Addition of unit of measurement inserted and double
-
underlined, as
follows:

particular matter (DPM) generated during construction would be less than significant.

Although the nearest sensitive receptor is located further than the 1,000 -
foot distance
,
Raven conducted a Health Risk Assessment (HRA) to quantify construction -
related
emissions and associated health risks due to DPM exposure during construction. The results of this analysis are presented in
Appendix A
. Even though an HRA was not
required b
ased on adopted thresholds, the HRA demonstrates that health impacts are ERRATA SHEET #1

Raven SR Bioenergy Project

5 ESA

/
D202100382

ERRATA SHEET #1 to the Updated Initial Study MND

March 14, 2023

below significance thresholds, and the
p
roject would result in a less than significant
impact during construction.

Page 53 ends

Last sentence of f
irst

full

paragraph:

Table reference corr
ected
, as follows:

Emissions from the loader were calculated using CalEEMod and included in the operational emissions, shown in
Table 4.3
-
4 3
.

Reduced TAC emissions due to the
reduction in flaring of landfill gas at the existing
WCCSL

flare were also quanti
fied and
included in this analysis.

Page 5 ends

4 ,
Last sentence of f
irst

full

paragraph:

Last row

(
“
Exceeds Significance Threshold
”
)
corrected
, as follows:

T
ABLE

4.3 -
6 H
EALTH
R
ISK
I

MPACTS AT THE
M
AXIMUM
E
XPOSED
S

ENSITIVE
R

ECEPTORS

Risk Scenario / Receptor Type

Maximum
Cancer Risk
(per million)

Chronic
Hazard

Index

Acute
Hazard

Index

PM

2.5 concentration
(μg/m
3 )

Construction + Operations

Worker

3.0 0.058

0.22 0.57

Resident

0.70 0.0086

0.0039

0.024

School

0.49 0.011

0.036

0.030

Clinic

0.46 0.0058

0.032

0.016

Landfill Reductions

Worker

-

5.7 -

0.21 -

0.49 -

0.84 Resident

-

1.3 -

0.018

-

0.10 -

0.042

School

-

0.81 -

0.019

-

0.091

-

0.044

Clinic

-

0.79 -

0.011

-

0.077

-

0.026

Project Construction + Operations with Landfill Reductions

Worker

-

2.7 -

0.16 -

0.27 -

0.27 Resident

-

0.57 -

0.009

-

0.064

-

0.018

School

-

0.32 -

0.0084

-

0.055

-

0.014

Clinic

-

0.33 -

0.0056

-

0.045

-

0.010

BAAQMD Threshold of Significance

10.0 1.0

1.0 0.3

Exceeds Significance Threshold?

No

No

No

No

NOTES: Numbers may not appear to sum correctly due to
rounding.

SOURCE: Ramboll (Appendix A

to this document
)

ERRATA SHEET #1

Raven SR Bioenergy Project

6 ESA

/
D202100382

ERRATA SHEET #1 to the Updated Initial Study MND

March 14, 2023

Page
88 ,
Table 4.8
-
3 :

Table s
ource
supplemented,
as follows:

T
ABLE

4.8 -
3 U

NMITIGATED
A
NNUAL
O

PERATIONAL
G

REENHOUSE
G
AS
E

MISSIONS

Source

GHG (
MTCO
2 e
)

Process Operations

Biogas Engines

16,398

Flare

205

Fire Pump Engines

2.5 Auxiliary Operations

Area

<1

Energy

80.5 Mobile

262.6

1909.2

Off
-
road

303.2

Waste

96.7 Water

17. 0

Amortized Construction Emissions

6.2 Amortized Construction Emissions
Landfill Flare
Reductions
(blended gas)

8.63 -
9,019

Total
Project GHG
Emissions

(blended gas)

697.17

9,999

Landfill Flare Reductions (100% LFG)

-
16,398

Total Project GHG Emissions (100% LFG)

2,620

NOTES:

A 30
-
year lifetime was assumed for the
project
, which was used to
amortize construction
emissions.

Landfill flare reductions were estimated based on the landfill gas usage of the Project biogas engines, which can operate using a blended gas consisting of at least 55

percent

landfill gas and up to 100

percent

landfill ga
s

MTCO
2 e = metric tons of carbon dioxide equivalent

Operational emissions
are

revised
in this updated IS/MND
to align with
more detailed
project information from the Project Applicant
.

SOURCE:

Data compiled by Environmental Science Associates

and
Ramboll
.
(
See
Appendix
A to this
document
checklist
.
)

Page
110
,
Second paragraph
:

Text added, as follows:

Operation

The Raven SR system
would

run
up to
24 hours per day,
7 days per week,
although
an
average of

1.5 days per month are planned down times
.

The primary source of noise during
project operation would be mechanical equipment associated with the Steam/CO 2 Reformation system, including heating systems, HVAC equipment.

Also, feedstock would be
physically
deposited in the receiving area

via self
-
unl
oading transfer trucks or other suitable
vehicles.

The hydrogen compressors are industrial pieces that could generat e

noise up to as
much as 85 dBa at 1
.0

meter.

Additionally, trucks used to distribute fuels generated on the site would be maneuvering withi
n the parking lot of the proposed facility.

As detailed in
Section 2.5 (
Technology
)
,

t
he purified, high
-
pressure hydrogen is not proposed to be flared

but
vented if necessary, thereby avoiding
potential noise emissions

that could be created by the
high
-
pre
ssure release
.

_____________________________