TERMINAL 4 WHARF, WAREHOUSE AND PILE REMOVAL PROJECT
Port of Richmond
SECTION 00410
BID FORM
Submit this BID FORM at or before the time and date and location referenced in the Invitation to Bid for the Project noted below.
1.1 PROJECT
A. In compliance with proposed Contract Documents for construction of:
TERMINAL 4 WHARF, WAREHOUSE, AND PILING REMOVAL PROJECT B. Undersigned acknowledges receipt of the following Addenda:
1. Addendum No. Dated 03.03.2023
2. Addendum No._ 2_ Dated- - 03.007.2023
3. Addendum No. 3 Dated- -03.14.2023
4. Addendum No. 4_ Dated- -03.24.2023
5. Addendum No. 5. Dated 04.06.2023
NOTE: Failure to acknowledge all Addenda may make the bid nonresponsive and shall be at the discretion of the City.
C. The undersigned has become thoroughly familiar with the terms and conditions of proposed Contract Documents and with local codes and conditions affecting performance and costs of Work at place where Work is to be completed.
D. The undersigned has fully inspected the site in all particulars.
E. The undersigned hereby proposes and agrees to fully perform Work as follows.
1. The undersigned agrees to perform Work within time agreed upon.
The undersigned agrees to perform Work in strict accordance with proposed Contract Documents, including furnishing any and all labor and materials.
The undersigned agrees to do all work required to construct and complete said Work in accordance with Contract Documents.
1.2 BID SCHEDULE
A. The Bidder is to submit unit prices for the Base Bid and Alternatives A and B for construction of the PROJECT at the Port of Richmond, Richmond, California in strict accordance with the Contract 00410 - 1 Bid Form
TERMINAL 4 WHARF, WAREHOUSE AND PILE REMOVAL PROJECT
Port of Richmond
BASE BID
Bid item Description Units Quantity Unit Price Bid Total Mobilization and 400,000.00 400,000.00
1 Demobilization LS 1
210,000.00 210,000.00
2 Permits LS 1
35,000.00 35,000.00
3 SWPPP LS 1
53,000.00 53,000.00
4 Submittals LS 1
15,000.00 15,000.00
5 Pre-Construction Survey EA 1
55,000.00 55,000.00
6 Turbidity Curtain LS 1
Wharf deck, Ltand, and
Warehouse Structure 45,000 10.00 620,000.00
Ta Demolition (F) SF 62,000
Removal of debris from bay 35,000 .20 10,000.00
7b floor (F) SF 50.000
600.00 12,000.00
Timber Pile removal EA 20
Concrete encased wood pile 600.00 480,000.00
7d Removal EA 800
2,400.00 360,000.00
7e Concrete Pile Removal EA 150
2,100.00 10,500.00
7f Steel Pile Removal EA 5
Contaminated Wood Debris 2,500 280.00 280,000.00
8a Disposal TON 1.000
125.00 25,000.00
8b Concrete Debris Disposal TON 200
200.00
2,000.00
8c Metal Debris Disposal TON 10
210.00 63,000.00
8d Other Debris Disposal TON 300
7.25 2,088.00
9a Saw cut concrete LF 288
165.00 579,150.00
9b Excavation CY 3,510
2.5833 62,000.00
9c Geofabric Placement SF 24,000
00410 - 2 Bid Form
TERMINAL 4 WHARF, WAREHOUSE AND PILE REMOVAL PROJECT
Port of Richmond
Bid Description Units Quantity Unit Price Bid Total
Item
Inner Rock Layer Backing 179.30 179,300.00
9d Placement CY 1,000
Armor rock (1/4 ton) 145.20 261,360.00
Placement CY 1,800
Toe construction with reused 57,816.00
80.30 9f stone CY 720
Fill voids with backing and 236.50 68,112.00
9g. 1"-3" gravel LF 288
203.50 20,350.00
9h RSP Other Backfill CY 100
2,000.00 18,000.00
10 Reef Ball Installation EA 9
10,000.00 30,000.00
11 Progress Surveys EA 3
34,000.00 34,000.00
12 Cleanup LS 1
10,000.00 10,000.00
13 Post-Construction Survey EA 1
Dispose of Contaminated 125.00 12,500.00
14 Soil (R) TON 100
Dispose of Hazardous Soil 262.00 26,200.00
15 (R) TON 100
Off-Site Groundwater 2.88 7,200.00
16 Disposal (R) GAL 2,500
60.00 600.00
17 Soil Import (R) TON 10
37.50 3,750.00
18 Soil Export (R) TON 100
500.00 10,000.00
19 Cutting Pile (R) EA 20
20 Supplemental Work ALLOW 1 $100,000.00 $100,000.00
The Total Cost for the Base Bid in numbers: $_ 4,112,926.00 four million one hundred twelve thousand nine hundred twenty six The Total Cost for the Base Bid in words: _Dollars
00410 - 3 Bid Form
TERMINAL 4 WHARF, WAREHOUSE AND PILE REMOVAL PROJECT
Port of Richmond
ADDITIONAL ALTERNATIVE A
Bid item Description Units Quantity Unit Price Bid Total 31,000.00 31,000.00
A-6 Turbidity Curtain LS 1
Wharf deck, and tandLand. 14,000 10.00 450,000.00
A-7a and Structure Demolition (E) SF 45.000
Removal of debris from bay 454,000 3.19 127,600.00
A-7b floor (F) SF 40,000
600.00 6,000.00
A-7c Timber Pile removal EA 10
Concrete encased wood pile 600.00 180,000.00
A-7d Removal EA 300
2,400.00 120,000.00
A-7e Concrete Pile Removal EA 50
2,100.00 8,400.00
A-7f Steel Pile Removal EA 4
Contaminated Wood Debris 1,000 280.00 168,000.00
A-8a Disposal TON 600
125.00 25,000.00
A-8b Concrete Debris Disposal TON 200
200.00 2,000.00
A-8c Metal Debris Disposal TON 10
210.00 42,000.00
A-&d Other Debris Disposal TON 200
10,000.00 10,000.00
A-11 Progress Surveys EA 1
10,000.00 10,000.00
A-13 Post-Construction Survey EA 1
500.00 5,000.00
A-19 Cutting Pile (R) EA 10
The Total Cost for Alternative A in numbers: $_ 1,185,000.00 one million one hundred eighty five thousand
The Total Cost for Alternative A in words: _Dollars
00410 - 4 Bid Form
TERMINAL 4 WHARF, WAREHOUSE AND PILE REMOVAL PROJECT
Port of Richmond
ADDITIONAL ALTERNATIVE B
Bid item Description Units Quantity Unit Price Bid Total 65,000.00 65,000.00
B-6 Turbidity Curtain LS 1
Wharf deck, Land, and 17,000 10.00 850,000.00
B-7a Structure Demolition (F SF 85.000
Removal of debris from bay 80,000 3.19 271,150.00
B-7b floor (F) SF 85.000
600.00 7,200.00
B-7c Timber Pile removal EA 12
Concrete encased wood pile 600.00 420,000.00
B-7d Removal EA 700
2,400.00 240,000.00
B-7e Concrete Pile Removal EA 100
2,100.00 6,300.00
B-7f Steel Pile Removal EA 3
Contaminated Wood Debris 1,000 280.00 140,000.00
B-8a Disposal TON 500
125.00 6,250.00
B-8b Concrete Debris Disposal TON 50
200.00 1,000.00
B-8c Metal Debris Disposal TON 5
210.00 21,000.00
B-8d Other Debris Disposal TON 100
10,000.00 20,000.00
B-11 Progress Surveys EA 2
10,000.00 10,000.00
B-13 Post-Construction Survey EA 1
500.00 10,000.00
B-19 Cutting Pile (R) EA 20
2,067,900.00
The Total Cost for Alternative B in numbers: $_
two million sixty seven thousand nine hundred
The Total Cost for Alternative B in words: _ _Dollars
00410 - 5 Bid Form
TERMINAL 4 WHARF, WAREHOUSE AND PILE REMOVAL PROJECT
Port of Richmond
1.5 BIDDER STATEMENTS
A. The Contractor shall include Bid Form A-1, Bidder Statement of Subcontractors, completed in its entirety with the Bid Form.
A. The Contractor shall include Bid Form A-2, Bidders Statement of Major Suppliers, completed in its entirety with the Bid Form.
B. The Contractor shall complete and include the Noncollusion Affidavit with the Bid Form.
C. The Contractor shall complete and include the Business Verification Form.
D. The Contractor shall complete and include the Proof of Solicitation - Good Faith Effort Requirement Form.
1.6 AWARD OF CONTRACT
A. The lowest bid shall be the lowest total of the bid prices on the base contract and those additive items that when taken in order from a specifically identified list of those items in the solicitation, and added to the base contract, are less than, or equal to, a funding amount shown in the Invitation to Bid.
B. It is understood that Owner reserves right to reject this bid but that it shall remain open and not be withdrawn for a period of ninety (90) calendar days from date prescribed for its opening.
C. Undersigned agrees to execute and deliver Contract to Owner in accordance with this bid if written acceptance is mailed or delivered before bid is withdrawn by written notification to Owner.
1.7 IDENTIFICATION
A. Notice of acceptance, or request for additional information, may be addressed to the undersigned at address set forth below.
B. The names of all persons interested in the foregoing bid as principals are:
Joseph Capriola
Peter Knuth
C. Important Notice: If a corporation, give legal name of corporation, state where incorporated, and names of president and secretary; if a partnership, give name of firm and names of all individual co-partners composing the firm; if an individual, give first and last names in full D. License: Contractor is licensed B General Building Contractor in accordance with an act for registration of contractors with license number:
782547
E. Business Address:
Silverado Contractors, Inc.
2855 Mandela Pkwy
Oakland. CA 94608
00410 - 6 Bid Form
TERMINAL 4 WHARF, WAREHOUSE AND PILE REMOVAL PROJECT
Port of Richmond
F. Telephone Number: 510) 658-9960
4/13/23
G. Date of Bid:
H. Signature of person(s) with legal authority to sign contracts:
1.8 A. Bid security as described in Document 00100 - Instructions for Bidders is attached for an amount equal to not less than ten percent (10%) of total base bid.
END OF BID FORM
00410 - 7 Bid Form
Bond No. NIA
BID BOND
KNOW ALL MEN BY THESE PRESENTS:
That We, Silverado Contractors, Inc. -, as Principal,
and Liberty Mutual Insurance Company - as Surety,
are hereby held and firmly bound unto the City of Richmond, in the penal sum of TEN PERCENT (10%) of the total bid submitted by said Principal to the City of Richmond for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THE ABOVE OBLIGATION IS SUCH THAT, whereas the Principal has submitted to the City of Richmond a certain bid, attached hereto and hereby made a part hereof, to enter into a contract in writing for the Terminal 4 Wharf, Warehouse, and Piling Removal Project NOW, THEREFORE, if said bid submitted by the Principal be accepted and the contract be awarded to the Principal and the Principal shall, within ten (10) days after having received notice that the contract has been awarded to the Principal, enter into the Contract so awarded, shall furnish the required corporate surety bonds and insurance coverage verification and shall in all other respects perform the agreement created by the acceptance of the bid, then this obligation shall be void, otherwise the same shall remain in full force and effect.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired or affected by any extension of the time within which the City of Richmond may accept such Bid; and said Surety does hereby waive notice of such extension.
As a part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by the City of Richmond in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals on this 6th day of April , 20_ 23
By:
Title Josefit CARRIOLA, PRESIDENT
Liberty Mutual Insurance Company
By: Thunduengle
Title: Thuyduong Le, Attorney-in-Fact
Bid Bond (11/4/03)
ACKNOWLEDGMENT
attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of Alameda
on Aprille, 2023 _ before me, Brittany Kavan, Notary Public (insert name and title of the officer)
personally appeared Thuyduong Le
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal. BRITTANY KAVAN
COMM. #2338092
NS NOTARY PUBLIC - CALIFORNIA Lds
CONTRA COSTA COUNTY
My Commission Expires 12/19/2024
sun Bany Kanon
This Power of Attorney limits the acts of those named herein, and they have no authority t ind the Company except in the manner and to the extent herein statec Liberty Liberty Mutual Insurance Company
Mutuál. The Ohio Casualty Insurance Company Certificate No: 8209187-024125 West American Insurance Company
SURETY
POWER OF ATTORNEY
all of the city of Walnut Creek state of CA each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons.
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 28th day of December 2022
Liberty Mutual Insurance Company
NSURANCE INSURANCE The Ohio Casualty Insurance Company
MUTUAL CORPORATE «CORPORATE! West American Insurance Company 1912 AMI 1991
ANTONO OHIO ANTINO
INDIANA
ДНІ By:
David M. Carey, Assistant Secretary
State of PENNSYLVANIA
County of MONTGOMERY SS
(POA) verification inquiries,
On this 28th day of December 2022 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance letter of credit. Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written. loan,
I SA PASTEL Commonwealth of Pennsyivania - Notary Seal
currency rate, interest rate or residual value guarantees Teresa Pastella, Notary Public Montgomery County Pereas tastella please call 610-832-8240 or email [email protected].
My commission expires March 28, 2025 By:
Commission number 1126044
ERMNSYLNANR Teresa Pastella, Notary Public
Member, Pennsylvania Association of Notaries
NOTARY PUBLIC
This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Not valid for mortgage, note, Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows:
ARTICLE IV - OFFICERS: Section 12. Power of Attorney.
Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority For ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in witing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attoreys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary.
Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys-in- fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations.
Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed.
1, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 6th day of April : 2023
INSURANCE INSURANCE
CORPORATE CORPORATED I CORPORATE
1912 1919 1991
ANTINO OHIO By:
INDIANA Renee C. Llewellyn, Assistant Secretary
LMS-12873 LMIC OCIC WAIC Multi Co 02/21
FORM A-1
BIDDER STATEMENT OF SUBCONTRACTORS
TERMINAL 4 WHARF, WAREHOUSE, AND PILING REMOVAL
NAME OF BIDDER: Silverado Contractors, Inc. PROJECT NAME OR DESCRIPTION: PROJECT
COMPANY NAME CONTACT PERSON ITEM CHECK CHECK PROPOSED SUBCONTRACTOR'S
AND ADDRESS AND DESCRIPTION BOX IF BOX IF SUBCONTRACTOR PERCENT SHARE TELEPHONE # FIRM IS FIRM IS AMOUNT OF PRIME'S TOTAL
SMALL RBE RBE BID
The Dutra Group Mike Edde
961 Stenmark St Shoreline excavation and 22.6%
415-458-5465 restoration $1,197,080.00
Richmond, CA 94801
Manson Construction Co. Chris Schaeffer
1401 Marina Way 510-412-8311 Marine demolition/pile $300,000.00 5.7% Richmond, CA 94804 extraction support
DWH Creative Contracting Donnie Howell Demolition and Abatement 750 National Ct 510-255-6555 $60,000.00 1.1%
Rchmond, CA 94804 Services
TOTAL
$1,557,080 29.4%
Joseph Capriola President
PRINT, TITLE
014/13/2023
Form A-1 (11/4/03)
FORM A-1 Cont. (Non RBE)
BIDDER STATEMENT OF SUBCONTRACTORS
Silverado Contractors, Inc. TERMINAL 4 WHARF, WAREHOUSE, AND PILING REMOVAL NAME OF BIDDER: PROJECT NAME OR DESCRIPTION: PROJECT
COMPANY NAME CONTACT PERSON ITEM CHECK CHECK PROPOSED SUBCONTRACTOR'S
AND ADDRESS AND DESCRIPTION BOX IF BOX IF SUBCONTRACTOR PERCENT SHARE TELEPHONE # FIRM IS FIRM IS AMOUNT OF PRIME'S TOTAL
SMALL RBE RBE BID
eTrac, Inc. Erik Mueller Preconstruction and progress
637 Lindaro 650-750-3239 surveys $47,200.00
San Rafael, CA 94901
Eighteen Trucking 41552-880 Trucking services
2230 Willow St $30,000.00
Oakland, CA 94607
TOTAL 77,200
Joseph Capriola President
NAME TITLE
+213 2023
Form A-1 (11/4/03)
FORM A-2
BIDDER STATEMENT OF MAJOR SUPPLIERS
TERMINAL 4 WHARF, WAREHOUSE, AND PILING REMOVAL
NAME OF BIDDER: Silverado Contractors, Inc. PROJECT NAME OR DESCRIPTION: PROJECT
COMPANY NAME CONTACT PERSON ITEM CHECK CHECK PROPOSED SUPPLIER'S
AND ADDRESS AND DESCRIPTION BOX IF BOX IF SUPPLIER PERCENT SHARE OF TELEPHONE # FIRM IS FIRM IS AMOUNT PRIME'S TOTAL BID
SMALL RBE RBE
American Textile &
Supplly, Inc. Greg Klein Containment boom, turbidity curtain, 3439 Regatta Blvd 510-2367424 sorbent pads, other various supplies $78,064.00 1.5% Richmond, CA 94804
TOTAL 78,064.00 1.5%
Joseph Capriola President
TITLE
4/13/2023
DATE
Form A-2 (11/4/03)
NONCOLLUSION AFFIDAVIT TO BE EXECUTED AND SUBMITTED WITH BID All bidders shall complete the following form and submit it with their bids:
State of California
county of ALAMEDA
[namel JOSEPH CAPRIOLA - being first duly sworn, deposes and says that he or she is [title] PRESiDENT of [company] SILVER-ADO CONTRACTOrS INL, thE party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, or connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or 4/13/2029
Signati
STATE OF CALIFORNIA
)SS.
COUNTY OF Alameda
April 13 Young Chen
On → 2023, before me, the
Notary Public, personally appeared Joseph Caprida _ personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) (is)are subscribed to the within instrument, and acknowledged to me that he)she/they executed the same in his/her/their authorized capacity(ies), and that by his her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
WITNESS my hand and official seal. YANG CHEN
Notary Public - California
Alameda County
Commission * 2427382
My Comm. Expires Dec 17. 2026
CITY OF RICHMOND
DEPARTMENT OF PUBLIC SERVICES
BUSINESS VERIFICATION
PART 1
Silverado Contractors, Inc. (Name of Prime Contractor or Subcontractor) hereby declare that, pursuant to the City of Richmond Business Ordinance, the named company is a bona fide
[RBE Firm
[ ] Small RBE Firm
and is doing business at the following address:
Name of company: Silverado Contractors, Inc.
Business address: 2855 Mandela Pkwy
Oakland, CA 94608
Complete PART 2 if firm is a Small RBE Firm
PART 2
I have knowledge of this company's financial records and have the authority to act on the company's behalf with regards to certifying the gross receipts and gross sales of the company. I hereby certify that, pursuant to Chapter 2.50.040 of the City of Richmond Municipal Code, the named company is certified as a small business by the California Department of General Services, or as a Disadvantaged Business Enterprise by the California Unified Certification Program.
The undersigned swears, under the penalty of perjury, that the forgoing statements are true 4/13/23
Date
CAPRIOLA President
Title
Business Verification (6/8/04)
FORM C
PROOF OF SOLICITATION
GOOD FAITH EFFORT REQUIREMENT
Silverado Contractors, Inc (Prime
Contractor) hereby certifies that the following company was contacted:
The Dutra Group
Name of company:
961 Stenmark St.
Business address:
Richmond, CA 94801
, for inclusion in the Prime Contractor's bid or proposal for _Terminal 4, Warehouse and Piling Removal Project (Name of Project), as a:
[X] RBE Firm
] Small RBE Firm
to perform or provide the following items of Work: Shoreline excavation and restoration (Description of work or item).
Result of Contact (please mark the appropriate box): (X) Business's bid/proposal has been accepted and is being used as a subcontractor on the project (attach copy of bid/proposal received from the business).
Business indicated an interest in bidding/proposing but is not included in the project. Attach copies of all bids/proposals received for this work from all solicited businesses.
Business is not interested and will not bid/propose on this project.
Signature Title •
Type or Print Name Date
Representative from the Business must sign above.
Business did not respond to my solicitations. Attach copies of certified letters, fax transmittals, and/or telephone logs with dates and times of initial and follow-up contact.
The undersigned swears, under the penalty of perjury, that the forgoing statements are true and
PRESIDENT
Title
7/33/2027
Type or Print Name
Form C (11/4/03)
O DUTRA
April 12, 2023
Scott Klopf
Zaccor - A Division of Silverado Contractors, Inc.
2855 Mandel Parkway, 2nd Floor
Oakland, CA 94608
Sent Via Email to: [email protected]
Re: Terminal 4 Wharf, Warehouse, & Piling Removal Project Proposal - Rev 1 Dear Mr. Klopf,
The Dutra Group, Inc. ("Dutra" or "Subcontractor") is pleased to provide you with a proposal for Terminal 4 Wharf, Warehouse, & Piling Removal Project. This proposal is subject to the defined scope of work provided below, including any understandings, inclusions, and exclusions listed, the preliminary schedule, and the General Conditions in Exhibit A.
Scope of Work
Dutra's proposal includes the rock work as priced below. The pile driving and marine support rates are optional, but the rock work is considered all or nothing.
Standby rate for crane barge unmanned is a daily rate for Dutra's crane barge to remain onsite without crew, awaiting future work.
Piling removal day rate includes a floating crane and crew capable of attempting to pull the pilings within the project limits as per the plans and specifications. Work together with Silverado equipment and crews to remove decking and pilings. Dutra's crane barge is capable of mooring via spuds or anchors. Silverado's spud barge, CB2, and possibly two material barges will be in addition to the Dutra crane barge to complete the work. The workday will consist of 10 hours allowing for 8 hours of site work with the crane. Silverado will provide transport of Dutra's crew to barge by small boat. Dutra's daily rate includes one marine mammal monitor. Anticipated pile removal rates are as 8 piles per day for each pile type.
Site support day rate includes a floating crane and crew capable of working together with Silverado equipment and crews to complete site work. Dutra's crane barge is capable of mooring via spuds and anchors. Silverado's spud barge, CB2, and possibly two material barges will be in addition to the crane barge to complete the work.
The workday should consist of 10 hours allowing for 8 hours of site work with the barge. Silverado will provide transport of Dutra's crew to barge by small boat. Site support days may be intermittently scheduled during the project duration of up to 200 days if all the alternates are awarded.
Material barge rental includes one flat deck material barge for the loading and transport of piling and debris.
Barge would approximately 180' x 54' with a concrete deck and rock rail. Barge would be delivered to and from the project site by Dutra but would be managed onsite and transported to offloading site by others. This is a bare boat charter. Any damage that occurs to the barge while in the custody of Silverado, is the responsibility of Silverado.
THE DUTRA GROUP
2350 Kerner Bivd., Suite 200 | San Rafael, CA 94901 | Office (415) 258-6876 | Fax (415) 258-9714 Pricing
Rock Work
Bid # Description Quantity • Units Unit Price Total Price 1 MOBILIZATION / DEMOBILIZATION 1 LS $75,000.00 $75,000.00 4 SUBMITTALS 1 LS $14,000.00 $14,000.00
EXCAVATION 3,510 CY $150.00 $526,500.00
9c GEOFABRIC PLACEMENT (INSTALL ONLY) 24,000 SF $2.00 $48,000.00 9d INNER ROCK LAYER BACKING 1,000 CY $163.00 $163,000.00
PLACEMENT
9e ARMOR ROCK (1/4 TON) PLACEMENT 1,800 CY $132.00 $237,600.00 9f TOE CONSTRUCTION WITH REUSED STONE 720 CY $73.00 $52,560.00 9g FILL VOIDS WITH BACKING & 1"-3" 288 LF $215.00 $61,920.00 GRAVEL
9h RSP OTHER BACKFILL 100 CY $185.00 $18,500.00
TOTAL ROCK WORK $1,197,080.00
Pile Driving & Marine Support Rates
Bid # Description Quantity Units Unit Price Total Price MOBILIZATION / DEMOBIILZATION 1 LS $128,000.00 $128,000.00 N/A STANDBY CRANE BARGE UNMANNED 1 DAY $10,000.00 $10,000.00 N/A PILING REMOVAL DAY RATE 1 DAY $26,000.00 $26,000.00 N/A SITE SUPPORT DAY RATE 1 DAY $22,000.00 $22,000.00
N/A MATERIAL BARGE RENTAL 1 MONTH $60,000.00 $60,000.00 Understandings / Assumptions
1. Geotextile fabric placement item excludes the furnishing of the material.
3. Piteria barday oat imdu disastmed in orarmal ense ane barge mob/demob occurs. Ifa separate mob/demob is required. this would be an additional cost to Silverado.
Exclusions
1. Removal and/or disposal of hazardous materials.
2. Performance & Payment Bonds. If desired, add 1%.
Schedule
1. Rock work is anticipated to occur in November 2023.
2. Pile removal is anticipated to commence in June 2023.
Please let me know if you have any questions. We look forward to working with you on this project.
Sincerely,
Michael of Falle
Michael Edde
Chief Estimator
The Dutra Group
Exhibit A
General Conditions
1. This proposal is valid for 30 days from the date submitted.
2. This proposal is contingent upon reaching mutually agreeable contract terms, with the understanding that all proposal terms and these General Conditions shall be incorporated into any resulting contract between the parties.
3. Any resulting contract will create an independent contractor relationship between the parties; no fiduciary duty or agency will be created.
4. In the event of any conflicts among the contract documents, the agreement between Contractor and Subcontractor shall control, with priority given to Subcontractor's Scope of Work and any conditions or exclusions therefrom.
5. Contractor will obtain all permissions, permits, licenses, and inspections required for Subcontractor to perform the Work and shall pay all costs associated therewith, excluding only those licenses required to be held by Subcontractor to generally perform this type of work.
6. Contractor will provide all plans, specifications, and other designs services required for the Work - no design services are included in Subcontractor's Scope of Work unless explicitly provided in the proposal.
7. Contractor will provide unlimited and unrestricted access to the site areas necessary for the Work.
8. Contractor will locate and mark or move, as necessary, any permanent or temporary utility, whether active or abandoned, that may be affected by the Work.
9. If vessel access is a component of the Work, the waterway(s) shall be of sufficient depth for the vessel's required draft at the time(s) Subcontractor requires access.
10. Subcontractor will not perform any containment, cleanup, or disposal of hazardous materials that (a) were pre- existing at the Site or (b) if brought to the Site for the Project, were not released by Subcontractor. If Subcontractor encounters any hazardous materials at the site that have not been rendered harmless, Subcontractor shall immediately stop work in the affected area and report the condition to Contractor. To the fullest extent permitted by law, Contractor shall defend, indemnify, and hold harmless Subcontractor, its affiliates, officers, employees, directors, and agents from all claims, damages, losses, and expenses, included but not limited to attorneys' fees, arising out of or resulting from any pre-existing hazardous materials.
11. If Contractor is providing any materials or equipment for Subcontractor's Work, they shall be provided at no cost to Subcontractor and shall meet the requirements of the Work, including applicable plans and specifications, without the need for any alteration or adjustment, and Subcontractor shall not be responsible for any defects therein, warranty thereto, or damage or loss thereto, except to the extent caused by Subcontractor or its lower tier contractors.
12. Subcontractor shall be entitled to rely on the accuracy, adequacy, and completeness of the information provided to it or authored by Contractor or Contractor's other contractors, including without limitation the plans and specifications, their compliance with applicable laws, codes, and standards, and any site data, including subsurface data, regardless of any disclaimer and regardless of when the information was provided to Subcontractor. Such information shall be incorporated into any resulting contract. Subcontractor shall not be required to independently verify the accuracy, adequacy, or completeness of such information, though Subcontractor shall promptly notify Contractor of any deficiencies or discrepancies that it discovers therein. If any deficiency or discrepancy impacts the Work, it shall be addressed via change order.
13. Subcontractor shall perform the Work in one continuous, uninterrupted operation, 12 hours per day, 6 days a week, unless otherwise specifically provided in the proposal.
14. Subcontractor shall commence and proceed with the Work according to a mutually agreeable schedule, which shall be incorporated into any resulting contract and which Contractor may modify via change order. This change order shall encompass all related price and time impacts to Subcontractor.
15. If Subcontractor is unable to maintain a continuous operation due to circumstances beyond its control, including as a result of Contractor's or Contractor's other contractors' delays or Contractor's suspension of the Work, Contractor shall pay Subcontractor its standby rate, unless otherwise specifically provided in the proposal.
16. If any delay/suspension not caused by Subcontractor exceeds ten consecutive working days, or twenty cumulative working days during the project, Subcontractor may, at its option, demobilize, to return at a future mutually agreeable date, at the cost of Contractor.
17. Subcontractor will provide payment and performance bonds upon request at an additional cost. Subcontractor will not provide a letter of credit, nor will Subcontractor's Contractors or officers provide a personal guarantee.
18. Contractor shall pay Subcontractor monthly for approved invoices, which shall include stored materials, within 7 days of Contractor's receipt of payment from Owner, or if not received from Owner through no fault of Subcontractor, no later than 60 days from the date of Subcontractor's invoice, assuming Subcontractor has provided all reasonably requested prerequisites.
19. Contractor shall not withhold any retention from its payments to Subcontractor.
20. Contractor shall pay Subcontractor 100% of its price for mobilization upon completion thereof.
21. Late payments by either party shall bear interest at the same rate, which shall be 18% per annum, unless otherwise
22. If Contractor has the right to deduct or offset any payment, Subcontractor shall have an equal right to do so.
23. Subcontractor may suspend Work if Contractor fails to pay undisputed amounts when due and fails to cure the nonpayment within five business days from written notice thereof.
24. Statutory lien/bond claim waivers shall be used wherever required or available. If the Work is being performed in a state that does not have statutory lien/bond claim waivers required or available, the lien/bond claim waivers shall mirror California's statutory waivers.
25. Subcontractor's lien rights shall not be subordinated to any other claimant of Contractor.
26. Subcontractor has performed a reasonable investigation of the site satisfying itself as to (1) the known and readily observable nature, location, and character of the site and the project, specifically including the surface conditions of the site and the surrounding area, and all structures and obstructions thereon, both natural and man-made, and any subsurface conditions disclosed in writing by Contractor; (2) the nature, location, and character of the general area in which the project is located, including generally prevailing climatic conditions, labor supply, labor cost, equipment supply, and equipment cost; (3) the quality and quantity of all materials, supplies, tools, equipment, labor, and services necessary to complete the Work at the quoted price and according to the mutually agreed schedule; and (4) any requirements imposed by applicable laws and applicable permits, and Subcontractor shall not be entitled to any increase in the price or extension to the schedule for its failure to perform such a reasonable site investigation. Subcontractor's obligation to perform a reasonable site investigation shall not extend beyond the foregoing and Subcontractor specifically repudiates any obligation to assume the risk of (a) subsurface conditions not disclosed in writing by Contractor, (b) differing site conditions, (c) abnormal weather conditions, or (d) delays not caused by Subcontractor, and Subcontractor shall be entitled to make a claim for an increase to the price and/or extension to the schedule caused thereby.
27. Subcontractor warrants that the Work shall be performed in a good and workmanlike manner, according to the plans and specifications, free from defects in design, material, and workmanship, and using new materials unless otherwise specified. Subcontractor specifically disclaims all other warranties implied by law, including the warranty of fitness for a particular purpose and warranty of merchantability, as well as any requirement to perform the Work according to Contractor's intent.
28. The duration of Subcontractor's warranty shall not (a) for construction Work, exceed one year from the substantial completion date of its Work or (b) for dredging Work, exceed the date the area is surveyed for
29. Subcontractor shall not bear the risk of loss for any loss or damage to the Work (a) caused by Contractor, Contractor's other contractors, any force majeure events, (b) covered by Contractor's builder's risk policy, or, if not caused or covered by any of the foregoing, (c)(i) for construction Work, beyond the date of substantial completion or Contractor's beneficial use (in whole or in part) of the Work, whichever occurs earlier, or (ii) for dredging Work, beyond the date the area is surveyed for payment.
30. The amount of liquidated damages to be assess for Subcontractor delays shall be negotiated and shall only apply to the extent Subcontractor and/or its lower tier contractors are responsible for causing the delay.
31. Subcontractor's liability and indemnity obligations for any property damage, physical injury, breach of contract, or other claim, loss, damage, or expense shall be proportional, to the extent of its or its lower tier contractors' acts or omissions. Subcontractor shall not be liable for Contractor's or any other party's acts or omissions, whether active or passive, or be required to indemnity Contractor or any other party for such. Contractor shall have the same liability and indemnity obligations to Subcontractor.
32. Subcontractor's provision of insurance, including its primary response, additional insured endorsements, and waivers of subrogation, shall be limited to the extent of Subcontractor's proportional liability and indemnity obligations.
33. Subcontractor shall not be required to waive any rights available to it under the law unless equally applicable to and waived by Contractor.
34. Except provisions for liquidated damages or damages that are a part of third-party claims that either Party has an obligation to indemnify the other Party from, neither party shall be liable to the other for indirect damages of any kind, including incidental, special, and consequential damages and encompassing, without limitation, loss of use, loss of profit, and loss of business opportunity.
35. Subcontractor may request a change order or pursue a claim against Contractor for an increase to the price and/or extension to the schedule when Contractor's or Contractor's other contractors' acts or omissions, including delays, adversely affect Subcontractor's performance of the Work or otherwise cause damage, loss, or expense to Subcontractor.
36. Change orders, and any claimed accord and satisfaction associated therewith, shall encompass only the scope of the change order, not the entirety of the project performed up to the date of the change order.
37. Change order / claim notice deadlines shall not be less than ten business days from the date Subcontractor knew of the circumstance giving rise thereto.
38. A change order shall utilize the unit prices provided in the contract, if applicable. If no such unit price is applicable, the parties will negotiate to reach a mutually agreeable price for the work. If the parties are unable to reach an agreement, Subcontractor shall perform the work on a time and materials basis, plus a fee of twenty-four percent for all overhead and profit associated therewith.
39. Force majeure shall include labor, material, equipment, and lower tier contractor shortages due to any pandemic or epidemic, including COVID-19, and all abnormal climate conditions, which shall be defined as all precipitation days for the period of time in excess of the ten year average reported by the National Oceanic and Atmospheric Administration reporting station located closest to the Site. Subcontractor shall not be responsible for any delay damages and shall be entitled to make a claim for an increase to the price and/or an extension to the schedule if delayed as a result thereof.
40. Subcontractor shall be given the opportunity to cure any breach of contract or defect in the Work, which it shall commence and diligently continue within a minimum of ten business days from written notice thereof.
41. In the event of termination for default, Contractor may take possession of Subcontractor's materials as well as equipment and tools specifically leased for the project. All equipment and tools owned or leased for non-project- related reasons by Subcontractor shall remain in the sole possession of Subcontractor.
42. In the event of termination for convenience, Subcontractor shall be paid (a) for mobilization, the Work completed to date, and demobilization, each at the rates provided, (b) reasonable costs of termination, and (c) twenty-four percent of those termination costs for overhead and profit.
FORM C
PROOF OF SOLICITATION
GOOD FAITH EFFORT REQUIREMENT
Silverado Contractors, Inc
_Prime
Contractor) hereby certifies that the following company was contacted:
Manson Construction Co.
Name of company:
1401 Marina Way
Business address:
Richmond, CA 94804
,for inclusion in the Prime Contractor's bid or proposal for Terminal 4, Warehouse and Piling Removal Project (Name of Project), as a:
[X] RBE Firm
] Small RBE Firm
to perform or provide the following items of Work: Marine demolition/pile extraction support (Description of work or item).
Result of Contact (please mark the appropriate box): (X) Business's bid/proposal has been accepted and is being used as a subcontractor on the project (attach copy of bid/proposal received from the business).
Business indicated an interest in bidding/proposing but is not included in the project. Attach copies of all bids/proposals received for this work from all solicited businesses.
Business is not interested and will not bid/propose on this project.
Signature Title
Type or Print Name
Representative from the Business must sign above.
Business did not respond to my solicitations. Attach copies of certified letters, fax transmittals, and/or telephone logs with dates and times of initial and follow-up contact.
The undersigned swears, under the penalty of perjury, that the forgoing statements are true and
PRESIDENT
Title
CAPMOLA 4 13 2023
Type or Print Name Date
Form C (11/4/03)
MANSON MANSONCONSTRUCTION.COM
April 10, 2023
Silverado Contractors, Inc.
Attn: Scott Klopf ([email protected])
Pier 96, M&R Building
San Francisco, CA 94124
Subject: Proposal for City of Richmond Terminal 4 Marine Demo Support Dear Mr. Klopf,
Manson Construction Co. (Manson) is pleased to submit this proposal in connection with the above referenced project. Established in 1905, Manson is a leading heavy civil marine contractor with a fleet of heavy marine equipment that includes 60 specialized vessels and over 50 barges.
Our core services include dredging, waterfront construction, bridge building, heavy lifts, and offshore work.
Our pricing is for the scope of work defined below:
Marine demolition support for the City of Richmond Wharf, Warehouse, and Pile Removal project as described in the plans dated 11/18/2022, and the specifications dated February 2023. Manson Acknowledges addendum 1, 2, 3, 4, and 5.
Proposal Rate Table
Client # Description Units Qty Unit Price (S) Extension (S) Comment 1 Mobilization/Demobilization EA $ 150,000.00 150.000.00 Yard to Jobsite, Derrick and Barge Biological Monitor SH $ 2,700.00 $ 2,700.00 1 Biologist, 8 HR, MMA and Noise monitoring 4 Submittals $ 15.000.00 15,000.00 Demo, Safety, USCG, Closeout 7a/7b Derrick Site Support SH $ 16,500.00 16,500.00 510, 5 Man, Einar, bucket 7c Timber Pile Extraction SH 1 $ 20,500.00 20,500.00 Pull @ 10 US, 510 7 Man, Einar, vibro, bucket 7d Conc Encased Pile Extraction SH 20,500.00 $ 20,500.00 [Pull @ 10 US, 510 7 Man, Einar, vibro, bucket 7e Concrete Pile Extraction SH 1 20,500.00 20,500.00 Pull @ 10 US, 510 7 Man, Einar, vibro, bucket Steel Pile Extraction SH 1 $ 20,500.00 $ 20,500.00 [Pull @ 13 US, 510 7 Man, Einar, vibro, bucket 999 Derrick Standby SH 1 $ 5,000.00 $ 5,000.00 508, 2 Man, No work 8a-d Flat Barge Rental MO $ 30,000.00 $ 30,000.00 M62 Barge (180'x44') Bare Rental Our pricing is based on emails from Matt Bramlett dated 4/1/2023 and 4/4/2023, scoping meeting on 3/21/2023, and as outlined below:
• Item 1 "Mobilization/Demobilization": Furnish labor, and equipment to mobilize and demobilize a 75 TN derrick barge and 44'x180' flat barge to the waterside edge of the existing terminal 4 structure at 2055 Stenmark Drive Richmond California. Includes 3rd party tugboat services to transport marine equipment. Cost is per occurrence. • Item 2 "Biological Monitor": Provide qualified biologist to perform marine mammal monitoring and noise monitoring per MMRP BIO-4 during vibratory pile extraction at the direction of Silverado Contractors, inc. Rate includes 1 each biologist working 8-hour day, Monday through Friday. Noise monitoring equipment included. • Item 4 "Submittals": Prepare Submittals for demolition plan (pile extraction with vibratory hammer), site specific health and safety plan (as it pertains to Manson work),
PACIFIC NORTHWEST (HQ) NORTHERN CALIFORNIA SOUTHERN CALIFORNIA GULF REGION EAST COAST REGION 5209 E. Marginal Way South 1401 Marina Way South, Suite 330 340 Golden Shore. Suite 310 408 Old Bayou Dularge Road 5985 Richard Street, Suite 1 Seattle, WA 98134 Richmond. CA 94804 Long Beach, CA 90802 Houma, LA 70363 Jacksonville. FL 32216 p: 206.762.0850 p: 510.232.6319 p: 562.983.2340 p: 985.580.1900 p: 904.821.0211 f: 206.764.8590 †: 510 232.4528 t: 562.436.2156 f: 985.580.1901 f: 904.443.6251 Page | 2 MANSON
USCG (notice to Mariners and Anchor Waiver Permit), and closeout (as it pertains to Manson work).
• Item 7alb "Derrick Site Support": Furnish labor and equipment to provide mooring support for Silverado barges at the direction of Silverado Contractors, Inc. Rate includes a 5-person crew working 10-hour shift Monday through Friday. Equipment spread includes 75 TN derrick barge Einar (with 4-point mooring system and spud anchors), and 8 CY heavy duty digging bucket.
• Item 7c-7f "Pile Extraction": Furnish labor and equipment to extract piling at the direction of Silverado Contractors, inc. Rate includes a 7-person crew working 10-hour shift Monday through Friday. Equipment spread includes 75 TN derrick barge Einar (with 4-point mooring system and spud anchors), Ape 150 vibratory hammer (with box clamp), and 8 CY heavy duty digging bucket. Manson anticipates achieving extraction of 10 pile per shift for timber/concrete piling, and 13 pile per shift for steel piling. • Item 999 "Derrick Standby": Furnish labor and equipment to standby between work tasks at the direction of Silverado Contractors, inc. Rate includes a 2-person crew working 8-hour shift Monday through Friday tending the equipment. Equipment spread includes 75 TN derrick barge Einar (with 4-point mooring system and spud anchors), and 8 CY heavy duty digging bucket.
Item Sa-d "Flat Barge Rental": Bare rental of flat barge for demolition debris at the direction of Silverado Contractors, inc. Rate includes a 44'x180' flat deck barge (Manson 62 Barge).
• Silverado Contractors Inc. to provide parking at jobsite (2055 Stenmark drive), skiff/boat access to mooring location of derrick barge, 3' party tug services to relocate derrick/flat barge as needed, water quality monitoring, installation/relocation/maintenance of a turbidity curtain, divers to cut pile that break at mudline, and any required land/hydrographic survey.
• Rates are provided as shown above and are on a single shift basis exclusive of travel time between the dock and the barge location.
• Special shift considerations have been excluded.
Inclusions and Exclusions:
• For avoidance of doubt, the specified rental rates shall apply when equipment is on stand- by and during any period of force majeure.
• Costs for Portable Toilets and garbage collection/disposal on board the barge, divers, positioning support, crewboat, and tug/tender services are specifically excluded. • All work will be performed per applicable union agreements. • Design, engineering and other professional services are EXCLUDED.
Performance of work is contingent upon the piling or structure being within the DB Einar working radius/capacity and draft limits. See attached general arrangement sheets. • Our price does not include Builder's Risk Insurance to protect insurable interests in materials, fixtures and any related structures, including property in temporary storage or in ocean or inland transit to be incorporated into the Project on the full market value thereof. In the event that Silverado Contractors, Inc. does not obtain such insurance naming Manson and any subcontractors as additional insured with waiver of subrogation, our price will need to be increased to account for the purchase of such Builder's Risk Insurance.
Page | 3 MANSON
• All other costs incurred while performing the work, as approved by Silverado Contractors, Inc., shall be reimbursed at a cost plus 18% mark up. • USL&H insurance is included for Manson employees only. • Handling and disposal of hazardous waste is excluded. • Silverado Contractors, Inc. responsible for identifying all existing structures and grades before commencing work
• Environmental permit restrictions or mitigation of any type are excluded unless noted otherwise.
• Quality Control testing/inspection is excluded.
Site-Specific Terms and Conditions
• This proposal is based on working unimpeded by other contractors and having full and unrestricted access to the jobsite during the entire duration of the Work. • Silverado Contractors, Inc. shall furnish a map setting forth the correct locations of all pipelines, utilities, platforms, other facilities, and obstructions in the area of the work, and shall release, defend, indemnify and hold harmless Manson from third party claims, demands, or suits to the extent arising out of errors or omissions contained in said map. • Only Manson personnel shall have access to Manson equipment.
Contractual Terms and Conditions
• This Proposal is contingent on both parties executing a mutually agreeable contract, unit rate structure and Project schedule.
• The Work will be performed under the direction and control of Silverado Contractors, Inc. and Manson shall not be responsible for the success or failure of the Work performed
• This proposal is valid for ninety (90) days following the date of this proposal. • Silverado Contractors, Inc. will provide all permits required for the performance of the project; Manson will provide only such permits as are required in its normal course of business.
• No retention will be withheld.
We appreciate the opportunity to provide our proposal for your project and would welcome your invitation to discuss the proposal in further detail at your earliest convenience.
Sincerely,
Brey sEe schole manso contruction. co
Manson Construction, OU-Operations, CN-CI
Chris Schaetter Said tatost to the accuracy and interty a enia.
DoNe 2223 04.10 16.00.18-0700
Chris Schaeffer, Estimator
FORM C
PROOF OF SOLICITATION
GOOD FAITH EFFORT REQUIREMENT
Silverado Contractors, Inc (Prime
Contractor) hereby certifies that the following company was contacted:
DWH Creative Contracting
Name of company:
750 National Ct
Business address:
Richmond, CA 94804
, for inclusion in the Prime Contractor's bid or proposal for Terminal 4, Warehouse and Piling Removal Project (Name of Project), as a:
[ ]RBE Firm
[X] Small RBE Firm
to perform or provide the following items of Work: Demolition and abatement services (Description of work or item).
Result of Contact (please mark the appropriate box): (X) Business's bid/proposal has been accepted and is being used as a subcontractor on the project (attach copy of bid/proposal received from the business).
Business indicated an interest in bidding/proposing but is not included in the project. Attach copies of all bids/proposals received for this work from all solicited businesses.
Business is not interested and will not bid/propose on this project.
Signature Title
Type or Print Name
Representative from the Business must sign above.
Business did not respond to my solicitations. Attach copies of certified letters, fax transmittals, and/or telephone logs with dates and times of initial and follow-up The undersigned swears, under the penalty of perjury, that the forgoing statements are true and
PRESIDENT
Title
4/13/2023
Type or Print Name Date
Form C (11/4/03)
750 National Ct., Richmond, CA 94804
510.255.6555
www.dwh-removal.com
CREATIVE CONTRACTING License #985951
SBE WOSB WBE
April 12, 2023
Mr. Scott Klopf
Silverado Construction, Inc.
2855 Mandela Parkway
Oakland, Ca 94608
RE: Terminal 4 Wharf
DWH Creative Contracting (DWH) is pleased to submit this proposal for the abatement portion on your Terminal 4 Pier project located at 2101 Stenmark Drive, Point San Pablo in Richmond, CA. Please see price breakout and scope of work per task noted below: DWH - DIR # is 1000006067
$110,000.00 - Lead Paint abatement from Small Office Building • Safe off, cutting, capping and temporary power by the appropriate trades. • DWH to provide Certified Union Lead Workers for this project. • Silverado will provide reach equipment by land or sea so DWH can fit and attach safety harnesses to our crew members to safely access the work.
• Silverado is to provide scaffolding in areas if needed. • Provide our own temporary power.
• Set up paint chip removal containments per area/phases as legally required. • By using vacuum attachments to our hand scraping tools, we will remove loose, blistering lead paint. • After loose lead paint has been removed, DWH spray paint the siding with a paint primer to stabilize the wood siding for removal.
• Silverado will then demolish the roof, siding, and structural framing. • One Small House Building to be removed in comments above. • No work on Warehouse Building or other structures not mentioned above. • Estimated Schedule is 10 to 12 weekdays Monday - Friday Note 1: Crane or reach equipment by land and water are to be provided by Silverado.
Note 2: Please add 3% to all pricing above should Payment and Performance Bonding be required.
Note 3: DWH will perform only the work mentioned above, ask for pricing should you need more.
Note 4: Addendum 1 dated 3/3/2023 and Addendum 2 dated 3/7/2023 has been received.
Standard Exclusions
Unless these items are listed in scope of work above DWH will not be performing or providing permits, utility safe off, cutting, or capping utilities, layout, engineering, shoring, pedestrian barricades, safety railings, preparation of surfaces, or any work with hazardous materials. Temporary power and restrooms are to be supplied for our use at no cost to DWH.
This document is also a contract and will include the following qualifications.
1. Price is based on up to 1 mobilization. Additional mobilization will be charged $1,500.00 each.
2. Pricing or Budgets are good for 30 days.
If any dispute arises regarding the performance under this contract, the parties hereby agree to arbitrate this dispute pursuant to the construction industry rules of the American Arbitration Association then in effect.
This provision does not affect the rights of DWH Creative Contracting Inc. in pursuing legal actions such as stop notices, mechanic's lines, and recovery against bonding companies.
4. The above written scope of work and its exclusions is to be the body of work for any subsequent subcontracts submitted by Owner or General Contractors.
5. Please add 3% to all pricing listed above if bonding is required.
6. Please ask for additional pricing if the insurance requirement is more than our Employers $1,000,000, General Aggregate $2,000,000, Auto $1,000,000 and Umbrella of $5,000,000. Certificate will be provided on request. request.
7. DWH is proud to be a WOSB, WBE, SBE and Union company.
Our Commitment to you
DWH Creative Contracting Inc. will perform our work in a professional-like manner and will be diligent in maintaining a clean and safe working environment. Any changes in the scope of work or additional request for additional work or unforeseen conditions that could qualify as additional cost will be performed only by written and approved agreements such as work orders and will be billed as an additional charge to the original contract amount. All agreements are contingent upon strikes, accidents, acts of nature or God or delays that are beyond our control.
We thank you for this opportunity and please feel free to contact me at 925-381-3612 should you have any questions or concerns.
Sincerely,
Donnie Howell
750 National Ct, Richmond, CA 94804
1-888-304-DWH1
www.dwhcreativecontracting.com
CREATIVE CONTRACTING License #985951
January 1, 2023
To: All current Clients
Re: Rates Current through end of June 30, 2023
Dear Project Manager / Estimator,
Please review our hourly labor rates below for Smaller Projects, Time and Materials Projects, as well as our Emergency Response Projects. With the understanding that this is a non-bid or T&M type of request. We felt it best to list our pricing below to minimize any confusion later.
Your field personnel are only being asked to verify that the proper amount of labor, materials and equipment was there on the site. Our field Superintendents or Foreman will be happy to fulfill any daily paperwork or forms your company may request or need. Please provide those on a daily basis.
LEAD - Hazwoper
LABOR RATES: DEMOLITION ABATEMENT ABATEMENT
Regular 154.00 146.00 159.00
Overtime 216.00 202.00 212.00
Double-time 298.00 285.00 293.00
FORMAN RATES:
Regular 158.00 150.00 162.00
Overtime 228.00 214.00 215.00
Double-time 315.00 311.00 297.00
SUPERINTENDENT RATES:
Regular 165.00 165.00 165.00
Overtime 232.00 228.00 228.00
Double-time 320.00 320.00 320.00
WAREHOUSE RATES:
Regular 135.00 135.00 135.00
Overtime 160.00 160.00 160.00
Double-time 228.00 228.00 228.00
Project Management 175.00 175.00 175.00
Negative Air Machines and HEPA Vacuums are $30.00 per day, per machine Additional needed items
Such as BAAQMD Notification fees, our subcontractor or vendor fees, air clearances, waste profiling fees, manifests, materials, equipment, disposal, rental etc. will be billed at cost plus 20%. Cost and item back up will be provide with invoice. When applicable, Recycling tags will be provided to you as soon as we receive them.
Standard Exclusions
Unless these items are listed in scope of work above DWH will not be performing or providing permits, utility safe off, cutting or capping utilities, layout, engineering, shoring, pedestrian barricades, safety railings, preparation of surfaces, or any work with hazardous materials. Temporary power and restrooms are to be supplied for our use at no cost to DWH.
This document is also a contract and will include the following qualifications
1. If any dispute arises regarding the performance under this contract, the parties hereby agree to arbitrate this dispute pursuant to the construction industry rules of the American Arbitration Association then in effect. This provision does not affect the rights of DWH Creative Contracting Inc. in pursuing legal actions such as stop notices, mechanic's liens, and recovery against bonding companies
2. DWH Creative Contracting Inc. reserves any salvage rights to items not designated or requested to be saved for owner
3. The above written scope of work and its exclusions is to be the body of work for any subsequent subcontracts submitted by Owner or General Contractors.
4. Please add 3% to any contract totals should bonding be required or requested.
5. Should your field personnel refuse to sign our daily documents, then DWH will bill the project based on our timesheets as labor back up and bill the direct cost items such as BAAQMD Notification, air clearances, manifests, materials, equipment, disposal, rental etc. along with an ad of 20% for mark-up charge.
6. DWH is a proud WOSB, WBE, SBE and Union affiliated Company.
Please sign in the area provided below for a timely start to your immediate needs with our crews.
Sincerely, Accepted by
Donnie Howell
FORM C
PROOF OF SOLICITATION
GOOD FAITH EFFORT REQUIREMENT
Silverado Contractors, Inc _(Prime
Contractor) hereby certifies that the following company was contacted:
American Textile & Supply, Inc.
Name of company:
Business address: 3439 Regatta Blvd
Richmond, CA 94804
, for inclusion in the Prime Contractor's bid or proposal for Terminal 4, Warehouse and Piling Removal Project (Name of Project), as a:
[ ]RBE Firm
[X] Small RBE Firm
to perform or provide the following items of Work: Containment boom, turbidity curtain, sorbent pads, other various supplies (Description of work or item).
Result of Contact (please mark the appropriate box): (X) Business's bid/proposal has been accepted and is being used as a subcontractor on the project (attach copy of bid/proposal received from the business).
Business indicated an interest in bidding/proposing but is not included in the project. Attach copies of all bids/proposals received for this work from all solicited businesses.
Business is not interested and will not bid/propose on this project.
Signature Title
Type or Print Name Date
Representative from the Business must sign above.
Business did not respond to my solicitations. Attach copies of certified letters, fax transmittals, and/or telephone logs with dates and times of initial and follow-up contact.
The undersigned swears, under the penalty of perjury, that the forgoing statements are true and correct:
PRESIDENT
Title
4/13/2023
-
Date
Form C (11/4/03)
ERI American Textile & Supply Inc.
Environmental Grime Solutions ™M QUOTE
7 3439 Regatta Boulevard
Richmond, CA 94804
510-236-7424
*TI www.americantex.com
Scott Klopf Date: 4/12/2023
Silverado Contractors Phone: (510) 658-9960
2885 Mandella Parkway Fax: 415-695-7900
Rep.: GK
2nd floor Email: [email protected]
Oakland Ca. 94608
Home of the RagBALE™
Qty Item # Name Price
3000| FOAM FILLEED BOOM FOAM FILLED BOOM 12"x18"x100' $9.95 $29,850 Type 3 Turbidity Control Curtain 5ft skirt 8 in flotation $26.83 1000 Turbidity Control Curtain $26,830
Impermeable Skirt
10 AT10ODP Oil Only Pad, HW, 15''x18': Dimpled & Perfed, 100/Bale $47.80 $478 120 6005-NSPEC Rice Wattle; 8"×25'100% Biodegradable Burlap Netting, Per $47.85 $5,742 Wattle, 12/Pallet
8 Towing Bridles Towing Bridles $61.25 $490
10 AT510 Oil Only Boom 5'x10' 4/bale $90.80 $908
2 AT SPILL55 OIL 55 Gallon Oil Only Spill Kit $369.20 $738 6 Geotextile Roll 15'×300' Roll $1,158.66 $6,951
1 603 Shipping - Estimate $4,944.00 $4,944
Sub Total $76,932.
Shipping & Handling
Taxes 0.000% $
TOTAL $76.932
NOTE: Due to market conditions all pricing is subject to change without notice.
You will be advised of any changes via confirmation before shipment.
Comments: Office Use Only:
Thank you for your business.
FORM C
PROOF OF SOLICITATION
GOOD FAITH EFFORT REQUIREMENT
Silverado Contractors, Inc
(Prime
Contractor) hereby certifies that the following company was contacted:
Bay Area Land Surveying, Inc
Name of company:
Business address: 3065 Richmond Pkwy #101
Richmond, CA 94806
, for inclusion in the Prime Contractor's bid or proposal for _ Terminal 4, Warehouse and Piling Removal Project (Name of Project), as a:
[ ]RBE Firm
[X] Small RBE Firm
to perform or provide the following items of Work: Site Surveying (Description of work or item).
Result of Contact (please mark the appropriate box): (X) Business's bid/proposal has been accepted and is being used as a subcontractor on the project (attach copy of bid/proposal received from the business.
Business indicated an interest in bidding/proposing but is not included in the project. Attach copies of all bids/proposals received for this work from all solicited businesses.
Business is not interested and will not bid/propose on this project. ith CEO
Signature Title X
Keith S. Bush 4/11/23
Type or Print Name Date
Representative from the Business must sign above.
Business did not respond to my solicitations. Attach copies of certified letters, fax transmittals, and/or telephone logs with dates and times of initial and follow-up contact.
The undersigned swears, under the penalty of perjury, that the forgoing statements are true and correct:
PRESIDENT
Title
LAPRIOLA 4/13/2023
Type or Print Name
Form C (11/4/03)
FORM C
PROOF OF SOLICITATION
GOOD FAITH EFFORT REQUIREMENT
Silverado Contractors, Inc
(Prime
Contractor) hereby certifies that the following company was contacted:
Bay Cities Refuse Services
Name of company:
Business address: 2525 Garden Tract Rd
Richmond, CA 94801
, for inclusion in the Prime Contractor's bid or proposal for Terminal 4, Warehouse and Piling Removal Project _ Name of Project), as a:
[ ]RBE Firm
[X] Small RBE Firm
to perform or provide the following items of Work: Bin rental and debris disposal (Description of work or item).
Result of Contact (please mark the appropriate box): (X) Business's bid/proposal has been accepted and is being used as a subcontractor on the project (attach copy of bid/proposal received from the business).
Business indicated an interest in bidding/proposing but is not included in the project. Attach copies of all bids/proposals received for this work from all solicited businesses.
Business is not interested and will not bid/propose on this project. offee manse
Signature Title X
Christ 3-30-2023
Type or Print Name Date
Representative from the Business must sign above.
Business did not respond to my solicitations. Attach copies of certified letters, fax transmittals, and/or telephone logs with dates and times of initial and follow-up contact.
The undersigned swears, under the penalty of perjury, that the forgoing statements are true and
PRESIDENT
Title
CAPROLA 4/13/2023
Date
Form C (11/4/03)
FORM C
Silverado Contractors, Inc (Prime
Contractor hereby certifies that the following company was contacted:
W.R. Forde Associates
Name of company:
984 Hensley St
Business address:
Richmond, CA 94801
, for inclusion in the Prime Contractor's bid or proposal for Terminal 4, Warehouse and Piling Removal Project (Name of Project), as a:
[ ]RBE Firm
[X] Small RBE Firm
to perform or provide the following items of Work: Structural demo and shoreline excavation (Description of work or item).
Result of Contact (please mark the appropriate box): (X) Business's bid/proposal has been accepted and is being used as a subcontractor on the project (attach copy of bid/proposal received from the business).
Business indicated an interest in bidding/proposing but is not included in the project. Attach copies of all bids/proposals received for this work from all solicited businesses.
Business is not interested and will not bid/propose on this project.
Signature Title
Type or Print Name Date
Representative from the Business must sign above.
Business did not respond to my solicitations. Attach copies of certified letters, fax transmittals, and/or telephone logs with dates and times of initial and follow-up contact. Called and spoke with the owner twice. Both times he mentioned he did not ‹now if he wanted to provide pricing to do any of the work The undersigned swears, under the penalty of perjury, that the forgoing statements are true and
PRESIDENT
Title
4/13/2023
Type or Print Name Date
Form C (11/4/03)
•B AT&T 5GE 11:44 AM 80%
AA @ att.com
*7 Back lö usage
saPrn 1 M5 Downlced :
Data, text & talk logs
Device: Billing period:
RAYMOND S. KLOPF | 510.385.5795 Current Billed Usage Mar C3. 2023 . Apr 02. 2023 # View details by: Talk :
Shve Numbers Nicknana a humber Search by: Date
Ex muricu vyys
Date : Time - Contact Call Type Minutes Charge (S)
10:05AM( ( 406 609 4473 Incoming. CL SODV 0.00
10:51AM (5 326.818.2324 Incoming, CL SODV 23 0.00
0312B.2023
03/28:2023 11 22AM (* 325 813.2324 Incoring. CL SODV 0.0c 03/28/2023 11.42AM (* 825.787.2053 Concord. CA SODV 0.00 03:28/2023 11,54AM C: VIG 332 2646 Sausalito, CA SDDV 0.00 11:59AM E* $68.724.7864 Toll Free, CL SDDV :0.00
03:28:2023 12:58PM t: 225.819.2324 Walnut Crk. CA SODV 14 0.00 03/28:2023 01:13PM LE 510.680.0767 Richmond, CA SDDV 0.00 03/28/2023 01:14PM t* 6:0 215.5338 Richmond, CA SDDV 2 0.00 01:24PM L 415.647.4186 San Rafael, CA SDDV 0.00
03/28:2023 01:28PM ( 325.724 ₴843 incoming. CL SODV 10 0.00 01:37PM t: 926.797.2553 Concord, CA SODV 0.00
C 510.223.5167 SODV attH)
03:28/2023 01:56PM Elsobmpin, CA
03:28/2023 02:07PM t2 510255 6505 Richmond, CA SODV 0.00 03/28:2023 02:08PM C: 916.381.3612 Scrm Main. CA SDDV 0.00 02:09PM C: 510.285.05S6 Richmond, CA SDDV 0.00
03/28:2023 02:11PM t* 925361 3612 Concord. CA SODV
03/28/2023 02:17PM E: $25.818.2324 Walnut Crk, CA SODV S.UU 03/28/2023 03:11PM C 1:5.680.3938 San Rafael. CA SODV 0.00 03:16PM ( 925.816.2334 Cal Wait SODV 33 0.00
03/28/2023 03.17PM (: 415.285 3938 Cak Wait SDDV
03/28/2023 08:21PM (: 510.702.Y908 incoming, CL SDDV 0.00 03/29/2023 08:41AM (: 203.304.6490) Incaring, CL SODV
03:29/2023 08:57AM (: 925.818.2324 Incoming, CL SODV 0.00 03/29/2023 09:51AM C: 529 618 2324 Walnut Crk, CA SODV 0.00 :
03/29/2023 10:28AM (: 570881.2602 SODV 0.00
03/29/2023 10:43AM (E S25.724.8843 SODV 0.0c
03/29/2023 10:49AM (: 818.221.1746 SODV 0.00
03/29:2023 10:51AM (: 714.920.0060 SODV 0.00
03/29/2023 10:54AM CC 510.365.3424 Okld Bkiv. CA SODV 0.00 03/29/2023 11,494M (E 825 818 2324 Incoming CL SODV 0.00 03/29/2023 01:52PM (: 416.271.2060 Incoming, SDDV
P P
03/29:2023 03:17PM (: 325.387.2853 Incoming 53 0.00
03/29/2023 03-220M (: 225.818.2324 Call Wall 0.00
03/29:2023 04:15PM 850.483.5545 San Mateo, CA SODV o u g 0.00 03/29/2023 06:56PM (E 951.529.702d incoming, CL SODV 0.00 Incoming. CL SODV 21 0.00
03/29/2023 02 29PM (: 209 560.0368
03/30/2023 08:15AM t: 702.3727139 Fairtidsur CA SODV 0.00 03/30/2023 12:38PM ( 415.2620715 Incoming. cL SODV 0.00 03/30/2023 01:17PM t* 925 381 3612 Concord. CA SODV
<
11:34
< Recents
(510) 215-9338
Richmond, CA
message call video
April 4, 2023
12:02 PM Outgoing Call
42 seconds
Share Contact
Create New Contact
Add to Existing Contact
Add to Emergency Contacts
Share My Location
Block this Caller
806
Favoriles Recents Contacts Keypad Voiceman
FORM C
PROOF OF SOLICITATION
GOOD FAITH EFFORT REQUIREMENT
Silverado Contractors, Inc _(Prime
ontractor) hereby certifies that the following company was contacte BE Tohn Balobeck Enterprise
Name of company:
5926 Kipling Drive
Business address:
Richmond, CA 94803
for inclusion in the Prime Contractor's bid or proposal for Terminal 4, Warehouse and Piling Removal Project _(Name of Project), as a:
[ ]RBE Firm
[X] Small RBE Firm
to perform or provide the following items of Work: SWPPP/EHS Consulting (Description of work or item).
Result of Contact (please mark the appropriate box): (X) Business's bid/proposal has been accepted and is being used as a subcontractor on the project attach copy of bid/proposal received from the business).
Business indicated an interest in bidding/proposing but is not included in the project. Attach copies of all bids/proposals received for this work from all solicited businesses.
Business is not interested and will not bid/propose on this project.
Signature Title
Type or Print Name Date
Representative from the Business must sign above.
Business did not respond to my solicitations. Attach copies of certified letters, fax transmittals, and/or telephone logs with dates and times of initial and follow-up Called and left 2 voicemails with no response
The undersigned swears, under the penalty of perjury, that the forgoing statements are true and correct:
PRESIDENT
Title
4/13/2024
Type or Print Name 'Date
Form C (11/4/03)
• AT&T 5GE 11:44 AM 80%
AA • att.com
2: Báck to usage
A Pes 113 Download
Data, text & talk logs
Device: Billing period:
RAYMOND S. KLOPF | 510.385.5795 Current Billed Usage Mar 03. 2023 - Apr 02.2023 # Talk :
VRT OPRAS CY
• Hicknamed Numbers searcn oy. Date Ex nestedyyry
Date / Time - Contact Location Call Type Minutes Chargo (s! 03:28:2023 10:05AM Incoming. CL SOUV 0.00
( +05 682 $472
10:51AM C 926.518.2324 Incoming. CL SODV 0.00
0312812023
11.22AM ( #25 818 2324 Incoming. CL S00V 0.00
03/28:2023
03/28/2023 11:42AM : 925.787.2553 Concord. CA SDÜV 0.00 03:28/2023 11.54AM C: 415.332 364i) Sausalilo, CA SODV 0.00 03/28/2023 11:58AM V 288.724.7868 Toll Free, CL SDDV 0.00 03/28/2023 12:58PM V: 325.018.2324 Walnut Crk, CA SODV 14 0.00 01439M 49 E10.6B60167 Richmond, CA SDDV 0,00
03/28/2023
01:14PM C 510 215.9338 Richmond, CA SODV 0.00
03:28:2023
03/28/2023 01:24PM (: 4:5.867.4185 San Rafael. CA SDDV 0.00 03128:2023 01:28PM C 325724 ₴84] Incoming. CL SODV 0.00 01:37PM t* 925.787.255a Concord. CA SDDV 0.00
03/28:2023 01:56PM C 500.223.5367 Elsobmpn. CA SODV 0.00 03/28/2023 02:07PM C 510.255.6555 Ricturond, CA SDDV 0.00 03:28/2023 02.08PM C 816 381 3612 Scim Main. CA SODV 0.00 03/28/2023 02:09PM C: 810.255.6555 Richmond, CA SODV 0.00 03:28/2023 02:11PM (:* 925 381 3612 Concord. CA SODV 0.00 03/28/2023 02:17PM C 926.618.2324 Walnut Crk. CA SDDV 0.00 03/28/2023 03:11PM L: 415.686. 3938 San Rafael. CA SODV 0.00 03/28:2023 03:16PM L: 926.818.2324 Cal Wait SODV 0.00
03/28/2023 (: 415.E86 3938 Call Wait SODV 0.00
03/2B/2023 08:21PM (E 510.708.1998 Incoming, CL SODV 10 0.00 03/29/2023 08:41AM (: 209.304,6490 Incoming, CL SODV 0.00 03/29:2023 08:57AM E: $25.818.2324 Incoming. CL SDDV .0.00 03/29:2023 C° 425 818 2324 Walnut Crk. CA
03/29/2023 10:28AM EE 570.881.2602 Incoming, CL 0.00
03/29:2023 ( 525 724.2643 Incoming CL 0.00
03/29/2023 10:49AM (E 818.221.1743 Incoming 0.00
F 8
( 714.920.9669 Incorning 0.00
03/29/2023
03/29/2023 10:54AM L: 510.385.5424 Okld Bkly. CA 0.00
(E 325 818.2324 incaming CL 0.00
03/29/2023
03/29/2023 61.52PM (: 415.271.2009 Incoming 0.00
03:17PM t: 925.783.2553 Incoming. 0.00
03/29/2023
03:22PM ( 925.618.2324 Call Wail 54 0.00
03/29/2023
San Maleo. CA 0.00
03:29:2023 C: 450.483. SS45
03/29:2023 08:56PM (E 951.529.7924 Incoming CL .0.00
07 29PM (: 203 566.6368 Incoming 0.00
08:15AM t: 707.372.7330 Fairfidsun. 0.00
03/30/2023
12:38PM (: +:5264 0715 Incoming. CL
03/30/2023 61 170 (* 926 361 3612 Concerd. CA
>
11:34 • SC
< Recents
(510) 680-0767
Richmond, CA
message call video
April 4, 2023
11:09 AM Outgoing Call
54 seconds
Share Contact
Create New Contact
Add to Existing Contact
Add to Emergency Contacts
Share My Location
Block this Caller
Favorites Recents Contacts Keypad Voicemail