DRAFT - OCTOBER 2022
City of Richmond
Bicycle and Pedestrian
Action Plan

Acknowledgments
to be completed for FINAL VERSION OF THE DOCUMENT
Glossary
ADA – Americans with Disabilities Act
ATP – Active Transportation Program
BAAQMD – Bay Area Air Quality Management District
BART – Bay Area Rapid Transit
BPAC – Bicycle and Pedestrian Advisory Committee
BPAP – Bicycle and Pedestrian Action Plan
CA HCD – California Department of Housing and Community Development
CA DPR – California
CA OTS – California Office of Traffic Safety
CALTRANS – California Department of Transportation
CBO – Community Based Organization
CCTA CBPP – Contra Costa Transportation Authority Countywide Bicycle and Pedestrian Plan
CCTA – Contra Costa Transportation Authority
CIP – Capital Improvement Project
HSIP – Highway Safety Improvement Program
LRSP – Local Road Safety Plan
MPH – Miles Per Hour
MTC – Metropolitan Transportation Commission
MUTCD – Manual on Uniform Traffic Control Devices
OTS – Office of Traffic Safety
PHB – Pedestrian Hybrid Beacon
RAISE – Rebuilding American Infrastructure with Sustainability and Equity Grant Program
RNCC – Richmond Neighborhood Coordinating Council
RRFB – Rectangular Rapid Flashing Beacon
SRTCP – South Richmond Transportation Connectivity Plan TIMS – [University of California Berkeley] Transportation Injury Mapping System
USDOT – United States Department of Transportation
Proposed Spot Improvements by Prioritization Category
Table of Contents
00 Executive Summary ........................................................................................... I 01 Int
roduction ....................................................................................................... 1 02 Comm
unity Engagement .............................................................................. 12 03 Bicy
cle Recommendations ........................................................................... 22 04 Pedes
trian Recommendations .................................................................... 42 05 Imp
lementation ............................................................................................... 61 A App
endices ................................................................................................... 109 List of Tables
01 High-Priority Bicycle Improvement Projects (corridor) ............................ IV 02 High
-Priority Pedestrian Spot Improvements. ......................................... VII 03 Exis
ting and Proposed Bikeways ................................................................ 30 04 Bicy
cle Recommendations ........................................................................... 34 05 Spot
Improvement Recommendations ...................................................... 54 06 Priorit
ization Criteria ..................................................................................... 63 07 Bicyc
le Prioritization Summary ................................................................... 64 08 Bicyc
le Projects by Prioritization Scores .................................................... 71 09 Spot
Recommendation Prioritization Summary ........................................ 81 10 Bicyc
le Projects by Prioritization Scores ................................................... 88 11 Fundin
g Opportunities by Project Type .................................................... 99 12 Bicy
cle Planning Level Cost Estimates
by Bik
eway Classification ............................................................................ 101 13 Spot I
mprovement Planning Level Cost Estimates ............................... 102 List of Figures
i High-Priority Bicycle Improvement Projects. ............................................. III i
i High
-Priority Bicycle Improvement Projects. ............................................ VI 01 Mult
imodal High Injury Network ................................................................... 6 02 Healt
h and Equity Analysis Process ............................................................. 8 03 Heal
th Index Score Map ................................................................................. 9 04 Equi
ty Index Score Map ................................................................................. 10 05 Heal
th and Equity Combined Index Map .................................................... 11 06 Prop
osed Bicycle Improvements ................................................................. 31 07 Prop
osed Bicycle Improvements (central core) ....................................... 32 08 Prop
osed Bicycle Improvements (North Richmond) ............................... 33 09 Propo
sed Spot Improvements ...................................................................... 51 10 Propo
sed Spot Improvements (Central Core) .......................................... 52 11 Prop
osed Spot Improvements (North Richmond) .................................... 53 12 Propo
sed Bicycle Improvements by Prioritization Category ................. 65 13 Propo
sed Bicycle Improvements by Prioritization Category
(Centr
al Core) ................................................................................................. 66 14 Propo
sed Bicycle Improvements by Prioritization Category
(Nort
h Richmond) .......................................................................................... 67 15 High-Priority Bicycle Improvement Projects .............................................. 68 16 High-Priority Bicycle Im provement Projects (Centr al Core) .................... 69 17 High-Priority Bicycle Impro vement Projects (North Richm ond) .............. 70 18 Prop
osed Spot Improvements by Prioritization Category ..................... 82 19 Prop
osed Spot Improvements by Prioritization Category
(Centr
al Core) ................................................................................................. 83 20 Prop
osed Spot Improvements by Prioritization Category
(Nort
h Richmond) .......................................................................................... 84 21 High-Priority Spot I mprovements ............. ............................ ...................... 85 22 High-Priority Spot Improvements (Central Cor e) .....................................86 23 High-Priority Spot Improve ments (North Richmond) ............................... . 87 24 Implementatio n Process Flowch art ............................................ ................107 Executive Summary
The 2022 Bicycle and Pedestrian Action
Plan (BPAP) provides a set of short-term
infrastructure recommendations and
actions for the City of Richmond to quickly
and effectively improve biking, walking,
and rolling (i.e., micromobility device,
wheelchairs, etc.). The recommendations
recognize that funding and resources
will incrementally build upon these
improvements over time. The primary goal
of this document is to guide Richmond
towards a balanced transportation system
that is safe, comfortable, accessible, and
equitable for people of all ages and abilities.

The plan lays out a strategy to develop
comprehensive bicycling and walking
networks that provide access to transit,
schools, parks, trails, the waterfront, and
downtown. Project recommendations were
developed based on a detailed needs
analysis, safety analysis, and community
engagement process. This document also
provides a strategy to design and construct
new infrastructure through prioritization
and phasing to ensure implementation is
manageable and fundable.

This Plan is designed to work in conjunction
with the City’s Local Road Safety Plan
(LRSP), created in tandem as part of the
Travel Safe Richmond initiative. The LRSP
identified traffic safety trends and developed
systemic recommendations to fund and
implement infrastructure countermeasure to
help address safety issues. The two plans
work together to create unified policies
and infrastructure recommendations for
improving roadway safety and comfort for
roadway users of all ages and abilities.

The chapters included in the BPAP include:

1. A
n introduction to the plan and process

2. A
n overview of community engagement

3. B
icycle project recommendations

4. P
edestrian project recommendations

5. D
irections for implementation.

A set of appendices were also developed
and include an update to the City’s bicycle
facility design guidelines and a list of
available sources of funding to jump-start
the implementation progress.

The recommendations included in this
plan are designed to provide short-term
infrastructure improvements with focus on
decreasing the risk of collisions for people
walking, biking, rolling, and driving across
Richmond. Data on bicycle- and pedestrian-
involved collisions provided insight into
locations and roadways representing the
biggest safety challenges.

Richmond has a rich history of community-
driven planning projects (i.e., neighborhood
and corridor plans) guiding bicycle and
pedestrian planning. This BPAP consolidates
and sets those ideas into a prioritized set
of feasible, immediate actions. Further, the
Plan combines past planning efforts, existing
guidance, and documentation to create a set
of achievable objectives and projects for the
City of Richmond to implement.

Richmond Residents bicycling along Bay Trail.

I
Executive Summary
Richmond Bicycle and Pedestrian Action Plan
Richmond resident walking along the Bay Trail. – Image: City of Richmond.

The Bicycle and Pedestrian Action Plan
included a multifaceted community
engagement process: The City used multiple
engagement methods and partnerships to
further the reach and effectiveness of the
engagement opportunities. Community
engagement included three community
workshops; three pop-up events, the
development of a project website with an
interactive webmap; coordination with the
City’s Bicycle and Pedestrian Advisory
Committee (BPAC); and, numerous meetings
with neighborhood councils. The City
partnered with Rich City Rides to lead
community engagement with Richmond’s
neighborhood councils. Over the project’s
life, the community provided over 500
interactions (workshop or pop-up attendance
and online interactions) with community
members and stakeholders.

The plan recommends over 84 miles of
new or improved bicycle facilities as well
as pedestrian spot improvements at 105
locations. Recommendations include projects
from other Richmond corridor and specific
plans and the recently approved Local Road
Safety Plan (LRSP). The recommended
improvements directly respond to safety
concerns and community feedback.

Four categories drove the recommendation
of projects:
• S
afety
• H
ealth and Equity
• C
onnectivity
• C
ommunity Support
The plan sets forth 72 high priority projects,
103 medium priority projects, and 105
opportunity projects. These can be found
in the tables and figures included in the
following pages. The prioritized list of
projects is not intended to be a hardened
order of projects but rather a guide to
support City of Richmond staff in selecting
projects that can fill a variety of grants,
repaving, or opportunistic situations.

The maps and tables on the following
pages summarize the High-priority bicycle
and pedestrian projects. These facility
improvements have been proposed to
help formulate a strategic list to guide
project implementation. However, as
development occurs or other changes
to the City’s transportation network take
place the framework can be used to
reevaluate remaining projects and continue
pursuing the plan’s implementation. The full
prioritization breakdown can be found in
Chapter 5.

II
Executive Summary
Richmond Bicycle and Pedestrian Action Plan

HIGH PRIORITY

BICYCLE

PROJECTS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/4/2022.

EXISTING BICYCLE

FACILITIES
Existing Bicycle
Facilities
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
0 0.5 1 MILES
San Francisco Bay

PROPOSED BICYCLE

FACILITIES
High Priority Project
Medium Priority and
Opportunity Project
!
!
!
!
!
!
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
! !
!
!!!
!! !
! !
!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80
¥80

EL CERRITO
PINOLE
SAN
PABLO

BERKELEY
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

KENSINGTON

MONTALVIN
MANOR

NORTH RICHMOND

ROLLINGWOOD
TARA
HILLS
SAINT

JO SEPH

CEMETERY

MIL L ER-KNOX

REG IO NAL

SHO REL INE
PO INT

PINO L E REG

SHO REL INE

SO BRANTE

RIDG E REG

PRESERVE

RICHMO ND

CO UNTRY
CLUB

TIL DEN

REG IO NAL
PARK

TIL DEN

NATU RE

STU DY AREA

WILDCAT CANYON

REGIONAL PARK

KENNEDY

G ROVE REG

REC AREA

SAN PABLO

RESERVO IR

REC AREA

PINO L E PARK

MIRA VISTA

CO UNTRY

C L U B & G O L F

HILLSIDE

NATU RAL
AREA

ROLLIN G
HIL LS

MEMO RIAL
PARK

FIE LDC
REST
DR

CASTRORANCH RD

PINE AVE

SAN PABLO AVE

CUTTING BLVD
7TH

ST ANDRADE AVE

GARRARD BL

VDTEWKSBURY AVE CARLSON BLVDFLORIDA AVE
PARKRI
DGEDR

PARKSIDE D R

HILLTOP
M
ALLRD

REGAT T A
BL
VD

AUTO PL
Z
6TH ST

RHEEM AVE

MCBRYDE
AVE

KEITHDR

MAINE AVE

ESMOND AVE

HILLTOP DR
BLUME
DR

VIEW DR

HILLVIEW DR

FOOTHILLAVE
SHAN
EDR

SANTA RIT
ARD

COSTA AVE

VALLEYVIEW R
D

BAYVIEW AVE

GIANT HWY

MACDONALD AVE

COLLINS A
VE
HE

NSLEY S T
RICHMO
NDAVE

MARINA WAY
23RD ST
47TH
ST
8TH ST
16TH ST

POTRERO AVE
4TH ST

HALL AVE

VIRGINIA AVE

TULARE AVE

LINKSDR
29TH STGARVIN AVE
RO
CK
ROSE
WAY
45TH ST
SCE
N
ICA
V E
WEST
ERNDR
LAKES

IDE D R

MEADEST
P
ARK

CENTRAL

WRIGHT AVE

ATLAS RD
22ND ST
MEADOW

VIEW DR
37TH ST

VIA VERDI
PAIN

TEDPONY RD

OHIO AVE

SANTAFE A
VE

RIPLEY AVE
20TH ST
MOYERS
RD

LUCAS AVE

GRANT AVE
CURR
YST
MAY RD
38TH ST
KEY

BLVDCANAL
BL
VD

SAN MATEO ST

BURBECK AVE
33RD ST

ROOSEVEL T AVE

GOODRICK AVE
TE

HAMA AV
E
FRAN
W
A Y

WALL AVE

NEVIN AVE
SAN J

OAQUIN ST
34TH ST

MONTEREY ST
13TH ST

SELMIGRV
52ND ST

GROOM DR
26TH ST

CHANSLOR AVE CARLSTO
N
ST
39TH ST
M
ARINA
BAY
PKWY

AMENDRD

LOWELL AVE
30TH ST
55TH ST

BUC KBOARD WAY

CARRIAGEDR

ALAMO AVE
28TH ST

SHELDONDR
42ND ST

HEAVENLY RIDGE LN

BERK AVE

MORNING SIDE DR
24TH ST
COA
CH
DR
11TH ST
PARK
RID
GE D
R
SIERRA
AVE
12TH ST
W
ISW
AL
L
DR

JENKINS WAY
DUKE
AVE
SA
N
LUIS
ST
O
X
FORD
A
VE
BA

RKLEYDR

OVEREND AVE
56TH
ST
B ST

AMADOR ST
18TH ST

CENTER AVE

PARKER RD
17TH ST
3RD ST
1ST ST
15TH ST

MARICOPA AVE

SANFORD AVE
2ND ST
50TH ST

K LOSEW
AY

KIPLING
DR

JOANNDR
49TH ST
NELSO
NDR
9TH ST

DUNN AVE
19TH ST

COALINGA AVE

GAYNOR AVE
21ST ST

BISSELL AVE
31ST ST32ND ST
5TH ST
DORN
AN
DR

YUBA ST

KERN STLASSEN ST

ROCKY R
D

BARRETT AVE
HA
RBOU
R
WAY

FASCINATION
CIR

CO NTRA
CO STA

COLLE GE
Figure i High-Priority Bicycle Impr ovement Projects.

III
Executive Summary
Richmond Bicycle and Pedestrian Action Plan
Table 01 H igh-Priority Bicycle Improvement Projects (corridor).

STREET START END RECOMMENDED FACILITY MILES PRIORITIZATION SCORE
Carlson Blvd Richmond Greenway Broadway Class I - Shared-Use Path 0.07 81 23rd St Overcrossing Richmond Greenway Richmond Greenway Class I - Shared-Use Path 0.11 80 Central Ave Jacuzzi St Pierce St Class I - Shared-Use Path 0.10 79 16th St Macdonald Ave Livingston Ln Class IV - Separated Bikeway 0.01 77 16th St Nevin Plaza Richmond Greenway Class IIIB - Bicycle Boulevard 0.08 77 Harbour Way Richmond Greenway Macdonald Ave Class II - Bicycle Lane 0.31 77 Macdonald Ave Harbour Way 16th St Class III - Bicycle Route 0.32 77 Nevin Ave Marina Way 15th St Class IIIB - Bicycle Boulevard 0.05 76 23rd St Broadway Brooks Ave Class II - Bicycle Lane 0.61 75 Espee Ave Bisell Ave Trail south of Chanslor Ave Class IIIB - Bicycle Boulevard 0.19 75 Marina Way Macdonald Ave Richmond Greenway Class II - Bicycle Lane 0.30 75 Pierce St Central Ave Cerrito Creek Class IV - Separated Bikeway 0.23 75 S 49th St Wall Ave Cutting Blvd Class IIIB - Bicycle Boulevard 0.17 75 Carlson Blvd Bayview Ave Broadway Class IV - Separated Bikeway 1.81 73 Barrett Ave 19th St Marina Way Class IV - Separated Bikeway 0.21 72 Bayview Ave Seaport Ave S 55th St Class IIB - Buffered Bicycle Lane 0.36 72 Carlson Blvd Bayview Ave Tehama Ave Class IIB - Buffered Bicycle Lane 0.49 72 Ohio Ave Harbour Way 2nd St Class IIIB - Bicycle Boulevard 0.42 72 Plaza Way S 49th St S 50th St Class IIIB - Bicycle Boulevard 0.05 72 Barrett Ave 19th St 22nd St Class II - Bicycle Lane 0.20 71 Harbour Way Macdonald Ave Barrett Ave Class II - Bicycle Lane 0.19 71 IV
Executive Summary
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES PRIORITIZATION SCORE
Nevin Ave 8th St 11th St Class IIIB - Bicycle Boulevard 0.15 70 New Shared-Use Path S 28th St S 29th St Class I - Shared-Use Path 0.07 70 San Joaquin St Central Ave Imperial Ave Class III - Bicycle Route 0.83 69 22nd St Brooks Ave Bissell Ave Class II - Bicycle Lane 0.49 68 Berk Ave - S 49th St Cutting Blvd Cutting Blvd Class IIIB - Bicycle Boulevard 0.78 68 Spring St S 29th St Regatta Blvd Class IIIB - Bicycle Boulevard 0.52 68 Tewksburry Ave Santa Fe Ave Washington Ave Class IV - Separated Bikeway 0.10 68 Chanslor Ave 2nd St 8th St Class IIIB - Bicycle Boulevard 0.32 67 Cutting Blvd Hoffman Blvd Carlson Blvd Class IV - Separated Bikeway 1.43 67 Macdonald Ave Richmond Parkway Harbour Way Class II - Bicycle Lane 0.70 67 Bissell Ave Richmond Parkway Espee Ave Class IIIB - Bicycle Boulevard 1.29 66 BNSF Easement near Railroad Ave
(not acquired yet) Richmond Ave Washington Ave Class I - Shared-Use Path 0.23 66 25th St Macdonald Ave Roosevelt Ave Class IIIB - Bicycle Boulevard 0.30 65 45th St Nevin Ave Macdonald Ave Class IIIB - Bicycle Boulevard 0.08 65 Ells St Flemino Ave Bayview Ave Class IIIB - Bicycle Boulevard 0.11 65 Macdonald Ave 16th St Key Blvd Class II - Bicycle Lane 1.80 65 Miraflores Greenbelt - Ohio
Connection S 45th St Miraflores Greenbelt Class I - Shared-Use Path 0.10 65 Ohio Ave 17th St 23rd St Class II - Bicycle Lane 0.30 65 Table 01 High-Priority Bicycle Improvement Projects (corridor) (continued).

V
Executive Summary
Richmond Bicycle and Pedestrian Action Plan

HIGH PRIORITY

PEDESTRIAN SPOT

IMPROVEMENTS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/4/2022.

BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
0 0.5 1 MILES
San Francisco Bay

PROPOSED

PEDESTRIAN PROJECTS
Prioritization Category
High Priority Project
Medium Priority and
Opportunity Projects
!
!
!
!
!
!
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
! !
!
!!!
!! !
! !
!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80
¥80

EL CERRITO
PINOLE
SAN
PABLO

BERKELEY
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

KENSINGTON

MONTALVIN
MANOR

NORTH RICHMOND

ROLLINGWOOD
TARA
HILLS
SAINT

JO SEPH

CEMETERY

MIL L ER-KNOX

REG IO NAL

SHO REL INE
PO INT

PINO L E REG

SHO REL INE

SO BRANTE

RIDG E REG

PRESERVE

RICHMO ND

CO UNTRY
CLUB

TIL DEN

REG IO NAL
PARK

TIL DEN

NATU RE

STU DY AREA

WILDCAT CANYON

REGIONAL PARK

KENNEDY

G ROVE REG

REC AREA

SAN PABLO

RESERVO IR

REC AREA

PINO L E PARK

MIRA VISTA

CO UNTRY

C L U B & G O L F

HILLSIDE

NATU RAL
AREA

ROLLIN G
HIL LS

MEMO RIAL
PARK

FIEL DCREST
DR

CASTRORANCH RD

PINE AVE

SAN PABLO AVE

LINCOLN AVE

CUTTING BLVD
7THST ANDRADE AVE

GARRARD BLV

DTEWKSBURY AVE

CARLSON BLVDFLORIDA AVE

PARKRIDGEDR
PA

RKSIDE D R

HILLTOP
M
ALLRD

REGAT T A
BLVD

AUTO PLZ

RHEEM AVE

MCBRYDE
AVE
KEIT
HDR
GOLD

EN GATEAV
E

MAINE AVE
B

AY VI EWAVE

HILLTOP DR
BLUM
E DR

VIEW DR

HILLVIEW DR

FOOTHILLAVE
SH
ANEDR

SANTA R
ITARD

COSTA AVE

VALLEYVIEW
RD
GIA
NT
HWY

MACDONALD AVE

GARVIN AVE
COL
LINS
AVE

HENSLEY S T

RICHMONDAVE

MARINA WAY

BUSH AVE
23RD ST
47TH
ST
16TH ST

POTRERO AVE
4TH ST

HALL AVE

VIRGINIA AVE

TULARE AVE

LINKSDR
RO
CK

ROSEWAY
45TH ST
SCE
N
ICA
V E
WESTE
RN
DR
35TH ST
LAKES

IDE D R
PA
RK

CEN TRAL

WRIGHT AVE
BROADW
AY

ATLAS RD
22ND ST
MEADOW

VIEW DR
37TH ST

VIA VERDI

PAINTEDPONY RD

OHIO AVE

RIPLEY AVE
20TH ST
MOYERS
RD

LUCAS AVE
8TH ST

GRANT AVE
CURR
YST
MAY RD
38TH ST
KEY
BLVD

SAN MATEO ST

BURBECK AVE
33RD ST

ROOSEVELT AVE

GOODRICK AVE
TE

HAMA AV
E
6TH ST
FRAN
WA Y

ESMOND AVE

WALL AVE

NEVIN AVE
SAN

JOAQUIN ST

MONTEREY ST
13TH ST
31ST ST

SELMIGRV
52ND ST

GROOM DR
26TH ST

CHANSLOR AVE CARLSTO
N
ST
34TH ST

CLINTON AVE
AME
ND
RD

LOWELL AVE
30TH ST
MA
RINA

BAYPKWY
55TH ST

BUC KBOARD WAY

CARRIAGEDR

ALAMO AVE
28TH ST

SHELDONDR
42ND ST

HEAVENLY RIDGE LN

BERK AVE

MORNING SIDE D
R
COACH
DR
11TH ST
PARK
RIDGE
DR
HAR
BOUR
WAY

SIERRA AVE
12TH ST
W
ISW
AL
L
DR

JENKINS WAY
DUKE
AVE

SAN LUIS ST
36TH ST
O
X
FORD
AV
E

OVEREND AVE
57TH ST
56TH
ST
B ST

AMADOR ST
18TH ST

CENTER AVE

PARKER RD
17TH ST
3RD ST
1ST ST
15TH ST

MARICOPA AVE

SANFORD AVE
2ND ST
CANAL
BL
VD
KLOSEW
AY

KIPLING
DR

JOANNDR
49TH ST
NELS
ONDR
9TH ST
19TH ST

COALINGA AVE
39TH ST
21ST ST

BISSELL AVE
32ND ST
43RD ST
5TH ST

GAYNOR AVE

YUBA STKERN STLASSEN ST

MEADEST

ROCKY R
D
DORN
AN
DR

BARRETT AVE
1 2
3 6
7 17
18 22
23 24 25
26 29
61 62
68 80
81 82
83 85
97 98
123
124
128
135
136

CO NTRA
CO STA

COLLE GE

EXISTING

PEDESTRIAN PROJECTS
Class I Shared-Use
Path
Figure ii High-Priority Pedestrian Spot Improvement Projects.

VI
Executive Summary
Richmond Bicycle and Pedestrian Action Plan
Table 02 H igh-Priority Pedestrian Spot Improvements

PROJECT
ID
CROSS
STREET
CROSS
STREET

IMPROVEMENT

TYPE RECOMMENDATION PRIORITIZATION
SCORE
26 Broadway 23rd St Intersection
Upgrade
Widen, lengthen, and channelize median islands. Restripe crosswalks as high-visibility crosswalks. 81
2 Macdonald
Ave 15th St Crossing
Improvement
Consider constructing a raised intersection or raised crosswalk at the eastern approach. Construct curb extensions at all four corners. Install high-visibility crosswalks at the eastern and western approaches on top of decorative paving. 81 31 S 49th St Cutting Blvd Lighting LRSP high-injury intersection,: install intersection lighting. 81 32 San Joaquin
St Central Ave Intersection
Upgrade LRSP high-injury intersection: construct bulb outs and install advanced warning signs. 81 67 Broadway 24th St Crossing
Improvement Construct curb extensions at all corners. 80 92 Central Ave I-80 Crossing
Improvement
Coordinate with Caltrans to upgrade all crosswalks to high-visibility crosswalks and provide leading pedestrian intervals for all crossing phases. Extend bicycle conflict markings on Central through the Jacuzzi intersection and interchange. Long term, construct curb extensions to tighten radii and square up approaches. 80 19 Harbour Way 300’ north of
Chanslor Ave
Crossing
Improvement Install a high-visibility midblock crosswalk with a median refuge island. 80 37 25th St Macdonald
Ave
Crossing
Improvement
LRSP high-injury intersection: Upgrade all crosswalks to high-visibility. Consider installing RRFB or PHB. Construct curb extensions at all corners. 79 51 23rd St Exchange Pl Crossing
Improvement Construct a median refuge island and install an RRFB for a crossing of 23rd Street. . 78 93 Nevin Ave Marina Way Crossing
Improvement
Upgrade all crosswalks to high-visibility crosswalks and provide a leading pedestrian interval for call crossing phases. Long term, consider converting the intersection to a raised intersection.
78 66 Ohio Ave S 23rd St Crossing
Improvement Construct curb extensions at all corners. 78 15 Carlson Blvd Bayview Ave Intersection
Upgrade Install intersection improvements including curb extensions and a median nose. 77 1 Macdonald
Ave 16th St Intersection
Upgrade
Consider scramble phase or otherwise don’t allow permitted left turns to conflict with pedestrians in the crosswalk. Create LPI. Consider parklet on southwest corner 77 20 S 23rd St Virginia Ave Crossing
Improvement Consider installation of a pedestrian refuge island and install pedestrian scale lighting. 77 6 15th St Nevin Ave Other Provide a ramp to allow bicycle access to/from plaza. 76 VII
Executive Summary
Richmond Bicycle and Pedestrian Action Plan

PROJECT
ID
CROSS
STREET
CROSS
STREET

IMPROVEMENT

TYPE RECOMMENDATION PRIORITIZATION
SCORE
104 22nd St Macdonald
Ave
Crossing
Improvement
Install curb extensions at the northwest and northeast corners. Install a pedestrian count display at the southwest corner. When next repaved, reduce the intersection’s crown and conform asphalt to the gutter pan.
76 49 23rd St Barrett Ave Crossing
Improvement Implement improvement in CCTA CSSA. 76
50 23rd St Macdonald
Ave
Crossing
Improvement Implement improvement in CCTA CSSA. 76
52 Barrett Ave BART Tracks Sidewalk Widen sidewalk on northern side through underpass (Requires road diet). 76 14 Carlson Blvd Cutting Blvd Intersection
Upgrade
Construct intersection improvements including: formalized curb extensions, widened sidewalk, and additional sidewalks. 76
54 Cutting Blvd S 12th St Crossing
Improvement Install high-visibility crosswalks at all approaches. 76 21 Harbour Way Cutting Blvd Intersection
Upgrade
Install curb extensions, directional ramps and high-visibility crosswalks, and median crossing islands. 76
97 Macdonald
Ave 45th St Crossing
Improvement
Upgrade all crosswalks to high-visibility crosswalks and install advance yield markings.

Install an RRFB for the Macdonald crosswalks. On the south side of the street, widen the sidewalk and provide a connection to the “Target Path.” 76 7 Marina Way Barrett Ave Intersection
Upgrade
Install a curb extension at the northwest and southwest corners. Provide a leading pedestrian interval and adjust pedestrian phase length to provide sufficient crossing times. Realign the southern crosswalk several feet south and install high-visibility crosswalks at the north and eastern approaches. Consider installing bicycle lane conflict markings and a two-stage bike turn box for NB-WB bike movements. 76 22 Marina Way Cutting Blvd Intersection
Upgrade
Install curb extensions, directional ramps and high-visibility crosswalks and median crossing islands. 76
3 Nevin Ave 15th St Crossing
Improvement
Consider constructing a median refuge or traffic circle to accommodate direct pedestrian path of travel. 76
23 S 23rd St Cutting Blvd Intersection
Upgrade
Restripe crosswalks as high-visibility crosswalks. Install curb extensions at all corners with directional ramps. Construct median crossing islands. 76 105 23rd St Rheem Ave Crossing
Improvement
Upgrade all curb ramps to current best practices; specifically, replace the southwest corner ramp with a “parallel” ramp and “centered” ramps at the two eastern corners.

Adjust pedestrian signal heads as needed. Provide a leading pedestrian interval for all crossing phases.
60 Table 02 High-Priority Pedestrian Spot Improvements (continued).

VIII
Executive Summary
Richmond Bicycle and Pedestrian Action Plan
Introduction
01 Chapter
Travel Safe Richmond
In 2021 the City embarked in a two-pronged approach to improving safety for all roadway users. Travel Safe Richmond, as the initiative was named, included a Local Roadway Safety Plan (LRSP) and a complementary Bicycle and Pedestrian Action Plan (BPAP). Both components of Travel Safe Richmond work together to create unified policies and infrastructure recommendations for improving roadway safety and comfort for roadway users of all ages and abilities. This chapter describes those efforts and details how the Bicycle and Pedestrian Action Plan was developed.

The BPAP covers: 1) an introduction to the plan and process, 2) an overview of community engagement, 3) bicycle project recommendations, 4) pedestrian project recommendations, and 5) directions for implementation. Additionally, the appendices include an update to the City’s bicycle facility design guidelines and a list of available sources of funding to jump-start the implementation progress.
2 Introduction
Richmond Bicycle and Pedestrian Action Plan
Local Roadway Safety Plan Vision and Goals
Traffic safety impacts the health and comfort of all who live and travel in Richmond. The City of Richmond’s Local Roadway Safety Plan (LRSP) identified traffic safety trends and developed systemic recom - mendations to fund and implement infrastructure countermeasure to help address safety issues. Implementing the LRSP is a step toward making Richmond’s transportation network safer and more equitable for all users.

The LRSP’s primary goals included:
• R
educe fatal and serious injury collisions
• En
sure equitable traffic safety investments in the neighborhoods that need them most
• S
upport safe travel for people walking and biking, especially near schools and other high-demand areas
• E
ncourage safe driving through roadway design and outreach • P
repare for the future with climate-resilient transportation safety infrastructure
• I
mprove emergency vehicle response and access
The Richmond City Council adopted the Local Roadway Safety Plan on July 19, 2022. The recommendations from the LRSP have been incorporated into the BPAP’s recommendations.

The City of Richmond Local Road Safety Plan, adopted July 2022.

Richmond Local Roadway Safety Plan i

LOCAL ROADWAY

SAFETY PLAN

LOCAL ROADWAY
SAFETY PLAN July 2022
3 Introduction
Richmond Bicycle and Pedestrian Action Plan
The Bicycle and Pedestrian Action Plan
(BPAP) works toward building a balanced
transportation system that is safe,
comfortable, and accessible for all users
with a focus on improving conditions for
people walking, biking, and rolling (i.e., on
wheelchairs, skateboards, scooters, and
other emerging micromobility options).

The Plan lays out a strategy to develop
comprehensive bicycling and walking
networks that provide access to transit,
schools, parks, trails, downtown, and other
community destinations. As part of this
effort, the City developed a set of project
recommendations based on thorough
needs analysis and community engagement
processes. The BPAP serves as the blueprint
for improving walking and bicycling
conditions in Richmond for the next five
years. The document presents a short-term
set of actions and projects recognizing that
funding and resources will incrementally
build upon these improvements over time.

The document also provides a plan to
ensure implementation is manageable and
fundable. Input from City stakeholders and
community members played a critical role in
the development of this plan.

This BPAP consolidates safety
recommendations derived from the LRSP
and other past planning efforts including
corridor plans and studies, to provide
comprehensive near-term bicycle and
pedestrian infrastructure improvements. It
is the hope of the City that the proposed
improvements will make walking, biking,
rolling, transit access, and driving throughout
Richmond safer, easier, and more practical.

Goals for the Bicycle and Pedestrian Action
Plan included:
• D
evelop a list of near-term (1-5 year)
infrastructure projects focusing on
bicycle and pedestrian safety and
comfort.
• De
velop a recommended bicycle and
pedestrian networks that build on
Richmond’s existing assets and focus
on closing existing gaps.
• De
velop a general set of design
guidelines for implementing new or
improved bicycle facilities and off-street
paths (Appendix B) .
• De
velop an implementation strategy
that identifies potential funding
opportunities and applies those to each
project ( Appendix C).

Bicycle and Pedestrian Action Plan
Richmond Wellness Trail Wayfinding
4 Introduction
Richmond Bicycle and Pedestrian Action Plan
Making Streets Safe
for All Users
Natural and infrastructure barriers (ex.
water features, railroads, highways) can
limit connectivity, alter travel behavior, and
directly affect modal access. To understand
how safely and comfortably residents are
able to access important neighborhood
destinations using low-stress routes, as
well as to understand deficiencies in the
network for people biking and walking,
the study team completed a demand
analysis. The project team then overlaid
these high-demand areas with collision
density to better comprehend where
safety improvements could benefit the
most people. By understanding these
deficiencies and barriers, the project team
developed recommendations for providing
safe and convenient access to community
destinations and activity centers, both vital
elements to the physical and mental well-
being of community members.

The project team also embarked on an
analysis of collision data to understand
where and how collisions were happening
throughout the City. Using available data
from the University of California Berkeley
Transportation Injury Mapping System
(TIMS) for the antecedent five years (2015-
2019), the project team identified where
bicycle or pedestrian collisions occurred in
Richmond. Several corridors exhibited a high
concentration of pedestrian/bicycle-involved
collisions. The LRSP identified corridors with
elevated collision levels and grouped them
to create a multimodal high-injury network,
shown in Figure 1 .

Past Efforts Focused
on Making City Streets Safer
Over the past several years, the City has
developed numerous citywide plans that
set safety-focused policies and goals.

Richmond has also advanced corridor
plans that include multimodal access
and safety recommendations for specific
corridors, as well as area plans that
prioritize improvements across broader
regions. The Contra Costa Transportation
Authority (CCTA) has also developed and
begun implementing countywide plans that
support the City of Richmond’s efforts and
work towards unified regional connectivity
at the county level. In general, many of the
documents reviewed for the development
of this plan emphasize the need for a
transportation system that supports safe,
comfortable, and equitable transportation
networks for vulnerable users (e.g., people
walking, biking, and rolling – especially
youth, seniors, and those with limited
physical mobility or limited mobility options). A Richmond resident biking through a protected intersection on Central Avenue. 5 Introduction
Richmond Bicycle and Pedestrian Action Plan
Figure 01 M ultimodal High Injury Network (LRSP)
6 Introduction
Richmond Bicycle and Pedestrian Action Plan
Major themes throughout the documents
reviewed included:
• N
eed for improving safety and comfort
of all users
• N
eed for improving connectivity and
access to multimodal transportation
networks under a more equitable
approach
• N
eed to enhance connectivity to
neighboring jurisdictions
• N
eed to standardize implementation
of Active Transportation facilities and
networks
• N
eed to improve quality of life by
focusing on improving health (personal,
environmental, and economic)
• C
ommitment to encourage and
promote walking and bicycling as
viable modes of transportation
The recommendations included in this
document consider these key themes and
the previous infrastructure recommendations
made in the plans reviewed. Additional
information about the plans reviewed can be
found in Appendix A .

Health and Equity
Historically disadvantaged and vulnerable
populations may rely more on walking
and bicycling to meet daily needs. Safe,
healthy, affordable, and convenient
transportation options are not always
available to the disadvantaged populations
that need them most. These low-income
and unserved communities have historically
been left out of past conversations about
transportation and planning, leading to
systemic underinvestment and conditions
where pedestrians and bicyclists are
over-represented in collisions. A lack of
high-quality walking, biking, and transit
infrastructure can result in long, unhealthy,
unaffordable, and riskier (people bicycling
and walking are overrepresented in
collisions) travel for some of Richmond’s
most vulnerable populations.

Uneven distribution of active transportation
infrastructure also results in health, safety,
mobility, and economic benefits accruing
to those who are more socio-economically
fortunate while increasing hardships
for Richmond’s most vulnerable and
disadvantaged populations.

By prioritizing active transportation
infrastructure for these disadvantaged
populations, more Richmond residents will
be able to physically and fiscally navigate the
City they call home. With this in mind, the
City embarked on an analysis of equity and
health deficiencies based on available data.

Why Did We Complete
This Analysis?
Research indicates that communities with
higher health risk factors tend to have
less access to roadway infrastructure that
promotes walking and biking.
1 Walking,
bicycling, and other forms of physical activity
benefit community members’ physical and
mental health. Increasing physical activity
can help people reduce their risk of coronary
heart disease, stroke, diabetes, and other
chronic diseases. That can also lower health
care costs and improve the quality of life
for people of all ages, particularly children
and seniors with more limited mobility
options. By prioritizing active transportation
infrastructure for these populations, the
City can help improve safety, and residents
can reduce their transportation costs and
healthcare burden. Figure 2 shows the
weighted variables that compose the equity
and health index analysis.

To understand which neighborhoods
experience the highest rate of health-

1. Mahmoudi, J. “Health impacts of nonmotorized travel behavior and the built environment: Evidence from the 2017 National Household Travel Survey.” (2022). Journal of Transport & Health, 26.

Maizlish, N. “Increasing walking, cycling, and transit: Improving Californians’ health, saving costs, and reducing greenhouse gases.” (2016). California Department of Public Health: Office of Health Equity. 7 Introduction
Richmond Bicycle and Pedestrian Action Plan
related issues, the project team completed
a multi-variate health analysis. This analysis
included four variables:
• L
ife expectancy
• H
igh blood pressure
• H
eart disease
• D
iabetes
These four variables were combined into an
index to provide a holistic understanding
areas of the City experiencing the highest
impacts of health related issues. As shown
in Figure 3, the areas with the highest health
burdens include the central core, including
the Richmore Village, Pullman, Santa Fe,
and Coronado neighborhoods, and the
southern portion of the City between I-80
and I-580 including the Parkview, Southwest
Annex neighborhoods. Other areas of the
City disproportionately impacted by health
burdens include the Fairmede/Hilltop, Hilltop
Green, and May Valley neighborhoods.

To complement the health multivariate
analysis, the project team completed a
socio-economic analysis or equity index.

This analysis used the following statistics to
understand where the highest concentration
of socio-economically burdened residents is
within the City:
• L
ow-income households
• P
opulation over age 75
• R
ent-burdened population
• Z
ero-vehicle households
Figure 02
H
ealth and Equity Analysis Process
The indexed analysis is noted in Figure 4 .

The areas of Richmond with the highest
equity needs include the central part of
the City between Cutting Boulevard and
Macdonald Avenue and the Iron Triangle
area. The combined health and equity index
indicates the communities with the greatest
needs include the North and East, Richmore
Village, Park Plaza, Coronado, Park Plaza,
and Cortez/Stege neighborhoods.

Figure 5 shows the combined health and
equity index scores for the entire City.

How Did We Use These
Analyses?
The recommendations put forth in this plan
were informed by the health and equity
analyses and reflect where the most need
in the community is. The results of these
analyses were integral to the prioritization
and ranking for proposed projects for
improving the bicycle and pedestrian
networks in the City. Health and equity
scores comprised 25% of the cumulative
Quantitative Corridor Score which drove
project prioritization (see Chapter 5 for
details). Following score calculations,
improvements were sorted into high,
medium, and low priority categories based
on the distribution of scores. These data can
inform quick, effective changes Richmond
can more readily implement to make tangible
differences in the community.

How Do We Compile the Index?
Eight variables relating different dimensions of health and equity are aggregated to census block group geographies and are then compiled into a composite index.

EC O N O M IC O P P O R TU N ITY

ZER O V EH IC LE H O U S EH O LD S
P O P U LA TIO N O V ER 75
H EA R T D IS EA S E/five.numr
H O U SIN G C O ST B U R D EN /two.numr
P O V ER T Y LEV EL/two.numr

LIFE EX P EC TA N C Y

IN C ID EN C E O F D IA B ETES
=

HIGH LOW

FIN A L C O M P O S ITE IN D EX
8 Introduction
Richmond Bicycle and Pedestrian Action Plan

HEALTH INDEX

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, Ecopia, and Contra Costa County. Document: N:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 11/23/2021.

BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Contra Costa College
City Boundary

HEALTH INDEX
Top Quintile (Highest
Need)
Second Highest
Quintile
Middle Quintile
Second Lowest
Quintile
Lowest Quintile
(Lowest Need)
!
!
!
!
!
!
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
! !
!
!!!
!! !
! !
!
!
!
!
!
!
!
!
!
!
!
Ä123
¥
580
¥
580
¥80
¥80

EL CERRITO
PINOLE
SAN
PABLO
ALBANY

BERKELEY
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

KENSINGTON

MONTALVIN
MANOR
NORTH

RICHMOND

ROLLINGWOOD
TARA
HILLS

CA STRO RA
NCH RD

PINE AVE
SAN

PABLO A
VE

LINCOLN AVE

BLUME DR

HELLINGS AVE

ANDRADE AVE

GARRARD B
L
VD

ESMOND AVE

TEWKSBURY AVE

MARINA WAY

CARLSON BL
VD

FLORIDA AVE
15TH ST
PARKRI
DGEDR

PARKSIDE DR

HIL LTOP
M
ALLRD

REGATTA BLVD

AUTO PLZ
6TH ST

RHEEM AVE

MCBRYDE AVE
KEIT
HDR

MAINE AVE

BAY VI EW
AVE

VIEW DR

HILLVIEW DR

FOOTHILLAVE
SH
ANE
DR

SANTA R
ITARD

COSTA AVE

VALLEYVIEW
RD

GIANT HWY

MACDONALD AVE

COLLINS A
VE
HENSLE
Y
ST
RICHMO
ND AV
E

HILLTOP DR

BUSH AVE
MA
RIN
A
BAY
PKWY

CUTTING BLVD
23RD ST
47T
H
ST
8TH ST 16TH ST
HA
RBOUR
WAY

HALL AVE

VIRGINIA AVE

TULARE AVE
LIN
KSDR

GARVIN AVE
RO
CK
ROSE
WAY

POTRERO AVE
45TH ST
WH
ARF
ST
SCEN
ICA
V E
WEST
ERNDR
35TH ST

LAKESIDE
DR
PARK
CE
NTRAL
4TH ST

ATLAS RD
22ND ST

VIA VERDI

PAINTEDPONY RD
41ST ST

OHIO AVE

RIPLEY AVE
20TH ST
MOYERS
RD

LUCAS AVE

GRANT AVE
CURRY
ST
MAY RD
38TH ST
KEY
BLVD

SAN MATEO ST

BURBECK AVE
33RD ST

ROOSEVEL T AVE

GOODRICK AVE

TEHAMA AVE
FR
AN
W
A Y

WALL AVE

DOWNER AVE
SAN
JOAQU
IN
ST

MONTEREY ST
13TH ST
SEL
MIGRV
52ND ST

GROOM DR
24TH ST

CHANSLOR AVE

CARLSTON
ST

CLINTON AVE WILSON AVE
AMEND
RD

LOWELL AVE
30TH ST
19TH ST
55 TH S
T

BUCKBOARD W
AY

CARRIAGEDR

ALAMO AVE

NEVIN AVE

SHELDON DR HEAVENLY RIDGE LN

BERK AVE

MORNINGSIDE DR
1ST ST
7TH ST
COAC
H
DR
11TH ST

MARICOPA AVE
PAR
K
RIDGE
DR
SIERRA
AVE

CANAL BL
VD
12TH ST3RD ST
W
ISW
AL
L
DR

JENKINS WAY
DUKE
AVE

SAN LUIS ST
36TH ST
2ND ST
O

XFORDAV
E

WRIGHT AVE

BARKLEY
DR

OVEREND AVE
57TH ST

CE RRO SUR
56TH ST
37T
H
ST
B ST

AMADOR ST

UTAH DR

CENTER AVE

PARKE R RD
17TH ST

SANFORD AVE
50TH ST

KL OSEW
AY
KI
PLING
DR

JOANNDR
49TH ST

HUMPHREY AVE
9TH ST

DUNN AVE
C ST

COALINGA AVE
39TH ST
21ST ST
5TH ST
18TH ST

BISSELL AVE
31ST ST

WOOD GLENDR
32ND ST29TH ST25TH ST26TH ST

GAYNOR AVE

YUBA STKERN ST

LASSEN ST
MEA
DE S
T

ROCKY RD

TAFT AVE

GILMA DR
DORNA
N
DR

BARRETT AVE

FASCINATION
CIR

CO NTRA
CO STA

COLLE GE
0 0.5 1 MILES
San Francisco Bay
Figure 03 H ealth Index Score Map
9 Introduction
Richmond Bicycle and Pedestrian Action Plan

EQUITY INDEX

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, Ecopia, and Contra Costa County. Document: N:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 11/23/2021.

BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Contra Costa College
City Boundary

EQUITY INDEX
Top Quintile (Highest
Need)
Second Highest
Quintile
Middle Quintile
Second Lowest
Quintile
Lowest Quintile
(Lowest Need)
!
!
!
!
!
!
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
! !
!
!!!
!! !
! !
!
!
!
!
!
!
!
!
!
!
!
Ä123
¥
580
¥
580
¥80
¥80

EL CERRITO
PINOLE
SAN
PABLO
ALBANY

BERKELEY
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

KENSINGTON

MONTALVIN
MANOR
NORTH

RICHMOND

ROLLINGWOOD
TARA
HILLS

CA STRO RA
NCH RD

PINE AVE
SAN

PABLO A
VE

LINCOLN AVE

BLUME DR

HELLINGS AVE

ANDRADE AVE

GARRARD B
L
VD

ESMOND AVE

TEWKSBURY AVE

MARINA WAY

CARLSON BL
VD

FLORIDA AVE
15TH ST
PARKRI
DGEDR

PARKSIDE DR

HIL LTOP
M
ALLRD

REGATTA BLVD

AUTO PLZ
6TH ST

RHEEM AVE

MCBRYDE AVE
KEIT
HDR

MAINE AVE

BAY VI EW
AVE

VIEW DR

HILLVIEW DR

FOOTHILLAVE
SH
ANE
DR

SANTA R
ITARD

COSTA AVE

VALLEYVIEW
RD

GIANT HWY

MACDONALD AVE

COLLINS A
VE
HENSLE
Y
ST
RICHMO
ND AV
E

HILLTOP DR

BUSH AVE
MA
RIN
A
BAY
PKWY

CUTTING BLVD
23RD ST
47T
H
ST
8TH ST 16TH ST
HA
RBOUR
WAY

HALL AVE

VIRGINIA AVE

TULARE AVE
LIN
KSDR

GARVIN AVE
RO
CK
ROSE
WAY

POTRERO AVE
45TH ST
WH
ARF
ST
SCEN
ICA
V E
WEST
ERNDR
35TH ST

LAKESIDE
DR
PARK
CE
NTRAL
4TH ST

ATLAS RD
22ND ST

VIA VERDI

PAINTEDPONY RD
41ST ST

OHIO AVE

RIPLEY AVE
20TH ST
MOYERS
RD

LUCAS AVE

GRANT AVE
CURRY
ST
MAY RD
38TH ST
KEY
BLVD

SAN MATEO ST

BURBECK AVE
33RD ST

ROOSEVEL T AVE

GOODRICK AVE

TEHAMA AVE
FR
AN
W
A Y

WALL AVE

DOWNER AVE
SAN
JOAQU
IN
ST

MONTEREY ST
13TH ST
SEL
MIGRV
52ND ST

GROOM DR
24TH ST

CHANSLOR AVE

CARLSTON
ST

CLINTON AVE WILSON AVE
AMEND
RD

LOWELL AVE
30TH ST
19TH ST
55 TH S
T

BUCKBOARD W
AY

CARRIAGEDR

ALAMO AVE

NEVIN AVE

SHELDON DR HEAVENLY RIDGE LN

BERK AVE

MORNINGSIDE DR
1ST ST
7TH ST
COAC
H
DR
11TH ST

MARICOPA AVE
PAR
K
RIDGE
DR
SIERRA
AVE

CANAL BL
VD
12TH ST3RD ST
W
ISW
AL
L
DR

JENKINS WAY
DUKE
AVE

SAN LUIS ST
36TH ST
2ND ST
O

XFORDAV
E

WRIGHT AVE

BARKLEY
DR

OVEREND AVE
57TH ST

CE RRO SUR
56TH ST
37T
H
ST
B ST

AMADOR ST

UTAH DR

CENTER AVE

PARKE R RD
17TH ST

SANFORD AVE
50TH ST

KL OSEW
AY
KI
PLING
DR

JOANNDR
49TH ST

HUMPHREY AVE
9TH ST

DUNN AVE
C ST

COALINGA AVE
39TH ST
21ST ST
5TH ST
18TH ST

BISSELL AVE
31ST ST

WOOD GLENDR
32ND ST29TH ST25TH ST26TH ST

GAYNOR AVE

YUBA STKERN ST

LASSEN ST
MEA
DE S
T

ROCKY RD

TAFT AVE

GILMA DR
DORNA
N
DR

BARRETT AVE

FASCINATION
CIR

CO NTRA
CO STA

COLLE GE
0 0.5 1 MILES
San Francisco Bay
Figure 04 E quity Index Score Map
10 Introduction
Richmond Bicycle and Pedestrian Action Plan
HEALTH +

EQUITY INDEX

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, Ecopia, and Contra Costa County. Document: N:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 11/23/2021.

BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Contra Costa College
City Boundary
HEALTH + EQUITY INDEX
Top Quintile (Highest
Need)
Second Highest
Quintile
Middle Quintile
Second Lowest
Quintile
Lowest Quintile
(Lowest Need)
!
!
!
!
!
!
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
! !
!
!!!
!! !
! !
!
!
!
!
!
!
!
!
!
!
!
Ä123
¥
580
¥
580
¥80
¥80

EL CERRITO
PINOLE
SAN
PABLO
ALBANY

BERKELEY
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

KENSINGTON

MONTALVIN
MANOR
NORTH

RICHMOND

ROLLINGWOOD
TARA
HILLS

CA STRO RA
NCH RD

PINE AVE
SAN

PABLO A
VE

LINCOLN AVE

BLUME DR

HELLINGS AVE

ANDRADE AVE

GARRARD B
L
VD

ESMOND AVE

TEWKSBURY AVE

MARINA WAY

CARLSON BL
VD

FLORIDA AVE
15TH ST
PARKRI
DGEDR

PARKSIDE DR

HIL LTOP
M
ALLRD

REGATTA BLVD

AUTO PLZ
6TH ST

RHEEM AVE

MCBRYDE AVE
KEIT
HDR

MAINE AVE

BAY VI EW
AVE

VIEW DR

HILLVIEW DR

FOOTHILLAVE
SH
ANE
DR

SANTA R
ITARD

COSTA AVE

VALLEYVIEW
RD

GIANT HWY

MACDONALD AVE

COLLINS A
VE
HENSLE
Y
ST
RICHMO
ND AV
E

HILLTOP DR

BUSH AVE
MA
RIN
A
BAY
PKWY

CUTTING BLVD
23RD ST
47T
H
ST
8TH ST 16TH ST
HA
RBOUR
WAY

HALL AVE

VIRGINIA AVE

TULARE AVE
LIN
KSDR

GARVIN AVE
RO
CK
ROSE
WAY

POTRERO AVE
45TH ST
WH
ARF
ST
SCEN
ICA
V E
WEST
ERNDR
35TH ST

LAKESIDE
DR
PARK
CE
NTRAL
4TH ST

ATLAS RD
22ND ST

VIA VERDI

PAINTEDPONY RD
41ST ST

OHIO AVE

RIPLEY AVE
20TH ST
MOYERS
RD

LUCAS AVE

GRANT AVE
CURRY
ST
MAY RD
38TH ST
KEY
BLVD

SAN MATEO ST

BURBECK AVE
33RD ST

ROOSEVEL T AVE

GOODRICK AVE

TEHAMA AVE
FR
AN
W
A Y

WALL AVE

DOWNER AVE
SAN
JOAQU
IN
ST

MONTEREY ST
13TH ST
SEL
MIGRV
52ND ST

GROOM DR
24TH ST

CHANSLOR AVE

CARLSTON
ST

CLINTON AVE WILSON AVE
AMEND
RD

LOWELL AVE
30TH ST
19TH ST
55 TH S
T

BUCKBOARD W
AY

CARRIAGEDR

ALAMO AVE

NEVIN AVE

SHELDON DR HEAVENLY RIDGE LN

BERK AVE

MORNINGSIDE DR
1ST ST
7TH ST
COAC
H
DR
11TH ST

MARICOPA AVE
PAR
K
RIDGE
DR
SIERRA
AVE

CANAL BL
VD
12TH ST3RD ST
W
ISW
AL
L
DR

JENKINS WAY
DUKE
AVE

SAN LUIS ST
36TH ST
2ND ST
O

XFORDAV
E

WRIGHT AVE

BARKLEY
DR

OVEREND AVE
57TH ST

CE RRO SUR
56TH ST
37T
H
ST
B ST

AMADOR ST

UTAH DR

CENTER AVE

PARKE R RD
17TH ST

SANFORD AVE
50TH ST

KL OSEW
AY
KI
PLING
DR

JOANNDR
49TH ST

HUMPHREY AVE
9TH ST

DUNN AVE
C ST

COALINGA AVE
39TH ST
21ST ST
5TH ST
18TH ST

BISSELL AVE
31ST ST

WOOD GLENDR
32ND ST29TH ST25TH ST26TH ST

GAYNOR AVE

YUBA STKERN ST

LASSEN ST
MEA
DE S
T

ROCKY RD

TAFT AVE

GILMA DR
DORNA
N
DR

BARRETT AVE

FASCINATION
CIR

CO NTRA
CO STA

COLLE GE
0 0.5 1 MILES
San Francisco Bay
Figure 05 H ealth and Equity Combined Index Map
11 Introduction
Richmond Bicycle and Pedestrian Action Plan
Community Engagement
02 Chapter
Overview
The Bicycle and Pedestrian Action Plan
included a multifaceted community
engagement process which included
multiple engagement methods and
partnerships to further the reach and
effectiveness of the engagement events.

Community engagement included three
community workshops, three pop-up
events, a project website with an interactive
webmap, coordination with the City’s Bicycle
and Pedestrian Advisory Committee (BPAC),
and twelve meetings with neighborhood
councils. Richmond partnered with Rich
City Rides, a local non-profit focused on
creating opportunities to improve health
and economics in the City by promoting
cycling as a social, sustainable and green
mode of transportation. Rich City Rides
helped lead community engagement with
the City’s neighborhood councils. The Plan’s
engagement process lasted the entire length
of Plan development from November 2021
to November 2022. The project team led
community engagement in three phases:

1. E
xisting conditions

2. P
roject recommendations

3. D
raft BPAP
Community Engagement
During the existing conditions phase,
community members provided comments
on walking, bicycling, rolling, and any
transportation safety issues within
Richmond. The project team used the
feedback and information gathered from this
phase to help inform the recommendations
included in the LRSP and BPAP.

The second engagement phase enabled
community members to provide input on
draft walking and bicycling recommendations
included in this plan. Recommendations
were revised based on comments received
in this engagement phase.

The Travel Safe Richmond website homepage.

The third engagement phase presented
revised project recommendations and the
draft Bicycle and Pedestrian Action Plan.

Changes were incorporated into the final
draft Plan before presentation to the BPAC
and City Council.

Details on individual events and activities are
provided below. Overarching lessons and
themes from the community engagement
process are detailed in the subsequent
section.
13 Community Engagement
Richmond Bicycle and Pedestrian Action Plan
Phase 1: Existing Condition (Fall 2021–Winter 2021-22)
Project Website and Interactive Webmap
As previously noted, the City promoted community engagement for the LRSP and BPAP projects under the unified Travel Safe Richmond project. The project website, TravelSafeRichmond.org, provided an overview of both planning projects and their shared goals. The website promoted events for both initiatives. The website launched in September 2021 and remained active throughout the project’s life through the end of 2022. The website also included an interactive webmap requesting input from community members on where and how they bike. The webmap allowed community members to provide location-specific comments on existing walking and bicycling facilities and other locations throughout Richmond where they had safety, access, or connectivity feedback. During the first engagement phase, users provided 209 comments on the webmap, as well as 240 likes/ dislikes from fellow community members. Over 1,100 community members visited the website in Phase 1.

BPAC Meetings
Throughout the development of the BPAP, City staff provided regular updates on the progress of the Plan and coordinated feedback between the BPAC and the Plan team. In addition to periodic updates, the project team presented to the Committee during their January 2022 meeting. The team presented the health and equity analysis and shared feedback heard at the first community workshop.

This Map shows the locations of community
member comments on the phase one
interactive webmap.

Community Engagement Activities
14 Community Engagement
Richmond Bicycle and Pedestrian Action Plan
Dani Lanis from Rich
City Rides presenting
to Coronado
Neighborhood Council
in April 2022.

Rich City Rides conducting a demonstration of the interactive webmap for the Hilltop Neighborhood Council in April 2022
Neighborhood Council Meetings
Rich City Rides was brought on as a member
of the project’s community engagement
team to help support the City’s efforts to
deepen community engagement. Leveraging
their deep ties to the Richmond community
and other local organizations, Rich City Rides
led the coordination and engagement with
12 neighborhood councils.

During Phase 1 of public engagement, Rich
City Rides met with five neighborhood
councils. Rich City Rides met with the
following groups:
• L
aurel Park Neighborhood Council
• S
anta Fe Neighborhood Council
• P
ark Plaza Neighborhood Council
• C
oronado Neighborhood Council
• H
illtop Neighborhood Council
These meetings promoted awareness of the
project and encouraged community members
to visit the project website to leave their
comments on the webmap or contact form.
15 Community Engagement
Richmond Bicycle and Pedestrian Action Plan
The project team presenting on the Safe System Approach during the first workshop.

Pop-up Event
As part of the LRSP, the project team hosted
a community pop-up event at Cafecito con
Claudia on September 25, 2021. This pop-up
event was the official launch of the Travel
Safe Richmond initiative. In addition to
promoting the launch of the project website
and interactive webmap, the pop-up also
provided an overview of roadway safety
conditions in Richmond, discussed a safety-
focused vision for Richmond, and showcased
the preliminary collision profiles and their
countermeasures.

Community Workshop
The City hosted a virtual community
workshop on the evening of Wednesday,
December 8, 2021. An interactive
presentation anchored the workshop with
live polling and opportunities to engage
with community members throughout the
presentation. During the presentation,
the project team provided an overview
of Travel Safe Richmond initiative (LRSP
and BPAP), included a short demo of
the project website and interactive map,
summarized the health and equity analyses,
and reviewed the existing bicycle and
pedestrian networks. The project team also
provided a brief presentation on the LRSP,
creating an opportunity for attendees to ask
questions and share feedback about the
project’s safety-centered vision. Twenty-six
community members attended the workshop
and provided comments on the initiative and
respective plans.

One of the interactive word clouds during the first community workshop.

This word cloud had 65 responses.
16 Community Engagement
Richmond Bicycle and Pedestrian Action Plan
The interactive webmap with draft project recommendations. The map shows bicycle lanes (colored lines) and spot improvements (blue points).

This spot recommendation on Harbour Way has two likes from community members.

Project Website and Interactive Webmap
Following the development of draft recommended improvements, the project team updated the website to show draft pedestrian and bicycle recommendations. Community members and local stakeholders were asked to comment on, like, or dislike draft project recommendations. Interactive map users were also asked to indicate additional locations for the project team to consider for improvements to the existing bicycle and pedestrian networks. In phase two, project recommendations were liked and disliked 171 times and were commented on 20 times. Thirty-five additional comments for additional projects were left on the webmap by the community. Over 600 people visited the website in Phase 2.

BPAC Meetings
City staff continued to provide regular updates to the Bicycle and Pedestrian Advisory Committee (BPAC) on the BPAP and LRSP projects throughout this engagement phase. During the BPAC’s April 2022 meeting, the project team presented draft project recommendations and requested feedback from the committee on ways to improve/enhance the proposed improvements. The project team was also available to answer any questions by members of the BPAC on the recommended network. The City used feedback received from BPAC members to enhance the proposed improvements.

Phase 2: Project Recommendations (Winter 2021/22–Summer 2022) 17 Community Engagement
Richmond Bicycle and Pedestrian Action Plan
Rich City Rides presenting to the North and East Neighborhood Council in May 2022 .

Neighborhood Council Meetings
Rich City Rides continued to meet with neighborhood councils in Phase Two of the engagement portion of the project. These meetings continued to raise awareness of the project and focused on soliciting feedback on draft project recommendations through the interactive webmap. As Rich City Rides could not meet with every Neighborhood Council, the project team prioritized meeting with the Richmond Neighborhood Coordinating Council (RNCC) as an opportunity to help spread the word about Travel Safe Richmond to every council.

Rich City Rides met with the following Neighborhood Councils during Phase 2:
• R
ichmond Neighborhood Coordinating Council
• N
orth and East Neighborhood Council
18 Community Engagement
Richmond Bicycle and Pedestrian Action Plan
Pop-Up Events
The BPAP was promoted at two pop-up
events during engagement phase two. The
pop-up events were:
• 2
3rd Street Bridge Project, April 2022
(Design charette).
• U
nity Park Earth Day Event, April 2022
(Shared event with RichCityRides)
The Earth Day event also included large
plotted maps with project recommendations
and informational boards that community
members could comment on.

Community Workshop
On the evening of Wednesday, May 18,
2022, the City hosted an in-person, outdoor
community workshop at Richmond Civic
Center Plaza. The workshop was hosted in
the central plaza and was organized around
several stations. Stations included welcome/
check-in, bicycle recommendations,
pedestrian recommendations, project
prioritization, and the LRSP. Attendees
reviewed informational boards and other
project materials and provided comments
on project recommendations, proposed
project prioritization, and the draft LRSP.

Ten community members attended the
workshop, and provided over 30 comments. Workshop attendees provided feedback
on draft pedestrian
recommendations
at the May 2022
outdoor workshop.
19 Community Engagement
Richmond Bicycle and Pedestrian Action Plan
The City is currently conducting the final
phase of public outreach which will include
updates to the website including an online
interactive comment tool, five additional
neighborhood council meetings, and a virtual
community workshop.

What We Heard
Across all community engagement phases
and events, comments and feedback from
community members generally fell into four
categories:
• S
afety
• C
onnectivity
• S
afe routes to school
• M
aintenance
A summary of the feedback for each theme
is provided below:

Safety
• R
educing the speed of vehicular traffic
across the City.
• I
mplementing traffic calming on
residential streets would improve safety
for all, especially for people walking,
biking, and rolling.
• H
ighway interchanges represent a
significant safety and connectivity
barrier.
• R outes to community destinations like
parks and schools need to be safe for
people of all ages and abilities
• S
treet lighting needs to be improved
across the City.
» I
mproved lighting can improve both
traffic safety and perceptions of
personal safety.
» I
mproved lighting can also benefit
trails and trail users.
• R
educing the likeliness of multi-threat
collisions (i.e., crossing multilane
roads at uncontrolled locations) will
significantly improve the safety and
comfort of people crossing large
arterial or collector streets.

Connectivity
• R
ichmond residents believe the City
feels disconnected, and there is a lack
of comfortable north-south routes to
cross the City.
• M
ajor arterial streets and freeways (ex.,
San Pablo Avenue, Carlson Boulevard,
Giant Highway, I-580, I-80) act as
barriers and limit connections across
them.
• C
ommunity members want safer, more
comfortable, and easier access to
local community-serving destinations,
including parks, schools, libraries, the
waterfront/trails, and transit like BART.

Phase 3: Draft Plan–Fall-Winter 2022 (UPCOMING)
City resident walking along Wellness Trail
20 Community Engagement
Richmond Bicycle and Pedestrian Action Plan
Safe Routes to Schools
• I
mproving walking, rolling, and bicycling access to schools should be a priority.
• C
oordination with school stakeholders, parents, and staff to provide a more holistic approach to safe routes to schools should be a focus.

Maintenance
• Sid
ewalks should be kept clean and repaired when needed.
• T
rails and walking paths should be kept clear of debris and obstructions.
• T
rails should be kept clear of dumping sites.

Corridors and Intersections
In addition to these four themes, community members provided comments and suggestions for improvements along and across roads in Richmond. Across all engagement methods, community members consistently nominated several corridors and intersections for safety improvements. Those corridors included:
• 23
rd Street
• B
arrett Avenue
• C
arlson Boulevard
• Cu
tting Boulevard
• M
acdonald Avenue
• R
ichmond Wellness Trail
• S
an Pablo Avenue
The most frequently noted intersections by the community were:
• 23
rd Street/Carlson Boulevard/Broadway
• 23
rd Street/Garvin Avenue
• R
ichmond Greenway Gap Closure
• I
-580/Marina Bay Parkway
Richmond Wellness Trail
21 Community Engagement
Richmond Bicycle and Pedestrian Action Plan
Bicycle Recommendations
03 Chapter
Bicycle Recommendations
Richmond’s proposed network provides
increased connectivity between destinations
through low-stress facilities that are
comfortable for all ages and abilities. The
proposed improvements include shared-use
paths (Class I), bicycle lanes (Class II) and
buffered bike lanes (Class IIB), bicycle
routes (Class III), bicycle boulevards (Class IIIB)
and separated bikeways (Class IV). The
proposed network focuses on providing
increased connectivity and safety with
particular attention to areas surrounding
schools, key community destinations and
increased connectivity to BART and other
regional destinations.

Based on the needs, opportunities, and
challenges identified through the existing
conditions analysis, the project team
developed recommendations through an
iterative process with both City staff, local
stakeholders, and the community. This
chapter describes recommended bicycle
projects and provides informational toolkits
describing the recommended infrastructure.

The proposed improvements included in
this plan serve as a foundation to create
successful, well-used, and safe spaces for
people bike and roll.

The recommendations
in this chapter are for
planning purposes only.

Recommendations may
be altered depending on
opportunities, constraints,
and/or roadway changes.

Feasibility determination, final
design, accessibility, funding,
and implementation of any
recommended improvements
is the responsibility of the
appropriate governing agency.
23 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan
Class I – Shared-use Path
Dedicated paths for walking and bicycling that are completely separated from the roadway.

Class II – Bicycle Lane
Striped lanes for bicyclists located against the curb or next to a parking lane.

A shared-use path
(trail) that is part of the
Bay Trail.

A bike lane on 37th
Street.

Bicycle Facility Toolkit
This toolkit includes brief descriptions of
recommended facility types within the Travel
Safe Richmond Bicycle and Pedestrian
Action Plan. The treatments offered herein
offer a range of options stemming from
current best practices and established
guidance at the state and national levels.

This toolkit intends to serve as a flexible
menu of options for developing and refining
project recommendations. For more detailed
information and specific design guidance,
see the Design Guidelines technical
document in Appendix B .
24 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan
Class III – Bicycle Route
Signed routes for bicyclists where lanes
are shared with motorists. Streets are
designated as bike routes because they are
suitable for sharing with motor vehicles and/
or provide better (or needed) connectivity
than other streets. Routes are marked with
signs and/or shared lane bicycle pavement
markings (also known as “sharrows”) to alert
motorists to expect to share this roadway
with bicyclists. The placement of the
sharrow marking delineates the position in
the lane where bicyclists are expected to be
so they are clear of car door zones and other
potential conflict areas.

Class IIIB – Bicycle Boulevard
Bicycle routes on low-speed, low-volume
streets that are further enhanced with traffic
calming features or other treatments to
prioritize bicyclist comfort. Slowing vehicles
down and improving intersection safety also
makes walking and rolling on these streets a
more comfortable and enjoyable experience.

Bicycle route markings on Key Boulevard.Buffered bike lane on 37th Street. Bicycle boulevard pavement markings on Nevin Avenue.

Class IIB – Buffered Bicycle Lane
Bicycle lanes with a striped “buffer” area
either between the bicycle lane and the
travel lane or between the bicycle lane and
parked cars (sometimes in both places).
25 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan
Bicycle Boulevard Toolkit
Unlike other classifications of bicycle
facilities, bicycle boulevards are unique
in that there are no specific standards or
treatments. Bicycle boulevards can be
implemented in various ways to achieve
streets where bicycle travel is more
comfortable sharing with cars. There are
three primary categories of improvements:
• S
igns and pavement markings
• V
ehicle speed management
• V
ehicle volume reduction
Individual projects will be analyzed to
determine the treatments that best reflect
the solutions that will bring about the highest
increase in bicyclist comfort and safety
while respecting and coordinating with
the needs and desires of nearby residents
and stakeholders. Treatments will vary
from simple signage and striping only to
more advanced intersection redesigns.

This plan does not provide specific
infrastructure treatment recommendations
for the individual bicycle boulevard
recommendations.

Additional details on the three treatment
categories previously mentioned can be
found in the following pages.

Signs and Pavement Markings
Pavement Markings
Bicycle boulevards can have unique “BIKE
BLVD” pavement markings to reinforce that
the street is a shared space for bicycles and
vehicles. These pavement markings can
also include high-visibility green backing
to increase driver visibility and awareness
further.

Wayfinding Signs
Wayfinding is an essential component of
the overall bicycle network (discussed in
a subsequent section) but plays an even
more significant role on bicycle boulevards.

Bicycle boulevards can weave through
neighborhoods, increasing the importance of
the signs to help users complete their trips
on the network. Wayfinding can also raise
awareness of the presence of the bicycle
boulevard, potentially generating new users.

Bicycle Boulevard pavement markings on Nevin Avenue.
26 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan
Vehicle Speed Management
Reduce Speed Limit
In some areas, especially around schools,
reducing the speed limit below 25 MPH
may be a helpful strategy in slowing cars
and making bicyclists and pedestrians more
comfortable in the corridor.

Neighborhood Traffic Circle
Neighborhood traffic circles are an
alternative intersection treatment to a signal
or stop sign, and traffic circles can regulate
traffic flow while adding a calming element.

Curb Extensions
These improvements extend the curb
into the street and improve visibility at
intersections, slow vehicular turning speeds,
and providing additional, consolidated
queueing space. When implemented on
streets with bicycle facilities, they should
be designed with slot to accommodate the
bicycle lane.

Chicanes
Chicanes add gentle curves to otherwise
straight streets. Adding curves to the road
can slow car traffic by narrowing the travel
lane and force drivers to slow down going
around corners. The lane adjustments
can be created with striping or offset curb
extensions/landscaping.

Bicycle boulevard wayfinding signs on the
18th Street and 19 th Street bike boulevards.

A painted curb extension with separated
space for bicyclists next to lake Merritt BART.

A chicane on a Berkeley bicycle boulevard.
27 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan
Pinch Points
A pinch point narrows available roadway
width with two curb extensions. Limiting
the available width creates a narrow road
environment where drivers drive slower.

Installing trees in these areas can further
narrow the profile of the road.

Speed Bumps/Speed Humps/Speed
Cushions
Speed bumps (and similar devices) are
undulations that span the width of the
roadway and encourage cars to slow down.

Speed bumps can be designed with slots for
emergency vehicles to use.

Vehicle Volume Reduction
Partial street closures, diagonal diverters,
and median diverters are variations of ways
to partially close off streets to vehicles while
maintaining pedestrian and bicycle access.

These can be useful for forcing drivers
to stay on arterial and collector streets,
reducing cut-through traffic.

Class IV Separated Bikeways
On-street bicycle facilities with a physical
vertical barrier between the bicycle space
and motor vehicle lanes, including bollards,
curbs, or parking.

A two-way separated bikeway on Ohio Avenue.

A partial pinch point on Nevin Ave
near City Hall.

A diagonal diverter at Virginia/15 th Street.
28 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan
Road Diets
A road diet is generally described as a
reconfiguration of travel lanes to utilizing the
space for other uses and travel modes. This
usually requires the removal of a travel lane
which allows the roadway cross section to be
reallocated for other uses such as bike lanes,
pedestrian refuge islands, transit uses, and/
or parking. These roadway reconfigurations
offer many high-level benefits including
enhanced safety, mobility, and access for all
road users, and create a complete streets
environment along the corridor. These
benefits include:
2 • C
rash reduction rates between 19-47%
• R
educed vehicle speeds
• I
mproved mobility and access for all
road users
• B
etter integration of the roadway into
surrounding land uses
Conflicts between high-speed through
traffic, left-turning vehicles, and other
road users that are more prevalent on
traditional multilane roadways can lead
to relatively higher crash frequencies
compared to roadways that have been
reconfigured. These reconfigurations allow
cities to integrate additional pedestrian
and bicycle facilities along these corridors.

Right-sizing roads with excess space, can
create a solution that addresses safety
concerns and benefits for all road users.

These reconfigurations can also be cost-
effective when combined with already
planned roadway reconstruction or overlay
(repaving and restriping) projects. Changing
a road’s configuration can sometimes
impact neighboring streets. During the
design phase of a road diet project, project
elements can be added to reduce and
mitigate impacts on neighboring streets to
reduce and control cut-through and other
diverted traffic.

Several recommended improvements
included in this Plan will require some form
of lane reconfiguration due to existing
roadway and environmental constraints.

Please note implementation of any road diets
will require additional engineering study
and community engagement before moving
forward. Impacts to local traffic patterns
should also be assessed when considering
these roadway reconfigurations.

An example of a typical -3to4- lane conversion road diet. Image: FHWA.

2. Evaluation of Lane Reduction ”Road Diet“ Measures on Crashes, FHWA-HRT-10-053, (2010). 29 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan
Recommended Improvements
This plan recommends over 80 miles of
new or upgraded bicycle facilities across
Richmond, building on the existing 114.1-
mile network. Table 3 provides an overview
of existing and recommended bicycle
facilities by bikeway classification, and
Table 4 (page 34) lists individual projects.

Recommendations are shown in Figures 6-8
on the following pages.

These improvements focus on closing
existing gaps in the City of Richmond’s
network; providing key access to local and
regional community destinations (schools,
parks, transit, etc.); and improving the health,
equity, and safety of Richmond. A clear
pattern emerged around certain hubs of
activity, and this plan strives to make those
getting to those destinations safer, more
accessible, and more comfortable for people
of varying ages and abilities.

Multiple factors were considering in the
development of recommended bicycle
improvements for a specific corridor. Some
of these factors, presence of schools
and collision history for example, were
considered when recommending facilities
that provide increased modal separation
and traffic calming. Other factors like
Table 03
E
xisting and Proposed Bikeways
Note: Total miles account for 11.6 miles of upgraded facilities.

BIKEWAY CLASSIFICATION EXISTING (MI) PROPOSED (MI) TOTAL (MI) Class I - Shared-use Path 49.9 10.2 63.9
Class II - Bicycle Lane 40.7 14.0 49.3
Class IIB - Buffered Bicycle Lane 6.1 0.9 6.5
Class III - Bicycle Route 10.1 7.1 7.2
Class IIIB - Bicycle Boulevard 3.4 31.5 41.8
Class IV - Separated Bikeway 3.9 20.6 24.7
Total 114.1 84.3 189.6
traffic volumes and roadway widths which
negatively impact people bicycling, were
also considered. Based on an examination
of these factors, many of the recommended
improvements include Class IIB bicycle
boulevards and Class IV separated bikeways.

While sometimes more challenging to
implement, these two bikeway types provide
the greatest comfort and safety benefits
for people biking. These recommendations
create a connected lower-stress network
with facilities that serve people of all ages
and abilities.
30 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan

PROPOSED

BIKEWAYS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/3/2022.

EXISTING BICYCLE

FACILITIES
Class I Shared-Use Path
Class II Bicycle Lane
Class III Bicycle Route
Class IV Separated
Bikeway
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
!
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
! !
!
!!!
!! !
! !
!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80
¥80

EL CERRITO
PINOLE
SAN
PABLO
ALBANY

BERKELEY
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

KENSINGTON

MONTALVIN
MANOR
NORTH

RICHMOND

ROLLINGWOOD
TARA

HILLSSAINT

JO SEPH

CEMETERY

MIL L ER-KNOX

REG IO NAL

SHO REL INE
PO INT

PINO L E REG

SHO REL INE

SO BRANTE

RIDG E REG

PRESERVE

RICHMO ND

CO UNTRY
CLUB

TIL DEN

REG IO NAL
PARK

TIL DEN

NATU RE

STU DY AREA

WILDCAT CANYON

REGIONAL PARK

KENNEDY

G ROVE REG

REC AREA

SAN PABLO

RESERVO IR

REC AREA

PINO L E PARK

MIRA VISTA

COUNTRY CLUB
& GOLF

HILLSIDE

NATU RAL
AREA

ROLLIN G
HIL LS

MEMO RIAL
PARK

CASTRORANCH RD

PINE AVE

SAN PABLO AVE
7THST ANDRADE AVE

GARRARD

BLVDTEWKSBURY AVE CARLSON BLVD

FLORIDA AVE

PARKRIDGEDR
PA

RKSIDE DR

HIL LTOP
M
ALLRD

REGAT TA
BLV
D

AUTO PLZ
6TH ST

RHEEM AVE

MCBRYDE AVE

KEITHDR

MAINE AVE

BAY VI EW
AVE

HILLTOP DR
BLUME
DR

VIEW DR

HILLVIEW DR

FOOTHILLAVE
SH
ANE
DR

SANTARITARD

COSTA AVE

VALLEYVI
EW
RD
GIA
NT
HWY

MACDON ALD AV E
COLL
INS A
VE

HENSLEY ST
RICHMO
NDAV
E

MARINA WAY

BUSH AVE
MARI
N
A
BAY
PKW
Y

CUTTING BLVD
23RD ST
47 TH
ST
16TH ST
4TH ST

HALL AVE

VIRGINIA AVE

BISSELL AVE

LINKSDR

GARVIN AVE
RO
CK
ROSE
WAY

POTRERO AVE
45TH ST
SCEN
ICAV E
WEST
ERNDR
35TH ST
LAKES
IDE DR
MEAD
EST
PA
RK

CEN TRAL

WRIGHT AVE

ATLAS RD
22ND ST
37TH ST

VIA VERDI
PAIN

TEDPONY RD

OHIO AVE

RIPLEY AVE
20TH ST
MOYERS
RD

LUCAS AVE
8TH ST

GRANT AVE
CURRY
ST
MAY RD
38TH ST
KEY
BLVD

SAN MATEO ST
33RD ST

ROOSEVELT AVE

GOODRICK AVE

TEHAMA A
VE
FR
AN
W
A Y

ESMOND AVE

WALL AVE

NEVIN AVE
SAN J
O
AQU
IN ST

MONTEREY ST
13TH ST
SEL
MIGRV
52ND ST

GROOM DR
24TH ST26TH ST

CHANSLOR AVE CARLSTO
N ST
34TH ST

CLINTON AVE
25TH S
T
AME
NDRD

LOWELL AVE
30TH ST
55TH ST

BUCKBOARD W
AY

CARRIAGEDR

ALAMO AVE
28TH ST

SHELDON DR
42ND ST

HEAVENLY RIDGE LN

BERK AVE

MORNING SIDE
DR
COACH
DR
11TH ST

MARICOPA AVE
PAR
K
RIDGE
D
R
SIERRA
AVE
12TH ST
W
ISW
ALL
DR

JENKINS WAY
DUKE
AVE
SAN

LUIS ST
36TH
ST
15TH ST
18TH ST

OVEREND AVE
57TH ST

CE RRO SUR
56TH
ST
B ST

AMADOR ST

CENTER AVE

PARKE R RD
17TH ST
3RD ST
1ST ST

SANFORD AVE
2ND ST

KL OSEW
AY
KI
PLING
DR

JOANNDR
49TH ST
NELSO
NDR
9TH ST
19TH ST

COALINGA AVE
40TH ST
39TH ST
21ST ST 31ST ST

WOOD GLENDR
32ND ST

GAYNOR AVE

YUBA STKERN ST

LASSEN ST
ROCKY
RD

GILMA DR
DORNA
NDR

BARRETT AVE
HA
RBOU
R W
AY

FASCINATION
CI R

CO NTRA
CO STA

COLLE GE
0 0.5 1 MILES
San Francisco Bay

PROPOSED BICYCLE

FACILITIES
Class I Shared-Use Path
Class II Bicycle Lane
Class IIB Buffered Bicycle
Lane
Class III Bicycle Route
Class IIIB Bicycle
Boulevard
Class IV Separated
Bikeway
Figure 06 P roposed Bicycle Improvements
31 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan

PROPOSED

BIKEWAYS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/3/2022.

EXISTING BICYCLE

FACILITIES
Class I Shared-Use Path
Class II Bicycle Lane
Class III Bicycle Route
Class IV Separated Bikeway
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
!
!
!! !
!
!!
!
!
!
!
!!
!!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80

EL CERRITO
SAN
PABLO
EAST

RICHMOND

HEIGHTS
NORTH

RICHMOND

MIL L ER-KNOX

REG IO NAL

SHO REL INE

WILDCAT CANYON

REGIONAL PARK

BOOK E R T

ANDERSO N JR

U NITY PARK

SAN PABLO AVELINCOLN AVE

CUTTING BLVD
HELLINGS AVE7THST ANDRADE AVE
2ND ST

CARLSON BLVD

REGATTA BLVD
6TH ST

RHEEM AVE

MAINE AVE

CUTTING BLVD

BAYVIEW
AVE

ESMOND AVE

HARTNETT

AVEMARI
NA BAY
PKWY
47TH ST

FOOTHILLAVE

COSTA AVE

MCBRYDE AVE

MEEKER AVE

MACDONALD AVE

HENSLEY ST

MARINA WAY
MACDONALD AVE 23RD ST8TH ST
16TH ST

MORAN AVE

PENNSYLVANIA AVE

POTRERO AVE

HARBOUR WAY
4TH ST

HALL AVE

TULARE AVE

GARVIN AVE
45TH ST

PINE AVE
44TH ST

WHARF ST
35TH ST

MEADE S
T

WRIGHT AVE
BROAD
WAY
22ND ST
37TH ST

PENINSULADR
41ST ST

OHIO AVE

RIPLEY AVE
20TH ST

LUCAS AVE

FLEMING AVE

GRANT AVE

CURRY ST
38TH ST
KEY
BLVD
59TH ST

SAN MATEO ST
BURBECK AVE10TH ST

ROOSEVEL T AVE

EGRET WAY

TEHAMA AVE

MOUNTST

DOWNER AVE
POR
TOLA A
VE
33RD ST
SA
N

JOAQUIN S
T
34TH ST

MONTEREY ST

MERCED ST
13TH ST
52ND ST
DIMM
ST
24TH ST
26TH ST

CHANSLOR AVE
CAR
LST
ON
ST

YUBA ST
28TH ST

WALL AVE

CLINTON AVE
COLLIN
SST

WILSON AVE

HOFFMAN BLVD

LOWELL AVE
30TH ST

VAN FLEET AVE
55TH ST

SANTA CLARA ST
56TH ST

AMADOR ST
13TH ST
HU
M
BOLDT
ST

VIRGINIA AVE
HINKLE
Y AVE

ALAMO AVE

FALL AVE

NEVIN AVE
42ND ST

ESPEE AVE
21ST ST

BERK AVE
CANAL
BLVD
11TH ST
SO
NOM
A
ST

BURLINGAME AVE

SIERRAAVE
M

CLAUGHL
IN
ST

SOUTH ST

BE RK PL
12TH ST
SAN

LUIS ST
36TH ST
15TH ST

OVEREND AVE
57TH ST
B ST

DUBOCE AVE

CENTER AVE
17TH ST
3RD ST
1ST ST

MARICOPA AVE

SANFORD AVE

WILLARD AVE

FLORIDA AVE
50TH ST
27TH ST29TH ST
49TH ST

COLUMBIA AVE

OHIO AVE

FRESNO AVE

HUMPHREY AVE
9TH ST

DUNN AVE
18TH ST
C ST
19TH ST

COALINGA AVEFACTORY
ST

WALLER AVE
40TH ST39TH ST

CREELY AVE
5TH ST

BISSELL AVE
31ST ST

VISALIA AVE
32ND ST

GATELY AVE
43RD ST
25TH ST

GAYNOR AVE

WENDELL AVE
46TH ST

KERN ST
LASSEN
ST

VENTURA ST

SPRING ST
58TH ST

BELL AVE

STEGE AVE

TAFT AVE

BARRETT AVE
0 0.5 1 MILES

PROPOSED BICYCLE

FACILITIES
Class I Shared-Use Path
Class II Bicycle Lane
Class IIB Buffered Bicycle
Lane
Class III Bicycle Route
Class IIIB Bicycle Boulevard
Class IV Separated Bikeway

CENTRAL CORE

CENTRAL
CORE
Figure 07 P roposed Bicycle Improvements (central core) 32 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan

PROPOSED

BIKEWAYS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/3/2022.

EXISTING BICYCLE

FACILITIES
Class I Shared-Use Path
Class II Bicycle Lane
Class III Bicycle Route
Class IV Separated Bikeway
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
!
!
! !
!
!
!!
Ä4
¥80
¥80

EL CERRITO
PINOLE

SAN PABLO
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

MONTALVIN
MANOR

ROLLINGWOOD
TARA
HILLS
SAINT

JO SEPH

CEMETERY

PO INT PINO L E
REG

SHO REL INE

SO BRANTE

RIDG E REG

PRESERVE

RICHMO ND

CO UNTRY
CLUB

WILDCAT CANYON

REGIONAL PARK

KENNEDY

G ROVE REG

REC AREA

SAN PABLO

RESERVO IR

REC AREA

PINO L E PARK

ROLLIN G
HIL LS

MEMO RIAL
PARK

CAST RORANCHRD

PINE AVE

ANDRADE AVE

SAN PABLO AVE

PARKRIDGEDR

PARKSIDE DR

HILLTOP
M

ALLRD AUTO PLZ

RHEEM AVE

MCBRYDE
AVE

KEITHDR

BARRETT AVE

ESMOND AVE

HILLTOP DR
BLUME
DR

VIEW DR

HILLVIEW DR

SHANE D
R

SANTA R
ITARD

COSTA AVE

VALLEYVIEW
RD
GIA
NT
HWY

MACDONALD AVE

COLLINS AVE
23RD ST

TULARE AVE
LIN
KS DR
29TH ST
RO
CKROSE
WAY
35TH ST
LAKES
IDE DR
PARK

CENTRAL

ATLAS RD
22ND ST

VIA VERDI
PAIN

TEDPONY RD
MOYERS
RD

GRANT AVE
MAY RD
38TH S
T
FRA
N
WA Y

ROOSEVEL T AVE

DOWNER AVE

NEVIN AVEBISSELL AVE
34TH ST

SELMIGRV

GROOM DR
30TH ST
24TH ST26TH ST
20TH ST
AME
NDRD

LOWELL AVE
19TH ST

AMADOR ST

BUCKBOARD W
AY

CARRIAGEDR
28TH ST

SHELDON DR HEAVENLY RIDGE LN

MORNING SIDE DR

GARVIN AVE
COACH
DR
PARK
RIDGE
D
R
SIERRA
AVE
KEY B
LVD
W
IS
W
ALL
DR
DUKE
AVE
36T
H
ST
BAR
KLEY
DR

CE RRO SUR

LINCOLN AVE

PARKE R RD
33RD ST

KL OSEW
AY

KIPLING
DR

JOANNDR

NELSONDR
17TH ST
40TH ST
39TH ST
18TH ST 31ST ST

WOOD GLENDR

GAYNOR AVE

YUBA ST

KERN STLASSEN ST

ROCKY RD
FA

SCINATION
CIR

CO NTRA
CO STA

COLLE GE
0 0.5 1 MILES

PROPOSED BICYCLE

FACILITIES
Class I Shared-Use Path
Class II Bicycle Lane
Class IIB Buffered Bicycle
Lane
Class III Bicycle Route
Class IIIB Bicycle Boulevard
Class IV Separated Bikeway

NORTH RICHMOND
NORTH

RICHMOND
Figure 08 P roposed Bicycle Improvements (North Richmond) 33 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES
13th St Harbour Way Costa Ave / City Boundary Class IV Separated Bikeway 0.60 15th St Roosevelt Ave Costa Ave Class IIIB Bicycle Boulevard 0.72 16th St Macdonald Ave Livingston Ln Class IV Separated Bikeway 0.01 16th St Nevin Plaza Richmond Greenway Class IIIB Bicycle Boulevard 0.08 20th St Espee Ave Potaro Ave Class IIIB Bicycle Boulevard 0.67 22nd St Brooks Ave Bissell Ave Class II Bicycle Lane 0.49 23rd St Brooks Ave Maricopa Ave Class II Bicycle Lane 0.66 23rd St Broadway Brooks Ave Class II Bicycle Lane 0.61
23rd St Overcrossing Richmond Greenway Richmond Greenway Class I Shared-Use Path 0.11 24th St Maricopa Ave Downer Ave Class IIIB Bicycle Boulevard 0.53 25th St Grant Ave Downer Ave Class II Bicycle Lane 0.12 25th St Macdonald Ave Roosevelt Ave Class IIIB Bicycle Boulevard 0.30 27th St Broadway Grant Ave Class IIIB Bicycle Boulevard 0.45 29th St Howard St Garvin Ave Class IIIB Bicycle Boulevard 0.66 2nd/ S 2nd St I-580 Pennsylvania Ave Class IIIB Bicycle Boulevard 1.05 30th St Garvin Ave Nevin Ave Class IIIB Bicycle Boulevard 0.55 43rd St Macdonald Ave Wilson Ave Class IIIB Bicycle Boulevard 0.42 45th St Nevin Ave Macdonald Ave Class IIIB Bicycle Boulevard 0.08 6th St Maine Ave Ripley Ave Class III Bicycle Route 0.73 7th St 7th St bike lane Lincoln Ave Class III Bicycle Route 0.10 7th St Barrett Ave Ripley Ave Class II Bicycle Lane 0.13 Alamo Ave Cherry St City Boundary (North Richmond) Class IIIB Bicycle Boulevard 0.45 Table 04 B icycle Recommendations (alphabetical order)
34 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES
Amador Street McBryde Ave Clinton Ave Class III Bicycle Route 0.51 Barrett Ave 19th St 22nd St Class II Bicycle Lane 0.20
Barrett Ave 19th St Marina Way Class IV Separated Bikeway 0.21 Barrett Ave San Pablo Ave Key Blvd Class II Bicycle Lane 0.11 Barrett Ave 43rd St 45th St Class II Bicycle Lane 0.07
Barrett Ave A St 7th St Class IIIB Bicycle Boulevard 0.34 Bay Trail Extension: Point Pinole -
San Pablo Bay Regional Shoreline Existing Bay Trail Existing Bay Trail Class I Shared-Use Path 1.02 Bay Trail Extension: Miller-Knox
Regional Shoreline Existing Bay Trail near Dornan Dr Existing Bay Trail near Brickyard Cove Rd Class I Shared-Use Path 0.40 Bayside Dr Marina Bay Pkwy Traffic circle Class II Bicycle Lane 0.15 Bayview Ave Seaport Ave S 55th St Class IIB Buffered Bicycle Lane 0.36
Bayview Ave Seaport Ave S 55th St Class IV Separated Bikeway 0.36 Berk Ave - S 49th St Cutting Blvd Cutting Blvd Class IIIB Bicycle Boulevard 0.78 Bissell Ave Richmond Parkway Espee Ave Class IIIB Bicycle Boulevard 1.29 BNSF Easement near Railroad Ave
(not acquired yet) Richmond Ave Washington Ave Class I Shared-Use Path 0.23 Brickyard Cove Rd Dornan Dr Sandpiper Spit Class II Bicycle Lane 0.30 Canal Blvd Cutting Blvd Seacliff Dr Class IV Separated Bikeway 0.76 Canal Blvd Ohio Ave Cutting Blvd Class IV Separated Bikeway 0.38 Carlson Blvd Richmond Greenway Broadway Class I Shared-Use Path 0.07 Carlson Blvd Bayview Ave Broadway Class IV Separated Bikeway 1.81 Carlson Blvd Bayview Ave Tehama Ave Class IIB Buffered Bicycle Lane 0.49
Table 04 Bicycle Recommendations (alphabetical order) (continued). 35 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES
Center Ave Carlson Blvd S 41st St Class IIIB Bicycle Boulevard 0.76 Central Ave Jacuzzi St Pierce St Class I Shared-Use Path 0.10 Central Ave Existing Bay Trail Rydin Rd Class I Shared-Use Path 0.02 Cerrito Ave - 38th St 37th St Solano Ave Class IIIB Bicycle Boulevard 0.22 Chanslor Ave 2nd St 8th St Class IIIB Bicycle Boulevard 0.32 Chesley Ave UPRR BNSF Class IIIB Bicycle Boulevard 0.10 Clinton Ave Key Blvd City Boundary Class IIIB Bicycle Boulevard 0.50 Coalinga Ave 13th St 23rd St Class IIIB Bicycle Boulevard 0.54 Cutting Blvd Hoffman Blvd Carlson Blvd Class IV Separated Bikeway 1.43 Cypress Ave S 47th St Ells St Class IIIB Bicycle Boulevard 0.21 Doran Dr Western Dr Brickyard Cove Rd Class IV Separated Bikeway 0.87 E Richmond Ave Gerrard Blvd Canal Blvd Parking Lot Cut Through Class II Bicycle Lane 0.27 El Portal Dr Near I-80 Near San Pablo Dam Rd Class II Bicycle Lane 0.18 Ells St Flemino Ave Bayview Ave Class IIIB Bicycle Boulevard 0.11 Elm St 7th St 8th St Class IIIB Bicycle Boulevard 0.05
Esmond Ave San Pablo Ave 37th St Class IIIB Bicycle Boulevard 0.12 Espee Ave Bisell Ave Trail south of Chanslor Ave Class IIIB Bicycle Boulevard 0.19 Filbert St Chesley Ave Existing Class II Class IIIB Bicycle Boulevard 0.34 Garvin Ave Portola Ave San Pablo Ave Class IIIB Bicycle Boulevard 1.57 Giant Hwy Atlas Rd Griffin Dr Class IV Separated Bikeway 0.95 Giant Hwy Collins Ave Richmond Parkway Class IV Separated Bikeway 0.33 Golden Gate Ave Ocean Ave Washington Ave Class III Bicycle Route 0.86 Table 04 Bicycle Recommendations (alphabetical order) (continued). 36 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES
Grant Ave 24th St 30th St Class II Bicycle Lane 0.32
Grant Ave 23rd St 24th St Class III Bicycle Route 0.14
Groom Dr - Wiswal Dr - Parker Rd Oxford Ave Movers Rd Class IIIB Bicycle Boulevard 1.48 Harbour Way Richmond Greenway Macdonald Ave Class II Bicycle Lane 0.31 Harbour Way Macdonald Ave Barrett Ave Class II Bicycle Lane 0.19 Hensley St Willard Ave Richmond Parkway Class II Bicycle Lane 0.40 Hilltop Dr Richmond Parkway Robert Miller Dr Class IV Separated Bikeway 0.84 Hilltop Dr Robert Miller Dr Park Central St Class IV Separated Bikeway 1.11 Hilltop Mall Rd Hilltop Mall Rd Hilltop Mall Rd Class IV Separated Bikeway 1.28 Hillview Dr Hilltop Mall Rd Hilltop Dr Class IV Separated Bikeway 0.09 Kelsey St Chesley Ave Willard Ave Class IIIB Bicycle Boulevard 0.25 Key Blvd Macdonald Ave Clinton Ave Class II Bicycle Lane 0.51 Klose Way Hilltop Mall Rd Blume Dr Class II Bicycle Lane 0.10 Lakeside Dr Richmond Parkway Research Dr Class II Bicycle Lane 0.54 Lincoln Ave 8th St 7th St Class IIIB Bicycle Boulevard 0.05 Lucas Ave Richmond Parkway Lucas Park Class IIIB Bicycle Boulevard 0.32 Macdonald Ave 16th St Key Blvd Class II Bicycle Lane 1.80 Macdonald Ave Richmond Parkway Harbour Way Class II Bicycle Lane 0.70 Macdonald Ave Harbour Way 16th St Class III Bicycle Route 0.32 Maine Ave S 12th St S 28th St Class IIIB Bicycle Boulevard 0.82 Maine Ave S 2nd St Harbour Way Class IIIB Bicycle Boulevard 0.43 Maricopa Ave 23rd St 36th St Class IIIB Bicycle Boulevard 0.77 Table 04 Bicycle Recommendations (alphabetical order) (continued). 37 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES
Marina Bay Parkway Regatta Blvd Peninsula Dr Class II Bicycle Lane 0.63 Marina Bay Pkwy Cutting Blvd Meeker Ave Class IV Separated Bikeway 0.39 Marina Bay Pkwy I-580 Meeker Ave Class I Shared-Use Path 0.16 Marina Way Richmond Greenway Waterfront / Lucretia Edwards Park Class IV Separated Bikeway 1.48 Marina Way Macdonald Ave Richmond Greenway Class II Bicycle Lane 0.30 Market Ave San Pablo city limit North Richmond city limit Class IIIB Bicycle Boulevard 0.07 May Rd Laurel Ln Valley View Rd Class II Bicycle Lane 0.66 McBryde Ave San Pablo Ave Wildcat Canyon Parking Lot Class II Bicycle Lane 0.65 McBryde Ave 23rd St San Pablo Ave Class IIIB Bicycle Boulevard 0.91 McGlothen Way - Phanor Dr - Giant
Hwy Williams Dr Point Pinole Regional Shoreline Park Class IIIB Bicycle Boulevard 0.44 Meade St Regatta Blvd Seaport Ave Class IV Separated Bikeway 0.72 Meeker Ave S 19th St Marina Bay Parkway Class II Bicycle Lane 0.26 Miraflores Greenbelt - Ohio
Connection S 45th St Miraflores Greenbelt Class I Shared-Use Path 0.10 Molate Point Bay Trail Extension Stenmark Dr Bridge Trail Class I Shared-Use Path 2.39 Morningside Dr Valley View Rd Full Moon Dr/ Thunderhead Ct Class IIIB Bicycle Boulevard 0.93 Moyers Rd - Oxford Ave -
Birmingham Dr Hilltop Dr Hilltop Dr Class IIIB Bicycle Boulevard 1.89 N Castro St Bay Trail Filbert St Class IIIB Bicycle Boulevard 0.17 Nevin Ave 27th St 45th St Class IIIB Bicycle Boulevard 0.85 Nevin Ave Richmond Parkway 8th St Class IIIB Bicycle Boulevard 0.54 Nevin Ave 8th St 11th St Class IIIB Bicycle Boulevard 0.15 Nevin Ave Marina Way 15th St Class IIIB Bicycle Boulevard 0.05 Table 04 Bicycle Recommendations (alphabetical order) (continued). 38 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan
38 Bicycle RecommendationsRichmond Local Roadway Safety Plan

STREET START END RECOMMENDED FACILITY MILES
New Shared-Use Path Lincoln Ave Garvin Ave Class I Shared-Use Path 0.14 New Shared-Use Path Bay Trail Meade St Class I Shared-Use Path 0.58 New Shared-Use Path S 28th St S 29th St Class I Shared-Use Path 0.07 New Shared-Use Path Brookside Dr Richmond Parkway Class I Shared-Use Path 1.47 Ohio Ave 17th St 23rd St Class II Bicycle Lane 0.30
Ohio Ave Harbour Way 2nd St Class IIIB Bicycle Boulevard 0.42 Park Central St Hilltop Dr Park Central Ct Class IV Separated Bikeway 0.86 Park Central St Shopping Center
Access Park Central Ct Shopping Center Class I Shared-Use Path 0.03 Pierce St Central Ave Cerrito Creek Class IV Separated Bikeway 0.23 Plaza Way S 49th St S 50th St Class IIIB Bicycle Boulevard 0.05 Point Pinole Bay Trail spur Existing Bay Trail Existing Bay Trail Class I Shared-Use Path 0.60 Point Richmond Bike Boulevard Ocean Ave Garrard Blvd Class III Bicycle Route 1.17 Point San Pablo Bay Trail extension Molate Point Bay Trail extension Point San Pedro Class I Shared-Use Path 1.63 Potrero Ave Carlson Blvd San Pablo Ave (beyond City limit) Class II Bicycle Lane 0.97 Regatta Blvd Regatta Blvd Trail Julia Wood St/Spring St Class IV Separated Bikeway 0.20 Regatta Blvd S 32nd St Robin Dr Class II Bicycle Lane 0.44 Regatta Blvd Marina Bay Pkwy S 32nd St Class II Bicycle Lane 0.37 Regatta Blvd Bay Trail / Marina Park & Green Marina Bay Parkway Class IV Separated Bikeway 0.17 Regatta Blvd Spring St Julia Woods St Class III Bicycle Route 0.11 Research Dr Hilltop Dr Lakeside Dr Class IIIB Bicycle Boulevard 0.05 Richmond Ave - Canal Blvd
connector Richmond Ave Canal Blvd Class I Shared-Use Path 0.06 Table 04 Bicycle Recommendations (alphabetical order) (continued). 39 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES
Richmond Pkwy Goodrick Ave Hilltop Dr Class IV Separated Bikeway 1.76 Richmond Pkwy San Pablo Ave Blume Dr Class IV Separated Bikeway 0.94 Robert Miller Dr Hilltop Mall Rd Hilltop Dr Class II Bicycle Lane 0.08 Robin Dr Regatta Blvd Meade St Class I Shared-Use Path 0.34 Roosevelt Ave Portola Ave 44th St Class IIIB Bicycle Boulevard 1.56 S 19th St Wright Ave Meeker Ave Class III Bicycle Route 0.10 S 2nd St I-580 Cutting Blvd Class II Bicycle Lane 0.13
S 33rd St Wall Ave Nevin Ave Class IIIB Bicycle Boulevard 0.53 S 39th St Center Ave Richmond Greenway Class IIIB Bicycle Boulevard 0.08 S 41st St Center Ave Cutting Blvd Class IIIB Bicycle Boulevard 0.33 S 45th St Richmond Greenway Wall Ave Class IIIB Bicycle Boulevard 0.22 S 47th St Potrero Ave Carlson Blvd Class II Bicycle Lane 0.28 S 47th St - Fall Ave - S 45th St -
Overend Ave - JFK Park Wall Ave Potrero Ave Class IIIB Bicycle Boulevard 0.64 S 47th St - I-580 Overpass Carlson Blvd Meade St Class I Shared-Use Path 0.08 S 49th St Wall Ave Cutting Blvd Class IIIB Bicycle Boulevard 0.17 S 51st St Seaport Ave Bay Trail Class IIIB Bicycle Boulevard 0.08 S 55th St San Joaquin St Creely Ave / City Boundary Class III Bicycle Route 0.58 S 56th St Tehama Ave Carlos Ave / City Boundary Class III Bicycle Route 0.64 Sacramento Ave San Pablo Abe San Luis St Class IIIB Bicycle Boulevard 0.41 San Joaquin St Central Ave Imperial Ave Class III Bicycle Route 0.83 San Luis St Central Ave Carlson Blvd Class III Bicycle Route 0.75 Table 04 Bicycle Recommendations (alphabetical order) (continued). 40 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES
San Pablo Ave Natalie Ct (City Boundary) Macdonald Ave (City Boundary) Class IV Separated Bikeway 1.34 San Pablo Ave Hilltop Dr La Puerta Dr Class II Bicycle Lane 0.57 San Pablo Ave Hilltop Dr Richmond Pkwy Class IV Separated Bikeway 0.37 San Pablo Dam Rd Near Martins Ln Near Martins Ln Class IV Separated Bikeway 0.06 San Pablo Dam Rd El Portal Dr City Limits Class IV Separated Bikeway 0.07 Shane Dr Hilltop Mall Rd Hilltop Dr Class IV Separated Bikeway 0.12 Solano Ave 38th Ave City Boundary Class IIIB Bicycle Boulevard 0.71 Southside Park Trail extension S 7th St Cutting Blvd Class I Shared-Use Path 0.11 Southside Park Trail west extension S 3rd St S 2nd St Class I Shared-Use Path 0.06 Spring St S 29th St Regatta Blvd Class IIIB Bicycle Boulevard 0.52 Sutter Ave San Luis St San Pablo city limit Class IIIB Bicycle Boulevard 0.42 Tehama Ave Carlson Blvd City Boundary (El Cerrito) Class IIIB Bicycle Boulevard 0.40 Tewksburry Ave Santa Fe Ave Washington Ave Class IV Separated Bikeway 0.10 Valley View Rd City Boundary (El Sobrante) Pine Hill Dr Class IV Separated Bikeway 0.78 Wall Ave S 41st St S 49th St Class IIIB Bicycle Boulevard 0.40 Wall Ave S 39th St S 41st St Class I Shared-Use Path 0.09 Wall Ave S 33rd St John F. Kennedy Park Class IIIB Bicycle Boulevard 0.34 Washington Ave Casey Dr Richmond Ave Class III Bicycle Route 0.25 Wildcat Creek Trail Gap Closure Existing trail (North Richmond) Existing trail (near Hubert Park - San Pablo) Class I Shared-Use Path 0.34 Wilson Ave McBryde Ave 44th St Class IIIB Bicycle Boulevard 0.70 Wright Ave Marina Way S 19th St Class II Bicycle Lane 0.24 Table 04 Bicycle Recommendations (alphabetical order) (continued). 41 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan
Pedestrian
Recommendations
04 Chapter
Based on the needs, opportunities,
and challenges identified through the
existing conditions analysis, pedestrian
recommendations were developed
through an iterative process with both City
staff, partner agency stakeholders, and
the community. This chapter describes
recommended pedestrian projects and
provides informational toolkits describing
the recommended infrastructure.

Recommendations described in this Plan
serve as a foundation to create successful,
well-used, and safe spaces for people
to walk and roll. In addition to projects
identified in this plan, Richmond can install
pedestrian enhancements on other routes as
appropriate.

Pedestrian Facilities Toolkit
The toolkit below includes brief descriptions
of the pedestrian improvements provided
within the Bicycle and Pedestrian Action
Plan. The treatments offered herein offer
a range of options stemming from current
best practices and established guidance
at the state and national levels. This toolkit
intends to serve as a flexible menu of
options for developing and refining project
recommendations. For more detailed
information and specific design guidance,
The recommendations
in this chapter are for
planning purposes only.

Recommendations may
be altered depending on
opportunities, constraints,
and/or roadway changes.

Feasibility determination, final
design, accessibility, funding,
and implementation of any
recommended improvements
is the responsibility of the
appropriate governing agency.

Pedestrian Recommendations
see the Design Guidelines technical
document in Appendix B .

This Plan’s toolkit provides pedestrian
infrastructure that falls into six general
categories:
• P
avement markings
• P
edestrian-actuated beacons
• S
treet furniture
• Sid
ewalks, trails, and medians
• I
ntersection and street design
• P
rojects that require additional studies
A short description of infrastructure
components from each of the categories is
provided in the toolkit below. The toolkit is
not an exhaustive list of potential solutions.

Exact solutions for each location should be
selected based on engineering and planning
judgment and best practices to maximize
safety and pedestrian accessibility
43 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan
Pavement Markings
Advance Stop & Advance Yield
Markings
Advance yield pavement markings, also
referred to as “shark’s teeth,” are markings
placed on the roadway before a mid-block
crosswalk or before a crosswalk at an
intersection approach without a signal or
stop sign.

Stop lines are solid white lines extending
across approach lanes, indicating the
point behind which vehicles must stop in
compliance with a STOP sign or some other
traffic control device that requires vehicles to
stop. Advanced stop lines should be placed
the roadway 20-50 feet before a mid-block
crosswalk or 4-30 feet before a crosswalk at
an intersection. These can help improve the
visibility of pedestrians to people driving.

Crosswalks
All crosswalk recommendations are subject
to a pedestrian needs analysis to determine
the safest, most efficient location to install
the crosswalk.

High-Visibility Crosswalks
High-Visibility crosswalks are marked with
thick bars, drawing additional attention and
awareness to the crossing. In school zones,
these crossings are yellow instead of the
standard white color.

Decorative Crosswalks
Decorative crosswalks can add a
placemaking element to the street while
still serving a marked crosswalk’s primary
visibility and awareness objectives.

Decorative crosswalks can be themed to
reflect the surrounding neighborhood or
nearby destinations. Decorative crosswalks
must meet specific design parameters to
remain compliant with state and federal
standards; most importantly, they include
the white transverse markings around any
decorative pavement treatment.

A freshly painted high-visibility crosswalk on Marina Way.

A decorative crosswalk out of San Leandro
BART.
44 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan
Raised Crosswalks
A raised crosswalk is a modification of a speed table. Speed tables reduce vehicle speeds by elevating the entire wheelbase of a vehicle (unlike a speed bump that raises each axel individually). Speed tables can be designed to include a mid-block raised crosswalk; in these cases, the height of the speed table matches the sidewalk. This treatment can help slow traffic while increasing pedestrian visibility to approaching motorists.

Trail Markings
Paved trails can include striping to demarcate separate areas for pedestrians and bicyclists. Especially on crowded trails with high pedestrian usage, encouraging spatial separation can reduce conflicts and improve the efficiency and consistency of travel.

A raised crosswalk in front of Hayward’s Public Library main branch. Signs and pavement markings on the Richmond Parkway Trail. 45 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan
Pedestrian-Actuated Beacons
Rectangular Rapid Flashing Beacons
Rectangular Rapid Flashing Beacons (RRFBs)
are user-activated flashing lights used at
unsignalized intersections or mid-block
crossings. These beacons alert motorists to
the presence of people in the crosswalk.

Pedestrian Hybrid Beacons
A pedestrian hybrid beacon (PHB) is a signal
designed to increase safety for pedestrians
crossing at non-signalized locations
on multilane roadways. Thresholds for
installation vary based on the posted speed
limit, crossing distance, vehicular volumes,
and volumes of pedestrian crossings.

Scramble Pedestrian Crossings
A scramble pedestrian crossing, also
called “exclusive pedestrian phasing” is a
pedestrian-only signal phase to allow for
people walking at an intersection to walk
and cross in any direction or approach.

During this exclusive pedestrian phase, all
motorists cars have a red light during the
scramble and right-turns-on-red are typically
prohibited at these intersections. The
diagonal pedestrian crossing is often marked
at these intersections.

A RRFB across Grand
Avenue in Oakland.

A newly install
pedestrian hybrid
beacon installed as
part of the Yellow
Brick Road project at
Barrett Avenue/8th
Street.

A pedestrian
scramble in Oakland’s
Chinatown.
46 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan
Street Furniture
Signage
Signs serve many uses, from prohibiting
movements, limiting parking, or providing
advance notice of school zones or
crosswalks.

Street Furniture/Amenities
Street furniture includes benches, transit
shelters, trash cans, newsstands, and other
items within the public right-of-way. Street
furnishings provide important amenities
for pedestrians by adding functionality and
vitality to the pedestrian realm and add
placemaking elements to the street. They
announce that pedestrians are welcome and
that the street is a comfortable place to be.

These amenities provide a functional service
to people walking and provide visual detail
and interest.

Lighting
Pedestrian-scale lighting improves visibility
for people walking and driving, particularly
at intersections. These lights focus on
illuminating the sidewalk, not the roadway.

Lighting can be achieved on one light pole
(with one light for the road and one for the
sidewalk) or on separate poles. Lighting is
also an essential consideration along trails.

Street furniture on Nevin Avenue, including benches, tables, trash and recycling cans, and pedestrian lighting. 47 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan
Sidewalks, Trails and Medians
Sidewalks
Sidewalks provide dedicated space for
pedestrians to walk. Sidewalks are raised
from the roadway, and some have a planting
strip for increased separation from the street.

Obstructions like utility boxes, signs, and
poles can sometimes limit available sidewalk
width.

Shared-Use Paths
Dedicated paths for walking and bicycling
completely separated from the roadway.

When paved with asphalt or concrete, trails
can include markings to encourage the
separation of modes.

Curb Extensions
Curb extensions extend the curb into the
street. Curb extensions can provide several
valuable traffic calming and safety benefits.

They shorten the crossing distance for
people walking, provide improved visibility
at intersections, make pedestrians more
visible to motorists, and provide additional
pedestrian queueing space. They can be
installed at intersections or mid-block.

Curb extensions can be constructed with
permanent materials like cement, pavement
markings, and bollards.

Curb Ramps
Curb ramps allow for smooth transitions
between the sidewalk and street level.

Curb ramps are essential for those with
special mobility needs, strollers, and many
other users. Ramps must be built to current
accessibility standards.

A curb extension with green, stormwater infrastructure near the Richmond BART. 48 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan
Intersection and Street Design
Intersection Redesign
Intersections are not always symmetrical
and can take on confusing designs when
multiple streets come together or when
two streets come together at acute angles.

Design components like curb extensions,
painted buffer areas, and medians make
intersections more inviting and less stressful
for active transportation users.

Free-Right Turn Lane/Slip Lane Removal
Free-right turn lanes facilitate increased
vehicle throughput and faster turns at
intersections at the expense of pedestrian
and bicyclist safety and movement.

Traffic Calming
Traffic calming is the implementation of
roadway changes to slow down vehicle
traffic. Engineers can consider many tools to
slow vehicle traffic, including speed bumps,
chicanes, speed feedback signs, and other
items. Traffic calming is also an essential
component of bicycle boulevards.

Stop Signs
A stop sign is a traffic control device used
to regulate traffic through an intersection,
and one or multiple intersection approaches
can be stop-controlled. In general, the
implementation of stop control is regulated
by the CA-MUTCD and requires that a
technical analysis be conducted.

Projects That Require Additional Studies
A free-right turn lane, located at the northwest corner, at the intersection of San Pablo Avenue/ Macdonald Avenue. Image: Google
Complex Intersections/Situations
While most of the locations examined for
the Plan have recommendations, some will
require additional study and traffic analysis
to develop recommendations for those
locations.
49 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan
Recommended Improvements
This plan recommends 105 spot improvements to improve intersection crossing, trail, and sidewalk safety, access, and comfort for people walking, biking, and rolling. Table 5 (page 54) lists the location, type, and brief description of each recommended improvement. Project recommendations include projects from prior community and corridor plans in addition to new recommendations. The location of each spot improvement can be seen in Figures 9-11 on the following pages.

Projects are shown with an ID number that corresponds to the ID column in Table 5 .
50 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan

PROPOSED

PEDESTRIAN SPOT

IMPROVEMENTS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 9/15/2022.

BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
!
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
! !
!
!!!
!! !
! !
!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80
¥80
¥80

EL CERRITO
PINOLE
SAN
PABLO
ALBANY

BERKELEY
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

KENSINGTON

MONTALVIN
MANOR

NORTH RICHMOND

ROLLINGWOOD
TARA
HILLS
SAINT

JO SEPH

CEMETERY

MIL L ER-KNOX

REG IO NAL

SHO REL INE
PO INT

PINO L E REG

SHO REL INE

SO BRANTE

RIDG E REG

PRESERVE

RICHMO ND

CO UNTRY
CLUB

TIL DEN

REG IO NAL
PARK

TIL DEN

NATU RE

STU DY AREA

WILDCAT CANYON

REGIONAL PARK

KENNEDY

G ROVE REG

REC AREA

SAN PABLO

RESERVO IR

REC AREA

PINO L E PARK

MIRA VISTA

COUNTRY CLUB
& GOLF

HILLSIDE

NATU RAL
AREA

ROLLIN G
HIL LS

MEMO RIAL
PARK

CASTRORANCH RD

PINE AVE

SAN PABLO AVE

LINCOLN AVE
7THST ANDRADE AVE

GARRARD

BLVDTEWKSBURY AVE

CARLSON BLVDFLORIDA AVE

PARKRIDGEDR

PARKSID E DR

HIL LTOP
M
ALLRD

REGAT TA
BLV
D

AUTO PLZ
6TH ST

RHEEM AVE

MCBRYDE AVE

KEITHDR

CUTTING BLVD

BAY VI EW
AVE

HILLTOP DR
BLUME
DR

VIEW DR
MARINA

BAYPKWY

HILLVIEW DR

FOOTHILLAVE
SH
ANE
DR

SANTARITARD

VALLEYVI
EW
RD
GIA
NT
HWY

COLLINS
AVE

HENSLEY ST
RICHMO
NDAV
E

MARINA WAY

BUSH AVE

MACDONALD AVE

ATLAS RD
47 TH
ST
16TH ST
4TH ST

HALL AVE

VIRGINIA AVE

BISSELL AVE

LINKSDR
RO
CK
ROSE
WAY

POTRERO AVE
SCEN
ICAV E
WEST
ERNDR
35TH ST
LAKES
IDE DR
MEAD
EST
PARK

CENTRAL
37TH ST

VIA VERDI
PAIN

TEDPONY RD

OHIO AVE

RIPLEY AVE
20TH ST
MOYERS
RD

LUCAS AVE
8TH ST

GRANT AVE
CURRY
ST
MAY RD
38TH ST
KEY
BLVD

SAN MATEO ST

BURBECK AVE
33RD ST

ROOSEVEL T AVE

GOODRICK AVE

TEHAMA A
VE
FR
AN
W
A Y

ESMOND AVE

WALL AVE

NEVIN AVE
SAN J
O
AQU
IN ST

MONTEREY ST
13TH ST
SEL
MIGRV
52ND ST

GROOM DR

CHANSLOR AVE CARLSTO
N
ST
28TH ST
34TH ST

CLINTON AVE
AME
NDRD

LOWELL AVE
30TH ST
55TH ST

BUCKBOARD W
AY

CARRIAGEDR

ALAMO AVE

SHELDON DR HEAVENLY RIDGE LN

BERK AVE

MORNING SIDE
DR
COA
CH
DR
11TH ST

MARICOPA AVE
PAR
K
RIDGE
D
R
SIERRA
AVE
12TH ST
W
ISW
ALL
DR

JENKINS WAY
DUKE
AVE
SA
N
LU
IS ST

GARVIN AVE
36TH
ST

WRIGHT AVE
57TH ST

MAINE AVE

CE RRO SUR
45TH ST
56TH
ST
B ST

AMADOR ST

CENTER AVE

PARKE R RD
17TH ST
3RD ST
1ST ST

SANFORD AVE
2ND ST

KL OSEW
AY
KI
PLING
DR

JOANNDR
49TH ST
NELSO
NDR
9TH ST

DUNN AVE
39TH ST
31ST
ST

WOOD GLENDR
32ND ST

GAYNOR AVE

YUBA ST

KERN ST

LASSEN ST

ROCKY RD

TAFT AVE

GILMA DR
DORNA
NDR

BARRETT AVE
HA
RBOU
R W
AY

FASCINATION
CI R
1 2
3 4
5 6
7 8
9 11
12 13
14 17
18 19
20 21
22 23
24 25 26
27 28
29 30 31
58 60
61 62
63 64
65 67
68 6970
71 72
73 74
75 76
77 78
79 80
8182
83 84
85 86
87 8889
90 91
92 93
94 95
9697
98 99
100
101
102 103
104
105 106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136

CO NTRA
CO STA

COLLE GE
0 0.5 1 MILES
San Francisco Bay

PROPOSED

PEDESTRIAN PROJECTS
Spot Improvement
Class I Shared-Use
Path
Figure 09 Pr oposed Spot Improvements
51 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan

PROPOSED

PEDESTRIAN SPOT

IMPROVEMENTS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 9/15/2022.

BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
!
!
!! !
!
!!
!
!
!
!
!!
!!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80

EL CERRITO
SAN
PABLO

EAST RICHMOND

HEIGHTS
NORTH

RICHMOND

MIL L ER-KNOX

REG IO NAL

SHO REL INE

WILDCAT CANYON

REGIONAL PARK

BOOK E R T

ANDERSO N JR

U NITY PARK

SAN PABLO AVE

LINCOLN AVE
HELLINGS AVE7THST ANDRADE AVE
2ND ST

CARLSON BLVD

REGATTA BLVD
6TH ST

RHEEM AVE

CUTTING BLVD

BAYVIEW
AVE
MARI
NA BAY
PKWY
47TH ST

FOOTHILLAVE

COSTA AVE

MCBRYDE AVE

MEEKER AVE

MACDONALD AVE

HENSLEY ST

MARINA WAY

HARTNETT
AVE

MACDONALD AVE
23RD ST
8TH ST
16TH ST

MORAN AVE

PENNSYLVANIA AVE

POTRERO AVE
HARBO
UR WA
Y
4TH ST

HALL AVE

TULARE AVE

GARVIN AVE
45TH ST

PINE AVE
44TH ST

WHARF ST
35TH ST

MEADE S
T

WRIGHT AVE
BROADW
AY
37TH ST

PENINSULADR
41ST
ST

OHIO AVE

RIPLEY AVE
20TH ST

LUCAS AVE

FLEMING AVE

GRANT AVE

CURRY ST
38TH ST
KEY BL
VD
59TH ST

SAN MATEO ST
BURBECK AVE10TH ST

ROOSEVEL T AVE

EGRET WAY

TEHAMA AVE

MOUNTST

DOWNER AVE
POR
TOLA A
VE
33RD ST
SA
N

JOAQUIN S
T
34TH ST

MONTEREY ST

MERCED ST
13TH ST
52ND ST
DIMM
ST
24TH ST
26TH ST

CHANSLOR AVE
CAR
LST
ON
ST

YUBA ST
28TH ST

WALL AVE

CLINTON AVE
COLLIN
SST

HOFFMAN BLVD

LOWELL AVE
30TH ST
19TH ST

VAN FLEET AVE
55 TH
ST

SANTA CLARA ST
56TH ST

AMADOR ST
13TH ST
HUM
BOLDT
ST

VIRGINIA AVE
HINKL
EY AVE

ALAMO AVE

FALL AVE

NEVIN AVE
42ND ST

ESPEE AVE
21ST ST

BERK AVE
CANAL
BLVD
11TH ST
SO
NOM
A
ST

BURLINGAME AVE

SIERRA AVE
M
CLA
UGHLIN
ST

SOUTH ST
BE
R K PL
12TH ST

SAN LUIS ST
36TH ST
15TH ST

OVEREND AVE
57TH ST

MAINE AVE
B ST

DUBOCE AVE
18TH ST

CENTER AVE
17TH ST
3RD ST
1ST ST

MARICOPA AVE

SANFORD AVE

WILLARD AVE

FLORIDA AVE
50TH ST
27TH ST29TH ST
49TH ST

COLUMBIA AVE
22ND ST

OHIO AVE

FRESNO AVE

HUMPHREY AVE
9TH ST

DUNN AVE
C ST

COALINGA AVE

ESMOND AVE

FACTORY
ST

WALLER AVE
40TH ST39TH ST

WILSON AVE

CREELY AVE

BISSELL AVE
31ST ST

VISALIA AVE
32ND ST

GATELY AVE
43RD ST

MARIPOSA ST
25TH ST
5TH ST

GAYNOR AVE
46TH ST

KERN ST
LASSEN
ST

VENTURA ST

SPRING ST
58TH ST

BELL AVE

STEGE AVE

TAFT AVE

BARRETT AVE
12 3
4 5
6 7
8 9
11 12
13 14
17 18
19 20
21 22
23 24 25 26
27 28
29 30
31 58
60 61
6365
67 68
69 7071
72 73
74 7576
77 78
79 80
81 82
83 84
85 86 87 8889 90 91 92 93
94 95
96 97
98 99
100
101
109
110
111
112113
114
115
116
117
118
119
120
121
122
124
126
127
128
129
130
131
132
133
134
135
136
0 0.5 1 MILES

PROPOSED PEDESTRIAN

PROJECTS
Spot Improvement
Class I Shared-Use Path

CENTRAL CORE

CENTRAL
CORE
Figure 10 P roposed Spot Improvements (Central Core)
52 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan

PROPOSED

PEDESTRIAN SPOT

IMPROVEMENTS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 9/15/2022.

BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
!
!
! !
!
!
!!
Ä4
¥80
¥80

EL CERRITO
PINOLE

SAN PABLO
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

MONTALVIN
MANOR

ROLLINGWOOD
TARA
HILLS
SAINT

JO SEPH

CEMETERY

PO INT PINO L E
REG

SHO REL INE

SO BRANTE

RIDG E REG

PRESERVE

RICHMO ND

CO UNTRY
CLUB

WILDCAT CANYON

REGIONAL PARK

KENNEDY

G ROVE REG

REC AREA

SAN PABLO

RESERVO IR

REC AREA

PINO L E PARK

ROLLIN G
HIL LS

MEMO RIAL
PARK

CAS TRO RANCHRD

PINE AVE

ANDRADE AVE

SAN PABLO AVE

PARKRIDGEDR

PARKSIDE DR

HILLTOP
M

ALLRD AUTO PLZ

RHEEM AVE

MCBRYDE
AVE

KEITHDR

BARRETT AVE

ESMOND AVE

HILLTOP DR
BLUME
DR

VIEW DR

GARVIN AVE

HILLVIEWDR

SHANE D
R

SANTA R
ITARD

VALLEYVIEW
RD
GIA
NT
HWY

COLLINS AVE

ATLAS RD

TULARE AVE
LIN
KS DR
29TH ST
RO
CKROSE
WAY
LAKES
IDE DR
PARK

CENTRAL
22ND ST

VIA VERDI
PAIN

TEDPONY RD
MOYERS
RD

GRANT AVE
MAY RD
38TH ST
37TH ST
FRA
N
WA Y

ROOSEVEL T AVE

NEVIN AVE
34TH ST

SELMIGRV

GROOM DR
30TH ST
24TH ST
26TH ST20TH ST
AME
NDRD

LOWELL AVE
19TH ST

AMADOR ST

BUCKBOARD W
AY

CARRIAGEDR

SHELDON DR HEAVENLY RIDGE LN

MORNING SIDE DR
COA
CH
DR
PARK
RIDGE
D
R
SIERRA
AVE
KEY
BLVD
W
IS
W
ALL
DR
DUKE
AVE
36T
H
ST
BARK
LEY
DR

CE RRO SUR

PARKE R RD
33RD ST

KL OSEW
AY

KIPLING
DR

JOANNDR

NELSONDR
17TH ST
40TH ST
18TH ST 31ST ST

WOOD GLENDR
32ND ST

YUBA ST

KERN STLASSEN ST

ROCKY RD
FA

SCINATION
CIR
4 5
27 30
3163
64 65 68
69 70 71
72 73
74 75
76 77
78 79
80 81
82 84
99 100
101
102
103
104
105 106
107
108
109
110
111
112
113
115
119
120
121
125
127
129
134
135
136

CO NTRA
CO STA

COLLE GE
0 0.5 1 MILES

PROPOSED PEDESTRIAN

PROJECTS
Spot Improvement
Class I Shared-Use Path

NORTH RICHMOND
NORTH

RICHMOND
Figure 11 P roposed Spot Improvements (North Richmond) 53 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan

ID CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION
1 Macdonald
Ave 16th St Intersection Upgrade Consider scramble phase or otherwise don’t allow permitted left turns to conflict with pedestrians in the crosswalk. Create LPI. Consider parklet on southwest corner 2 Macdonald
Ave 15th St Crossing Improvement
Consider constructing a raised intersection or raised crosswalk at the eastern approach. Construct curb extensions at all four corners. Install high-visibility crosswalks at the eastern and western approaches on top of decorative paving.
3 Nevin Ave 15th St Crossing Improvement Consider constructing a median refuge or traffic circle to accommodate direct pedestrian path of travel. 4 Barrett Ave 18th St Crossing Improvement
Install the north, south, and west crosswalk legs as high-visibility. Install an RRFB or PHB for Barrett crossings (based on warrants). Add appropriate signs and advance pavement markings based on selected actuated crossing beacon.
5 Barrett Ave 19th St Crossing Improvement Stripe fourth crosswalk leg and upgrade traffic signal to include pedestrian countdown. 6 15th St Nevin Ave Other Provide a ramp to allow bicycle access to/from plaza. 7 Marina Way Barrett Ave Intersection Upgrade
Install a curb extension at the northwest and southwest corners. Provide a leading pedestrian interval and adjust pedestrian phase length to provide sufficient crossing times. Realign the southern crosswalk several feet south and install high-visibility crosswalks at the north and eastern approaches. Consider installing bicycle lane conflict markings and a two-stage bike turn box for NB-WB bike movements. 8 Ohio Ave Canal Blvd Crossing Improvement Refresh existing intersection markings, upgrade remaining crosswalks to high-visibility and provide a leading pedestrian interval.
9 Ohio Ave S 2nd St Crossing Improvement Potential for bike and pedestrian intersection improvements. 10 Hoffman
Blvd Harbour Way Intersection Upgrade Install high-visibility crosswalks and install curb extensions. 11 Wright Ave Harbour Way Crossing Improvement Implement ADA accessible accommodations throughout the intersection, sidewalk and curbs. 12 1000’ north
of Hall Ave Harbour Way Crossing Improvement Coordinate with railroad operator to install pedestrian railroad crossing gates, Implement ADA accessible accommodations throughout the intersection, sidewalk, and curbs. 13 Harbour Way I-580 On and
Off Ramps Intersection Upgrade Coordinate with Caltrans install high-visibility crosswalks and curb extensions at all corners. 14 Carlson Blvd Cutting Blvd Intersection Upgrade Construct intersection improvements including: formalized curb extensions, widened sidewalk, and additional sidewalks.
15 Carlson Blvd Bayview Ave Intersection Upgrade Install intersection improvements including curb extensions and a median nose.

Table 05 S pot Improvement Recommendations
54 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan

ID CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION
16 Carlson Blvd I-80
Undercrossing Intersection Upgrade Construct intersection improvements including: median refuge islands and curb extensions. 17 Sacramento
Ave San Luis St Crossing Improvement Path crossing improvements: upgrade crosswalk to high-visibility and install advance yield markings.

Consider installing RRFB.
18 Harbour Way Bissell Ave Intersection Upgrade Install curb extensions at all corners and re-stripe crosswalks as high-visibility. 19 Harbour Way 300’ north of
Chanslor Ave Crossing Improvement Install a high-visibility midblock crosswalk with a median refuge island. 20 S 23rd St Virginia Ave Crossing Improvement Consider installation of a pedestrian refuge island and install pedestrian scale lighting. 21 Harbour Way Cutting Blvd Intersection Upgrade Install curb extensions, directional ramps and high-visibility crosswalks, and median crossing islands. 22 Marina Way Cutting Blvd Intersection Upgrade Install curb extensions, directional ramps and high-visibility crosswalks and median crossing islands. 23 S 23rd St Cutting Blvd Intersection Upgrade Restripe crosswalks as high-visibility crosswalks. Install curb extensions at all corners with directional ramps. Construct median crossing islands.
24 San Pablo
Ave McBryde Ave Intersection Upgrade Install curb extensions and ramps, and construct curb extensions so that streets intersect at right angles.
25 Harbour Way Pennsylvania
Ave/13th St Intersection Upgrade Install high-visibility crosswalks, and construct medians/channelized islands/curb extensions and advance stop bars. Consider slip lane removal.
26 Broadway 23rd St Intersection Upgrade Widen, lengthen, and channelize median islands. Restripe crosswalks as high-visibility crosswalks. 27 Barrett Ave I-80
Undercrossing Intersection Upgrade
Coordinate with Caltrans to consider reconfiguring the through and turn lanes around the interchange.

Coordinate with Caltrans to remove/trim vegetation around the off-ramp that blocks visibility of pedestrians in the north crosswalk. Install a high-visibility crosswalk across the eastern approach. 28 San Pablo
Ave Roosevelt Ave Intersection Upgrade Install curb extensions to tighten turn radii, and shorten crossing distances, Coordinate with Caltrans to study removing double right turn lane from San Pablo onto I-80 on-ramp. 29 S 45th St
Richmond
Greenway Trail
connection
Trail Access Improve connections to trail connector ramp from 45th St 30 Seacliff Dr Seaview Dr Crossing Improvement LRSP high-injury intersection. Install crosswalk on northeast leg of intersection to connect to Class I path. Consider installing yield markings and radar speed feedback signs. 31 S 49th St Cutting Blvd Lighting LRSP high-injury intersection,: install intersection lighting.

Table 05 Spot Improvement Recommendations ) (continued). 55 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan

ID CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION
32 San Joaquin
St Central Ave Intersection Upgrade LRSP high-injury intersection: construct bulb outs and install advanced warning signs. 33 33rd St Barrett Ave Crossing Improvement LRSP high-injury intersection. Construct curb extensions and install advanced warning signs and markings.
34 Atlas Rd Oakmont Dr Crossing Improvement LRSP high-injury intersection. Construct curb extensions and install advanced warning signs and markings, Consider installing an RRFB or PHB for the Atlas Road crossing. 35 Macdonald
Ave 21st St Crossing Improvement LRSP high-injury intersection. Upgrade all crosswalks to high-visibility. Consider installing an RRFB or PHB. Construct curb extensions at all corners.
36 5th St Barrett Ave Crossing Improvement LRSP high-injury intersection. Upgrade crosswalks to high-visibility. Consider installing an RRFB or PHB. Construct curb extensions.
37 25th St Macdonald Ave Crossing Improvement LRSP high-injury intersection: Upgrade all crosswalks to high-visibility. Consider installing RRFB or PHB. Construct curb extensions at all corners.
38 23rd St Lowel Ave Crossing Improvement Implement improvement in CCTA CSSA. 39 23rd St Dunn Ave Crossing Improvement Construct median refuge island and install an RRFB. 40 23rd St Hellings Ave Crossing Improvement Install high-visibility crosswalks and install an RRFB for the 23rd Street crossing. 41 23rd St Andrade Ave Crossing Improvement Construct median refuge island and install RRFB. 42 23rd St Visalia Ave Crossing Improvement Install a new high-visibility crosswalk across 23rd Street. Install an RRFB at the crossing. 43 23rd St Esmond Ave Crossing Improvement Construct median refuge island and install an RRFB. 44 23rd St Gaynor Ave Crossing Improvement Install high-visibility crosswalks and an RRFB for the crossing of 23rd. 45 23rd St Garvin Ave Crossing Improvement Improve accessibility features (push buttons, curb ramps, etc.) at all corners (more details in the CSSA).

Install curb extensions at all corners and crosswalk landings. Upgrade crosswalks to high-visibility. 46 23rd St Downer Ave Crossing Improvement Install a new high-visibility crosswalk across 23rd Street with an RRFB. 47 23rd St Clinton Ave Crossing Improvement Construct a median refuge island and install an RRFB for the 23rd crossing. 48 23rd St Grant Ave Crossing Improvement Install high-visibility crosswalks at all approaches. 49 23rd St Barrett Ave Crossing Improvement Implement improvement in CCTA CSSA.

Table 05 Spot Improvement Recommendations ) (continued). 56 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan

ID CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION
50 23rd St Macdonald Ave Crossing Improvement Implement improvement in CCTA CSSA. 51 23rd St Exchange Pl Crossing Improvement Construct a median refuge island and install an RRFB for a crossing of 23rd Street. . 52 Barrett Ave BART Tracks Sidewalk Widen sidewalk on northern side through underpass (Requires road diet). 53 Barrett Ave 21st St Crossing Improvement Install a new high-visibility crosswalk at the western approach. 54 Cutting Blvd S 12th St Crossing Improvement Install high-visibility crosswalks at all approaches. 55 Cutting Blvd S 15th St Crossing Improvement Install high-visibility crosswalks at all approaches. 56 Cutting Blvd S 18th St Crossing Improvement Install high-visibility crosswalks at all approaches. 57 Cutting Blvd S 21st St Crossing Improvement Upgrade all crosswalks to high-visibility. 58 Cutting Blvd S 17th St Crossing Improvement Install high-visibility crosswalks at all approaches. 59 Cutting Blvd 20th St Crossing Improvement Restripe the existing high-visibility crosswalks. 60 Cutting Blvd S 24th St Crossing Improvement Construct a pedestrian refuge island; and install RRFB/PHB. 61 Cutting Blvd S 26th St Crossing Improvement Construct pedestrian refuge island with an RRFB/PHB. 62 Cutting Blvd S 29th St Crossing Improvement Construct pedestrian refuge island and install RRFB/PHB. 63 Cutting Blvd S 31st St Crossing Improvement Construct a pedestrian refuge island and install an RRFB/PHB. 64 Chanslor Ave Espee Ave Crossing Improvement Install curb extensions at the two western corners to square up the intersection. 65 Maine Ave S 23rd St Crossing Improvement Install high-visibility crosswalks at all approaches and construct curb extensions at all corners. 66 Ohio Ave S 23rd St Crossing Improvement Construct curb extensions at all corners. 67 Broadway 24th St Crossing Improvement Construct curb extensions at all corners. 68 Broadway Bissell Ave Crossing Improvement Install curb extensions at the northern corners to square-up the intersection. Realign and upgrade all crosswalks to high-visibility crosswalks.
69 Broadway 26th St Crossing Improvement Install high-visibility crosswalks at all approaches. 70 Mcbryde Ave Sonoma St Crossing Improvement Construct curb extensions.

Table 05 Spot Improvement Recommendations ) (continued). 57 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan

ID CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION
71 Hilltop Dr San Pablo Ave Crossing Improvement Construct curb extensions. 72 Hilltop Dr Research Dr Crossing Improvement Construct curb extensions at all corners. 73 Hilltop Dr Robert Miller
Dr Intersection Upgrade Study removal free right turn lanes. 74 Hilltop Dr Shane Dr Intersection Upgrade Study removal of free right turn lanes. 75 Hilltop Dr Blumer Dr Intersection Upgrade Study removal of free-right turn lane. 76 Morningside
Dr Valley View Rd Crossing Improvement Install high-visibility crosswalks. 77 May Rd Valley View Rd Crossing Improvement Upgrade crosswalks to high-visibility and install curb extensions. 78 Garvin Ave 30th St Crossing Improvement Install high-visibility crosswalks and an RRFB for a crossing of Gavin Avenue. 79 Mcbryde Ave 37th St Crossing Improvement Install curb extensions at all corners. 80 Esmond Ave 26th St Crossing Improvement Install high-visibility crosswalks. 81 Maricioa Ave 28th St Crossing Improvement Install high-visibility crosswalks. 82 Maricopa
Ave 26th St Crossing Improvement Install high-visibility crosswalks. 83 Tulare Ave 28th St Crossing Improvement Install high-visibility crosswalks. 84 Solano Ave Amador St Crossing Improvement Install curb extensions at all corners. 85 Maine Ave S 16th St Bicycle Access Install bicycle cutthrough in traffic divertor. 86 Florida Ave S 20th St Bicycle Access Install bicycle cutthrough in traffic divertor. 87 Virginia Ave S 20th Street Bicycle Access Install a bicycle cutthrough in traffic divertor. 88 29th St/Vale
Rd
Howard St/
Salesian Ave Crossing Improvement Study locations for a marked crossing of 29th/Vale, including one block south at Moran Avenue.

Coordinate with City of San Pablo as necessary.
89 Garvin Ave San Pablo Ave Crossing Improvement Install high-visibility crosswalks at all intersection approaches. Provide a leading pedestrian interval with all crossing phases. Install bicycle conflict markings.

Table 05 Spot Improvement Recommendations ) (continued). 58 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan

ID CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION
90 Coalinga Ave 18th St Crossing Improvement
Upgrade the two existing crosswalks to high-visibility and install high-visibility crosswalks at the northern and eastern approaches. Install advance stop markings at all approaches. Study intersection traffic control options with the design of the Coalinga Avenue bicycle boulevard. 91 Sutter Ave Carlson Blvd Crossing Improvement
SRTCP: Upgrade the existing southern crosswalk to high-visibility and install advance yield markings.

Install transverse crosswalks at the eastern and western approaches with advance stop markings.

Install an RRFB for the Carlson (southern) crosswalk. Consider building a refuge islands from the existing median.
92 Central Ave I-80 Crossing Improvement
Coordinate with Caltrans to upgrade all crosswalks to high-visibility crosswalks and provide leading pedestrian intervals for all crossing phases. Extend bicycle conflict markings on Central through the Jacuzzi intersection and interchange. Long term, construct curb extensions to tighten radii and square up approaches.
93 Nevin Ave Marina Way Crossing Improvement Upgrade all crosswalks to high-visibility crosswalks and provide a leading pedestrian interval for call crossing phases. Long term, consider converting the intersection to a raised intersection. 94 Park Central
St Hilltop Dr Crossing Improvement
Study intersection design changes to improve pedestrian crossings and accessibility. Improvements should include high-visibility crosswalks and curb extensions. Coordinate with property owners and other jurisdictions as required.
95 Lucas Ave 7th St Crossing Improvement
Upgrade the two existing crosswalks to high-visibility and install high-visibility crosswalks at the northern and eastern approaches. Build out the northeast corner to square up the intersection.

Construct curb extensions at all corners.
96 Barrett Ave 25th St Crossing Improvement
Upgrade the three existing crosswalks to high-visibility crosswalks and provide a leading pedestrian interval for all crossing phases. Install bicycle conflict markings through the intersection and consider other intersection treatments like bicycle boxes.
97 Macdonald
Ave 45th St Crossing Improvement
Upgrade all crosswalks to high-visibility crosswalks and install advance yield markings. Install an RRFB for the Macdonald crosswalks. On the south side of the street, widen the sidewalk and provide a connection to the “Target Path.”
98 McBryde
Ave/Park Ave Marin Ave Crossing Improvement Study intersection redesign options to improve driver and pedestrian visibility at all intersection approaches. Study should look at crossing, visibility/site lines, and intersection control changes. 99 Center Ave S 39th St Wayfinding Add wayfinding signs directing people walking and biking to the Richmond Greenway trailhead off of 39th Street.
100 Meeker Ave Marina Bay
Pkwy Crossing Improvement
Install a leading pedestrian interval for all crossing phases. Study removal of the free-right turn lane from the northwest corner. If removed, realign the west crosswalk to be parallel to Marina Bay Parkway.

Due to the asymmetrical intersection and challenging site lines, consider providing a protected turn phase for northbound left traffic.

Table 05 Spot Improvement Recommendations ) (continued). 59 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan

ID CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION
101 I-580 Marina Bay
Pkwy Crossing Improvement Coordinate with Caltrans to upgrade all crosswalks to high-visibility. At signalized crossings, provide a leading pedestrian interval for all crossing phases. At uncontrolled crossings, install RRFBs. 102 Sea Cliff Dr Canal Blvd Crossing Improvement
Trim vegetation around stop sign to improve visibility. Consider adding street lighting to this intersection. Upgrade the existing crosswalk to high-visibility.

Coordinate with the Port to trim vegetation along Sea Cliff Drive. 103 38th St Boyd Ave/
Solano Ave Crossing Improvement
Upgrade all crosswalks to high-visibility crosswalks. Install advance yield/stop marks where appropriate. Long term, study additional park access improvements include converting Boyd to one- way, curb extensions, and other traffic calming measures. 104 22nd St Macdonald Ave Crossing Improvement
Install curb extensions at the northwest and northeast corners. Install a pedestrian count display at the southwest corner. When next repaved, reduce the intersection’s crown and conform asphalt to the gutter pan.
105 23rd St Rheem Ave Crossing Improvement
Upgrade all curb ramps to current best practices; specifically, replace the southwest corner ramp with a “parallel” ramp and “centered” ramps at the two eastern corners. Adjust pedestrian signal heads as needed. Provide a leading pedestrian interval for all crossing phases.

Table 05 Spot Improvement Recommendations ) (continued). 60 Pedestrian Recommendations
Richmond Bicycle and Pedestrian Action Plan
Implementation
05 Chapter
This chapter outlines the potential next
steps to move the recommended projects
toward implementation. Recommended
pedestrian and bicycle projects were
prioritized to help City staff select which
project (or groups of projects) to implement
first. This section also provides information
on funding sources (i.e., competitive grants
and formulaic funding opportunities) that
the City and partner agencies can use to
design and build projects. The chapter also
provides a summary of maintenance policies
that Richmond should strive to follow to
maintain a state of good repair and improve
safety. The “Quick-Build” section describes
how some projects may be implemented
using a more streamlined and cost-effective
implementation strategy. Lastly, the chapter
describes the potential next steps after this
Action Plan and briefly discuss aspects of
the implementation process that influence
project development like funding, staff time,
and multijurisdictional coordination.

Project Prioritization
The approach to enhancing and expanding
Richmond’s active transportation network
must consider what is realistic given
historical and anticipated funding while
also providing the City with the flexibility
Implementation
to respond to changing conditions and
project opportunities that may arise. The
prioritization of proposed projects helps
formulate a strategic list to guide project
implementation. Over time as development
occurs or other changes to land uses and
the City’s transportation network take place,
this framework can be used to re-evaluate
remaining projects and continue pursuing
the plan’s implementation. For example,
an opportunity-priority spot improvement
may be completed ahead of a high-priority
corridor project due to immediate funding
opportunities as part of a redevelopment
or larger project. Similarly, a high-priority
project may require additional study and
funding, extending the time it takes to
implement. Prioritization results should be
considered flexible concepts that serve as
project selection guidelines.

Prioritization Methodology
Recommended projects were evaluated
using four overarching criteria. Each
evaluation criterion was given a normalized
score as listed in the table below: the higher
the number, the higher ranking an individual
project received based on the criteria. The
scores were combined for each corridor
and spot improvement; each project has a
Quantitative Corridor Score ranging from
0–100, with 100 being the highest ranked.

Table 6 outlines the criteria and provides
details about each input of the prioritization
score. Following score calculations,
improvements were sorted into high,
medium, and opportunity priority categories
based on the distribution of scores. High-
priority projects should start to move forward
within two years. Medium priority projects
should begin to progress within two to four
years. Opportunity projects should start
implementation after five years or when
opportunities like repaving or development
projects occur.

62 Implementation
Richmond Bicycle and Pedestrian Action Plan
Table 06 P rioritization Criteria

CRITERIA CRITERIA DEFINITION DATA USED SCORING POINTS AVAILABLE Safety A bicycle or pedestrian collision occurred
at the project intersection or along the
identified project segment.

Collision Data
(TIMS 2015-2019)
Weighted Density Based on Severity 25
Health and
Equity
The project improves active
transportation networks in areas with a
high density of residents experiencing
health risks, low income, and low vehicle
access.
• Longitudinal Employer-
Household Dynamics
Data (Census Tract)
• Metropolitan
Transportation
Commission (MTC) Equity
priority communities
Calculate each indicator (i.e., health and equity) and buffer every network segment by 500ft, taking the proportional average of each indicator and percentile.

Indicators:
• Composite health (density of)
o High Blood Pressure
o Coronary Heart Disease
o Diabetes
• Composite Equity (density of)
o Low-income workers per acre
o Severely rent-burdened population
o Zero Vehicle Household
25 Connectivity The project improves connections
to destinations, including schools,
recreation, transit, regional trails, and
commercial centers.

Project overcomes major barriers (i.e.,
major arterials and rail lines).

City Data
• School locations
• Parks
• Transit hubs
• Regional Trails
• Commercial Areas
• Roadways
• Railways
Proximity Analysis (within 1,000 ft)
5 points per destination type, within 1,000 ft
35 Community
Support
The project reflects the most commonly
identified needs or barriers received by
community input.

Public Input Map comments
and BPAC comments
Public support density percentile tool 15
Total 100
63 Implementation
Richmond Bicycle and Pedestrian Action Plan
Bicycle Project Prioritization Results

PRIORITIZATION CATEGORY POINT RANGE NUMBER OF PROJECTS
High priority 65-100 44
Medium priority 48-64 63
Opportunity priority 0-47 68
Out of 100 possible points, recommended
bicycle project prioritization scores ranged
between 24 and 81 points. The average
project score was 53. Bicycle Project
Prioritization results are shown
in Table 7 below.

Table 8 lists each project with its
prioritization score and category.

Figures 12-14 below show the category
of each recommended bicycle project.

Figures 15-17 in the following pages
highlight the high-priority projects.

Bicycle Parking at the Richmond Ferry Terminal
Table 07
B
icycle Prioritization Summary
64 Implementation
Richmond Bicycle and Pedestrian Action Plan

BICYCLE

PROJECT

PRIORITIZATION

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/4/2022.

EXISTING BICYCLE

FACILITIES
Existing Bicycle
Facilities
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
!
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
! !
!
!!!
!! !
! !
!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80
¥80

EL CERRITO
PINOLE
SAN
PABLO

BERKELEY
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

KENSINGTON

MONTALVIN
MANOR
NORTH

RICHMOND ROLLINGWOOD
TARA
HILLS
SAINT

JO SEPH

CEMETERY

MIL L ER-KNOX

REG IO NAL

SHO REL INE
PO INT

PINO L E REG

SHO REL INE

SO BRANTE

RIDG E REG

PRESERVE

RICHMO ND

CO UNTRY
CLUB

TIL DEN

REG IO NAL
PARK

TIL DEN

NATU RE

STU DY AREA

WILDCAT CANYON

REGIONAL PARK

KENNEDY

G ROVE REG

REC AREA

SAN PABLO

RESERVO IR

REC AREA

PINO L E PARK

MIRA VISTA

CO UNTRY

C L U B & G O L F

HILLSIDE

NATU RAL
AREA

ROLLIN G
HIL LS

MEMO RIAL
PARK

FIE LDCREST
DR
CASTRO

RANCH RD

PINE AVE

SAN PABLO AVE

LINCOLN AVE
7TH

ST ANDRADE AVE

GARRARD BLV
D

ESMOND AVE

TEWKSBURY AVE CARLSON BLVDFLORIDA AVE
PARKRI
DGEDR
PA

RKSIDE D R

HILLTOP
M
ALLRD

REGAT T A
BLVD

AUTO PLZ
6TH ST

RHEEM AVE

MCBRYDE
AV
E

KEITHDR

MAINE AVE
B

AY VI EWAVE

HILLTOP DR

BLUME DR

VIEW DR

HILLVIEW DR
SHA
NE D
R

SANTA R
ITARD

COSTA AVE

VALLEYVIEW R
D
GIA
NT
HWY

MACDONALD AVE
COLL
IN
S AV
E

HENSLEY S T
RICHM
ONDAVE

MARINA WAY

BUSH AVE
MARI
NA
BAY
PKW
Y
23RD ST
47TH
ST
8TH ST
16TH ST
4TH ST

HALL AVE

VIRGINIA AVE

TULARE AVE

LINKSDR
29TH STGARVIN AVE
RO

CKROSEWAY

POTRERO AVE

CUTTING BLVD
45TH ST
SCE
N
ICA
V E
WEST
ERNDR
35TH ST
LAKES

IDE D R
PA
RK

CEN TRAL

WRIGHT AVE

BROADWAY

ATLAS RD
22ND ST
MEADOW

VIEW DR
37TH ST

VIA VERDI
PAIN

TEDPONY RD

OHIO AVE

SANTAFE A
VE

RIPLEY AVE
20TH ST

MOYERS RD

LUCAS AVE

GRANT AVE
CURRY
ST
MAY RD
38TH ST

KEYBLVD

SAN MATEO ST

BURBECK AVE
33RD ST

ROOSEVEL T AVE

GOODRICK AVE
TE

HAMA AV
E
FRAN
WA Y

WALL AVE

NEVIN AVE
SAN
JO
AQUIN
ST

MONTEREY ST
13TH ST

SELMIGRV
52ND ST

GROOM DR
30TH ST
24TH ST

CHANSLOR AVE CARLSTO
N ST
34TH ST
39TH ST

CLINTON AVE
AM
END
RD

LOWELL AVE
55TH ST

BUC KBOARD WA Y

CARRIAGEDR

ALAMO AVE
28TH ST

SHELDONDR
42ND ST

HEAVENLY RIDGE LN

BERK AVE

MORNING SIDE D
R
CANAL
BL
VD
COA
CH
DR
11TH ST
PARK
RID
GE
DR

SIERRA AVE
12TH ST
W
ISW
ALL
DR

JENKINS WAY
DUKE
AVE
SA
N
LU
IS ST
OX
FOR
D
A
VE
BAR
KLEYDR

OVEREND AVE
57TH ST

CER RO SUR
56TH
ST
B ST

AMADOR ST
18TH ST

CENTER AVE

PARKER RD
17TH ST
3RD ST
1ST ST
15TH ST

MARICOPA AVE

SANFORD AVE
2ND ST
KLOSEW
AY

KIPLING
DR

JOANNDR
49TH ST

NELSONDR

MOZARTDR
9TH ST

DUNN AVE
19TH ST

COALINGA AVE
21ST ST

BISSELL AVE
31ST ST
5TH ST

GAYNOR AVE
MEADE
ST

YUBA ST

KERN STLASSEN ST

ROCKY R
D
DO
RNAN
DR

BARRETT AVE
HARBO
UR W
AY

FASCINATION
CIR

CO NTRA
CO STA

COLLE GE
0 0.5 1 MILES
San Francisco Bay

PROPOSED BICYCLE

FACILITIES
Prioritization Category
High Priority Project
Medium Priority Project
Opportunity Project
Figure 12 P roposed Bicycle Improvements by Prioritization Category 65 Implementation
Richmond Bicycle and Pedestrian Action Plan

BICYCLE

PROJECT

PRIORITIZATION

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/4/2022.

EXISTING BICYCLE

FACILITIES
Existing Bicycle Facilities
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
!
!
!! !
!
!!
!
!
!
!
!!
!!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80

EL CERRITO
SAN
PABLO

EAST RICHMOND

HEIGHTS
NORTH

RICHMOND

MIL L ER-KNOX

REG IO NAL

SHO REL INE

WILDCAT CANYON

REGIONAL PARK

BOOK E R T

ANDERSO N JR

U NITY PARK

SAN PABLO AVELINCOLN AVE
HELLINGS AVE7THST ANDRADE AVE
2ND ST

CARLSON BLVD

REGATTA BLVD
6TH ST

RHEEM AVE

MAINE AVE

CUTTING BLVD

BAYVIEW
AVE

ESMOND AVE

HARTNETT

AVEMARI
NA BAY
PKWY
47TH ST

FOOTHILLAVE

COSTA AVE

MCBRYDE AVE

MEEKER AVE

MACDONALD AVE

HENSLEY ST

MARINA WAY

MACDONALD AVE
23RD ST
8TH ST
16TH ST

MORAN AVE

PENNSYLVANIA AVE

POTRERO AVE

HARBOUR WAY
4TH ST

HALL AVE

TULARE AVE

GARVIN AVE
45TH ST

PINE AVE
44TH ST

WHARF ST
35TH ST

MEADE S
T

WRIGHT AVE
BROAD
WAY
22ND ST
37TH ST

PENINSULADR
41ST
ST

OHIO AVE

RIPLEY AVE
20TH ST

LUCAS AVE

FLEMING AVE

GRANT AVE

CURRY ST
38TH ST
KEY
BLVD
59TH ST

SAN MATEO ST
BURBECK AVE10TH ST

ROOSEVEL T AVE

EGRET WAY

TEHAMA AVE

MOUNTST

DOWNER AVE

NEVIN A VE
POR
TOLA A
VE
33RD ST
SA
N

JOAQUIN S
T
34TH ST

MONTEREY ST

MERCED ST
13TH ST
52ND ST
DIMM
ST
24TH ST
26TH ST

CHANSLOR AVE
CAR
LST
ON
ST

YUBA ST
28TH ST

WALL AVE

CLINTON AVE
COLLIN
SST

WILSON AVE

HOFFMAN BLVD

LOWELL AVE
30TH ST

VAN FLEET AVE
55 TH
ST

SANTA CLARA ST
56TH ST

AMADOR ST
13TH ST
HU
M
BOLDT
ST

VIRGINIA AVE
HINKLE
Y AVE

ALAMO AVE

FALL AVE
42ND ST

ESPEE AVE
21ST ST

BERK AVE
CANAL
BLVD
11TH ST
SO
NOM
A
ST

BURLINGAME AVE

SIERRA AVE
M

CLAUGHL
IN
ST

SOUTH ST

BE RK PL
12TH ST

SAN LUIS ST
36TH ST
15TH ST

OVEREND AVE
57TH ST
B ST

DUBOCE AVE

CENTER AVE
17TH ST
3RD ST
1ST ST

MARICOPA AVE

SANFORD AVE

WILLARD AVE

FLORIDA AVE
50TH ST
27TH ST29TH ST
49TH ST

COLUMBIA AVE

OHIO AVE

FRESNO AVE

HUMPHREY AVE
9TH ST

DUNN AVE
18TH ST
C ST
19TH ST

COALINGA AVEFACTORY
ST

WALLER AVE
40TH ST39TH ST

CREELY AVE
5TH ST

BISSELL AVE
31ST ST

VISALIA AVE
32ND ST

GATELY AVE
43RD ST

MARIPOSA ST
25TH ST

GAYNOR AVE

WENDELL AVE
46TH ST

KERN ST
LASSEN
ST

VENTURA ST

SPRING ST
58TH ST

BELL AVE

STEGE AVE

TAFT AVE

BARRETT AVE
0 0.5 1 MILES

PROPOSED BICYCLE

FACILITIES
Prioritization Category
High Priority Project
Medium Priority Project
Opportunity Project

CENTRAL CORE

CENTRAL
CORE
Figure 13 P roposed Bicycle Improvements by Prioritization Category (Central Core) 66 Implementation
Richmond Bicycle and Pedestrian Action Plan

BICYCLE

PROJECT

PRIORITIZATION

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/4/2022.

EXISTING BICYCLE

FACILITIES
Existing Bicycle Facilities
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
!
!
! !
!
!
!!
Ä4
¥80
¥80

EL CERRITO
PINOLE

SAN PABLO
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

MONTALVIN
MANOR

ROLLINGWOOD
TARA
HILLS
SAINT

JO SEPH

CEMETERY

PO INT PINO L E
REG

SHO REL INE

SO BRANTE

RIDG E REG

PRESERVE

RICHMO ND

CO UNTRY
CLUB

WILDCAT CANYON

REGIONAL PARK

KENNEDY

G ROVE REG

REC AREA

SAN PABLO

RESERVO IR

REC AREA

PINO L E PARK

ROLLIN G
HIL LS

MEMO RIAL
PARK

CAS TRO RANCHRD

PINE AVE

ANDRADE AVE

SAN PABLO AVE

PARKRIDGEDR

PARKSIDE DR

HILLTOP
M

ALLRD AUTO PLZ

RHEEM AVE

MCBRYDE
AVE

KEITHDR

BARRETT AVE

ESMOND AVE

HILLTOP DR
BLUME
DR

VIEW DR

HILLVIEW DR

SHANE D
R

SANTA R
ITARD

COSTA AVE

VALLEYVIEW
RD
GIA
NT
HWY

MACDONALD AVE

COLLINS AVE
23RD ST

TULARE AVE
LIN
KS DR
29TH ST
RO
CKROSE
WAY
35TH ST
LAKES
IDE DR
PARK

CENTRAL

ATLAS RD
22ND ST

VIA VERDI
PAIN

TEDPONY RD
MOYERS
RD

GRANT AVE
MAY RD
37TH ST
FRA
N
WA Y

ROOSEVEL T AVE

DOWNER AVE

NEVIN AVEBISSELL AVE
34TH ST

SELMIGRV

GROOM DR
30TH ST
24TH ST20TH ST
AME
NDRD

LOWELL AVE
19TH ST

AMADOR ST

BUCKBOARD W
AY

CARRIAGEDR

SHELDON DR HEAVENLY RIDGE LN

MORNING SIDE DR

GARVIN AVE
COA
CH
DR
PARK
RIDGE
D
R
SIERRA
AVE
KEY B
LVD
W
IS
W
ALL
DR
DUKE
AVE
36T
H
ST
BARK
LEY
DR

CE RRO SUR

PARKE R RD
33RD ST

KL OSEW
AY

KIPLING
DR

JOANNDR

NELSONDR
17TH ST
40TH ST
39TH ST
18TH ST
31ST ST

WOOD GLENDR
32ND ST

GAYNOR AVE

YUBA ST

KERN STLASSEN ST

ROCKY RD
FA

SCINATION
CIR

CO NTRA
CO STA

COLLE GE
0 0.5 1 MILES

BICYCLE

PROJECT

PRIORITIZATION
High Priority Project
Medium Priority Project
Opportunity Project

NORTH RICHMOND
NORTH

RICHMOND
Figure 14 P roposed Bicycle Improvements by Prioritization Category (North Richmond) 67 Implementation
Richmond Bicycle and Pedestrian Action Plan

HIGH PRIORITY

BICYCLE

PROJECTS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/4/2022.

EXISTING BICYCLE

FACILITIES
Existing Bicycle
Facilities
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
0 0.5 1 MILES
San Francisco Bay

PROPOSED BICYCLE

FACILITIES
High Priority Project
Medium Priority and
Opportunity Project
!
!
!
!
!
!
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
! !
!
!!!
!! !
! !
!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80
¥80

EL CERRITO
PINOLE
SAN
PABLO

BERKELEY
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

KENSINGTON

MONTALVIN
MANOR

NORTH RICHMOND

ROLLINGWOOD
TARA
HILLS
SAINT

JO SEPH

CEMETERY

MIL L ER-KNOX

REG IO NAL

SHO REL INE
PO INT

PINO L E REG

SHO REL INE

SO BRANTE

RIDG E REG

PRESERVE

RICHMO ND

CO UNTRY
CLUB

TIL DEN

REG IO NAL
PARK

TIL DEN

NATU RE

STU DY AREA

WILDCAT CANYON

REGIONAL PARK

KENNEDY

G ROVE REG

REC AREA

SAN PABLO

RESERVO IR

REC AREA

PINO L E PARK

MIRA VISTA

CO UNTRY

C L U B & G O L F

HILLSIDE

NATU RAL
AREA

ROLLIN G
HIL LS

MEMO RIAL
PARK

FIE LDC
REST
DR

CASTRORANCH RD

PINE AVE

SAN PABLO AVE

CUTTING BLVD
7TH

ST ANDRADE AVE

GARRARD BL

VDTEWKSBURY AVE CARLSON BLVDFLORIDA AVE
PARKRI
DGEDR

PARKSIDE D R

HILLTOP
M
ALLRD

REGAT T A
BL
VD

AUTO PL
Z
6TH ST

RHEEM AVE

MCBRYDE
AVE

KEITHDR

MAINE AVE

ESMOND AVE

HILLTOP DR
BLUME
DR

VIEW DR

HILLVIEW DR

FOOTHILLAVE
SHAN
EDR

SANTA RIT
ARD

COSTA AVE

VALLEYVIEW R
D

BAYVIEW AVE

GIANT HWY

MACDONALD AVE

COLLINS A
VE
HE

NSLEY S T
RICHMO
NDAVE

MARINA WAY
23RD ST
47TH
ST
8TH ST
16TH ST

POTRERO AVE
4TH ST

HALL AVE

VIRGINIA AVE

TULARE AVE

LINKSDR
29TH STGARVIN AVE
RO
CK
ROSE
WAY
45TH ST
SCE
N
ICA
V E
WEST
ERNDR
LAKES

IDE D R

MEADEST
P
ARK

CENTRAL

WRIGHT AVE

ATLAS RD
22ND ST
MEADOW

VIEW DR
37TH ST

VIA VERDI
PAIN

TEDPONY RD

OHIO AVE

SANTAFE A
VE

RIPLEY AVE
20TH ST
MOYERS
RD

LUCAS AVE

GRANT AVE
CURR
YST
MAY RD
38TH ST
KEY

BLVDCANAL
BL
VD

SAN MATEO ST

BURBECK AVE
33RD ST

ROOSEVEL T AVE

GOODRICK AVE
TE

HAMA AV
E
FRAN
W
A Y

WALL AVE

NEVIN AVE
SAN J

OAQUIN ST
34TH ST

MONTEREY ST
13TH ST

SELMIGRV
52ND ST

GROOM DR
26TH ST

CHANSLOR AVE CARLSTO
N
ST
39TH ST
M
ARINA
BAY
PKWY

AMENDRD

LOWELL AVE
30TH ST
55TH ST

BUC KBOARD WAY

CARRIAGEDR

ALAMO AVE
28TH ST

SHELDONDR
42ND ST

HEAVENLY RIDGE LN

BERK AVE

MORNING SIDE DR
24TH ST
COA
CH
DR
11TH ST
PARK
RID
GE D
R
SIERRA
AVE
12TH ST
W
ISW
AL
L
DR

JENKINS WAY
DUKE
AVE
SA
N
LUIS
ST
O
X
FORD
A
VE
BA

RKLEYDR

OVEREND AVE
56TH
ST
B ST

AMADOR ST
18TH ST

CENTER AVE

PARKER RD
17TH ST
3RD ST
1ST ST
15TH ST

MARICOPA AVE

SANFORD AVE
2ND ST
50TH ST

K LOSEW
AY

KIPLING
DR

JOANNDR
49TH ST
NELSO
NDR
9TH ST

DUNN AVE
19TH ST

COALINGA AVE

GAYNOR AVE
21ST ST

BISSELL AVE
31ST ST32ND ST
5TH ST
DORN
AN
DR

YUBA ST

KERN STLASSEN ST

ROCKY R
D

BARRETT AVE
HA
RBOU
R
WAY

FASCINATION
CIR

CO NTRA
CO STA

COLLE GE
Figure 15 H igh Priority Bicycle Improvement Projects
68 Implementation
Richmond Bicycle and Pedestrian Action Plan

HIGH PRIORITY

BICYCLE PROJECTS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/4/2022.

EXISTING BICYCLE

FACILITIES
Existing Bicycle Facilities
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
!
!
!! !
!
!!
!
!
!
!
!!
!!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80

EL CERRITO
SAN
PABLO

EAST RICHMOND

HEIGHTS
NORTH

RICHMOND

MIL L ER-KNOX

REG IO NAL

SHO REL INE

WILDCAT CANYON

REGIONAL PARK

BOOK E R T

ANDERSO N JR

U NITY PARK

SAN PABLO AVELINCOLN AVE
HELLINGS AVE7THST ANDRADE AVE
2ND ST

CARLSON BLVD

REGATTA BLVD
6TH ST

RHEEM AVE

MAINE AVE

CUTTING BLVD

BAYVIEW
AVE

ESMOND AVE

HARTNETT

AVEMARI
NA BAY
PKWY
47TH ST

FOOTHILLAVE

COSTA AVE

MCBRYDE AVE

MEEKER AVE

MACDONALD AVE

HENSLEY ST

MARINA WAY

MACDONALD AVE
23RD ST
8TH ST
16TH ST

MORAN AVE

PENNSYLVANIA AVE

POTRERO AVE

HARBOUR WAY
4TH ST

HALL AVE

TULARE AVE

GARVIN AVE
45TH ST

PINE AVE
44TH ST

WHARF ST
35TH ST

MEADE S
T

WRIGHT AVE
BROAD
WAY
22ND ST
37TH ST

PENINSULADR
41ST
ST

OHIO AVE

RIPLEY AVE
20TH ST

LUCAS AVE

FLEMING AVE

GRANT AVE

CURRY ST
38TH ST
KEY
BLVD
59TH ST

SAN MATEO ST
BURBECK AVE10TH ST

ROOSEVEL T AVE

EGRET WAY

TEHAMA AVE

MOUNTST

DOWNER AVE

NEVIN A VE
POR
TOLA A
VE
33RD ST
SA
N

JOAQUIN S
T
34TH ST

MONTEREY ST

MERCED ST
13TH ST
52ND ST
DIMM
ST
24TH ST
26TH ST

CHANSLOR AVE
CAR
LST
ON
ST

YUBA ST
28TH ST

WALL AVE

CLINTON AVE
COLLIN
SST

WILSON AVE

HOFFMAN BLVD

LOWELL AVE
30TH ST

VAN FLEET AVE
55 TH
ST

SANTA CLARA ST
56TH ST

AMADOR ST
13TH ST
HU
M
BOLDT
ST

VIRGINIA AVE
HINKLE
Y AVE

ALAMO AVE

FALL AVE
42ND ST

ESPEE AVE
21ST ST

BERK AVE
CANAL
BLVD
11TH ST
SO
NOM
A
ST

BURLINGAME AVE

SIERRA AVE
M

CLAUGHL
IN
ST

SOUTH ST

BE RK PL
12TH ST

SAN LUIS ST
36TH ST
15TH ST

OVEREND AVE
57TH ST
B ST

DUBOCE AVE

CENTER AVE
17TH ST
3RD ST
1ST ST

MARICOPA AVE

SANFORD AVE

WILLARD AVE

FLORIDA AVE
50TH ST
27TH ST29TH ST
49TH ST

COLUMBIA AVE

OHIO AVE

FRESNO AVE

HUMPHREY AVE
9TH ST

DUNN AVE
18TH ST
C ST
19TH ST

COALINGA AVEFACTORY
ST

WALLER AVE
40TH ST39TH ST

CREELY AVE
5TH ST

BISSELL AVE
31ST ST

VISALIA AVE
32ND ST

GATELY AVE
43RD ST

MARIPOSA ST
25TH ST

GAYNOR AVE

WENDELL AVE
46TH ST

KERN ST
LASSEN
ST

VENTURA ST

SPRING ST
58TH ST

BELL AVE

STEGE AVE

TAFT AVE

BARRETT AVE
0 0.5 1 MILES

PROPOSED BICYCLE

FACILITIES
High Priority Project
Medium Priority and
Opportunity Project

CENTRAL CORE

CENTRAL
CORE
Figure 16 H igh Priority Bicycle Improvement Projects (Central Core) 69 Implementation
Richmond Bicycle and Pedestrian Action Plan

HIGH PRIORITY

BICYCLE PROJECTS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/4/2022.

EXISTING BICYCLE

FACILITIES
Existing Bicycle Facilities
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
!
!
! !
!
!
!!
Ä4
¥80
¥80

EL CERRITO
PINOLE

SAN PABLO
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

MONTALVIN
MANOR

ROLLINGWOOD
TARA
HILLS
SAINT

JO SEPH

CEMETERY

PO INT PINO L E
REG

SHO REL INE

SO BRANTE

RIDG E REG

PRESERVE

RICHMO ND

CO UNTRY
CLUB

WILDCAT CANYON

REGIONAL PARK

KENNEDY

G ROVE REG

REC AREA

SAN PABLO

RESERVO IR

REC AREA

PINO L E PARK

ROLLIN G
HIL LS

MEMO RIAL
PARK

CAS TRO RANCHRD

PINE AVE

ANDRADE AVE

SAN PABLO AVE

PARKRIDGEDR

PARKSIDE DR

HILLTOP
M

ALLRD AUTO PLZ

RHEEM AVE

MCBRYDE
AVE

KEITHDR

BARRETT AVE

ESMOND AVE

HILLTOP DR
BLUME
DR

VIEW DR

HILLVIEW DR

SHANE D
R

SANTA R
ITARD

COSTA AVE

VALLEYVIEW
RD
GIA
NT
HWY

MACDONALD AVE

COLLINS AVE
23RD ST

TULARE AVE
LIN
KS DR
29TH ST
RO
CKROSE
WAY
35TH ST
LAKES
IDE DR
PARK

CENTRAL

ATLAS RD
22ND ST

VIA VERDI
PAIN

TEDPONY RD
MOYERS
RD

GRANT AVE
MAY RD
37TH ST
FRA
N
WA Y

ROOSEVEL T AVE

DOWNER AVE

NEVIN AVEBISSELL AVE
34TH ST

SELMIGRV

GROOM DR
30TH ST
24TH ST20TH ST
AME
NDRD

LOWELL AVE
19TH ST

AMADOR ST

BUCKBOARD W
AY

CARRIAGEDR

SHELDON DR HEAVENLY RIDGE LN

MORNING SIDE DR

GARVIN AVE
COA
CH
DR
PARK
RIDGE
D
R
SIERRA
AVE
KEY B
LVD
W
IS
W
ALL
DR
DUKE
AVE
36T
H
ST
BARK
LEY
DR

CE RRO SUR

PARKE R RD
33RD ST

KL OSEW
AY

KIPLING
DR

JOANNDR

NELSONDR
17TH ST
40TH ST
39TH ST
18TH ST
31ST ST

WOOD GLENDR
32ND ST

GAYNOR AVE

YUBA ST

KERN STLASSEN ST

ROCKY RD
FA

SCINATION
CIR

CO NTRA
CO STA

COLLE GE
0 0.5 1 MILES

BICYCLE

PROJECT

PRIORITIZATION
High Priority Project
Medium Priority and
Opportunity Project

NORTH RICHMOND
NORTH

RICHMOND
Figure 17 H igh Priority Bicycle Improvement Projects (North Richmond) 70 Implementation
Richmond Bicycle and Pedestrian Action Plan
Table 08 B icycle Projects by Prioritization Scores

STREET START END RECOMMENDED FACILITY MILES PRIORITIZATION SCORE

PRIORITIZATION

CATEGORY
Carlson Blvd Richmond Greenway Broadway Class I Shared-Use Path 0.07 81 High-Priority 23rd St Overcrossing Richmond Greenway Richmond Greenway Class I Shared-Use Path 0.11 80 High-Priority Central Ave Jacuzzi St Pierce St Class I Shared-Use Path 0.10 79 High-Priority Harbour Way Richmond Greenway Macdonald Ave Class II Bicycle Lane 0.31 77 High-Priority 16th St Macdonald Ave Livingston Ln Class IV Separated Bikeway 0.01 77 High-Priority Macdonald Ave Harbour Way 16th St Class III Bicycle Route 0.32 77 High-Priority 16th St Nevin Plaza Richmond Greenway Class IIIB Bicycle Boulevard 0.08 77 High-Priority Nevin Ave Marina Way 15th St Class IIIB Bicycle Boulevard 0.05 76 High-Priority Pierce St Central Ave Cerrito Creek Class IV Separated Bikeway 0.23 75 High-Priority Marina Way Macdonald Ave Richmond Greenway Class II Bicycle Lane 0.30 75 High-Priority S 49th St Wall Ave Cutting Blvd Class IIIB Bicycle Boulevard 0.17 75 High-Priority 23rd St Broadway Brooks Ave Class II Bicycle Lane 0.61 75 High-Priority Espee Ave Bisell Ave Trail south of Chanslor
Ave Class IIIB Bicycle Boulevard 0.19 75 High-Priority
Carlson Blvd Bayview Ave Broadway Class IV Separated Bikeway 1.81 73 High-Priority Carlson Blvd Bayview Ave Tehama Ave Class IIB Buffered Bicycle Lane 0.49 72 High-Priority Bayview Ave Seaport Ave S 55th St Class IIB Buffered Bicycle Lane 0.36 72 High-Priority Barrett Ave 19th St Marina Way Class IV Separated Bikeway 0.21 72 High-Priority Plaza Way S 49th St S 50th St Class IIIB Bicycle Boulevard 0.05 72 High-Priority Ohio Ave Harbour Way 2nd St Class IIIB Bicycle Boulevard 0.42 72 High-Priority Barrett Ave 19th St 22nd St Class II Bicycle Lane 0.20 71 High-Priority 71 Implementation
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES PRIORITIZATION SCORE

PRIORITIZATION

CATEGORY
Harbour Way Macdonald Ave Barrett Ave Class II Bicycle Lane 0.19 71 High-Priority New Shared-Use
Path S 28th St S 29th St Class I Shared-Use Path 0.07 70 High-Priority Nevin Ave 8th St 11th St Class IIIB Bicycle Boulevard 0.15 70 High-Priority San Joaquin St Central Ave Imperial Ave Class III Bicycle Route 0.83 69 High-Priority Berk Ave - S 49th St Cutting Blvd Cutting Blvd Class IIIB Bicycle Boulevard 0.78 68 High-Priority Spring St S 29th St Regatta Blvd Class IIIB Bicycle Boulevard 0.52 68 High-Priority Tewksburry Ave Santa Fe Ave Washington Ave Class IV Separated Bikeway 0.10 68 High-Priority 22nd St Brooks Ave Bissell Ave Class II Bicycle Lane 0.49 68 High-Priority Chanslor Ave 2nd St 8th St Class IIIB Bicycle Boulevard 0.32 67 High-Priority Macdonald Ave Richmond Parkway Harbour Way Class II Bicycle Lane 0.70 67 High-Priority Cutting Blvd Hoffman Blvd Carlson Blvd Class IV Separated Bikeway 1.43 67 High-Priority BNSF Easement
near Railroad Ave
(not acquired yet)
Richmond Ave Washington Ave Class I Shared-Use Path 0.23 66 High-Priority Bissell Ave Richmond Parkway Espee Ave Class IIIB Bicycle Boulevard 1.29 66 High-Priority Ells St Flemino Ave Bayview Ave Class IIIB Bicycle Boulevard 0.11 65 High-Priority Macdonald Ave 16th St Key Blvd Class II Bicycle Lane 1.80 65 High-Priority Miraflores Greenbelt
- Ohio Connection S 45th St Miraflores Greenbelt Class I Shared-Use Path 0.10 65 High-Priority 45th St Nevin Ave Macdonald Ave Class IIIB Bicycle Boulevard 0.08 65 High-Priority Ohio Ave 17th St 23rd St Class II Bicycle Lane 0.30 65 High-Priority 25th St Macdonald Ave Roosevelt Ave Class IIIB Bicycle Boulevard 0.30 65 High-Priority Table 08 Bicycle Projects by Prioritization Scores (continued). 72 Implementation
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES PRIORITIZATION SCORE

PRIORITIZATION

CATEGORY
2nd/ S 2nd St I-580 Pennsylvania Ave Class IIIB Bicycle Boulevard 1.05 64 Medium Priority Project Nevin Ave Richmond Parkway 8th St Class IIIB Bicycle Boulevard 0.54 64 Medium Priority Project 6th St Maine Ave Ripley Ave Class III Bicycle Route 0.73 64 Medium Priority Project Southside Park Trail
extension S 7th St Cutting Blvd Class I Shared-Use Path 0.11 64 Medium Priority Project 23rd St Brooks Ave Maricopa Ave Class II Bicycle Lane 0.66 63 Medium Priority Project New Shared-Use
Path Lincoln Ave Garvin Ave Class I Shared-Use Path 0.14 63 Medium Priority Project Wilson Ave McBryde Ave 44th St Class IIIB Bicycle Boulevard 0.70 63 Medium Priority Project S 41st St Center Ave Cutting Blvd Class IIIB Bicycle Boulevard 0.33 63 Medium Priority Project Bayview Ave Seaport Ave S 55th St Class IV Separated Bikeway 0.36 63 Medium Priority Project 43rd St Macdonald Ave Wilson Ave Class IIIB Bicycle Boulevard 0.42 63 Medium Priority Project 13th St Harbour Way Costa Ave / City
Boundary Class IV Separated Bikeway 0.60 62 Medium Priority Project Maine Ave S 2nd St Harbour Way Class IIIB Bicycle Boulevard 0.43 62 Medium Priority Project Barrett Ave A St 7th St Class IIIB Bicycle Boulevard 0.34 62 Medium Priority Project S 47th St - Fall Ave -
S 45th St - Overend
Ave - JFK Park
Wall Ave Potrero Ave Class IIIB Bicycle Boulevard 0.64 61 Medium Priority Project Nevin Ave 27th St 45th St Class IIIB Bicycle Boulevard 0.85 61 Medium Priority Project 7th St Barrett Ave Ripley Ave Class II Bicycle Lane 0.13 61 Medium Priority Project San Luis St Central Ave Carlson Blvd Class III Bicycle Route 0.75 60 Medium Priority Project S 55th St San Joaquin St Creely Ave / City
Boundary Class III Bicycle Route 0.58 60 Medium Priority Project Table 08 Bicycle Projects by Prioritization Scores (continued). 73 Implementation
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES PRIORITIZATION SCORE

PRIORITIZATION

CATEGORY
Maine Ave S 12th St S 28th St Class IIIB Bicycle Boulevard 0.82 60 Medium Priority Project San Pablo Ave Natalie Ct (City
Boundary)
Macdonald Ave (City
Boundary) Class IV Separated Bikeway 1.34 60 Medium Priority Project Barrett Ave San Pablo Ave Key Blvd Class II Bicycle Lane 0.11 60 Medium Priority Project S 47th St - I-580
Overpass Carlson Blvd Meade St Class I Shared-Use Path 0.08 60 Medium Priority Project Central Ave Existing Bay Trail Rydin Rd Class I Shared-Use Path 0.02 59 Medium Priority Project S 47th St Potrero Ave Carlson Blvd Class II Bicycle Lane 0.28 59 Medium Priority Project Southside Park Trail
west extension S 3rd St S 2nd St Class I Shared-Use Path 0.06 59 Medium Priority Project Grant Ave 23rd St 24th St Class III Bicycle Route 0.14 58 Medium Priority Project Center Ave Carlson Blvd S 41st St Class IIIB Bicycle Boulevard 0.76 57 Medium Priority Project S 2nd St I-580 Cutting Blvd Class II Bicycle Lane 0.13 57 Medium Priority Project Barrett Ave 43rd St 45th St Class II Bicycle Lane 0.07 57 Medium Priority Project 20th St Espee Ave Potero Ave Class IIIB Bicycle Boulevard 0.67 57 Medium Priority Project Klose Way Hilltop Mall Rd Blume Dr Class II Bicycle Lane 0.10 57 Medium Priority Project S 33rd St Wall Ave Nevin Ave Class IIIB Bicycle Boulevard 0.53 56 Medium Priority Project Esmond Ave San Pablo Ave 37th St Class IIIB Bicycle Boulevard 0.12 56 Medium Priority Project Cypress Ave S 47th St Ells St Class IIIB Bicycle Boulevard 0.21 55 Medium Priority Project 15th St Roosevelt Ave Costa Ave Class IIIB Bicycle Boulevard 0.72 55 Medium Priority Project Coalinga Ave 13th St 23rd St Class IIIB Bicycle Boulevard 0.54 55 Medium Priority Project Robert Miller Dr Hilltop Mall Rd Hilltop Dr Class II Bicycle Lane 0.08 55 Medium Priority Project S 45th St Richmond Greenway Wall Ave Class IIIB Bicycle Boulevard 0.22 54 Medium Priority Project Table 08 Bicycle Projects by Prioritization Scores (continued). 74 Implementation
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES PRIORITIZATION SCORE

PRIORITIZATION

CATEGORY
24th St Maricopa Ave Downer Ave Class IIIB Bicycle Boulevard 0.53 54 Medium Priority Project Grant Ave 24th St 30th St Class II Bicycle Lane 0.32 54 Medium Priority Project Marina Bay Pkwy Cutting Blvd Meeker Ave Class IV Separated Bikeway 0.39 53 Medium Priority Project Elm St 7th St 8th St Class IIIB Bicycle Boulevard 0.05 53 Medium Priority Project Wright Ave Marina Way S 19th St Class II Bicycle Lane 0.24 53 Medium Priority Project E Richmond Ave Gerrard Blvd Canal Blvd Parking
Lot Cut Through Class II Bicycle Lane 0.27 53 Medium Priority Project Roosevelt Ave Portola Ave 44th St Class IIIB Bicycle Boulevard 1.56 53 Medium Priority Project 30th St Garvin Ave Nevin Ave Class IIIB Bicycle Boulevard 0.55 53 Medium Priority Project 25th St Grant Ave Downer Ave Class II Bicycle Lane 0.12 53 Medium Priority Project S 19th St Wright Ave Meeker Ave Class III Bicycle Route 0.10 53 Medium Priority Project 27th St Broadway Grant Ave Class IIIB Bicycle Boulevard 0.45 53 Medium Priority Project Marina Way Richmond Greenway Waterfront / Lucretia
Edwards Park Class IV Separated Bikeway 1.48 52 Medium Priority Project Wall Ave S 41st St S 49th St Class IIIB Bicycle Boulevard 0.40 52 Medium Priority Project McBryde Ave San Pablo Ave Wildcat Canyon
Parking Lot Class II Bicycle Lane 0.65 51 Medium Priority Project Maricopa Ave 23rd St 36th St Class IIIB Bicycle Boulevard 0.77 50 Medium Priority Project Regatta Blvd Marina Bay Pkwy S 32nd St Class II Bicycle Lane 0.37 50 Medium Priority Project Key Blvd Macdonald Ave Clinton Ave Class II Bicycle Lane 0.51 50 Medium Priority Project Garvin Ave Portola Ave San Pablo Ave Class IIIB Bicycle Boulevard 1.57 49 Medium Priority Project Marina Bay Pkwy I-580 Meeker Ave Class I Shared-Use Path 0.16 49 Medium Priority Project Table 08 Bicycle Projects by Prioritization Scores (continued). 75 Implementation
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES PRIORITIZATION SCORE

PRIORITIZATION

CATEGORY
Hilltop Mall Rd Hilltop Mall Rd Hilltop Mall Rd Class IV Separated Bikeway 1.28 49 Medium Priority Project Regatta Blvd Spring St Julia Woods St Class III Bicycle Route 0.11 49 Medium Priority Project S 39th St Center Ave Richmond Greenway Class IIIB Bicycle Boulevard 0.08 49 Medium Priority Project S 56th St Tehama Ave Carlos Ave / City
Boundary Class III Bicycle Route 0.64 48 Medium Priority Project Hilltop Dr Robert Miller Dr Park Central St Class IV Separated Bikeway 1.11 48 Medium Priority Project Filbert St Chesley Ave Existing Class II Class IIIB Bicycle Boulevard 0.34 48 Medium Priority Project Wall Ave S 39th St S 41st St Class I Shared-Use Path 0.09 47 Medium Priority Project Wall Ave S 33rd St John F. Kennedy Park Class IIIB Bicycle Boulevard 0.34 47 Opportunity Project Alamo Ave Cherry St City Boundary (North
Richmond) Class IIIB Bicycle Boulevard 0.45 47 Opportunity Project Shane Dr Hilltop Mall Rd Hilltop Dr Class IV Separated Bikeway 0.12 47 Opportunity Project 7th St 7th St bike lane Lincoln Ave Class III Bicycle Route 0.10 46 Opportunity Project Amador Street McBryde Ave Clinton Ave Class III Bicycle Route 0.51 46 Opportunity Project Tehama Ave Carlson Blvd City Boundary (El
Cerrito) Class IIIB Bicycle Boulevard 0.40 45 Opportunity Project Meade St Regatta Blvd Seaport Ave Class IV Separated Bikeway 0.72 45 Opportunity Project Clinton Ave Key Blvd City Boundary Class IIIB Bicycle Boulevard 0.50 45 Opportunity Project Kelsey St Chesley Ave Willard Ave Class IIIB Bicycle Boulevard 0.25 45 Opportunity Project Regatta Blvd Regatta Blvd Trail Julia Wood St/Spring
St Class IV Separated Bikeway 0.20 45 Opportunity Project Richmond Pkwy San Pablo Ave Blume Dr Class IV Separated Bikeway 0.94 45 Opportunity Project Sacramento Ave San Pablo Abe San Luis St Class IIIB Bicycle Boulevard 0.41 44 Opportunity Project Table 08 Bicycle Projects by Prioritization Scores (continued). 76 Implementation
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES PRIORITIZATION SCORE

PRIORITIZATION

CATEGORY
Potrero Ave Carlson Blvd San Pablo Ave
(beyond City limit) Class II Bicycle Lane 0.97 44 Opportunity Project Marina Bay Parkway Regatta Blvd Peninsula Dr Class II Bicycle Lane 0.63 44 Opportunity Project Solano Ave 38th Ave City Boundary Class IIIB Bicycle Boulevard 0.71 44 Opportunity Project Lucas Ave Richmond Parkway Lucas Park Class IIIB Bicycle Boulevard 0.32 44 Opportunity Project Hilltop Dr Richmond Parkway Robert Miller Dr Class IV Separated Bikeway 0.84 44 Opportunity Project McBryde Ave 23rd St San Pablo Ave Class IIIB Bicycle Boulevard 0.91 44 Opportunity Project 29th St Howard St Garvin Ave Class IIIB Bicycle Boulevard 0.66 44 Opportunity Project Regatta Blvd Bay Trail / Marina
Park & Green Marina Bay Parkway Class IV Separated Bikeway 0.17 44 Opportunity Project Chesley Ave UPRR BNSF Class IIIB Bicycle Boulevard 0.10 44 Opportunity Project Robin Dr Regatta Blvd Meade St Class I Shared-Use Path 0.34 43 Opportunity Project McGlothen Way -
Phanor Dr - Giant
Hwy
Williams Dr Point Pinole Regional
Shoreline Park Class IIIB Bicycle Boulevard 0.44 43 Opportunity Project Groom Dr - Wiswal
Dr - Parker Rd Oxford Ave Movers Rd Class IIIB Bicycle Boulevard 1.48 43 Opportunity Project Lincoln Ave 8th St 7th St Class IIIB Bicycle Boulevard 0.05 43 Opportunity Project S 51st St Seaport Ave Bay Trail Class IIIB Bicycle Boulevard 0.08 42 Opportunity Project Meeker Ave S 19th St Marina Bay Parkway Class II Bicycle Lane 0.26 41 Opportunity Project Canal Blvd Ohio Ave Cutting Blvd Class IV Separated Bikeway 0.38 41 Opportunity Project San Pablo Ave Hilltop Dr Richmond Pkwy Class IV Separated Bikeway 0.37 41 Opportunity Project Sutter Ave San Luis St San Pablo city limit Class IIIB Bicycle Boulevard 0.42 41 Opportunity Project Table 08 Bicycle Projects by Prioritization Scores (continued). 77 Implementation
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES PRIORITIZATION SCORE

PRIORITIZATION

CATEGORY
New Shared-Use
Path Brookside Dr Richmond Parkway Class I Shared-Use Path 1.47 40 Opportunity Project N Castro St Bay Trail Filbert St Class IIIB Bicycle Boulevard 0.17 40 Opportunity Project Washington Ave Casey Dr Richmond Ave Class III Bicycle Route 0.25 40 Opportunity Project Lakeside Dr Richmond Parkway Research Dr Class II Bicycle Lane 0.54 40 Opportunity Project Research Dr Hilltop Dr Lakeside Dr Class IIIB Bicycle Boulevard 0.05 39 Opportunity Project Park Central St Hilltop Dr Park Central Ct Class IV Separated Bikeway 0.86 39 Opportunity Project Golden Gate Ave Ocean Ave Washington Ave Class III Bicycle Route 0.86 39 Opportunity Project Richmond Ave
- Canal Blvd
connector
Richmond Ave Canal Blvd Class I Shared-Use Path 0.06 38 Opportunity Project Moyers Rd - Oxford
Ave - Birmingham Dr Hilltop Dr Hilltop Dr Class IIIB Bicycle Boulevard 1.89 38 Opportunity Project Valley View Rd City Boundary (El
Sobrante) Pine Hill Dr Class IV Separated Bikeway 0.78 38 Opportunity Project Hensley St Willard Ave Richmond Parkway Class II Bicycle Lane 0.40 38 Opportunity Project Doran Dr Western Dr Brickyard Cove Rd Class IV Separated Bikeway 0.87 38 Opportunity Project El Portal Dr Near I-80 Near San Pablo Dam
Rd Class II Bicycle Lane 0.18 38 Opportunity Project
Hillview Dr Hilltop Mall Rd Hilltop Dr Class IV Separated Bikeway 0.09 38 Opportunity Project Richmond Pkwy Goodrick Ave Hilltop Dr Class IV Separated Bikeway 1.76 37 Opportunity Project San Pablo Dam Rd El Portal Dr City Limits Class IV Separated Bikeway 0.07 37 Opportunity Project Cerrito Ave - 38th St 37th St Solano Ave Class IIIB Bicycle Boulevard 0.22 36 Opportunity Project Canal Blvd Cutting Blvd Seacliff Dr Class IV Separated Bikeway 0.76 36 Opportunity Project Table 08 Bicycle Projects by Prioritization Scores (continued). 78 Implementation
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES PRIORITIZATION SCORE

PRIORITIZATION

CATEGORY
Point Richmond Bike
Boulevard Ocean Ave Garrard Blvd Class III Bicycle Route 1.17 35 Opportunity Project Bay Trail Extension:

Miller-Knox Regional
Shoreline
Existing Bay Trail
near Dornan Dr
Existing Bay Trail near
Brickyard Cove Rd Class I Shared-Use Path 0.40 35 Opportunity Project Park Central St
Shopping Center
Access
Park Central Ct Shopping Center Class I Shared-Use Path 0.03 34 Opportunity Project Wildcat Creek Trail
Gap Closure
Existing trail (North
Richmond)
Existing trail (near
Hubert Park - San
Pablo)
Class I Shared-Use Path 0.34 34 Opportunity Project
San Pablo Ave Hilltop Dr La Puerta Dr Class II Bicycle Lane 0.57 34 Opportunity Project Brickyard Cove Rd Dornan Dr Sandpiper Spit Class II Bicycle Lane 0.30 34 Opportunity Project Molate Point Bay
Trail Extension Stenmark Dr Bridge Trail Class I Shared-Use Path 2.39 33 Opportunity Project Morningside Dr Valley View Rd Full Moon Dr/
Thunderhead Ct Class IIIB Bicycle Boulevard 0.93 33 Opportunity Project May Rd Laurel Ln Valley View Rd Class II Bicycle Lane 0.66 33 Opportunity Project Giant Hwy Collins Ave Richmond Parkway Class IV Separated Bikeway 0.33 33 Opportunity Project Market Ave San Pablo city limit North Richmon city
limit Class IIIB Bicycle Boulevard 0.07 32 Opportunity Project New Shared-Use
Path Bay Trail Meade St Class I Shared-Use Path 0.58 31 Opportunity Project Bayside Dr Marina Bay Pkwy Traffic circle Class II Bicycle Lane 0.15 31 Opportunity Project Giant Hwy Atlas Rd Griffin Dr Class IV Separated Bikeway 0.95 31 Opportunity Project Point Pinole Bay Trail
spur Existing Bay Trail Existing Bay Trail Class I Shared-Use Path 0.60 26 Opportunity Project Table 08 Bicycle Projects by Prioritization Scores (continued). 79 Implementation
Richmond Bicycle and Pedestrian Action Plan

STREET START END RECOMMENDED FACILITY MILES PRIORITIZATION SCORE

PRIORITIZATION

CATEGORY
Point San Pablo Bay
Trail extension
Molate Point Bay
Trail extension Point San Pedro Class I Shared-Use Path 1.63 25 Opportunity Project Bay Trail Extension:

Point Pinole - San
Pablo Bay Regional
Shoreline
Existing Bay Trail Existing Bay Trail Class I Shared-Use Path 1.02 25 Opportunity Project Regatta Blvd S 32nd St Robin Dr Class II Bicycle Lane 0.44 25 Opportunity Project San Pablo Dam Rd Near Martins Ln Near Martins Ln Class IV Separated Bikeway 0.06 24 Opportunity Project Table 08 Bicycle Projects by Prioritization Scores (continued). 80 Implementation
Richmond Bicycle and Pedestrian Action Plan
Pedestrian Project Prioritization Results

PRIORITIZATION CATEGORY POINT RANGE NUMBER OF PROJECTS
High priority 76-100 28
Medium priority 58-75 40
Opportunity priority 0-57 37
Out of 100 possible points, recommended
pedestrian project prioritization scores
ranged between 27 and 81 points. The
average project score was 61. Spot
improvement projects broke down into the
categories shown in Table 9 .

Figures 18-20 below show the category
of each recommended bicycle project.

Figures 21-23 in the following pages
highlight the high-priority projects.

Table 10 lists all spot improvements with
their prioritization score and category.

Table 09
S
pot Recommendation Prioritization Summary
81 Implementation
Richmond Bicycle and Pedestrian Action Plan

PROPOSED

PEDESTRIAN SPOT

IMPROVEMENT

PRIORITIZATION

TRAVEL SAFE
RICHMOND Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/4/2022.

BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
San Francisco Bay
0 0.5 1 MILES

PROPOSED

PEDESTRIAN PROJECTS
Prioritization Category
High Priority Project
Medium Priority
Project
Opportunity Project
!
!
!
!
!
!
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
! !
!
!!!
!! !
! !
!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80
¥80

EL CERRITO
PINOLE
SAN
PABLO

BERKELEY
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

KENSINGTON

MONTALVIN
MANOR
NORTH

RICHMOND ROLLINGWOOD
TARA
HILLS
SAINT

JO SEPH

CEMETERY

MIL L ER-KNOX

REG IO NAL

SHO REL INE
PO INT

PINO L E REG

SHO REL INE

SO BRANTE

RIDG E REG

PRESERVE

RICHMO ND

CO UNTRY
CLUB

TIL DEN

REG IO NAL
PARK

TIL DEN

NATU RE

STU DY AREA

WILDCAT CANYON

REGIONAL PARK

KENNEDY

G ROVE REG

REC AREA

SAN PABLO

RESERVO IR

REC AREA

PINO L E PARK

MIRA VISTA

CO UNTRY

C L U B & G O L F

HILLSIDE

NATU RAL
AREA

ROLLIN G
HIL LS

MEMO RIAL
PARK

FIE LDCREST
DR

CASTRO RANCH RD

PINE AVE

SAN PABLO AVE

LINCOLN AVE

CUTTING BLVD
7TH
ST

ANDRADE AVE

GARRARD BLV
D

ESMOND AVE

TEWKSBURY AVE

CARLSON BLVDFLORIDA AVE
PARKRI
DGEDR

PARKSIDE DR

HILLTOP
M
ALLRD

REGAT T A
BLVD

AUTO PLZ
6TH ST

RHEEM AVE

MCBRYDE
AV
E

KEITHDR
23RD ST
B

AY VI EWAVE

HILLTOP DR

BLUME DR

VIEW DR
MARINA
BAY P
KWY

HILLVIEWDR

FOOTHILLAVE
SHA
NE D
R

SANTA R
ITARD

COSTA AVE

VALLEYVIEW R
D
GIA
NT
HWY
COLL
IN
S AV
E

HENSLEY S T
RICHM
ONDAVE

MARINA WAY

BUSH AVE
47TH
ST
8TH ST
16TH ST

POTRERO AVE
4TH ST

HALL AVE

VIRGINIA AVE

LINKSDR

GARVIN AVE
RO

CKROSEWAY
45TH ST
SCE
N
ICA
V E
WEST
ERNDR
35TH ST
LAKES

IDE D R
PARK

CENTRAL

ATLASRD
22ND ST
MEADOW

VIEW DR
37TH ST

VIA VERDI
PAIN

TEDPONY RD

OHIO AVE

SANTAFE A
VE

RIPLEY AVE

MOYERS RD

LUCAS AVE

GRANT AVE
CURRY
ST
MAY RD
38TH ST

KEYBLVD

SAN MATEO ST

BURBECK AVE

ROOSEVEL T AVE

GOODRICK AVE
TE

HAMA AV
E
FRAN
WA Y

WALL AVE

NEVIN AVE
SAN
JO
AQUIN
ST

MONTEREY ST
13TH ST

SELMIGRV
52ND ST

GROOM DR
30TH ST
24TH ST

CHANSLOR AVE

CARLSTO
N ST
28T
H
ST
34TH ST
19TH ST
AM
END
RD

LOWELL AVE
55TH ST

BUC KBOARD WA Y

CARRIAGEDR

ALAMO AVE

SHELDONDR
42ND ST

HEAVENLY RIDGE LN

BERK AVE

MORNING SIDE D
R
CANAL
BLVD
COA
CH
DR
11TH ST
PARK
RID
GE
DR

SIERRA AVE
36TH ST
12TH ST
W
ISW
ALL
DR

JENKINS WAY
DUKE
AVE
SA
N
LU
IS ST
OX
FOR
D
A
VE

WRIGHT AVE
BAR
KLEYDR

OVEREND AVE
57TH ST

MAINE AVE

CER RO SUR
56TH
ST
B ST

AMADOR ST
18TH ST

CENTER AVE

PARKER RD
17TH ST
3RD ST
1ST ST
15TH ST

MARICOPA AVE

SANFORD AVE
2ND ST
KLOSEW
AY

KIPLING
DR

JOANNDR
49TH ST

NELSONDR

MOZARTDR
9TH ST

COALINGA AVE

GAYNOR AVE
5TH ST

BISSELL AVE
31ST ST32ND ST
MEADE
ST

YUBA ST

KERN STLASSEN ST

ROCKY R
D
DO
RNAN
DR

BARRETT AVE
HARBO
UR W
AY

FASCINATION
CIR
12 3
4 5
6 7
8 9
11 12
13 14
17 18
19 20
21 22
23 24 25 26
27 28
29 30 31
58 60
61 62
63 64
65 67
68 6970
71 72
73 74
7576
77 78
79 80
81 82
83 84
85 86
87 8889 90 91
92 93
94 95
96 97
98 99100
101
102
103
104 105 106
107
108
109
110
111
112
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136

CO NTRA
CO STA

COLLE GE

EXISTING PEDESTRIAN
PATHS
Existing Pedestrian
Paths
Figure 18 P roposed Spot Improvements by Prioritization Category 82 Implementation
Richmond Bicycle and Pedestrian Action Plan

PROPOSED

PEDESTRIAN SPOT

IMPROVEMENT

PRIORITIZATION

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/4/2022.

EXISTING PEDESTRIAN
PATHS
Existing Pedestrian Paths
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
!
!
!! !
!
!!
!
!
!
!
!!
!!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80

EL CERRITO
SAN
PABLO

EAST RICHMOND

HEIGHTS
NORTH

RICHMOND

MIL L ER-KNOX

REG IO NAL

SHO REL INE

WILDCAT CANYON

REGIONAL PARK

BOOK E R T

ANDERSO N JR

U NITY PARK

SAN PABLO AVE

LINCOLN AVE
HELLINGS AVE7THST ANDRADE AVE
2ND ST

CARLSON BLVD

REGATTA BLVD
6TH ST

RHEEM AVE

CUTTING BLVD

BAYVIEW
AVE

HARTNETT

AVEMARI
NA BAY
PKWY
47TH ST

FOOTHILLAVE

COSTA AVE

MCBRYDE AVE

MEEKER AVE

MACDONALD AVE

HENSLEY ST

MARINA WAY
MACDONALD AVE 23RD ST8TH ST
16TH ST

MORAN AVE

PENNSYLVANIA AVE

POTRERO AVE
HARBO
UR WA
Y

BARRETT AVE
4TH ST

HALL AVE

TULARE AVE

GARVIN AVE
45TH ST

PINE AVE
44TH ST

WHARF ST
35TH ST

MEADE S
T

WRIGHT AVE
BROAD
WAY 37TH ST

PENINSULADR
41ST
ST

OHIO AVE

RIPLEY AVE
20TH ST

LUCAS AVE

FLEMING AVE

GRANT AVE

CURRY ST
38TH ST
KEY BL
VD
59TH ST

SAN MATEO ST
BURBECK AVE10TH ST

ROOSEVEL T AVE

EGRET WAY

TEHAMA AVE

MOUNTST

DOWNER AVE
POR
TOLA A
VE
33RD ST
SA
N

JOAQUIN S
T
34TH ST

MONTEREY ST
13TH ST
52ND ST
DIMM
ST
24TH ST
26TH ST

CHANSLOR AVE
CAR
LST
ON
ST

YUBA ST
28TH ST

WALL AVE

CLINTON AVE
COLLIN
SST

WILSON AVE

HOFFMAN BLVD

LOWELL AVE
30TH ST
19TH ST

VAN FLEET AVE
55TH
ST

SANTA CLARA ST
56TH ST

AMADOR ST
13TH ST
HUM
BOLDT
ST

VIRGINIA AVE
HINKL
EY AVE

ALAMO AVE

FALL AVE

NEVIN AVE
42ND ST

ESPEE AVE
21ST ST

BERK AVE
CANAL
BLVD
11TH ST
SO
NOM
A
ST

BURLINGAME AVE

SIERRA AVE
M
CLA
UGHLIN
ST

SOUTH ST
BE
R K PL
12TH ST

SAN LUIS ST
36TH ST
15TH ST

OVEREND AVE
57TH ST

MAINE AVE
B ST

DUBOCE AVE
18TH ST

CENTER AVE
17TH ST
3RD ST
1ST ST

MARICOPA AVE

SANFORD AVE

WILLARD AVE

FLORIDA AVE
50TH ST
27TH ST29TH ST
49TH ST

COLUMBIA AVE
22ND ST

OHIO AVE

FRESNO AVE

HUMPHREY AVE
9TH ST

DUNN AVE
C ST

COALINGA AVE

ESMOND AVE

FACTORY
ST

WALLER AVE
40TH ST39TH ST

CREELY AVE

BISSELL AVE
31ST ST

VISALIA AVE
32ND ST

GATELY AVE
43RD ST

MARIPOSA ST
25TH ST
5TH ST

GAYNOR AVE

WENDELL AVE
46TH ST

KERN ST
LASSEN
ST

VENTURA ST

SPRING ST
58TH ST

BELL AVE

STEGE AVE

TAFT AVE

BARRETT AVE
1 2
3 4 5
6 7
8 9
11 12
13 14
17 18
19 20
21 22
23 24 25 26
27 28
29 30 31
58 60
61 6365
67 68
69 7071
72 73
7475
76 77
78 79
80 81
82 83
84 85 86 87 8889 90
91 92 93
94 95
96 97
98 99
100
101
109
110
111
112113
114
115
116
117
118
119
120
121
122
124
126
127
128
129
130
131
132
133
134
135
136
0 0.5 1 MILES

PROPOSED BICYCLE

FACILITIES
High Priority Project
Medium Priority Project
Opportunity Project

CENTRAL CORE

CENTRAL
CORE
!
!
!
!
!
!
!
Figure 19 P roposed Spot Improvements by Prioritization Category (Central Core) 83 Implementation
Richmond Bicycle and Pedestrian Action Plan

PROPOSED

PEDESTRIAN SPOT

IMPROVEMENT

PRIORITIZATION

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/4/2022.

EXISTING BICYCLE

FACILITIES
Existing Pedestrian Paths
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
!
!
! !
!
!
!!
Ä4
¥80
¥80

EL CERRITO
PINOLE

SAN PABLO
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

MONTALVIN
MANOR

ROLLINGWOOD
TARA
HILLS
SAINT

JO SEPH

CEMETERY

PO INT PINO L E
REG

SHO REL INE

SO BRANTE

RIDG E REG

PRESERVE

RICHMO ND

CO UNTRY
CLUB

WILDCAT CANYON

REGIONAL PARK

KENNEDY

G ROVE REG

REC AREA

SAN PABLO

RESERVO IR

REC AREA

PINO L E PARK

ROLLIN G
HIL LS

MEMO RIAL
PARK

CAS TRO RANCHRD

PINE AVE

LINCOLN AVE

ANDRADE AVE

SAN PABLO AVE

PARKRIDGEDR

PARKSIDE DR

HILLTOP
M

ALLRD AUTO PLZ

MCBRYDE
AVE

KEITHDR

BARRETT AVE

ESMOND AVE

HILLTOP DR
BLUME
DR

VIEW DR

GARVIN AVE

HILLVIEWDR

SHANE D
R

SANTA R
ITARD

VALLEYVIEW
RD
GIA
NT
HWY

MACDONALD AVE

COLLINS AVE

ATLAS RD
23RD ST

TULARE AVE
LIN
KS DR
RO
CKROSE
WAY
LAKES
IDE DR
PARK

CENTRAL
22ND ST

VIA VERDI
PAIN

TEDPONY RD
MOYERS
RD

GRANT AVE
MAY RD
38TH ST37TH ST
FRA
N
WA Y

ROOSEVEL T AVE

NEVIN AVE
34TH ST

SELMIGRV

GROOM DR
30TH ST
26TH ST

CLINTON AVE
20TH ST
AME
NDRD

LOWELL AVE
19TH ST

AMADOR ST

BUCKBOARD W
AY

CARRIAGEDR

SHELDON DR HEAVENLY RIDGE LN

MORNING SIDE DR
COA
CH
DR
PARK
RIDGE
D
R
SIERRA
AVE
KEY B
LVD
W
IS
W
ALL
DR
DUKE
AVE
36TH ST
BARK
LEY
DR

CE RRO SUR

PARKE R RD
33RD ST

KL OSEW
AY

KIPLING
DR

JOANNDR

NELSONDR
18TH ST

WOOD GLENDR
32ND ST

YUBA ST

KERN STLASSEN ST

ROCKY RD
FA

SCINATION
CIR
4 5
27 30
31 63
64 65 68
69 70
71 72 73
74 75
76 77
78 79
80 82
100
101
102
103
104 105 106
107
108
109
110
111
112113
114
115
119
120
121
125
127
129
134
135
136

CO NTRA
CO STA

COLLE GE
0 0.5 1 MILES

BICYCLE

PROJECT

PRIORITIZATION
High Priority Project
Medium Priority Project
Opportunity Project

NORTH RICHMOND
NORTH

RICHMOND
Figure 20 P roposed Spot Improvements by Prioritization Category (North Richmond) 84 Implementation
Richmond Bicycle and Pedestrian Action Plan

HIGH PRIORITY

PEDESTRIAN SPOT

IMPROVEMENTS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/4/2022.

BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
0 0.5 1 MILES
San Francisco Bay

PROPOSED

PEDESTRIAN PROJECTS
Prioritization Category
High Priority Project
Medium Priority and
Opportunity Projects
!
!
!
!
!
!
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
! !
!
!!!
!! !
! !
!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80
¥80

EL CERRITO
PINOLE
SAN
PABLO

BERKELEY
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

KENSINGTON

MONTALVIN
MANOR

NORTH RICHMOND

ROLLINGWOOD
TARA
HILLS
SAINT

JO SEPH

CEMETERY

MIL L ER-KNOX

REG IO NAL

SHO REL INE
PO INT

PINO L E REG

SHO REL INE

SO BRANTE

RIDG E REG

PRESERVE

RICHMO ND

CO UNTRY
CLUB

TIL DEN

REG IO NAL
PARK

TIL DEN

NATU RE

STU DY AREA

WILDCAT CANYON

REGIONAL PARK

KENNEDY

G ROVE REG

REC AREA

SAN PABLO

RESERVO IR

REC AREA

PINO L E PARK

MIRA VISTA

CO UNTRY

C L U B & G O L F

HILLSIDE

NATU RAL
AREA

ROLLIN G
HIL LS

MEMO RIAL
PARK

FIEL DCREST
DR

CASTRORANCH RD

PINE AVE

SAN PABLO AVE

LINCOLN AVE

CUTTING BLVD
7THST ANDRADE AVE

GARRARD BLV

DTEWKSBURY AVE

CARLSON BLVDFLORIDA AVE

PARKRIDGEDR
PA

RKSIDE D R

HILLTOP
M
ALLRD

REGAT T A
BLVD

AUTO PLZ

RHEEM AVE

MCBRYDE
AVE
KEIT
HDR
GOLD

EN GATEAV
E

MAINE AVE
B

AY VI EWAVE

HILLTOP DR
BLUM
E DR

VIEW DR

HILLVIEW DR

FOOTHILLAVE
SH
ANEDR

SANTA R
ITARD

COSTA AVE

VALLEYVIEW
RD
GIA
NT
HWY

MACDONALD AVE

GARVIN AVE
COL
LINS
AVE

HENSLEY S T

RICHMONDAVE

MARINA WAY

BUSH AVE
23RD ST
47TH
ST
16TH ST

POTRERO AVE
4TH ST

HALL AVE

VIRGINIA AVE

TULARE AVE

LINKSDR
RO
CK

ROSEWAY
45TH ST
SCE
N
ICA
V E
WESTE
RN
DR
35TH ST
LAKES

IDE D R
PA
RK

CEN TRAL

WRIGHT AVE
BROADW
AY

ATLAS RD
22ND ST
MEADOW

VIEW DR
37TH ST

VIA VERDI

PAINTEDPONY RD

OHIO AVE

RIPLEY AVE
20TH ST
MOYERS
RD

LUCAS AVE
8TH ST

GRANT AVE
CURR
YST
MAY RD
38TH ST
KEY
BLVD

SAN MATEO ST

BURBECK AVE
33RD ST

ROOSEVELT AVE

GOODRICK AVE
TE

HAMA AV
E
6TH ST
FRAN
WA Y

ESMOND AVE

WALL AVE

NEVIN AVE
SAN

JOAQUIN S
T

MONTEREY ST
13TH ST
31ST ST

SELMIGRV
52ND ST

GROOM DR
26TH ST

CHANSLOR AVE CARLSTO
N
ST
34TH ST

CLINTON AVE
AME
ND
RD

LOWELL AVE
30TH ST
MA
RINA

BAYPKWY
55TH ST

BUC KBOARD WAY

CARRIAGEDR

ALAMO AVE
28TH ST

SHELDONDR
42ND ST

HEAVENLY RIDGE LN

BERK AVE

MORNING SIDE D
R
COACH
DR
11TH ST
PARK
RIDGE
DR
HAR
BOUR
WAY

SIERRA AVE
12TH ST
W
ISW
AL
L
DR

JENKINS WAY
DUKE
AVE

SAN LUIS ST
36TH ST
O
X
FORD
AV
E

OVEREND AVE
57TH ST
56TH
ST
B ST

AMADOR ST
18TH ST

CENTER AVE

PARKER RD
17TH ST
3RD ST
1ST ST
15TH ST

MARICOPA AVE

SANFORD AVE
2ND ST
CANAL
BL
VD
KLOSEW
AY

KIPLING
DR

JOANNDR
49TH ST
NELS
ONDR
9TH ST
19TH ST

COALINGA AVE
39TH ST
21ST ST

BISSELL AVE
32ND ST
43RD ST
5TH ST

GAYNOR AVE

YUBA STKERN STLASSEN ST

MEADEST

ROCKY R
D
DORN
AN
DR

BARRETT AVE
1 2
3 6
7 17
18 22
23 24 25
26 29
61 62
68 80
81 82
83 85
97 98
123
124
128
135
136

CO NTRA
CO STA

COLLE GE

EXISTING

PEDESTRIAN PROJECTS
Class I Shared-Use
Path
Figure 21 H igh Priority Spot Improvements
85 Implementation
Richmond Bicycle and Pedestrian Action Plan

HIGH PRIORITY

PEDESTRIAN SPOT

IMPROVEMENTS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/4/2022.

EXISTING PEDESTRIAN

PROJECTS
Class I Shared-Use Path
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
!
!
!! !
!
!!
!
!
!
!
!!
!!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80

EL CERRITO
SAN
PABLO

EAST RICHMOND

HEIGHTS
NORTH

RICHMOND

MIL L ER-KNOX

REG IO NAL

SHO REL INE

WILDCAT CANYON

REGIONAL PARK

BOOK E R T

ANDERSO N JR

U NITY PARK

SAN PABLO AVELINCOLN AVE
HELLINGS AVE7THST ANDRADE AVE
2ND ST

CARLSON BLVD

REGATTA BLVD
6TH ST

RHEEM AVE

CUTTING BLVD

BAYVIEW
AVE

ESMOND AVE

HARTNETT

AVEMARI
NA BAY
PKWY
47TH ST

FOOTHILLAVE

COSTA AVE

MCBRYDE AVE

MEEKER AVE

MACDONALD AVE

HENSLEY ST

MARINA WAY
MACDONALD AVE 23RD ST8TH ST
16TH ST

MORAN AVE

PENNSYLVANIA AVE

POTRERO AVE
HARBO
UR WA
Y

BARRETT AVE
4TH ST

HALL AVE

TULARE AVE

GARVIN AVE
45TH ST

PINE AVE
44TH ST

WHARF ST
35TH ST

MEADE S
T

WRIGHT AVE
BROAD
WAY
22ND ST
37TH ST

PENINSULADR
41ST
ST

OHIO AVE

RIPLEY AVE
20TH ST

LUCAS AVE

FLEMING AVE

GRANT AVE

CURRY ST
38TH ST
KEY
BLVD
59TH ST

SAN MATEO ST
BURBECK AVE10TH ST

ROOSEVEL T AVE

EGRET WAY

TEHAMA AVE

MOUNTST

DOWNER AVE
POR
TOLA A
VE
33RD ST
SA
N

JOAQUIN S
T
34TH ST

MONTEREY ST

MERCED ST
13TH ST
52ND ST
DIMM
ST
24TH ST
26TH ST

CHANSLOR AVE
CAR
LST
ON
ST

YUBA ST
28TH ST

WALL AVE

CLINTON AVE
COLLIN
SST

WILSON AVE

HOFFMAN BLVD

LOWELL AVE
30TH ST

VAN FLEET AVE
55TH
ST

SANTA CLARA ST
56TH ST

AMADOR ST
13TH ST
HUM
BOLDT
ST

VIRGINIA AVE
HINKLE
Y AVE

ALAMO AVE

FALL AVE

NEVIN AVE
42ND ST

ESPEE AVE
21ST ST

BERK AVE
CANAL
BLVD
11TH ST
SO
NOM
A
ST

BURLINGAME AVE

SIERRA AVE
M

CLAUGHL
IN
ST

SOUTH ST
BE
R K PL
12TH ST
SAN

LUIS ST
36TH ST
15TH ST

OVEREND AVE
57TH ST

MAINE AVE
B ST

DUBOCE AVE

CENTER AVE
17TH ST
3RD ST
1ST ST

MARICOPA AVE

SANFORD AVE

WILLARD AVE

FLORIDA AVE
50TH ST
27TH ST29TH ST
49TH ST

COLUMBIA AVE

OHIO AVE

FRESNO AVE

HUMPHREY AVE
9TH ST

DUNN AVE
18TH ST
C ST
19TH ST

COALINGA AVEFACTORY
ST

WALLER AVE
40TH ST39TH ST

CREELY AVE
5TH ST

BISSELL AVE
31ST ST

VISALIA AVE
32ND ST

GATELY AVE
43RD ST

MARIPOSA ST
25TH ST

GAYNOR AVE

WENDELL AVE
46TH ST

KERN ST
LASSEN
ST

VENTURA ST

SPRING ST
58TH ST

BELL AVE

STEGE AVE

TAFT AVE

BARRETT AVE
1 2
3 6
7 17
18 22
23 24 25 26
29 61
68 80
81 82
83 85
97 98
124
128
135
136
0 0.5 1 MILES

PROPOSED BICYCLE

FACILITIES
High Priority Project
Medium Priority and
Opportunity Projects

CENTRAL CORE

CENTRAL
CORE
Figure 22 H igh Priority Spot Improvements (Central Core) 86 Implementation
Richmond Bicycle and Pedestrian Action Plan

HIGH PRIORITY

PEDESTRIAN SPOT

IMPROVEMENTS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/4/2022.

EXISTING PEDESTRIAN

PROJECTS
Class I Shared-Use Path
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
0 0.5 1 MILES

PROPOSED PEDESTRIAN

PROJECTS
High Priority Project
Medium Priority and
Opportunity Projects

NORTH RICHMOND
NORTH

RICHMOND
!
!
!
!
!
! !
!!
!!
!
!
!! !
! !!
!
!
! !
!
!
!!
Ä4
¥80
¥80

EL CERRITO
PINOLE

SAN PABLO
EAST

RICHMOND

HEIGHTS

EL SOBRANTE

MONTALVIN
MANOR

ROLLINGWOOD
TARA
HILLS
SAINT

JO SEPH

CEMETERY

PO INT PINO L E
REG

SHO REL INE

SO BRANTE

RIDG E REG

PRESERVE

RICHMO ND

CO UNTRY
CLUB

WILDCAT CANYON

REGIONAL PARK

KENNEDY

G ROVE REG

REC AREA

SAN PABLO

RESERVO IR

REC AREA

PINO L E PARK

ROLLIN G
HIL LS

MEMO RIAL
PARK

CAS TRO RANCHRD

PINE AVE

ANDRADE AVE

SAN PABLO AVE

PARKRIDGEDR

PARKSIDE DR

HILLTOP
M

ALLRD AUTO PLZ

RHEEM AVE

MCBRYDE
AVE

KEITHDR

BARRETT AVE

HILLTOP DR
BLUME
DR

VIEW DR

HILLVIEW DR

SHANE D
R

SANTA R
ITARD

VALLEYVIEW
RD
GIA
NT
HWY

COLLINS AVE
23RD ST

TULARE AVE
LIN
KS DR
29TH ST
RO
CKROSE
WAY
35TH ST
LAKES
IDE DR
PARK

CENTRAL

ATLAS RD
22ND ST

VIA VERDI
PAIN

TEDPONY RD
MOYERS
RD

GRANT AVE
MAY RD
38TH ST
FRA
N
WA Y

ROOSEVEL T AVE

DOWNER AVE

NEVIN AVE
34TH ST

SELMIGRV

GROOM DR
30TH ST
26TH ST

CLINTON AVE
20TH ST
AME
NDRD

LOWELL AVE
19TH ST

AMADOR ST

BUCKBOARD W
AY

CARRIAGEDR

SHELDON DR HEAVENLY RIDGE LN

MORNING SIDE DR

GARVIN AVE
24TH ST
COA
CH
DR
PARK
RIDGE
D
R
SIERRA
AVE
KEY B
LVD
W
IS
W
ALL
DR
DUKE
AVE
36TH ST
BARK
LEY
DR

CE RRO SUR

LINCOLN AVE
37TH
ST

PARKE R RD
33RD ST

KL OSEW
AY

KIPLING
DR

JOANNDR

NELSONDR
17TH ST
40TH ST
39TH ST
18TH ST
31ST ST

WOOD GLENDR
32ND ST

GAYNOR AVE

YUBA ST

KERN STLASSEN ST

ROCKY RD
FA

SCINATION
CIR
68 80
81 82
135
136

CO NTRA
CO STA

COLLE GE
Figure 23 H igh Priority Spot Improvements (North Richmond) 87 Implementation
Richmond Bicycle and Pedestrian Action Plan
Table 10 Bic ycle Projects by Prioritization Scores

PROJECT
ID
CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION PRIORITIZATION
SCORE

PRIORITIZATION

CATEGORY
2 Macdonald Ave 15th St Crossing
Improvement
Consider constructing a raised intersection or raised
crosswalk at the eastern approach. Construct curb
extensions at all four corners. Install high-visibility crosswalks at the eastern and western approaches on top of decorative paving.
81 High Priority
Project
26 Broadway 23rd St Intersection
Upgrade
Widen, lengthen, and channelize median islands. Restripe crosswalks as high-visibility crosswalks. 81 High Priority Project
31 S 49th St Cutting Blvd Lighting LRSP high-injury intersection,: install intersection lighting. 81 High Priority Project
32 San Joaquin St Central Ave Intersection
Upgrade
LRSP high-injury intersection: construct bulb outs and
install advanced warning signs. 81 High Priority
Project
19 Harbour Way 300’ north of
Chanslor Ave
Crossing
Improvement
Install a high-visibility midblock crosswalk with a median refuge island. 80 High Priority
Project
67 Broadway 24th St Crossing
Improvement Construct curb extensions at all corners. 80 High Priority Project
92 Central Ave I-80 Crossing
Improvement
Coordinate with Caltrans to upgrade all crosswalks to
high-visibility crosswalks and provide leading pedestrian intervals for all crossing phases. Extend bicycle conflict markings on Central through the Jacuzzi intersection
and interchange. Long term, construct curb extensions to tighten radii and square up approaches.
80 High Priority
Project
37 25th St Macdonald
Ave
Crossing
Improvement
LRSP high-injury intersection: Upgrade all crosswalks to high-visibility. Consider installing RRFB or PHB. Construct curb extensions at all corners.
79 High Priority
Project
51 23rd St Exchange Pl Crossing
Improvement
Construct a median refuge island and install an RRFB for a crossing of 23rd Street. . 78 High Priority
Project
66 Ohio Ave S 23rd St Crossing
Improvement Construct curb extensions at all corners. 78 High Priority Project
93 Nevin Ave Marina Way Crossing
Improvement
Upgrade all crosswalks to high-visibility crosswalks and provide a leading pedestrian interval for call crossing phases. Long term, consider converting the intersection to a raised intersection.
78 High Priority
Project
1 Macdonald Ave 16th St Intersection
Upgrade
Consider scramble phase or otherwise don’t allow
permitted left turns to conflict with pedestrians in the crosswalk. Create LPI. Consider parklet on southwest
corner
77 High Priority
Project
88 Implementation
Richmond Bicycle and Pedestrian Action Plan

PROJECT
ID
CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION PRIORITIZATION
SCORE

PRIORITIZATION

CATEGORY
15 Carlson Blvd Bayview Ave Intersection
Upgrade
Install intersection improvements including curb
extensions and a median nose. 77 High Priority
Project
20 S 23rd St Virginia Ave Crossing
Improvement
Consider installation of a pedestrian refuge island and install pedestrian scale lighting. 77 High Priority
Project
3 Nevin Ave 15th St Crossing
Improvement
Consider constructing a median refuge or traffic circle to accommodate direct pedestrian path of travel. 76 High Priority Project
6 15th St Nevin Ave Other Provide a ramp to allow bicycle access to/from plaza. 76 High Priority Project
7 Marina Way Barrett Ave Intersection
Upgrade
Install a curb extension at the northwest and southwest corners. Provide a leading pedestrian interval and adjust pedestrian phase length to provide sufficient crossing
times. Realign the southern crosswalk several feet south and install high-visibility crosswalks at the north and eastern approaches. Consider installing bicycle lane
conflict markings and a two-stage bike turn box for NB- WB bike movements.
76 High Priority
Project
14 Carlson Blvd Cutting Blvd Intersection
Upgrade
Construct intersection improvements including:
formalized curb extensions, widened sidewalk, and
additional sidewalks.
76 High Priority
Project
21 Harbour Way Cutting Blvd Intersection
Upgrade
Install curb extensions, directional ramps and high-
visibility crosswalks, and median crossing islands. 76 High Priority Project
22 Marina Way Cutting Blvd Intersection
Upgrade
Install curb extensions, directional ramps and high-
visibility crosswalks and median crossing islands. 76 High Priority Project
23 S 23rd St Cutting Blvd Intersection
Upgrade
Restripe crosswalks as high-visibility crosswalks. Install curb extensions at all corners with directional ramps.

Construct median crossing islands.
76 High Priority
Project
49 23rd St Barrett Ave Crossing
Improvement
Implement improvement in CCTA CSSA.
76 High Priority
Project
50 23rd St Macdonald
Ave
Crossing
Improvement
Implement improvement in CCTA CSSA.
76 High Priority
Project
52 Barrett Ave BART Tracks Sidewalk Widen sidewalk on northern side through underpass (Requires road diet). 76 High Priority
Project
Table 10 Bicycle Projects by Prioritization Scores (continued). 89 Implementation
Richmond Bicycle and Pedestrian Action Plan

PROJECT
ID
CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION PRIORITIZATION
SCORE

PRIORITIZATION

CATEGORY
54 Cutting Blvd S 12th St Crossing
Improvement
Install high-visibility crosswalks at all approaches.
76 High Priority
Project
97 Macdonald Ave 45th St Crossing
Improvement
Upgrade all crosswalks to high-visibility crosswalks and install advance yield markings. Install an RRFB for the Macdonald crosswalks. On the south side of the street,
widen the sidewalk and provide a connection to the
“Target Path.”
76 High Priority
Project
104 22nd St Macdonald
Ave
Crossing
Improvement
Install curb extensions at the northwest and northeast
corners. Install a pedestrian count display at the
southwest corner. When next repaved, reduce the
intersection’s crown and conform asphalt to the gutter
pan.
76 High Priority
Project
4 Barrett Ave 18th St Crossing
Improvement
Install the north, south, and west crosswalk legs as high- visibility. Install an RRFB or PHB for Barrett crossings (based on warrants). Add appropriate signs and advance
pavement markings based on selected actuated crossing
beacon.
75 Medium Priority
Project
16 Carlson Blvd I-80
Undercrossing
Intersection
Upgrade
Construct intersection improvements including: median
refuge islands and curb extensions. 75 Medium Priority
Project
57 Cutting Blvd S 21st St Crossing
Improvement
Upgrade all crosswalks to high-visibility.
75 Medium Priority
Project
18 Harbour Way Bissell Ave Intersection
Upgrade
Install curb extensions at all corners and re-stripe
crosswalks as high-visibility. 74 Medium Priority
Project
5 Barrett Ave 19th St Crossing
Improvement
Stripe fourth crosswalk leg and upgrade traffic signal to include pedestrian countdown. 73 Medium Priority
Project
35 Macdonald Ave 21st St Crossing
Improvement
LRSP high-injury intersection. Upgrade all crosswalks
to high-visibility. Consider installing an RRFB or PHB.

Construct curb extensions at all corners.
72 Medium Priority
Project
64 Chanslor Ave Espee Ave Crossing
Improvement
Install curb extensions at the two western corners to
square up the intersection. 72 Medium Priority
Project
68 Broadway Bissell Ave Crossing
Improvement
Install curb extensions at the northern corners to square- up the intersection. Realign and upgrade all crosswalks to high-visibility crosswalks.
72 Medium Priority
Project
Table 10 Bicycle Projects by Prioritization Scores (continued). 90 Implementation
Richmond Bicycle and Pedestrian Action Plan

PROJECT
ID
CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION PRIORITIZATION
SCORE

PRIORITIZATION

CATEGORY
28 San Pablo Ave Roosevelt Ave Intersection
Upgrade
Install curb extensions to tighten turn radii, and shorten crossing distances, Coordinate with Caltrans to study
removing double right turn lane from San Pablo onto I-80 on-ramp.
71 Medium Priority
Project
55 Cutting Blvd S 15th St Crossing
Improvement
Install high-visibility crosswalks at all approaches.
71 Medium Priority
Project
59 Cutting Blvd 20th St Crossing
Improvement
Restripe the existing high-visibility crosswalks.
71 Medium Priority
Project
69 Broadway 26th St Crossing
Improvement Install high-visibility crosswalks at all approaches. 71 Medium Priority Project
56 Cutting Blvd S 18th St Crossing
Improvement
Install high-visibility crosswalks at all approaches.
70 Medium Priority
Project
46 23rd St Downer Ave Crossing
Improvement
Install a new high-visibility crosswalk across 23rd Street with an RRFB. 69 Medium Priority
Project
47 23rd St Clinton Ave Crossing
Improvement
Construct a median refuge island and install an RRFB for the 23rd crossing. 69 Medium Priority
Project
48 23rd St Grant Ave Crossing
Improvement
Install high-visibility crosswalks at all approaches.
69 Medium Priority
Project
63 Cutting Blvd S 31st St Crossing
Improvement
Construct a pedestrian refuge island and install an RRFB/ PHB. 69 Medium Priority
Project
65 Maine Ave S 23rd St Crossing
Improvement
Install high-visibility crosswalks at all approaches and construct curb extensions at all corners. 69 Medium Priority Project
58 Cutting Blvd S 17th St Crossing
Improvement Install high-visibility crosswalks at all approaches. 68 Medium Priority Project
Table 10 Bicycle Projects by Prioritization Scores (continued). 91 Implementation
Richmond Bicycle and Pedestrian Action Plan

PROJECT
ID
CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION PRIORITIZATION
SCORE

PRIORITIZATION

CATEGORY
60 Cutting Blvd S 24th St Crossing
Improvement
Construct a pedestrian refuge island; and install RRFB/ PHB. 67 Medium Priority
Project
42 23rd St Visalia Ave Crossing
Improvement
Install a new high-visibility crosswalk across 23rd Street.

Install an RRFB at the crossing. 64 Medium Priority
Project
53 Barrett Ave 21st St Crossing
Improvement
Install a new high-visibility crosswalk at the western
approach. 64 Medium Priority
Project
87 Virginia Ave S 20th Street Bicycle Access Install a bicycle cutthrough in traffic divertor. 64 Medium Priority Project
45 23rd St Garvin Ave Crossing
Improvement
Improve accessibility features (push buttons, curb ramps, etc.) at all corners (more details in the CSSA). Install curb extensions at all corners and crosswalk landings. Upgrade crosswalks to high-visibility.
63 Medium Priority
Project
25 Harbour Way Pennsylvania
Ave/13th St
Intersection
Upgrade
Install high-visibility crosswalks, and construct medians/ channelized islands/curb extensions and advance stop
bars. Consider slip lane removal.
62 Medium Priority
Project
62 Cutting Blvd S 29th St Crossing
Improvement
Construct pedestrian refuge island and install RRFB/PHB. 62 Medium Priority
Project
27 Barrett Ave I-80
Undercrossing
Intersection
Upgrade
Coordinate with Caltrans to consider reconfiguring
the through and turn lanes around the interchange.

Coordinate with Caltrans to remove/trim vegetation
around the off-ramp that blocks visibility of pedestrians in the north crosswalk. Install a high-visibility crosswalk across the eastern approach.
61 Medium Priority
Project
38 23rd St Lowel Ave Crossing
Improvement
Implement improvement in CCTA CSSA.
61 Medium Priority
Project
43 23rd St Esmond Ave Crossing
Improvement
Construct median refuge island and install an RRFB.
61 Medium Priority
Project
Table 10 Bicycle Projects by Prioritization Scores (continued). 92 Implementation
Richmond Bicycle and Pedestrian Action Plan

PROJECT
ID
CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION PRIORITIZATION
SCORE

PRIORITIZATION

CATEGORY
79 Mcbryde Ave 37th St Crossing
Improvement Install curb extensions at all corners. 61 Medium Priority Project
9 Ohio Ave S 2nd St Crossing
Improvement
Potential for bike and pedestrian intersection
improvements. 60 Medium Priority
Project
24 San Pablo Ave McBryde Ave Intersection
Upgrade
Install curb extensions and ramps, and construct curb
extensions so that streets intersect at right angles. 60 Medium Priority Project
29 S 45th St
Richmond
Greenway
Trail
connection
Trail Access Improve connections to trail connector ramp from 45th St 60 Medium Priority Project
39 23rd St
Dunn Ave Crossing
Improvement
Construct median refuge island and install an RRFB.
60 Medium Priority
Project
44 23rd St Gaynor Ave Crossing
Improvement
Install high-visibility crosswalks and an RRFB for the
crossing of 23rd. 60 Medium Priority
Project
105 23rd St Rheem Ave Crossing
Improvement
Upgrade all curb ramps to current best practices;
specifically, replace the southwest corner ramp with a
“parallel” ramp and “centered” ramps at the two eastern corners. Adjust pedestrian signal heads as needed.

Provide a leading pedestrian interval for all crossing
phases.
60 High Priority
Project
36 5th St Barrett Ave Crossing
Improvement
LRSP high-injury intersection. Upgrade crosswalks
to high-visibility. Consider installing an RRFB or PHB.

Construct curb extensions.
59 Medium Priority
Project
41 23rd St Andrade Ave Crossing
Improvement
Construct median refuge island and install RRFB.
59 Medium Priority
Project
17 Sacramento
Ave San Luis St Crossing
Improvement
Path crossing improvements: upgrade crosswalk to high-
visibility and install advance yield markings. Consider installing RRFB.
58 Medium Priority
Project
40 23rd St Hellings Ave Crossing
Improvement
Install high-visibility crosswalks and install an RRFB for the 23rd Street crossing. 58 Medium Priority
Project
Table 10 Bicycle Projects by Prioritization Scores (continued). 93 Implementation
Richmond Bicycle and Pedestrian Action Plan

PROJECT
ID
CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION PRIORITIZATION
SCORE

PRIORITIZATION

CATEGORY
89 Garvin Ave San Pablo Ave Crossing
Improvement
Install high-visibility crosswalks at all intersection
approaches. Provide a leading pedestrian interval with all crossing phases. Install bicycle conflict markings.
58 Medium Priority
Project
75 Hilltop Dr Blumer Dr Intersection
Upgrade Study removal of free-right turn lane. 56 Opportunity Project
8 Ohio Ave Canal Blvd Crossing
Improvement
Refresh existing intersection markings, upgrade
remaining crosswalks to high-visibility and provide a
leading pedestrian interval.
55 Opportunity
Project
70 Mcbryde Ave Sonoma St Crossing
Improvement Construct curb extensions. 55 Opportunity
Project
96 Barrett Ave 25th St Crossing
Improvement
Upgrade the three existing crosswalks to high-visibility crosswalks and provide a leading pedestrian interval
for all crossing phases. Install bicycle conflict markings through the intersection and consider other intersection treatments like bicycle boxes.
55 Opportunity
Project
73 Hilltop Dr Robert Miller
Dr
Intersection
Upgrade Study removal free right turn lanes. 54 Opportunity Project
101 I-580 Marina Bay
Pkwy
Crossing
Improvement
Coordinate with Caltrans to upgrade all crosswalks to
high-visibility. At signalized crossings, provide a leading pedestrian interval for all crossing phases. At uncontrolled crossings, install RRFBs.
54 Opportunity
Project
82 Maricopa Ave 26th St Crossing
Improvement Install high-visibility crosswalks. 53 Opportunity Project
33 33rd St Barrett Ave Crossing
Improvement
LRSP high-injury intersection. Construct curb extensions and install advanced warning signs and markings. 52 Opportunity Project
81 Maricioa Ave 28th St Crossing
Improvement Install high-visibility crosswalks. 52 Opportunity Project
78 Garvin Ave 30th St Crossing
Improvement
Install high-visibility crosswalks and an RRFB for a
crossing of Gavin Avenue. 51 Opportunity
Project
94 Park Central St Hilltop Dr Crossing
Improvement
Study intersection design changes to improve pedestrian crossings and accessibility. Improvements should include high-visibility crosswalks and curb extensions. Coordinate with property owners and other jurisdictions as required. 50 Opportunity
Project
Table 10 Bicycle Projects by Prioritization Scores (continued). 94 Implementation
Richmond Bicycle and Pedestrian Action Plan

PROJECT
ID
CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION PRIORITIZATION
SCORE

PRIORITIZATION

CATEGORY
85 Maine Ave S 16th St Bicycle Access Install bicycle cutthrough in traffic divertor. 49 Opportunity Project
86 Florida Ave S 20th St Bicycle Access Install bicycle cutthrough in traffic divertor. 49 Opportunity Project
61 Cutting Blvd S 26th St Crossing
Improvement
Construct pedestrian refuge island with an RRFB/PHB.
48 Opportunity
Project
83 Tulare Ave 28th St Crossing
Improvement Install high-visibility crosswalks. 48 Opportunity Project
90 Coalinga Ave 18th St Crossing
Improvement
Upgrade the two existing crosswalks to high-visibility
and install high-visibility crosswalks at the northern and eastern approaches. Install advance stop markings at all approaches. Study intersection traffic control options with the design of the Coalinga Avenue bicycle boulevard.
48 Opportunity
Project
95 Lucas Ave 7th St Crossing
Improvement
Upgrade the two existing crosswalks to high-visibility
and install high-visibility crosswalks at the northern and eastern approaches. Build out the northeast corner to
square up the intersection. Construct curb extensions at all corners.
48 Opportunity
Project
74 Hilltop Dr Shane Dr Intersection
Upgrade Study removal of free right turn lanes. 47 Opportunity Project
99 Center Ave S 39th St Wayfinding Add wayfinding signs directing people walking and biking to the Richmond Greenway trailhead off of 39th Street. 47 Opportunity Project
13 Harbour Way I-580 On and
Off Ramps
Intersection
Upgrade
Coordinate with Caltrans install high-visibility crosswalks and curb extensions at all corners. 46 Opportunity
Project
10 Hoffman Blvd Harbour Way Intersection
Upgrade
Install high-visibility crosswalks and install curb
extensions. 45 Opportunity
Project
11 Wright Ave Harbour Way Crossing
Improvement
Implement ADA accessible accommodations throughout
the intersection, sidewalk and curbs. 45 Opportunity
Project
91 Sutter Ave Carlson Blvd Crossing
Improvement
SRTCP: Upgrade the existing southern crosswalk to
high-visibility and install advance yield markings. Install transverse crosswalks at the eastern and western
approaches with advance stop markings. Install an RRFB
for the Carlson (southern) crosswalk. Consider building a refuge islands from the existing median.
44 Opportunity
Project
Table 10 Bicycle Projects by Prioritization Scores (continued). 95 Implementation
Richmond Bicycle and Pedestrian Action Plan

PROJECT
ID
CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION PRIORITIZATION
SCORE

PRIORITIZATION

CATEGORY
76 Morningside Dr Valley View
Rd
Crossing
Improvement Install high-visibility crosswalks. 43 Opportunity Project
77 May Rd Valley View
Rd
Crossing
Improvement
Upgrade crosswalks to high-visibility and install curb
extensions. 43 Opportunity
Project
71 Hilltop Dr San Pablo Ave Crossing
Improvement Construct curb extensions. 40 Opportunity
Project
100 Meeker Ave Marina Bay
Pkwy
Crossing
Improvement
Install a leading pedestrian interval for all crossing
phases. Study removal of the free-right turn lane from
the northwest corner. If removed, realign the west
crosswalk to be parallel to Marina Bay Parkway. Due to
the asymmetrical intersection and challenging site lines, consider providing a protected turn phase for northbound left traffic.
40 Opportunity
Project
72 Hilltop Dr Research Dr Crossing
Improvement Construct curb extensions at all corners. 39 Opportunity Project
80 Esmond Ave 26th St Crossing
Improvement Install high-visibility crosswalks. 39 Opportunity Project
30 Seacliff Dr Seaview Dr Crossing
Improvement
LRSP high-injury intersection. Install crosswalk on
northeast leg of intersection to connect to Class I path.

Consider installing yield markings and radar speed
feedback signs.
38 Opportunity
Project
88 29th St/Vale Rd Howard St/
Salesian Ave
Crossing
Improvement
Study locations for a marked crossing of 29th/Vale,
including one block south at Moran Avenue. Coordinate
with City of San Pablo as necessary.
37 Opportunity
Project
103 38th St Boyd Ave/
Solano Ave
Crossing
Improvement
Upgrade all crosswalks to high-visibility crosswalks.

Install advance yield/stop marks where appropriate. Long term, study additional park access improvements include converting Boyd to one-way, curb extensions, and other
traffic calming measures.
36 Opportunity
Project
84 Solano Ave Amador St Crossing
Improvement Install curb extensions at all corners. 35 Opportunity Project
Table 10 Bicycle Projects by Prioritization Scores (continued). 96 Implementation
Richmond Bicycle and Pedestrian Action Plan

PROJECT
ID
CROSS
STREET
CROSS

STREET IMPROVEMENT RECOMMENDATION PRIORITIZATION
SCORE

PRIORITIZATION

CATEGORY
102 Sea Cliff Dr Canal Blvd Crossing
Improvement
Trim vegetation around stop sign to improve visibility.

Consider adding street lighting to this intersection.

Upgrade the existing crosswalk to high-visibility.

Coordinate with the Port to trim vegetation along Sea Cliff Drive.
35 Opportunity
Project
12 1000’ north of
Hall Ave Harbour Way Crossing
Improvement
Coordinate with railroad operator to install pedestrian railroad crossing gates, Implement ADA accessible
accommodations throughout the intersection, sidewalk,
and curbs.
30 Opportunity
Project
98 McBryde Ave/
Park Ave Marin Ave Crossing
Improvement
Study intersection redesign options to improve driver
and pedestrian visibility at all intersection approaches.

Study should look at crossing, visibility/site lines, and intersection control changes.
28 Opportunity
Project
34 Atlas Rd Oakmont Dr Crossing
Improvement
LRSP high-injury intersection. Construct curb extensions and install advanced warning signs and markings,
Consider installing an RRFB or PHB for the Atlas Road
crossing.
27 Opportunity
Project
Table 10 Bicycle Projects by Prioritization Scores (continued). 97 Implementation
Richmond Bicycle and Pedestrian Action Plan
Project Funding
Following the designation of a recommended
improvement, projects require funding for
design (i.e., detailed engineering work)
and construction. Funding for design and
build active transportation projects is
available at all levels of government (local,
regional, state, and federal) and from
private sources. Project funding can take
the form of competitive grants, formula-
based allocations, tax measure-based
funding, funds from private development,
and others. Appendix C provides a detailed
list of potential funding sources with a brief
description.

Table 11 below summarizes the type of
projects and project phases (planning,
design, construction) that each funding
opportunity listed in Appendix C will fund.

Planning Level Cost Estimates
Table 10 below provides high and low
planning-level cost estimates for each
class of bicycle facility. Table 12 on page
101 provides high and low planning-level
cost estimates for each class of bicycle
facility. Table 13 (on page 102) provides
this information for different types of spot
improvements. Cost estimates include
30% extra for “soft costs” for items like
City staff time and other administrative-
related work. These are order of magnitude
planning budgetary figures; a complete
detailed engineering design will be needed
to determine the most probable cost of
individual projects.
98 Implementation
Richmond Bicycle and Pedestrian Action Plan

FUNDING SOURCE

FUNDING

FOR PLANNING (P),

DESIGN (D), OR

CONSTRUCTION (C)

ON-STREET

BIKEWAYS/

END-OF-TRIP
TRAILS
SAFE
ROUTES

TO SCHOOL
SAFE
ROUTES

TO TRANSIT

CROSSINGS/

INTERSECTIONS PROGRAMS STUDIES

LOCAL AND REGIONAL OPPORTUNITIES
Contra Costa County Measure J (CCTA) P/D/C • • • • • •
Transportation Fund for Clean Air, County Program
Manager Fund (CCTA)
C
• • • •
511 Contra Costa Bike Rack and Locker Program
(Contra Costa County)
C
•
One Bay Area Grants (MTC) D/C • • •
Transportation Development Act Article 3 (CCTA) D/C • • • • • Bicycle Facilities Grant Program (BAAQMD) C •
Climate Initiatives Innovative Grants (MTC) - •
New Developments/Resurfacing Projects
(Richmond)
D/C
• • •
Assessment Districts (Richmond) P/D/C • • • • • • •
Impact Fees (Richmond) P/D/C • • • • • • •

STATE AND FEDERAL OPPORTUNITIES
Active Transportation Program (CTC) P/D/C • • • • • • • Sustainable Transportation Planning Grants
(Caltrans)
P
•
Highway Safety Improvement Program (Caltrans) D/C • • • • • Solutions for Congested Corridors (CTC) C • • •
Office of Traffic Safety (CA OTS) - •
Table 11 F unding Opportunities by Project Type
99 Implementation
Richmond Bicycle and Pedestrian Action Plan

FUNDING SOURCE

FUNDING

FOR PLANNING (P),

DESIGN (D), OR

CONSTRUCTION (C)

ON-STREET

BIKEWAYS/

END-OF-TRIP
TRAILS
SAFE
ROUTES

TO SCHOOL
SAFE
ROUTES

TO TRANSIT

CROSSINGS/

INTERSECTIONS PROGRAMS STUDIES
Recreational Trails Program (CA DPR) C •
Affordable Housing & Sustainable Communities
(CA HCD)
C
• • •
Urban Greening Grants (CA NRA) C • • • •
Statewide Park Program (CA DPR) C • •
RAISE Grants (USDOT) P/D/C • • • • • •
Congestion Mitigation and Air Quality (Caltrans
and MTC)
C
• • • • •
Surface Transportation Block Grants (Caltrans and
MTC)
C
• • • • •

OTHER STATE FUNDS
Local Partnership Program (CTC) C • • • •
Road Maintenance and Rehabilitation Program
(Controller’s Office)
D/C
• • •
Table 11 Funding Opportunities by Project Type (continued). 100
Implementation
Richmond Bicycle and Pedestrian Action Plan
Table 12 B icycle Planning Level Cost Estimates by Bikeway Classification

BIKEWAY

CLASSIFICATION

COST PER MILE

ASSUMPTIONS

LOW HIGH
Class I
- Shared-use Path $500,000 $1,500,000 Cost includes asphalt path and minor crossing improvements. Cost does not include signal modification or right of way acquisition.

Class II
- Bicycle Lane $50,000 $350,000 Low cost assumes signage and striping. High cost assumes green conflict marking, and traffic signal modification, in-cluding bike signal detection.

Class IIB
- Buffered
Bicycle Lane
$100,000 $400,000 Low cost assumes signage, striping, and a painted buffer. High cost assumes green conflict marking, traffic signal modification (including bike signal detection), and wayfinding signage.

Class III
- Bicycle Route $15,000 $25,000 Cost includes signage and striping.

Class IIIB
- Bicycle Boulevard $70,000 $1,000,000
Low cost assumes signage, striping, and minor traffic calming (such as speed humps and up to 3 other elements such as medians, diverters, or a raised crosswalk). High cost assumes low-cost items plus traffic circles, curb extensions, traffic signal modification (including bike signal detection), and wayfinding signage.

Class IV
- Separated Bikeway $300,000 $1,500,000 Low cost assumes signage, striping, and a painted buffer with flexible delineators. High cost assumes green conflict marking, traffic signal modification (including bike signal detection), and a raised concrete buffer.

Please note that all costs are based on values obtained from Bid Documents of local (i.e., Contra Costa, Alameda, Santa Clara, and San Mateo counties) projects from 2019 to present, or historic planning level costs generated for local planning efforts from 2018 to present. Values derived from Bid documents were multiplied by a planning-level contingency factor to account for additional project needs not explicitly stated in the descriptions. Costs include the cost of materials, labor and administration of the identified facilities and items, and do not include design fees, public outreach efforts, or inter-agency coordination.
101
Implementation
Richmond Bicycle and Pedestrian Action Plan
Table 13 S pot Improvement Planning Level Cost Estimates (by cost)

FACILITY TYPE COST UNIT NOTES
Signage $500 Each
Pavement Markings (stop/yield) $2,000 Each
Transverse crosswalk $3,000 Each Transverse crosswalk
High-visibility crosswalk $4,000 Each High-visibility crosswalk Curb Ramps $15,000 Each Assumes no drainage relocation
Red Curb Paint $26,500 Per Mile
Wayfinding Signs $30,000 Per Mile
Curb extensions/Corner Radii $50,000 Each Varies by size and assumes no drainage relocation Median Refuge Island $50,000 Each Varies by size
Median (short) $50,000 Each
Rectangular Rapid Flashing Beacon (RRFB) $60,000 Each
Leading Pedestrian Interval $100,000 Each Cost varies based on the cost of existing and required equipment Slip Lane (Free right turn lane) Removal $100,000 Each Varies by size Pedestrian-only Signal Phase $100,000 Each Cost varies based on the cost of existing and required equipment Neighborhood Traffic Circle $150,000 Each
Pedestrian Hybrid Beacon (PHB) $400,000 Each
Protected Intersection $500,000 Each
Sidewalk $500,000 Per Mile Six-foot wide sidewalk on one side of the street Please note that all costs are based on values obtained from Bid Documents of local (i.e., Contra Costa, Alameda, Santa Clara, and San Mateo counties) projects from 2019 to present, or historic planning level costs generated for local planning efforts from 2018 to present. Values derived from Bid documents were multiplied by a planning-level contingency factor to account for additional project needs not explicitly stated in the descriptions.

Costs include the cost of materials, labor and administration of the identified facilities and items, and do not include design fees, public outreach efforts, or inter-agency coordination.
102
Implementation
Richmond Bicycle and Pedestrian Action Plan
Maintenance
Timely and regular maintenance of bicycle
facilities, shared-use paths, trails, and
sidewalks are critical for their continued
safe and comfortable use. Inadequately
maintained facilities can create potentially
hazardous conditions and reduce the
accessibility and connectivity of the walking,
rolling, and bicycling networks. Providing
safe, accessible, comfortable, and well-
maintained walking, bicycling, and rolling
facilities allows active transportation
to be a viable travel option. Prioritizing
the procurement of new equipment
for conducting regular maintenance
and sweeping on new facilities such as
protected bicycle lanes will benefit the City’s
active transportation long-term goals by
encouraging people bicycling and walking
to use these well-maintained facilities. The
following section offers maintenance policies
the City should consider.

Maintenance Policies
The City should consider the implementation
of the following policies to maintain the
active transportation networks in a state of
good repair, high usability, and accessibility.

Implementation of all maintenance policies
is subject to sufficient allocation of staff,
capital, and funding resources.

Policy 1: Identify all maintenance
stakeholders across City of Richmond
Departments and partner agencies/
jurisdictions.

A.

R
egularly coordinate to establish and
update maintenance needs across
the City and share resources when
possible and practical.

B.

C
reate a facility inspection schedule
to inspect facilities and update
maintenance priorities regularly.
103
Implementation
Richmond Bicycle and Pedestrian Action Plan
Policy 3: Maintain bicycle parking and other support facilities for a more comprehensive bicycle network.

A.

De
velop a procedure for inspection and prompt repair/
replacement of damaged bicycle racks or other facilities in the public right-of-way.

B.

E
ncourage public event organizers to provide and publicize valet bicycle parking at special events. Amend the City’s event permitting process to include bicycle access accommodations and parking as part of necessary traffic control provisions.

Policy 4: Develop a communications protocol for walking, bicycling, or rolling-related updates.

A.

R
egularly update digital and printed bicycle and trail network maps. Distribute paper maps at libraries, community centers, bike shops, and other locations.

B.

P
romote Richmond’s eTRAKiT service as an easy-to-use
method for the public to report maintenance and other facility issues.

Policy 2: Maintain designated walking and bicycling facilities to be safe, comfortable, accessible, and usable for walking, bicycling, and rolling.

A.

S
weep streets regularly with priority given to roads with higher pedestrian and bicycle traffic volumes.

B.

E
nsure Richmond Public Works has all necessary equipment to maintain all facility types, including trails and separated bikeways.

C.

D
evelop a schedule to sweep separated bikeways regularly.

D. T
rim overhanging vegetation and work with appropriate
property owners to maintain a clear path of travel along pedestrian and bicycle facilities. Consider working with neighborhood councils and community groups to help maintain vegetated pieces of infrastructure.

E.

De
velop and implement an appropriate minimum paving
surface standard for bicycle boulevards and other low-stress bikeways that maintain a higher safety and comfort level for active transportation users.

F.

U
pdate the City’s repaving project methodology to prioritize bicycle boulevards and other low-stress bikeways to maintain the minimum paving surface standard.

G.

I
ncorporate maintenance needs into the design of separated bikeways and other facilities to ensure proper maintenance after construction.

H.

De
velop a construction mitigation policy for impacted
pedestrian and bicycle facilities requiring City staff and contractors to create fully accessible detours of equivalent standards, where possible, when construction, maintenance, or other activities restrict the use of bikeways and walkways.

Please note that all costs are based on values obtained from Bid Documents of local (i.e., Contra Costa, Alameda, Santa Clara, and San Mateo counties) projects from 2019 to present, or historic planning level costs generated for local planning efforts from 2018 to present. Values derived from Bid documents were multiplied by a planning-level contingency factor to account for additional project needs not explicitly stated in the descriptions.

Costs include the cost of materials, labor and administration of the identified facilities and items, and do not include design fees, public outreach efforts, or inter-agency coordination.
104
Implementation
Richmond Bicycle and Pedestrian Action Plan
A quick-build curb extensions in Oakland near Lake Merritt BART.

Many infrastructure improvements
(especially pedestrian projects and
intersection geometry changes) can be
completed using signage, striping, and
other quick-build strategies. Facilities like
curb extensions, medians, and separated
bikeways are examples of treatments that
can be built with quick-build materials. These
improvements can be left permanently with
the quick-build materials or used as a short-
term improvement until additional funding
for design and construction can be secured
for permanent, more expensive design
iterations. Constructing improvements with
quick-build materials can make immediate
safety and comfort impacts at lower costs
to the City. Using quick-build materials also
allows the City to trial design changes before
committing to long-term installations.

There are many resources available to help
Richmond and community partners learn
more about and implement quick-build
projects. The California Bicycle Coalition
has an 80-page guide with details on how
to move forward with these low-cost, high-
impact project types.

Quick-Build Project Alternatives
105
Implementation
Richmond Bicycle and Pedestrian Action Plan
Public Art
Public art is a crucial component of
placemaking and allows community
members to help establish and reinforce
a public identity. Public art can take
many forms, including sculptures, murals,
decorative crosswalks, painted curb
extensions, and themed street furniture.

Public art can also help create a more
welcoming and engaging environment
to walk, roll, and bike through; helping
to encourage more people to use active
transportation. Public art can be coordinated
through the City’s Public Art Advisory
Commission and the Richmond Arts and
Culture Commission.

Next Steps
Project Timing and Funding
Projects can take a long time to get from “a
line on a map” to being fully constructed.

Limited staff time and limited City resources
constrict how many projects can move
forward at a given time and how fast those
projects move. In some cases, funding
for project phases (planning, engineering
design, and construction) is found separately,
sometimes with years between phases. As
the City wins competitive grants, it can take
one to two years for the City to get access to
those funds to continue moving the project
forward. The realities of active transportation
funding strengthen the importance of project
prioritization to guide City staff in selecting
projects that will provide the most significant
safety and overall community benefits.

Black Lives Matter painted on Nevin Avenue in front of City Hall.

Pride and Purpose mural on an overpass wall.

Richmond and Partner Agencies
The City of Richmond is not the only
jurisdiction or agency responsible for
planning, designing, and constructing
walking, bicycling, and rolling facilities
across the City. Some of the project
recommendations in this plan are in the
rights-of-way of other agencies, jurisdictions,
or private owners, such as Caltrans, Contra
Costa County, or Union Pacific Railroad.

The City will need to coordinate with the
appropriate stakeholders for planning,
design, funding, and implementation. These
partner agencies may have final approval
on these projects, even if they are located
within the City of Richmond. Examples
of projects out of the City’s right-of-way
include trails on railroad company property,
bicycle facilities on Caltrans-operated roads,
or pedestrian crossing improvements at
interchanges.
106
Implementation
Richmond Bicycle and Pedestrian Action Plan
What Projects Move Forward Next?
Given the limited amount of staff time and budget for new projects, several factors impact which recommended projects move forward and when. The infographic to the right, Figure 26 , provides a simplified visualization of the project development and implementation process.

Focusing on Safety
Throughout the community engagement process, community
members consistently stated that improving safety was their top priority. Travel Safe Richmond analyzed collision histories across the City and developed recommendations that responded to those locations. Additionally, safety was one of the major components of the project prioritization process (one-quarter of possible priority points).

When seeking funding sources, many competitive grants have collision history as a score factor. Some grants, including the Highway Safety Improvement Program (HSIP) and those from the Office of Traffic Safety (OTS), focus on responding to collision locations and other safety concerns.

Interpreting Prioritization Results
The overall prioritization rankings provide an order of projects that can improve safety and benefit the community. Overall project rankings can help select projects for Active Transportation Program (ATP) grant applications or for projects to add to the City’s next Capital Improvement Plan (CIP). Breaking down the scores of the different inputs can provide guidance for more specific needs. For example, City staff could sort projects by order of the “safety” score to find the best projects for HSIP or OTS grants. The rankings are not intended to be a hardened list but rather a guide for staff to select projects based on the myriad of factors that present opportunities to move projects forward.

Figure 24
I
mplementation Process Flowchart
Bike and Ped
Action Plan
Local Road
Safety Plan
Prior corridor
and community
plans
Prioritized
Projects
Project Selection
In/f_luences
City Staff
BPAC
Community
Members
CBOs/ Advocates
Other
Jurisdictions
Corridor
Studies
Capital
Plans
Outside
Funding
Development
Projects
Repaving
Projects
Interjurisdictional
Coordination
Engineering
Design Work
Construction
Maintenance
Other plans
and policies
City Council
Blue: Plans and policies
Red: Coordination opportunities
Y ellow: Jurisdictions and CBOs
Green: Project implementation
107
Implementation
Richmond Bicycle and Pedestrian Action Plan
Staying informed and involved with
Richmond’s active transportation activities is
one of the best ways to continue to advocate
for your community and show support for the
projects that matter to you most. There are
multiple ways you can get involved:

Attend Bicycle and Pedestrian Advisory
Committee Meetings
The Bicycle and Pedestrian Advisory
Committee (BPAC) meets monthly to discuss
current and future active transportation
projects and needs. City staff present
updates, and there are opportunities for
public comment. If you don’t have time to
attend,
checking the agenda and minutes
is a great way to stay informed.

Get Involved With Your Local
Neighborhood Council or Community
Association
Neighborhood councils and community
associations are great ways to meet your
neighbors and stay informed about different
happenings in your area. Neighborhood
councils receive presentations and updates
from City staff on projects and other issues.

Find your neighborhood council.

Get Involved With Local Walking and
Biking Organizations
Supporting local community and advocacy
groups like Rich City Rides and Bike East
Bay is another way to advocate for active
transportation in your community. These
groups focus on advocating for safer roads
and getting more people walking and
bicycling. Your membership and support
allow them to grow and continue their
advocacy and education work on behalf of
the community.

How Can the Community Stay Involved?
108
Implementation
Richmond Bicycle and Pedestrian Action Plan
Plan Review Summary
A
Appendix
Bicycle Design Guidelines
B
Appendix
Project Funding
C
Appendix