TITLE PURSUANT TO THE LETTER OF TITLE WRITTEN BY    , DATED , AND AFTER EXAMINING THE SAME, I DEEM THAT SAID MAP COMPLIES IN ALL

RESPECTS WITH THE PROVISIONS OF STATE LAW AND LOCAL ORDINANCES GOVERNING THE FILING OF SUBDIVISION MAPS.

FILED THIS     DAY OF    , 2022, AT        .M. IN BOOK     OF MAPS AT PAGES        , IN THE OFFICE OF THE COUNTY RECORDER OF THE COUNTY OF CONTRA COSTA AT THE REQUEST OF CLIENT.

DEBORAH COOPER

COUNTY RECORDER IN AND FOR

THE COUNTY OF CONTRA COSTA,

STATE OF CALIFORNIA
BY:

DEPUTY COUNTY RECORDER

BKF ENGINEERS
4670 WILLOW ROAD
SUITE 250
PLEASANTON, CA 94588
(925) 396-7700
www.bkf.com
DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA SOILS REPORT:

A SOILS REPORT WAS PREPARED BY ENGEO INCORPORATED, DATEDNOVEMBER 17, 2021, PROJECT NO. 7102.000.001, SIGNED BY SIOBHAN O'REILLY-SHAH, JOSEF J. TOOTLE, AND PHIL STUECHELI AND IS ON FILE AT THE OFFICE OF THE CITY ENGINEER.

CLERK OF THE BOARD OF SUPERVISORS' STATEMENT:

I, MONICA NINO, CLERK OF THE BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR OF THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, DO HEREBY CERTIFY, AS CHECKED BELOW, THAT:
[ ] AN APPROVED BOND HAS BEEN FILED WITH THE BOARD OF SUPERVISORS OF SAID COUNTY AND STATE IN THE AMOUNT OF $   , CONDITIONED FOR THE PAYMENT OF ALL

THE TAXES AND SPECIAL ASSESSMENTS COLLECTED AS TAXES WHICH ARE NOW A LIEN AGAINST

SAID LAND OR ANY PART THEREOF BUT NOT YET PAYABLE, AND WAS DULY APPROVED BY SAID BOARD IN SAID AMOUNT.
[ ] ALL TAXES AND SPECIAL ASSESSMENTS COLLECTED AS TAXES HAVE BEEN PAID, AS CERTIFIED BY THE TREASURER-TAX COLLECTOR OF THE COUNTY OF ALAMEDA.
[ ] EXEMPT
IN WITNESS WHEREOF, I HAVE HEREUNTO SET MY HAND THIS     DAY OF    , 2022.

MONICA NINO

CLERK OF THE BOARD OF SUPERVISORS AND

COUNTY ADMINISTRATOR OF THE COUNTY

CONTRA COSTA, STATE OF CALIFORNIA
BY:

DEPUTY COUNTY CLERK
PLANNING DIRECTOR'S STATEMENT:

I HEREBY STATE THAT THE PLANNING COMMISSION OF THE CITY OF RICHMOND, COUNTY OF CONTRA

COSTA, STATE OF CALIFORNIA, HAS APPROVED THE TENTATIVE MAP UPON WHICH THIS FINAL MAP IS BASED.

DATE:

RICHARD MITCHELL

CITY OF RICHMOND, CALIFORNIA

SHEET INDEX:

SHEET 1: STATEMENTS AND VICINITY MAP
SHEET 2: STATEMENTS, NOTES AND BASIS OF BEARINGS
SHEET 3: EXISTING BOUNDARY
SHEET 4: EXISTING BOUNDARY LINE TABLES
SHEET 5: EXISTING BOUNDARY DETAILS
SHEET 6: NEW PARCEL OVERVIEW AND KEY SHEET
SHEET 7: LOTS 1 THROUGH 3 AND PARCELS A THROUGH C
SHEET 8: LOT 4 & PARCEL E
SHEET 9: LOT 5, PARCEL F AND PARCEL M3
SHEET 10: LOT 6, LOT 11 AND PARCEL G
SHEET 11: LOTS 7 THROUGH 9, LOTS 42 THROUGH 44, AND PARCEL M2 SHEET 12: LOT 10
SHEET 13: LOTS 12 THROUGH 41
SHEET 14: PARCEL D AND PARCELS W1 AND W2
SHEET 15: PARCEL M1
SHEET 16: LINE AND CURVE TABLES FOR PARCELS D, M1, W1, AND W2 SHEET 17: NEW EASEMENT DETAILS
SHEET 18: EXISTING EASEMENTS
SHEET 1 OF 18SCALE: NONE
DRAFT

Page 1108 of 1303 ends

NOTES:

ACCORDING TO THE PRELIMINARY REPORT PREPARED BY FIRST AMERICAN TITLE COMPANY, ORDER NUMBER 0131-623876ala, DATED JANUARY 30, 2020, THE LANDS WITHIN THIS SUBDIVISION ARE ENCUMBERED BY AND SUBJECT TO THE FOLLOWING:
a. THE EFFECT OF AN EASEMENT FOR BROAD GAUGE STEAM RAILROAD RECORDED AUGUST 19, 1902, IN BOOK 94 OF DEEDS AT PAGE 473, THE EXACT LOCATION OF WHICH HAS BEEN SHOWN ACCORDING TO AVAILABLE RAILROAD MAPS OBTAINED FROM THE UNION PACIFIC RAILROAD COMPANY.

EXCEPTION 5
b. THE EFFECT OF AN EASEMENT FOR PIPE LINES RECORDED OCTOBER 5, 1905, IN BOOK 113 OF DEEDS AT PAGE 307, THE LOCATION OF WHICH DOES NOT PLOT ON THE SUBJECT PROPERTY. EXCEPTION 6 c. THE EFFECT OF AN EASEMENT FOR A SINGLE LINE OF POLES RECORDED OCTOBER 23, 1907, IN BOOK 127 OF DEEDS AT PAGE 566, THE EXACT LOCATION OF WHICH CANNOT BE DETERMINED FROM RECORD INFORMATION. EXCEPTION 9
d. THE EFFECT OF AN EASEMENT FOR A SINGLE LINE OF POLES RECORDED OCTOBER 23, 1907, IN BOOK 127 OF DEEDS AT PAGE 569, THE EXACT LOCATION OF WHICH CANNOT BE DETERMINED FROM RECORD INFORMATION. EXCEPTION 10
e. THE EFFECT OF AN EASEMENT FOR MAINS OR PIPES RECORDED OCTOBER 23, 1907, IN BOOK 127 OF DEEDS AT PAGE 572, THE EXACT LOCATION OF WHICH CANNOT BE DETERMINED FROM RECORD INFORMATION. EXCEPTION 11
f. THE EFFECT OF AN EASEMENT FOR MAINS OR PIPES RECORDED OCTOBER 29, 1907, IN BOOK 131 OF DEEDS AT PAGE 58, THE EXACT LOCATION OF WHICH CANNOT BE DETERMINED FROM RECORD INFORMATION. EXCEPTION 12
g. THE EFFECT OF AN EASEMENT FOR POLES RECORDED DECEMBER 7, 1907, IN BOOK 131 OF DEEDS AT PAGE 408, THE EXACT LOCATION OF WHICH CANNOT BE DETERMINED FROM RECORD INFORMATION.

EXCEPTION 13
h. THE EFFECT OF AN EASEMENT FOR ROADWAY, PIPE LINES, AND UTILITIES RECORDED FEBRUARY 16, 1929, IN BOOK 176 OF OFFICIAL RECORDS AT PAGE 105, THE EXACT LOCATION OF A PORTION OF WHICH CANNOT BE DETERMINED FROM RECORD INFORMATION. EXCEPTION 19 i. THE EFFECT OF AN AGREEMENT FOR PIPELINES RECORDED APRIL 4, 1930, IN BOOK 223 OR OFFICIAL RECORDS AT PAGE 362, THE EXACT LOCATION OF WHICH CANNOT BE DETERMINED FROM RECORD INFORMATION. EXCEPTION 20
j. THE EFFECT OF AN EASEMENT FOR SLOPES AND EMBANKMENTS RECORDED JUNE 13, 1931, IN BOOK 287 OR OFFICIAL RECORDS AT PAGE 67, THE EXACT LOCATION OF WHICH CANNOT BE DETERMINED FROM RECORD INFORMATION. EXCEPTION 23
k. THE EFFECT OF AN EASEMENT FOR POLES RECORDED APRIL 27, 1938, IN BOOK 460 OR OFFICIAL RECORDS AT PAGE 232, THE EXACT LOCATION OF WHICH CANNOT BE DETERMINED FROM RECORD INFORMATION. EXCEPTION 26
l. THE EFFECT OF A JUDGEMENT AS TO PACIFIC GAS AND ELECTRIC FOR POLE LINE EASEMENTS RECORDED FEBRUARY 18, 1946, IN BOOK 887 OF OFFICIAL RECORDS AT PAGE 256, THE EXACT LOCATION OF WHICH CANNOT BE DETERMINED FROM RECORD INFORMATION. EXCEPTION 27 m. THE EFFECT OF A DOCUMENT ENTITLED RETROCESSION OF LEGISLATIVE JURISDICTION, RECORDED FEBRUARY 23, 1999. EXCEPTION 33
n. MATTERS CONTAINED THE DOCUMENT RECORDED SEPTEMBER 30, 2003, AS DOCUMENT NUMBER 2003-489199. EXCEPTION 34
o. MATTERS AND THE EFFECT OF EASEMENTS FOR UTILITIES AND ACCESS RECORDED SEPTEMBER 30, 2003, AS DOCUMENT NUMBER 2003-489200, AND MARCH 29, 2010, AS DOCUMENT NUMBER 2010-0060369. EXCEPTIONS 35, 36, AND 37.
p. MATTERS CONTAINED THE DOCUMENT RECORDED MARCH 29, 2010, AS DOCUMENT NUMBER 2010-0060367. EXCEPTION 38
q. MATTERS CONTAINED THE DOCUMENT RECORDED MARCH 29, 2010, AS DOCUMENT NUMBER 2010-0060368. EXCEPTION 39
r. ANY CLAIM THAT ANY PORTION OF THE LAND IS BELOW THE ORDINARY HIGH WATER MARK WHERE IT

WAS LOCATED PRIOR TO ANY ARTIFICIAL OR AVULSIVE CHANGES IN THE LOCATION OF THE SHORELINE OR RIVERBANK.
s. ANY RIGHTS, INTERESTS, OR EASEMENTS IN FAVOR OF THE PUBLIC, WHICH EXIST OR ARE CLAIMED TO

EXIST OVER ANY PORTION OF SAID LAND COVERED BY WATER, INCLUDING A PUBLIC RIGHT OF ACCESS TO THE WATER.
t. ANY CLAIM THAT ANY PORTION OF THE LAND IS OR WAS FORMERLY TIDELANDS OR SUBMERGED LANDS.
u. RIGHTS OF THE PUBLIC IN AND TO THAT PORTION OF THE LAND LYING WITHIN ANY ROAD, STREET, ALLEY OR HIGHWAY.

ALL OFFICIAL RECORDS OF CONTRA COSTA COUNTY
SIGNATURE OMISSIONS:

PURSUANT TO SECTION 66436(3)(A) OF THE SUBDIVISION MAP ACT THE SIGNATURES OF THE FOLLOWING

OWNERS OR SUCCESSORS THEREOF OF EASEMENTS HAVE BEEN OMITTED SINCE THEIR INTERESTS CANNOT RIPEN INTO A FEE.

1. RICHMOND BELT RAILWAY, OWNER OF AN EASEMENT FOR A BROAD-GAUGE STEAM RAILROAD RECORDED AUGUST 19, 1902, IN BOOK 94 AT PAGE 473 OF DEEDS.

2. PACIFIC COAST OIL COMPANY, OWNER OF AN EASEMENT FOR PIPE LINE RECORDED OCTOBER 5, 1905, IN BOOK 113 AT PAGE 307 OF DEEDS.

3. STANDARD OIL COMPANY, OWNER OF EASEMENTS FOR PIPE LINES AND TELEPHONE OR TELEGRAPH LINES RECORDED JANUARY 7, 1907, IN BOOK 122 AT PAGE 382 OF DEEDS.

4. EAST SHORE COMPANY, OWNER OF EASEMENTS FOR WHARF AND RAILROAD PURPOSES RECORDED JANUARY 24, 1907, IN BOOK 122 AT PAGE 595 AND RECORDED MARCH 24, 1913, IN BOOK 197 AT PAGE 391 OF DEEDS.

5. BAY COUNTIES POWER COMPANY, OWNER OF EASEMENTS FOR A SINGLE LINE OF POLES RECORDED OCTOBER 23, 1907, IN BOOK 127 AT PAGE 566 AND RECORDED OCTOBER 23, 1907, IN BOOK 127 AT PAGE 569 OF DEEDS.

6. OAKLAND GAS, LIGHT AND HEAT COMPANY, OWNER OF EASEMENTS FOR MAINS OR PIPES RECORDED OCTOBER 23, 1907, IN BOOK 127 AT PAGE 572 AND RECORDED OCTOBER 29, 1907, IN BOOK 131 AT PAGE 58 OF DEEDS.

7. PACIFIC TELEPHONE AND TELEGRAPH COMPANY, OWNER OF EASEMENTS FOR POLES RECORDED DECEMBER 7, 1907, IN BOOK 131 AT PAGE 408 OF DEEDS AND RECORDED APRIL 27, 1938, IN BOOK 460 AT PAGE 232 OF OFFICIAL RECORDS.

8. GREAT WESTERN POWER COMPANY, OWNER OF AN EASEMENT FOR A LINE OF POLES RECORDED MAY 24, 1913, IN BOOK 202 AT PAGE 247 OF DEEDS.

9. STANDARD OIL COMPANY, OWNER OF EASEMENTS FOR PIPE LINES, RECORDED JANUARY 19, 1926, IN BOOK 20 AT PAGE 81, RECORDED JANUARY 2, 1929, IN BOOK 167 AT PAGE 66, AND RECORDED JANUARY 19, 1929, IN BOOK 176 AT PAGE 20.

10. STANDARD OIL COMPANY, OWNER OF AN EASEMENT FOR ROADWAY, PIPE LINES AND UTILITIES RECORDED FEBRUARY 16, 1929, IN BOOK 176 AT PAGE 105.

11. STANDARD OIL COMPANY, OWNER OF AN EASEMENT FOR ROADWAY AND PIPE LINES, RECORDED APRIL 4, 1930, IN BOOK 223 AT PAGE 362 OF OFFICIAL RECORDS.

12. STANDARD OIL COMPANY, OWNER OF AN EASEMENTS FOR A SINGLE LINE OF POLES, RECORDED APRIL 10, 1930, IN BOOK 237 AT PAGE 77 OF OFFICIAL RECORDS.

13. STANDARD OIL COMPANY, OWNER OF EASEMENTS FOR PRIVATE ROAD, RECORDED APRIL 22, 1931 IN BOOK 245 AT PAGE 481 AND RECORDED NOVEMBER 22, 1932 IN BOOK 314 AT PAGE 284 OF OFFICIAL RECORDS.

14. RICHMOND BELT RAILWAY, OWNER OF AN EASEMENT FOR SLOPES AND EMBANKMENTS, RECORDED JUNE 13, 1931 IN BOOK 287 AT PAGE 67 OF OFFICIAL RECORDS.

15. RICHMOND BELT RAILWAY, OWNER OF AN EASEMENT FOR CONSTRUCTION AND OPERATION OF A STANDARD GAUGE RAILROAD, RECORDED JULY 20, 1931 IN BOOK 284 AT PAGE 103 OF OFFICIAL RECORDS.

BASIS OF BEARINGS
THE BEARINGS SHOWN HEREON ARE BASED UPON THE CALIFORNIA COORDINATE SYSTEM OF 1983, CCS83, ZONE 3, EPOCH 2017.50, IN ACCORDANCE WITH CALIFORNIA PUBLIC RESOURCES CODE SECTIONS 8801-8819; SAID COORDINATES ARE BASED LOCALLY UPON FIELD-OBSERVED TIES RELATIVE TO CALIFORNIA SPATIAL REFERENCE NETWORK STATION P181. DISTANCES ARE GRID BASED. DIVIDE BY A COMBINED SCALE FACTOR OF 0.99993778 TO OBTAIN GROUND DISTANCES. VALUES SHOWN BELOW IN THE TABLE ARE IN ITRF 2014.

STATION LATITUDE LONGITUDE HEIGHT (m)
P181 37°54'52.356151" -122°22'36.272680" 129.0464
SIGMA (mm) 5.841.962.00
SURVEYOR'S STATEMENT:

THIS MAP WAS PREPARED BY ME OR UNDER MY DIRECTION AND IS BASED UPON A FIELD SURVEY IN

CONFORMANCE WITH THE REQUIREMENTS OF THE SUBDIVISION MAP ACT AND LOCAL ORDINANCE AT THE REQUEST OF THE CITY OF RICHMOND, IN OCTOBER OF 2021. I HEREBY STATE THAT ALL THE MONUMENTS

ARE OF THE CHARACTER AND OCCUPY THE POSITIONS INDICATED OR THAT THEY WILL BE SET IN THOSE POSITIONS MAY 30, 2024, AND THAT THE MONUMENTS ARE, OR WILL BE, SUFFICIENT TO ENABLE THE

SURVEY TO BE RETRACED, AND THAT THIS MAP SUBSTANTIALLY CONFORMS TO THE CONDITIONALLY APPROVED TENTATIVE MAP.

DATE:

DAVIS THRESH, P.L.S. NO. 6868
[email protected]
CITY ENGINEER'S STATEMENT:

I, YADER BERMUDEZ, CITY ENGINEER OF THE CITY OF RICHMOND, DO HEREBY STATE THAT I HAVE EXAMINED

THIS MAP AND THAT THE SUBDIVISION AS SHOWN HEREON IS SUBSTANTIALLY THE SAME AS IT APPEARED ON THE TENTATIVE MAP, IF REQUIRED, AND ANY APPROVED ALTERATIONS THEREOF; THAT ALL PROVISIONS

OF THE SUBDIVISION MAP ACT OF THE STATE OF CALIFORNIA AND OF ANY LOCAL ORDINANCES APPLICABLE AT THE TIME OF APPROVAL OF THE TENTATIVE, IF REQUIRED, HAVE BEEN COMPLIED WITH; AND THAT I AM SATISFIED THAT THIS MAP IS TECHNICALLY CORRECT.

DATE:

YADER BERMUDEZ, RCE 40523

CITY OF RICHMOND

CONTRA COSTA COUNTY

STATE OF CALIFORNIA
ACTING CITY SURVEYOR'S STATEMENT:

ACTING CITY SURVEYOR’S STATEMENT:

I AM SATISFIED THAT THE WITHIN SUBDIVISION MAP IS TECHNICALLY CORRECT.

DATE:

JOSH WOELBING P.L.S. 9387
NOTES:

1. THE TOTAL AREA WITHIN THE EXTERIOR SUBDIVISION BOUNDARY OF THIS MAP IS 412.796 ACRES, MORE OR LESS.

2. DIMENSIONS SHOWN HEREON ARE IN US SURVEY FEET AND DECIMALS THEREOF.

3. ALL TIES ARE PERPENDICULAR, UNLESS NOTED OTHERWISE.

DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA SHEET 2 OF 18SCALE: NONE
DRAFT

Page 1109 of 1303 ends

STENMARK DRIVE(FORMERLY WESTERN DRIVE)

S A N F R A N C I S C O B A Y

S A N F R A N C I S C O B A Y

G R O S S L A N D A R E A
AREA = 412.796 ACRES ±
LEGEND

EXTERIOR SUBDIVISION BOUNDARY

EXISTING INTERIOR PARCEL LINE

EXTERIOR BOUNDARIES OF THE RANCHO SAN PABLO

LOT LINE OF HISTORIC RECORD

CENTERLINE

DOC DOCUMENT NUMBER

OR OFFICIAL RECORDS

STA STATION ON THE EXTERIOR BOUNDARY OF
THE SAN PABLO RANCHO (R1)

SPR SAN PABLO RANCHO
FOUND 3" BRASS DISK w/PUNCH, UNLESS NOTED OTHERWISE
FOUND 3/4" IRON PIPE WITH PLUG STAMPED, "LS 7019", R4
FOUND BOAT SPIKE AND WASHER STAMPED, "LS 7019", R4
FOUND 6" SQUARE CONCRETE MONUMENT w/PIN, R2,R3
FOUND 10" DIAMETER CONCRETE MONUMENT w/PIN, R2
NOTE:

1. SEE SHEET 4 FOR LINE TABLES, RECORD REFERENCES (R#)

SHOWN, AND A NARRATIVE OF THE SAN PABLO RANCHO
BOUNDARY DETERMINATION.

2. SHEET 5 FOR DETAILS A, B, AND C.

3. * DENLINIATES A RANCHO COURSE, R1, FROM THE LINE OF
MEAN HIGH TIDE AS DESCRIBED IN R2.

SHEET 3 OF 18DATED: MAY 2022
BY: BKF ENGINEERS, JOB: 20166080
SCALE: 1" = 300'
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA DRAFT

Page 1110 of 1303 ends

REFERENCES:

R1 "MAP OF THE SAN PABLO RANCHO," ACCOMPANYING

THE FINAL REPORT OF THE REFEREES IN PARTITION
RECORDED MARCH 5, 1894, BOOK 69 OF DEEDS AT PAGE 1
R2 QUITCLAIM DEED RECORDED SEPTEMBER 30, 2003,
DOCUMENT NUMBER 2003-0489200
QUITCLAIM DEED RECORDED MARCH 29, 2010
DOCUMENT NUMBER 2010-0060367
R3 RECORD OF SURVEY, FILED MAY 14, 1975,
BOOK 59 OF RECORD OF SURVEY AT PAGE 10
R4 RECORD OF SURVEY, "FILED FEBRUARY 13, 1985,
BOOK 76 OF RECORD OF SURVEY AT PAGE 29
R5 RECORD OF SURVEY NO. 2778 FILED JUNE 25, 2003,
BOOK 126 OF RECORD OF SURVEY AT PAGE 14
NOTE:

1. THE EXTERIOR BOUNDARY OF THE SAN PABLO RANCHO WAS ESTABLISHED BY A GRANT

BOUNDARY LINE ADJUSTMENT PROCEDURE HELD BETWEEN SAN PABLO RANCHO STATIONS 183 AND 226.

2. RECORD OF SURVEY, R/S 2778 (R5), APPEARS TO HAVE CALCULATED A RECORD DISTANCE BETWEEN SAN PABLO RANCHO STATIONS 205 AND 206 AS 141.04 FEET. THE CONVERTED RECORD DISTANCE IS 140.58' (2.13 CHAINS). THE RESULTANT DIFFERENCE

IN LOCATION WOULD BE THE DIFFERENCE OF THE ERROR IN THE CALCULATED RECORD DISTANCE OF 0.46 FEET, PLUS THE PRORATED DISTRIBUTION BETWEEN A GIVEN PAIR OF STATIONS AS A RESULT OF A GRANT BOUNDARY LINE ADJUSTMENT. THIS IS REFLECTED

ON THIS MAP WHICH SHOWS THE RESULTANT LOCATION OF IRON PIPE MONUMENTS, SET BY SAID SURVEY, TO BE APPROXIMATELY 0.7 FEET NORTHWESTERLY OF STATIONS 204, 205, AND 206. SEE DETAIL B ON SHEET 5 FOR DETAILED DIMENSIONS.

DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA SHEET 4 OF 18SCALE: NONE
DRAFT

Page 1111 of 1303 ends

S A N F R A N C I S C O B A Y

STENMARK DRIVE(FORMERLY WESTERN DRIVE)
LEGEND

EXTERIOR SUBDIVISION BOUNDARY

EXISTING INTERIOR PARCEL LINE

EXTERIOR BOUNDARIES OF THE RANCHO SAN PABLO

LOT LINE OF HISTORIC RECORD

CENTERLINE

DOC DOCUMENT NUMBER

OR OFFICIAL RECORDS

STA STATION ON THE EXTERIOR BOUNDARY OF
THE SAN PABLO RANCHO (R1)

CR CALCULATED FROM RECORD DATA

SPR SAN PABLO RANCHO
FOUND 3" BRASS DISK w/PUNCH, UNLESS NOTED OTHERWISE
FOUND 3/4" IRON PIPE WITH PLUG STAMPED, "LS 7019", R4
FOUND BOAT SPIKE AND WASHER STAMPED, "LS 7019", R4
FOUND 6" SQUARE CONCRETE MONUMENT w/PIN, R2,R3
FOUND 10" DIAMETER CONCRETE MONUMENT w/PIN, R2
REFERENCES:

R1 "MAP OF THE SAN PABLO RANCHO," ACCOMPANYING

THE FINAL REPORT OF THE REFEREES IN PARTITION
RECORDED MARCH 5, 1894, BOOK 69 OF DEEDS AT PAGE 1
R2 QUITCLAIM DEED RECORDED SEPTEMBER 30, 2003,
DOCUMENT NUMBER 2003-0489200
QUITCLAIM DEED RECORDED MARCH 29, 2010
DOCUMENT NUMBER 2010-0060367
R3 RECORD OF SURVEY, FILED MAY 14, 1975,
BOOK 59 OF RECORD OF SURVEY AT PAGE 10
R4 RECORD OF SURVEY, "FILED FEBRUARY 13, 1985,
BOOK 76 OF RECORD OF SURVEY AT PAGE 29
R5 RECORD OF SURVEY NO. 2778 FILED JUNE 25, 2003,
BOOK 126 OF RECORD OF SURVEY AT PAGE 14
DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA SHEET 5 OF 18SCALE: AS SHOWN
DRAFT

Page 1112 of 1303 ends

P A R C E L G
SEE SHEET 10

P A R C E L E
SEE SHEET 8
L O T 1 1
SEE SHEET 10
L O T 4
SEE SHEET 8
L O T 6
SEE SHEET 10
L O T 1
SEE SHEET 7
L O T 2
SEE SHEET 7
P A R C E L W 2
SEE SHEET 14
P A R C E L W 1
SEE SHEET 14
2 5
3 94 0

PARCEL B
SEE SHEET 7
P A R C E L CSEE SHEET 7
L O T 3
SEE SHEET 7

P A R C E L A
SEE SHEET 7

P A R C E L D
SEE SHEET 14
L O T 1 0
SEE SHEET 12
L O T 5
SEE SHEET 9
L O T 4 3
SEE SHEET 11
L O T 4 4
SEE SHEET 11
L O T 4 2
SEE SHEET 11
L O T 8
SEE SHEET 11
L O T 7
SEE SHEET 11
L O T 9
SEE SHEET 11

P A R C E L F
SEE SHEET 9
P A R C E L M 2
SEE SHEET 11
P A R C E L M 1
SEE SHEET 15
P A R C E L M 3
SEE SHEET 9

STENMARK DRIVE(FORMERLY WESTERN DRIVE)

S A N F R A N C I S C O B A Y

S A N F R A N C I S C O B A Y
LEGEND

EXTERIOR SUBDIVISION BOUNDARY

NEW INTERIOR PARCEL/LOT

NEW EASEMENT
SET 1" IRON PIPE WITH CAP STAMPED "PLS 6868"
DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA NOTE:

SEE SHEET 13 FOR LOTS 12 THROUGH 41.

SHEET 6 OF 18SCALE: 1"= 300'
DRAFT

Page 1113 of 1303 ends

P A R C E L A
AREA = 83.720 ACRES ±

P A R C E L B
AREA = 1.016 ACRES ±
L O T 1
AREA = 16.726 ACRES ±
L O T
2 AREA =

7.538 ACRES ±
L O T 3

SEE RIGHT

P A R C E L C
AREA = 1.137 ACRES ±

P A R C E L D
L O T 4

L O T E
P A R C E L M1
L O T 3
AREA = 2.105 ACRES ±

P A R C E L A
LEGEND

EXTERIOR SUBDIVISION BOUNDARY

NEW INTERIOR PARCEL/LOT

NEW EASEMENT
SET 1" IRON PIPE WITH CAP STAMPED "PLS 6868"

PUBLIC ACCESS AND UTILITY EASEMENT
PAUE
DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA SHEET 7 OF 18SCALE: AS SHOWN
DRAFT

Page 1114 of 1303 ends

P A R C E L E
AREA = 23.859 ACRES ±
L O T 4
AREA = 11.356 ACRES ±
L O T 3

P A R C E L A
L O T 2

P A R C E L B

P A R C E L G
L O T 6
L O T 7
L O T 8
L O T 4 2
L O T 4 3

P A R C E L D
P A R C E L 9

P A R C E L F
L O T 5

P A R C E L F

P A R C E L D
P A R C E L M 1
L O T 5
P A R C E L W 1
L O T 2
P A R C E L M 2
LEGEND

EXTERIOR SUBDIVISION BOUNDARY

NEW INTERIOR PARCEL/LOT

NEW EASEMENT
SET 1" IRON PIPE WITH CAP STAMPED "PLS 6868"
DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA SHEET 8 OF 18SCALE: 1" = 150'
DRAFT

Page 1115 of 1303 ends

L O T 5
AREA = 3.295 ACRES ±

P A R C E L F
AREA = 14.735 ACRES ±
L O T 8
L O T 7
L O T 9

P A R C E L D
L O T 1 0

P A R C E L D
P A R C E L W 1
L O T 4

P A R C E L E

P A R C E L G

P A R C E L A

P A R C E L
A

P A R C E L E
P A R C E L 6
P A R C E L M 1
P A R C E L M 2
P A R C E L M 3
AREA = 1.515 ACRES ±

P A R C E L D
L O T 4
LEGEND

EXTERIOR SUBDIVISION BOUNDARY

NEW INTERIOR PARCEL/LOT

NEW EASEMENT
SET 1" IRON PIPE WITH CAP STAMPED "PLS 6868"
DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA SHEET 9 OF 18SCALE: 1" = 80'
DRAFT

Page 1116 of 1303 ends

P A R C E L G
AREA = 32.460 ACRES ±

P A R C E L E
L O T 6
AREA = 7.218 ACRES ±
L O T 4
L O T 3 9
L O T 1 1
L O T 4 3
L O T 4 2
L O T 4 4
L O T 7
L O T 8
L O T 9

P A R C E L D
P A R C E L W 2

P A R C E L F
P A R C E L M 3
L O T 5
P A R C E L M 1
P A R C E L M 2

P A R C E L
M 2
LEGEND

EXTERIOR SUBDIVISION BOUNDARY

NEW INTERIOR PARCEL/LOT

NEW EASEMENT
SET 1" IRON PIPE WITH CAP STAMPED "PLS 6868"
DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA SHEET 10 OF 18SCALE: 1" = 150'
DRAFT

Page 1117 of 1303 ends

L O T 4 3
AREA = 5.223 ACRES ±
L O T 4 2
AREA =

1.160 ACRES ±
P A R C E L M 2
AREA = 2.079 ACRES ±
L O T 7
AREA =

1.692 ACRES ±
L O T 8
AREA = 3.417 ACRES ±
L O T 9
AREA = 2.493 ACRES ±

PARCEL D
LOT 6
LOT 4

PARCEL E

PARCEL G
L O T 4 4
AREA = 2.874 ACRES ±
PARCEL M3
PARCEL 5

PARCEL F
PARCEL W2
40 38
37 36
35 34 33 32 31
30 29
LOT 41
LOT 39
LOT 11

PARCEL G
24 23
22 21 20
19 18 17
16 15
14 PARCEL M1
PARCEL 5
P A R C E L M 2
AREA = 2.079 ACRES ±
LEGEND

EXTERIOR SUBDIVISION BOUNDARY

NEW INTERIOR PARCEL/LOT

NEW EASEMENT
SET 1" IRON PIPE WITH CAP STAMPED "PLS 6868"

PUBLIC ACCESS EASEMENT

PUBLIC ACCESS AND UTILITY EASEMENT
PAE
PAUE
DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA SHEET 11 OF 18SCALE: 1" = 100"
DRAFT

Page 1118 of 1303 ends

L O T 2 5
AREA = 0.208 ACRES ±
L O T 1 1
AREA = 2.570 ACRES ±

P A R C E L G
L O T 3 9
AREA = 1.283 ACRES ±
L O T 6
L O T 4 3
L O T 4 4
L O T 4 1
AREA = 0.417 ACRES ±
L O T 4 0
AREA = 0.589 ACRES ±
1 2
1 3
1 4
1 5
1 6
1 7
1 8
1 9
2 0
2 12 22 32 42 93 0
3 1
2 6
2 7
2 8
3 2
3 3
3 4
3 5
3 6
3 7
3 8
P A R C E L M 2
P A R C E L M 2
LEGEND

EXTERIOR SUBDIVISION BOUNDARY

NEW INTERIOR PARCEL/LOT

NEW EASEMENT
SET 1" IRON PIPE WITH CAP STAMPED "PLS 6868"
DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA SHEET 13 OF 18SCALE: 1" = 50'
DRAFT

Page 1119 of 1303 ends

L O T 1 0
AREA = 4.000 ACRES ±

P A R C E L D
P A R C E L W 2
L O T 5
L O T 9

P A R C E L F

P A R C E L D
P A R C E L M 3
LEGEND

EXTERIOR SUBDIVISION BOUNDARY

NEW INTERIOR PARCEL/LOT

NEW EASEMENT
SET 1" IRON PIPE WITH CAP STAMPED "PLS 6868"
DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA SHEET 12 OF 18SCALE: 1" = 50'
DRAFT

Page 1120 of 1303 ends

P A R C E L D
AREA = 35.923 ACRES ±
LOT 5
LOT 9
LOT 8
LOT 44

PARCEL F
LOT 10
PARCEL M3

S A N F R A N C I S C O B A Y
LOT 43
LOT
42 P A R C E L W 1
AREA =

92.102 ACRES ±
P A R C E L W 2
AREA = 43.882 ACRES ±
P A R C E L W 1
AREA = 92.102 ACRES ±
PARCEL F LOT 3
LOT 2

PARCEL A
LOT 1

PARCEL C

S A N F R A N C I S C O B A Y
PARCEL M1

PARCEL A
P A R C E L DAREA = 35.923 ACRES ±
P A R C E L W 1
LEGEND

EXTERIOR SUBDIVISION BOUNDARY

NEW INTERIOR PARCEL/LOT

NEW EASEMENT
SET 1" IRON PIPE WITH CAP STAMPED "PLS 6868"
NOTE:

1. SEE SHEET 16 FOR LINE AND CURVE TABLES.

DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA

MATCH LINESEE RIGHT

MATCH LINE

SEE LEFT
SHEET 14 OF 18SCALE: 1" = 200'
DRAFT

Page 1121 of 1303 ends

P A R C E L M 1
AREA = 4.113 ACRES ±

P A R C E L D
L O T 1

P A R C E L C

P A R C E L A

P A R C E L A
L O T 2
P A R C E L W 1
L O T 2

P A R C E L D
P A R C E L W 1
P A R C E L M 1
AREA = 4.294 ACRES ±

P A R C E L A
L O T 3

P A R C E L
A

P A R C E L E
L O T 4

P A R C E L F
L O T 5
L O T 4
L O T 4

P A R C E L E
PARCEL
G
L O T 5

P A R C E L F

P A R C E L
M 3
PARCEL
M2
LEGEND

EXTERIOR SUBDIVISION BOUNDARY

NEW INTERIOR PARCEL/LOT

NEW EASEMENT
SET 1" IRON PIPE WITH CAP STAMPED "PLS 6868"
NOTE:

1. SEE SHEET 16 FOR LINE AND CURVE TABLES.

DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA

MATCH LINE

SEE BELOW

MATCH LINE

SEE ABOVE
SHEET 15 OF 18SCALE: 1" = 80'
DRAFT

Page 1122 of 1303 ends

DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA SHEET 16 OF 18SCALE: AS SHOWN
DRAFT

Page 1123 of 1303 ends

P A R C E L B
L O T 2

P A R C E L A

P A R C E L A
P A R C E L M 1
LEGEND

EXTERIOR SUBDIVISION BOUNDARY

NEW INTERIOR PARCEL/LOT

NEW EASEMENT
SET 1" IRON PIPE WITH CAP STAMPED "PLS 6868"

PUBLIC ACCESS EASEMENT

PUBLIC ACCESS AND UTILITY EASEMENT
PAE
PAUE
L O T 4 3
L O T 4 4

P A R C E L D
DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA SHEET 17 OF 18SCALE: AS SHOWN
DRAFT

Page 1124 of 1303 ends

STENMARK DRIVE(FORMERLY WESTERN DRIVE)

S A N F R A N C I S C O B A Y

S A N F R A N C I S C O B A Y
P A R C E L M 3
P A R C E L M 1
P A R C E L M 2

P A R C E L F
L O T 9
L O T 7
L O T 8
L O T 4 2
L O T 4 4
L O T 4 3
L O T 5
L O T 1 0

P A R C E L D

P A R C E L A
L O T 3

P A R C E L C

P A R C E L
B
4 0 3 9
2 5
P A R C E L W 1
P A R C E L W 2
L O T 2
L O T 1
L O T 6
L O T 4
L O T 1 1

P A R C E L EP A R C E L G
LEGEND

EXTERIOR SUBDIVISION BOUNDARY

NEW INTERIOR PARCEL/LOT

EASEMENT

CENTERLINE

D BOOK OF DEEDS

OR OFFICIAL RECORDS
40' EASEMENT FOR ROAD PURPOSES; 13044 OR 945 AND 13830 OR 772 30' STRIP RESERVED BY THE EAST SHORE CO.; 122 D 595
50' STRIP, RIGHT OF WAY TO RICHMOND BELT RAILWAY FOR RAILROAD PURPOSES; 122 D 595 AND 223 OR 362
16' EASEMENT FOR PRIVATE RIGHT OF WAY FOR ROADWAY PURPOSES; 245 OR 481
EASEMENT FOR WHARF PURPOSES; 122 D 595
50' EASEMENT FOR RAILROAD PURPOSES; PARCEL 1, 1340 OR 501 16' EASEMENT FOR PRIVATE RIGHT OF WAY FOR ROAD PURPOSES ONLY; 314 OR 284
8' EASEMENT FOR PIPE LINES; 167 OR 66
8' EASEMENT FOR PIPE LINES; 176 OR 20
RIGHT OF WAY FOR PUBLIC STREET AND HIGHWAY; 1276 OR 1
EXISTING EASEMENT TABLE:

NOTE:

1. EASEMENT FOR PIPELINES, 122 D 382, DESCRIBED AS BEING "... BOUNDED BY TIDE LOTS NO.S 2 IN SECTION 16 AND 13 AND 14 IN SECTION 9 AND

SAN FRANCISCO BAY AND BOUNDED EASTERLY AND NORTHEASTERLY

BY WHAT IS NOW AND HAS BEEN KNOWN AS THE EASTERLY AND
NORTHEASTERLY BOUNDARY OF COUNTY ROAD NO. TWENTY SEVEN
(27)...")
DATED: MAY 2022
BY: BKF ENGINEERS JOB NO.: 20166080
SUBDIVISION MAP 9611
POINT MOLATE PHASE 1
LOTS 1 THROUGH 11 AND A PORTION OF LOTS 12 AND 13 IN SECTION 9, TOWNSHIP 1 NORTH, RANGE 5 WEST, MOUNT DIABLO BASE AND MERIDIAN, AS DESIGNATED ON "MAP NO. 1, SALT MARSH AND TIDE LANDS, SITUATE IN THE COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, 1872," AND A PORTION OF LOTS 49 AND 50, AS DESIGNATED ON THE "MAP OF THE SAN PABLO RANCHO, ACCOMPANYING AND FORMING A PART OF THE FINAL REPORT OF THE REFEREES IN PARTITION"

CITY OF RICHMOND, COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA FOR: CITY OF RICHMOND, A MUNICIPAL CORPORATION OF THE STATE OF CALIFORNIA SHEET 18 OF 18SCALE: 1" = 300'
DRAFT

Page 1125 of 1303 ends
Page 1 of 2 ends

May 3, 2022

City Council

DATE: May 3, 2022
TO: Mayor Butt and Members of the City Council
FROM:

Councilmember Demnlus Johnson III

Subject:

Update on the Transportation Division
FINANCIAL IMPACT: There is no financial impact related to this item.

PREVIOUS COUNCIL
ACTION:

The City Council has received presentations in 2021 on
various programs and grants received.

STATEMENT OF THE
ISSUE:

Councilmember Johnson has requested an update on the
Transportation Division.

RECOMMENDED ACTION:

RECEIVE a presentation from the Transportation Division to update the City Council and the community on the
status of current and upcoming projects - City Council
Office (Councilmember Demnlus Johnson III 510-620-
6568). This item was continued from the April 26,
2022, meeting.

DISCUSSION:

There are several programs within the Transportation Division that are helping to promote a greener environment. The City Council and the community would benefit from an update on the current and upcoming projects including, but not limited to the EV AGENDA
REPORT

Page 1126 of 1303 ends
Page 2 of 2 ends

May 3, 2022
Charging Stations, e-bikes, e-scooters, the Neighborhood Parking Permit Program, and other information that would be helpful to the community.

There has also been an increase in requests for speed calming measures such as speed undulations and roundabouts. The presentation will include information on the process and how to make requests for speed undulations.

DOCUMENTS ATTACHED:

None

Page 1127 of 1303 ends
Page 1 of 4 ends

May 3, 2022

Finance Department

DATE: May 3, 2022
TO: Mayor Butt and Members of the City Council
FROM:

Delmy Cuellar, Interim Director of Finance
Antonio Banuelos, Accounting Manager

SUBJECT:

Approval of New Fees for the Revised Master Fee
Schedule
FINANCIAL IMPACT: Fees for services provided by Community Services, Code Enforcement, and the Fire Department have been
analyzed to determine the cost of providing such services by reviewing the number of hours and related expenses it takes to complete the service. In some cases, this
analysis supports a fee increase; In others, fee
reductions are supported.

Based on the level of activity in the prior year, the
proposed fee adjustments are estimated to generate
additional annual revenue totaling $92,000 for the City of Richmond, including $31,800 for the Fire Department,
$11,900 for Recreation, and $48,300 for Code
Enforcement.

PREVIOUS COUNCIL
ACTION:

November 16, 2021
February 15, 2022
March 1, 2022

AGENDA
REPORT

Page 1128 of 1303 ends
Page 2 of 4 ends

May 3, 2022

STATEMENT OF THE
ISSUE:

Sections 2.34.040 (Schedule of Fees and Charges) and

13.45.020 (Approval of adjustments by City Council) of
the Richmond Municipal Code authorize periodic
adjustments to all City levied fees and charges, subject to approval by the City Council. City staff members are
requesting adoption of an ordinance to establish new
fees and charges as outlined in the proposed Master Fee Schedule.

RECOMMENDED ACTION: INTRODUCE an ordinance (first reading) establishing certain fees for the proposed Master Fee Schedule -
Finance Department (Delmy Cuellar/Antonio Banuelos
510-620-6741).

DISCUSSION:

Section 2.34.040 of the Richmond Municipal Code (RMC) (Schedule of fees and service charges) provides that, “The City Manager shall review the fees and charges based upon the review schedule set forth (herein) and shall set and adjust the fees or charges so as to recover up to the … costs reasonably necessary to provide the listed regulations, products or services.”

Section 13.45.020 of the RMC (Approval of adjustments by City Council) further provides that, “Each quarter, the Finance Director shall submit to the City Council a report listing all proposed adjustments for approval. No proposed adjustment shall take effect until it is approved by the City Council. The City Council may reject, but may not modify, any one or more of the proposed adjustments in any report before approving the adjustments.”

At the February 15, 2022, and March 1, 2022, City Council meetings, the Master Fee Schedule was reviewed and approved for the first and second readings of the Ordinance. That included updates for various fees based on changes to the Employment Cost Index (ECI) and changes based on studies prepared by City consultants. This requested update captures changes that were not included in the previous update such as those for Recreation, Fire Department, Code Enforcement, and minor adjustments to other fees.

To allow for the City to establish new fees and charges for services, and therefore, collect increased revenue, it was imperative that the proposed Master Fee Schedule be brought back before City Council for approval. The Finance Department has worked with Willdan Financial Services and various departments to process the User Fee reports. The goal is to produce reports used in updating the Master Fee Schedule to help better capture city costs in providing city services. The updates to both the Code Enforcement and Fire Department fees stems from Willdan’s analysis and reports. The Master Fee Schedule proposed for adoption by the City Council includes the following changes and/or adjustments:

Page 1129 of 1303 ends
Page 3 of 4 ends

May 3, 2022

 New fees for services are proposed for services provided by the Fire Department.

 Code Enforcement Fees are being updated to reflect actual time spent on services provided.

 The Recreation facility and park rental fees for various sites have been updated to more clearly display the current discounts provided to governmental entities and City departments (discount of 50 percent) and non-profit organizations (discount of 25 percent). The majority of the Recreation facility and park rental fees will remain the same; however, Recreation’s proposed updates to the Master Fee Schedule include reductions to refundable deposits, as well as minimal increases to a few specific fees. There is also the addition of a handful of new fees designed to accommodate the increased requests for demonstrations, marches and film permits. New fees are listed in the Ordinance (Attachment 1).

On March 15, 2022, City Council was presented with a draft Fee Waiver Policy and a draft Partnership Policy. Once finalized and adopted, these policies will provide a formal process for eligible organizations to enter into partnerships with Richmond’s Recreation Division and/or request the use of City facilities and parks at no cost (fee waiver) or reduced costs (fee reductions) based on the Master Fee Schedule approved rates.

 Community Development is listing the non-residential nexus fee and in-lieu fee for residential development projects per the City Council adopted Resolution No.115-20.

 Update corrects two fees collected by the Engineering Division within the Public Works Department. For the Encroachment Permit fee, the amount previously approved was incorrectly listed at $488; correct amount is $527. Additionally, the current Traffic Control Plan Review fee is listed at $240 per hour, while the correct amount should be $263.

 The Subregional Transportation Mitigation Program (STMP) Fees included in the Impact Fees section are set by West Contra Costa Transportation Advisory Committee (“WCCTAC”). The updated rates are effective July 1, 2022.

 Fees not included in this Master Fee Schedule update shall remain the same.

NEXT STEPS:

If the attached Ordinance is introduced, City staff will return on May 17, 2022, for the second and final reading of the ordinance adopting the new fees and adoption of the resolution in Attachment 3 amending the current fees. Moving forward, City staff will aim to adjust the fees annually in March.

Page 1130 of 1303 ends
Page 4 of 4 ends

May 3, 2022

Additionally, City staff is working with consultants to produce a comprehensive update of the Impact Fees and will return at a subsequent meeting later this fiscal year with those proposed changes.

DOCUMENTS ATTACHED:

Attachment 1 – Ordinance For New Fees
Attachment 2 – Updated Proposed Master Fee Schedule (New and Modified Fees) Attachment 3 – Resolution for Modified Fees (to be adopted at Second Reading of Ordinance)

Page 1131 of 1303 ends

1 ORDINANCE NO. _____ - 22

AN ORDINANCE OF THE CITY OF RICHMOND ESTABLISHING FEES IN

THE MASTER FEE SCHEDULE FOR SPECIFIED SERVICES RENDERED BY CITY DEPARTMENTS. THIS ORDINANCE AMENDS THE FEE SCHEDULE

WHICH WILL IMPLEMENT COST RECOVERY AND WILL SERVE AS THE BASIS FOR FUTURE FEE ADJUSTMENTS.

The City Council of the City of Richmond does ordain as follows:

SECTION 1. Section 2.34.040 of the City of Richmond Municipal Code is hereby amended to include the following fees within the various categories:

Description Percentage
of Costs
Proposed
Fees
RMC 6.38.110 Section 5 allows the City to collect fees solely to defray actual cost.

RMC 6.02.180

Community Services - Recreation
Various Fees
Road Closure Fee Traffic Impact/Block 100% As Needed
Block Party Per Day (8am- 9pm) 100% As Needed
Rally/March Fee 100% As Needed
Stanchions 100% As Needed
Expressive Demonstrations of First Amendment Rights
Application/Processing Fee 100% As Needed
Late Appl. Fee/Short Notice (Received under 30 days) 100% As Needed Attendees <250 100% As Needed
Attendees 250+ 100% As Needed
Fire
SECTION I – OCCUPANCY
Process Transfer
High Pile Storage 10,001-20,000 sq. ft. 100% As Needed High Pile Storage 20,001-50,000 sq. ft. 100% As Needed High Pile Storage >50,000 sq. ft. 100% As Needed
High Pile Storage per 10k sq feet above 50k 100% As Needed Open Flames/Candle Single Use 100% As Needed
Cannabis/Plant Extraction 100% As Needed
Additional Permits

Page 1132 of 1303 ends

2 Five Year Sprinkler Test 100% As Needed
Emergency Responder Radio System 100% As Needed
Single Use Permit Issuance
Outdoor Assembly Event 100% As Needed
Additional inspection/standby time during business hours, per person, per half hour 100% As Needed
After hours inspection time/standby minimum (3 hours) 100% As Needed Additional inspection/standby time after business hours, per person, per half hour 100% As Needed
SECTION II –SPECIAL SERVICES

SPECIAL SERVICE TASK
Weld Inspection 100% As Needed
Standby: Single person, after business hours, per hour 100% As Needed SECTION III – PLAN REVIEW
Tenant Improvement Plan Review (for building additions see PR 3.1) Industrial Ovens (CFC 105.7.15) 100% As Needed
Motor Vehicle Repair Room and Booths (CFC 105.7.17) 100% As Needed Solar Photovoltaic Power Systems (CFC 105.7.21) 100% As Needed

FIRE PROTECTION SYSTEMS
Emergency Responder Radio Coverage System 100% As Needed

FLAMMABLE & COMBUSTIBLE LIQUIDS (TANKS- PIPING & DISPENSING) Install, Modify, Repair Compressed Gas Storage
Install, Modify Cannabis/Plant Extraction System (CFC 105.7.18) 100% As Needed Plus $0.08 per square foot in excess of 2,000 sq. ft. 100% As Needed SPECIAL HAZARDS – HAZARDOUS
Hazardous Materials – Storage /Dispensing – Open/Closed Systems Dipping (CFC 105.7.23) 100% As Needed
Install, Modify, Repair Mechanical Refrigeration Systems Fuel Cell Power Systems (CFC 105.7.10) 100% As Needed

HIGH PILE RACK STORAGE SYSTEMS
Install, Modify, Repair, Replace Piping for Systems Containing Hazardous Materials Minimum plan review base fees up to two hours. 100% As Needed Additional Plan Review Fees
Additional inspection time during business hours, per half hour 100% As Needed Additional inspection time, after hours, per half hour 100% As Needed Working without approved plans 100% As Needed

Page 1133 of 1303 ends

3 SECTION V – REIMBURSEMENT FOR FIRE DEPARTMENT RESPONSE

FIRE INCIDENT RESPONSE
RFD reserves the right to invoice for individual event with customized mitigation rates including itemized, per person, at various response levels and for itemized products and equipment used.
100% As Needed
Fire & Life Safety Inspections (does not include applicable operational permits) Assembly/Business/Mercantile/Office Suite
B/M 5,001 – 10,000 sq. feet 100% As Needed
B/M 10,001 – 20,000 sq. feet 100% As Needed
B/M 20,001 – 40,000 sq. feet 100% As Needed
B/M 40,001+ sq. feet 100% As Needed
Other Occupancy (F/H/L/S)
O 0-5,000 sq. feet 100% As Needed
O 5,001-10,000 sq. feet 100% As Needed
O 10,001-20,000 sq. feet 100% As Needed
O each 10k sq feet above 20k 100% As Needed
Residential R1/R2 Occupancies
Residential - Transient (hotel, motel, shelter) 100% As Needed

FIRE INCIDENT RESPONSE CHIEF LEVEL RESPONSE
Fire Investigator, during business hours, per hour 100% As Needed Fire Investigator, outside business hours, per hour 100% As Needed Emergency Services Manager, per hour 100% As Needed
Captain, per hour 100% As Needed
Engineer, per hour 100% As Needed
Firefighter, per hour 100% As Needed

Page 1134 of 1303 ends

4 SECTION 2. Commencing with the effective date of this or dinance, the fees established in Section 1, above shall be as follows, subject to adjustme nt in accordance with Richmond Municipal Code Section 13.45:

Description New Proposed
Fees
RMC 6.38.110 Section 5 allows the City to collect fees solely to defray actual cost.

Community Services - Recreation
Various Fees
Road Closure Fee Traffic Impact/Block New 100.00 Block Party Per Day (8am- 9pm) New 50.00
Rally/March Fee New 50.00
Stanchions New 2.00
Expressive Demonstrations of First Amendment Rights
Application/Processing Fee New 50.00
Late Appl. Fee/Short Notice (Recv'd under 30 days) New 50.00 Attendees <250 New 100.00
Attendees 250+ New 250.00
Fire
SECTION I – OCCUPANCY
Process Transfer
High Pile Storage 10,001-20,000 sq. ft. New 571.00 High Pile Storage 20,001-50,000 sq. ft. New 629.00 High Pile Storage >50,000 sq. ft. New 688.00
High Pile Storage per 10k sq feet above 50k New 58.00 Open Flames/Candle Single Use New 117.00
Cannabis/Plant Extraction New 1,445.00
Additional Permits
Five Year Sprinkler Test New 234.00
Emergency Responder Radio System New 234.00
Single Use Permit Issuance
Outdoor Assembly Event New 441.00
Additional inspection/standby time during business hours, per person, per half hour New 117.00
After hours inspection time/standby minimum (3 hours) New 878.00 Additional inspection/standby time after business hours, per person, per half hour New 175.00

Page 1135 of 1303 ends

5 SECTION II –SPECIAL SERVICES

SPECIAL SERVICE TASK
Weld Inspection New 292.00
Standby: Single person, after business hours, per hour New 316.00 SECTION III – PLAN REVIEW
Tenant Improvement Plan Review (for building additions see PR 3.1) Industrial Ovens (CFC 105.7.15) New 590.00
Motor Vehicle Repair Room and Booths (CFC 105.7.17) New 590.00 Solar Photovoltaic Power Systems (CFC 105.7.21) New 590.00

FIRE PROTECTION SYSTEMS
Emergency Responder Radio Coverage System New 590.00

FLAMMABLE & COMBUSTIBLE LIQUIDS (TANKS- PIPING & DISPENSING) Install, Modify, Repair Compressed Gas Storage
Install, Modify Cannabis/Plant Extraction System (CFC 105.7.18) New 1,015.00 Plus $0.08 per square foot in excess of 2,000 sq. ft. New 0.09 SPECIAL HAZARDS – HAZARDOUS
Hazardous Materials – Storage /Dispensing – Open/Closed Systems Dipping (CFC 105.7.23) New 648.00
Install, Modify, Repair Mechanical Refrigeration Systems Fuel Cell Power Systems (CFC 105.7.10) New 882.00

HIGH PILE RACK STORAGE SYSTEMS
Install, Modify, Repair, Replace Piping for Systems Containing Hazardous Materials Minimum plan review base fees up to two hours. New 590.00 Additional Plan Review Fees
Additional inspection time during business hours, per half hour New 117.00 Additional inspection time, after hours, per half hour New 175.00 Working without approved plans New DOUBLE
FEE
SECTION V – REIMBURSEMENT FOR FIRE DEPARTMENT RESPONSE

FIRE INCIDENT RESPONSE
RFD reserves the right to invoice for individual event with customized mitigation rates including itemized, per person, at various response levels and for itemized products and equipment used.

New Actual
Cost
Fire & Life Safety Inspections (does not include applicable operational permits)

Page 1136 of 1303 ends

6 Assembly/Business/Mercantile/Office Suite
B/M 5,001 – 10,000 sq. feet New 341.00
B/M 10,001 – 20,000 sq. feet New 458.00
B/M 20,001 – 40,000 sq. feet New 576.00
B/M 40,001+ sq. feet New 751.00
Other Occupancy (F/H/L/S)
O 0-5,000 sq. feet New 283.00
O 5,001-10,000 sq. feet New 400.00
O 10,001-20,000 sq. feet New 576.00
O each 10k sq feet above 20k New 576.00
Residential R1/R2 Occupancies
Residential - Transient (hotel, motel, shelter) New 400.00

FIRE INCIDENT RESPONSE CHIEF LEVEL RESPONSE
Fire Investigator, during business hours, per hour New 234.00 Fire Investigator, outside business hours, per hour New 351.00 Emergency Services Manager, per hour New 136.00
Captain, per hour New 224.00
Engineer, per hour New 198.00
Firefighter, per hour New 195.00

SECTION 3. Pursuant to Section 2.34.040 of the Municipal C ode of the City of Richmond which provides for the establishment of a Master Fee S chedule for the fee s to be charged by the various City d epartments for City services, City Council of the City of Richmond hereby enacts a Master Fee Schedule that updates the fees assessed by the City departments to reflect the actual cost associated with providing the serv ice. The Master Fee Schedule can be u tilized as the basis for the future fee adjustments based on the Employment Cost Index.

SECTION 4. Severability. If any section, subsection, sentence, clause, phrase or portion of this ordinance is f or any reason held invalid or unconstitutional by a cour t of competent jurisdiction, such holding shall not affect the validity of the remaining portions of this ordinance. T he City Council hereby declares th at it would have passed each and every section, subsection, phrase or clause of this ordinance irrespect ive of the fact that any one or more sections, subsections , phrases or clauses be declared invalid or unconstitutional, whether on its face or as applied.

SECTION 5. This ordinance shall be effective 30 days after passage and adoption, with the exception of A.B. 1600 Developer impact fees which will become effective sixty days after the adoption of this ordinance.

Page 1137 of 1303 ends

7 *****************************
First introduced at a regular meeting of the City Council of the City of Richmond held on May 3, 2022, and finally passed and adopted at a re gular meeting held on May 17, 2022, by the following vote:

AYES:

NOES:

ABSTENTIONS:

ABSENT:

_____________________________________
Clerk of the City of Richmond

(SEAL)

Approved:

_______________________________
Mayor

Approved as to form:

____________________________
City Attorney

Page 1138 of 1303 ends

Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

Residential, single-family development, per
dwelling unit (DU), allocated as follows: 17,670.00 17,670.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 15.08.400-2, RMC

15.08.400-8, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
- Park/open space
6,950.00 No Change 6,950.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
- Sewer 3,625.00 No Change 3,625.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
- Traffic 1,968.00 No Change 1,968.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
- Community/aquatic centers 1,667.00 No Change 1,667.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
- Storm Drainage 710.00 No Change 710.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
- Library 1,883.00 No Change 1,883.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
- Police facilities 391.00 No Change 391.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
- Fire facilities 476.00 No Change 476.00 Residential, multi-family development, per
dwelling unit (DU), allocated as follows: 14,238.00 14,238.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space 5,707.00 No Change 5,707.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 2,934.00 No Change 2,934.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 1,573.00 No Change 1,573.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers 1,368.00 No Change 1,368.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 386.00 No Change 386.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 1,883.00 No Change 1,883.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 208.00 No Change 208.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 179.00 No Change 179.00 Commercial development, per 1,000 square
feet, allocated as follows:
9,997.00 9,997.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 3,305.00 No Change 3,305.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 4,888.00 No Change 4,888.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 988.00 No Change 988.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 251.00 No Change 251.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 301.00 No Change 301.00 ECI
Factor
ECI Index for
proposed
increase

DEVELOPER FEES
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Public Facility Impact Fees (The fees pay for major infrastructure improvements in each area required as a result of new development, for example off-site roads, traffic signals, fire and police facilities and park and recreation facilities )
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase
May 3, 2022

Page 1 of 40 ends
Page 1139 of 1303 ends

Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

ECI
Factor
ECI Index for
proposed
increase
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 264.00 No Change 264.00 Office development, per 1,000 square feet,
allocated as follows: 8,355.00 8,355.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 2,319.00 No Change 2,319.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 4,312.00 No Change 4,312.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 742.00 No Change 742.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 417.00 No Change 417.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 301.00 No Change 301.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 264.00 No Change 264.00 Industrial development, per 1,000 square feet,
allocated as follows: 3,984.00 3,984.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 1,142.00 No Change 1,142.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 1,575.00 No Change 1,575.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 788.00 No Change 788.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 178.00 No Change 178.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 114.00 No Change 114.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 187.00 No Change 187.00 Warehousing space, per 1,000 square feet,
allocated as follows: 3,860.00 3,860.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 1,142.00 No Change 1,142.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 1,575.00 No Change 1,575.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 788.00 No Change 788.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 54.00 No Change 54.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 114.00 No Change 114.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 187.00 No Change 187.00 Mitigation Administrative Fee
Not applicable N/A Not applicable N/A N/A
Section 66000 CA Govt Code;
Reso. 6-04; RMC 2.34.040,
Ord. 3-04
Mitigation Administrative Fee -- 3% of the total
project impact fees (for Building Regulations
included in Impact Fees administered by Finance) 3.0% N/A 3.0% Inclusionary Housing Fees
May 3, 2022

Page 2 of 40 ends
Page 1140 of 1303 ends

Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

ECI
Factor
ECI Index for
proposed
increase
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase

INCLUSIONARY HOUSING IN-LIEU FEES

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
In Lieu Fees -- per non-inclusionary unit (unit is a
dwelling, live/work or multi-family unit)
7% of cost of
construction of
habitable space
N/A
7% of cost of
construction of
habitable space
Type of Project

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Rental Residential Development $12 per square foot N/A $12 per square foot

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Ownership Residential Development May not pay in-lieu fee N/A May not pay in-lieu fee

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
0 - 370 - N/A -

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
371 - 74 3.00 N/A 3.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
742 - 1,111 6.00 N/A 6.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
1,112 - 1,482 9.00 N/A 9.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
More than 1,482 12.00 N/A 12.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
*NOTES:

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3 04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

1. Fee applies to residential components of mixed-use projects.

2. Fee applies to fractional inclusionary unit requirement below 0.5 and to any required inclusionary units for which developer desires to pay an in-lieu fee. These fees shall be calculated by determining the in-lieu fee that would be due were the entire inclusionary requirement for the residential development project to be satisfied with in-lieu fees and then multiplying by the percentage of the total number of inclusionary units to be satisfied through an in-lieu fee payment.

Example: Assume that a 10 percent inclusionary requirement for 104 units equals 10.4 inclusionary units, and that an in- lieu fee of $1.2 million would be required if in-lieu fees were used to satisfy the entire 10.4-unit requirement. The developer provides 10 on-site units. The fractional unit in-lieu payment would equal: 0.4 [fractional unit]/10.4 [total inclusionary requirement] x $1.2 million = $46,154.

Example: Assume in the previous example that the developer provides 6 on-site inclusionary units and desires to pay an in-lieu fee for the remaining 4.4 units. The in-lieu fee would equal: 4.4 units/10.4 units x $1.2 million = $507,692.

3. Fee am
ounts shall be adjusted once each year by the community development director based on the percentage increase in the Engineering News-Record Construction Cost Index for San Francisco, California for the corresponding year.

RESIDENTIAL DEVELOPMENT PROJECTS PROPOSED SOUTH
OF I-580 AND ON THE POINT SAN PABLO PENINSULA

OTHER RESIDENTIAL DEVELOPMENT PROJECTS
Building Permits for Number of Residential Units
Issued after the Resolution's Effective Date
Applicable Fee per
Square Foot of Net
New Residential Floor
May 3, 2022

Page 3 of 40 ends
Page 1141 of 1303 ends

Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

ECI
Factor
ECI Index for
proposed
increase
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Office, Research & Development, Retail/Servie,
Warehouse/Distribution, Hotel, Industrial 2.00 N/A 2.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
*NOTES:

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3 04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04 Park Land Dedication Fees Calculated on a Per Unit Basis

N/A N/A N/A N/A N/A
RMC 6.02.180; RMC 2.34.040,
Ord. 3-04 Single Family dwelling unit, detached or
townhouse, fee per unit 432.00 N/A 432.00 N/A N/A N/A N/A N/A RMC 6.02.180; RMC 2.34.040,
Ord. 3-04 Duplex, medium low 372.00 N/A 372.00 N/A N/A N/A N/A N/A RMC 6.02.180; RMC 2.34.040,
Ord. 3-04 Condominiums and Clusters 300.00 N/A 300.00 N/A N/A N/A N/A N/A RMC 6.02.180; RMC 2.34.040,
Ord. 3-04 Apartments (7 units or more) 216.00 N/A 216.00 Other Mandated Building Permit Fees
STMP, CBSC and SMIP FEES are collected by,
but not set by the City
Subregional Transportation Mitigation Program (STMP) Fees

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Single family residential, fee per dwelling unit 5,881.00 N/A 5,881.00

3. Fee amounts shall be adjusted once each year by the community development director based on the percentage increase in the Engineering News-Record Construction Cost Index for San Francisco, California for the corresponding year.

4. Net new gross floor area shall be calculated as required by Richmond Municipal Code Section 15.04.103.090.

5. Fees
for non-residential uses shall be paid only once prior to issuance of the first building permit for the space.

4. Net
new residential floor area shall be calculated based on the floor area of dwelling units in the building, excluding unheated unenclosed spaces such as balconies, patios, unfinished garages or outside storage lockers, areas used for off- street parking and loading, and common hallways and common areas

5. All in-lieu fees shall be paid for a dwelling unit prior to issuance of a building permit for that unit, unless the conditions of approval allow the fees to be paid at occupancy. Fees for fractional units shall be paid at issuance of the first building permit for the project.

Nonresidential Uses Fee per Square Foot
of Net New Gross
Floor Area*

1. Projects adding less than 5,000 sq. ft. of net new gross floor area are exempt from payment of the linkage fee.

2. Fee appl
ies to non-residential components of mixed-use projects.

Affordable Housing Linkage Fee for Non-residential Development Projects May 3, 2022

Page 4 of 40 ends
Page 1142 of 1303 ends

Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

ECI
Factor
ECI Index for
proposed
increase
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Multi-family Residential, fee per dwelling unit 2,897.00 N/A 2,897.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Senior Housing, fee per dwelling unit 1,588.00 N/A 1,588.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Commercial hotel per room 3,764.00 N/A 3,764.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Commercial Retail, fee per square feet 7.13 N/A 7.13

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Office, fee per square feet 9.43 N/A 9.43

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Industrial, fee per square feet 6.01 N/A 6.01

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Mini Storage Space, fee per square fee 0.82 N/A 0.82

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Other Fee per dwelling unit (Per AM pk hr trip) 7,948.00 N/A 7,948.00 Subregional Transportation Mitigation Program (STMP) Fees EFFECTIVE JULY 1, 2022 AS SET BY
West Contra Costa
Transportation Advisory Committee (“WCCTAC”)

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Single family residential, fee per dwelling unit 5,881.00 1.098 6,458.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Multi-family Residential, fee per dwelling unit 2,897.00 1.098 3,181.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Senior Housing, fee per dwelling unit 1,588.00 1.098 1,744.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Commercial hotel per room 3,764.00 1.098 4,133.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Commercial Retail, fee per square feet 7.13 1.097 7.82

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Office, fee per square feet 9.43 1.098 10.35

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Industrial, fee per square feet 6.01 1.098 6.60

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Mini Storage Space, fee per square fee 0.82 1.098 0.90

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Other Fee per dwelling unit (Per AM pk hr trip) 7,948.00 1.098 8,727.00 California Building Standards Commission (CBSC) Fees

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
$1 - 25,000 Permit Valuation 1.00 N/A 1.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
$25,001 - 50,000 2.00 N/A 2.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
$50,000 - 75,000 3.00 N/A 3.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
$75,000 - 100 000 4.00 N/A 4.00 May 3, 2022

Page 5 of 40 ends
Page 1143 of 1303 ends

Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

ECI
Factor
ECI Index for
proposed
increase
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Every $25,000 or fraction thereof above $100,000 Add $1 N/A Add $1 Strong-Motion Instrumentation & Seismic Hazard Mapping Fees

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
1 to 3 story Residential .00013 * Project
Valuation
Min Fee $.50
N/A
.00013 * Project
Valuation
Min Fee $.50

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Commercial and over 3 story Residential .00028 * Project Valuation
Min Fee $.50
N/A
.00028 * Project
Valuation
Min Fee $.50
Public Art Fee

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
All new commercial structures; all new industrial
structures; all new residential projects of ten or
more dwelling units; and all construction of
building additions, and/or renovations and/or
tenant improvements exceeding $500,000.00 in
building development costs shall contribute an
amount equal to one percent of the total
development cost to be set aside for public art.
1% of Building
Development Cost N/A 1% of Building
Development Cost

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
All City capital improvement projects, including all
City bond measure projects and all other City
capital projects funded from outside granting
authorities, shall contribute an amount equal to
one and one-half percent of the total development
costs of the City capital improvement project, to
be set aside for public art.

1.5% of Building
Dev
elopment Cost N/ A 1.5% of Building
Development Cost
Note: for detail Building Development Cost - Refer to Chapter 6.50

May 3, 2022

Page 6 of 40 ends
Page 1144 of 1303 ends

Code Enforcement
# Description Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 CODE
2 Videodisks -- charged at cost for time and materials.

Average approximate cost begins at $25 for one
tape, $40 for two tapes (same footage) (materials
and man hours)
Actual Cost NA NA Actual Cost $0
3 Inspection Warrant $417.00 $1,064.99 0% $1,064.00 $647 4 Appeal to Hearing Officer Cost of Citation NA NA Cost of Citation $0 5 Administrative fee for site clean-up $195.00 $705.31 0% $705.00 $510 6 Administrative fee for board up $195.00 $705.31 0% $705.00 $510 7 Re-inspection $91.00 $143.66 0% $143.00 $52
8 Abatement Warrant $187.00 $2,848.31 56% $1,250.00 $1,063 9 Lien and Special Assessment $239.00 $5,359.66 53% $2,500.00 $2,261 10 Release of Recordation Processing Fee $166.00 $439.82 0% $439.00 $273 11 Vacant Dwellings or Building
12 Vacant Property Registration $166.00 $214.05 0% $214.00 $48 13 Permit to secure the building, calculated based on
building valuation and square footage
Calculate based on
valuation
NA NA Calculate based on
valuation
$0
14 Per month fee to cover the staff time and cost to
monitor our chronically vacant property inventory $81.00 $574.66 0% $574.00 $493 May 3, 2022

Page 7 of 40 ends
Page 1145 of 1303 ends

Engineering
Description CURRENT FEE Proposed FEE
SECTION 1 - PERMITS
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.28.130, RMC

2.34.040.12b, Ord. 21-03;
Reso. 6-04
Encroachment Permit/Digging up and Disturbance of Roadways, etc.-/Maintenance and Construction, Monitoring of Wells Additional expenses for services and field time over alloted time will be charged at cost. If encroachment refund is requested, once verified work was not done, refund will be made to applicant less 20%.
488.00 8. 0% 527.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.28.130, RMC

2.34.040.12b, Ord. 21-03;
Reso. 6-04
Monitoring/Boring Wells 527.00 N o Change 527.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.28.130, RMC

2.34.040.12b, Ord. 21-03;
Reso. 6-04
Facility Placement (Pods, debris boxes), up to 10 days. 200.00 N o Change 200.00 Concrete Permit - curb, gutter, sidewalk, and driveway
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.36.060, RMC

12.36.170-a, RMC 12.36.170-b,
RMC 2.34.040.40a(1), RMC

2.34.040.40a(2), Ord. 21-03;
Reso. 6-04
Concrete Permit
205.00 N o Change 205.00
SECTION 2 - OTHER ENGINEERING FEE RELATED TO PERMITS
not applicable na not applicable na na RMC 2.34 Traffic Control Plan Review 240.00 per hour 9.6% 263.00 per hour 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Plumbing Permit Fee 178.00 N o Change 178.00 not applicable na not applicable na na
RMC 2.34 Document retrieval fee (reproduction costs only - see fees for duplication) cost No Change cost
not applicable na not applicable na na
RMC 2.34 Consultant Services Actual Cost + 10% No Change Actual Cost + 10% Violation of Job Completion Without Permit
Work Excavation without permit or violation of job completion without permit will result in a fee of double the toal cost.

Double fee of total
cost of job No Change
Double fee of total
cost of job
SECTION 3 - HOURLY RATES
Fees for Work Performed by City Staff - Includes work
performed in excess of the standard fees listed or for
services not otherwise listed.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 City Engineer 350.00 N o Change 350.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Capital Projects Manager 316.00 N o Change 316. 00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Senior Civil Engineer 266.00 N o Change 266. 00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Associate Civil Engineer 249.00 N o Change 249. 00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Engineer II 201.00 N o Change 201. 00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Engineer I 176.00 N o Change 176. 00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Engineer Asset Administrator 244.00 N o Change 244. 00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Construction Inspector II 201.00 N o Change 201. 00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Construction Inspector I 176.00 N o Change 176. 00 ECI Index for
proposed
increase
ECI
Factor
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Description
ECI Index for
last increase

UTILITIES
May 3, 2022

Page 8 of 40 ends
Page 1146 of 1303 ends

Engineering
Description CURRENT FEE Proposed FEE
ECI Index for
proposed
increase
ECI
Factor
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Description
ECI Index for
last increase

UTILITIES
SECTION 4 - FEES FOR DUPLICATION
not applicable 35.00 No Change 35.00 not applicable 55.00 No Change 55.00 not applicable na not applicable na na RMC 2.34.040.123b, Ord. 21- 03, RMC 2.40.110 Photocopying, per page (8-1/2 x 11) 0.10 No Change 0.10 not applicable na not applicable na na RMC 2.34.040.123d, Ord. 21- 03; Reso. 6-04 Plan size (24"x36"), per page 9.00 No Change 9.00 not applicable na not applicable na na Reso. 6-04; RMC 2.34.040, Ord. 3-04
Plotting - Refer to GIS fees for Custom Maps and Predefined Maps cost No Change cost
not applicable na not applicable na na Digital Imaging Fee - Parcel Map, Tract Map or Improvement Plans, plus 25.00 No Change 25.00 not applicable na not applicable na na Per sheet to be imaged 2.00 No Change 2.00

MISCELLANEOUS FEES
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040.123b, Ord. 21- 03, RMC 2.40.110
Bike plan Check - Per hour 239.00 No Change 239.00 Refunds for Permit Cancellations Fees
Cancelled permits are eligible for an 80% refund, upon approval by the Public Works Director. 20% of the fee is retained to recover the estimated average costs of the City’s administrative and technical efforts required to initiate and facilitate the permitting process.

Plan Check Review fees are non-refundable.
not applicable na
Sale of Plans and Specifications for Construction Jobs--From $35 (hardcopy) - $55.00 (cost for printing and mailing)na RMC 2.34.040.123a, Ord. 21- 03; Reso. 6-04na
May 3, 2022

Page 9 of 40 ends
Page 1147 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
SECTION I – OCCUPANCY

GROUP PERMIT TO OPERATE - SPECIAL USE/ACTIVITY/OPERATIONS Annual Operational Permit per CFC 105.6
OP19-1 Aerosol Products $264.00 $265.85 0% $265.00 $1.00 OP19-3 Aviation Facilities $461.00 $324.44 0% $324.00 -$137.00 OP19-5 Cellulose Nitrate Film $396.00 $324.44 0% $324.00 -$72.00 OP19-6 Combustible Dust-Producing Operations up to 5,000 sq. feet $328.00 $265.85 0% $265.00 -$63.00 OP19-6.1 Each additional 5,000 square feet or fraction thereof $264.00 $58.59 1% $58.00 -$206.00 OP19-7 Combustible Fibers/Material Storage $461.00 $441.63 0% $441.00 -$20.00 OP19-8 Compressed Flammable Gases $328.00 $324.44 0% $324.00 -$4.00 OP19-8.1 Compressed/Liquified Gas Plant ( up to 5,000 sq. feet) $594.00 $571.30 0% $571.00 -$23.00 OP19-8.2 Each additional 5,000 sq. feet or fraction thereof $594.00 $117.19 0% $117.00 -$477.00 OP19-9 Covered & Open Mall Buildings $328.00 $207.25 0% $207.00 -$121.00 OP19-10 Cryogenic Fluids $328.00 $324.44 0% $324.00 -$4.00 OP19-11 Cutting & Welding (fixed facility) $328.00 $207.25 0% $207.00 -$121.00 OP19-12 Dry Cleaning $328.00 $324.44 0% $324.00 -$4.00
OP19-14 Explosives or Blasting Agents $461.00 $676.01 0% $676.00 $215.00 OP19-15 Fire Hydrants & Valves - Private $264.00 $265.85 0% $265.00 $1.00 Flammable Combustible Liquids. Permit to store, handle or the use of (includes installation of new tank):

OP19-16.1 Class I liquids in excess of 5 gallons – Inside $328.00 $383.04 0% $383.00 $55.00 OP19-16.2 Class I liquids in excess of 10 gallons – Outside $461.00 $500.23 0% $500.00 $39.00 OP19-16.3 Class II or Class III A liquids in excess of 25 gallons - Inside $328.00 $383.04 0% $383.00 $55.00 OP19-16.4 Class II or Class III A liquids in excess of 60 gallons – Outside $461.00 $500.23 0% $500.00 $39.00 OP19-16.5 Flammable/Combustible Liquids – (removal) $328.00 $383.04 0% $383.00 $55.00 OP19-16.6 Flammable/Combustible Liquids - Plants/Warehouse - Up to 5k sq ft $461.00 $454.11 0% $454.00 -$7.00 OP19-16.7 Each additional 5,000 sq ft or fraction of $461.00 $117.19 0% $117.00 -$344.00 OP19-16.8 Flammable/Combustible Liquids – Out of Service Tank $656.00 $571.30 0% $571.00 -$85.00 OP19-16.9 Flammable/Combustible Liquids – Change of Contents $328.00 $336.92 0% $336.00 $8.00 OP19-16.10 Flammable/Combustible Liquids - Manufacture $461.00 $454.11 0% $454.00 -$7.00 Operational Permits include normal inspection time during business hours and one reinspection. Additional inspection time, reinspections, and inspections outside of normal business hours will incur appropriate staffing charge (SST).

May 3, 2022

Page 10 of 40 ends
Page 1148 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
OP19-16.11 Printing Plant or Shop $264.00 $148.66 0% $148.00 -$116.00 OP19-16.12 Highly Combustible Storage 0-5,000 sq ft $522.00 $500.23 0% $500.00 -$22.00 OP19-16.13 Highly Combustible Storage, each additional 5,000 sq ft or fraction thereof $328.00 $58.59 1% $58.00 -$270.00 OP19-17 Floor Finishing $328.00 $265.85 0% $265.00 -$63.00 OP19-18 Fruit & Crop Ripening $264.00 $265.85 0% $265.00 $1.00 OP19-19 Fumigation & Insecticidal Fogging NA NA N/C $0
OP19-20 Hazardous Materials Storage/Use $264.00 $512.70 0% $512.00 $248.00 OP19-20.1 Chemical Plant 0-5,000 sq ft $594.00 $571.30 0% $571.00 -$23.00 OP19-20.2 Chemical Plant - Each additional 5,000 sq ft or fraction thereof $594.00 $117.19 0% $117.00 -$477.00 OP19-20.3 Radioactive Material (any amount) $527.00 $500.23 0% $500.00 -$27.00 Chemical Warehouse
OP19-20.4 5,000 square feet or less $328.00 $336.92 0% $336.00 $8.00 OP19-20.5 Each additional 5,000 square feet or fraction thereof $328.00 $58.59 1% $58.00 -$270.00 Laboratory
OP19-20.6 5,000 square feet or less $594.00 $629.89 0% $629.00 $35.00 OP19-20.7 Each additional 5,000 square feet or fraction thereof $594.00 $117.19 0% $117.00 -$477.00 Bulk Plant/Terminal
OP19-20.8 10 acres or less $2,871.00 $3,081.08 0% $3,081.00 $210.00 OP19-20.9 Each additional 10 acres or fraction thereof $2,871.00 $2,729.52 0% $2,729.00 -$142.00 Bulk Transfer
OP19-20.10 10 acres or less $2,871.00 $3,081.08 0% $3,081.00 $210.00 OP19-20.11 Each additional 10 acres or fraction thereof $2,871.00 $2,729.52 0% $2,729.00 -$142.00 Process Transfer
OP19-20.12 10 acres or less $2,871.00 $3,081.08 0% $3,081.00 $210.00 OP19-20.13 Each additional 10 acres or fraction thereof $2,871.00 $2,729.52 0% $2,729.00 -$142.00 OP19-21 HPM (Hazardous Production Material) Facilities - Semiconductor manufacturer $1,318.00 $1,333.03 0% $1,333.00 $15.00 OP19-22 High Pile Storage 1-10,000 sq. feet $739.00 $454.11 0% $454.00 -$285.00 OP19-22.1 High Pile Storage 10,001-20,000 sq. ft. $571.30 0% $571.00 NA OP19-22.2 High Pile Storage 20,001-50,000 sq. ft. $629.89 0% $629.00 NA OP19-22.3 High Pile Storage >50,000 sq. ft. $688.49 0% $688.00 NA OP19-22.4 High Pile Storage per 10k sq feet above 50k $58.59 1% $58.00 NA OP19-23 Hot Work Operations $264.00 $324.44 0% $324.00 $60.00 OP19-24 Industrial Ovens/ Commercial Incinerator $461.00 $383.04 0% $383.00 -$78.00 OP19-25 Lumber Yards & Woodworking Plants $527.00 $500.23 0% $500.00 -$27.00 OP19-26 Liquid or Gas Fueled Vehicles or Equipment in Assembly Buildings $264.00 $265.85 0% $265.00 $1.00 May 3, 2022

Page 11 of 40 ends
Page 1149 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
OP19-27 Liquid Propane (LP) Gas per tank - cylinder exchange only $264.00 $90.06 0% $90.00 -$174.00 OP19-27.1 LPG (less than 2K gallons) $328.00 $148.66 0% $148.00 -$180.00 OP19-27.2 LPG (more than 2K gallons) $527.00 $207.25 0% $207.00 -$320.00 OP19-27.3 LPG Plant/Facility 0-5,000 sq ft $527.00 $571.30 0% $571.00 $44.00 OP19-27.4 LPG Plant/Facility each additional 5k sq ft or fraction thereof $527.00 $117.19 0% $117.00 -$410.00 OP19-28 Magnesium $396.00 $324.44 0% $324.00 -$72.00
OP19-29 Miscellaneous Combustible Storage $527.00 $441.63 0% $441.00 -$86.00 OP19-30 Mobile Food Prep Vehicles NA NA N/C $0
OP19-31 Motor Fuel Dispensing Facilities $461.00 $324.44 0% $324.00 -$137.00 OP19-31.1 Tank Vehicle Dispensing $264.00 $148.66 0% $148.00 -$116.00 OP19-32 Open Burning $264.00 $148.66 0% $148.00 -$116.00 OP19-33 Open Flames & Torches $264.00 $148.66 0% $148.00 -$116.00 OP19-34 Open Flames & Candles $264.00 $148.66 0% $148.00 -$116.00 OP19-34.1 Open Flames/Candle Single Use $117.19 0% $117.00 NA OP19-35 Organic Coatings $264.00 $148.66 0% $148.00 -$116.00 OP19-37 Places of Assembly 50-99 persons $320.00 $90.06 0% $90.00 -$230.00 OP19-37.1 Places of Assembly 100-299 persons $460.00 $148.66 0% $148.00 -$312.00 OP19-37.2 Places of Assembly 300+ persons $531.00 $207.25 0% $207.00 -$324.00 OP19-38 Cannabis/Plant Extraction $1,445.18 0% $1,445.00 NA OP19-39 Private Fire Hydrants $264.00 $265.85 0% $265.00 $1.00 OP19-41 Pyroxylin Plastics $264.00 $265.85 0% $265.00 $1.00 OP19-42 Refrigeration Operation Equipment $396.00 $324.44 0% $324.00 -$72.00 OP19-43.1 Repair Garage $328.00 $265.85 0% $265.00 -$63.00 OP19-44 Rooftop Heliports $264.00 $265.85 0% $265.00 $1.00 OP19-45 Spraying or Dipping 5,000 sq ft or less $522.00 $441.63 0% $441.00 -$81.00 OP19-45.1 Spraying or Dipping, each additional 5,000 sq ft or fraction thereof $328.00 $58.59 1% $58.00 -$270.00 OP19-46 Storage of Scrap Tires & Tire Byproducts $461.00 $441.63 0% $441.00 -$20.00 OP19-48 Tire-Rebuilding Plants $461.00 $441.63 0% $441.00 -$20.00 OP19-49 Waste Handling $492.00 $441.63 0% $441.00 -$51.00 OP19-50 Wood Products $461.00 $441.63 0% $441.00 -$20.00 Additional Permits
OP19-51 1. Production Facilities – Change use or occupancy or allow the attendance of a live audience, or for wrap parties. $527.00 $558.82 0% $558.00 $31.00
May 3, 2022

Page 12 of 40 ends
Page 1150 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
OP19-51.1 2. Pyrotechnics & Special Effects – Use of pyrotechnics special effects for the use of motion picture, television and commercial production. $527.00 $558.82 0% $558.00 $31.00 OP19-51.2 3. Live Audiences – Install seating for live audiences (production studios & sound stages) $264.00 $324.44 0% $324.00 $60.00 OP19-54 Asbestos Removal $264.00 $324.44 0% $324.00 $60.00 OP19-55 Battery System Storage $264.00 $165.88 1% $165.00 -$99.00 Change of Occupancy/Site Inspection or Miscellaneous Inspection OP19-60
A permit is required for a requested inspection for the change of occupancy including, but not limited to: Inspections conducted when required by Building Official, Planning, or other Governmental agency and where not elsewhere listed.
$321.00 $351.57 0% $351.00 $30.00
OP19-61 Five Year Sprinkler Test $234.38 0% $234.00 NA
OP19-64 Emergency Responder Radio System $234.38 0% $234.00 NA Single Use/Temporary Operational Permit per CFC 105.6
Single Use Permit Issuance
OP19-2 Amusement Buildings (each occurrence) $264.00 $441.49 0% $441.00 $177.00 OP19-4 Carnivals and Fairs (each occurrence) $328.00 $379.10 0% $379.00 $51.00 OP19-4.1 Float, Parade $132.00 $175.78 11% $156.00 $24.00 OP19-53 Christmas Tree Lot, including tents $264.00 $382.89 0% $382.00 $118.00 OP19-11.1 Cutting & Welding Single Use (Valid for 180 days) $264.00 $224.48 0% $224.00 -$40.00 OP19-13 Exhibits & Trade Shows $264.00 $320.51 0% $320.00 $56.00 OP19-23.1 Hot Work Operations - Single Use $328.00 $320.51 0% $320.00 -$8.00 OP19-40 Pyrotechnic Special Effects Material, Inside. $527.00 $554.88 0% $554.00 $27.00 OP19-36 Outdoor Assembly Event $441.49 0% $441.00 NA
Rates include plan review and site inspection conducted during business hours only. Inspections outside of business hours subject to minimum rates specified under OP-100.

May 3, 2022

Page 13 of 40 ends
Page 1151 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
OP19-51 Temporary Assembly, Indoor $509.00 $503.88 0% $503.00 -$6.00 Firework Aerial Display
Pyrotechnics, outside (Firework Aerial Display)
OP19-56 Pyrotechnics, outside (Firework Aerial Display) $1,564.00 $1,426.09 0% $1,426.00 -$138.00 OP19-56.1 Standby personnel minimum (3 hours) $792.00 $878.92 0% $878.00 $86.00 OP19-56.2 Additional hours, per person/per hour $264.00 $292.97 0% $292.00 $28.00 PTO -56.3 Set Piece Display $527.00 $492.50 0% $492.00 -$35.00 Temporary Membrane Structures & Tents
OP19-47 Temporary Membrane Structures & Tents, each (399 - 699 sq. ft.) $132.00 $203.32 0% $203.00 $71.00 OP19-47.1 Temporary Membrane Structures & Tents, each (700-4999 sq. ft.) $264.00 $320.51 0% $320.00 $56.00 OP19-47.2 Temporary Membrane Structures & Tents, each (5,000 + sq. ft.) $396.00 $441.49 0% $441.00 $45.00 OP19-47.3 Temporary Membrane/Tent Extended Use (180 days) $264.00 $234.38 0% $234.00 -$30.00 OP19-57 Model Rocket Event $396.00 $140.93 1% $140.00 -$256.00 OP19-57.1 Model Rocket Sales $132.00 $140.93 1% $140.00 $8.00 OP19-57.2 Model Rockets Youth Scouts/Troops $31.00 $58.59 39% $36.00 $5.00 OP19-58 Temporary Water Supply $264.00 $292.97 0% $292.00 $28.00 OP-100.1 Additional inspection/standby time during business hours, per person, per half hour $117.19 0% $117.00 NA OP-100.2 After hours inspection time/standby minimum (3 hours) $878.92 0% $878.00 NA OP-100.3 Additional inspection/standby time after business hours, per person, per half hour $175.78 0% $175.00 NA

GROUP HIGH RISE
H-1 High Rise Inspection (State certification inspection) - Post 1974 $574.00 $585.95 0% $585.00 $11.00 H-1.1 Plus $ .05 per square foot $0.05 $0.05 0% $0.05 $0.00 H-2 Mid Rise- Life safety systems test $574.00 $589.74 0% $589.00 $15.00 H-2.1 Plus ($ .05 per square foot) $0.05 $0.05 0% $0.05 $0.00 H-3 Low Rise- Life safety systems test (includes 4 hours) $1,030.00 $1,058.50 0% $1,058.00 $28.00 GROUP REFINERY/BULK PLANT or TERMINAL/BULK TRANSFER/PROCESS TRANSFER Bulk Plant/Terminal Rate (Section III plan review, Section IV Permit to Operate 21.10 & 21.11) Permit to Operate a Bulk Plant or Terminal facility where flammable or combustible liquids are received by tank vessel, pipelines, tank car or tank vehicle and are stored or blended in bulk for the purpose of distributing such liquids by tank vessel pipeline tank car tank vehicle portable tank or container May 3, 2022

Page 14 of 40 ends
Page 1152 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
SECTION II –SPECIAL SERVICES

GROUP SPECIAL SERVICE TASK
SST - 1 Reinspections (third and subsequent) or callback $264.00 $308.80 0% $308.00 $44.00 SST – 1.1 Additional inspection time during normal business hours - per half hour. $132.00 $117.19 0% $117.00 -$15.00 SST – 1.2 Additional inspection time after normal business hours - per half hour. $264.00 $175.78 0% $175.00 -$89.00 SST – 1.3 Inpections conducted after business hours, on weekends, or holidays (3 hour minimum) $792.00 $878.92 0% $878.00 $86.00 SST – 2 Consultation: 1/2 hour minimum $132.00 $124.77 1% $124.00 -$8.00 SST – 3 Copying: Per Page $0.20 NA NA $0.20 $0.00 False Alarms: Initial notice to correct any malfunctions with alarm system NA NA No Charge $0 SST – 4 For 1st (within 180 days) $295.00 $295.29 0% $295.00 $0.00 SST – 4.1 2nd – (within 180 days) $591.00 $570.64 0% $570.00 -$21.00 SST – 4.2 3rd – and/or each occurrence thereafter (within 365 days) $1,182.00 $1,125.13 0% $1,125.00 -$57.00 SST-5 Weld Inspection $292.97 0% $292.00 NA
Fire Protection System Signaling Service
SST – 6 Registration and 1st Year service fee $264.00 $258.12 0% $258.00 -$6.00 SST – 6.1 Annual Service Fee $46.00 $47.48 1% $47.00 $1.00 SST – 7 Halon Concentration Test $527.00 $527.35 0% $527.00 $0.00 SST – 8 Knox Box Service $44.00 $74.42 30% $52.00 $8.00 SST – 9 Standby: Single person during business hours, per hour $264.00 $257.82 0% $257.00 -$7.00 SST-9.1 Standby: Single person, after business hours, per hour $316.41 0% $316.00 NA SST-9.2 Standby: Fire Engine/Unit per hour $792.00 $771.83 0% $771.00 -$21.00 SST – 10 Training/Instructional Services Base Fee (up to 2 hours) $527.00 $534.95 0% $534.00 $7.00 SST - 10.1 Additional training/instructional time, per hour $264.00 $234.38 0% $234.00 -$30.00 SST – 11 File Research and Review $31.00 $47.48 24% $36.00 $5.00 SST – 12 Business License Inspection $132.00 $258.12 40% $156.00 $24.00 SST - 13 Failure to obtain operational permit $576.00 NA NA DOUBLE FEES NA SST - 14 Extend plan review/construction permit 180 days $264.00 $148.51 0% $148.00 -$116.00 REF/BULK Bulk Transfer Rate (Section III Plan Review, Section IV Permit to Operate 21.12 & 21.13) Permit to Operate a Bulk Transfer facility where loading or unloading of flammable or combustible liquids from or between tank Process Transfer Rate (Section III Plan Review, Section IV Permit to Operate 21.14 & 21.15) Permit to Operate a Process Transfer facility where the transfer of flammable or combustible liquids between tank vehicles or tank cars and process operations. Process operations may include containers, tanks, piping and May 3, 2022

Page 15 of 40 ends
Page 1153 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
SECTION III – PLAN REVIEW
GROUP PRELIMINARY PLAN REVIEW – CONSULTATIONS/MEETING
PR-1 In Office Design/Consultation per half hour $132.00 $124.77 1% $124.00 -$8.00 PR-1.2 Out of Office Design/Consultation per hour (min. 2 hours) $527.00 $499.10 0% $499.00 -$28.00 PR-1.3 Review of fire & life safety systems $527.00 $542.52 0% $542.00 $15.00 PR-1.4 Gates and barricades on fire roads $527.00 $590.00 0% $590.00 $63.00 Major Subdivision Plan Review (5 or More Lots/Parcels) (See PR 11.1) PR – 2 Review of subdivision for access, hydrant placement. $792.00 $839.55 0% $839.00 $47.00 Minor Subdivision Plan Review (1 to 4 Lots/Parcels) (See PR 11.1) PR – 2.2 Review of subdivision for access, hydrant placement. $396.00 $465.23 0% $465.00 $69.00 Single Family Home Review – access & water supply
PR – 2.3 Single Family Home Review – access & water supply (new construction) $396.00 $172.26 0% $172.00 -$224.00 PR – 2.3.1 Single Family Home Review – access & water supply (TI/modifications) $264.00 $172.26 0% $172.00 -$92.00 GROUP BUILDING CONSTRUCTION – NEW BUILDINGS & TENANT IMPROVEMENTS New Construction or Building Additions Plan Review (See PR 11.1) PR – 3 Minimum plan review base fee. $792.00 $590.00 0% $590.00 -$202.00 PR – 3.1 Plus $.08 per square foot in excess of 2,000 sq. ft. $0.08 $0.09 0% $0.09 $0.01 Tenant Improvement Plan Review (for building additions see PR 3.1) PR – 3.2 Minimum plan review base fee. $527.00 $590.00 0% $590.00 $63.00 PR – 3.2.1 Plus $.08 per square foot in excess of 2,000 sq. ft. $0.08 $0.09 0% $0.09 $0.01 All fees
include
minimum plan
review and
May 3, 2022

Page 16 of 40 ends
Page 1154 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR-3.3 Industrial Ovens (CFC 105.7.15) $590.00 0% $590.00 NA PR-3.4 Motor Vehicle Repair Room and Booths (CFC 105.7.17) $590.00 0% $590.00 NA PR-3.5 Solar Photovoltaic Power Systems (CFC 105.7.21) $590.00 0% $590.00 NA SECTION III – PLAN REVIEW
GROUP WATER SUPPLY – FIRE SERVICE MAINS – FIRE HYDRANTS Fire Service – Emergency Repair
PR – 4 Review of underground piping, placement, and size. $527.00 $590.00 0% $590.00 $63.00 Install, Repair Private Fire Service Hydrants and/or Piping to Firewater Lines PR – 4.2 Minimum plan review base fee of system. $527.00 $590.00 0% $590.00 $63.00 Flush - Private Fire Service System
PR – 4.3 Minimum inspection base fee. $264.00 $340.45 0% $340.00 $76.00 Hydrostatic Test - Private Fire Service System
PR – 4.4 Minimum inspection/test base fee. $527.00 $633.43 0% $633.00 $106.00 Water Flow Information Field Test
PR – 4.5 Minimum field test base fee. $527.00 $758.20 0% $758.00 $231.00 PR – 4.5.1 Additional or multiple flow tests per ½ hour. $132.00 $117.19 0% $117.00 -$15.00 SECTION III – PLAN REVIEW

GROUP FIRE PROTECTION SYSTEMS
Tenant Improvement Fire Sprinklers (without calculations) PR – 5 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 PR – 5.1.2 Additional inspections per hour (i.e. weld-o-let, hydro, visual, etc…) $264.00 $292.97 0% $292.00 $28.00 Tenant Improvement Fire Sprinklers (with calculations)
May 3, 2022

Page 17 of 40 ends
Page 1155 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR – 5.2 Minimum plan review base fee. $656.00 $773.37 0% $773.00 $117.00 PR–5.2.2 Each additional inspection per hour (i.e. weld-o-let, hydro, visual, etc…) $264.00 $292.97 0% $292.00 $28.00 New Commercial Fire Sprinkler System (13, 13R, & 15 systems) PR – 5.3 Minimum plan review base fee per riser. $1,054.00 $1,191.12 0% $1,191.00 $137.00 PR–5.3.2 Each additional inspection per hour (i.e. weld-o-let, hydro, visual, etc…) $264.00 $292.97 0% $292.00 $28.00 Residential Fire Sprinkler System (single family home)
PR – 5.4 Minimum plan review base fee. $593.00 $882.98 0% $882.00 $289.00 Residential Fire Sprinkler System (multiple homes)
PR – 5.5 Minimum plan review base fee per model. $656.00 $1,058.76 0% $1,058.00 $402.00 PR–5.5.1 Each additional lot (flush, hydrostatic test and final) $396.00 $351.57 0% $351.00 -$45.00 PR–5.5.2 Each Additional inspection per hour (i.e. models, individual homes) $264.00 $292.97 0% $292.00 $28.00 Standpipe System
PR – 5.6 Minimum plan review base fee. $792.00 $882.98 0% $882.00 $90.00 PR–5.6.1 Each additional inspection per hour (i.e. hydro, flush, flow test, etc…) $264.00 $234.38 0% $234.00 -$30.00 Spray Booth (includes booth and fire extinguishing system) PR – 5.7 Minimum plan review base fee. $792.00 $898.15 0% $898.00 $106.00 Pre-Action Fire Suppression System
PR – 5.8 Minimum plan review base fee. $792.00 $882.98 0% $882.00 $90.00 Fixed Fire Suppression System – (wet/dry chem., water mist, etc…) May 3, 2022

Page 18 of 40 ends
Page 1156 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR – 5.9 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 PR–5.9.1 Each additional separate system at same location. $264.00 $234.38 0% $234.00 -$30.00 Clean Agent Fire Suppression System
PR – 5.10 Minimum plan review base fee. $1,054.00 $1,117.35 0% $1,117.00 $63.00 Fire Pump Installation
PR – 5.11 Minimum plan review base fee. $1,845.00 $1,835.66 0% $1,835.00 -$10.00 Commercial Cooking (Hood and Duct) Fire Suppression System PR – 5.12 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 PR–5.12.1 Each additional system. $264.00 $234.38 0% $234.00 -$30.00 Smoke & Heat Vents
PR – 5.13 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 Smoke Management/Control System
PR – 5.14 Minimum plan review base fee. $1,845.00 $1,909.43 0% $1,909.00 $64.00 Explosion Control (includes: vents, dust collection, etc…) PR – 5.15 Minimum plan review base fee. $1,054.00 $1,132.53 0% $1,132.00 $78.00

GROUP FIRE ALARM SYSTEM
Fire Alarm System
May 3, 2022

Page 19 of 40 ends
Page 1157 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR – 6 Minimum plan review base fee. $656.00 $898.15 0% $898.00 $242.00 PR – 6.1 Plus $ 11.00 per initiating device $12.00 $7.81 10% $7.00 -$5.00 PR – 6.1.2 Pre-wire inspections per hour. $264.00 $292.97 0% $292.00 $28.00 Dedicated Function Fire Alarm System (i.e. sprinkler monitoring, elevator recall, etc…) PR – 6.2 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 Fire Alarm Panel Replacement Only
PR – 6.3 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 High-Rise Fire Alarm (new and/or system upgrade)
PR - 6.4 Minimum plan review base fee. $2,109.00 $2,217.57 0% $2,217.00 $108.00 PR - 6.4.1 Plus $ 11.00 per initiating device $12.00 $7.81 10% $7.00 -$5.00 PR – 6.4.3 Pre-wire inspections per hour. $264.00 $234.38 0% $234.00 -$30.00 PR-6.5 Emergency Responder Radio Coverage System $590.00 0% $590.00 NA

GROUP FLAMMABLE & COMBUSTIBLE LIQUIDS (TANKS- PIPING & DISPENSING) Remove (Repair, Modify, Extend Piping) Underground Tank PR – 7.1 Install/Repair/Modify/Extend Piping/Remove Underground Tank. $792.00 $824.38 0% $824.00 $32.00 Install (Repair, Modify, Extend Piping) Aboveground Tank PR – 7.2 Install/Repair/Modify/Extend Piping/Remove Aboveground Tank. $527.00 $590.00 0% $590.00 $63.00 PR – 7.2.1 Each additional tank. $264.00 $234.38 0% $234.00 -$30.00 Abandon Underground Tank in Place
PR – 7.3 Minimum plan review base fee. $792.00 $758.20 0% $758.00 -$34.00 May 3, 2022

Page 20 of 40 ends
Page 1158 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
Environmental Upgrade (vapor recovery and processing systems, spill control, secondary containment and environmental agency requirements)
PR – 7.4 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 Apply Interior Coating to Flammable Liquid Tanks
PR – 7.5 Minimum plan review base fee. $792.00 $882.98 0% $882.00 $90.00 GROUP COMPRESED GAS SYSTEMS: LPG /CNG/MEDICAL/CRYOGENICS Container Exchange Programs; LPG Tank Installation Without Dispensing PR – 8 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 Install, Modify, Repair LPG – CNG – Hydrogen (Tank Install and/or Dispensing) PR – 8.2 Minimum plan review base fee. $923.00 $1,007.75 0% $1,007.00 $84.00 Install, Modify, Repair Medical or Compressed Gas Systems PR – 8.3 Minimum plan review base fee. $923.00 $1,124.94 0% $1,124.00 $201.00 Install, Modify, Repair Cryogenics Fixed Installation
PR – 8.4 Minimum plan review base fee. $923.00 $1,124.94 0% $1,124.00 $201.00 Install, Modify, Repair Compressed Gas Storage
PR – 8.5 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 PR-8.6 Install, Modify Cannabis/Plant Extraction System (CFC 105.7.18) $1,015.34 0% $1,015.00 NA PR-8.6.1 Plus $0.08 per square foot in excess of 2,000 sq. ft. $0.09 0% $0.09 NA GROUP SPECIAL HAZARDS – HAZARDOUS
Battery Systems
May 3, 2022

Page 21 of 40 ends
Page 1159 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR – 9 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 Dust Collection Systems
PR – 9.2 Minimum plan review base fee. $656.00 $648.60 0% $648.00 -$8.00 Explosives Storage
PR – 9.3 Minimum plan review base fee. $1,054.00 $1,249.71 0% $1,249.00 $195.00 Hazardous Materials Compliance Review
PR – 9.4 Minimum review of MSDS, HMMP and/or HMIS submittals. $264.00 $249.55 0% $249.00 -$15.00 Hazardous Materials – Storage /Dispensing – Open/Closed Systems PR – 9.5 Minimum plan review base fee. $1,054.00 $1,249.71 0% $1,249.00 $195.00 PR – 9.5.1 Each additional system. $527.00 $483.93 0% $483.00 -$44.00 PR-9.5.3 Dipping (CFC 105.7.23) $648.60 0% $648.00 NA
Install, Modify, Repair Mechanical Refrigeration Systems PR – 9.6 Minimum plan review base fee. $792.00 $1,000.17 0% $1,000.00 $208.00 PR-9.7 Fuel Cell Power Systems (CFC 105.7.10) $882.98 0% $882.00 NA

GROUP HIGH PILE RACK STORAGE SYSTEMS
High-Pile or Rack Storage
PR – 10 Minimum plan review base fee. $792.00 $831.97 0% $831.00 $39.00 Temporary Access Roads & Water Supply
Install a Temporary Access Road – Residential and Commercial PR – 11 Install a Temporary Access Road - 1-2 Homes $264.00 $289.44 0% $289.00 $25.00 May 3, 2022

Page 22 of 40 ends
Page 1160 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR–11.1 Install a Temporary Access Road 3+ Homes or Commerical $527.00 $648.60 0% $648.00 $121.00 Install a Temporary Water Supply System
PR – 12 Minimum plan review base fee. $527.00 $590.00 0% $590.00 $63.00 Miscellaneous Submittals - Alternative Means and Methods Miscellaneous Submittals or Plans Review
PR – 13 Minimum plan review base fees up to two hours. $527.00 $590.00 0% $590.00 $63.00 Alternative Means and Methods Requests or Code Interpretation Review PR – 13.2 Minimum review base fee. $527.00 $499.10 0% $499.00 -$28.00

GROUP EXPEDITE PLAN REVIEW REQUEST & ADDITIONAL CHARGES/INSPECTION TIME PR – 14 Expedited Plans Surcharge (after business hours) $792.00 $748.65 0% $748.00 -$44.00 Demolition Permit pursuant to Chapter 33, CFC
PR – 15 Demolition Permit pursuant to Chapter 33, CFC $264.00 $348.04 0% $348.00 $84.00

GROUP BULK/TERMINAL/BULK TRANSER/PROCESS TRANSFER MAINTENANCE REVIEW Fees will be based on construction permit required for routine maintenance/repair work which conducted within these facilities.

Install, Modify, Repair, Replace Fireproofing
PR – 16 Minimum plan review base fees up to two hours. $527.00 $590.00 0% $590.00 $63.00 Install, Modify, Repair, Replace Piping for Systems Containing Hazardous Materials May 3, 2022

Page 23 of 40 ends
Page 1161 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR – 17 Minimum plan review base fees up to two hours. $527.00 $590.00 0% $590.00 $63.00 Install, Modify, Repair, Replace Piping for Systems Containing Hazardous Materials PR – 18 Minimum plan review base fees up to two hours. $590.00 0% $590.00 NA Install, Modify, Repair Pump Installed In Hazardous Material Process System PR – 19 Minimum plan review base fees up to two hours. $527.00 $590.00 0% $590.00 $63.00 Additional Plan Review Fees
PR – 20 Revisions and resubmittals, per hour $264.00 $249.55 0% $249.00 -$15.00 PR – 21 Additional plan review time, per half hour $132.00 $124.77 1% $124.00 -$8.00 PR – 21.1 Additional plan review time, expedited, per hour $264.00 $249.55 0% $249.00 -$15.00 PR – 22 Additional inspections during business hours (min 1 hour) $264.00 $292.97 0% $292.00 $28.00 PR – 22.1 Additional inspection time during business hours, per half hour $117.19 0% $117.00 NA PR – 22.2 After hours inspection, 3 hour minimum $792.00 $878.92 0% $878.00 $86.00 PR – 22.3 Additional inspection time, after hours, per half hour $175.78 0% $175.00 NA PR – 23 Working without approved plans NA NA DOUBLE FEE NA SECTION IV – NOTES

GROUP NOTES
SECTION V – REIMBURSEMENT FOR FIRE DEPARTMENT RESPONSE

GROUP FIRE INCIDENT RESPONSE
FIR – 1 Per unit response, per hour (includes captain, engineer and firefighter) $442.00 $617.46 0% $617.00 $175.00 FIR – 2 Damaged or consumable equipment replaced at cost. $331.00 NA NA Actual Cost NA FIR – 3 RFD reserves the right to invoice for individual event with customized mitigation rates including itemized, per person, at various response levels and for itemized products and equipment used. NA NA Actual Cost NA Fire & Life Safety Inspections (does not include applicable operational permits) Group Assembly/Business/Mercantile/Office Suite
Permits are non-transferrable and fees are non-refundable. Failure to pay invoice fees within 30 days shall result in a 20 percent late payment charge. In the case of multiple annual permits, permits may be issued for shorter periods and prorated on the basis of a 1/12th charge for each month and portion thereof.

May 3, 2022

Page 24 of 40 ends
Page 1162 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
BM-1 B/M 0-5,000 sq. feet $129.00 $178.11 14% $153.00 $24.00 BM-2 B/M 5,001 – 10,000 sq. feet $341.67 0% $341.00 NA
BM-3 B/M 10,001 – 20,000 sq. feet $458.86 0% $458.00 NA BM-4 B/M 20,001 – 40,000 sq. feet $576.05 0% $576.00 NA BM-5 B/M 40,001+ sq. feet $751.83 0% $751.00 NA
Group Other Occupancy (F/H/L/S)
O-1 O 0-5,000 sq. feet $283.07 0% $283.00 NA
O-2 O 5,001-10,000 sq. feet $400.26 0% $400.00 NA
O-3 O 10,001-20,000 sq. feet $576.05 0% $576.00 NA
O-4 O each 10k sq feet above 20k $576.05 0% $576.00 NA
Group Schools
E-1 Occupant load 1- 50 $328.00 $400.26 0% $400.00 $72.00 E-2 Occupant load 51-149 $461.00 $517.45 0% $517.00 $56.00 E-3 Occupant load 150-499 $546.00 $634.64 0% $634.00 $88.00 E-4 Occupant load 500+ $656.00 $751.83 0% $751.00 $95.00 Group State Licensed Care Facilities
SL-1 Residential Large Family Day Care (7-14 persons) $264.00 $341.67 0% $341.00 $77.00 SL-2 Commercial Day Care E3/I4 (7-49 persons) $264.00 $517.45 0% $517.00 $253.00 SL-3 Commercial Day Care E3/I4 (50+ persons) $264.00 $634.64 0% $634.00 $370.00 SL-4 Pre-inspection/850 Form $264.00 $234.38 0% $234.00 -$30.00 SL-5 Residential Assisted Living Facility (24 hr) $264.00 $400.26 0% $400.00 $136.00 SL-6 Other Licensed Facilities $264.00 $400.26 0% $400.00 $136.00 Group Institutional
I-1 Hospital/Surgical Center <50k sq. feet $527.00 $751.83 0% $751.00 $224.00 I-2 Hospital/Surgical Center 50,001+ sq. feet $527.00 $1,689.35 0% $1,689.00 $1,162.00 I-3 Nursing/Nonambulatory Facilities $527.00 $634.64 0% $634.00 $107.00 I-4 Jails/Detention Facilities $986.00 $1,572.16 0% $1,572.00 $586.00 I-5 Police Holding Cells or DOJ Review $263.00 $249.55 0% $249.00 -$14.00 Group Residential R1/R2 Occupancies
R-1 Residential 1-5 units $124.00 $182.85 20% $147.00 $23.00 R-2 Residential 6-15 units $227.00 $238.95 0% $238.00 $11.00 R-3 Residential 16-99 units $278.00 $346.42 0% $346.00 $68.00 May 3, 2022

Page 25 of 40 ends
Page 1163 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
R-4 Residential 100-249 units $557.00 $699.61 0% $699.00 $142.00 R-5 Residential 250-499 units $926.00 $1,109.77 0% $1,109.00 $183.00 R-6 Residential 500+ units $926.00 $3,172.60 0% $3,172.00 $2,246.00 R-7 Residential - Transient (hotel, motel, shelter) $400.26 0% $400.00 NA

GROUP FIRE INCIDENT RESPONSE CHIEF LEVEL RESPONSE
CLR – 1 Chief of Department, per hour $207.00 $311.19 0% $311.00 $104.00 CLR – 2 Deputy Fire Chief, per hour $185.00 $276.67 0% $276.00 $91.00 CLR – 3 Battalion Chief, per hour $113.00 $240.05 0% $240.00 $127.00 CLR – 4 Fire Marshal, per hour $138.00 $249.55 0% $249.00 $111.00 CLR – 5 Deputy Fire Marshal, per hour $114.00 $234.38 0% $234.00 $120.00 CLR-6 Fire Investigator, during business hours, per hour $234.38 0% $234.00 NA CLR-6.1 Fire Investigator, outside business hours, per hour $351.57 0% $351.00 NA CLR-7 Emergency Services Manager, per hour $136.96 1% $136.00 NA CLR-8 Captain, per hour $224.39 0% $224.00 NA
CLR-9 Engineer, per hour $198.00 0% $198.00 NA
CLR-10 Firefighter, per hour $195.07 0% $195.00 NA
Fees removed, replaced, or consolidated

GROUP AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES
APP – 1 Small (elementary school size or smaller)
APP – 2 Medium (middle school size or smaller)
APP – 3 Larger (high school size or smaller)
APP - 4 Extra Large (cost will vary depending on overall size) GROUP LICENSED CARE FACILITIES – 24 HOUR
LCF – 1 Base Fee:

LCF – 2 Plus each additional unit/occupant
Infant-care facility for children 2 ½ years of age and younger LCF – 3 Base Fee:

LCF – 4 Plus each additional unit/occupant
GROUP LICENSED CARE FACILITIES – LESS 24 HOUR
Adult or Day Care Facility (Nonambulatory Person)
LCF – 5 Base Fee:

LCF – 6 Plus per unit/occupant
Adult or Child Large Family Day Care
LCF – 7 Base Fee:

LCF – 8 Plus per unit/occupant
Adult or Child Day Care Center
LCF – 9 Base Fee:

A one (1) time
***Occupant
(a) Permit to operate a licensed care facility such as: Rehabilitation facility, Assisted Living, Halfway Houses, ***Occupant
May 3, 2022

Page 26 of 40 ends
Page 1164 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
LCF – 10 Plus per unit/occupant
LCF – 11 Licensed Clinic
LCF – 12 Pre – Inspection Fees – 850 Form

GROUP EDUCATIONAL (PRIVATE SCHOOL) OCCUPANCY
EDU – 1 Occupant load less than 50
EDU – 2 Occupant load 50-149
EDU – 3 Occupant load 150-499
EDU – 4 Occupant load 500 or more

GROUP INSTITUTIONAL OCCUPANCIES
INS – 1 HOSPITAL (medical, surgical & psychiatric) and Nursing Homes INS – 1.1 Plus $5.00 per patient/bed
INS – 2 Out Patient Clinics greater than 5 patients
INS – 2.1 Plus $5.00 per patient/bed
Inspection of Police Services facilities (holding cells) & DOJ Review INS – 3 (Includes the approval of Evacuation & Life Safety Procedures).

INS – 4 Inspection of adult and/or juvenile detention facilities

GROUP RESIDENTIAL OCCUPANCIES
HOTEL/MOTEL OR APARTMENT/CONDOMINIUM HOUSE:

RES – 1 *250 or more units
RES – 2 *100 249 units
RES – 3 *15 99 units
RES – 4 *6 14 units
RES – 5 *5 or Less units

GROUP BUSINESS OCCUPANCIES
MULTI-BUSINESS OCCUPANCIES :

BUS – 1 35 or more Suites
BUS – 2 25 34 Suites
BUS – 3 15 24 Suites
BUS – 4 6 14 Suites
BUS – 5 5 or Less Suites
HR – 1 To inspect a Hi-Rise building (State certification inspection) - Pre 1974 SST – 1.4 Fire Company Mercantile Inspection
SST - 1.5 Annual Commercial Warehouse Fire Inspection – Greater than 3,000 square feet.

SST – 3 Per hour
SST – 8 Fire Hydrant Flow Test
SST – 10 High Rise Certification
PR – 2.1 Each additional site inspection per hour.

PR-20 Re-submittals or revisions.

PR-21 Additional plan review time, per half hour.

PR – 2.2.1 Each additional inspection.

To operate
(a) Permit to operate a licensed care facility such as: Adult Day Care, Adult Day Support Center, Child Day May 3, 2022

Page 27 of 40 ends
Page 1165 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR – 17 Additional plan review time, per half hour.

PR – 5.1.1 Plus $1.00 per head in excess of 10 heads.

PR–5.2.1 Plus $1.00 per head in excess of 10 heads.

PR–5.3.1 Plus $1.00 per sprinkler head.

PR–5.4.1 Each additional inspection per hour.

PR–5.7.1 Each additional inspection per hour.

PR–5.8.1 Each additional inspection per hour.

PR–5.9.2 Each additional inspection per hour.

PR–5.10.1 Each Additional inspection per hour.

PR–5.11.1 Each Additional inspection per hour.

PR–5.12.2 Each additional inspection per hour.

PR –5.13.1 Each additional inspection per hour.

PR–5.14.1 Each Additional inspection per hour.

PR–5.15.1 Each Additional inspection per hour.

PR – 6.1.1 Each additional inspection per hour.

PR–6.2.1 Each additional inspection per hour.

PR – 6.3.1 Each additional inspection per hour.

PR - 6.4.2 Each additional inspection per hour.

Install Underground Tanks
PR – 7 Minimum plan review base fee.

PR-7.1.1 Each additional inspection/stand-by time per hour.

PR – 7.2.2 Each additional inspection.

PR – 7.3.1 Each additional inspection/stand-by time per hour.

PR – 7.4.1 Each additional inspection per hour.

PR – 7.5.1 Each additional inspection/stand-by time per hour.

PR – 8.1 Each additional inspection per hour.

PR – 8.2.1 Each additional inspection per hour.

PR – 8.3.1 Each additional inspection per hour.

PR – 8.4.1 Each additional inspection per hour.

PR – 8.5.1 Each additional inspection per hour.

PR – 9.1 Each additional inspection per hour.

PR – 9.2.1 Each additional inspection per hour.

PR – 9.3.1 Each additional inspection per hour.

PR – 9.4.1 Additional plan review time, per half hour.

PR – 9.5.2 Each additional inspection per hour.

PR – 9.6.1 Each additional inspection per hour.

PR–10.1 Field inspection time will be charged per hour.

May 3, 2022

Page 28 of 40 ends
Page 1166 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR–11.1.2 Each additional inspection per hour.

PR–12.1 Each additional inspection per hour.

PR–13.1 Additional plan review time will be charged on hourly basis.

PR–13.1.2 Each additional inspection per hour.

PR–14.1 (Additional plan review time, $ 251.00 per hour) PR–14.2 Expedited Plans - reviewed after normal business hours, three-hour minimum.

PR –14.3 (Additional plan review time, $ 251.00 per hour) PR-16.1 Additional plan review time will be charged on hourly basis.

PR-16.2 Each additional inspection per hour.

PR-17.1 Additional plan review time will be charged on hourly basis.

PR-17.2 Each additional inspection per hour.

PR–18.1 Additional plan review time will be charged on hourly basis.

PR–18.2 Each additional inspection per hour.

PR–19.1 Additional plan review time will be charged on hourly basis.

PR–19.2 Each additional inspection per hour.

Additional Charges and Inspection Time
PR - 20 Re-submittals or revisions.

PR – 21 Additional plan review time, $ 125.00 per half hour.

PTO - 4 Carbon Dioxide Systems used in Beverage Dispensing Application – Permit is required for carbon dioxide systems used in beverage dispensing applications having more than 100 pounds of PTO – 5.1 Additional inspection time during normal business hours per ½ hour.

PTO – 5.2 After hours inspection time per ½ hour.

PTO – 5.3 Overtime & Weekend inspections - three (3) hours minimum.

Dry Cleaning Plant
PTO – 13.1 Permit to operate a dry cleaning plant operation .

PTO – 15.1 Over 100 lbs.

PTO - 15.2 Ammonium Nitrate Storage
PTO – 15.3 Gunpowder Sales - 100 lbs. or less
PTO – 15.4 Gunpowder Sales – Over 100 lbs.

PTO – 17 Repair, Modification or Extension of Piping
PTO – 21.1 5 – 10 Products
PTO – 21.2 11 or more Products
PTO – 23.1 Each additional 5,000 square feet or fraction thereof PTO – 24.2 Additional inspection time during normal business hours per ½ hour.

May 3, 2022

Page 29 of 40 ends
Page 1167 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PTO – 24.3 After hours inspection time per ½ hour.

PTO – 24.4 Overtime & Weekend inspections - three (3) hours minimum.

PTO – 25.1 Commercial Incinerators
PTO – 36 *ASSEMBLY: With stage, 1,000 or more occupant load PTO – 38.1 Additional inspection time during normal business hours @ $125.00 per ½ hour PTO – 38.2 Additional inspection time after normal business hours @ $251.00 per hour PTO – 38.3 Overtime and weekend inspections: Three hour minimum fee - $ 753.00.

PTO – 41.1 5 – 8 repair bays
PTO – 41.2 Greater than 8 repair bays
PTO – 45.3 Additional inspection time during normal business hours @ $125.00 per ½ hour PTO – 45.4 Additional inspection time after normal business hours @ $251.00 per hour PTO – 45.5 Three-hour minimum fee - $753.00
Firework Aerial Display
Permit to use fireworks, pyrotechnics outside.

PTO-54.1 Additional inspection time during normal business hours @ $125.00 per ½ hour Tire Storage & Scrap Tires
PTO – 57 Permit to store tires in excess of 1,000 cubic feet inside buildings (per Ch. 25 – CFC)

GROUP MOTOR VEHICLE INCIDENT
MVI – 1 Provide hazardous materials assessment and scene stabilization. This will be the most common "invoice level " This occurs almost every time a RFD apparatus responds to an accident/incident MVI – 2 Includes MVI 1 services as well as clean up and material used (absorbents) for hazardous fluid clean up and disposal Invoiced at this level if the RFD unit has to clean up any gasoline or other MVI - 3 (Vehicle Fire) Provide scene safety, fire suppression, breathing air, rescue tools, hand tools, hose tip use foam structure protection and clean up gasoline or other automotive fluids that MVI - 4 Includes MVI 1 & 2 services as well as extrication (heavy rescue tools, ropes, airbags, cribbing etc ) Invoiced at this level when RFD unit has to extricate anyone from the vehicle(s) using any MVI – 5 Includes MVI 1, 2, & 4 services as well as multi RFD unit response

GROUP HAZARDOUS MATERIAL INCIDENT
HZM-1
Basic Response: Invoice will include engine response, first responder assignment, and certified hazmat team and appropriate equipment, perimeter establishment, evacuations, set-up and command.

HZM – 2
Intermediate Response: Invoice will include engine response, first responder assignment, certified hazmat team and appropriate equipment, perimeter establishment, evacuations, set- up and command, Level A or B suit donning, breathing air and detection equipment. Set-up and removal of decontamination center.

May 3, 2022

Page 30 of 40 ends
Page 1168 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
HZM – 3
Advanced Response: Invoice will include engine response, first responder assignment, hazmat certified team and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command, Level A or B suit donning, breathing air and detection equipment and robot deployment. Set-up and removal of decontamination center, detection equipment, recovery and identification of material. Disposal and environment clean up. Includes above in addition to any disposal fees of material and contaminated equipment and material used at scene. Includes 3 hours of on scene time.

HZM–3.1 Each additional hour @$315.00 per hazardous material team.

GROUP PIPELINE INCIDENTS/POWER LINE INCIDENTS not Limited to Gas, Sewer, & Water PLI – 1 Basic Response: Invoice will include engine response and first responder assignment, perimeter establishment, evacuations, first responder set-up and command.

PLI – 2
Intermediate Response: Invoice will include engine response, first responder assignment, and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command. May include HAZMAT team, Level A or B suit donning, breathing air and detection equipment.

PLI - 3
Advanced Response: Invoice will include engine response, first responder assignment, and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command. May include HAZMAT team, Level A or B suit donning, breathing air and detection equipment. Supervise and/or assist pipeline repair of intermediate to major pipeline damage.

May include set-up and removal of decontamination center, detection, recovery and identification of material. Disposal and environment clean up.

GROUP FIRE INVESTIGATOR RESPONSE
Includes the following: Scene Investigation, Investigation Report, Scene Documentation based on per hour.

INV – 1 The claim begins when the Fire Investigator responds to the incident and is billed for logged time only.

SECTION VI – REIMBURSEMENT FOR FIRE DEPARTMENT RESPONSE

GROUP WATER INCIDENT RESPONSE
WIR - 1
Basic Response: Invoice will include engine response, first responder assignment, perimeter establishment, evacuations, first responder set-up and command, scene safety and investigation (including possible patient contact, hazard control). This will be the most common "billing level." This occurs almost every time RFD Victory responds to a water incident.

WIR – 1.1 *Plus $52.00 per hour, per rescue person (minimum 3 fire personnel) WIR – 2
Intermediate Response: Includes WIR 1 services as well as clean up and material used (sorbents), minor hazardous clean up and disposal. Invoiced at this level if the RFD has to clean up small amounts of gasoline or other fluids that are spilled as a result of the incident.

WIR – 2.1 *Plus $52.00 per hour, per rescue person (minimum 3 fire personnel) May 3, 2022

Page 31 of 40 ends
Page 1169 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
WIR – 3 Advanced Response: Includes WIR 1 and WIR 2 services, including HAZMAT team, set up and removal of decontamination center detection equipment recovery and identification of WIR-3.1 *Plus $52 per hour, per rescue person (minimum 3 fire personnel) WIR-3.2 *Plus $105 per hour, per HAZMAT team member
WIR – 4 RFD reserves the right to invoice for individual event with customized mitigation rates including itemized, per person, at various response levels and for itemized products and equipment used.

FIR – 2 Breathing Support Unit, per hour (includes captain, engineer and firefighter) FIR – 3 Per truck response, per hour (includes captain, engineer and firefighter) NOTES:

General Aerial preplans shall comply with the following requirements:

Please review section RMC 8.16.040 Fire Prevention Code & Section 404 of CFC (California Fire Code) for complete requirements.

Where Required Occupancies:

Exception: Other than Group A occupancy used exclusively for the purpose of religious worship having an occupant load less than 2,000

1. Group B (Business) – Occupant load of 500 or more persons

2. Group E (Educational) – Schools

3. Group F (Factory) – Occupant load of 500 or more persons

4. Group H (High Hazards) – Including any facility in the Contra Costa Health Services Hazardous Material Program

5. Group I (Institutional) – Hospitals, nursing homes, Jails, etc…)

6. Group R – 1, Hotels & motels (transient) – 20 or more sleeping units

7. Group R – 2, Apartments, hotels & motels (non-transient), Live/work units

8. Group R – 4, Licensed Care Facilities (referrer to

9. High-rise buildings

10. Group M (mercantile) buildings i.e. Department stores, markets, retail or wholesales stores having an occupant load of 500 or more person

11. Covered malls exceeding 50,000 square feet

12. Open malls exceeding 50,000 square feet

13. Underground buildings

14. Buildings with atrium and having an occupancy in Group A, E or M Aerial pre-plans shall include but not be limited to the following:

1. Knox Box location

2. Fire Alarm Control Panel (FACP)

3. Emergency vehicle access

4. Post Indicator Valve (PIV)

5. OS&Y valve

6. Location of hazardous Materials

7. Sprinkler riser

8. Gas Valve

9. Electrical main valve

10. Fire Department Connection (FDC)

1. Group A (Assembly) - An aerial pre-plan is required for assembly occupancies having an occupant load of 300 or more and larger than 5,000 square feet. If occupancy is attached to commercial complex larger than 10,000 square feet than an aerial pre- May 3, 2022

Page 32 of 40 ends
Page 1170 of 1303 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ

11. Hydrant location

12. Elevator equipment room
Residential Occupancies with 20 or more complexes will have the following:

1. An annual inspection

2. A mid-year review inspection

3. *One (1) fire safety training session (12:00 p.m. – 4: p.m. on a scheduled Saturday) i.e.
a. Fire extinguisher training
b. Smoke alarm & carbon monoxide education
c. Cooking in the home safety
d. E.D.I.T.H. (Exit Drills In The Home) Training
*Appointments for fire safety training session need to be made 30 days in advance.

A floor plan outlining but not limited to the following is required.

1. Number of people expected to attend

2. Number of exits

3. Location of fire extinguishers

4. Location of tables & chairs

5. Location of stage

6. Location of tents
requires separate permit – PTO – 45

7. Location of cooking area(s)

8. Location of any open flames used for cooking or decorating

MITIGATION RATE NOTES
The mitigation rates above are average "billing levels," and are typical for the incident responses listed, however, when a claim is submitted, it will be itemized and based on the actual services Notes:

All fees shall be based on a $251.00 hourly rate and rounded up to the next whole dollar.

After Hour Inspection minimum $251.00, minimum three (3) hours – $753.00 Expedite Plan Review minimum $251.00, minimum three (3) hours – $753.00 These average mitigation rates were determined by itemizing costs for a typical run (from the time a fire apparatus leaves the station until it returns to the station) and are based on the actual costs, using amortized schedules for apparatus (including Any Fire Code Permit(s) issued or other request for use(s) not shown in this schedule will be charged at the hourly rate of $251.00. A one (1) hour minimum fee will apply and additional 15 minute increments (15 minutes - $63.00, 30 minutes -$125.00, p q g g y g hourly rate of $251.00. A four hour minimum fee will apply and additional 15 minute increments (15 minutes - $63.00, 30 minutes -$125.00, 45 minutes - $188.00) thereafter, in addition to the total initial fee.

May 3, 2022

Page 33 of 40 ends
Page 1171 of 1303 ends

RECREATION
# Description Current Fee/Charge Unit Suggested Fee Fee Δ Fee % Change 1 Cancellation more than 30 days prior to event, all fees and deposit will be refunded less the administrative costs associated with the reservation and event planning. 100% 100% 0.00 0% 2 Cancellation 30 days or less prior to event, no refund of deposit $0.00 $0.00 0.00 0% 3 Richmond Convention Center
4 5 Set up and Break down Fee (Only applies to Aud-Complex, Aud-Main Floor and Bermuda plus Catalina rentals), hourly $205.00 $205.00 0.00 0%
6 Deposit--$3000 minimum (may be higher) $3,081.00 $3,000.00 (81.00) -3% 7 Deposit--Concerts $5000 minimum (may be higher) Fees to be determined $5,135.00 $5,000.00 (135.00) -3% 8 Friday – Sunday, hourly $1,061.00 $1,061.00 0.00 0%
9 Monday – Thursday, hourly $848.00 $848.00 0.00 0%
10 Rental: Memorial Auditorium Main Floor
11 Deposit--$3000 minimum (may be higher) $3,081.00 $3,000.00 (81.00) -3% 12 Friday – Sunday, hourly (Whole Main Floor) $642.00 $642.00 0.00 0% 13 Monday – Thursday, hourly (Whole Main Floor) $514.00 $514.00 0.00 0% 14 Bingo, 8-hour max., daily $2,054.00 $2,054.00 0.00 0% 15 Rental: Bermuda/Catalina
16 Deposit--$500 minimum (may be higher) $514.00 $500.00 (14.00) -3% 17 Friday – Sunday, hourly $313.00 $313.00 0.00 0%
18 Monday – Thursday, hourly $251.00 $251.00 0.00 0%
19 Rental: Terrace Rooms (C/D/E/F/G/H)
20 Deposit--$250 minimum (may be higher) $257.00 $250.00 (7.00) -3% 21 First Room Monday - Thursday Hourly $124.00 $124.00 0.00 0% 22 Additional Terrace Room Monday - Thursday, hourly $52.00 $52.00 0.00 0% 23 First Room Friday - Sunday Hourly $155.00 $155.00 0.00 0% 24 Additional Terrace Room Friday - Sunday, hourly $66.00 $66.00 0.00 0% 25 Rental: Convention Center Lobby
Rental fees includes 3
contracted attendants &
janitorial supplies.

Additional attendants fee
maybe charged as needed
Rental: Convention Center Complex: Includes the Main Floor, Lobby , Bermuda Room and Terrace Rooms (C/D/E/F/G/H). Excludes the Kitchen and Dressing Rooms which may be rented separately.

Rental fees includes 2
contracted attendants &
janitorial supplies.

Rental fees includes 1
contracted attendant &
janitorial supplies.

Rental fees includes 2
contracted attendants &
janitorial supplies.

May 3, 2022

Page 34 of 40 ends
Page 1172 of 1303 ends

RECREATION
# Description Current Fee/Charge Unit Suggested Fee Fee Δ Fee % Change 26 Deposit--$500 minimum (may be higher) $514.00 $500.00 (14.00) -3% 27 Monday – Thursday, hourly $251.00 $251.00 0.00 0%
28 Friday – Sunday, hourly $313.00 $313.00 0.00 0%
29 Rental: Convention Center Kitchen and Dressing Rooms, Ticket Booth 30 Shared use Monday - Thursday, daily (with event booking) $106.00 $106.00 0.00 0% 31 Shared use Friday - Sunday, daily (with event booking) $132.00 $132.00 0.00 0% 32 Sole use Monday - Thursday, daily (with event booking) $165.00 $165.00 0.00 0% 33 Sole use Friday - Sunday, daily (with event booking) $206.00 $206.00 0.00 0% 34 Sole use Monday - Thursday, flat fee, 6 hours max. (without event booking) $514.00 $514.00 0.00 0% 35 Sole use Friday - Sunday, flat fee, 6 hours max. (without event booking) $642.00 $642.00 0.00 0% 36 Deposit for sole use, without event booking $514.00 $500.00 (14.00) -3% 37 Dressing Room-Band/Chorus Room Monday to Thursday, daily (w/event booking) $65.00 $65.00 0.00 0% 38 Dressing Room--Band/Chorus Room Friday to Sunday, daily (w/event booking) $81.00 $81.00 0.00 0% 39 Individual Dressing Room, upstairs, Monday to Thursday, daily (w/event booking) $34.00 $34.00 0.00 0% 40 Individual Dressing Room, upstairs, Friday to Sunday, daily (w/event booking) $42.00 $42.00 0.00 0% 41 Ticket Booth, Monday to Thursday, daily $52.00 $52.00 0.00 0% 42 Ticket Booth, Friday to Sunday, daily $66.00 $66.00 0.00 0% 43 Community Center Rooms
44 45 Deposit--$500 minimum (may be higher) $514.00 $500.00 (14.00) -3% 46 Social Hall - hourly (RRC) $158.00 $158.00 0.00 0%
47 Deposit--$500 minimum (may be higher) $514.00 $500.00 (14.00) -3% 48 Social Hall - hourly (NEVIN) $139.00 $139.00 0.00 0% 49 Deposit--$500 minimum (may be higher) $514.00 $500.00 (14.00) -3% 50 Social Hall - hourly (PARCHESTER, SHIELDS REID) $119.00 $119.00 0.00 0% 51 52 Deposit--$250 minimum (may be higher) $257.00 $250.00 (7.00) -3% 53 Multi Purpose Room - hourly (BTA, NEVIN, SRCC & PT. RICHMOND) $104.00 $104.00 0.00 0% 54 55 Deposit--$250 minimum (may be higher) $257.00 $250.00 (7.00) -3% Social Hall for 75 to 190 attendees. Rental fees includes 1 contracted attendant & janitorial supplies, available chairs and tables.

Minimum of two (2) hours rental.

Multi Purpose Room- Maximum 50 attendees. Rental fees includes 1 contracted attendant & janitorial supplies, available chairs and tables. Minimum of two (2) hours rental.

Conference Room for 20 to 30 attendees. Rental fees includes 1 contracted attendant & janitorial supplies, available chairs and tables. Minimum of two (2) hours rental.

May 3, 2022

Page 35 of 40 ends
Page 1173 of 1303 ends

RECREATION
# Description Current Fee/Charge Unit Suggested Fee Fee Δ Fee % Change 56 Conference Room - hourly (NCC,BTA,PCC,PRCC,SRCC) $83.00 $83.00 0.00 0% 57 Field Permits
58 Non League Deposit--$100 minimum (may be higher) $103.00 $100.00 (3.00) -3% 59 League Deposit--$300 minimum (may be higher) $308.00 $300.00 (8.00) -3% 60 Youth Sports, hourly $28.00 $28.00 0.00 0%
61 Adult Sports, hourly (Excluding Adult Baseball) $41.00 $41.00 0.00 0% 62 Adult Baseball, hourly $73.00 $73.00 0.00 0%
63 Tennis Courts
64 Deposit--$100 minimum (may be higher) $103.00 $100.00 (3.00) -3% 65 Tennis Courts, hourly $16.00 $16.00 0.00 0%
66 MLK Artificial Turf Field
67 Non League Deposit--$100 minimum (may be higher) $103.00 $100.00 (3.00) -3% 68 League Deposit--$300 minimum (may be higher) $308.00 $300.00 (8.00) -3% 69 Youth Sports, hourly $41.00 $41.00 0.00 0%
70 Adult Sports, hourly $51.00 $51.00 0.00 0%
71 Track - Youth, hourly $31.00 $31.00 0.00 0%
72 Track - Adult, hourly $41.00 $41.00 0.00 0%
73 Gymnasiums
74 Deposit--$250 minimum (may be higher) $257.00 $500.00 243.00 95% 75 Gymnasium, hourly (BTA, RRC & Sports Events) $152.00 $150.00 (2.00) -1% 76 Deposit--$500 minimum (may be higher) $514.00 $500.00 (14.00) -3% 77 Gymnasium, as Social Hall, hourly (BTA, RRC & Social Events) $259.00 $259.00 0.00 0% 78 Park Reservations
79 Deposit--$100 minimum (may be higher) $103.00 $100.00 (3.00) -3% 80 Groups of 50 or less participants, for general use, hourly (Includes 2 Trash Cans) $31.00 $31.00 0.00 0% 81 Deposit--$150 minimum (may be higher) $154.00 $150.00 (4.00) -3% 82 Groups of 51 to 100 participants, for general or fundraiser/commercial use, hourly (Includes 4 Trash Cans) $63.00 $63.00 0.00 0%
Rental fees includes 1
contracted attendants &
janitorial supplies.

Standard Fees
Reservation of Nicholl,
Country Club Vista,
Marina Bay, Barbara & Jay
Vincent, and Shimada is
limited to the picnic areas,
except by special
arrangement. Permission
Rental fees includes 1
trash can and
Rental fees includes 1
trash can and
May 3, 2022

Page 36 of 40 ends
← All documents from this meeting