Parks Maintenance Division
City of
3201 Leona Avenue
Richmond
Richmond, CA 94804
Rubberized Surfacing Bid Request
Scope of work
Repair various locations of rubberized surfacing; Colors of repairs will match existing as close as possible unless otherwise notified. The City of Richmond reserves the right to remove any line item from the bid schedule prior to contract award as deemed necessary. Contractors shall bid accordingly
Lamoine Park - 3535 Morningside Drive.
• 12 Various areas ranging in size (See photos)
Nevin Park - 4th St. & Macdonald Ave.
• 14 various areas ranging from small to large repairs (See photos) Burg Park - 30th St & Clinton Ave.
• 4 areas (See photos)
Huntington Park- Carlson & Huntington Ave.
• Recover entire pad with 1.5in depth "Retop"
• Pad size 25ft x 30ft )See photo
• Meet all industry standards for playground safety surfacing Contractor is responsible for any damage to City and private property resulting from work on this project.

Bid Requirements:

Contractor must have a valid City of Richmond Business license and State Contractor's License.

Contractor responsible for meeting City of Richmond contractor's requirements including insurance and prevailing wage guidelines.
1 All work to be coordinated with City of Richmond Parks and Landscaping Superintendent or his designee.

MANDATORY site visit will start at 9 a.m. on Monday, August 1, 2022, at Huntington Park, 2217 Carlson Blvd., Richmond. Site Visit in this order: Huntington, Nevin, Burg and La Moine. All sites are mandatory.

Bids are due no later than 10:00 a.m. on Monday, August 8, 2022. Bids must be submitted electronically on BidsOnline thru the City of Richmond website, www.ci.richmond.ca.us - click on Projects and Bids.

Please contact Mark Maltagliati, Parks Supervisor with questions at 510-231-3037 or mark [email protected].

City of
Bichmond
Rubberized Surfacing at Various Parks
Addendum No. 1
The scope of work has been changed to the following:

Lamoine Park
• Recover each of the 3 pads with 1.5in depth "Re-top", Blue color, no black with 1.5mm to 4mm vulcanized surface
• Pad 1, most northernly 1300sqft, Pad 2, center 750sqft, Pad 3, closest to road, 1200sqft
• Add ADA ramps for Pad 1 and 3 on the Eastern side of both. Cut in 48in to facilitate access. Pad 1 should be at closest to "Transfer Station", Pad 3 should be on SE corner
• Replace beneath the strap swings to Blue .5mm to 1.5mm TPV Supreme, cut out area is 8ft by 12ft = 96sqft
• Meet all industry standards for playground safety surfacing Nevin Park
• Recover the large play area with 1.5in "Re-top", Blue color, no black with

1.5mm to 4mm vulcanized surface
• Cut out approximately 200 lineal feet of tree roots below existing surface.

Replace and build up sub surface as required.
• Play area is 7800sqft
• Replace at foot of the 4 slides to Blue .5mm to 1.5mm TPV Supreme, cut outs will be 4ft by 4ft or 16sqft each
• Meet all industry standards for playground safety surfacing.

Burg Park
• Recover entire play area with 1.5in "Re-Top", Terra Cotta color, no black, with 1.5mm to 4mm vulcanized surface
• Repair subsurface below swings as required
• Replace at foot of the 2 slides with 4ft by 4ft or 16sqft of TPV Supreme .5mm to 1.5mm Terra Cotta color
• Replace beneath the strap swings with same as above, with cut out area of 8ft by 12ft or 96sqft
• Total play area is 5500sqft
• Meet all industry standards for playground safety surfacing Huntington Park
• Remove and replace entire pad with standard depth vulcanized surface and base
• Solid color of Green
• Pad is 730sqft
• Meet all industry standards for playground safety surfacing