Richmond Police Department
Three-Year Maintenance Plan
August 1, £0££ -August 1, £0£5
RPD Vessels: Liberty 97, Rescue £8 & Rescue £9
Work Order - Not to exceed $50,000 over three years
• Haul out fee for vessels: Not to exceed $1,500.
• Hull and deck maintenance to include bottom painting and replacing zincs and anodes: Not to exceed $14,000. • General Service and Repair to all outboards and components: Not to exceed $7,000. • General Service and Repair on both starboard and port Cummings Diesel engines, to include Hamilton Jet Drives:
Not to exceed $9,000.
• Equipment and materials: not to exceed $5,500.
• Inspection and repair if needed all electrical systems on all vessels: Not to exceed $8,000.
Service Details
1. Moose boat: Service 2 Cummings diesel engines (2) 6.71trs.
2. Hamilton Jets: service per manual, with attention to the seals and changes required by number of hours.
3. Equipment and Materials
a. New batteries, new terminals, replace corroded wiring, steering cables, flushing hydraulic steering.
4. Bottom Paint
a. Supplies: Primer, bottom paint, sandpaper rollers, covers, tarps, tape, and consumable supplies b. Yard rent
5. Remove old fuel from tank
a. This requires using pumps to extract fuel. All fuel must be recycled. b. because the vessel has been sitting for more than six months, this service is necessary.
6. Nonskid Application
a. Remove old paint on deck, apply new primer and non-skid application b. Materials: non-skid, primer, brushes, tape tarps, plastic coverings
7. Inspection & Annual Survey
a. Create and maintain a file on each item on board (check list to be updated any time equipment is replace or added) for maintenance or guaranty. 6 hours one person
8. Remove old fuel
a. If vessel has been sitting for more than six months; this service is necessary.
TOTAL $16,600. Per vessel, $50,000 TOTAL for three-year contract.
This is a proposal. Before work begins, we would create a contract.
Proposal assumes client will work with us to ensure requests do no exceed annual budget.