Attachment 3 - Application Attachments.pdf

Richmond City Council
February 21, 2023

Document
Attachment 3 - Application Attachments.pdf
Meeting
February 21, 2023
Body
Richmond City Council
Original file
5.3 MB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.

280 FEET OF REPAIRED

AND WIDENED SIDEWALK
To
Civic
Center
To
BART,
Greenway West
To
Ohlone Greenway
To Unity Park,
Bay Trail,
Richmond-San
Rafael Bridge
23RD
ST
S 23RD ST

CARLSON BLVD

BROADWAY

CHANSLOR
AVE
24TH
ST

RICHMONDGREENWAY

OHIO AVE
UP
0 0.01 0.02
Miles
1 Inch = 100 Feet

CARLSON BLVD
Greenway Path Extension
Parcel Lines
Existing Bikeways
Class 1 Path
Class 2 Lane
Class 3 Sharrow
Close side-
walk gaps
and connect
to Greenway
Install lighting,
shelter, and red
curb at bus stop
Close west-
bound Bike
Lane gap and
realign through
lane
Consider installing trail
access point through
vacant lot (requires
easement)
Install proposed
16th St Bike Blvd
with traffic calming
improvements

Install bulbout at southeast
corner to shorten crosswalk
and align intersection
Formalize Miraflores
Greenbelt connection
to Ohio Avenue
Install proposed Bike
Boulevard with traffic
calming on 45th St
Explore easement with Target to
widen sidewalk between 45th St
and the Greenway; improve with
lighting, murals, and wayfindingFuther enhance lighting and actively maintain/monitor
the tunnel

Restripe segment of
Ohio Ave with bike
lanes
Straighten crosswalks,
add missing crosswalk,
install bulbouts on each
side
Opportunity site for
parks and housing with
22nd and 23rd St
two-way conversion
Install multimodal safety
project and repurpose
excess lanes on 22nd St for
streetscape and greening
Install separated bike
lanes on 23rd St be-
tween Ohio Ave and
Bissell Ave
Ensure signals at the
Bissell/23rd St intersection
are visible to bicyclists
Install multimodal
safety projects on
23rd St, convert to
two-way travel, and
install bike lanes
Install multimodal safety
project to repurpose one
northbound travel lane to
provide biking/walking
connection to 23rd St
Repurpose northbound
slip lane at Broadway
Convert existing
wide sidewalk to a
path and install
landscape buffer
and street trees
Install multimodal
safety project on
Carlson Blvd with
separated bike lanes
Enhance Center
Ave Bike Blvd with
additional traffic
calming
Install Bicycle Boulevard on 45th St,
connecting to Nevin Avenue and
Barrett Avenue. Install Pedestrian
Hybrid Beacon at 45th St
Potential access point to
Target via pedestrian
ramp
Enhance crossing at
Macdonald Ave
/gid00001
/gid00001
/gid01088/gid01088/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid01088/gid01089/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid01088/gid01090/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00014/gid00028/gid00045/gid00036/gid00041/gid00028/gid00001/gid00024/gid00028/gid00052 /gid01088/gid01092/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid01088/gid01093/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid01088/gid01094/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid01088/gid01095/gid00046/gid00047/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid01088/gid01096/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid01089/gid01087/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid01089/gid01088/gid00046/gid00047/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00004/gid00035/gid00028/gid00041/gid00046/gid00039/gid00042/gid00045/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00016/gid00035/gid00036/gid00042/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00009/gid00028/gid00045/gid00029/gid00042/gid00045/gid00001/gid00024/gid00028/gid00052 /gid00022/gid00041/gid00036/gid00042/gid00041/gid00001/gid00017/gid00028/gid00030/gid00036/gid00033/gid00036/gid00030/gid00001/gid00019/gid00028/gid00036/gid00039/gid00045/gid00042/gid00028/gid00031 /gid00003/gid00036/gid00046/gid00046/gid00032/gid00039/gid00039/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00003/gid00002/gid00019/gid00021
/gid01089/gid01090/gid00045/gid00031/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00003/gid00045/gid00042/gid00028/gid00031/gid00050/gid00028/gid00052 /gid00007/gid00039/gid00042/gid00045/gid00036/gid00031/gid00028/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00003/gid00045/gid00042/gid00028/gid00031/gid00050/gid00028/gid00052 /gid00014/gid00048/gid00045/gid00031/gid00042/gid00030/gid00038/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00008/gid00045/gid00042/gid00049/gid00032/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00006/gid00048/gid00030/gid00039/gid00036/gid00031/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00016/gid00035/gid00036/gid00042/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00007/gid00039/gid00042/gid00045/gid00036/gid00031/gid00028/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00020/gid00001/gid01089/gid01094/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00020/gid00001/gid01089/gid01096/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00020/gid00001/gid01090/gid01088/gid00046/gid00047/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00020/gid00001/gid01090/gid01090/gid00045/gid00031/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00020/gid00001/gid01090/gid01092/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00020/gid00001/gid01090/gid01094/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00004/gid00032/gid00041/gid00047/gid00032/gid00045/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid01089/gid01096/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00003/gid00036/gid00046/gid00046/gid00032/gid00039/gid00039/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00009/gid00028/gid00045/gid00045/gid00052/gid00001/gid00006/gid00039/gid00039/gid00046/gid00001/gid00017/gid00039/gid00028/gid00030/gid00032 /gid00014/gid00028/gid00030/gid00031/gid00042/gid00041/gid00028/gid00039/gid00031/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00003/gid00036/gid00046/gid00046/gid00032/gid00039/gid00039/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00001/gid01090/gid01094/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00001/gid01090/gid01095/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00001/gid01090/gid01096/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid01091/gid01087/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid01091/gid01088/gid00046/gid00047/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid01091/gid01089/gid00041/gid00031/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid01091/gid01090/gid00045/gid00031/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid01091/gid01091/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00015/gid00032/gid00049/gid00036/gid00041/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00014/gid00028/gid00030/gid00031/gid00042/gid00041/gid00028/gid00039/gid00031/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00003/gid00036/gid00046/gid00046/gid00032/gid00039/gid00039/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00020/gid00001/gid01090/gid01096/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00020/gid00001/gid01091/gid01088/gid00046/gid00047/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00020/gid00001/gid01091/gid01089/gid00041/gid00031/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00016/gid00035/gid00036/gid00042/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00004/gid00032/gid00041/gid00047/gid00032/gid00045/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00004/gid00032/gid00041/gid00047/gid00032/gid00045/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00016/gid00035/gid00036/gid00042/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00020/gid00001/gid01091/gid01092/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00015/gid00032/gid00049/gid00036/gid00041/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00014/gid00028/gid00030/gid00031/gid00042/gid00041/gid00028/gid00039/gid00031/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00020/gid00028/gid00041/gid00001/gid00017/gid00028/gid00029/gid00039/gid00042/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid00012/gid00032/gid00052/gid00001/gid00003/gid00042/gid00048/gid00039/gid00032/gid00049/gid00028/gid00045/gid00031 /gid01091/gid01092/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00021/gid00028/gid00045/gid00034/gid00032/gid00047
/gid00003/gid00002/gid00019/gid00021
/gid00004/gid00028/gid00045/gid00039/gid00046/gid00047/gid00042/gid00041/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid00016/gid00035/gid00039/gid00042/gid00041/gid00032/gid00001/gid00008/gid00045/gid00032/gid00032/gid00041/gid00050/gid00028/gid00052 /gid00014/gid00036/gid00045/gid00028/gid00033/gid00039/gid00042/gid00045/gid00032/gid00046 /gid00008/gid00045/gid00032/gid00032/gid00041/gid00029/gid00032/gid00039/gid00047 /gid00004/gid00028/gid00045/gid00039/gid00046/gid00042/gid00041/gid00001/gid00003/gid00042/gid00048/gid00039/gid00032/gid00049/gid00028/gid00045/gid00031 /gid00005/gid00036/gid00045/gid00047/gid00001/gid00024/gid00042/gid00045/gid00039/gid00031 /gid00005/gid00032/gid00011/gid00032/gid00028/gid00041/gid00001/gid00014/gid00036/gid00031/gid00031/gid00039/gid00032/gid00001/gid00020/gid00030/gid00035/gid00042/gid00042/gid00039 /gid00015/gid00036/gid00030/gid00035/gid00042/gid00039/gid00039/gid00001/gid00017/gid00028/gid00045/gid00038 /gid00022/gid00041/gid00036/gid00047/gid00052/gid00001/gid00017/gid00028/gid00045/gid00038 /gid00022/gid00041/gid00036/gid00042/gid00041/gid00001/gid00017/gid00028/gid00030/gid00036/gid00033/gid00036/gid00030/gid00001/gid00019/gid00028/gid00036/gid00039/gid00045/gid00042/gid00028/gid00031 /gid00003/gid00002/gid00019/gid00021
/gid00013/gid00036/gid00049/gid00036/gid00041/gid00034/gid00046/gid00047/gid00042/gid00041/gid00001/gid00013/gid00028/gid00041/gid00032 /gid00020/gid00001/gid01091/gid01094/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 Retrofit Nicholl Park
Bridge to address security
and accessibility issues
Enhance Center Ave Bike
Blvd with additional traffic
calming
Install proposed Bike Blvd
with traffic calming on S
33rd St / Harry Ells Pl
Raise 37th St Bike
Lanes with fire
truck-mountable curb
through the underpass
/gid00007/gid00039/gid00042/gid00045/gid00036/gid00031/gid00028/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 Install lighting and
shelters at bus stops
Potential easement be-
tween S 42nd St and
Ohio/Center Ave
Redevelop abandoned
Taco Bell site to better
maintain and improve
the Baxter Creek Open
Space
Implement road diet
with buffered bike
lanes and crossing
improvements.
/gid00014/gid00028/gid00030/gid00031/gid00042/gid00041/gid00028/gid00039/gid00031/gid00001/gid00002/gid00049/gid00032/gid00041/gid00048/gid00032 /gid01088/gid01096/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 /gid01089/gid01087/gid00047/gid00035/gid00001/gid00020/gid00047/gid00045/gid00032/gid00032/gid00047 Work with neighbors
to identify potential
access point to
Greenway
Enhance Greenway
access to local streets
for pedestrians and
bicyclists
Install raised intersec-
tion at 20th St. and ad-
dress drainage issues
Install safety elements
such as lighting,
emergency telephones.

Widen path and add
jogging path
Rest areas alongside trail
with benches, trash/
recycle, and call box
Rest areas alongside trail
with benches, trash/
recycle, and call box
Install safety elements such
as lighting, emergency
telephones. Widen path
and add jogging path
Potential pocket
park at 42nd St
Figure 19
Street Improvements West of and Across the Gap

STREET IMPROVEMENTS OVERVIEW
Beyond constructing a bridge across the Greenway Gap, street improvements are needed to provide safe connections for people walking or biking to and from the Greenway.

Improvements are planned for the area west of Harbor Way, North of Ohio Avenue, South of Macdonald Avenue, and West of San Pablo Avenue.

Improvements for people biking will include key safety and access improvements, such as installing protected bike lanes and closing bike lane gaps, implementing bike boulevards, and enhancing connections between the bikeway network at the Greenway.

Pedestrian improvements will include crosswalk enhancements, new bulbouts to shorten crossing distances, adding missing crosswalks, and increasing the number of access points to the Greenway from neighborhood streets. The Nicholl Park bridge will also be retrofitted to address security and accessibility issues.

Crossing Improvements
Crossing improvements will include bulbouts,
new crosswalks, and other crosswalk
improvements. Locations include Ohio Ave at
13th St, Marina Wy, 15th St, 17th St, 19th St, 20th
St, and 23rd St
; Chanslor Ave at 20th St
; and
Richmond Greenway at 20th St.

Neighborhood Traffic Calming
Neighborhood traffic calming will include elements like speed humps or tables, traffic circles, and raised intersections. Bike boulevards are considered on streets that have traffic calming treatments. Locations include 16th Street, Center Ave, 33rd St, and 45th St.

Bike Improvements
Existing Elements
Parks Improvements
Walking and Accessibility
Improvements
Bus Improvements
Street End Park Upgrade
Bridge
Red Curb
Stairs
Lighting
High Visibility Crosswalks
(One Leg)
High Visibility Crosswalks
(Entire intersection)
Shelter/Seating
Traffic Signal
P
Richmond
Opportunity Site for
Green Infrastructure

4.3 Street Concepts

RICHMOND GREENWAY GAP CLOSURE RICHMOND GREENWAY GAP CLOSURE 3938

PROPOSED

BIKEWAYS

TRAVEL SAFE

RICHMOND
Sources: City of Richmond, MTC, Caltrans, and Contra Costa County. Document: Z:\Shared\PROJECTS\2021\00-2021-114 MTC VMT Reduction Plan\GIS\Projects\21-114_MTC_VMT_ReductionPlan.aprx. Date saved: 10/3/2022.

EXISTING BICYCLE

FACILITIES
Class I Shared-Use Path
Class II Bicycle Lane
Class III Bicycle Route
Class IV Separated Bikeway
BOUNDARIES +

DESTINATIONS
! BART Station
! Amtrak Station
! Ferry Terminal
! School
! City Hall
! Library
! Community Center
Park
Contra Costa College
City Boundary
!
!
!
!
!
!
!
!! !
!
!!
!
!
!
!
!!
!!
!
!
!
!
!
!
!
!
!
!
Ä123
¥580
¥580
¥80

EL CERRITO
SAN
PABLO
EAST

RICHMOND

HEIGHTS
NORTH

RICHMOND

MIL L ER-KNOX

REG IO NAL

SHO REL INE

WILDCAT CANYON

REGIONAL PARK

BOOK E R T

ANDERSO N JR

U NITY PARK

SAN PABLO AVELINCOLN AVE

CUTTING BLVD
HELLINGS AVE7THST ANDRADE AVE
2ND ST

CARLSON BLVD

REGATTA BLVD
6TH ST

RHEEM AVE

MAINE AVE

CUTTING BLVD

BAYVIEW
AVE

ESMOND AVE

HARTNETT

AVEMARI
NA BAY
PKWY
47TH ST

FOOTHILLAVE

COSTA AVE

MCBRYDE AVE

MEEKER AVE

MACDONALD AVE

HENSLEY ST

MARINA WAY
MACDONALD AVE 23RD ST8TH ST
16TH ST

MORAN AVE

PENNSYLVANIA AVE

POTRERO AVE

HARBOUR WAY
4TH ST

HALL AVE

TULARE AVE

GARVIN AVE
45TH ST

PINE AVE
44TH ST

WHARF ST
35TH ST

MEADE S
T

WRIGHT AVE
BROAD
WAY
22ND ST
37TH ST

PENINSULADR
41ST ST

OHIO AVE

RIPLEY AVE
20TH ST

LUCAS AVE

FLEMING AVE

GRANT AVE

CURRY ST
38TH ST
KEY
BLVD
59TH ST

SAN MATEO ST
BURBECK AVE10TH ST

ROOSEVEL T AVE

EGRET WAY

TEHAMA AVE

MOUNTST

DOWNER AVE
POR
TOLA A
VE
33RD ST
SA
N

JOAQUIN S
T
34TH ST

MONTEREY ST

MERCED ST
13TH ST
52ND ST
DIMM
ST
24TH ST
26TH ST

CHANSLOR AVE
CAR
LST
ON
ST

YUBA ST
28TH ST

WALL AVE

CLINTON AVE
COLLIN
SST

WILSON AVE

HOFFMAN BLVD

LOWELL AVE
30TH ST

VAN FLEET AVE
55TH ST

SANTA CLARA ST
56TH ST

AMADOR ST
13TH ST
HU
M
BOLDT
ST

VIRGINIA AVE
HINKLE
Y AVE

ALAMO AVE

FALL AVE

NEVIN AVE
42ND ST

ESPEE AVE
21ST ST

BERK AVE
CANAL
BLVD
11TH ST
SO
NOM
A
ST

BURLINGAME AVE

SIERRAAVE
M

CLAUGHL
IN
ST

SOUTH ST

BE RK PL
12TH ST
SAN

LUIS ST
36TH ST
15TH ST

OVEREND AVE
57TH ST
B ST

DUBOCE AVE

CENTER AVE
17TH ST
3RD ST
1ST ST

MARICOPA AVE

SANFORD AVE

WILLARD AVE

FLORIDA AVE
50TH ST
27TH ST29TH ST
49TH ST

COLUMBIA AVE

OHIO AVE

FRESNO AVE

HUMPHREY AVE
9TH ST

DUNN AVE
18TH ST
C ST
19TH ST

COALINGA AVEFACTORY
ST

WALLER AVE
40TH ST39TH ST

CREELY AVE
5TH ST

BISSELL AVE
31ST ST

VISALIA AVE
32ND ST

GATELY AVE
43RD ST
25TH ST

GAYNOR AVE

WENDELL AVE
46TH ST

KERN ST
LASSEN
ST

VENTURA ST

SPRING ST
58TH ST

BELL AVE

STEGE AVE

TAFT AVE

BARRETT AVE
0 0.5 1 MILES

PROPOSED BICYCLE

FACILITIES
Class I Shared-Use Path
Class II Bicycle Lane
Class IIB Buffered Bicycle
Lane
Class III Bicycle Route
Class IIIB Bicycle Boulevard
Class IV Separated Bikeway

CENTRAL CORE

CENTRAL
CORE
Figure 07 P roposed Bicycle Improvements (central core) 32 Bicycle Recommendations
Richmond Bicycle and Pedestrian Action Plan
Table 08 B icycle Projects by Prioritization Scores

STREET START END RECOMMENDED FACILITY MILES PRIORITIZATION SCORE

PRIORITIZATION

CATEGORY
Carlson Blvd Richmond Greenway Broadway Class I Shared-Use Path 0.07 81 High-Priority 23rd St Overcrossing Richmond Greenway Richmond Greenway Class I Shared-Use Path 0.11 80 High-Priority Central Ave Jacuzzi St Pierce St Class I Shared-Use Path 0.10 79 High-Priority Harbour Way Richmond Greenway Macdonald Ave Class II Bicycle Lane 0.31 77 High-Priority 16th St Macdonald Ave Livingston Ln Class IV Separated Bikeway 0.01 77 High-Priority Macdonald Ave Harbour Way 16th St Class III Bicycle Route 0.32 77 High-Priority 16th St Nevin Plaza Richmond Greenway Class IIIB Bicycle Boulevard 0.08 77 High-Priority Nevin Ave Marina Way 15th St Class IIIB Bicycle Boulevard 0.05 76 High-Priority Pierce St Central Ave Cerrito Creek Class IV Separated Bikeway 0.23 75 High-Priority Marina Way Macdonald Ave Richmond Greenway Class II Bicycle Lane 0.30 75 High-Priority S 49th St Wall Ave Cutting Blvd Class IIIB Bicycle Boulevard 0.17 75 High-Priority 23rd St Broadway Brooks Ave Class II Bicycle Lane 0.61 75 High-Priority Espee Ave Bisell Ave Trail south of Chanslor
Ave Class IIIB Bicycle Boulevard 0.19 75 High-Priority
Carlson Blvd Bayview Ave Broadway Class IV Separated Bikeway 1.81 73 High-Priority Carlson Blvd Bayview Ave Tehama Ave Class IIB Buffered Bicycle Lane 0.49 72 High-Priority Bayview Ave Seaport Ave S 55th St Class IIB Buffered Bicycle Lane 0.36 72 High-Priority Barrett Ave 19th St Marina Way Class IV Separated Bikeway 0.21 72 High-Priority Plaza Way S 49th St S 50th St Class IIIB Bicycle Boulevard 0.05 72 High-Priority Ohio Ave Harbour Way 2nd St Class IIIB Bicycle Boulevard 0.42 72 High-Priority Barrett Ave 19th St 22nd St Class II Bicycle Lane 0.20 71 High-Priority 71 Implementation
Richmond Bicycle and Pedestrian Action Plan
CARLSON BOULEVARD CLASS 1 TRAIL ‐ GATEWAY TO GREENWAY
Concept Level Cost Estimate

01.20.23 UNIT
ITEM DESCRIPTION QTY. UNIT COST CONT AMOUNT
101 Mobilization/ Demobilization 1 LS $10,936 $10,936
102 Traffic Management 1 LS 10,000.00$ 10% $10,000 103 Water Pollution Control 1 LS 5,000.00$ 10% $5,500 104 Construction Layout 1 LS 3,000.00$ 10% $3,300 105 Clear and Grub 1,500 SF 1.85$ 15% $3,191 106 Concrete Removal 3,500 SF 2.25$ 15% $9,056 107 Tree Removal 3 EA 600.00$ 15% $2,070
108 Concrete Paving 2,300 SF 23.00$ 15% $60,835 109 Trail Shoulders 800 SF 6.00$ 15% $5,520 110 Mulch 20 CY 150.00$ 15% $3,450
111 Split Rail Fence 200 LF 28.00$ 15% $6,440 $120,000
Notes

1. Portion of work is within BART right of way $10,000

2. Assume 60 Working Days $18,000

3. No curb and gutter replacement $18,000

4. Trail constructed from concrete. $5,000

5. No landscaping or lighting in fee. $171,000
Prepared by:  R Stevens
BART Permit
Total Construction Cost:

Planning and Design
Construction Management
Total Cost (2023 Dollars)
Staff Time

Bike Education Program Cost Estimate

City of Richmond will contract with Rich City Rides for a two-year bicycle safety education program. It consists of eight 1-hour workshops. These 1-hour workshops will cover topics such as rules of the road, avoiding collisions, biking in city traffic, handling intersections, avoiding bike theft, riding after dark, and basic bike mechanics. They will be led by an instructor certified by the League of American Bicyclists in either a classroom or virtual webinar format. Average attendance: 10. Instruction hours: 1.

Number of Instructors: 1

ITEM UNIT COST UNITS TOTAL
1 Hour Workshop class $625 8 $5,000
Subtotal Bicycle Safety Education Program $5,000

Meeting Agenda
January 9, 2023    5:30‐7:30pm
Video Conference via Zoom
https://zoom.us/j/95678132207
Or dial (669)900‐6833 ‐ Meeting ID: 956 7813 2207 ‐ No Password Necessary

Subject                                                                                     Presenter      Time Welcome
Call to order, establish notetaker, introductions, ground rules, quorum, review & approval of November minutes
Catalin  5:30

Community briefs & announcements:
● PP announcement
● RBPAC Relationships with City Council and City of
Richmond
● RBPAC officer elections in March; new position:

Community Liaison
● Climate Ride ‐ Green Fondo ‐  May 12 - 14, 2023 - Starts and Ends In Walker Creek Ranch
●
various  5:45
● Update on TCC grant  Samantha
Carr
6:00
● Ideas for next TDA grant ($100-200K):*
● Improving connection of Nevin Bike Blvd to the
Target Path, Macdonald Ave & 45th St
Patrick  6:15

● Building out the sidewalk to be a multi‐use path
along Carlson Blvd between Broadway and the
Greenway (adding to the short‐term Greenway gap
improvements)
● RRFBS to improve pedestrian safety at key
unprotected intersections (these were very popular
and always funded in last year’s applications)
● Take a look at the BikePedActionPlan and see if any of the pedestrian spot improvements could be a good
candidate
● Other ideas?
Updates from last month (& prior) topics
●  Challenges & opportunities along Greenway East,
plan a walk? ‐ folder

7:10
Subcommittee reports/updates
Social events
Safe Routes to Schools and Parks: N&E kiddie ride Jan 1; Councilmember Claudia Jimenez joined ride

Dani,
Catalin
7:25
ADJOURN     7:30

*Notes from when we discussed TDA grant ideas in November:
● Eastern section of the Greenway in general needs improvements ● Path behind Target can use improvements, member almost crashed, not very visible. The gate doesn’t work as well as it could. ● No landing on Richmond Annex Sacramento Ave Pedestrian bridge. Cars going North, cars going North and no place to land.
● Greenway by Target. Target is a popular destination and access from the Greenway should be improved.
● Better, easier access to the Bay Trail.
● Connections between Richmond Annex and Bay Trail.
● Greenway East West Gap, safety is an issue
● Safe Streets for All is a good framework.
● Not enough intersections on San Pablo Ave that make it hard to go from one side to the other side of San Pablo. Something that connected Bayview from one side to the other would be good to connect to the Bay Trail and Greenway.
● Any thoughts on  Bike/Bed Action Plan
● Carlson is underestimated for its potential for connectivity. ● Consider a road diet on Carlson, may need to eliminate the median. ● Re: Bike/Ped Action Plan. There should be better connections between neighborhoods.
● Ohio & 37th St has 2 cul de sacs

Parking Lot: Future Agenda Items –  ECSR Safe Trec

APPENDIX: 2023 Planning Calendar ‐ please feel free to add ideas, notes, etc Month  Potential Events , special dates  Notes
January
February
March  Officer Elections

April  Earth Day; WCCUSD spring br eak ‐ opportunities for kid‐friendly events?

May  Bike to Work/School Day ‐3rd Friday of May, Cinco de Mayo parade on 23rd St; Ride of Silence ‐ 3rd Wednesday of May

June  Juneteenth; 511.org’s Su mmer Bike Challenge begins July   Idea: sidewalk chalk art event to celebrate and call atte ntion to sidewalks + combine with some temporary asphalt art
installations to reclaim and re‐envision specific public spaces;

August  Our traditional community clean‐up day; Richmond Home Fr ont Festival & Rosie Rally (?); school starts ‐ kids back in school ‐

opportunities to highlight Safe Routes to Schools
September  Coastal Cleanup Day ( Creek Cleanup Day); Richmond Sp irit & Soul Festival;

October  Richmond’s arbor day, N.Richmond Shoreline Festival (?) ; +idea:
decorated bikes parade for halloween. Start thinking about TDA grant.

November  Dark early ‐ lighting fo cus campaign on visibility for peds and bikes;
November 16, 2023 ‐ 4th anniversary of RSR Bridge trail

December  Our traditional holiday party
Jan 2024

Meeting Notes
January 9, 2023    5:30‐7:30pm
Video Conference via Zoom
https://zoom.us/j/95678132207
Or dial (669)900‐6833 ‐ Meeting ID: 956 7813 2207 ‐ No Password Necessary

Topic  Presenter  Notes  Decisions, Actions,
Follow‐up
Welcome
Call to order, establish notetaker,
introductions, ground rules,
quorum, review & approval of
October minutes
Catalin  Note taker: Patrick
Attendees: Catalin ( chair), Amy S (AS&R), Robert P
(BEB), Alex (RCR), Dani (vice chair & RCR), Bill
(county BPAC), Cosmo, Samantha (staff), Steve P
(ECS&R), Art, George, Ann

Quorum?
October
minutes
approved?

Community briefs &
announcements:
● PP announcement
● RBPAC Relationships with City
Council and City of Richmond
● RBPAC officer elections in
March; new position:

Community Liaison
various

● Catalin would like to write City asking for
job/position focusing on
bike/ped/environmental issues. Patrick
recommends framing it less about a particular
job but more about what the BPAC would like
from the City. Robert recommends asking staff

Catalin will have
proposed
changes coming
at Feb meeting
● Climate Ride ‐ Green Fondo ‐  May
12 - 14, 2023 - Starts and Ends In
Walker Creek Ranch
what they need to be successful and to make
bike/ped projects happen. Who does what in a
City? Planning or Public Works? IN Albany they
have committees and commissions ‐
everything has to go through them and the
public. Richmond doesn’t have transpo
commission. Patrick reminded that keeping
track of council meetings and calling in to
support projects/plans is important.
● Catalin proposes Community Liaison position.

Also, haven’t had Secretary for a long time. P
● Bike challenge w many distance options, also
fundraising/donating opportunity. Many
beneficiaries including local bike orgs

Consider
supporting Bike
East Bay Climate
Ride Team:
https://support.c
limateride.org/in
dex.cfm?fuseacti
on=donorDrive.t
eam&teamID=62
95 Or others!

● Update on TCC grant  Samantha
Carr
$35 million award. Partnership btw depts and
community orgs. Took years of planning. Have to
leverage $17.5 million in other funds. 9 projects:
resilient homes, basins of relations, orchards for all, veggies RX, neighborhood complete streets, RWT II,
ADA garden, e‐bike lending glibrary, bosque del barrio.

Also workforce dev plan, economic dev plan, education
& outreach plan.

Neighb complete streets: City is lead with help from
Main Street Richmond and Pogo Park. bike/ped
improvements on Harbour Way, traffic calming on
Ohio, bus stop improvements on Harbour &
Macdonald.

More info here
https://www.ci.ri
chmond.ca.us/16
10/Environmenta
l‐and‐Health‐
Initiatives
Can also go to
Strategic Growth
Council to look
up

Richmond Wellness Trail: TPL is lead.

Rich City doing long‐term e‐bike lending, plus rides and education workshops. City will be revamping Gotcha
program.

Samantha: we need help. Big projects. Outreach,
feedback. Also need feedback on Blue/Green Deal.

Leap is taking over Gotcha e‐bike share.

BPAC can help with outreach ‐ community feedback on
plans. Surveys, meetings. Send out through network.

Attend kick offs, need walkers and bikers to show up.

Come to workshops.

Catalin: please have staff come give presentations to
BPAC.

What kind of trees will be planted? Groundwork
Richmond will have tree menu. Depends on if there
are overhead wires (need smaller tree). Will mainly be
street trees but also in parks.

Patrick: BPAC should consider doing walk audits or bike rides to help shape project

Take survey
Blue/Green Deal
https://survey.al
chemer.com/s3/
6993203/d636e0
1b6995

Sign up for
Enviro list serve
and CM weekly
report list serve
https://www.ci.ri
chmond.ca.us/lis
t.aspx

● Ideas for next TDA grant ($100-
200K):*
● Improving connection of
Nevin Bike Blvd to the Target
Path, Macdonald Ave & 45th
St
● Building out the sidewalk to
be a multi‐use path along
Patrick  Robert: opportunities to fund things that are often harder to fund ‐ like funds for wayfinding signage, bike racks, programs,
Bill: want to focus on protected bikeways. Bill is on
BAC selection committee ‐ usually get around $1.25
million to give out and an ask of $2 million. How about funds for getting started on Greenway bridge
Dani: has been looking for bike safety education
specific to Richmond, would encourage that. Also likes

Group voted to
support motion
for
Carlson/Greenwa
y sidewalk path
project w bike ed
program

Carlson Blvd between
Broadway and the Greenway
(adding to the short‐term
Greenway gap
improvements)
● RRFBS to improve pedestrian
safety at key unprotected
intersections (these were very
popular and always funded in
last year’s applications)
● Take a look at the
BikePedActionPlan and see if
any of the pedestrian spot
improvements could be a good
candidate
● Other ideas?
Nevin‐to‐Target project and especially
Greenway/Carlson project
Art needs audible crossing improvements on San Pablo
Ave
Consider opening connections to east side of
Greenway.

Cosmo: likes Target connection project. RRFBs are
popular. Youth group supports them on Macdonald
Ave. Supports education programs.

Greenway maintenance is important ‐ Amy says never
really feels safe. Harbour way crossing light doesn’t
work.

Steve: bike/ped bridge over I‐80 needs improvement
Dani: Greenway maintenance ‐ sweeping, would be
really important. Could we pay the City to run
BroomBear on it?
Steve: El Cerrito has landscaping firm that does
maintenance

Patrick proposed: choose the Carlson sidewalk/path
project with side project for bike education that Dani
will prepare

(unrelated ‐ OBAG grants recommended for funding!)

Patrick to
prepare BPAC
letter

Dani to assist
with gathering
Letters of
Support

Attend MTC
meeting
https://mtc.ca.go
v/sites/default/fil
es/meetings/age
ndas/5606_A_Pr
ogramming_and
_Allocations_Co
mmittee_23‐01‐
11_Standing_Co
mmittee.pdf
Subcommittee reports/updates
Social events
Safe Routes to Schools and Parks:

N&E kiddie ride Jan 1;
Councilmember Claudia Jimenez
joined ride

Dani,
Catalin
Dani and Catalin organized kiddie bike ride in
North & East neighb. Went to Wendell Park, rode
to Humphrey Playlot, then Solano Playlot, then
Burg Park. Want to do it monthly; looking for
volunteers with ride marshaling
Hike on first Saturday of Feb (every month!)
RCR Sunday rides
Bike East Bay rides
Catalin interested in creating urban walks. Ann
recommends historic architecture walk.

ADJOURN

2023 Meeting Schedule: Jan 9, Feb 13, Mar 13, Apr 10, May 8, Jun 12, Jul 10, Aug 14 cleanup, Sep 11, Oct 16, Nov 13, Dec 11 social.

Parking Lot: Future Agenda Items –

01/23/23, Shasa Curl, City Manager City of Richmond Dear Ms. Curl, The Richmond Bicycle/Pedestrian Advisory Committee (R-BPAC) supports the City of Richmond’s application for the 2022/2023 Transportation Development Act (TDA) Article 3 fund. Because this grant program provides funding for a variety of purposes, Richmond proposes a project that includes bicycle safety education with Rich City Rides and improvements of the Richmond Greenway. City staff presented ideas to the R-BPAC where these ideas were explored, vetted, and decided upon in a collaborative process over several meetings. As R-BPAC understands, opportunities to fund education and improvements are rare. Both the lack of bicycle safety education and multi-use path improvements are serious issues in Richmond. The City has made significant investments in improving active transportation infrastructure in the eleven years since Richmond Bicycle Master Plan was created - creating this plan was one of the first projects the R-BPAC took on. But physical changes alone cannot create a safe environment for new or less-confident bike riders. Having bicycle safety education programming tailored to the City’s needs will go a long way to encourage more local residents to try out bike lanes and paths. Rich City Rides is a logical partner, as they are the established leader in the realm of bicycling in Richmond, often ride along the Greenway on their community rides, and Rich City Rides staff attend R-BPAC meetings and provide support to the group and the City in multiple ways. The Richmond Greenway is an important cross-town walking and biking route but has an unsafe access point at Carlson Blvd, where bicyclists either need to bike on the sidewalk or cross over four lanes of the busy street at an unprotected intersection. The improvement project will repair and widen this existing sidewalk to meet standards for a multi-use path, in essence extending the Greenway to the corner of Carlson and Broadway, where bicyclists can make a safer connection using existing bike lanes. This proposal comes from both the City’s draft Bicycle & Pedestrian Action Plan and the Richmond Greenway Gap Closure Study. The Richmond Bicycle/Pedestrian Advisory Committee urges the Contra Costa County reviewing committee to consider this multi-benefit proposal which was crafted in part by our organization. If awarded, this funding could create city-wide educational programming, and improve a section of the Richmond Greenway multi-use path. Sincerely, Dani Lanis Richmond Bicycle/Pedestrian Advisory Committee

January 24 2023,
Shasa Curl, City ManagerCity of RichmondRichmond, CA
Dear Ms. Curl,
Rich City Rides supports the City of Richmond’s application for the 2022/2023 TransportationDevelopment Act (TDA) Article3fundas it focuses onimprovements of theRichmondGreenwayandabicycle education program.

Foundedin2012, RichCityRides was foundedtocreateopportunitiesforthemostvulnerablemembersof society to use cycling to improve health, economic stability, and individual and collective capacitywhile increasing the use of bikes for all community members as a sustainable social green mode oftransportation. Rich City Rides aims to be the hub, nest, and incubator for community bicycling forsustainabletransportation, physical andmental health, andhuman-to-humanconnections.WeenvisionRichmond as aworld-renownedbicyclingcommunityknownfor its bike-friendlyneighborhoods anditsworker-runbusinesseswhichareownedandoperatedbyhistoricallymarginalizedresidentsandfamilies.We support this project in its efforts to help bring this vision forward.

Theproject will improvetheRichmondGreenwaytomeet theneedsofalluserswhileimprovingsafety,promoting walking, biking, and rolling.

Sincerely,
Najari SmithExecutive DirectorRich City Rides
www.richcityrides.org| Rich City Rides | 1500 MacDonaldAve Unit C, Richmond, CA 94801| 510.255.0625 |[email protected] 1 of 1

2604 Roosevelt Ave. | Richmond, CA. 94804-1623 p o g o p a r k . o r g TEL: 510-215-5500 | FAX: 510-215-5600 January 25, 2023
Ms. Shasa Curl
City Manager
City of Richmond
450 Civic Center Plaza, Ste 300
Richmond, CA 94804

Dear Shasa,

On behalf of Pogo Park, I am writing to articulate our enthusiastic support for the City of Richmond’s application for 2022/2023 Transportation Development Act Article 3 funding to improve the safety of bicycling via improvements to the Richmond Greenway as well as cyclist safety education.

Pogo Park is a community-based, 501(c)3 nonprofit organization that transforms dispirited city parks in Richmond’s Iron Triangle neighborhood into safe, green, beautiful spaces for children to play. Our second Pogo Park (Harbour-8 Park) is located on the Richmond Greenway, one of the main bike - walk routes through the central core of Richmond.

Over the past 15 years, Pogo Park has become more and more involved in creating safe passages for residents through the Iron Triangle neighborhood to walk, bike – and access our park.

We feel strongly that the proposed multi-use trail extension of the Richmond Greenway to the corner of Carlson and Broadway is an important bicyclist safety measure. It is recommended by both the City’s draft Bicycle & Pedestrian Action Plan and the Richmond Greenway Gap Closure Study. Cyclist safety education programming tailored to the City’s needs will encourage healthy use of bikeways and multi-use trails, while reducing cyclist conflicts with both pedestrians and motor vehicles.

Pogo Park hopes that Contra Costa County will approve this grant for creating city-wide educational programming for cyclists and improving a section of the Richmond Greenway multi- use trail.

All the best,

Toody Maher
Executive Director

Trails for Richmond Action Committee
TRAC
73 Belvedere Avenue
Richmond, CA 94801
Phone/Fax 510-235-2835
[email protected]
January 24, 2023
Via Email:

Ms. Shasa Curl, City Manager
City of Richmond
Richmond, CA
Dear Ms. Curl,
TRAC, the Trails for Richmond Action Committee, supports the City of Rich - mond’s application for 2022/2023 Transportation Development Act Article 3 fund- ing to improve the safety of bicycling via improvements to the Richmond Green- way as well as cyclist safety education.

The proposed multi-use trail extension of the Richmond Greenway to the corner of Carlson and Broadway is an important bicyclist safety measure recommended by both the City’s draft Bicycle & Pedestrian Action Plan and the Richmond Greenway Gap Closure Study. Cyclist safety education programming tailored to the City’s needs will encourage healthy use of bikeways and multi-use trails, while reducing cyclist conflicts with both pedestrians and motor vehicles.

TRAC hopes that Contra Costa County will approve this grant for creating city- wide educational programming for cyclists and improving a section of the Rich- mond Greenway multi-use trail.

Best Regards,

Bruce Beyaert, TRAC Chair

.RrintForm
Notice of Exemption Appendix E
To: Office of Planning and Research From: (Public Agency): City of Richmond P.O. Box 3044, Room 113 450 civic Center Plaza
Sacramento, CA 95812-3044
Richmond, CA 94804
County Clerk
County of: Contra Costa _ (Address)
555 Escobar Street
Martinez,CA 94553 _ ^^ ^^ ^ ^ Rjchmond
Title: carlson Blvd path & Bike Education Program
Project Applicant: City of Richmond
Project Location - Specific: Carlson Blvd between Broadway and the Richmond Greenway in Richmond, CA
Project Location - City: Richmond _ Project Location - County: Contra Costa Description of Nature, Purpose and Beneficiaries of Project:

Repair and widen 280 feet of existing sidewalk to meet standards for a multi-use path.

Name of Public Agency Approving Project: citY of Richmond, Engineering Department Name of Person or Agency Carrying Out Project: city of Richmond Exempt Status: (check one):
a Ministerial (Sec. 21080(b)(1); 15268);
a Declared Emergency (Sec. 21080(b)(3); 15269(a));
a Emergency Project (Sec. 21 080(b)(4); 15269(b)(c));
[3 Categorical Exemption. State type and section number: §15301 (c) D Statutory Exemptions. State code number:

Reasons why project is exempt:

The project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301, Existing Facilities, consisting of minor alteration to existing bicycle and pedestrian trails and similar facilities.

Lead Agency
Contact Person: Patrick Phelan _ Area Code/Telephone/Extension: 510-307-8111 If filed by applicant:

1. Attach certified document of exemption finding.

2. Has a Notice of Exemption been filed by the public agency approving the project? Yes No Signature: ^^ t^V _____ Date: 1/23/2023 Title: Planner I Lydia Elias
• Signed by [Lead Agency) Signed by Applicant
Authority cited: Sections 21083 and 21110, Public Resources Code. Date Received for filing at OPR:.

Reference: Sections 21108, 21152, and 21152.1, Public Resources Code.

Revised 2011
Audit Requirement

In January of 2019, City of Richmond staff contacted MTC staff via telephone to inquire on the audit requirement. City staff was informed the City is clear to submit this grant application.