ptember 27, 2023
Rob
ert Stevens email: [email protected]
Port of Richmond
Sub
ject: Port of Richmond Shore power
Dear Mr. Stevens:
We are pleased to submit our design only proposal for this project. The following identifies our scope of work and pricing.
I. SCOPE OF WORK
A.
ITEMS INCLUDED IN QUOTATION:
The
Contractor shall provide a complete design for the high voltage shore connection (HVSC) system. The design shall be in conformance to the IEC/IEEE CDV 80005-1 “Utility Connections in Port” as shown in the attached markup drawing. The design shall include the following components:
a. Connection to the Pacific Gas and Electric (PG&E) transformer or future equipment provided and installed by PG&E. This location shall be known as the service point.
b. Switch gear, fuses, and meter.
c. Transformer
d. Shore power equipment.
e. Cabling, conduits, pull boxes, and related appurtenances. f. Cable reel and vehicle.
Rosendin shall provide submittals to the Authority having Jurisdiction (AHJ) via the Client for review and approval. Rosendin will not advance to the next phase without approval from the Client and AHJ. This shall include the following phases:
a. Basis of design.
b. Draft Plans and Specifications.
c. Permit Plans and Specifications.
d. Final Plans and Specifications.
ex hibi t a-1
Port of Richmond Shore Power SJ231236
September 27, 2023
Rosendin Page 2 of 4
Building Quality | Building Value | Building People®
Rosendin will meet with the Client and AHJ on three (3) separate occasions as follows:
a. A kickoff meeting at the site to review conditions and discuss the overall objective.
b. A review meeting of the draft documents.
c. A review meeting to review permit comments.
Rosendin will provide Plans and related documents to the Client and AHJ to submit for Permit. Rosendin will assume at least one re-submittal to secure an electrical permit.
Upon completion of installation, Rosendin shall provide an as built of the installed components as well as all maintenance and operations documents.
B. ITEMS EXCLUDED FROM QUOTATION:
1. Procurement of equipment
2. Installation of equipment
3. Bond premiums.
4. Utility connection and usage fees.
5. All plan-check permit fees.
6. BIM and clash detection
7. Field painting.
8. Handling and disposal of hazardous materials
9. Fuel.
10. Off-site electrical work – Utility conduits & manholes, street lighting, traffic signals, etc.
11. Photovoltaic (PV).
12. Lightning protection.
13. Offsite parking.
14. Allowances unless specifically noted in this proposal.
15. Seismic Engineering calculations and wind calculations.
16. Any and all City of Richmond local, and SBE requirements
Port of Richmond Shore Power SJ231236
September 27, 2023
Rosendin Page 3 of 4
Building Quality | Building Value | Building People®
C. CLARIFICATIONS:
1. Rosendin will obtain the IEC/IEEE 80005-1:2019+AMD1:2022+AMD2:2023 as part of the above scope. Any requirements set forth by this document beyond what can be reasonably implied by said scope - will be extra.
2. All work will be performed on straight time.
3. We reserve the right to amend the electrical subcontract by mutual agreement by both parties.
4. Rosendin is not responsible for late adds or scope revisions by others that cause Rosendin to perform additional work.
5. Current OSHA and NFPA-70E (NEC) regulations do not permit us to perform work on energized electrical systems.
6. We will use the following wiring methods:
a) PVC 80 - underground MV conduits.
b) PVC 40 – Underground conduits.
c) EMT – branch & feeder conduits exposed not subject to vehicle damage. d) RGS or IMC – branch & feeder conduits exposed to vehicle damage. e) MV Cable – 15KV AL provided
7. Bus bars in switchboards & panels and transformer windings are aluminum.
8. The current market is experiencing a high level of volatility in pricing for materials, including quoted and commodity materials. Prices are fluctuating daily, and the availability of some materials is in question. Pricing is based on current market costs and does not reflect or include any forecasted or increased tariffs, escalation and/or additional contingency costs of any kind. Substantial changes in commodities and/or manufacturing costs may be subject to request additional costs. We will re-evaluate this cost at the time of award and advise of the impact at that time.
9. Due to the volatility of the commodity market and supply chain, our pricing is only good for 30 days, and we will require a written commitment so that Rosendin can provide the same written commitment to its suppliers to hold pricing.
10. Lead times are subject to the timing of the PO issue, PO released, manufacturer load, and capabilities and can be affected throughout the submittal process.
11. Permits are by others
12. Testing and Geotechnical services by others
13. Site water to be supplied by others
14. No dewatering of trenches is included
15. Existing asphalt assumed to be no greater than 4” in depth
16. No hard rock excavation
17. Soil offhaul based on clean soil
Port of Richmond Shore Power SJ231236
September 27, 2023
Rosendin Page 4 of 4
Building Quality | Building Value | Building People®
II. QUOTATION PRICING:
A. BASE BID:
Design : $ 120,000
TOTAL $ 120,000
B. ALLOWANCES (NOT INCLUDED IN BASEBID)
C. COST OF BONDS:
Provide 100% Payment and Performance Bonds,
if required ...................................................................... Included in Base bid 0.7%
Should you have any questions regarding this quotation, please feel free to contact Bryan Low /Estimator at 408-504-9134, or the undersigned.
Very truly yours,
Bryan Low
MPH 15 SLOW
MPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOW MPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOW MPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOW MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOW MPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOW MPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOW MPH 15 SLOW
MPH 15 SLOWMPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOWMPH 15 SLOW MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOWMPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW
MPH 15 SLOW MPH 15 SLOW
MPH 15 SLOWMPH 15 SLOW
MPH 15 SLOW
LEAD-AUTOMOTIVE
C18
C19
LOADING 7
S16C20
C21
LOADING 3
S17
C22
LOADING 5
S18
C23
LOADING 6
S19
LOADING 2
S20
C24
LOADING 4
S21
C25LOADING 1
C33
LEAD - INDUSTRY 2 (TO BP-ARCO)
C34
LEAD-INDUSTRY 2
SHAG ROADSHAG ROADSHAG ROAD
1234567891011121314151617181920212223242526272829303132333435363738394041424344454647484950515253 1234567891011121314151617181920212223242526272829303132333435363738394041424344454647484950515253 1234567891011121314151617181920212223242526272829303132333435363738394041424344454647484950515253 1234567891011121314151617181920212223242526272829303132333435363738394041424344454647484950515253 1920212223242526272829303132333435363738394041424344454647484950515253 151617181920212223242526272829303132333435363738394041424344454647484950515253 3738394041424344454647484950515253
212223242526272829303132333435363738394041424344454647484950515253 37383940414243444546474849
37383940414243444546474849
3738394041424344454647484950515253
3738394041424344454647484950515253
2324252627282930313233343536
123456789101112131415161718192021
123456789101112131415161718192021
1234567891011121314151617181920212223242526272829313233343536 123456789101112131415161718192021222324252627282931323334353637383940414243 37383941424340
12345678910111213141516171819202122232425262728293031323334353637383940414243444546 12345678910111213141516171819202122232425262728293031323334353637383940414243444546 12345678910111213141516
123456789101112123456789 1516
12345 1234567891011121314
1234567
891011121314
91011121314
12345678910111213141516
12345678910111213141516
13141516
6789
SHAG ROADSHAG ROADSHAG ROAD
SECURITY ANDOPERATION CENTER(APPROX. 5,200± SF)
CANAL BOULEVARD
POINT POTREROMARINE TERMINAL
BASIN 1BASIN 2BASIN 3BASIN 4BASIN 5
BCDC JURISDICTIONAL LIMIT
BCDC JURISDICTIONAL LIMIT
BCDC JURISDICTIONAL LIMIT
BCDC JURISDICTIONAL LIMIT
SANTA FE CHANNELSLOW
MPH 15 SLOW
MPH 15 SLOW
123
123
123
REVISIONS
NO. BYDATEDESCRIPTION34
DRAWN:DESIGNED:CHECKED:CSW|ST2CSW|ST2RCS
SHEET NO.COUNTY NO.NONE
DATE12.27.2022
RICHMOND
PORT OF RICHMOND
RCSPOINT POTRERO MARINE TERMINALSHORE POWER APPV'D12
APPROVED:
FILE NO.
JOB NO.SCALE
CALIFORNIA
NONE
E-1 210 WASHINGTON AVENUE SUITE GRICHMOND, CA 94801CONTRA COSTA
MARINAWAY S
MACDONALD AVERICHMONDPKWY
HALLAVE
FORD CHANNEL
CANAL BLVD
CUTTING BLVD
W. OHIO AVE.I-580
HARBOUR WAY
CASTRO ST
CLIFFDORNAN DR
WHARFST
SEADR.
SANTA FE CHANNEL
HARBOR CHANNEL
BNSF RRBNSF RR
VICINITY MAPNTS
HARBOR CHANNELRICHMOND INNERHARBOR
WASTEWATERTREATMENTPLANT
PROJECT LOCATION
SITE PLANNTS
DETAIL 1NTS
SHORE POWER - SEE DETAIL 1
Existing 12Kv/480v Oil
Filled XFMR
Existing 480/277
two-section meter
main
Existing Vault, presumably
servicing existing 12Kv
/480v transformer
New 12Kv Meter Main
Fence is at edge of seawall
The intent is to have the gear on this shore side of
the fence but have the receptacle in a box that
protrudes to the dock side of the fence. Any
related controls would need to be accessible from
the dock side of the fence. All gear sized to
provide 3MVa at 11Kv.
880 Mabury Road
San Jose, CA 95133
T: 408.286.2800
F: 408.808.1932
www.rosendin.com
LEAD . INSPIRE . BUILD .
License: 142881 (A, B, C-10, C-7)
Building Quality | Building Value | Building People®
January 11, 2024
Robert Stevens
email: [email protected]
Port of Richmond
Subject: Port of Richmond Shore Power Preliminary Budget Pricing and Scope
Dear Mr. Stevens:
We are pleased to submit our preliminary budgetary proposal for this project. The following identifies our scope of work and pricing. This scope is subject to change once engineering and design is complete.
I. SCOPE OF WORK
A. ITEMS INCLUDED IN QUOTATION:
Electrical scope
1. Furnish & install 1200A 12KV switchgear
a. Switchgear consists of:
• METAL CLAD SWGR - OUTDOOR NON-WALK-IN
• 1200 AMP CU BUS, 3-PHASE 3-WIRE 12KV 95KV BIL,
• 1 - INCOMING / EUSERC UTILITY METER SECTION
• 1 - BATTERY SECTION
• 1 - 48VDC BATTERY, RACK & CHARGER
• 1 - 48VDC/120AC PANEL
• 1 - MAIN BREAKER SECTION(S) - CONSISTING OF:
o 1 - 1200 AMP 40 KAIC VACUUM BREAKER
o 48VDC TRIP, CHARGE & CLOSE
o 1 - 3-STAGE MOC SWITCH (3A3B)
o 1 - 3-STAGE TOC SWITCH (3A3B)
o 3 - 600:5 / C100 CT'S
o 2 - DRAW OUT MOUNTED PT'S WITH 2 C.L. FUSES EACH
o 1 - DRAW OUT MOUNTED 15KVA 1-PHASE CPT
o 2 - FEEDER PROTECTION RELAY (SEL-351)
o 1 - 86 LOCKOUT RELAY (LOR-1)
o 3 - STATION CLASS ARRESTERS
o 1 - BREAKER CONTROL SWITCH WITH LIGHTS
o 1 - TRANSITION SECTION
o 1 - ACCESSORIES:
o 1 - AC STATION PANEL 1-PHASE 3-WIRE 120/240V
o 2 - OUTDOOR LIGHTS
o 2 - CONVENIENCE OUTLETS
o 1 - LIFTING DEVICE
o 1 - MANUAL RACKING HANDLE
2. Conduit from 12K switchgear to transformer
a. (1) 4” Sch 40 PVC with 3#250kcmil 15Kv AL cable & #2G included
3. Furnish & install 3000 KVa 12Kv to 11Kv Step down transformer a. Transformer consists of:
3000 KVA Cast Primary Unit Substation
Port of Richmond Shore Power SJ231236
January 11, 2024
Rosendin Page 2 of 5
Building Quality | Building Value | Building People®
• 3 Phase 60 Hertz, 80/80 Degree C Rise, AN/Future AF
• 30 Average / 40 Maximum Ambient
• 5.75 Percent Impedance with +/- 7.5 ANSI Standard Tolerance Phase relation Dyn1
• 3300 Feet Maximum Altitude
• 68 dB(a) Guaranteed Sound Level (AA)
• Approximate Dimensions: Ht 120 in X Wd 126 in X Dp 78 in Approximate Total Weight: 29900 lbs
HIGH VOLTAGE 12000 Delta
• 95 kV BIL
• Taps: No Taps on 12000 Copper Conductor
• Termination in ANSI segment 2
• Air Terminal Chamber (Add 18" to Width) - HV Air Terminal Chamber Cable Support - HV
• Air Terminal Chamber Removable Bottom Panel - HV
LOW VOLTAGE 11000Y/6350
• 95 kV BIL
• Taps: No Taps Copper Conductor
• Termination in ANSI segment 4
• Air Terminal Chamber (Add 18" to Width) - LV Air Terminal Chamber Cable Support - LV
• Air Terminal Chamber Removable Bottom Panel - LV
CORE/COIL
• IBC/CBC 1.85 SDS
• Tin Plated Phase Bus Except Coil Bus
ENCLOSURES
• 150 MPH Category III, Exposure D, Wind Rated Enclosure • 11 Gauge Bottom Plate
• Copper Ground Bus, .25" X 2.00"
• Stainless Steel Hardware - Throughout Transformer
FINISH
• 1500 Hour Paint System Primer
• ANSI 61 Paint
MONITORING
• Control Power Furnished by Customer
• Qualitrol 3-Phase Series 118 ITM Temperature Monitor
NP/SIGN/TAG
• Stainless Steel Nameplate
PROTECTION
• 240 VAC Space Heaters Operated @ 120 VAC Thermostat For Space Heaters
• 120 VAC External Power Source for Heater Circuit
4. Conduit from transformer to Cavotec shore power box
a. (1) 4” Sch 40 PVC with 3#250kcmil 15Kv AL cable & #2G included
5. Furnish & install Cavotec shore power outlet box
6. Relocation of site lighting conduits around area of new equipment a. (2) 2” conduits w/3#8, 3#10 & 1#10G max per as-built drawings b. (2) N52 concrete boxes are included for splicing
7. Relocation of existing feed from existing genset
Port of Richmond Shore Power SJ231236
January 11, 2024
Rosendin Page 3 of 5
Building Quality | Building Value | Building People®
a. (1) 2”PVC w/4#3/0 & 1#6G max included
b. (2) N52 concrete boxes are included for splicing
Civil Scope
1. Perform scanning of area utilizing ground penetrating radar.
2. Sawcut, demo and dispose of AC/Concrete at trench and concrete pad locations.
3. Excavate & backfill trench 50 ft long x 4 ft wide and 4 ft deep.
4. Install (7) bollards.
5. Patch pave around new bollards
6. Install 10 ft x 10ft x 6in. concrete pad.
7. Install 5 ft x 5 ft x 6” concrete pad.
8. Patch concrete at trench locations.
9. Excavate & backfill for Generator/lighting conduit reroutes.
B. ITEMS EXCLUDED FROM QUOTATION:
1. Cavotec mobile power unit and associated accessories
2. Connection to utility (PG&E or otherwise) equipment and associated raceway and or junction boxes
3. Design or design drawings
4. Engineering or engineered drawings
5. Permits
6. Bond premiums.
7. Utility connection and usage fees.
8. All plan-check permit fees.
9. BIM and clash detection
10. Field painting.
11. Handling and disposal of hazardous materials, if required.
12. Off-haul of trench spoils.
13. Off-site electrical work – Utility conduits & manholes, street lighting, traffic signals, etc.
14. Photovoltaic (PV).
15. Lightning protection.
16. Offsite parking.
17. Allowances unless specifically noted in this proposal.
18. Seismic Engineering calculations and wind calculations.
19. Testing/Geotechnical services by others
20. Site water to be supplied by others.
21. No dewatering of trenches included.
22. No utility/conduit reroutes included.
23. Existing asphalt assumed to be no greater than 4” in depth.
Port of Richmond Shore Power SJ231236
January 11, 2024
Rosendin Page 4 of 5
Building Quality | Building Value | Building People®
C. CLARIFICATIONS:
1. This is a preliminary scope and pricing which are subject to change once engineering and design is complete.
2. All work will be performed on straight time.
3. We reserve the right to amend the electrical subcontract by mutual agreement by both parties.
4. We are not responsible for late adds or scope revisions by other subcontractors that cause Rosendin to perform additional work.
5. Spoils to be spread on site.
6. Current OSHA and NFPA-70E (NEC) regulations do not permit us to perform work on energized electrical systems.
7. We will use the following wiring methods:
1. PVC 80 - underground MV conduits.
2. PVC 40 – Underground conduits.
3. EMT – branch & feeder conduits exposed not subject to vehicle damage.
4. RGS or IMC – branch & feeder conduits exposed to vehicle damage.
5. MV Cable – 15KV AL provided
8. Bus bars in switchboards & panels and transformer windings are aluminum.
9. The current market is experiencing a high level of volatility in pricing for materials, including quoted and commodity materials. Prices are fluctuating daily, and the availability of some materials is in question. Pricing is based on current market costs and does not reflect or include any forecasted or increased tariffs, escalation and/or additional contingency costs of any kind. Substantial changes in commodities and/or manufacturing costs may be subject to request additional costs. We will re-evaluate this cost at the time of award and advise of the impact at that time.
10. Due to the volatility of the commodity market and supply chain, our pricing is only good for 30 days, and we will require a written commitment so that Rosendin can provide the same written commitment to its suppliers to hold pricing.
11. Lead times are subject to the timing of the PO issue, PO released, manufacturer load, and capabilities and can be affected throughout the submittal process.
12. Permits are by others
13. No hard rock excavation
14. Soil offhaul based on clean soil
15. Rebar reinforcement #5 bar 18” on center.
16. Concrete pads to be 6” in depth without thickened edges.
17. It is assumed that holes for bollards can be drilled, and walls will stand up in a neat fashion. If cobble is encountered a Change Order will be issued to change our means and methods for installing.
880 Mabury Road
San Jose, CA 95133
T: 408.286.2800
F: 408.808.1932
www.rosendin.com
LEAD . INSPIRE . BUILD .
License: 142881 (A, B, C-10, C-7)
Building Quality | Building Value | Building People®
January 11, 2024
Robert Stevens
email: [email protected]
Port of Richmond
Subject: Port of Richmond Shore power – Cavotec equipment procurement
Dear Mr. Stevens:
We are pleased to submit our preliminary budgetary proposal for the procurement of Cavotec equipment. Pricing subject to change once customized to customer specifications.
I. SCOPE OF WORK
A. ITEMS INCLUDED IN QUOTATION:
1. 046965-AMP1 (TS01a) - PowerMove 1 HV cable with PC5 plugs a. Per drawing OP-046965-T01 and specification PowerMove RoRo Towable attached.
b. 10m Maximum Hatch Height Reach (High Tide/Empty Vessel) c. 2m Minimum Hatch Height Reach (Low Tide/Full Vessel) d. UL Field Certification will be charged cost + 20%. We have allowed $26,875 final cost is TBD.
e. Shipping is DDP Richmond, California. All cost to complete DDP from Italy to California, USA will be charged cost + 20%. We have allowed $46,388.26. Final cost is TBD.
2. Start up & Commissioning – Cavotec field technician one day onsite
3. 115’ of CP2X325-Y/O 2-Channel Cable Protectors
4. 9.75% Sales Tax
B. ITEMS EXCLUDED FROM QUOTATION:
1. Connection to utility (PG&E or otherwise) equipment and associated raceway and or junction boxes
2. Engineering or engineered drawings
3. Design and design drawings.
4. Permits
5. Bond premiums.
6. Utility connection and usage fees.
7. All plan-check permit fees.
8. BIM and clash detection
9. Field painting.
10. Handling and disposal of hazardous materials, if required.
11. Off-haul
Port of Richmond Shore Power – Cavotec procurement SJ231236 January 11, 2024
Rosendin Page 2 of 3
Building Quality | Building Value | Building People®
12. Off-site electrical work – Utility conduits & manholes, street lighting, traffic signals, etc.
13. Photovoltaic (PV).
14. Lightning protection.
15. Offsite parking.
16. Allowances unless specifically noted in this proposal.
17. Seismic Engineering calculations and wind calculations.
18. Testing/Geotechnical services by others
19. Site water to be supplied by others.
C. CLARIFICATIONS:
1. This is a preliminary scope which is subject to change once engineering and design is complete.
2. Pricing subject to change once customized to customer specifications.
3. All work will be performed on straight time.
4. We reserve the right to amend the electrical subcontract by mutual agreement by both parties.
5. We are not responsible for late adds or scope revisions by other subcontractors that cause Rosendin to perform additional work.
6. Current OSHA and NFPA-70E (NEC) regulations do not permit us to perform work on energized electrical systems.
7. The current market is experiencing a high level of volatility in pricing for materials, including quoted and commodity materials. Prices are fluctuating daily, and the availability of some materials is in question. Pricing is based on current market costs and does not reflect or include any forecasted or increased tariffs, escalation and/or additional contingency costs of any kind. Substantial changes in commodities and/or manufacturing costs may be subject to request additional costs. We will re-evaluate this cost at the time of award and advise of the impact at that time.
8. Due to the volatility of the commodity market and supply chain, our pricing is only good for 30 days, and we will require a written commitment so that Rosendin can provide the same written commitment to its suppliers to hold pricing.
9. Lead times are subject to the timing of the PO issue, PO released, manufacturer load, and capabilities and can be affected throughout the submittal process.
10. Permits are by others
11. Payment Terms are 50% Down/50% Net 30
12. Warranty 12 months from commissioning
D. LEAD TIMES
1. 54 weeks manufacturing from date of release.
2. 4-6 Weeks shipping