Sole Source Justification
THIS FORM MUST BE COMPLETED AND APPROVED PRIOR TO ANY PURCHASE Contact the Purchasing Division and discuss your rationale before completing this form. If Purchasing can help you make this a competitive purchase, then this form will not be required.
Attach this completed/approved form to requisitions when competitive quotes/bids/proposals are not solicited. (Required for requisitions > $3,000)
Requested Sole Source Supplier:
Company Name: Wiss, Janney, Elstner Associates, Inc. Contact Name: Aaron Weiss Address: 2000 Powell St. Suite 1650
City: Emeryvile State: CA Zip Code: 94608
Phone Number (941) 914-1021 E-Mail [email protected] ofc: 510-428-2907 Duration of Contract: February 21, 2023 - June 30, 2024 Estimated Cost: $ 250,000 Funding Source (Account String) 01917090-400201-PM902 Is the product/service IT related? Yes No X If Yes, please attach the approved IT Authorization Form For Product: Is the recommended company the manufacturer of the product? Yes No For Product: Does the manufacturer sell the items) through distributors? Yes No Description of Product or Service:
Describe the full scope of work or service contemplated including installation if required; items should include brand, model and part number if applicable; (if additional space is needed, include them in a separate page) WJE will provide evaluation services of the cafeteria building at historic Shipyard No. 3 and the cottages, fire station, and Winemaster's house at Point Molate to identify deterioration of the primary structural or enclosure components that appear likely to lead to significant loss of integrity of these historic structures to identify what temporary shoring, structural repairs, or enclosure repairs are necessary to mitigate the further deterioration of these buildings to avoid any significant loss of integrity of these historic structures. These services are a continuation of previous work completed by WJE. /
Sole Source Rationale: PLEASE ANSWER ALL THE FOLLOWING QUESTIONS: Explain why the recommended company is the only company that can meet the requirement. Address the following: Are there any other companies who can do this job? What condition (e.g. technological superiority, or performance risks, etc.) exists so that the recommended company has a significant advantage over any other company who can do this job? It is important to sufficiently address the key reason for awarding an order/contract without soliciting competitive bids. The rational must be clear and convincing, avoiding generalities and unsupported conclusions.
As noted above, this work will be a continuation of work previously done by WJE at the subject sites. In 2010; WJE completed a Historic Structures Report for Historic Shipyard Number Three, that included a conditions assessment of the Cafeteria Building, including character defining features of the building. In 2012, WJE also assisted the City in completing similar evaluation services for the Winehaven Historic District Buildings No. 1, 6, 10, 13, and 63. WJE expertise in these two historic district properties and familiarity with the compromised building conditions will ensure the work is done in a cost-effective, sensitive, and safe manner. (if additional space is needed, include them in a separate page) Page | 1 Sole Source Form - Rev. May 12, 2016
Complete the following checklist
A specific contractor is the only source of the required item because (check all that apply):
The required items are proprietary to the Contractor, and contractor solely transacts (sells) direct to the customer. (There are no dealers or distributors for contractor).
The required items are proprietary to the Contractor, and contractor does not sell direct to the customer. Contractor solely distributes the item or service through only one dealer or distributor in the United States. (There are no dealers or distributors for contractor).
Note: If item or service is available from more than one source, the item or service may be treated as proprietary, but must be competitively solicited from multiple (two or more) sources.
A specific item is needed:
To be compatible or interchangeable with existing hardware As spare or replacement hardware For the repair or modification of existing hardware Federal or state grant names vendor as condition of funding. (Attach copy of grant that names vendor)
There is a substantial risk in contracting with any other contractor, (e.g., only one contractor has been successful to date in implementing a difficult manufacturing process or the services sought). In a brief explanation, provide supporting evidence of why other contractors are considered to be unable to overcome the substantial risk.
Continuation of prior Work - Additional item, service or work required, but not known to have been needed when the original order was placed with vendor, and it is not feasible or practicable to contract separately for the additional need. Provide brief explanation and supporting evidence.
In 2010, WJE completed a Historic Structures Report for Historic Shipyard Three, that included a conditions assessment of all the buildings, including the Cafeteria Building. The HSR also included identifying all the character defining features of the building and district that needed to be preserved. In 2012, WJE also assisted the City in completing similar evaluation services for the Winehaven Historic District Buildings No. 1, 6, 10, 13, and 63. Both document covers and table of contents are attached.
(if additional space is needed, include them in a separate page) 2 | Page
I acknowledge the City's requirements for soliciting competitive quotes/bids for purchases over $3,000.00 and the criteria for justification for Sole Source purchases. I have gathered the required information, have made a concerted effort to review comparable/equal equipment/services (e.g., market research), and further affirm that there is no conflict of interest involved in the selection made.
Department: Public Works
Requester Name and Title: Daniel Chavarria, Public Works Director Note: Requester must berable to defend this justification.
Date: 02/07/2023 Phone: (510) 620-5478
Department Director (Print) Daniel Chavarria (Sign). Date: 02107/2023 Submit completed form to the Purchasing Division (Prior to submission to City Manager) Finance Director:
APPROVED: Anellar DATE: 219123
NOT APPROVED: COMMENTS:
City Manager City Clerk Attesting to Council Approval
(Under $10,000.00) (Over $10,000.00) (Copy of Minutes may be substituted) Note: Richmond Municipal Code Section 2.52.326 Sole Source Procurement requires final approval by the City Manager and/or City Council. Sole Source must be approved by Finance Director, PRIOR to Council Approval.
PROCEDURE
Sole Source purchase/service are exceptions to the normal bidding process and require a detailed justification. In processing Sole Source requests for supplies, services and/or equipment, the Purchasing Division adheres to and is governed by the principles set forth in City of Richmond Municipal Code Section 2.52.326 Sole Source Procurement.
If you are requesting a particular vendor, brand or product, you must make this fact clear on your Sole Source form.
Your request will then be restrictive and non-competitive, and will fall into a sole source category. If the sole source justification is approved, the requisition can be expedited without the normal bidding requirements.
Such a request should not be made unless you are confident that your request is reasonable and appropriately justified to meet the City's requirements and withstand any possible audit. The City's requirements and the format for submitting such requests are contained herein. Sole Source form must be signed by authorized department representative(s). The certification will remain on file for audit purposes.
The following factors DO NOT apply to sole source requests and should not be included in your sole source justification. They will not be considered and only tend to confuse the evaluation process.
1. Personal preference for product or vendor.
2. Cost, vendor performance, and local service (these are generally considered award factors in competitive bidding).
3. Features which exceed the minimum department requirements. 3 | Page
HISTORIC STRUCTURE REPORT
WJE Richmond Shipyard Number Three
Richmond, California
August 23, 2017
WJE No. 2009.0001.J
Prepared for:
National Park Service
Rosie. the Riveter/World War II Home Front National Historical Park 2566 Macdonald Avenue
Richmond, CA
Prepared by:
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel | 510.428.0456 fax
1 TABLE OF CONTENTS
2 Executive Summary Error! Bookmark not defined.
Introduction Error! Bookmark not defined.
Project Scope and Methodology... Error! Bookmark not defined.
Research and Document Review.. Error! Bookmark not defined.
Development of Chronology of Construction and Evaluation of SignificanceError! Bookmark not defined.
9 Guidelines for Preservation and Treatment Recommendations... Error! Bookmark not defined. 10 Preparation of Historic Structure Report.. Error! Bookmark not defined. 11 Developmental History ... Error! Bookmark not defined. 12 Historical Background and Context.... . Error! Bookmark not defined. 13 The City of Richmond - Pre-World War II Error! Bookmark not defined. 14 Context for Shipyard Construction... Error! Bookmark not defined. 15 The Design of Shipyard Number Three.... Error! Bookmark not defined. 16 Design of the Shipyard Layout. Error! Bookmark not defined. 17 Working in the Shipyards... Error! Bookmark not defined. 18 Architectural Style.. Error! Bookmark not defined.
19 After the War (Post-1945) Error! Bookmark not defined. 20 Construction and Demolition Summary 1940-2005 Error! Bookmark not defined. 21 Evaluation of Significance. Error! Bookmark not defined. 22 Overall Significance.. Error! Bookmark not defined.
23 Character-Defining Features Error! Bookmark not defined. 24 Assessment of Integrity Error! Bookmark not defined. 25 Guidelines and Standards for Treatment Error! Bookmark not defined. 26 Selecting an Appropriate Treatment Standard Error! Bookmark not defined. 27 Secretary of the Interior's Standards for Rehabilitation.. Error! Bookmark not defined. 28 Guidelines for Treatment.. Error! Bookmark not defined. 29 Building Treatment Standards. Error! Bookmark not defined. 30 Guidelines for Prioritization of Work. Error! Bookmark not defined. 31 Physical Description, Conditions Assessment, and Recommendations For TreatmentError! Bookmark 32 not defined.
33 Overall Description Error! Bookmark not defined.
34 Shipyard Grounds Error! Bookmark not defined.
35 Physical Description.. Error! Bookmark not defined.
36 Condition Assessment Error! Bookmark not defined.
37 Recommendations for Treatment.... Error! Bookmark not defined. 38 General Warehouse.... Error! Bookmark not defined.
39 Physical Description... Error! Bookmark not defined. 40 Conditions Assessment. Error! Bookmark not defined.
41 Recommendations for Treatment ...... Error! Bookmark not defined. 42 Machine Shop ... Error! Bookmark not defined.
43 Physical Description... Error! Bookmark not defined. 44 Conditions Assessment. Error! Bookmark not defined.
45 Recommendations for Treatment .... Error! Bookmark not defined. 46 Riggers Loft Error! Bookmark not defined.
47 Forge Shop. Error! Bookmark not defined.
48 Physical Description.. Error! Bookmark not defined.
WINEHAVEN NATIONAL REGISTER HISTORIC
WJE DISTRICT
2012 Annual Condition Assessment
Point Molate
Richmond, California
Final Report
October 2, 2012
WJE No. 2011.4615
Prepared for:
Mr. Joel Camacho
City of Richmond
450 Civic Center Plaza, 2nd Floor
Richmond, CA 94804
Prepared by:
Wiss, Janney, Elstner Associates, Inc.
2000 Powell Street, Suite 1650
Emeryville, California 94608
510.428.2907 tel | 510.428.0456 fax
ENGINEERS
WJE ARCHITECTS
MATERIALS SCIENTISTS
WINEHAVEN NATIONAL REGISTER HISTORIC DISTRICT
2012 Annual Condition Assessment
Point Molate
Richmond, California
BACKGROUND
In July 2010, Wiss, Janney, Elstner Associates, Inc. (WJB) was engaged by the City of Richmond to In 2011, the City of Richmond engaged Plant Construction to perform emergency stabilization based on the recommendations described in the July 2010 Wie report. WIt was engaged by Plant Construction to provide engineering services to design the stabilization. This work was completed circa August 2011.
Since the emergency stabilization work was limited to those conditions that were observed to be hazardous at the time of the previous site observations, and since the stabilization work was not intended to include protection of the building from weather, further deterioration of portions of the building that had not been stabilized was considered to be likely. As a result, the City of Richmond, engaged WJE to conduct follow-up inspections of the buildings to assess whether any significant further deterioration had occurred and whether additional stabilization would be needed. The buildings included in the follow-up inspection are:
* Building 1: Wine Cellar/Storage
* Building 6: Wine Cellar/Adiministration
• Building 10: Warehouse
• Building 13: Power House
* Building 63: Storage/Fire Station
Descriptions of each of the buildings are included in the July 20, 2012 report. Descriptions of the emergency stabilization work are shown on the Emergency Stabilization drawings dated July 28, 2011.
SITE OBSERVATIONS
Alan Dreyfuss and Brian Kehoe of WJE visited the site on July 25, 2012 to observe the conditions at th ive buildings listed above. Our findings are based on visible observations of accessible areas of eac building.