Cities Index.
2022-09-13(sr)(con) Spectra Turf for Playground Resurfacing Contract(1).pdf

Richmond City Council
September 20, 2022

Document
2022-09-13(sr)(con) Spectra Turf for Playground Resurfacing Contract(1).pdf
Meeting
September 20, 2022
Body
Richmond City Council
Pages
2
Original file
249 KB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.
Page 1 of 2 ends

September 20, 2022

Public Works

DATE: September 20, 2022
TO: Mayor Butt and Members of the City Council
FROM:

Joe Leach, PE, Director of Public Works
Greg Hardesty, Parks & Landscaping Superintendent
Subject:

Playground Resurfacing Contract
FINANCIAL IMPACT: The proposed expenditure of $269,519 will be funded from the Open Space/Park Impact Fee – Fund 2116 and
will cover the repair of four parks. (21633131-400642-
23027).

PREVIOUS COUNCIL
ACTION:

-

STATEMENT OF THE
ISSUE:

The Department of Public Works, Parks Maintenance
Division is seeking approval of a contract with
SpectraTurf for playground resurfacing.

RECOMMENDED ACTION:

APPROVE a contract in the amount of $269,519 with
SpectraTurf for playground resurfacing, with a contract term from September 21, 2022, to June 30, 2023; and
APPROPRIATE budget using fund balance – Public
Works Department (Joe Leach 620-5478/Greg Hardesty
620-6920).

AGENDA
REPORT

Page 2 of 2 ends

September 20, 2022
DISCUSSION:

The Parks and Landscape Maintenance Division of the Public Works Department maintains numerous playgrounds throughout the City. The playgrounds include surfaces or materials to ensure safe play on structures and amenities. A number of these surfaces are rubberized pads (as compared to Engineered Wood Fiber, aka “chips”) that need replacement or updating due to age and/or vandalism.

A request for bids was placed on the City’s Bids online system for playground resurfacing at Burg Park, La Moine Park, Nevin Park, and Huntington Park. Two proposals were received. The proposals were as follows:

1. SpectraTurf (Corona, CA) $269,519.00

2. Robertson Recreational Surfaces (Tempe, AZ) $290,929.60

City staff recommends approval of a contract with SpectraTurf as the lowest bidder.

NEXT STEPS:

City staff will issue a Notice to Proceed to the contractor. It is anticipated that construction will commence on or about October 11, 2022, and be completed within two to four weeks.

DOCUMENTS ATTACHED:

Attachment 1 – Contract
Attachment 2 – Request for Bids
Attachment 3 – Bid Results
Attachment 4 – Map of Park Locations
Attachment 5 – Photos of Existing Conditions

← All documents from this meeting