Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

Residential, single-family development, per
dwelling unit (DU), allocated as follows: 17,670.00 17,670.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 15.08.400-2, RMC

15.08.400-8, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04
- Park/open space
6,950.00 No Change 6,950.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
- Sewer 3,625.00 No Change 3,625.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
- Traffic 1,968.00 No Change 1,968.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
- Community/aquatic centers 1,667.00 No Change 1,667.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
- Storm Drainage 710.00 No Change 710.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
- Library 1,883.00 No Change 1,883.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
- Police facilities 391.00 No Change 391.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04
- Fire facilities 476.00 No Change 476.00 Residential, multi-family development, per
dwelling unit (DU), allocated as follows: 14,238.00 14,238.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space 5,707.00 No Change 5,707.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 2,934.00 No Change 2,934.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 1,573.00 No Change 1,573.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers 1,368.00 No Change 1,368.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 386.00 No Change 386.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 1,883.00 No Change 1,883.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 208.00 No Change 208.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 179.00 No Change 179.00 Commercial development, per 1,000 square
feet, allocated as follows:
9,997.00 9,997.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 3,305.00 No Change 3,305.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 4,888.00 No Change 4,888.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 988.00 No Change 988.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 251.00 No Change 251.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 301.00 No Change 301.00 ECI
Factor
ECI Index for
proposed
increase

DEVELOPER FEES
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Public Facility Impact Fees (The fees pay for major infrastructure improvements in each area required as a result of new development, for example off-site roads, traffic signals, fire and police facilities and park and recreation facilities )
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase
May 3, 2022

Page 1 of 40 ends

Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

ECI
Factor
ECI Index for
proposed
increase
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 264.00 No Change 264.00 Office development, per 1,000 square feet,
allocated as follows: 8,355.00 8,355.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 2,319.00 No Change 2,319.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 4,312.00 No Change 4,312.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 742.00 No Change 742.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 417.00 No Change 417.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 301.00 No Change 301.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 264.00 No Change 264.00 Industrial development, per 1,000 square feet,
allocated as follows: 3,984.00 3,984.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 1,142.00 No Change 1,142.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 1,575.00 No Change 1,575.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 788.00 No Change 788.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 178.00 No Change 178.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 114.00 No Change 114.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 187.00 No Change 187.00 Warehousing space, per 1,000 square feet,
allocated as follows: 3,860.00 3,860.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Park/open space - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Sewer 1,142.00 No Change 1,142.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Traffic 1,575.00 No Change 1,575.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Community/aquatic centers - - - 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Storm Drainage 788.00 No Change 788.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Library 54.00 No Change 54.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Police facilities 114.00 No Change 114.00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 6.02.180; RMC 2.34.040, Ord. 3-04 - Fire facilities 187.00 No Change 187.00 Mitigation Administrative Fee
Not applicable N/A Not applicable N/A N/A
Section 66000 CA Govt Code;
Reso. 6-04; RMC 2.34.040,
Ord. 3-04
Mitigation Administrative Fee -- 3% of the total
project impact fees (for Building Regulations
included in Impact Fees administered by Finance) 3.0% N/A 3.0% Inclusionary Housing Fees
May 3, 2022

Page 2 of 40 ends

Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

ECI
Factor
ECI Index for
proposed
increase
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase

INCLUSIONARY HOUSING IN-LIEU FEES

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
In Lieu Fees -- per non-inclusionary unit (unit is a
dwelling, live/work or multi-family unit)
7% of cost of
construction of
habitable space
N/A
7% of cost of
construction of
habitable space
Type of Project

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Rental Residential Development $12 per square foot N/A $12 per square foot

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Ownership Residential Development May not pay in-lieu fee N/A May not pay in-lieu fee

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
0 - 370 - N/A -

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
371 - 74 3.00 N/A 3.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
742 - 1,111 6.00 N/A 6.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
1,112 - 1,482 9.00 N/A 9.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
More than 1,482 12.00 N/A 12.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
*NOTES:

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3 04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

1. Fee applies to residential components of mixed-use projects.

2. Fee applies to fractional inclusionary unit requirement below 0.5 and to any required inclusionary units for which developer desires to pay an in-lieu fee. These fees shall be calculated by determining the in-lieu fee that would be due were the entire inclusionary requirement for the residential development project to be satisfied with in-lieu fees and then multiplying by the percentage of the total number of inclusionary units to be satisfied through an in-lieu fee payment.

Example: Assume that a 10 percent inclusionary requirement for 104 units equals 10.4 inclusionary units, and that an in- lieu fee of $1.2 million would be required if in-lieu fees were used to satisfy the entire 10.4-unit requirement. The developer provides 10 on-site units. The fractional unit in-lieu payment would equal: 0.4 [fractional unit]/10.4 [total inclusionary requirement] x $1.2 million = $46,154.

Example: Assume in the previous example that the developer provides 6 on-site inclusionary units and desires to pay an in-lieu fee for the remaining 4.4 units. The in-lieu fee would equal: 4.4 units/10.4 units x $1.2 million = $507,692.

3. Fee am
ounts shall be adjusted once each year by the community development director based on the percentage increase in the Engineering News-Record Construction Cost Index for San Francisco, California for the corresponding year.

RESIDENTIAL DEVELOPMENT PROJECTS PROPOSED SOUTH
OF I-580 AND ON THE POINT SAN PABLO PENINSULA

OTHER RESIDENTIAL DEVELOPMENT PROJECTS
Building Permits for Number of Residential Units
Issued after the Resolution's Effective Date
Applicable Fee per
Square Foot of Net
New Residential Floor
May 3, 2022

Page 3 of 40 ends

Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

ECI
Factor
ECI Index for
proposed
increase
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Office, Research & Development, Retail/Servie,
Warehouse/Distribution, Hotel, Industrial 2.00 N/A 2.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
*NOTES:

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3 04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04 Park Land Dedication Fees Calculated on a Per Unit Basis

N/A N/A N/A N/A N/A
RMC 6.02.180; RMC 2.34.040,
Ord. 3-04 Single Family dwelling unit, detached or
townhouse, fee per unit 432.00 N/A 432.00 N/A N/A N/A N/A N/A RMC 6.02.180; RMC 2.34.040,
Ord. 3-04 Duplex, medium low 372.00 N/A 372.00 N/A N/A N/A N/A N/A RMC 6.02.180; RMC 2.34.040,
Ord. 3-04 Condominiums and Clusters 300.00 N/A 300.00 N/A N/A N/A N/A N/A RMC 6.02.180; RMC 2.34.040,
Ord. 3-04 Apartments (7 units or more) 216.00 N/A 216.00 Other Mandated Building Permit Fees
STMP, CBSC and SMIP FEES are collected by,
but not set by the City
Subregional Transportation Mitigation Program (STMP) Fees

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Single family residential, fee per dwelling unit 5,881.00 N/A 5,881.00

3. Fee amounts shall be adjusted once each year by the community development director based on the percentage increase in the Engineering News-Record Construction Cost Index for San Francisco, California for the corresponding year.

4. Net new gross floor area shall be calculated as required by Richmond Municipal Code Section 15.04.103.090.

5. Fees
for non-residential uses shall be paid only once prior to issuance of the first building permit for the space.

4. Net
new residential floor area shall be calculated based on the floor area of dwelling units in the building, excluding unheated unenclosed spaces such as balconies, patios, unfinished garages or outside storage lockers, areas used for off- street parking and loading, and common hallways and common areas

5. All in-lieu fees shall be paid for a dwelling unit prior to issuance of a building permit for that unit, unless the conditions of approval allow the fees to be paid at occupancy. Fees for fractional units shall be paid at issuance of the first building permit for the project.

Nonresidential Uses Fee per Square Foot
of Net New Gross
Floor Area*

1. Projects adding less than 5,000 sq. ft. of net new gross floor area are exempt from payment of the linkage fee.

2. Fee appl
ies to non-residential components of mixed-use projects.

Affordable Housing Linkage Fee for Non-residential Development Projects May 3, 2022

Page 4 of 40 ends

Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

ECI
Factor
ECI Index for
proposed
increase
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Multi-family Residential, fee per dwelling unit 2,897.00 N/A 2,897.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Senior Housing, fee per dwelling unit 1,588.00 N/A 1,588.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Commercial hotel per room 3,764.00 N/A 3,764.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Commercial Retail, fee per square feet 7.13 N/A 7.13

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Office, fee per square feet 9.43 N/A 9.43

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Industrial, fee per square feet 6.01 N/A 6.01

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Mini Storage Space, fee per square fee 0.82 N/A 0.82

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Other Fee per dwelling unit (Per AM pk hr trip) 7,948.00 N/A 7,948.00 Subregional Transportation Mitigation Program (STMP) Fees EFFECTIVE JULY 1, 2022 AS SET BY
West Contra Costa
Transportation Advisory Committee (“WCCTAC”)

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Single family residential, fee per dwelling unit 5,881.00 1.098 6,458.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Multi-family Residential, fee per dwelling unit 2,897.00 1.098 3,181.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Senior Housing, fee per dwelling unit 1,588.00 1.098 1,744.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Commercial hotel per room 3,764.00 1.098 4,133.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Commercial Retail, fee per square feet 7.13 1.097 7.82

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Office, fee per square feet 9.43 1.098 10.35

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Industrial, fee per square feet 6.01 1.098 6.60

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Mini Storage Space, fee per square fee 0.82 1.098 0.90

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Other Fee per dwelling unit (Per AM pk hr trip) 7,948.00 1.098 8,727.00 California Building Standards Commission (CBSC) Fees

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
$1 - 25,000 Permit Valuation 1.00 N/A 1.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
$25,001 - 50,000 2.00 N/A 2.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
$50,000 - 75,000 3.00 N/A 3.00

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
$75,000 - 100 000 4.00 N/A 4.00 May 3, 2022

Page 5 of 40 ends

Building Regulatns, Impact Fees
CURRENT FEE Factor PROPOSED FEE
BUILDING REGULATIONS -- Developer Impact Fees
UBC Regulations used to factor fee amounts.

ECI
Factor
ECI Index for
proposed
increase
RMC 5.12.050, 5.12.070, 6.02.180, 6.36.080 and 12.44.220 Description
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Master Fee Schedule
ECI Index for
last increase

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Every $25,000 or fraction thereof above $100,000 Add $1 N/A Add $1 Strong-Motion Instrumentation & Seismic Hazard Mapping Fees

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
1 to 3 story Residential .00013 * Project
Valuation
Min Fee $.50
N/A
.00013 * Project
Valuation
Min Fee $.50

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
Commercial and over 3 story Residential .00028 * Project Valuation
Min Fee $.50
N/A
.00028 * Project
Valuation
Min Fee $.50
Public Art Fee

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
All new commercial structures; all new industrial
structures; all new residential projects of ten or
more dwelling units; and all construction of
building additions, and/or renovations and/or
tenant improvements exceeding $500,000.00 in
building development costs shall contribute an
amount equal to one percent of the total
development cost to be set aside for public art.
1% of Building
Development Cost N/A 1% of Building
Development Cost

N/A N/A N/A N/A N/A
RMC 15.12.050, RMC

6.02.180; RMC 2.34.040, Ord.
3-04
All City capital improvement projects, including all
City bond measure projects and all other City
capital projects funded from outside granting
authorities, shall contribute an amount equal to
one and one-half percent of the total development
costs of the City capital improvement project, to
be set aside for public art.

1.5% of Building
Dev
elopment Cost N/ A 1.5% of Building
Development Cost
Note: for detail Building Development Cost - Refer to Chapter 6.50

May 3, 2022

Page 6 of 40 ends

Code Enforcement
# Description Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 CODE
2 Videodisks -- charged at cost for time and materials.

Average approximate cost begins at $25 for one
tape, $40 for two tapes (same footage) (materials
and man hours)
Actual Cost NA NA Actual Cost $0
3 Inspection Warrant $417.00 $1,064.99 0% $1,064.00 $647 4 Appeal to Hearing Officer Cost of Citation NA NA Cost of Citation $0 5 Administrative fee for site clean-up $195.00 $705.31 0% $705.00 $510 6 Administrative fee for board up $195.00 $705.31 0% $705.00 $510 7 Re-inspection $91.00 $143.66 0% $143.00 $52
8 Abatement Warrant $187.00 $2,848.31 56% $1,250.00 $1,063 9 Lien and Special Assessment $239.00 $5,359.66 53% $2,500.00 $2,261 10 Release of Recordation Processing Fee $166.00 $439.82 0% $439.00 $273 11 Vacant Dwellings or Building
12 Vacant Property Registration $166.00 $214.05 0% $214.00 $48 13 Permit to secure the building, calculated based on
building valuation and square footage
Calculate based on
valuation
NA NA Calculate based on
valuation
$0
14 Per month fee to cover the staff time and cost to
monitor our chronically vacant property inventory $81.00 $574.66 0% $574.00 $493 May 3, 2022

Page 7 of 40 ends

Engineering
Description CURRENT FEE Proposed FEE
SECTION 1 - PERMITS
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.28.130, RMC

2.34.040.12b, Ord. 21-03;
Reso. 6-04
Encroachment Permit/Digging up and Disturbance of Roadways, etc.-/Maintenance and Construction, Monitoring of Wells Additional expenses for services and field time over alloted time will be charged at cost. If encroachment refund is requested, once verified work was not done, refund will be made to applicant less 20%.
488.00 8. 0% 527.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.28.130, RMC

2.34.040.12b, Ord. 21-03;
Reso. 6-04
Monitoring/Boring Wells 527.00 N o Change 527.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.28.130, RMC

2.34.040.12b, Ord. 21-03;
Reso. 6-04
Facility Placement (Pods, debris boxes), up to 10 days. 200.00 N o Change 200.00 Concrete Permit - curb, gutter, sidewalk, and driveway
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 12.36.060, RMC

12.36.170-a, RMC 12.36.170-b,
RMC 2.34.040.40a(1), RMC

2.34.040.40a(2), Ord. 21-03;
Reso. 6-04
Concrete Permit
205.00 N o Change 205.00
SECTION 2 - OTHER ENGINEERING FEE RELATED TO PERMITS
not applicable na not applicable na na RMC 2.34 Traffic Control Plan Review 240.00 per hour 9.6% 263.00 per hour 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 Reso. 142-86, RMC 6.02.180;
RMC 2.34.040, Ord. 3-04 Plumbing Permit Fee 178.00 N o Change 178.00 not applicable na not applicable na na
RMC 2.34 Document retrieval fee (reproduction costs only - see fees for duplication) cost No Change cost
not applicable na not applicable na na
RMC 2.34 Consultant Services Actual Cost + 10% No Change Actual Cost + 10% Violation of Job Completion Without Permit
Work Excavation without permit or violation of job completion without permit will result in a fee of double the toal cost.

Double fee of total
cost of job No Change
Double fee of total
cost of job
SECTION 3 - HOURLY RATES
Fees for Work Performed by City Staff - Includes work
performed in excess of the standard fees listed or for
services not otherwise listed.
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 City Engineer 350.00 N o Change 350.00
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Capital Projects Manager 316.00 N o Change 316. 00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Senior Civil Engineer 266.00 N o Change 266. 00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Associate Civil Engineer 249.00 N o Change 249. 00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Engineer II 201.00 N o Change 201. 00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Engineer I 176.00 N o Change 176. 00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Engineer Asset Administrator 244.00 N o Change 244. 00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Construction Inspector II 201.00 N o Change 201. 00 1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34 Construction Inspector I 176.00 N o Change 176. 00 ECI Index for
proposed
increase
ECI
Factor
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Description
ECI Index for
last increase

UTILITIES
May 3, 2022

Page 8 of 40 ends

Engineering
Description CURRENT FEE Proposed FEE
ECI Index for
proposed
increase
ECI
Factor
Last increase
implemented
Index Effective
date for
proposed
increase
Municipal Code or
Other Code
City of Richmond
Description
ECI Index for
last increase

UTILITIES
SECTION 4 - FEES FOR DUPLICATION
not applicable 35.00 No Change 35.00 not applicable 55.00 No Change 55.00 not applicable na not applicable na na RMC 2.34.040.123b, Ord. 21- 03, RMC 2.40.110 Photocopying, per page (8-1/2 x 11) 0.10 No Change 0.10 not applicable na not applicable na na RMC 2.34.040.123d, Ord. 21- 03; Reso. 6-04 Plan size (24"x36"), per page 9.00 No Change 9.00 not applicable na not applicable na na Reso. 6-04; RMC 2.34.040, Ord. 3-04
Plotting - Refer to GIS fees for Custom Maps and Predefined Maps cost No Change cost
not applicable na not applicable na na Digital Imaging Fee - Parcel Map, Tract Map or Improvement Plans, plus 25.00 No Change 25.00 not applicable na not applicable na na Per sheet to be imaged 2.00 No Change 2.00

MISCELLANEOUS FEES
1-Jul-2019 139.7 1-Jul-2021 146.9 1.052 RMC 2.34.040.123b, Ord. 21- 03, RMC 2.40.110
Bike plan Check - Per hour 239.00 No Change 239.00 Refunds for Permit Cancellations Fees
Cancelled permits are eligible for an 80% refund, upon approval by the Public Works Director. 20% of the fee is retained to recover the estimated average costs of the City’s administrative and technical efforts required to initiate and facilitate the permitting process.

Plan Check Review fees are non-refundable.
not applicable na
Sale of Plans and Specifications for Construction Jobs--From $35 (hardcopy) - $55.00 (cost for printing and mailing)na RMC 2.34.040.123a, Ord. 21- 03; Reso. 6-04na
May 3, 2022

Page 9 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
SECTION I – OCCUPANCY

GROUP PERMIT TO OPERATE - SPECIAL USE/ACTIVITY/OPERATIONS Annual Operational Permit per CFC 105.6
OP19-1 Aerosol Products $264.00 $265.85 0% $265.00 $1.00 OP19-3 Aviation Facilities $461.00 $324.44 0% $324.00 -$137.00 OP19-5 Cellulose Nitrate Film $396.00 $324.44 0% $324.00 -$72.00 OP19-6 Combustible Dust-Producing Operations up to 5,000 sq. feet $328.00 $265.85 0% $265.00 -$63.00 OP19-6.1 Each additional 5,000 square feet or fraction thereof $264.00 $58.59 1% $58.00 -$206.00 OP19-7 Combustible Fibers/Material Storage $461.00 $441.63 0% $441.00 -$20.00 OP19-8 Compressed Flammable Gases $328.00 $324.44 0% $324.00 -$4.00 OP19-8.1 Compressed/Liquified Gas Plant ( up to 5,000 sq. feet) $594.00 $571.30 0% $571.00 -$23.00 OP19-8.2 Each additional 5,000 sq. feet or fraction thereof $594.00 $117.19 0% $117.00 -$477.00 OP19-9 Covered & Open Mall Buildings $328.00 $207.25 0% $207.00 -$121.00 OP19-10 Cryogenic Fluids $328.00 $324.44 0% $324.00 -$4.00 OP19-11 Cutting & Welding (fixed facility) $328.00 $207.25 0% $207.00 -$121.00 OP19-12 Dry Cleaning $328.00 $324.44 0% $324.00 -$4.00
OP19-14 Explosives or Blasting Agents $461.00 $676.01 0% $676.00 $215.00 OP19-15 Fire Hydrants & Valves - Private $264.00 $265.85 0% $265.00 $1.00 Flammable Combustible Liquids. Permit to store, handle or the use of (includes installation of new tank):

OP19-16.1 Class I liquids in excess of 5 gallons – Inside $328.00 $383.04 0% $383.00 $55.00 OP19-16.2 Class I liquids in excess of 10 gallons – Outside $461.00 $500.23 0% $500.00 $39.00 OP19-16.3 Class II or Class III A liquids in excess of 25 gallons - Inside $328.00 $383.04 0% $383.00 $55.00 OP19-16.4 Class II or Class III A liquids in excess of 60 gallons – Outside $461.00 $500.23 0% $500.00 $39.00 OP19-16.5 Flammable/Combustible Liquids – (removal) $328.00 $383.04 0% $383.00 $55.00 OP19-16.6 Flammable/Combustible Liquids - Plants/Warehouse - Up to 5k sq ft $461.00 $454.11 0% $454.00 -$7.00 OP19-16.7 Each additional 5,000 sq ft or fraction of $461.00 $117.19 0% $117.00 -$344.00 OP19-16.8 Flammable/Combustible Liquids – Out of Service Tank $656.00 $571.30 0% $571.00 -$85.00 OP19-16.9 Flammable/Combustible Liquids – Change of Contents $328.00 $336.92 0% $336.00 $8.00 OP19-16.10 Flammable/Combustible Liquids - Manufacture $461.00 $454.11 0% $454.00 -$7.00 Operational Permits include normal inspection time during business hours and one reinspection. Additional inspection time, reinspections, and inspections outside of normal business hours will incur appropriate staffing charge (SST).

May 3, 2022

Page 10 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
OP19-16.11 Printing Plant or Shop $264.00 $148.66 0% $148.00 -$116.00 OP19-16.12 Highly Combustible Storage 0-5,000 sq ft $522.00 $500.23 0% $500.00 -$22.00 OP19-16.13 Highly Combustible Storage, each additional 5,000 sq ft or fraction thereof $328.00 $58.59 1% $58.00 -$270.00 OP19-17 Floor Finishing $328.00 $265.85 0% $265.00 -$63.00 OP19-18 Fruit & Crop Ripening $264.00 $265.85 0% $265.00 $1.00 OP19-19 Fumigation & Insecticidal Fogging NA NA N/C $0
OP19-20 Hazardous Materials Storage/Use $264.00 $512.70 0% $512.00 $248.00 OP19-20.1 Chemical Plant 0-5,000 sq ft $594.00 $571.30 0% $571.00 -$23.00 OP19-20.2 Chemical Plant - Each additional 5,000 sq ft or fraction thereof $594.00 $117.19 0% $117.00 -$477.00 OP19-20.3 Radioactive Material (any amount) $527.00 $500.23 0% $500.00 -$27.00 Chemical Warehouse
OP19-20.4 5,000 square feet or less $328.00 $336.92 0% $336.00 $8.00 OP19-20.5 Each additional 5,000 square feet or fraction thereof $328.00 $58.59 1% $58.00 -$270.00 Laboratory
OP19-20.6 5,000 square feet or less $594.00 $629.89 0% $629.00 $35.00 OP19-20.7 Each additional 5,000 square feet or fraction thereof $594.00 $117.19 0% $117.00 -$477.00 Bulk Plant/Terminal
OP19-20.8 10 acres or less $2,871.00 $3,081.08 0% $3,081.00 $210.00 OP19-20.9 Each additional 10 acres or fraction thereof $2,871.00 $2,729.52 0% $2,729.00 -$142.00 Bulk Transfer
OP19-20.10 10 acres or less $2,871.00 $3,081.08 0% $3,081.00 $210.00 OP19-20.11 Each additional 10 acres or fraction thereof $2,871.00 $2,729.52 0% $2,729.00 -$142.00 Process Transfer
OP19-20.12 10 acres or less $2,871.00 $3,081.08 0% $3,081.00 $210.00 OP19-20.13 Each additional 10 acres or fraction thereof $2,871.00 $2,729.52 0% $2,729.00 -$142.00 OP19-21 HPM (Hazardous Production Material) Facilities - Semiconductor manufacturer $1,318.00 $1,333.03 0% $1,333.00 $15.00 OP19-22 High Pile Storage 1-10,000 sq. feet $739.00 $454.11 0% $454.00 -$285.00 OP19-22.1 High Pile Storage 10,001-20,000 sq. ft. $571.30 0% $571.00 NA OP19-22.2 High Pile Storage 20,001-50,000 sq. ft. $629.89 0% $629.00 NA OP19-22.3 High Pile Storage >50,000 sq. ft. $688.49 0% $688.00 NA OP19-22.4 High Pile Storage per 10k sq feet above 50k $58.59 1% $58.00 NA OP19-23 Hot Work Operations $264.00 $324.44 0% $324.00 $60.00 OP19-24 Industrial Ovens/ Commercial Incinerator $461.00 $383.04 0% $383.00 -$78.00 OP19-25 Lumber Yards & Woodworking Plants $527.00 $500.23 0% $500.00 -$27.00 OP19-26 Liquid or Gas Fueled Vehicles or Equipment in Assembly Buildings $264.00 $265.85 0% $265.00 $1.00 May 3, 2022

Page 11 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
OP19-27 Liquid Propane (LP) Gas per tank - cylinder exchange only $264.00 $90.06 0% $90.00 -$174.00 OP19-27.1 LPG (less than 2K gallons) $328.00 $148.66 0% $148.00 -$180.00 OP19-27.2 LPG (more than 2K gallons) $527.00 $207.25 0% $207.00 -$320.00 OP19-27.3 LPG Plant/Facility 0-5,000 sq ft $527.00 $571.30 0% $571.00 $44.00 OP19-27.4 LPG Plant/Facility each additional 5k sq ft or fraction thereof $527.00 $117.19 0% $117.00 -$410.00 OP19-28 Magnesium $396.00 $324.44 0% $324.00 -$72.00
OP19-29 Miscellaneous Combustible Storage $527.00 $441.63 0% $441.00 -$86.00 OP19-30 Mobile Food Prep Vehicles NA NA N/C $0
OP19-31 Motor Fuel Dispensing Facilities $461.00 $324.44 0% $324.00 -$137.00 OP19-31.1 Tank Vehicle Dispensing $264.00 $148.66 0% $148.00 -$116.00 OP19-32 Open Burning $264.00 $148.66 0% $148.00 -$116.00 OP19-33 Open Flames & Torches $264.00 $148.66 0% $148.00 -$116.00 OP19-34 Open Flames & Candles $264.00 $148.66 0% $148.00 -$116.00 OP19-34.1 Open Flames/Candle Single Use $117.19 0% $117.00 NA OP19-35 Organic Coatings $264.00 $148.66 0% $148.00 -$116.00 OP19-37 Places of Assembly 50-99 persons $320.00 $90.06 0% $90.00 -$230.00 OP19-37.1 Places of Assembly 100-299 persons $460.00 $148.66 0% $148.00 -$312.00 OP19-37.2 Places of Assembly 300+ persons $531.00 $207.25 0% $207.00 -$324.00 OP19-38 Cannabis/Plant Extraction $1,445.18 0% $1,445.00 NA OP19-39 Private Fire Hydrants $264.00 $265.85 0% $265.00 $1.00 OP19-41 Pyroxylin Plastics $264.00 $265.85 0% $265.00 $1.00 OP19-42 Refrigeration Operation Equipment $396.00 $324.44 0% $324.00 -$72.00 OP19-43.1 Repair Garage $328.00 $265.85 0% $265.00 -$63.00 OP19-44 Rooftop Heliports $264.00 $265.85 0% $265.00 $1.00 OP19-45 Spraying or Dipping 5,000 sq ft or less $522.00 $441.63 0% $441.00 -$81.00 OP19-45.1 Spraying or Dipping, each additional 5,000 sq ft or fraction thereof $328.00 $58.59 1% $58.00 -$270.00 OP19-46 Storage of Scrap Tires & Tire Byproducts $461.00 $441.63 0% $441.00 -$20.00 OP19-48 Tire-Rebuilding Plants $461.00 $441.63 0% $441.00 -$20.00 OP19-49 Waste Handling $492.00 $441.63 0% $441.00 -$51.00 OP19-50 Wood Products $461.00 $441.63 0% $441.00 -$20.00 Additional Permits
OP19-51 1. Production Facilities – Change use or occupancy or allow the attendance of a live audience, or for wrap parties. $527.00 $558.82 0% $558.00 $31.00
May 3, 2022

Page 12 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
OP19-51.1 2. Pyrotechnics & Special Effects – Use of pyrotechnics special effects for the use of motion picture, television and commercial production. $527.00 $558.82 0% $558.00 $31.00 OP19-51.2 3. Live Audiences – Install seating for live audiences (production studios & sound stages) $264.00 $324.44 0% $324.00 $60.00 OP19-54 Asbestos Removal $264.00 $324.44 0% $324.00 $60.00 OP19-55 Battery System Storage $264.00 $165.88 1% $165.00 -$99.00 Change of Occupancy/Site Inspection or Miscellaneous Inspection OP19-60
A permit is required for a requested inspection for the change of occupancy including, but not limited to: Inspections conducted when required by Building Official, Planning, or other Governmental agency and where not elsewhere listed.
$321.00 $351.57 0% $351.00 $30.00
OP19-61 Five Year Sprinkler Test $234.38 0% $234.00 NA
OP19-64 Emergency Responder Radio System $234.38 0% $234.00 NA Single Use/Temporary Operational Permit per CFC 105.6
Single Use Permit Issuance
OP19-2 Amusement Buildings (each occurrence) $264.00 $441.49 0% $441.00 $177.00 OP19-4 Carnivals and Fairs (each occurrence) $328.00 $379.10 0% $379.00 $51.00 OP19-4.1 Float, Parade $132.00 $175.78 11% $156.00 $24.00 OP19-53 Christmas Tree Lot, including tents $264.00 $382.89 0% $382.00 $118.00 OP19-11.1 Cutting & Welding Single Use (Valid for 180 days) $264.00 $224.48 0% $224.00 -$40.00 OP19-13 Exhibits & Trade Shows $264.00 $320.51 0% $320.00 $56.00 OP19-23.1 Hot Work Operations - Single Use $328.00 $320.51 0% $320.00 -$8.00 OP19-40 Pyrotechnic Special Effects Material, Inside. $527.00 $554.88 0% $554.00 $27.00 OP19-36 Outdoor Assembly Event $441.49 0% $441.00 NA
Rates include plan review and site inspection conducted during business hours only. Inspections outside of business hours subject to minimum rates specified under OP-100.

May 3, 2022

Page 13 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
OP19-51 Temporary Assembly, Indoor $509.00 $503.88 0% $503.00 -$6.00 Firework Aerial Display
Pyrotechnics, outside (Firework Aerial Display)
OP19-56 Pyrotechnics, outside (Firework Aerial Display) $1,564.00 $1,426.09 0% $1,426.00 -$138.00 OP19-56.1 Standby personnel minimum (3 hours) $792.00 $878.92 0% $878.00 $86.00 OP19-56.2 Additional hours, per person/per hour $264.00 $292.97 0% $292.00 $28.00 PTO -56.3 Set Piece Display $527.00 $492.50 0% $492.00 -$35.00 Temporary Membrane Structures & Tents
OP19-47 Temporary Membrane Structures & Tents, each (399 - 699 sq. ft.) $132.00 $203.32 0% $203.00 $71.00 OP19-47.1 Temporary Membrane Structures & Tents, each (700-4999 sq. ft.) $264.00 $320.51 0% $320.00 $56.00 OP19-47.2 Temporary Membrane Structures & Tents, each (5,000 + sq. ft.) $396.00 $441.49 0% $441.00 $45.00 OP19-47.3 Temporary Membrane/Tent Extended Use (180 days) $264.00 $234.38 0% $234.00 -$30.00 OP19-57 Model Rocket Event $396.00 $140.93 1% $140.00 -$256.00 OP19-57.1 Model Rocket Sales $132.00 $140.93 1% $140.00 $8.00 OP19-57.2 Model Rockets Youth Scouts/Troops $31.00 $58.59 39% $36.00 $5.00 OP19-58 Temporary Water Supply $264.00 $292.97 0% $292.00 $28.00 OP-100.1 Additional inspection/standby time during business hours, per person, per half hour $117.19 0% $117.00 NA OP-100.2 After hours inspection time/standby minimum (3 hours) $878.92 0% $878.00 NA OP-100.3 Additional inspection/standby time after business hours, per person, per half hour $175.78 0% $175.00 NA

GROUP HIGH RISE
H-1 High Rise Inspection (State certification inspection) - Post 1974 $574.00 $585.95 0% $585.00 $11.00 H-1.1 Plus $ .05 per square foot $0.05 $0.05 0% $0.05 $0.00 H-2 Mid Rise- Life safety systems test $574.00 $589.74 0% $589.00 $15.00 H-2.1 Plus ($ .05 per square foot) $0.05 $0.05 0% $0.05 $0.00 H-3 Low Rise- Life safety systems test (includes 4 hours) $1,030.00 $1,058.50 0% $1,058.00 $28.00 GROUP REFINERY/BULK PLANT or TERMINAL/BULK TRANSFER/PROCESS TRANSFER Bulk Plant/Terminal Rate (Section III plan review, Section IV Permit to Operate 21.10 & 21.11) Permit to Operate a Bulk Plant or Terminal facility where flammable or combustible liquids are received by tank vessel, pipelines, tank car or tank vehicle and are stored or blended in bulk for the purpose of distributing such liquids by tank vessel pipeline tank car tank vehicle portable tank or container May 3, 2022

Page 14 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
SECTION II –SPECIAL SERVICES

GROUP SPECIAL SERVICE TASK
SST - 1 Reinspections (third and subsequent) or callback $264.00 $308.80 0% $308.00 $44.00 SST – 1.1 Additional inspection time during normal business hours - per half hour. $132.00 $117.19 0% $117.00 -$15.00 SST – 1.2 Additional inspection time after normal business hours - per half hour. $264.00 $175.78 0% $175.00 -$89.00 SST – 1.3 Inpections conducted after business hours, on weekends, or holidays (3 hour minimum) $792.00 $878.92 0% $878.00 $86.00 SST – 2 Consultation: 1/2 hour minimum $132.00 $124.77 1% $124.00 -$8.00 SST – 3 Copying: Per Page $0.20 NA NA $0.20 $0.00 False Alarms: Initial notice to correct any malfunctions with alarm system NA NA No Charge $0 SST – 4 For 1st (within 180 days) $295.00 $295.29 0% $295.00 $0.00 SST – 4.1 2nd – (within 180 days) $591.00 $570.64 0% $570.00 -$21.00 SST – 4.2 3rd – and/or each occurrence thereafter (within 365 days) $1,182.00 $1,125.13 0% $1,125.00 -$57.00 SST-5 Weld Inspection $292.97 0% $292.00 NA
Fire Protection System Signaling Service
SST – 6 Registration and 1st Year service fee $264.00 $258.12 0% $258.00 -$6.00 SST – 6.1 Annual Service Fee $46.00 $47.48 1% $47.00 $1.00 SST – 7 Halon Concentration Test $527.00 $527.35 0% $527.00 $0.00 SST – 8 Knox Box Service $44.00 $74.42 30% $52.00 $8.00 SST – 9 Standby: Single person during business hours, per hour $264.00 $257.82 0% $257.00 -$7.00 SST-9.1 Standby: Single person, after business hours, per hour $316.41 0% $316.00 NA SST-9.2 Standby: Fire Engine/Unit per hour $792.00 $771.83 0% $771.00 -$21.00 SST – 10 Training/Instructional Services Base Fee (up to 2 hours) $527.00 $534.95 0% $534.00 $7.00 SST - 10.1 Additional training/instructional time, per hour $264.00 $234.38 0% $234.00 -$30.00 SST – 11 File Research and Review $31.00 $47.48 24% $36.00 $5.00 SST – 12 Business License Inspection $132.00 $258.12 40% $156.00 $24.00 SST - 13 Failure to obtain operational permit $576.00 NA NA DOUBLE FEES NA SST - 14 Extend plan review/construction permit 180 days $264.00 $148.51 0% $148.00 -$116.00 REF/BULK Bulk Transfer Rate (Section III Plan Review, Section IV Permit to Operate 21.12 & 21.13) Permit to Operate a Bulk Transfer facility where loading or unloading of flammable or combustible liquids from or between tank Process Transfer Rate (Section III Plan Review, Section IV Permit to Operate 21.14 & 21.15) Permit to Operate a Process Transfer facility where the transfer of flammable or combustible liquids between tank vehicles or tank cars and process operations. Process operations may include containers, tanks, piping and May 3, 2022

Page 15 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
SECTION III – PLAN REVIEW
GROUP PRELIMINARY PLAN REVIEW – CONSULTATIONS/MEETING
PR-1 In Office Design/Consultation per half hour $132.00 $124.77 1% $124.00 -$8.00 PR-1.2 Out of Office Design/Consultation per hour (min. 2 hours) $527.00 $499.10 0% $499.00 -$28.00 PR-1.3 Review of fire & life safety systems $527.00 $542.52 0% $542.00 $15.00 PR-1.4 Gates and barricades on fire roads $527.00 $590.00 0% $590.00 $63.00 Major Subdivision Plan Review (5 or More Lots/Parcels) (See PR 11.1) PR – 2 Review of subdivision for access, hydrant placement. $792.00 $839.55 0% $839.00 $47.00 Minor Subdivision Plan Review (1 to 4 Lots/Parcels) (See PR 11.1) PR – 2.2 Review of subdivision for access, hydrant placement. $396.00 $465.23 0% $465.00 $69.00 Single Family Home Review – access & water supply
PR – 2.3 Single Family Home Review – access & water supply (new construction) $396.00 $172.26 0% $172.00 -$224.00 PR – 2.3.1 Single Family Home Review – access & water supply (TI/modifications) $264.00 $172.26 0% $172.00 -$92.00 GROUP BUILDING CONSTRUCTION – NEW BUILDINGS & TENANT IMPROVEMENTS New Construction or Building Additions Plan Review (See PR 11.1) PR – 3 Minimum plan review base fee. $792.00 $590.00 0% $590.00 -$202.00 PR – 3.1 Plus $.08 per square foot in excess of 2,000 sq. ft. $0.08 $0.09 0% $0.09 $0.01 Tenant Improvement Plan Review (for building additions see PR 3.1) PR – 3.2 Minimum plan review base fee. $527.00 $590.00 0% $590.00 $63.00 PR – 3.2.1 Plus $.08 per square foot in excess of 2,000 sq. ft. $0.08 $0.09 0% $0.09 $0.01 All fees
include
minimum plan
review and
May 3, 2022

Page 16 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR-3.3 Industrial Ovens (CFC 105.7.15) $590.00 0% $590.00 NA PR-3.4 Motor Vehicle Repair Room and Booths (CFC 105.7.17) $590.00 0% $590.00 NA PR-3.5 Solar Photovoltaic Power Systems (CFC 105.7.21) $590.00 0% $590.00 NA SECTION III – PLAN REVIEW
GROUP WATER SUPPLY – FIRE SERVICE MAINS – FIRE HYDRANTS Fire Service – Emergency Repair
PR – 4 Review of underground piping, placement, and size. $527.00 $590.00 0% $590.00 $63.00 Install, Repair Private Fire Service Hydrants and/or Piping to Firewater Lines PR – 4.2 Minimum plan review base fee of system. $527.00 $590.00 0% $590.00 $63.00 Flush - Private Fire Service System
PR – 4.3 Minimum inspection base fee. $264.00 $340.45 0% $340.00 $76.00 Hydrostatic Test - Private Fire Service System
PR – 4.4 Minimum inspection/test base fee. $527.00 $633.43 0% $633.00 $106.00 Water Flow Information Field Test
PR – 4.5 Minimum field test base fee. $527.00 $758.20 0% $758.00 $231.00 PR – 4.5.1 Additional or multiple flow tests per ½ hour. $132.00 $117.19 0% $117.00 -$15.00 SECTION III – PLAN REVIEW

GROUP FIRE PROTECTION SYSTEMS
Tenant Improvement Fire Sprinklers (without calculations) PR – 5 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 PR – 5.1.2 Additional inspections per hour (i.e. weld-o-let, hydro, visual, etc…) $264.00 $292.97 0% $292.00 $28.00 Tenant Improvement Fire Sprinklers (with calculations)
May 3, 2022

Page 17 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR – 5.2 Minimum plan review base fee. $656.00 $773.37 0% $773.00 $117.00 PR–5.2.2 Each additional inspection per hour (i.e. weld-o-let, hydro, visual, etc…) $264.00 $292.97 0% $292.00 $28.00 New Commercial Fire Sprinkler System (13, 13R, & 15 systems) PR – 5.3 Minimum plan review base fee per riser. $1,054.00 $1,191.12 0% $1,191.00 $137.00 PR–5.3.2 Each additional inspection per hour (i.e. weld-o-let, hydro, visual, etc…) $264.00 $292.97 0% $292.00 $28.00 Residential Fire Sprinkler System (single family home)
PR – 5.4 Minimum plan review base fee. $593.00 $882.98 0% $882.00 $289.00 Residential Fire Sprinkler System (multiple homes)
PR – 5.5 Minimum plan review base fee per model. $656.00 $1,058.76 0% $1,058.00 $402.00 PR–5.5.1 Each additional lot (flush, hydrostatic test and final) $396.00 $351.57 0% $351.00 -$45.00 PR–5.5.2 Each Additional inspection per hour (i.e. models, individual homes) $264.00 $292.97 0% $292.00 $28.00 Standpipe System
PR – 5.6 Minimum plan review base fee. $792.00 $882.98 0% $882.00 $90.00 PR–5.6.1 Each additional inspection per hour (i.e. hydro, flush, flow test, etc…) $264.00 $234.38 0% $234.00 -$30.00 Spray Booth (includes booth and fire extinguishing system) PR – 5.7 Minimum plan review base fee. $792.00 $898.15 0% $898.00 $106.00 Pre-Action Fire Suppression System
PR – 5.8 Minimum plan review base fee. $792.00 $882.98 0% $882.00 $90.00 Fixed Fire Suppression System – (wet/dry chem., water mist, etc…) May 3, 2022

Page 18 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR – 5.9 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 PR–5.9.1 Each additional separate system at same location. $264.00 $234.38 0% $234.00 -$30.00 Clean Agent Fire Suppression System
PR – 5.10 Minimum plan review base fee. $1,054.00 $1,117.35 0% $1,117.00 $63.00 Fire Pump Installation
PR – 5.11 Minimum plan review base fee. $1,845.00 $1,835.66 0% $1,835.00 -$10.00 Commercial Cooking (Hood and Duct) Fire Suppression System PR – 5.12 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 PR–5.12.1 Each additional system. $264.00 $234.38 0% $234.00 -$30.00 Smoke & Heat Vents
PR – 5.13 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 Smoke Management/Control System
PR – 5.14 Minimum plan review base fee. $1,845.00 $1,909.43 0% $1,909.00 $64.00 Explosion Control (includes: vents, dust collection, etc…) PR – 5.15 Minimum plan review base fee. $1,054.00 $1,132.53 0% $1,132.00 $78.00

GROUP FIRE ALARM SYSTEM
Fire Alarm System
May 3, 2022

Page 19 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR – 6 Minimum plan review base fee. $656.00 $898.15 0% $898.00 $242.00 PR – 6.1 Plus $ 11.00 per initiating device $12.00 $7.81 10% $7.00 -$5.00 PR – 6.1.2 Pre-wire inspections per hour. $264.00 $292.97 0% $292.00 $28.00 Dedicated Function Fire Alarm System (i.e. sprinkler monitoring, elevator recall, etc…) PR – 6.2 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 Fire Alarm Panel Replacement Only
PR – 6.3 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 High-Rise Fire Alarm (new and/or system upgrade)
PR - 6.4 Minimum plan review base fee. $2,109.00 $2,217.57 0% $2,217.00 $108.00 PR - 6.4.1 Plus $ 11.00 per initiating device $12.00 $7.81 10% $7.00 -$5.00 PR – 6.4.3 Pre-wire inspections per hour. $264.00 $234.38 0% $234.00 -$30.00 PR-6.5 Emergency Responder Radio Coverage System $590.00 0% $590.00 NA

GROUP FLAMMABLE & COMBUSTIBLE LIQUIDS (TANKS- PIPING & DISPENSING) Remove (Repair, Modify, Extend Piping) Underground Tank PR – 7.1 Install/Repair/Modify/Extend Piping/Remove Underground Tank. $792.00 $824.38 0% $824.00 $32.00 Install (Repair, Modify, Extend Piping) Aboveground Tank PR – 7.2 Install/Repair/Modify/Extend Piping/Remove Aboveground Tank. $527.00 $590.00 0% $590.00 $63.00 PR – 7.2.1 Each additional tank. $264.00 $234.38 0% $234.00 -$30.00 Abandon Underground Tank in Place
PR – 7.3 Minimum plan review base fee. $792.00 $758.20 0% $758.00 -$34.00 May 3, 2022

Page 20 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
Environmental Upgrade (vapor recovery and processing systems, spill control, secondary containment and environmental agency requirements)
PR – 7.4 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 Apply Interior Coating to Flammable Liquid Tanks
PR – 7.5 Minimum plan review base fee. $792.00 $882.98 0% $882.00 $90.00 GROUP COMPRESED GAS SYSTEMS: LPG /CNG/MEDICAL/CRYOGENICS Container Exchange Programs; LPG Tank Installation Without Dispensing PR – 8 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 Install, Modify, Repair LPG – CNG – Hydrogen (Tank Install and/or Dispensing) PR – 8.2 Minimum plan review base fee. $923.00 $1,007.75 0% $1,007.00 $84.00 Install, Modify, Repair Medical or Compressed Gas Systems PR – 8.3 Minimum plan review base fee. $923.00 $1,124.94 0% $1,124.00 $201.00 Install, Modify, Repair Cryogenics Fixed Installation
PR – 8.4 Minimum plan review base fee. $923.00 $1,124.94 0% $1,124.00 $201.00 Install, Modify, Repair Compressed Gas Storage
PR – 8.5 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 PR-8.6 Install, Modify Cannabis/Plant Extraction System (CFC 105.7.18) $1,015.34 0% $1,015.00 NA PR-8.6.1 Plus $0.08 per square foot in excess of 2,000 sq. ft. $0.09 0% $0.09 NA GROUP SPECIAL HAZARDS – HAZARDOUS
Battery Systems
May 3, 2022

Page 21 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR – 9 Minimum plan review base fee. $527.00 $648.60 0% $648.00 $121.00 Dust Collection Systems
PR – 9.2 Minimum plan review base fee. $656.00 $648.60 0% $648.00 -$8.00 Explosives Storage
PR – 9.3 Minimum plan review base fee. $1,054.00 $1,249.71 0% $1,249.00 $195.00 Hazardous Materials Compliance Review
PR – 9.4 Minimum review of MSDS, HMMP and/or HMIS submittals. $264.00 $249.55 0% $249.00 -$15.00 Hazardous Materials – Storage /Dispensing – Open/Closed Systems PR – 9.5 Minimum plan review base fee. $1,054.00 $1,249.71 0% $1,249.00 $195.00 PR – 9.5.1 Each additional system. $527.00 $483.93 0% $483.00 -$44.00 PR-9.5.3 Dipping (CFC 105.7.23) $648.60 0% $648.00 NA
Install, Modify, Repair Mechanical Refrigeration Systems PR – 9.6 Minimum plan review base fee. $792.00 $1,000.17 0% $1,000.00 $208.00 PR-9.7 Fuel Cell Power Systems (CFC 105.7.10) $882.98 0% $882.00 NA

GROUP HIGH PILE RACK STORAGE SYSTEMS
High-Pile or Rack Storage
PR – 10 Minimum plan review base fee. $792.00 $831.97 0% $831.00 $39.00 Temporary Access Roads & Water Supply
Install a Temporary Access Road – Residential and Commercial PR – 11 Install a Temporary Access Road - 1-2 Homes $264.00 $289.44 0% $289.00 $25.00 May 3, 2022

Page 22 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR–11.1 Install a Temporary Access Road 3+ Homes or Commerical $527.00 $648.60 0% $648.00 $121.00 Install a Temporary Water Supply System
PR – 12 Minimum plan review base fee. $527.00 $590.00 0% $590.00 $63.00 Miscellaneous Submittals - Alternative Means and Methods Miscellaneous Submittals or Plans Review
PR – 13 Minimum plan review base fees up to two hours. $527.00 $590.00 0% $590.00 $63.00 Alternative Means and Methods Requests or Code Interpretation Review PR – 13.2 Minimum review base fee. $527.00 $499.10 0% $499.00 -$28.00

GROUP EXPEDITE PLAN REVIEW REQUEST & ADDITIONAL CHARGES/INSPECTION TIME PR – 14 Expedited Plans Surcharge (after business hours) $792.00 $748.65 0% $748.00 -$44.00 Demolition Permit pursuant to Chapter 33, CFC
PR – 15 Demolition Permit pursuant to Chapter 33, CFC $264.00 $348.04 0% $348.00 $84.00

GROUP BULK/TERMINAL/BULK TRANSER/PROCESS TRANSFER MAINTENANCE REVIEW Fees will be based on construction permit required for routine maintenance/repair work which conducted within these facilities.

Install, Modify, Repair, Replace Fireproofing
PR – 16 Minimum plan review base fees up to two hours. $527.00 $590.00 0% $590.00 $63.00 Install, Modify, Repair, Replace Piping for Systems Containing Hazardous Materials May 3, 2022

Page 23 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR – 17 Minimum plan review base fees up to two hours. $527.00 $590.00 0% $590.00 $63.00 Install, Modify, Repair, Replace Piping for Systems Containing Hazardous Materials PR – 18 Minimum plan review base fees up to two hours. $590.00 0% $590.00 NA Install, Modify, Repair Pump Installed In Hazardous Material Process System PR – 19 Minimum plan review base fees up to two hours. $527.00 $590.00 0% $590.00 $63.00 Additional Plan Review Fees
PR – 20 Revisions and resubmittals, per hour $264.00 $249.55 0% $249.00 -$15.00 PR – 21 Additional plan review time, per half hour $132.00 $124.77 1% $124.00 -$8.00 PR – 21.1 Additional plan review time, expedited, per hour $264.00 $249.55 0% $249.00 -$15.00 PR – 22 Additional inspections during business hours (min 1 hour) $264.00 $292.97 0% $292.00 $28.00 PR – 22.1 Additional inspection time during business hours, per half hour $117.19 0% $117.00 NA PR – 22.2 After hours inspection, 3 hour minimum $792.00 $878.92 0% $878.00 $86.00 PR – 22.3 Additional inspection time, after hours, per half hour $175.78 0% $175.00 NA PR – 23 Working without approved plans NA NA DOUBLE FEE NA SECTION IV – NOTES

GROUP NOTES
SECTION V – REIMBURSEMENT FOR FIRE DEPARTMENT RESPONSE

GROUP FIRE INCIDENT RESPONSE
FIR – 1 Per unit response, per hour (includes captain, engineer and firefighter) $442.00 $617.46 0% $617.00 $175.00 FIR – 2 Damaged or consumable equipment replaced at cost. $331.00 NA NA Actual Cost NA FIR – 3 RFD reserves the right to invoice for individual event with customized mitigation rates including itemized, per person, at various response levels and for itemized products and equipment used. NA NA Actual Cost NA Fire & Life Safety Inspections (does not include applicable operational permits) Group Assembly/Business/Mercantile/Office Suite
Permits are non-transferrable and fees are non-refundable. Failure to pay invoice fees within 30 days shall result in a 20 percent late payment charge. In the case of multiple annual permits, permits may be issued for shorter periods and prorated on the basis of a 1/12th charge for each month and portion thereof.

May 3, 2022

Page 24 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
BM-1 B/M 0-5,000 sq. feet $129.00 $178.11 14% $153.00 $24.00 BM-2 B/M 5,001 – 10,000 sq. feet $341.67 0% $341.00 NA
BM-3 B/M 10,001 – 20,000 sq. feet $458.86 0% $458.00 NA BM-4 B/M 20,001 – 40,000 sq. feet $576.05 0% $576.00 NA BM-5 B/M 40,001+ sq. feet $751.83 0% $751.00 NA
Group Other Occupancy (F/H/L/S)
O-1 O 0-5,000 sq. feet $283.07 0% $283.00 NA
O-2 O 5,001-10,000 sq. feet $400.26 0% $400.00 NA
O-3 O 10,001-20,000 sq. feet $576.05 0% $576.00 NA
O-4 O each 10k sq feet above 20k $576.05 0% $576.00 NA
Group Schools
E-1 Occupant load 1- 50 $328.00 $400.26 0% $400.00 $72.00 E-2 Occupant load 51-149 $461.00 $517.45 0% $517.00 $56.00 E-3 Occupant load 150-499 $546.00 $634.64 0% $634.00 $88.00 E-4 Occupant load 500+ $656.00 $751.83 0% $751.00 $95.00 Group State Licensed Care Facilities
SL-1 Residential Large Family Day Care (7-14 persons) $264.00 $341.67 0% $341.00 $77.00 SL-2 Commercial Day Care E3/I4 (7-49 persons) $264.00 $517.45 0% $517.00 $253.00 SL-3 Commercial Day Care E3/I4 (50+ persons) $264.00 $634.64 0% $634.00 $370.00 SL-4 Pre-inspection/850 Form $264.00 $234.38 0% $234.00 -$30.00 SL-5 Residential Assisted Living Facility (24 hr) $264.00 $400.26 0% $400.00 $136.00 SL-6 Other Licensed Facilities $264.00 $400.26 0% $400.00 $136.00 Group Institutional
I-1 Hospital/Surgical Center <50k sq. feet $527.00 $751.83 0% $751.00 $224.00 I-2 Hospital/Surgical Center 50,001+ sq. feet $527.00 $1,689.35 0% $1,689.00 $1,162.00 I-3 Nursing/Nonambulatory Facilities $527.00 $634.64 0% $634.00 $107.00 I-4 Jails/Detention Facilities $986.00 $1,572.16 0% $1,572.00 $586.00 I-5 Police Holding Cells or DOJ Review $263.00 $249.55 0% $249.00 -$14.00 Group Residential R1/R2 Occupancies
R-1 Residential 1-5 units $124.00 $182.85 20% $147.00 $23.00 R-2 Residential 6-15 units $227.00 $238.95 0% $238.00 $11.00 R-3 Residential 16-99 units $278.00 $346.42 0% $346.00 $68.00 May 3, 2022

Page 25 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
R-4 Residential 100-249 units $557.00 $699.61 0% $699.00 $142.00 R-5 Residential 250-499 units $926.00 $1,109.77 0% $1,109.00 $183.00 R-6 Residential 500+ units $926.00 $3,172.60 0% $3,172.00 $2,246.00 R-7 Residential - Transient (hotel, motel, shelter) $400.26 0% $400.00 NA

GROUP FIRE INCIDENT RESPONSE CHIEF LEVEL RESPONSE
CLR – 1 Chief of Department, per hour $207.00 $311.19 0% $311.00 $104.00 CLR – 2 Deputy Fire Chief, per hour $185.00 $276.67 0% $276.00 $91.00 CLR – 3 Battalion Chief, per hour $113.00 $240.05 0% $240.00 $127.00 CLR – 4 Fire Marshal, per hour $138.00 $249.55 0% $249.00 $111.00 CLR – 5 Deputy Fire Marshal, per hour $114.00 $234.38 0% $234.00 $120.00 CLR-6 Fire Investigator, during business hours, per hour $234.38 0% $234.00 NA CLR-6.1 Fire Investigator, outside business hours, per hour $351.57 0% $351.00 NA CLR-7 Emergency Services Manager, per hour $136.96 1% $136.00 NA CLR-8 Captain, per hour $224.39 0% $224.00 NA
CLR-9 Engineer, per hour $198.00 0% $198.00 NA
CLR-10 Firefighter, per hour $195.07 0% $195.00 NA
Fees removed, replaced, or consolidated

GROUP AERIAL PRE-PLAN FEES FOR SPECIFIC OCCUPANCIES
APP – 1 Small (elementary school size or smaller)
APP – 2 Medium (middle school size or smaller)
APP – 3 Larger (high school size or smaller)
APP - 4 Extra Large (cost will vary depending on overall size) GROUP LICENSED CARE FACILITIES – 24 HOUR
LCF – 1 Base Fee:

LCF – 2 Plus each additional unit/occupant
Infant-care facility for children 2 ½ years of age and younger LCF – 3 Base Fee:

LCF – 4 Plus each additional unit/occupant
GROUP LICENSED CARE FACILITIES – LESS 24 HOUR
Adult or Day Care Facility (Nonambulatory Person)
LCF – 5 Base Fee:

LCF – 6 Plus per unit/occupant
Adult or Child Large Family Day Care
LCF – 7 Base Fee:

LCF – 8 Plus per unit/occupant
Adult or Child Day Care Center
LCF – 9 Base Fee:

A one (1) time
***Occupant
(a) Permit to operate a licensed care facility such as: Rehabilitation facility, Assisted Living, Halfway Houses, ***Occupant
May 3, 2022

Page 26 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
LCF – 10 Plus per unit/occupant
LCF – 11 Licensed Clinic
LCF – 12 Pre – Inspection Fees – 850 Form

GROUP EDUCATIONAL (PRIVATE SCHOOL) OCCUPANCY
EDU – 1 Occupant load less than 50
EDU – 2 Occupant load 50-149
EDU – 3 Occupant load 150-499
EDU – 4 Occupant load 500 or more

GROUP INSTITUTIONAL OCCUPANCIES
INS – 1 HOSPITAL (medical, surgical & psychiatric) and Nursing Homes INS – 1.1 Plus $5.00 per patient/bed
INS – 2 Out Patient Clinics greater than 5 patients
INS – 2.1 Plus $5.00 per patient/bed
Inspection of Police Services facilities (holding cells) & DOJ Review INS – 3 (Includes the approval of Evacuation & Life Safety Procedures).

INS – 4 Inspection of adult and/or juvenile detention facilities

GROUP RESIDENTIAL OCCUPANCIES
HOTEL/MOTEL OR APARTMENT/CONDOMINIUM HOUSE:

RES – 1 *250 or more units
RES – 2 *100 249 units
RES – 3 *15 99 units
RES – 4 *6 14 units
RES – 5 *5 or Less units

GROUP BUSINESS OCCUPANCIES
MULTI-BUSINESS OCCUPANCIES :

BUS – 1 35 or more Suites
BUS – 2 25 34 Suites
BUS – 3 15 24 Suites
BUS – 4 6 14 Suites
BUS – 5 5 or Less Suites
HR – 1 To inspect a Hi-Rise building (State certification inspection) - Pre 1974 SST – 1.4 Fire Company Mercantile Inspection
SST - 1.5 Annual Commercial Warehouse Fire Inspection – Greater than 3,000 square feet.

SST – 3 Per hour
SST – 8 Fire Hydrant Flow Test
SST – 10 High Rise Certification
PR – 2.1 Each additional site inspection per hour.

PR-20 Re-submittals or revisions.

PR-21 Additional plan review time, per half hour.

PR – 2.2.1 Each additional inspection.

To operate
(a) Permit to operate a licensed care facility such as: Adult Day Care, Adult Day Support Center, Child Day May 3, 2022

Page 27 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR – 17 Additional plan review time, per half hour.

PR – 5.1.1 Plus $1.00 per head in excess of 10 heads.

PR–5.2.1 Plus $1.00 per head in excess of 10 heads.

PR–5.3.1 Plus $1.00 per sprinkler head.

PR–5.4.1 Each additional inspection per hour.

PR–5.7.1 Each additional inspection per hour.

PR–5.8.1 Each additional inspection per hour.

PR–5.9.2 Each additional inspection per hour.

PR–5.10.1 Each Additional inspection per hour.

PR–5.11.1 Each Additional inspection per hour.

PR–5.12.2 Each additional inspection per hour.

PR –5.13.1 Each additional inspection per hour.

PR–5.14.1 Each Additional inspection per hour.

PR–5.15.1 Each Additional inspection per hour.

PR – 6.1.1 Each additional inspection per hour.

PR–6.2.1 Each additional inspection per hour.

PR – 6.3.1 Each additional inspection per hour.

PR - 6.4.2 Each additional inspection per hour.

Install Underground Tanks
PR – 7 Minimum plan review base fee.

PR-7.1.1 Each additional inspection/stand-by time per hour.

PR – 7.2.2 Each additional inspection.

PR – 7.3.1 Each additional inspection/stand-by time per hour.

PR – 7.4.1 Each additional inspection per hour.

PR – 7.5.1 Each additional inspection/stand-by time per hour.

PR – 8.1 Each additional inspection per hour.

PR – 8.2.1 Each additional inspection per hour.

PR – 8.3.1 Each additional inspection per hour.

PR – 8.4.1 Each additional inspection per hour.

PR – 8.5.1 Each additional inspection per hour.

PR – 9.1 Each additional inspection per hour.

PR – 9.2.1 Each additional inspection per hour.

PR – 9.3.1 Each additional inspection per hour.

PR – 9.4.1 Additional plan review time, per half hour.

PR – 9.5.2 Each additional inspection per hour.

PR – 9.6.1 Each additional inspection per hour.

PR–10.1 Field inspection time will be charged per hour.

May 3, 2022

Page 28 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PR–11.1.2 Each additional inspection per hour.

PR–12.1 Each additional inspection per hour.

PR–13.1 Additional plan review time will be charged on hourly basis.

PR–13.1.2 Each additional inspection per hour.

PR–14.1 (Additional plan review time, $ 251.00 per hour) PR–14.2 Expedited Plans - reviewed after normal business hours, three-hour minimum.

PR –14.3 (Additional plan review time, $ 251.00 per hour) PR-16.1 Additional plan review time will be charged on hourly basis.

PR-16.2 Each additional inspection per hour.

PR-17.1 Additional plan review time will be charged on hourly basis.

PR-17.2 Each additional inspection per hour.

PR–18.1 Additional plan review time will be charged on hourly basis.

PR–18.2 Each additional inspection per hour.

PR–19.1 Additional plan review time will be charged on hourly basis.

PR–19.2 Each additional inspection per hour.

Additional Charges and Inspection Time
PR - 20 Re-submittals or revisions.

PR – 21 Additional plan review time, $ 125.00 per half hour.

PTO - 4 Carbon Dioxide Systems used in Beverage Dispensing Application – Permit is required for carbon dioxide systems used in beverage dispensing applications having more than 100 pounds of PTO – 5.1 Additional inspection time during normal business hours per ½ hour.

PTO – 5.2 After hours inspection time per ½ hour.

PTO – 5.3 Overtime & Weekend inspections - three (3) hours minimum.

Dry Cleaning Plant
PTO – 13.1 Permit to operate a dry cleaning plant operation .

PTO – 15.1 Over 100 lbs.

PTO - 15.2 Ammonium Nitrate Storage
PTO – 15.3 Gunpowder Sales - 100 lbs. or less
PTO – 15.4 Gunpowder Sales – Over 100 lbs.

PTO – 17 Repair, Modification or Extension of Piping
PTO – 21.1 5 – 10 Products
PTO – 21.2 11 or more Products
PTO – 23.1 Each additional 5,000 square feet or fraction thereof PTO – 24.2 Additional inspection time during normal business hours per ½ hour.

May 3, 2022

Page 29 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
PTO – 24.3 After hours inspection time per ½ hour.

PTO – 24.4 Overtime & Weekend inspections - three (3) hours minimum.

PTO – 25.1 Commercial Incinerators
PTO – 36 *ASSEMBLY: With stage, 1,000 or more occupant load PTO – 38.1 Additional inspection time during normal business hours @ $125.00 per ½ hour PTO – 38.2 Additional inspection time after normal business hours @ $251.00 per hour PTO – 38.3 Overtime and weekend inspections: Three hour minimum fee - $ 753.00.

PTO – 41.1 5 – 8 repair bays
PTO – 41.2 Greater than 8 repair bays
PTO – 45.3 Additional inspection time during normal business hours @ $125.00 per ½ hour PTO – 45.4 Additional inspection time after normal business hours @ $251.00 per hour PTO – 45.5 Three-hour minimum fee - $753.00
Firework Aerial Display
Permit to use fireworks, pyrotechnics outside.

PTO-54.1 Additional inspection time during normal business hours @ $125.00 per ½ hour Tire Storage & Scrap Tires
PTO – 57 Permit to store tires in excess of 1,000 cubic feet inside buildings (per Ch. 25 – CFC)

GROUP MOTOR VEHICLE INCIDENT
MVI – 1 Provide hazardous materials assessment and scene stabilization. This will be the most common "invoice level " This occurs almost every time a RFD apparatus responds to an accident/incident MVI – 2 Includes MVI 1 services as well as clean up and material used (absorbents) for hazardous fluid clean up and disposal Invoiced at this level if the RFD unit has to clean up any gasoline or other MVI - 3 (Vehicle Fire) Provide scene safety, fire suppression, breathing air, rescue tools, hand tools, hose tip use foam structure protection and clean up gasoline or other automotive fluids that MVI - 4 Includes MVI 1 & 2 services as well as extrication (heavy rescue tools, ropes, airbags, cribbing etc ) Invoiced at this level when RFD unit has to extricate anyone from the vehicle(s) using any MVI – 5 Includes MVI 1, 2, & 4 services as well as multi RFD unit response

GROUP HAZARDOUS MATERIAL INCIDENT
HZM-1
Basic Response: Invoice will include engine response, first responder assignment, and certified hazmat team and appropriate equipment, perimeter establishment, evacuations, set-up and command.

HZM – 2
Intermediate Response: Invoice will include engine response, first responder assignment, certified hazmat team and appropriate equipment, perimeter establishment, evacuations, set- up and command, Level A or B suit donning, breathing air and detection equipment. Set-up and removal of decontamination center.

May 3, 2022

Page 30 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
HZM – 3
Advanced Response: Invoice will include engine response, first responder assignment, hazmat certified team and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command, Level A or B suit donning, breathing air and detection equipment and robot deployment. Set-up and removal of decontamination center, detection equipment, recovery and identification of material. Disposal and environment clean up. Includes above in addition to any disposal fees of material and contaminated equipment and material used at scene. Includes 3 hours of on scene time.

HZM–3.1 Each additional hour @$315.00 per hazardous material team.

GROUP PIPELINE INCIDENTS/POWER LINE INCIDENTS not Limited to Gas, Sewer, & Water PLI – 1 Basic Response: Invoice will include engine response and first responder assignment, perimeter establishment, evacuations, first responder set-up and command.

PLI – 2
Intermediate Response: Invoice will include engine response, first responder assignment, and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command. May include HAZMAT team, Level A or B suit donning, breathing air and detection equipment.

PLI - 3
Advanced Response: Invoice will include engine response, first responder assignment, and appropriate equipment, perimeter establishment, evacuations, first responder set-up and command. May include HAZMAT team, Level A or B suit donning, breathing air and detection equipment. Supervise and/or assist pipeline repair of intermediate to major pipeline damage.

May include set-up and removal of decontamination center, detection, recovery and identification of material. Disposal and environment clean up.

GROUP FIRE INVESTIGATOR RESPONSE
Includes the following: Scene Investigation, Investigation Report, Scene Documentation based on per hour.

INV – 1 The claim begins when the Fire Investigator responds to the incident and is billed for logged time only.

SECTION VI – REIMBURSEMENT FOR FIRE DEPARTMENT RESPONSE

GROUP WATER INCIDENT RESPONSE
WIR - 1
Basic Response: Invoice will include engine response, first responder assignment, perimeter establishment, evacuations, first responder set-up and command, scene safety and investigation (including possible patient contact, hazard control). This will be the most common "billing level." This occurs almost every time RFD Victory responds to a water incident.

WIR – 1.1 *Plus $52.00 per hour, per rescue person (minimum 3 fire personnel) WIR – 2
Intermediate Response: Includes WIR 1 services as well as clean up and material used (sorbents), minor hazardous clean up and disposal. Invoiced at this level if the RFD has to clean up small amounts of gasoline or other fluids that are spilled as a result of the incident.

WIR – 2.1 *Plus $52.00 per hour, per rescue person (minimum 3 fire personnel) May 3, 2022

Page 31 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ
WIR – 3 Advanced Response: Includes WIR 1 and WIR 2 services, including HAZMAT team, set up and removal of decontamination center detection equipment recovery and identification of WIR-3.1 *Plus $52 per hour, per rescue person (minimum 3 fire personnel) WIR-3.2 *Plus $105 per hour, per HAZMAT team member
WIR – 4 RFD reserves the right to invoice for individual event with customized mitigation rates including itemized, per person, at various response levels and for itemized products and equipment used.

FIR – 2 Breathing Support Unit, per hour (includes captain, engineer and firefighter) FIR – 3 Per truck response, per hour (includes captain, engineer and firefighter) NOTES:

General Aerial preplans shall comply with the following requirements:

Please review section RMC 8.16.040 Fire Prevention Code & Section 404 of CFC (California Fire Code) for complete requirements.

Where Required Occupancies:

Exception: Other than Group A occupancy used exclusively for the purpose of religious worship having an occupant load less than 2,000

1. Group B (Business) – Occupant load of 500 or more persons

2. Group E (Educational) – Schools

3. Group F (Factory) – Occupant load of 500 or more persons

4. Group H (High Hazards) – Including any facility in the Contra Costa Health Services Hazardous Material Program

5. Group I (Institutional) – Hospitals, nursing homes, Jails, etc…)

6. Group R – 1, Hotels & motels (transient) – 20 or more sleeping units

7. Group R – 2, Apartments, hotels & motels (non-transient), Live/work units

8. Group R – 4, Licensed Care Facilities (referrer to

9. High-rise buildings

10. Group M (mercantile) buildings i.e. Department stores, markets, retail or wholesales stores having an occupant load of 500 or more person

11. Covered malls exceeding 50,000 square feet

12. Open malls exceeding 50,000 square feet

13. Underground buildings

14. Buildings with atrium and having an occupancy in Group A, E or M Aerial pre-plans shall include but not be limited to the following:

1. Knox Box location

2. Fire Alarm Control Panel (FACP)

3. Emergency vehicle access

4. Post Indicator Valve (PIV)

5. OS&Y valve

6. Location of hazardous Materials

7. Sprinkler riser

8. Gas Valve

9. Electrical main valve

10. Fire Department Connection (FDC)

1. Group A (Assembly) - An aerial pre-plan is required for assembly occupancies having an occupant load of 300 or more and larger than 5,000 square feet. If occupancy is attached to commercial complex larger than 10,000 square feet than an aerial pre- May 3, 2022

Page 32 of 40 ends

Fire

PREVENTION SERVICES DIVISION
# Description
Current
Fee/Charge Full Cost Subsidy % Suggested Fee Fee Δ

11. Hydrant location

12. Elevator equipment room
Residential Occupancies with 20 or more complexes will have the following:

1. An annual inspection

2. A mid-year review inspection

3. *One (1) fire safety training session (12:00 p.m. – 4: p.m. on a scheduled Saturday) i.e.
a. Fire extinguisher training
b. Smoke alarm & carbon monoxide education
c. Cooking in the home safety
d. E.D.I.T.H. (Exit Drills In The Home) Training
*Appointments for fire safety training session need to be made 30 days in advance.

A floor plan outlining but not limited to the following is required.

1. Number of people expected to attend

2. Number of exits

3. Location of fire extinguishers

4. Location of tables & chairs

5. Location of stage

6. Location of tents
requires separate permit – PTO – 45

7. Location of cooking area(s)

8. Location of any open flames used for cooking or decorating

MITIGATION RATE NOTES
The mitigation rates above are average "billing levels," and are typical for the incident responses listed, however, when a claim is submitted, it will be itemized and based on the actual services Notes:

All fees shall be based on a $251.00 hourly rate and rounded up to the next whole dollar.

After Hour Inspection minimum $251.00, minimum three (3) hours – $753.00 Expedite Plan Review minimum $251.00, minimum three (3) hours – $753.00 These average mitigation rates were determined by itemizing costs for a typical run (from the time a fire apparatus leaves the station until it returns to the station) and are based on the actual costs, using amortized schedules for apparatus (including Any Fire Code Permit(s) issued or other request for use(s) not shown in this schedule will be charged at the hourly rate of $251.00. A one (1) hour minimum fee will apply and additional 15 minute increments (15 minutes - $63.00, 30 minutes -$125.00, p q g g y g hourly rate of $251.00. A four hour minimum fee will apply and additional 15 minute increments (15 minutes - $63.00, 30 minutes -$125.00, 45 minutes - $188.00) thereafter, in addition to the total initial fee.

May 3, 2022

Page 33 of 40 ends

RECREATION
# Description Current Fee/Charge Unit Suggested Fee Fee Δ Fee % Change 1 Cancellation more than 30 days prior to event, all fees and deposit will be refunded less the administrative costs associated with the reservation and event planning. 100% 100% 0.00 0% 2 Cancellation 30 days or less prior to event, no refund of deposit $0.00 $0.00 0.00 0% 3 Richmond Convention Center
4 5 Set up and Break down Fee (Only applies to Aud-Complex, Aud-Main Floor and Bermuda plus Catalina rentals), hourly $205.00 $205.00 0.00 0%
6 Deposit--$3000 minimum (may be higher) $3,081.00 $3,000.00 (81.00) -3% 7 Deposit--Concerts $5000 minimum (may be higher) Fees to be determined $5,135.00 $5,000.00 (135.00) -3% 8 Friday – Sunday, hourly $1,061.00 $1,061.00 0.00 0%
9 Monday – Thursday, hourly $848.00 $848.00 0.00 0%
10 Rental: Memorial Auditorium Main Floor
11 Deposit--$3000 minimum (may be higher) $3,081.00 $3,000.00 (81.00) -3% 12 Friday – Sunday, hourly (Whole Main Floor) $642.00 $642.00 0.00 0% 13 Monday – Thursday, hourly (Whole Main Floor) $514.00 $514.00 0.00 0% 14 Bingo, 8-hour max., daily $2,054.00 $2,054.00 0.00 0% 15 Rental: Bermuda/Catalina
16 Deposit--$500 minimum (may be higher) $514.00 $500.00 (14.00) -3% 17 Friday – Sunday, hourly $313.00 $313.00 0.00 0%
18 Monday – Thursday, hourly $251.00 $251.00 0.00 0%
19 Rental: Terrace Rooms (C/D/E/F/G/H)
20 Deposit--$250 minimum (may be higher) $257.00 $250.00 (7.00) -3% 21 First Room Monday - Thursday Hourly $124.00 $124.00 0.00 0% 22 Additional Terrace Room Monday - Thursday, hourly $52.00 $52.00 0.00 0% 23 First Room Friday - Sunday Hourly $155.00 $155.00 0.00 0% 24 Additional Terrace Room Friday - Sunday, hourly $66.00 $66.00 0.00 0% 25 Rental: Convention Center Lobby
Rental fees includes 3
contracted attendants &
janitorial supplies.

Additional attendants fee
maybe charged as needed
Rental: Convention Center Complex: Includes the Main Floor, Lobby , Bermuda Room and Terrace Rooms (C/D/E/F/G/H). Excludes the Kitchen and Dressing Rooms which may be rented separately.

Rental fees includes 2
contracted attendants &
janitorial supplies.

Rental fees includes 1
contracted attendant &
janitorial supplies.

Rental fees includes 2
contracted attendants &
janitorial supplies.

May 3, 2022

Page 34 of 40 ends

RECREATION
# Description Current Fee/Charge Unit Suggested Fee Fee Δ Fee % Change 26 Deposit--$500 minimum (may be higher) $514.00 $500.00 (14.00) -3% 27 Monday – Thursday, hourly $251.00 $251.00 0.00 0%
28 Friday – Sunday, hourly $313.00 $313.00 0.00 0%
29 Rental: Convention Center Kitchen and Dressing Rooms, Ticket Booth 30 Shared use Monday - Thursday, daily (with event booking) $106.00 $106.00 0.00 0% 31 Shared use Friday - Sunday, daily (with event booking) $132.00 $132.00 0.00 0% 32 Sole use Monday - Thursday, daily (with event booking) $165.00 $165.00 0.00 0% 33 Sole use Friday - Sunday, daily (with event booking) $206.00 $206.00 0.00 0% 34 Sole use Monday - Thursday, flat fee, 6 hours max. (without event booking) $514.00 $514.00 0.00 0% 35 Sole use Friday - Sunday, flat fee, 6 hours max. (without event booking) $642.00 $642.00 0.00 0% 36 Deposit for sole use, without event booking $514.00 $500.00 (14.00) -3% 37 Dressing Room-Band/Chorus Room Monday to Thursday, daily (w/event booking) $65.00 $65.00 0.00 0% 38 Dressing Room--Band/Chorus Room Friday to Sunday, daily (w/event booking) $81.00 $81.00 0.00 0% 39 Individual Dressing Room, upstairs, Monday to Thursday, daily (w/event booking) $34.00 $34.00 0.00 0% 40 Individual Dressing Room, upstairs, Friday to Sunday, daily (w/event booking) $42.00 $42.00 0.00 0% 41 Ticket Booth, Monday to Thursday, daily $52.00 $52.00 0.00 0% 42 Ticket Booth, Friday to Sunday, daily $66.00 $66.00 0.00 0% 43 Community Center Rooms
44 45 Deposit--$500 minimum (may be higher) $514.00 $500.00 (14.00) -3% 46 Social Hall - hourly (RRC) $158.00 $158.00 0.00 0%
47 Deposit--$500 minimum (may be higher) $514.00 $500.00 (14.00) -3% 48 Social Hall - hourly (NEVIN) $139.00 $139.00 0.00 0% 49 Deposit--$500 minimum (may be higher) $514.00 $500.00 (14.00) -3% 50 Social Hall - hourly (PARCHESTER, SHIELDS REID) $119.00 $119.00 0.00 0% 51 52 Deposit--$250 minimum (may be higher) $257.00 $250.00 (7.00) -3% 53 Multi Purpose Room - hourly (BTA, NEVIN, SRCC & PT. RICHMOND) $104.00 $104.00 0.00 0% 54 55 Deposit--$250 minimum (may be higher) $257.00 $250.00 (7.00) -3% Social Hall for 75 to 190 attendees. Rental fees includes 1 contracted attendant & janitorial supplies, available chairs and tables.

Minimum of two (2) hours rental.

Multi Purpose Room- Maximum 50 attendees. Rental fees includes 1 contracted attendant & janitorial supplies, available chairs and tables. Minimum of two (2) hours rental.

Conference Room for 20 to 30 attendees. Rental fees includes 1 contracted attendant & janitorial supplies, available chairs and tables. Minimum of two (2) hours rental.

May 3, 2022

Page 35 of 40 ends

RECREATION
# Description Current Fee/Charge Unit Suggested Fee Fee Δ Fee % Change 56 Conference Room - hourly (NCC,BTA,PCC,PRCC,SRCC) $83.00 $83.00 0.00 0% 57 Field Permits
58 Non League Deposit--$100 minimum (may be higher) $103.00 $100.00 (3.00) -3% 59 League Deposit--$300 minimum (may be higher) $308.00 $300.00 (8.00) -3% 60 Youth Sports, hourly $28.00 $28.00 0.00 0%
61 Adult Sports, hourly (Excluding Adult Baseball) $41.00 $41.00 0.00 0% 62 Adult Baseball, hourly $73.00 $73.00 0.00 0%
63 Tennis Courts
64 Deposit--$100 minimum (may be higher) $103.00 $100.00 (3.00) -3% 65 Tennis Courts, hourly $16.00 $16.00 0.00 0%
66 MLK Artificial Turf Field
67 Non League Deposit--$100 minimum (may be higher) $103.00 $100.00 (3.00) -3% 68 League Deposit--$300 minimum (may be higher) $308.00 $300.00 (8.00) -3% 69 Youth Sports, hourly $41.00 $41.00 0.00 0%
70 Adult Sports, hourly $51.00 $51.00 0.00 0%
71 Track - Youth, hourly $31.00 $31.00 0.00 0%
72 Track - Adult, hourly $41.00 $41.00 0.00 0%
73 Gymnasiums
74 Deposit--$250 minimum (may be higher) $257.00 $500.00 243.00 95% 75 Gymnasium, hourly (BTA, RRC & Sports Events) $152.00 $150.00 (2.00) -1% 76 Deposit--$500 minimum (may be higher) $514.00 $500.00 (14.00) -3% 77 Gymnasium, as Social Hall, hourly (BTA, RRC & Social Events) $259.00 $259.00 0.00 0% 78 Park Reservations
79 Deposit--$100 minimum (may be higher) $103.00 $100.00 (3.00) -3% 80 Groups of 50 or less participants, for general use, hourly (Includes 2 Trash Cans) $31.00 $31.00 0.00 0% 81 Deposit--$150 minimum (may be higher) $154.00 $150.00 (4.00) -3% 82 Groups of 51 to 100 participants, for general or fundraiser/commercial use, hourly (Includes 4 Trash Cans) $63.00 $63.00 0.00 0%
Rental fees includes 1
contracted attendants &
janitorial supplies.

Standard Fees
Reservation of Nicholl,
Country Club Vista,
Marina Bay, Barbara & Jay
Vincent, and Shimada is
limited to the picnic areas,
except by special
arrangement. Permission
Rental fees includes 1
trash can and
Rental fees includes 1
trash can and
May 3, 2022

Page 36 of 40 ends

RECREATION
# Description Current Fee/Charge Unit Suggested Fee Fee Δ Fee % Change 83 Deposit--$150 minimum (may be higher) $154.00 $150.00 (4.00) -3% 84 Groups of 101 to 199 participants, for general or fundraiser/commercial use, hourly (Includes 8 Trash Cans) $83.00 $83.00 0.00 0%
85 Deposit--$150 minimum (may be higher) $154.00 $150.00 (4.00) -3% 86 Groups of 200+ participants, for festivals and/or major celebrations, hourly (Includes 12 Trash Cans) $124.00 $124.00 0.00 0% 87 Civic Center Plaza
88 Deposit--$1000 minimum (may be higher) $1,027.00 $1,000.00 (27.00) -3% 89 Rental fee, hourly $205.00 $205.00 0.00 0%
90 Picnic Areas
91 Deposit--$100 for 50 and under, minimum (may be higher) $103.00 $100.00 (3.00) -3% 92 Deposit--$150 for 51 and over, minimum (may be higher) $154.00 $150.00 (4.00) -3% 93 Nicholl, Country Club Vista, Barbara & Jay Vincent - Picnic Area, hourly ( three (3) hours minimum rental), Includes 2 Trash Cans $39.00 $39.00 0.00 0%
94 Marina Bay Park, Shimada Park - Picnic Table, per day. Park standard fees will apply $27.00 $27.00 0.00 0% 95 Aquatic Fees - Commercial use by special arrangement 96 Deposit--$250 minimum (may be higher) $257.00 $250.00 (7.00) -3% 97 Pool Rental , Monday to Thursday, hourly $154.00 $154.00 0.00 0% 98 Pool Rental , Friday to Sunday, hourly $193.00 $193.00 0.00 0% 99 Pool Lane Rental, Monday to Thursday, hourly $47.00 $47.00 0.00 0% 100 Pool Lane Rental, Friday to Sunday, hourly $60.00 $60.00 0.00 0% 101 RSC Outdoor Picnic Area Only (No Pool), Monday to Thursday, rental only during Recreation Swim Session, maximum of 50 guests, seating for 36 at picnic tables. $92.00 $92.00 0.00 0% 102 RSC Outdoor Picnic Area Only (No Pool), Friday to Sunday, rental only during Recreation Swim Session, maximum of 50 guests, seating for 36 at picnic tables. $116.00 $116.00 0.00 0% 103 RSC Outside Pool plus Picnic Area, Monday to Thursday, hourly -two (2) hours minimum rental $154.00 $154.00 0.00 0% 104 RSC Outside Pool plus Picnic Area, Friday to Sunday, hourly -two (2) hours minimum rental $193.00 $193.00 0.00 0% 105 Rental Extra Fees, All fees are each/ per day unless stated otherwise 0.00 0% 106 Alcohol Sales Permit $132.00 $154.00 22.00 17%
107 Alcohol Service Only $67.00 $67.00 0.00 0%
108 Chairs $1.00 $1.00 0.00 0%
The hourly rental fee
includes pool lifeguards
for up to 25 guests but
additional lifeguards
maybe required due to
risk involved as
determined by the pool
May 3, 2022

Page 37 of 40 ends

RECREATION
# Description Current Fee/Charge Unit Suggested Fee Fee Δ Fee % Change 109 Convention Center Major Events Cleaning Fee, Per Rental $514.00 $550.00 36.00 7% 110 Contracted Attendant Fee ( Per Hour) $31.00 $31.00 0.00 0% 111 Convention Center Holiday Decoration Per Rental $205.00 $205.00 0.00 0% 112 Field Drag & line, Per Request $103.00 $103.00 0.00 0% 113 Field Light (Per Hour) $21.00 $21.00 0.00 0%
114 Field Maintenance Fee - Long Range, Per Rental (10-12 months rentals) $205.00 $205.00 0.00 0% 115 Field Maintenance Fee, Per Use (Monthly Rentals) $21.00 $21.00 0.00 0% 116 Field Soccer Goal Equipment Setup, Per Request $62.00 $20.00 (42.00) -68% 117 Jumper Permit $41.00 $41.00 0.00 0%
118 Kitchen use-Community Center $51.00 $51.00 0.00 0%
119 Kitchen use-Senior Center $106.00 $106.00 0.00 0%
120 Lifeguard, Per Hour $31.00 $31.00 0.00 0%
121 Microphone - Cordless $59.00 $59.00 0.00 0%
122 Piano - Baby Grand $65.00 $65.00 0.00 0%
123 Piano - Grand $126.00 $126.00 0.00 0%
124 Podium with sound $99.00 $99.00 0.00 0%
125 Podium without sound $36.00 $36.00 0.00 0%
126 Projector $51.00 $51.00 0.00 0%
127 Projector Screen $31.00 $31.00 0.00 0%
128 Riser $21.00 $21.00 0.00 0%
129 Scoreboard Equipment $15.00 $15.00 0.00 0%
130 Sound Permit $27.00 $27.00 0.00 0%
131 Tables- Rectangle/ Round $4.00 $4.00 0.00 0%
132 Trash Can $10.00 $10.00 0.00 0%
133 Wet Bar-Fixed $103.00 $103.00 0.00 0%
134 Wet Bar-Portable $51.00 $51.00 0.00 0%
135 Administrative Fees
136 Application Fee - Rentals $31.00 $50.00 19.00 61%
137 Application Short Notice Fee (Application fee must be received 30 days prior to event) $26.00 $50.00 24.00 92% 138 Gross Concessions-Alcohol (Per Assessed Number of Attendee) $1.00 $1.00 0.00 0% 139 Gross Concessions-all sales excluding alcohol (Per Assessed Number of Attendee) $1.00 $1.00 0.00 0% 140 Gross Ticket Sale (Per Assessed Number of Attendee) $1.00 $1.00 0.00 0% 141 Marquee weekly rental $51.00 $51.00 0.00 0%
142 Rental Amendment Fee (any changes on approved contract) $26.00 $26.00 0.00 0% 143 Rental Event Date Change Fee $31.00 $50.00 19.00 61% 144 Film Permits
Fees are waived for
Student Project but
requires an applicable
school letter confirming
project. If filming at the
May 3, 2022

Page 38 of 40 ends

RECREATION
# Description Current Fee/Charge Unit Suggested Fee Fee Δ Fee % Change 145 Still Photography, daily $51.00 $80.00 29.00 57%
146 Music Videos, Industrial, Web Content, daily $103.00 $250.00 147.00 143% 147 Commercial, Corporate, Short Films, Featur, Television, daily $154.00 $1,467.00 1,313.00 853% 148 BOOTHS AND FESTIVALS, EACH/PER DAY
149 Non-profit information/crafts $56.00 $56.00 0.00 0% 150 Non-profit food vendor (includes permit) $243.00 $243.00 0.00 0% 151 Commercial food vendor (includes permit) $359.00 $359.00 0.00 0% 152 Commercial merchandise $113.00 $113.00 0.00 0%
153 SPECIAL EVENT PERMIT FEES, All fees are per rental unless stated otherwise 154 Application Fee $31.00 $50.00 19.00 61%
155 Application Short Notice Fee (Application fee must be received 30 days prior to event) $26.00 $50.00 24.00 92% 156 Alcohol Sales Permit $132.00 $132.00 0.00 0%
157 Alcohol Service Only $67.00 $67.00 0.00 0%
158 Barricades - A Frame $2.00 NA 0.00 0%
159 Barricades - Cone $1.00 NA 0.00 0%
160 Barricades - Crowd Control $10.00 NA 0.00 0%
161 Barricades - Directional Signs $1.00 NA 0.00 0%
162 Barricades - No Parking Signs $1.00 NA 0.00 0%
163 Barricades - Delivery Fees $51.00 $51.00 0.00 0%
164 Jumper Permit $41.00 $50.00 9.00 22%
165 Parade Floats Permit** $75.00 $75.00 0.00
166 Sound Permit $27.00 $27.00 0.00 0%
167 Trash Can, Per Day $10.00 NA 0.00 0%
Add new fees or fee replacements below
168 Road Closure Fee Traffic Impact/Block 0 100.00 100.00 169 Block Party Per Day (8am- 9pm) 0 50.00 50.00
170 Rally/March Fee 0 50.00 50.00
171 Stanchions 0 2.00 2.00
Expressive Demonstrations of First Amendment Rights
172 Application/Processing Fee 0 50.00 50.00
173 Late Appl. Fee/Short Notice (Recv'd under 30 days) 0 50.00 50.00 174 Attendees <250 0 100.00 100.00
175 Attendees 250+ 0 250.00 250.00
178 Film Permits : City Property Locations 0 TBD by site TBD 179 Rental Setup/Late Notice & Change fee 0 $150.00 150.00 Fees removed, replaced, or consolidated
May 3, 2022

Page 39 of 40 ends

RECREATION
# Description Current Fee/Charge Unit Suggested Fee Fee Δ Fee % Change 14 Bingo, 8-hour max., daily 2054.00
165 Parade Floats Permit is a Fire Dept Fee 75.00
May 3, 2022

Page 40 of 40 ends