HILLTOP GATEWAYS SIGNAGE PROJECT, SIGN #4
CITY OF RICHMOND
DEPARTMENT OF ENGINEERING & CAPITAL IMPROVEMETN PROJECTS
PROPOSAL
The undersigned declares that he has carefully examined the location of the proposed work of:
HILLTOP GATEWAYS SIGNAGE PROJECT, SIGN #4
Construction to be in accordance with the Social Provisions includine the payment of not less than the minimum The work to be done and reforred to herein ic in the City of Richmond Contra Costa County. State of california. wage rates cet forth herein and the Contract annexed herato and aco in accordanco with the Ctandard file in the office of the City Clerk of the City of Richmond. Specifications dated July 2002, and the current "Equipment Rental Rates and General Prevailing Wage Rates" on To the City of Richmond Department of Public Services:
The undersigned, as Bidder, declares that the only persons or parties interested in this Proposal as principals are those named herein; that this Proposal is made without collusion with any other person, firm or corporation; that he has carefully examined the location of the proposed work; and the Plans therein referred to; and he proposes, and agrees if this Proposal is accepted, that he will contract with the City of Richmond to provide all necessary specified in the Contract, in the manner and time therein prescribed and according to the requirements of the machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials Engineer as therein set forth, and that he will take in full payment therefor the following item prices to wit:
Item Unit Cost Quantity
100 Unit Total Cost
Sign #4 LS
200 195,000.00
Traffic control
LS
3,000-00
300
Contingency $10,000 1 LS
$10,000
Base Bid Total (figures). 208, 000.00
Base Bid Total (words). Two Honda Ecght Thour and und
Alternate #1- Aluminum Framing and Powder-Costed Aluminum Cladding Aluminum may be substituted for internal structure and cladding. An 18" × 18" samples of solid and perforated cladding with applied faux Corten Steel finish must be submitted for approval..
Number Item Unit Cost Quantity
Unit Total Cost
100-A1 Sign #4
1 LS
180,000.00
200-A1 Traffic control 1
LS
3, 000.00
300-A1 Contingency $10,000
1 LS $10,000
Alternate #1 Total (figures) S/ 193, 000.00
Alternate #1 Total (words) one Hundred ninty Three THousand, Turner S16as