CITY OF RICHMOND
STANDARD CONTRACT
Department: Project Manager:
Project Manager E-mail:
Project Manager Phone No:
PR No: Vendor No: P.O./Contract No:
Description of Services:
The parties to this STANDARD CONTRACT do mutually agree and promise as follows:
1. Parties. The parties to this Contract are the City of Richmond (herein referred to as the “City”) and the following named Contractor:
Company Name:
Street Address:
City, State, Zip Code:
Contact Person:
Telephone: Email:
Business License No: / Expiration Date:
A California [ ] corporation, [ ] limited liability corporation [ ] general partnership, [ ] limited partnership, [ ] individual, [ ] non-profit corporation, [ ] individual dba as [specify:] , [ ] other [specify:]
2. Term. The effective date of this Contract is and it terminates unless terminated as provided herein.
3. Payment Limit. City’s total payments to Contractor under this Contract shall not exceed $ . City shall not pay for services that exceed the Contract Payment Limit unless a contract amendment has been approved by the City Council or City Manager.
4. Contractor’s Obligations. Contractor shall provide those services and carry out that work described in the Service Plan (Exhibit A) which is attached hereto and is incorporated herein by reference, subject to all the terms and conditions contained or incorporated herein.
5. City's Obligations. City shall make to the Contractor those payments described in the Payment Provisions (Exhibit B) which are attached hereto and are incorporated herein by reference, subject to all the terms and conditions contained or incorporated herein.
6. Authorized Representatives and Notices. This Contract is subject to the Authorized Representatives and Notices Provisions (Exhibit C) which are attached hereto and are incorporated herein by reference.
7. General Conditions. This Contract is subject to the General Conditions (Exhibit D) which are attached hereto and are incorporated herein by reference, subject to all the terms and conditions contained or incorporated herein.
8. Special Conditions. This Contract is subject to the Special Conditions (Exhibit E) (if any) which are attached hereto and are incorporated herein by reference, subject to all the terms and conditions contained or incorporated herein. (Note:
other than Public Works contracts, the City will agree to Special Conditions only in unusual circumstances.)
9. Insurance Provisions. This Contract is subject to the Insurance Provisions (Exhibit F) which are attached hereto and are incorporated herein by reference.
10. Signatures. These signatures attest the parties' Contract hereto:
CITY OF RICHMOND CONTRACTOR:
a municipal corporation
By:
(* The Corporation Chairperson of the Board,
President or Vice President should sign below)
Title: By:
I hereby certify that this Contract Title:
has been approved by City Council.
Date Signed:
B y :
City Clerk
(* The Corporation Chief Financial Officer,
Secretary or Assistant Secretary should sign below)
Approved as to form:
B y :
B y : T i t l e :
City Attorney
Date Signed:
(NOTE: Pursuant to California Corporations
Code Section 313, if Contractor is a corporation
or nonprofit organization, this Contract (1) must
be signed by (a) the Chairperson of the Board,
President or Vice-President
and (b) the
Secretary any Assistant Secretary, the Chief
Financial Officer or any Assistant Treasurer.
LIST OF ATTACHMENTS:
Service Plan Exhibit A
Payment Provisions Exhibit B
Authorized Representatives and Notices Exhibit C
General Conditions Exhibit D
Special Conditions Exhibit E
Insurance Provisions Exhibit F
Standard Contract/EJ/TE 9-26-07
For the Contract between the City of
Richmond and
EXHIBIT A
SERVICE PLAN
Contractor shall, to the satisfaction of the , perform the following services and be compensated as outlined below:
EXHIBIT B – BUDGET AND SCHEDULE OF DELIVERABLES
Project # and Name: 4 - Resilient Homes for Healthy Communities Strategy: Solar Installation and Energy Efficiency Lead Entity: GRID Alternatives Bay Area
Project Description: The Resilient Homes for Healthy Communities project will install 875 kilowatts (KW) of solar photovoltaic systems on approximately 250 single-family homes in the TCC Project Area. In addition, GRID will coordinate energy efficiency measures with MCE to amplify impact and savings to at least 216 solar install clients as well as additional assessed clients. GRID Alternatives will coordinate outreach efforts through the TCC Community Engagement Plan and workforce training efforts through the TCC Workforce Development Plan.
Operations & Maintenance Plan: GRID will issue a labor warranty on the single-family solar installation and make available copies of the manufacturer’s warranties for the inverter(s) and solar panels. GRID informs homeowners that they are not responsible for repairs or damage to the roof related to the installation of the systems. After the warranty expires, homeowners are responsible for any modifications and/or reinstallations. The warranty is 10 years on single-family projects. GRID provides homeowners with a Solar Electric System User Guide, instructions on how to care for their system, answers to common maintenance and repairs questions, and instructions on how to make a service call. Solar is very low maintenance and typically there is little that homeowners need to do to care for their system.
Reimbursement Conditions: Grantee will not be reimbursed for Task 2 (implementation) until all readiness deliverables within Task 1 are received, approved, and notified through an updated readiness memo provided by the TCC Grant Manager.
EXHIBIT B – BUDGET AND SCHEDULE OF DELIVERABLES
Task Deliverable(s) Timeline Grant Funds Leverage Funds Task 1: Single Family Resilient Homes Outreach
A: Develop outreach plan for solar
installation and energy efficiency
strategy components
Readiness Condition
A: Final outreach plan including
coordinated outreach approach with
partners and outreach materials
(including co-branded client
agreement) Project Completion
Period $451,000.00 $268,750.00
B: Identify eligible homes and create
a pipeline of potential clients B: Project pipeline report C: Conduct outreach to inform, recruit
and intake 50 eligible residents per
year
C: Summary of outreach conducted
per reporting period
Task 2: Single Family Solar Implementation
A: Assess eligible homes, design
solar systems, secure all necessary
permissions and permits, install solar
PV and provide on-going support and
maintenance for a goal of 875 KW of
solar PV installation - estimated 250
systems, 4 households per month
A: 1) Bimonthly summary reports of
household progress that period,
including (but not limited to):
address, method of contact/intake,
date of assessment, date design
completed, date permits pulled,
date of installation, number of kW
installed, final inspection report
date, connection date, and support
requests)
2) Final summary table that logs all
participating residents, dates,
installed, and # of kW installed
Project Completion
Period $1,984,359.34 $2,820,404.41
Task 3: Single Family Efficiency Upgrades Implementation
EXHIBIT B – BUDGET AND SCHEDULE OF DELIVERABLES
A: Asses eligible homes, secure all
necessary permissions and permits,
install home upgrade measures, and
provide on-going support and
maintenance for a goal of 216
households, 4 households per month
A: 1) Bimonthly summary reports of
household progress that period,
including (but not limited to):
address, method of contact/intake,
date of assessment, date permits
pulled, date of installation, number
and type of measures, cost per
measure, support requests, and
Rising Sun referrals)
2) Final summary table that logs all
participating residents, dates
installed, and total measures
installed
Project Completion
Period $2,327,273.00 $1,628,750.00
B: Refer eligible households to Rising
Sun for more efficiency
improvements, such as pest control
and remediation
B: Final summary table of referrals
Task 4: Grant Administration
A: Invoicing and reporting; including
metrics and project management
A: 1) Bimonthly progress reports
and invoicing
2) Final report highlighting project
metrics
3) Regular GHG calculations as
needed
Project Completion
Period $1,243,140.00 $277,600.00
B: Indicator Reports and Evaluation
Data for Evaluation Technical
Assistance Provider
B: 1) Annual Indicator Reports
2) Participation in Evaluation
Surveys, Interviews, Focus Groups,
Information Requests
Equipment (entire project) N/A Project Completion
Period $0 $0
EXHIBIT B – BUDGET AND SCHEDULE OF DELIVERABLES
Contingency 6% Contingency Project Completion
Period $600,577.23 $0
Lead Entity Indirect Costs
Indirect costs consistent with the
TCC guidelines and grant
agreement, at a rate approved
under this grant agreement.
Project Completion
Period $360,346.34 $0
Project Total $6,966,695.91 $4,995,504.41
Workforce Development and Economic Opportunities Plan Lead Entity: City of Richmond Plan Description: The dual Expanded Richmond Workforce Development Program and Richmond Solar Workforce Program will work collectively guided by a Place-Based Workforce Strategy to reduce barriers to workforce entrance and to train Project Area residents for jobs in the installation of solar PV and related clean energy career pathways - high-quality jobs that are growing in the City of Richmond. Funding will support the recruitment, development and implementation of immersive training experiences.
Special Reimbursement Conditions: N/A
Task Deliverable(s) Timeline Grant Funds Leverage Funds Task 3: GRID Solar Workforce Program
A: Develop & coordinate curriculum
for 5-week long trainings (GRID IBT-
200) on solar installation and general
construction skills.
A: Summary of training
curriculum developed with
industry-informed standards
and learning outcomes.
Project Completion
Period $646,250.00 $0 B: Recruitment of trainees from
Project Area for solar installation
trainings. Goal of at least 60% of low-
income residents from Project Area
for each training.
B: Annual Recruitment Report
including (but not limited to):
outreach conducted (overview
of methods, dates/locations,
EXHIBIT B – BUDGET AND SCHEDULE OF DELIVERABLES
and potential contacts
identified)
C: Develop and implement tracking
process for job placement and
retention
C: Tracking process outline
D: Coordinate with Richmond's
Workforce Development Board to
identify collaboration opportunities
and additional potential local partners
that GRID should connect with.
D: Meeting summary including
(but not limited to) potential
partners and collaboration
opportunities.
E: Lead 5-week long (IBT-200)
training on solar installation and
general construction skills, plus,
OSHA 10 safety training certificates.
Host one training per year for 5 years.
E: Annual report including (but
not limited to): training
curriculum provided, trainee
completion rates (goal of 75%
or higher), and completed
credentials to be provided
each progress report
F: Host 2 employer showcases and/or
job fairs per year for 5 years to
connect trainees with jobs and provide
ongoing job placement data tracking
and follow-up in accordance with
tracking plan.
F: Annual Summary report of
job placements for program
completers in high-quality
career pathways related to
training. Minimum 50%
placement rate for trainees
within 1 year of program
completion, minimum 20 job
placements (50% placement
rate)
EXHIBIT B – BUDGET AND SCHEDULE OF DELIVERABLES
G: Project management including
reporting and tracking of metrics for
program implementation
G: Bimonthly progress reports
including (but not limited to):
Project metrics, deliverables,
and jobs reporting
Contingency 10% Contingency Project
Completion Period $64,625.00 $0
GRID Indirect Costs
Indirect costs consistent with
the TCC guidelines and grant
agreement, at a rate approved
under this grant agreement.
Project
Completion Period $64,400.00 $0
Plan Total $775,275.00 $0.00
EXHIBIT B – BUDGET AND SCHEDULE OF DELIVERABLES
SPECIAL TERMS AND CONDITIONS
PART 1 – Transformative Requirements
1. Workforce Development and Economic Opportunities
Grantee will establish goals for workforce training, employment, and local business expansion for the TCC Project Area;
Grantee will ensure workforce development components are designed to address local residents’ and stakeholders’ needs;
Grantee will conduct or oversee workforce development and economic opportunities activities for the entirety of the TCC Project;
Grantee will report to SGC on workforce development and economic opportunities related activities; and
Grantee will ensure all Workforce Development costs are for eligible job training programs per Section II.E of the TCC Guidelines.
Part 2 – Project-Specific Terms and Conditions
Grantee certifies that it will ensure that the Lead Entity of each Project adheres to the following requirements.
2. Solar Installation, Energy Efficiency and Appliance Electrification Single-Family Residences
i. Single-family homes occupied by property owners are eligible for energy efficiency and Solar Photovoltaic (PV) installations. Single-family homes occupied by tenants are eligible for only energy efficiency installations.
ii. Lead Entity must have single-family property owners certify that they will not raise the rent of any property with energy efficiency and/or Solar PV installations for a period of two (2) years from the date of installation because of the increased value of the unit due solely to the installations provided (allowable factors for rent increase can include an actual increase in property taxes, actual cost of amortizing other improvements to the property accomplished after the date of work completed by the Partner and/or subcontractor, or actual increases in expenses of maintaining and operating this property). Additionally, the property owner must acknowledge and agree that the property is not for sale at the time of qualifying for the installations and will not be offered for sale or otherwise distributed or is not in foreclosure for at least sixty (60) calendar days following the completion of the installations. iii. Household income eligibility must be established at either 80% of the Area Median Income (AMI), or 80% of the State Median Income (SMI), whichever results in a higher allowable maximum income.
iv. The following types of buildings will not be eligible for installations:
a. Buildings requiring significant environmental review, any mitigation, including mitigation of fire hazards or electrification and/or environmental decontamination triggering a deferral as defined in the Deferral Policy section;
EXHIBIT B – BUDGET AND SCHEDULE OF DELIVERABLES
b. New buildings or buildings rebuilt or remodeled or retrofitted to meet Title 24 standards (Part 6, of the California Code of Regulations) are not eligible for energy efficiency installations, but are eligible for Solar PV installations; c. Buildings that are structurally unsound or condemned; d. Buildings under a legal cloud or importuned by illegal activity; e. Buildings that have been modified under the Low-Income Weatherization Program (LIWP), the Low-Income Home Energy Assistance Program (LIHEAP) or Department of Energy (DOE) federal programs within the past four (4) years, do not qualify for energy efficiency measures, with the exception of assessment for and installation of Solar Water Heating, and may receive Solar PV, if qualified. v. Buildings that have received only LIWP-funded Solar PV may qualify for energy efficiency measures.
vi. Each building must be assessed for suitability before proposed energy efficiency and/or Solar PV installations occur.
vii. Property owners are responsible for certifying participation in any additional energy efficiency upgrade programs that have resulted in modifications to the identified buildings within the project.
viii. All work performed must be in compliance with current and applicable provisions of the California Energy Commission Building Energy Efficiency Standards, Alterations under Title 24, Part 6, of the California Code of Regulations, California Home Energy Rating System (HERS) Program regulations. Standards within the current Uniform Building Code and local city and county codes should be adhered to. ix. Work provided to all covered pre-1978 buildings must be in compliance with current Environmental Protection Agency rules in 40 CFR 745 (Code of Federal Regulations), Lead-Based Paint Poisoning Prevention in Certain Residential Structures and the Housing and Urban Development rules in 24 CFR 35, as applicable to energy efficiency installations.
x. Solar Installation projects on single-family residences are invoiced on an agreed dollar per watt basis, reviewed and approved by the TCC Grant Manager prior to invoicing, or based on itemized invoices of actual costs incurred.
Multi-Family Residences
i. Multi-family properties must demonstrate at least 66% of households residing at the property meet the household income eligibility requirements to be eligible for Solar PV or energy efficiency installations. Multi-family properties, deed restricted and/or subsidized properties must provide regulatory agreements with the applicable local agency showing compliance with the income eligibility requirements. ii. Lead Entity must ensure that the property owner or manager certify that the rents for the qualified low-income units will not be increased for a period of two (2) years because of the energy efficiency and/or Solar PV installations and/or major capital improvements. Lead Entity must also require the property owner or manager agree that any units which are designated as vacant as of the effective date of the installations, must be rented to or occupied by a household at an income level such that at least 66% of households residing at the property meet the income eligibility
EXHIBIT B – BUDGET AND SCHEDULE OF DELIVERABLES
requirements. Lead Entity must require the property owner or manager not to evict or commence any eviction proceeding against any tenant(s) of any qualifying unit in the building as a result of upgrades, except for cause and subject to all legal requirements and procedures for any such eviction and/or proceeding. iii. Household income eligibility must be established at either 80% of the Area Median Income (AMI), or 80% of the State Median Income (SMI), whichever results in a higher allowable maximum income.
iv. The following types of buildings will not be eligible:
a. Buildings requiring significant environmental review, any mitigation, including mitigation of fire hazards or electrification and/or environmental decontamination triggering a deferral as defined in the Deferral Policy section; b. Buildings with significant energy efficiency upgrades installed within the previous five (5) years, unless energy savings goals can be attained at a reasonable cost through the implementation of additional measures;
c. New buildings or buildings rebuilt or remodeled or retrofitted to meet Title 24 standards (Part 6, of the California Code of Regulations) are not eligible for energy efficiency installations, but are eligible for Solar PV installations; d. Buildings that are structurally unsound or condemned; e. Buildings likely to be sold as evidenced by position in the market and refinancing cycle;
f. Buildings under a legal cloud or importuned by illegal activity; g. Property under single ownership, including closely held affiliates that, in the aggregate, total more than 1,000 units receiving energy efficiency and/or Solar PV installations.
h. Buildings that have previously received LIWP-funded energy efficiency measures within the past four (4) years do not qualify for additional energy efficiency measures, with the exception of assessment for and installation of the following:
(i) Solar Water Heating
(ii) Solar PV
iv. Each building must be assessed for suitability before proposed energy efficiency and/or Solar PV installations occur.
v. Property owners are responsible for certifying participation in any additional energy efficiency upgrade programs that have resulted in modifications to the identified buildings within the project.
vi. All work performed must be in compliance with current and applicable provisions of the California Energy Commission Building Energy Efficiency Standards, Alterations under Title 24, Part 6, of the California Code of Regulations, California Home Energy Rating System (HERS) Program regulations. Standards within the current Uniform Building Code and local city and county codes should be adhered to. vii. Work provided to all covered pre-1978 buildings must be in compliance with current Environmental Protection Agency rules in 40 CFR 745 (Code of Federal Regulations), Lead-Based Paint Poisoning Prevention in Certain Residential Structures and the
EXHIBIT B – BUDGET AND SCHEDULE OF DELIVERABLES
Housing and Urban Development rules in 24 CFR 35, as applicable to energy efficiency installations.
viii. Solar Installation projects on multi-family residences must be invoiced based on itemized invoices of actual costs incurred as defined in Section 14. Invoicing.
Assessment, Certification, and Compliance Requirements for Single- and Multi-Family Residences
i. Energy efficiency measures must be replacements of inefficient measures and eligible per these Guidelines.
ii. Lead Entity must keep records of project assessments, certifications, and compliance.
Lead Entity may refer to the Department of Community Services and Development’s (CSD) Low-Income Weatherization Program (LIWP) standards and forms for examples of information to collect and record retention. Information collected must include, but is not limited to:
a. Intake forms with information including, but not limited to household income, household members, eligibility, and energy service currently used; b. Property owner consent to receive energy efficiency and/or Solar PV installations; c. Property owner certification to comply with Single-Family Residence and Multi- Family Residence requirements outlined above;
d. Confirmation that property owner has been informed of potential hazardous materials exposure during energy efficiency and/or Solar PV installations, as such hazards are identified;
e. Documentation that a building assessment has been completed (pre-and-post project completion).
f. Property owner confirmation that proposed energy efficiency and/or Solar PV installations were received and installed properly;
g. Documentation showing why energy efficiency and/or Solar PV installations were deferred or denied, as applicable;
h. Documentation of compliance with the Department of Public Health’s Renovation, Repair, and Painting Rule (RRP) (40 Code of Federal Regulations 745), as applicable;
i. Documentation of trainings taken by certified renovators (per RRP), as applicable; and
j. Documentation that property owner has signed the California Solar Consumer Protection Guide (https://www.cpuc.ca.gov/solarguide/) prior to installation, as applicable to interconnection of residential solar customers in the investor-owned utility service areas of Pacific Gas and Electric Company (PG&E), Southern California Edison (SCE), and San Diego Gas & Electric (SDG&E).
Operations and Maintenance for both Single- and Multi-Family Residences i. The Lead Entity is responsible for providing verbal and written instructions for each installation to the property owner describing proper operation, maintenance requirements, system components, warranty information, programming of controls, and safety considerations, as applicable. This must occur prior to project completion.
All work must be in accordance with the CSD LIWP Measure Standards. System
EXHIBIT B – BUDGET AND SCHEDULE OF DELIVERABLES
sizing should be in accordance with the TCC Round 4 Guidelines, which may be updated to provide greater flexibility for system size requirements. ii. The Lead Entity must establish and maintain policies and procedures for handling complaints in accordance with the CSD LIWP Measure Standards. a. The policies and procedures shall be in writing and shall be provided to interested individuals upon request. Complaints may include, but are not limited to, equipment failure during the warranty period, and incorrect installation of equipment. The Lead Entity should retain records of all complaints, and how they were resolved, in the event of an audit.
Deferral Policy for both Single- and Multi-Family Residences i. Conditions may exist which cannot be mitigated because corrections exceed the scope of this program or cannot be achieved in a cost-effective manner. In these instances, contractors shall install feasible measures and, as applicable, refer the property owner to other agencies/programs for additional assistance. Once conditions have been corrected, installations for which the property qualifies may be installed. Presence of any of the conditions below shall require deferral of all installation activities:
a. Mechanical, electrical, or plumbing system is in such disrepair that failure is imminent.
b. An environmental condition exists that endangers the occupants or contractor workers. (Example: standing water/sewage, mold, friable asbestos, etc.). c. Evidence of significant infestation of rodents, insects, and/or other vermin is present.
d. Moisture conditions within the building are severe and infiltration reduction measures are not feasible.
e. Building is condemned, is under remodeling or rehabilitation, or has structural issues.
f. Building has unsafe air quality. (Examples: sewage, significant animal feces in the building, improperly stored chemicals, combustible materials, or other fire hazards present a danger to the occupants or workers, etc.)
g. Building is pre-1978 construction and paint is seriously degraded and/or damaged, creating a hazardous condition with paint chips or dust. h. Manufactured housing registration is not current or in good standing, and a Department of Housing and Community Development permit will not be granted. i. Occupant has a known health condition/s that would be made worse by installation activities.
j. Maintenance or housekeeping practices limit access of workers to the property for diagnostics or services.
k. Property owner refusal of combustion appliance safety (CAS) testing l. Hazardous combustion appliance conditions that cannot be remedied through repair or replacement.
EXHIBIT B – BUDGET AND SCHEDULE OF DELIVERABLES
m. Property owner is uncooperative, abusive, or threatening to installation personnel. n. Illegal activities are taking place in the property. ii. A contractor may need to defer some or all services when unsafe conditions require repairs or replacements that exceed the scope or funding of this program (known as a limited deferral). When this occurs, the contractor shall provide written and photographic documentation of the condition. Once conditions have been corrected, measures for which the property qualifies may be installed.
End-of-Life Notification Policy for Third-Party Ownership Agreements i. Lead Entity must make a good faith effort to ensure notifications and instructions on the end-of-life options are provided to the property owner via multiple communication channels. Lead Entity and third-party ownership (TPO) subcontractors shall not automatically renew the solar installation agreement or charge automatic payments to homeowners until this good faith effort to notify property owners has been completed according to the plan outlined below:
a. Lead Entity must notify the property owner using at least two different forms of communication, such as email, telephone, and/or a written letter. The chosen communication forms will be dependent on availability of contact information and communication preferences of the client, including language preferences or any necessary accommodations. Lead Entity must ensure the notification process starts at least 60 calendar days prior to the end of the solar installation agreement which provides and allows for free repairs, insurance, and warranties during a specific agreement term (e.g., 20 to 25 years), at the end of which the ownership turns over to the TPO entity.
b. If contact is not established with the property owner through the process identified above within 30 calendar days prior to the expiration of initial solar installation agreement term, Lead Entity must attempt to make contact in-person with the property owner. Notification in-person will consist of either one visit to the home with a written notification left at the home if contact isn’t made with the property owner, or, a notification via certified mail requiring a signature from the property owner. Lead Entity will make a good faith effort to carry out more than one attempt of in-person notification.
c. If, after Lead Entity has taken all of the above-required actions and the property owner has not responded or is unable to be found or contacted, the property owner's solar agreement shall be automatically renewed in accordance with the original solar installation agreement and the property owner shall continue to be subject to all of the terms and conditions of that agreement. ii. In the event of a change in ownership, the original solar installation agreement signed by the homeowner should be made available to any future owner of the home through the real estate disclosures and transfer process.
For the Contract between the City of
Richmond and
EXHIBIT B
PAYMENT PROVISIONS
{PLEASE NOTE THAT THE CITY OF RICHMOND SHALL NOT PAY FOR SERVICES
THAT EXCEED THE CONTRACT PA YMENT LIMIT UNLESS A CONTRACT
AMENDMENT HAS BEEN APPROVED BY THE CITY COUNCIL OR THE CITY MANAGER}
1. Provided Contractor is not in default under this Contract, Contractor shall be compensated as provided below.
2. Any and all payments made pursuant to this Contract shall be subject to the Contract Payment Limit. The Payment Limit includes expenses (phones, photo copying, meals and travel etc). Invoices, shall be adequately detailed, based on accurate records, and be in a form reasonably satisfactory to the City. Contractor may be required to provide back-up material upon request.
3. Contractor shall submit timely invoices to the following address:
Attention: City of Richmond, Finance Department - Accounts Payable Project Manager: Department:
PO Box 4046
Richmond, CA 94804-0046
4. All invoices that are submitted by Contra ctor shall be subject to the approval of the City’s Project Manager, before payments shall be authorized.
5. The City will pay invoice(s) within 45 days a fter completion of services to the City’s satisfaction. The City shall not pay late fees or interest.
6. A Richmond business license shall be obtained before any payment under this Contract shall be authorized and the business license must be kept current during the term of this Contract for payments to continue to be authorized.
7. All insurance coverage required by this Contract shall be provided by the Contractor before this Contract shall be executed by the City. The insurance coverage must be kept current during the term of this Contract for payments to continue to be authorized.
For the Contract between the City of
Richmond and
EXHIBIT C
AUTHORIZED REPRESENTATIVES AND NOTICES
1. Notices
. All notices, demands, statements, or communications provided for by this Contract shall be in writing and may be delivered by deposit in the United States mail, postage prepaid. Notices to the City shall be addressed to the Department Head and (as delineated below in section 1.1) to the project manager responsible for the administration of or the supervision of the scope of work under this Contract. Notices to the Contractor shall be addressed to the party designated by Contractor (as delineated below in section 1.2). Notice shall be deemed delivered (a) upon personal delivery; (b) as of the fifth business day after mailing by United States certified mail, postage prepaid, addressed to the proper party; or (c) as of 12:00 p.m. on the second business day immediately after the day it is deposited with and accepted by Federal Express, or a similar overnight courier service, addressed to the proper party and marked for next business day morning delivery. For the purposes of this Contract, a "business day" means any day Monday through Friday that is not a holiday recognized by the federal government or the State of California.
1. 1 CITY hereby designates as its Authorized Representative the Project Manager whose name and address are as follows:
City of Richmond
Richmond, CA 94804-0046
1. 2 CONTRACTOR hereby designates as its Authorized Representative the Project Manager whose name and address are as follows:
General Conditions/EJ/TE 01-19-11 1 of 13
EXHIBIT D
GENERAL CONDITIONS
1. Independent Contractor . Contractor acknowledges, represents and warrants that Contractor is not a regular or temporary employee, joint venturer or partner of the City, but rather an independent Contractor. This Contract shall not be construed to create an agency, servant, employee, partnership, or joint venture relationship. As an independent Contractor, Contractor shall have no authority to bind City to any obligation or to act as City's agent except as expressly provided herein. Due to the independent Contractor relationship created by this Contract, City shall not withhold state or federal income taxes, the reporting of which shall be Contractor's sole responsibility.
2. Brokers . Contractor acknowledges, represents and warrants that Contractor has not hired, retained or agreed to pay any entity or person any fee, commission, percentage, gift, or any other consideration, contingent upon or resulting from the award or making of this Contract.
3. City Property . The rights to applicable plans, drawings, reports, calculations, data, specifications, videos, graphics or other materials prepared for or obtained pursuant to this Contract, which, upon request, are to be delivered to City within a reasonable time, shall be deemed assigned to City. If applicable, Contractor shall prepare check prints upon request. Notwithstanding the foregoing, Contractor shall not be obligated to provide to City proprietary software or data which Contractor has developed or had developed for Contractor's own use; provided, however, that Contractor shall, pursuant to Section 15 below, indemnify, defend and hold harmless City from and against any discovery or Public Records Act request seeking the disclosure of such proprietary software or data.
4. Patents, Trademarks, C opyrights and Rights in Data
. Contractor shall not
publish or transfer any materials, discoveries, developments, concepts, designs, ideas, know how, improvements, inventions and/or original works of authorship resulting from activities supported by this Contract without the express prior written consent of the City Manager. If anything resulting from activities supported by this Contract is patentable, trademarkable, copyrightable or otherwise legally protectable, City reserves the exclusive right to seek such intellectual property rights. Notwithstanding the foregoing, Contractor may, after receiving City's prior written consent, seek patent, trademark, copyright or other intellectual property rights on anything resulting from activities supported by this Contract. However, City reserves, and Contractor irrevocably grants, a nonexclusive, fully paid-up, royalty-free, assumable, perpetual, worldwide license, with the right to transfer, sublicense, practice and exploit said license and the right to make, have made, copy, modify, make derivative works of, use, sell, General Conditions/EJ/TE 01-19-11 2 of 13
import, and otherwise distribute under all applicable intellectual properties without restriction of any kind said license.
Contractor further agrees to assist City, at City's expense, in every proper way to secure the City’s rights in any patents, trademarks, copyrights or other intellectual property rights relating thereto, including the disclosure to City of all pertinent information and data with respect thereto. Contractor shall also assist City in the execution of all applications, specifications, oaths, assignments, recordations, and all other instruments which City shall deem necessary in order to apply for, obtain, maintain and transfer such rights, or if not transferable, to waive such rights. Contractor shall further assist City in the execution of all applications, specifications, oaths, assignments, recordations and all other instruments which City shall deem necessary in order to assign and convey to City, and any assigns and nominees the sole and exclusive right, title and interest in and to any patents, trademarks, copyrights or other intellectual property rights relating thereto. Contractor further agrees that its obligation to execute or cause to be executed, when it is in Contractor's power to do so, any such instruments or papers shall continue during and at all times after the end of Contractor's services and until the expiration of the last such intellectual property right. Contractor hereby irrevocably designates and appoints City, and its duly authorized officers, agents and servants, as its agent and attorney-in-fact, to act for and in its behalf and stead to execute and file any such applications and to do all other lawfully permitted acts to further the application for, prosecution, issuance, maintenance or transfer of letters of patents, copyright and other registrations. This power of attorney is coupled with an interest and shall not be affected by Contractor's subsequent incapacity.
5. Inspection
. Contractor's performance, place of business and records pertaining to this Contract are subject to monitoring, inspection, review and audit by authorized representatives of the CITY, the State of California, and the United States Government.
If the project or services set forth in Exhibit A shall be performed on City or other public property, City shall have the right to inspect such work without notice. If such project or services shall not be performed on City or other public property, City shall have the right to inspect such work upon reasonable notice.
6. Services
. The project or services set forth in Exhibit A shall be performed to the full satisfaction and approval of City. In the event that the project or services set forth in Exhibit A are also itemized by price, City, in its sole discretion, may, upon notice to Contractor, delete certain items or services set forth in Exhibit A, in which case there shall be a corresponding reduction in the amount of compensation paid to Contractor.
General Conditions/EJ/TE 01-19-11 3 of 13
Contractor shall, at its own cost and expense, furnish all facilities and equipment necessary for Contractor to complete the project or perform the services required herein, unless otherwise provided in Exhibit A.
7. Records
. Contractor shall keep and make available for inspection and copying by authorized representatives of the City, the State of California, and the United States Government, the Contractor's regular business records and such additional records pertaining to this Contract as may be required by the City.
Contractor shall retain all documents pertaining to this Contract for a period of five (5) years after this C ontract's termination (or for any further period that is required by law) and until all Fede ral or State audits are complete and exceptions resolved for this contract's funding period. Upon request, CONTRACTOR shall make thes e records available to authorized representatives of the CITY, the State of California, and the United States Government.
Contractor shall keep full and detailed accounts, maintain records, and exercise such controls as may be necessary for proper financial management under this Contract. The Contractor’s accounting and control systems shall be satisfactory to City. Contractor's accounting systems shall conform to generally accepted accounting principles and all records shall provide a breakdown of total costs charged under this Contract, including properly executed payrolls, time records, utility bills, invoices and vouchers. The City shall be afforded prompt access to Contractor's records, books, and Contractor shall preserve such project records for a period of at least five (5 years after the termination of this Contract , or for such longer period as may be required by law.
Contractor shall permit City and its authorized representatives and accountants to inspect, examine and copy Contractor's books, records, accounts, correspondence, instructions, drawings, receipts, subcontracts, purchase orders, vouchers, memoranda and other data relating to the project or services set forth in Exhibit A, and any and all data relevant to this Contract at any reasonable time for the purpose of auditing and verifying statements, invoices, or bills submitted by Contractor pursuant to this Contract and shall provide such assistance as may be reasonably required in the course of such inspection. Contractor shall also allow City access to the record keeping and accounting personnel of Contractor.
City further reserves the right to examine and re-examine said books, records, accounts, and data during the five (5 year period following the termination of this Contract; and Contractor shall in no event dispose of, destroy, alter, or mutilate said books, records, accounts, and data in any manner whatever for five (5 years after the termination of this Contract.
General Conditions/EJ/TE 01-19-11 4 of 13
Pursuant to California Government Code § 10527, the parties to this Contract shall be subject to the examination and audit of representatives of the Auditor General of the State of California for a period of three (3) years after final payment under this Contract. The examination and audit shall be confined to those matters connected with the performance of this Contract including, but not limited to, the cost of administering this Contract.
8. Changes and Extra Work . All changes and/or extra work under this Contract shall be performed and paid for in accordance with the following:
Only the City Council or the City Manager may authorize extra and/or changed work. Contractor expressly recognizes that other City personnel are without authorization to either order extra and/or changed work or waive contract requirements. Failure of Contractor to secure the authorization for such extra and/or changed work shall constitute a waiver of any and all right to adjustment in contract price due to such unauthorized work and Contractor thereafter shall be entitled to no compensation whatsoever for performance of such extra and/or changed work.
If Contractor is of the opinion that any work which Contractor has been directed to perform is beyond the scope of this Contract and constitutes extra work, Contractor shall promptly notify City of the fact. The City shall make a determination as to whether or not such work is, in fact, beyond the scope of this Contract and constitutes extra work. In the event that City determines that such work does constitute extra work, City shall provide extra compensation to Contractor on a fair and equitable basis. A change order or Contract Amendment providing for such compensation for extra work shall be negotiated between City and Contractor and executed by Contractor and the appropriate City official.
In the event City determines that such work does not constitute extra work, Contractor shall not be paid extra compensation above that provided herein and if such determination is made by City staff, said determination may be appealed to the City Council; provided, however, a written appeal must be submitted to the City Manager within five (5) days after the staff's determination is sent to Contractor. Said written appeal shall include a description of each and every ground upon which Contractor challenges the staff's determination.
9. Additional Assistance
. If this Contract requires Contractor to prepare
plans and specifications, Contractor shall provide assistance as necessary to resolve any questions regarding such plans and specifications that may arise during the period of advertising for bids, and Contractor shall issue General Conditions/EJ/TE 01-19-11 5 of 13
any necessary addenda to the plans and specifications as requested. In the event Contractor is of the opinion that City's requests for addenda and assistance is outside the scope of normal services, the parties shall proceed in accordance with the changes and extra work provisions of Section 8 of these General Conditions.
10. Professional Ability. Contractor acknowledges, represents and warrants that Contractor and its employees are skilled and able to competently provide the services hereunder, and possess all professional licenses, certifications, and approvals necessary to engage in their occupations.
City has relied upon the professional ability and training of Contractor as a material inducement to enter into this Contract. Contractor shall perform in accordance with generally accepted professional practices and standards of Contractor's profession. In the event that City, in its sole discretion, desires the removal of any person employed or retained by Contractor to perform services hereunder, such person shall be removed immediately upon receiving notice from City.
11. Business License
. Contractor shall obtain a Richmond Business License
before performing any services required under this Contract. The failure to so obtain such license shall be a material breach of this Contract and grounds for immediate termination by City; provided, however, that City may waive the business license requirement in writing under unusual or extraordinary circumstances without necessitating any modification of this Contract to reflect such waiver.
12. Termination Without Default. Notwithstanding any provision herein to the contrary, City may, in its sole and absolute discretion and without cause, terminate this Contract at any time prior to completion by Contractor of the project or services hereunder, immediately upon written notice to Contractor. Contractor may terminate this Contract at any time in its sole and absolute discretion and without cause upon 30 days' written notice to City. In the event of termination by either party, Contractor shall be compensated for: (1) all authorized work satisfactorily performed prior to the effective date of termination; (2) necessary materials or services of others ordered by Contractor for this Contract, prior to receipt of notice of termination, irrespective of whether such materials or services of others have actually been delivered, provided that Contractor is not able to cancel such orders. Compensation for Contractor in such event shall be determined by City in accordance with the percentage of the project or services completed by Contractor; and all of Contractor's finished or unfinished work product through the time of the City's last payment shall be transferred and assigned to City. Additionally, in the event of such termination, the City may proceed with the work in any reasonable manner it chooses.
General Conditions/EJ/TE 01-19-11 6 of 13
13. Termination in the Event of Default. Should Contractor fail to perform any of its obligations hereunder, within the time and in the manner provided or otherwise violate any of the terms of this Contract, City may immediately terminate this Contract by giving written notice of such termination, stating the reasons for such termination. Contractor shall be compensated as provided in Section 12 of these General Conditions; provided, however, there shall be deducted from such amount the amount of damage, including attorney's fees, expert witness fees and costs, if any, sustained by City by virtue of Contractor's breach of this Contract. Additionally, in the event of such termination, the City may proceed with the work in any reasonable manner it chooses.
14. Conflict of Interest. Contractor acknowledges, represents and warrants that Contractor shall avoid all conflicts of interest (as defined under any federal, state or local statute, rule or regulation, or at common law) with respect to this Contract. Contractor further acknowledges, represents and warrants that no City official or employee has any economic interest, as defined in Title 2, California Code of Regulations §§ 18703.1 through 18703.5, with Contractor that would invalidate this Contract. Contractor acknowledges that in the event that Contractor shall be found by any judicial or administrative body to have any conflict of interest (as defined above) with respect to this Contract, all consideration received under this Contract shall be forfeited and returned to City forthwith. This provision shall survive the termination of this Contract for one (1) year.
15. Indemnification.
(a) If this Contract is a contract for design professional services subject to California Civil Code Section 2782.8(a) and Contractor is a design professional, as defined in California Civil Code Section 2782.8(b)(2), Contractor shall hold harmless, defend and indemnify the City, its officers, agents, employees, and volunteers from and against any and all claims, damages, losses, and expenses including attorneys’ fees arising out of, or pertaining to, or relating to the negligence, recklessness, or willful misconduct of the Contractor, except where caused by the active negligence, sole negligence, or willful misconduct of the City. To the fullest extent permitted by law, Contractor shall immediately defend and indemnify the City and its officers, agents, employees, and volunteers from and against any and all liabilities, regardless of nature or type, that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor, or its employees, agents, or subcontractors.
Liabilities subject to the duties to defend and indemnify include, without limitation, any and all claims, losses, damages, penalties, fines, and judgments; associated investigation and administrative expenses; defense costs, including but not limited to reasonable attorneys’ fees; court costs; and costs of alternative dispute resolution. Contractor’s obligation to General Conditions/EJ/TE 01-19-11 7 of 13
indemnify applies unless it is finally adjudicated that the liability was caused by the sole active negligence or sole willful misconduct of an indemnified party.
(b) If this Contract is not a contract for design professional services subject to California Civil Code Section 2782.8(a) or Contractor is not a design professional as defined in California Civil Code Section 2782.8(b)(2), Contractor shall indemnify, defend, and hold harmless the City, its officers, agents, employees and volunteers from any and all claims, suits, or actions of every name, kind and description, brought forth on account of injuries to or death of any person or damage to property arising from or connected with the willful misconduct, negligent acts, errors or omissions, ultra-hazardous activities, activities giving rise to strict liability, or defects in design by Contractor or any person directly or indirectly employed by, or acting as, the agent for Contractor in the performance of this Contract, including the concurrent or successive passive negligence of the City, its officers, agents, employees or volunteers.
(c) It is understood that the duty of Contractor to indemnify and hold harmless includes the duty to defend as set forth in Section 2778 of the California Civil Code. Contractor shall be obligated to defend, in all legal, equitable, administrative, or special proceedings, with counsel approved by the City, the City and its officers, agents, employees, and volunteers, immediately upon tender to Contractor of the claim in any form or at any stage of an action or proceeding, whether or not liability is established. An allegation or determination that persons other than Contractor are responsible for the claim does not relieve Contractor from its separate and distinct obligation to defend under this Section 15. The obligation to defend extends through final judgment, including exhaustion of any appeals. The defense obligation includes an obligation to provide independent counsel if Contractor asserts that liability is caused in whole, or in part, by the negligence or willful misconduct of an indemnified party. (d) The review, acceptance or approval of the Contractor’s work or work product by any indemnified party shall not affect, relieve or reduce the Contractor’s indemnification or defense obligations. This Section 15 survives completion of the services or the termination of this Contract.
The provisions of this Section 15 are not limited by, and do not affect, the provisions of this Contract relating to insurance.
(e) Acceptance of insurance certificates and endorsements required under this Contract does not relieve Contractor from liability under this Section
15. This Section 15 shall apply whether or not such insurance policies are determined to be applicable to any such damages or claims for damages.
16. Safety
. Contractor acknowledges that the City is committed to the highest standards of workplace safety. Contractor shall perform all work hereunder in full compliance with applicable local, state and federal safety requirements including but not limited to Occupational Safety and Health Administration requirements, and shall assume sole and complete General Conditions/EJ/TE 01-19-11 8 of 13
responsibility for the safety of Contractor's employees and any subContractor's employees. If a death, serious personal injury or substantial property damage occurs in connection with the performance of this Contract, Contractor shall immediately notify the City by telephone.
17. Insurance. Insurance requirements are set forth in Exhibit F to this Contract. Contractor shall abide by the insurance requirements set forth in said Exhibit F.
18. Non-Liability of Officials and Employees of the City. No official or employee of the City shall be personally liable for any default or liability under this Contract.
19. Compliance with Laws. Contractor shall comply with all federal, state and local laws, statutes, ordinances, rules and regulations, and the orders and decrees of any courts or administrative bodies or tribunals, with respect to this Contract, including without limitation environmental laws, employment discrimination laws and prevailing wage laws. Compliance under this provision includes compliance with all provisions of the Richmond Municipal Code ("Municipal Code"), including Chapters 2.50, 2.52, 2.56, and 2.60, if applicable.
Contractor acknowledges that under § 2.60.070 of the Municipal Code ("Living Wage Ordinance"), Contractor shall promptly provide to City documents and information verifying its compliance with the Living Wage Ordinance. Also as prescribed in § 2.60.070, Contractor shall notify each of its affected employees with regards to the wages that are required to be paid pursuant to the Living Wage Ordinance.
Contractor shall comply with § 2.28.030 of the Municipal Code, obligating every Contractor or subcontractor under a contract or subcontract with the City for public work or for goods or for services to refrain from discriminatory employment or subcontracting practices on the basis of race, color, sex, sexual orientation, religious creed, national origin or ancestry of any employee, any applicant for employment or any potential subcontractor.
Contractor acknowledges that the City’s Drug Free Workplace Policy, Violence in the Workplace Policy and the Policy Against Workplace Harassment, are available on the City’s website at
http://www.ci.richmond.ca.us/workplacepolicies
. Contractor agrees to
abide by the terms and conditions of said policies.
20. Limitations upon Subcontracting and Assignment. This Contract binds the heirs, successors, assigns and representatives of Contractor. The Contractor shall not enter into subcontracts for any work contemplated General Conditions/EJ/TE 01-19-11 9 of 13
under this Contract and shall not assign this Contract, nor any portion hereof or monies due or to become due, without the prior written consent of the City Council or its designee.
Contractor acknowledges that the services which Contractor shall provide under this Contract are unique, personal services which, except as otherwise provided herein, Contractor shall not assign or sublet to any other party without the prior written approval of City, which approval may be withheld in City's sole and absolute discretion. In the event that City, in writing, approves any assignment or subletting of this Contract or the retention of subcontractors by Contractor, Contractor shall provide to City upon request copies of each and every subcontract contract prior to the execution thereof by Contractor and subcontractor. Any assignment by Contractor of any or all of its rights under this Contract without first obtaining City's prior written consent shall be a default under this Contract.
The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Contractor (if applicable), or of the interest of any general partner or joint venturer or syndicate member if Contractor is a partnership or joint-venture or syndicate, which shall result in a change of control of Contractor, shall be deemed an assignment. For this purpose, control shall mean fifty percent or more of the voting power or twenty-five percent or more of the assets of the corporation, partnership or joint-venture.
21. Integration
. This Contract constitutes the entire agreement between the parties concerning the subject matter hereof and supersedes any previous oral or written agreement; provided, however, that correspondence or documents exchanged between Contractor and City may be used to assist in the interpretation of the Exhibits to this Contract.
22. Modifications and Amendments. This Contract may be modified or amended only by a change order or Contract Amendment executed by both parties and approved as to form by the City Attorney.
23. Conflicting Provisions. In the event of a conflict between these General Conditions and those of any Exhibit or attachment hereto, these General Conditions shall prevail; provided, however, that any Special Conditions as set forth in Exhibit E shall prevail over these General Conditions. In the event of a conflict between the terms and conditions of any two or more Exhibits or attachments hereto, those prepared by City shall prevail over those prepared by the Contractor, and the terms and conditions preferred by the City shall prevail over those preferred by the Contractor.
24. Non-exclusivity. Notwithstanding any provision herein to the contrary, the services provided by Contractor hereunder shall be non-exclusive, and General Conditions/EJ/TE 01-19-11 10 of 13
City reserves the right to employ other Contractors in connection with the project.
25. Exhibits. All Exhibits hereto are made a part hereof and incorporated herein by reference; provided, however, that any language in Exhibit A which does not pertain to the project description, proposal, scope of services, or method of compensation (as applicable) , or any corresponding responsibilities of City, shall be deemed extraneous to, and not a part of, this Contract.
26. Force Majeure. Neither party hereto shall be considered in default in the performance of its obligations hereunder to the extent that the performance of such an obligation is prevented or delayed by reason of acts of God, strikes, boycotts, lock-outs, inability to procure materials not related to the price thereof, failure of power, restrictive governmental laws and regulations enacted after the date of this Contract, riots, civil unrest, acts of terrorism, insurrection, war, declaration of a state or national emergency or other reasons of a like nature not within the reasonable control of such party.
27. Time of the Essence. Time is of the essence of this Contract. Contractor and City agree that any time period set forth in Exhibit A represents their best estimates with respect to completion dates and both Contractor and City acknowledge that departures from the schedule may occur.
Therefore, both Contractor and City will use reasonable efforts to notify one another of changes to the schedule. Contractor shall not be responsible for performance delays caused by others, or delays beyond Contractor's control, and such delays shall extend the times for performance of Contractor's work.
28. Confidentiality. Contractor agrees to comply with, and to require its employees, agents and partners to comply with, all applicable State or Federal statutes or regulations respecting confidentially, including but not limited to, the identity of persons served under this Contract, their records, or services provided them, and assures that:
All applications and records concerning any individual made or kept by Contractor or any public officer or agency in connection with the administration of or relating to services provided under this Contract will be confidential, and will not be open to examination for any purposes not directly connected with the administration of such service.
No person will publish or disclose or permit or cause to be published or disclosed, any list of persons receiving services, except as may be required in the administration of such service.
General Conditions/EJ/TE 01-19-11 11 of 13
29. Third Parties. Nothing herein shall be interpreted as creating any rights or benefits in any third parties. For purposes hereof, transferees or assignees as permitted under this Contract shall not be considered "third parties."
30. Governing Law. This Contract shall be construed in accordance with the law of the State of California without regard to principles of conflicts of law.
This Contract is made in Contra Costa County, California, and any action relating to this Contract shall be instituted and prosecuted in the courts of Contra Costa County, California.
31. Nonrenewal. Contractor understands and agrees that there is no representation, implication, or understanding that the services provided by Contractor under this Contract will be purchased or renewed by the City under a new contract following expiration or termination of this Contract, and waives all rights or claims to notice or hearing respecting any failure by City to continue the purchase of all or any failure to continue purchase of all or any such services from Contractor.
32. Claims. Any claim by Contractor against City hereunder shall be subject to Government Code §§ 800 et seq. The claims presentation provisions of said Act are hereby modified such that the presentation of all claims hereunder to the City shall be waived if not made within six months after accrual of the cause of action.
33. Interpretation. This Contract shall be interpreted as if drafted by both parties.
34. Warranty. In the event that any product shall be provided to the City as part of this Contract, Contractor warrants as follows: Contractor possesses good title to the product and the right to transfer the product to City; the product shall be delivered to the City free from any security interest or other lien; the product meets any specifications contained herein; the product shall be free from material defects in materials and workmanship under normal use for a period of one (1) year from the date of delivery; and the product shall be fit for its intended purpose(s). Notwithstanding the foregoing, consumable and maintenance items (such as light bulbs and batteries) shall be warranted for a period of one hundred and eighty (180) days from the date of delivery. All repairs during the warranty period shall be promptly performed by Contractor, at Contractor's expense, including shipping.
35. Severability. In the event that any of the provisions or portions or applications thereof of this Contract are held to be unenforceable or invalid by any court of competent jurisdiction, City and Contractor shall negotiate an equitable adjustment in the provisions of the Contract with a view General Conditions/EJ/TE 01-19-11 12 of 13
toward effecting the purpose of this Contract, and the validity and enforceability of the remaining provisions or portions or applications thereof, shall not be affected thereby.
36. Authority. City warrants and represents that the signatory hereto (the Mayor of the City of Richmond or the City Manager) is duly authorized to enter into and execute this Contract on behalf of City. The party signing on behalf of Contractor warrants and represents that he or she is duly authorized to enter into and execute this Contract on behalf of Contractor, and shall be personally liable to City if he or she is not duly authorized to enter into and execute this Contract on behalf of Contractor.
37. Waiver. The waiver by City of any breach of any term or provision of this Contract shall not be construed as a waiver of any subsequent breach.
Inspections or approvals, or statements by any officer, agent or employee of the City relating to the Contractor’s performance, or payments therefore, or any combination of these acts, shall not relieve the Contractor’s obligation to fulfill this Contract as prescribed; nor shall the City be thereby stopped from bringing any action for damages or enforcement arising from any failure to comply with any of the terms and conditions of this Contract.
38. Possessory Interest. If this Contract results in the Contractor having possession of, claim to or right to the possession of land or improvements, but does not vest ownership of the land or improvements in the same person, or if this Contract results in the placement of taxable improvements on tax exempt land (Revenue and Taxation Code 107), such interest or improvements may represent a possessory interest subject to property tax, and Contractor may be subject to the payment of property taxes levied on such interest.
39. Performance and Final Acceptance.
Contractor represents that it is experienced, qualified, registered, licensed, equipped, organized and financed to perform the services under this Contract.
Contractor shall perform the services under this Contract with that degree of skill and judgment normally exercised by professional firms performing services of a similar nature in the State of California, and shall be responsible for the professional quality, technical accuracy and coordination of the services it performs under this Contract. In addition to the other rights and remedies which City may have, Contractor shall, at its own expense, correct any services which fail to meet the above standard.
General Conditions/EJ/TE 01-19-11 13 of 13
City shall provide Contractor an opportunity to cure errors and omission which may be disclosed during the review of submittals, with no increase in the authorized Contract Payment Limit. Should Contractor fail to make necessary corrections in a timely manner, such corrections shall be made by the City and the cost thereof shall be charged to Contractor.
If warranted, City shall determine, and Contractor may request such determination, that Contractor has satisfactorily completed performance of this Contract. Upon such determination, City shall issue to Contractor a written Notice of Final Acceptance, after which Contractor shall not incur further costs under this Contract. Contractor shall respond to such Notice of Final Acceptance by executing and submitting to City a Release and Certificate of Final Payment.
40. Survival
. The rights and obligations of the parties which by their nature survive termination or completion of the services covered by this Contract shall remain in full force and effect after termination or completion.
For the Contract between the City of
Richmond and
EXHIBIT E
SPECIAL CONDITIONS
The General Conditions are hereby amended to include the following modifications and/or provisions (if applicable):
For the Contract between the City of
Richmond and
EXHIBIT F
INSURANCE PROVISIONS
During the entire term of this Contract and any extension or modification thereof, the CONTRACTOR shall keep in effect insurance policies meeting the insurance requirements specified in the insurance provisions which are attached hereto and incorporated herein by this reference.
___ Exhibit F
___ Section 8
City of Richmond - Insurance Requirements - Type 2:
Professional Services
Type 2 – Page 1 of 3
Revised: September 2011
In all instances where CONTRACTOR or its representatives will provide professional services (architects, engineers, construction management, counselors, medical professionals, hospitals, clinics, attorneys, consultants, accountants, etc.) to the City of Richmond (City), the City requires the following MINIMUM insurance requirements and limits.
CONTRACTOR shall procure and maintain for the duration of the contract, agreement, or other order for work, services or supplies, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder and the results of that work by the CONTRACTOR, its agents, representatives, employees or subcontractors. Maintenance of proper insurance coverage is a material element of the contract. Failure to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of contract.
CONTRACTOR agrees that in the event of loss due to any of the perils for which it has agreed to provide Commercial General Liability insurance, CONTRACTOR shall look solely to its insurance for recovery.
CONTRACTOR hereby grants to CITY, on behalf of any insurer providing Commercial General Liability insurance to either CONTRACTOR or CITY with respect to the services of CONSULTANT herein, a waiver of any right to subrogation which any such insurer of said CONTRACTOR may acquire against the CITY by virtue of the payment of any loss under such insurance.
Original, signed certificates and original, separate policy endorsements, naming the City as an additional insured for general liability coverage, as well as a waiver of subrogation for Workers’ Compensation insurance, shall be received and approved by the City before any work may begin. However, failure to do so shall not operate as a waiver of these insurance requirements.
City reserves the right to modify or require additional coverages for specific risk exposures depending on scope of CONTRACTORS work.
Minimum coverage is detailed below. The policy limits of coverage shall be made available to the full limits of the policy. The minimum limits stated herein shall not serve to reduce the policy limits of coverage of CONTRACTOR.
Minimum Scope of Insurance – the following forms shall be provided and coverage shall be at least as broad as the following:
1. Insurance Services Office Commercial General Liability coverage (ISO Occurrence Form CG 0001), and including coverage for bodily and personal injury, property damage, and products and completed operations (if applicable).
2. Insurance Services Office Automobile Liability coverage (ISO Form CA 0001, Code 1, Any Auto).
3. Original and Separate Additional Insured Endorsement for General Liability (ISO Form CG 20 10 11/85 or its equivalent) with primary and non-contributory language.
4. Workers’ Compensation Insurance as required by the State of California including Employer’s Liability coverage.
5. Original and Separate Waiver of Subrogation for Workers’ Compensation insurance.
6. Professional Liability or Errors & Omissions Liability Insurance appropriate to the CONTRACTOR’s profession (if required.)
Required Coverage Minimum Limits
Workers’ Compensation and
Employers’ Liability
Statutory limits as required by the State of California including $1 million Employers’ Liability per accident, per employee for bodily injury or disease.
If CONTRACTOR is self-insured, provide a certificate of Permission to Self- Insure, signed by the California Department of Industrial Relations and Self- Insurance. If contractor is a sole proprietor (has no employees) than contractor must sign “Contractor Release of Liability” found at:
http://www.ci.richmond.ca.us/index.aspx?nid=61.
General Liability
(primary and excess limits
combined)
$2,000,000 per occurrence for bodily injury, personal injury and property damage. If the policy includes a general aggregate, either the general aggregate shall apply separately to this project, service or location or the minimum required aggregate limit shall be twice the per occurrence limit ($4 million aggregate limit).
Policy shall be endorsed to name the City of Richmond as an additional insured per the conditions detailed below.
___ Exhibit F
___ Section 8
City of Richmond - Insurance Requirements - Type 2:
Professional Services
Type 2 – Page 2 of 3
Revised: September 2011
Automobile Liability $1,000,000 per occurrence for bodily injury and property damage.
PROJECT COST R EQUIRED LIMIT
$0 - $1 million $1 million p/o
$1 million - $5 million $2 million p/o
Over $5 million $5 million p/o
Professional Liability or Errors &
Omissions Liability –
Required for all professionals
including architects, engineers,
consultants, construction
management, counselors, medical
professionals, hospitals, clinics,
attorneys and accountants, & other
consultants as may be required by
the City.
Required Policy Conditions
Additional Insured Endorsement
Applicable to General Liability coverage.
The City of Richmond, its officers, officials, employees, agents and volunteers are to be named as additional insureds for all liability arising out of the operations by or on behalf of the named insured including bodily injury, deaths and property damage or destruction arising in any respect directly or indirectly in the performance of this contract.
ISO form CG 20 10 (11/85) or its equivalent is required. If the Contractor is supplying their product or providing a service then the endorsement must not
exclude products and completed operations
coverage. If it does, then CG 20 37 (10/01) is also required.
SAMPLE Endorsements can be found at
http://www.ci.richmond.ca.us/index.aspx?nid=61
.
Primary and Noncontributory The contractor’s insurance coverage must be primary coverage as it pertains to the City, its officers, officials, employees, agents and volunteers. Any insurance or self insurance maintained by the City is wholly separate from the insurance of the contractor and in no way relieves the contractor from its responsibility to provide insurance.
Waiver of Subrogation
Endorsement Form
Contractor’s insurer will provide a Waiver of Subrogation in favor of the City for Workers’ Compensation Insurance during the life of this contract.
SAMPLE Endorsements can be found at
http://www.ci.richmond.ca.us/index.aspx?nid=61.
Deductibles and Self-Insured
Retentions
Any deductible or self-insured retention must be declared to and approved by the City. At the option of the City either the insurer shall reduce or eliminate such deductibles or self-insured retention as respects the City or the CONTRACTOR shall procure a financial guarantee in an amount equal to the deductible or self-insured retention guaranteeing payment of losses and related investigations, claims administration and defense expenses.
Contractor is responsible for satisfaction of the deductible and/or self-insured retention for each loss.
A. M. Best Rating A:VII or Better. If the A.M. Best Rating falls below the required rating, CONTRACTOR must replace coverage immediately and provide notice to City.
Umbrella/Excess Liability Policies
If an Umbrella or Excess Liability Policy is used to meet the liability limits, coverage shall be as broad as specified for underlying coverage’s and cover those insured in the underlying policies.
___ Exhibit F
___ Section 8
City of Richmond - Insurance Requirements - Type 2:
Professional Services
Type 2 – Page 3 of 3
Revised: September 2011
Claims-Made Policies
If any insurance policy is written on a claims-made form: 1) the retroactive date must be shown, and must be before the date of the contract or the beginning of contract work. 2) Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work. 3) If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective date, the Contractor must purchase an extended period coverage for a minimum of five (5) years after completion of contract work.
Subcontractors
CONTRACTOR
shall include all subcontractors as insured under its policies or shall furnish to the City for review and approval, separate certificates and endorsements for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated herein.
CONTRACTOR agrees to defend and indemnify the City of Richmond for any damage resulting to it from failure of either CONTRACTOR or any subcontractor to take out or maintain the required insurance policies.
The fact that
insurance is obtained by CONTRACTOR, and/or CONTRACTOR’s subcontractors, will not be deemed to release or diminish the liability of CONTRACTOR, including, without limitation, liability under the indemnity provisions of this contract. Damages recoverable by CITY from CONTRACTOR or any third party will not be limited by the amount of the required insurance coverage.
Verification of Coverage
All original certificates and endorsements shall be received and approved by the City before work may begin .
The City of Richmond reserves the right to require complete, certified copies of all required insurance policies including endorsements affecting the coverage at any time.
Original insurance certificates and required policy endorsements shall be mailed or delivered to the Designated Project Manager for the City of Richmond.
Insurance certificates and endorsements may be faxed to the Designated Project Manger. However, CONTRACTOR must mail the original certificates and endorsements to Designated Project Manager once faxed.
Continuous Coverage
CONTRACTOR shall maintain the required insurance for the life of the contract. Should the CONTRACTOR cease to have insurance as required during this time, all work by the CONTRACTOR pursuant to this agreement shall cease until insurance acceptable to the City is provided. In the event that CONTRACTOR fails to comply with the City’s insurance requirements, the City may take such action as it deems necessary to protect the City’s interests. Such action may include but is not limited to termination of the contract, withholding of payments, or other actions as the City deems appropriate.
If services or the scope of work extend beyond the expiration dates of the required insurance policies initially approved by the City, CONTRACTOR must provide updated certificates and endorsements indicating that the required coverage, terms and conditions are still in place. Renewal certificates and updated endorsements shall be mailed to the Designated Project Manager.
Cancellation
CONTRACTOR shall ensure that coverage shall not be cancelled, reduced or otherwise materially changed except after thirty (30) days’ prior written notice has been given to the City.
Reporting Requirements
Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the City, its officers, officials, employees or volunteers.
Consistent with Public Policy
The insuring provisions, insofar as they may be judged to be against public policy shall be void and unenforceable only to the minimum extent necessary so that the remaining terms and provisions herein may be consistent with public policy and thus enforceable.
CITY OF RICHMOND
Sanctuary City Compliance Statement
The undersigned, an authorized agent of (hereafter
"Contractor"), has had an opportunity to review the requirements of City of Richmond Ordinance 12-18 (hereafter "Sanctuary City Contracting Ordinance" or “SCCO”). Contractor understands and agrees that the City may choose with whom it will maintain business relations and may refrain from contracting with any person or entity that provides Data Broker or Extreme Vetting services to the U.S. Immigration and Customs Enforcement Division of the United States Department of Homeland Security (“ICE”). Con tractor understands the meaning of the following terms used in the SCCO:
a. "Data Broker” means either of the following:
i. The collection of inform ation, including personal information about consumers, from a wide variety of sources for the purposes of reselling such information to their customers, which include both private-sector business and government agencies;
ii. The a ggregation of data that was collected for another purpose from that for which it is ultimately used.
b. “Extre me Vetting” means data mining, threat modeling, predictive risk analysis, or other similar services."
Contractor understands that it is not eligible to receive or retain a City contract if at the time the Contract is executed, or at any time during the term of the Contract, it provides Data Broker or Extreme Vetting services to ICE.
Contractor further understands and agrees that Contractor's failure to comply with the SCCO shall constitute a material default of the Contract and the City Manager may terminate the Contract and bar Contractor from bidding on future contracts with the City for five (5) years from the effective date of the contract termination.
By executing this Statement, Contractor certifies that it complies with the requirements of the SCCO and that if at any time during the term of the Contract it ceases to comply, Contractor will promptly notify the City Manager in writing.
Any person or entity who knowingly or willingly supplies false information in violation of the SCCO shall be guilty of a misdemeanor and subject to a $1,000 fine.
Based on the foregoing, the undersigned declares under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Execu ted this day of , 20 , at , C alifornia.
Printed Name: Title:
Signed: Date:
Business Entity:
Vendor SCCO Compliance Statement (Augt2020)
DocuSign Envelope ID: F1D32199-F50D-4E3F-BC3D-3140BF8A43BF Executive Director
8/31/2023
23 Arthur Bart-Williams
31st
Nonprofit Corporation
GRID Alternatives, Inc. Bay Area
August