Cities Index.
Attachment 5 - Richmond Civic Auditorium Alt 2 Proposal.pdf

Richmond City Council
April 18, 2023

Document
Attachment 5 - Richmond Civic Auditorium Alt 2 Proposal.pdf
Meeting
April 18, 2023
Body
Richmond City Council
Original file
159 KB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.

POWERED BY PROEST

Richmond Civic Auditorium Alt #2
From To
David Ornelas
Pro-Cal Lighting Inc.
1155 S. Santa Fe Ave
Vista, CA, 92083

Mark Albertson
Architects MA
[email protected]

1155 S Santa Fe Ave. Suite A, Vista CA 92083 | o: 760.994.6959 f: 760.560.1670 | ProCalLighting.com CSLB #C-10 1002601 8(a) Certified (MBE) Certified Minority Owned Business (SB) Small Business (DBE) Disadvantaged Business Enterprise CAGE CODE: 7CR52 CS DGS Supplier #1795967 NAICS: 237130, 238210, 541490, 561790, 711510. DIR #1000019052 DUNS #079708930

Scope of Work

We propose to furnish the material and labor on the above referenced project for the amount shown below. This proposal is based on the scope of work as detailed below and the following clarifications / exclusions listed below.

Narrative
• First Floor and Mezzanine Floor Corridor Lighting
a. (23) AE1 lamps
b. (51) AG1 fixtures phase dimming (8 week lead time)
c. (7) AB2 lamps
• Alternative ETC Gear (20 week lead time with shop drawing approval) a. Theatrical Relay Panel ARP3 w/ ETC ERP-FMD (flush mount door) b. Theatrical Relay Panel ARP4 w/ ETC ERP-FMD (flush mount door) c. Theatrical Relay Panel ARP5 w/ ETC ERP-FMD (flush mount door) d. EBDK (Emergency Bypass Detection Kit)

10 GENERAL CONDITIONS $9,343 4.61%
12 ROUGH-IN/WIRE/DISTRIBUTION (L) $3,997 1.97%
18 CONTINGENCY/ALLOWANCES $2,945 1.45%
20 ENERGY LABOR (L) $14,738 7.28%
50 RACEWAY/WIRE/DISTRO MATERIAL $14,525 7.17%
51 LIGHTING MATERIAL $100,706 49.74%
52 DEVICES MATERIAL $35 0.02%
53 SPECIALTY MATERIALS $53,230 26.29%
60 EQUIPMENT & TOOLS $2,939 1.45%
Total Estimate $202,458 100%

POWERED BY PROEST

Qualifications

1. Pricing is based on acceptance entire scope. Pricing may change if a scope needs to be changed or removed.

2. It is presumed that the existing electrical service/equipment can accept any/all of the added electrical equipment/ demand, and that all existing equipment is in good working conditions to accept the alterations per the above scope of work.

3. Pricing is based on the quantities as detailed above and does not necessarily represent a one for one installation.

4. Pricing is based on lay-down for tools, equipment and material being in the immediate area.

5. Education and Teaching of the programming software is not included in this pricing.

6. This bid assumes that the staff facilities will be available during this time to assist access to the site, and during the commissioning process.

7. Pricing is based on providing safe-off only for electrical devices and equipment to be removed under the demolition scope of work. Salvage or storage of any equipment/materials is by others.

8.) Includes 1 Year Workmanship Warranty

9.) Service is defined as 8 hours per month to reso lve non-workmanship items.

POWERED BY PROEST

Exclusions

1. Any work other than what is specially mentioned in the scope noted above.

2. Unforeseen conditions.

3. Field cutting, coring, patching, painting and coatings for all exterior surfaces.

4. Spare materials.

5. Utility fees.

6. Concrete rework or repair.

POWERED BY PROEST

Please call me at (760) 994-8250 if there are any questions regarding this proposal. This quotation is valid for (30) days from the date of proposal, and any modifications or amendments to this document must be in writing.

Sincerely,

David Ornelas
Project Manager
(760) 994 -8250
[email protected]

Customer Signature

← All documents from this meeting