Cities Index.
Attachment 1 - Du-All Safety Contract and Proposal.pdf

Richmond City Council
July 2, 2024

Document
Attachment 1 - Du-All Safety Contract and Proposal.pdf
Meeting
July 2, 2024
Body
Richmond City Council
Pages
18
Original file
25.3 MB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.

CITY OF RICHMOND

STANDARD CONTRACT
Department: Project Manager:

Project Manager E-mail: Project Manager Phone No:

Vendor No: Contract No:

Description of Services:

The parties to this STANDARD CONTRACT do mutually agree and promise as follows:

1. Parties. The parties to this Contract are the City of Richmond, a municipal corporation (“the City”), and the following named Contractor:

Contractor Name:

Street Address:

City, State, Zip Code:

Contact Person:

Telephone: Email:

Business License No:

2. Term. The effective date of this Contract is ________________________ and terminates ______________ unless terminated earlier as set forth herein.

3. Payment Limit. City’s total payments to Contractor under this Contract shall not exceed $______________ (“Contract Payment Limit”) unless a Contract Amendment has been approved by the City Council or City Manager. If this amount includes a contingency, Contractor acknowledges that any use of such contingency shall be for work beyond the original scope of services and requires prior written authorization by the City. If noted below, Compensation for work done under this Contract, shall not exceed as follows:

FY total compensation shall
not exceed $
FY total compensation shall not exceed $
FY total compensation shall not exceed $

4. Contractor’s Obligations. Contractor agrees to perform all work at its own cost and expense, to furnish all labor, tools, equipment, materials, except as otherwise specified, in accordance with Exhibit A:

Service Plan which is attached hereto and incorporated herein. [ ] A California corporation , [ ] limited liability corporation, [ ] general partnership, [ ] limited partnership, [ ] individual, [ ] non-profit corporation, [ ] individual dba as [specify:]______________________________ [ ] other [specify:]__________________________________ Human Resources
Sharrone Taylor
[email protected]
510-621-1583
5775
7033
Safety/Loss Prevention Program and Administration
7/1/2024
480,960
Du-All Safety LLC
4950 Hotchkiss Street
Fremont, CA 94539
Michael Connelly
510-651-8289
[email protected]
4000 9774
6/30/2027
✔
160,320
160,320
160,320
26/27
25/26
24/25

5. City Obligations. City shall make payments to the Contractor in accordance with the Payment Provisions set forth in Exhibit B, attached hereto and incorporated herein.

6. Authorized Representatives and Notices. This Contract is subject to the Authorized Representatives and Notices Provisions (Exhibit C), attached hereto and incorporated herein.

7. General Conditions. This Contract is subject to the General Conditions (Exhibit D) which are attached hereto and incorporated herein.

8. Special Conditions. This Contract is subject to the Special Conditions (Exhibit E) (if any) which are attached hereto and incorporated herein.

9. Insurance Provisions. This Contract is subject to the Insurance Provisions (Exhibit F) which are attached hereto and incorporated herein.

10. Signatures. These signatures attest the parties' agreement hereto:

CITY OF RICHMOND,
a municipal corporation [BUSINESS NAME]
(* The Corporation Chairperson of the Board,
President or Vice President should sign below)
By:

Title By:

I hereby certify that this Contract Title:
has been approved by City Council
or the City Manager. Date Signed:

By:

City Clerk
(* The Corporation Chief Financial Officer, Secretary or Assistant Secretary should sign below)
Approved as to form:

By:

By: Title:

City Attorney
Date Signed:

LIST OF ATTACHMENTS:

Service Plan Exhibit A
Payment Provisions Exhibit B
Authorized Representatives and Notices Exhibit C
General Conditions Exhibit D
Special Conditions Exhibit E
Insurance Provisions Exhibit F
Sanctuary City Compliance Statement Exhibit G
Du-All Safety LLC

Contract No: For the Contract between the City of Richmond and

EXHIBIT A

SERVICE PLAN

Contractor shall, to the satisfaction of the Project Manager (set forth in Exhibit B), perform the following services and be compensated as outlined below [or attach service plan if necessary]:

7033
Du-All Safety LLC
See attached service plan.

Contract No: For the Contract between the City of
Richmond and

EXHIBIT B

PAYMENT PROVISIONS

1. COMPENSATION TO CONTRACTOR:
a. Provided Contractor is not in default under this Contract, Contractor shall be compensated in the manner set forth herein.
b. All payments made pursuant to this Contract shall be subject to the Contract Payment Limit. The Payment Limit includes expenses (phones, photo copying, meals and travel, etc). Invoices, shall be adequately detailed, based on accurate records, and be in a form reasonably satisfactory to the City. Contractor may be required to provide back-up material upon request.
c. All City vendors receiving new contracts shall sign up to receive electronic payments through the City’s Automated Clearinghouse (ACH) payments service/provider.

2. SUBMISSION OF INVOICES:

Contractor shall submit timely invoices by email to
[email protected] and/or to the following address: Attention:

City of Richmond Finance/Account Payable
Project Manager:

P.O. Box 4046
Richmond, CA 94804

3. All invoices that are submitted by Contractor shall be subject to the approval of the City Project Manager, before payments shall be authorized.

4. The City will pay invoice(s) within 45 days after completion of services to the City’s satisfaction. The City shall not pay late fees or interest.

5. All appropriate permits, certificates, and licenses, including a City business license shall be obtained and maintained for the duration of this Contract before any payment is authorized.

6. All insurance coverage required by this Contract shall be provided by the Contractor before this Contract is executed by the City. The insurance coverage required by this Contract shall be maintained by Contractor for the duration of this Contract and must be in place before any payment is authorized. 7033
Sharrone Taylor
Sharrone Taylor
Contract No: For the Contract between the City of
Richmond and

EXHIBIT C

AUTHORIZED REPRESENTATIVES AND NOTICES

1. All required written notices shall be delivered: (i) by hand; or (ii) sent by registered, express, or certified mail, with return receipt requested or with delivery confirmation requested from the U.S. postal service; (iii) sent by overnight or same day courier service at the party’s respective address listed in this Section.

2. Each notice shall be deemed to have been received on the earlier to occur of: actual delivery or the date on which delivery is refused; or three (3) days after notice is deposited in the U.S. mail or with a courier service in the manner described above (Sundays and City holidays excepted).

3. Either party may, at any time, change its notice address (other than to a post office box address) by giving the other party three (3) days prior written notice of the new address.

4. All notices, demands, requests, or approvals from Contractor to the City shall be addressed to the City at:

City of Richmond –
Richmond, CA 94804
Email: ______________________________________________________

5. All notices, demands, requests, or approvals from the City to Contractor shall be addressed to Contractor at:

Business Name
Street Address
City, State Zip
Email: ______________________________________________________ 450 Civic Center Plaza Suite 310
[email protected]
[email protected]
Du-All Safety
4950 Hotchkiss Street
Fremont, CA 94539
Michael Connolly
Contract No: For the Contract between the City of
Richmond and

EXHIBIT D

GENERAL CONDITIONS

1. INDEPENDENT PARTIES:

Contractor hereby declares that Contractor is engaged as an independent business and Contractor agrees to perform the services as an independent contractor. The manner and means of conducting the services and tasks are under the control of Contractor exce pt to the extent they are limited by statute, rule or regulation and the express terms of this Contract. No civil service status or other right of employment will be acquired by virtue of Contractor’s services. None of the benefits provided by the City t o its employees, including but not limited to unemployment insurance, workers’ compensation plans, vacation and sick leave, are available from the City to Contractor, its employees or agents. Deductions shall not be made for any state or federal taxes, FICA payments, PERS payments, or other purposes normally associated with an employer - employee relationship from any compensation due to Contractor. Payments of the above items, if required, are the responsibility of Contractor.

2. TIME IS OF THE ESSENCE:

Contractor and the City agree that time is of the essence regarding the performance of this Contract.

3. STANDARD OF CARE:

Contractor agrees to perform all services hereunder in a manner commensurate with the prevailing standards of like professionals or service Contractors, as applicable, in the San Francisco Bay Area and agrees that all services shall be performed by qualified and experienced personnel who are not employed by the City.

4. IMMIGRATION REFORM AND CONTROL ACT (IRCA):

Contractor assumes all responsibility for verifying the identity and employment authorization of all of its employees performing work hereunder, pursuant to all applicable IRCA or other federal, or state rules and regulations. Contractor shall indemnify, defend, and hold the City harmless from and against any loss, damage, liability, costs or expenses arising from any noncompliance of this provision by Contractor.

5. NON-DISCRIMINATION:

Consistent with the City’s policy and state and federal law that harassment and discrimination are unacceptable conduct, Contractor and its employees, contractors, and agents shall not harass or discriminate against any job applicant, City employee, or any other person on the basis of any kind of any statutorily (federal, state or local) protected class, including but not limited to: race, religious creed, color, national origin, ancestry, disability (both mental and physical) including HIV and AIDS, medi cal condition (e.g. cancer), genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, pregnancy, political 7033

Contract No: For the Contract between the City of
Richmond and
affiliation, military and veteran status or legitimate union activities . Contractor agrees that any violation of this provision shall constitute a material breach of this Contract.

6. CITY PROPERTY:
a. Each and every report, draft, work product, map, record, applicable plans, drawings, calculation, data, specification, video, graphic or any other material or document produced, prepared or caused to be prepared by Contractor pursuant to or in connection with this Contract shall be the exclusive property of the City.
b. Notwithstanding the foregoing, Contractor shall not be obligated to provide to City proprietary software or data which Contractor has developed or had developed for Contractor's own use; provided, however, that Contractor shall, pursuant to Section 11 below, indemnify, defend and hold the City harmless from and against any discovery or Public Records Act request seeking the disclosure of such proprietary software or data. c. No report, information or other data given to or prepared or assembled by Contractor pursuant to this Contract shall be made available to any individual or organization by Contractor without prior approval of the City Manager or their designee. d. Contractor shall, at such time and in such form as City Manager or their designee may require, furnish reports concerning the status of services and tasks required under this Contract.

7. RECORDS:
a. Contractor shall maintain complete and accurate records with respect to the services, tasks, work, documents and data in sufficient detail to permit an evaluation of Contractor’s performance under the Contract, as well as maintain books and records related to sales, costs, expenses, receipts and other such information required by the City that relate to the performance of the services and tasks under this Contract (collectively the “Records”). b. All Records shall be maintained in accordance with generally accepted accounting principles and shall be clearly identified and readily accessible. Contractor shall provide free access to the Records to the representatives of the City or its designees during regular business hours upon reasonable prior notice. The City has the right to examine and audit the Records, and to make copies or transcripts therefrom as necessary, and t o allow inspection of all proceedings and activities related to this Contract. Such Records, together with supporting documents, shall be kept separate from other documents and records and shall be maintained by Contractor for a period of five (5) years after receipt of final payment. c. If supplemental examination or audit of the Records is necessary due to concerns raised by the City’s preliminary examination or audit of records, and the City’s supplemental examination or audit of the records discloses a failure to adhere to appropriate internal financial controls, or other breach of this Contract or failure to act in good faith, then Contractor shall reimburse the City for all reasonable costs and expenses associated with the supplemental examination or audit.
7033

Contract No: For the Contract between the City of
Richmond and

8. PERMITS AND LICENSES:

Contractor, at its sole expense, shall obtain and maintain during the term of this Contract, all appropriate permits, certificates and licenses, including a City business license , required in connection with the performance of the services and tasks hereunder . The failure to obtain such permits and licenses shall be a material breach of this Contract and grounds for immediate termination by City; provided, however, that City may waive the business license requirement in writing under unusual or extraordinary circumst ances without necessitating any modification of this Contract to reflect such waiver.

9. TERMINATION:
a. Termination Without Default. Notwithstanding any provision herein to the contrary, the City may, in its sole and absolute discretion and without cause, terminate this Contract at any time prior to completion by Contractor of the project or services hereunder immediately upon transmission of written notice to Contractor as provided in Exhibit C “Authorized Representatives and Notices”.
b. Termination in the Event of Default. Should Contractor fail to perform any of its obligations hereunder, within the time and in the manner provided or otherwise violate any of the terms of this Contract, City may immediately terminate this Contract by giving written notice of such termination, stating the reasons for such termination. Contractor shall be compensated as provided in Exhibit B; provided, however, there shall be deducted from such amount the amount of damage, including attorney's fees, expert witness fees and costs, if any, sustained by City by virtue of Contractor's breach of this Contract. Additionally, in the event of such termination, the City may proceed with the work in any reasonable manner it chooses.

10. CONFLICT OF INTEREST:

Contractor acknowledges, represents and warrants that Contractor shall avoid all conflicts of interest (as defined under any federal, state or local statute, rule or regulation, or at common law) with respect to this Contract. Contractor further acknowledges, represents and warrants that no City official or employee has any economic interest, as defined in Title 2, California Code of Regulations §§ 18703.1 through 18703.5, with Contractor that would invalidate this Contract. Contractor acknowledges that in the event that Contractor shall be found by any judicial or administrative body to have any conflict of interest (as defined above) with respect to this Contract, all consideration received under this Contract shall be forfeited and returned to City forthwith. This provision shall survive the termination of this Contract for one (1) year.

11. HOLD HARMLESS:
a. To the fullest extent permitted by law, Contractor shall indemnify, defend (with counsel acceptable to the City) and hold harmless the City, its City Council, boards, commissions, officials, employees, agents and volunteers (“Indemnitees”) from and against any and all loss, damages, liability, obligations, claims, suits, judgments, costs and expenses 7033

Contract No: For the Contract between the City of
Richmond and
whatsoever, including attorney’s fees and costs of litigation (“Claims”), arising from or in any manner connected to Contractor’s performance of its obligations under this Contract or failure to comply with any of its obligations under this Contract or out of the operations conducted by Contractor even if the City is found to have been negligent. If the Claims filed against Indemnitees allege negligence, recklessness or willful misconduct on the part of Contractor, Contractor shall have no right of reimbursement against Indemnitees for the costs of defense even if negligence, recklessness or willful misconduct is not found on the part of Contractor.

Contractor shall not have any obligations to indemnify Indemnitees if the loss or damage is found to have resulted solely from the negligence or the willful misconduct of the City. The defense and indemnification obligations of this Contract are undertaken in addition to, and shall not in any way be limited by, the insurance obligations contained in this Contract. b. This indemnification obligation shall survive this Contract and shall not be limited by any term of any insurance policy required under this Contract; provided however, that if this Contract is for design professional services, this indemnity provision is limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the design professional (as defined in California Civil Code section 2782.8).

12. LIMITATIONS UPON SUBCONTRACTING AND ASSIGNMENT:
a. This Contract binds the heirs, successors, assigns and representatives of Contractor. The Contractor shall not enter into subcontracts for any work contemplated under this Contract and shall not assign this Contract, nor any portion hereof or monies due or to become due, without the prior written consent of the City Council or its designee. b. Contractor shall not assign, sublease, hypothecate, or transfer this Contract, or any interest therein, directly or indirectly, by operation of law or otherwise, without prior written consent of the City Manager. Contractor shall submit a written request for consent to transfer to the City Manager at least thirty (30) days in advance of the desired transfer. The City Manager or their designee may consent or reject such request in their sole and absolute discretion. Any attempt to do so without said consent shall be null and void, and any assignee, sublessee, hypothecate or transferee shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer. However, claims for money against the City under this Contract may be assigned by Contractor to a bank, trust company or other financial institution without prior written consent.
c. The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Contractor (if applicable), or of the interest of any general partner or joint venturer or syndicate member if Contractor is a partnership or joint-venture or syndicate, which shall result in a change of control of Contractor, shall be deemed an assignment. For this purpose, control shall mean fifty percent or more of the voting power or twenty-five percent or more of the assets of the corporation, partnership or joint-venture. d. Only those persons and/or businesses whose names and resumés are attached to this Contract shall be used in the performance of this Contract. However, if after the start of this Contract, Contractor wishes to use sub-contractors, at no additional costs to the City, then 7033
Du-All Safety LLC
Contract No: For the Contract between the City of
Richmond and
Contractor shall submit a written request for consent to add sub-contractors including the names of the sub-contractors and the reasons for the request to the City Manager at least five (5) days in advance. The City Manager may consent or reject such requests in their sole and absolute discretion.
e. Each sub-contractor shall be required to furnish proof of workers’ compensation insurance and shall also be required to carry general, automobile and professional liability insurance (as applicable) in reasonable conformity to the insurance carried by Contractor. f. In addition, any tasks or services performed by sub-contractors shall be subject to each provision of this Contract. Contractor shall include the following language in their Contract with any sub-contractor: “Sub-Contractors hired by Contractor agree to be bound to Contractor and the City in the same manner and to the same extent as Contractor is bound to the City.” g. The requirements in this Section 12 shall not apply to persons who are merely providing materials, supplies, data or information that Contractor then analyzes and incorporates into its work product.
13 SAFETY:
a. Contractor acknowledges that the City is committed to the highest standards of workplace safety. Contractor will be solely and completely responsible for conditions of all vehicles owned or operated by Contractor, including the safety of all persons and property during performance of the services and tasks under this Contract. Contractor shall assume sole and complete responsibility for the safety of Contractor's employees and any of subcontractor's employees This requirement will apply continuously and not be limited to normal working hours.

In addition, Contractor will comply with all safety provisions in conformance with U.S.

Department of Labor Occupational Safety and Health Act, any equivalent state law, and all other applicable federal, state, county and local laws, ordinances, codes, and any regulations that may be detailed in other parts of the Contract. Where any of these are in conflict, the more stringent requirements will be followed. Contractor’s failure to thoroughly familiarize itself with the aforementioned safety provisions will not relieve it from compliance with the obligations and penalties set forth herein.
b. Contractor will immediately notify the City (in no event less than 24 hours) of any incident of death, serious personal injury or substantial property damage that occurs in connection with the performance of this Contract. Contractor will promptly submit to the City a written report of all incidents that occur in connection with this Contract. This report must include the following information: (i) name and address of injured or deceased person(s); (ii) name and address of Contractor’s employee(s) involved in the incident; (iii) name and address of Contractor’s liability insurance carrier; (iv) a detailed description of the incident; and (v) a police report.
c. Contractor acknowledges that the City shall have the right to impose, at the City’s sole discretion, requirements that it deems are necessary to protect the health and safety of the City employees, residents, and visitors. Contractor agrees to comply with all such requirements, 7033

Contract No: For the Contract between the City of
Richmond and
including, but not limited to, mandatory vaccinations, the use of personal protective equipment (e.g. masks), physical distancing, and health screenings. Contractor also agrees to make available to the City, at the City’s request, records to demonstrate Contractor’s compliance with this Section.

14. INSURANCE:

Insurance requirements are set forth in Exhibit F to this Contract. Contractor shall abide by the insurance requirements set forth in said Exhibit F.

15. COMPLIANCE WITH ALL APPLICABLE LAWS:
a. During the term of this Contract, Contractor shall keep fully informed of all existing and future state and federal laws and all municipal ordinances and regulations of the City of Richmond which affect the manner in which the services or tasks are to be performed by Contractor, as well as all such orders and decrees of bodies or tribunals having any jurisdiction or authority over the same. Contractor shall comply with all applicable laws, state and federal and all ordinances, rules and regulations enacted or issued by the City. Compliance under this provision includes compliance with all provisions of the Richmond Municipal Code ("Municipal Code"), including Chapters 2.50, 2.52, 2.56, and 2.60, if applicable. b. Contractor acknowledges that under § 2.60.070 of the Municipal Code ("Living Wage Ordinance"), Contractor is required to provide the City with documents and information verifying its compliance with the Living Wage Ordinance. Contractor shall notify each of its affected employees with regards to the wages that are required to be paid pursuant to the Living Wage Ordinance as prescribed in § 2.60.070 of the Municipal Code. c. Contractor shall comply with § 2.28.030 of the Municipal Code, obligating every Contractor or sub-Contractor under an agreement or sub-agreement with the City for public works, goods or services to refrain from discriminatory employment or practices on the basis of race, color, sex, sexual orientation, religious creed, national origin or ancestry of any employee, any applicant for employment or any potential sub-contractor .
d. Contractor acknowledges that the City’s Drug Free Workplace Policy, Violence in the Workplace Policy and the Policy Against Workplace Harassment, are available on the City’s website at http://www.ci.richmond.ca.us/workplacepolicies . Contractor agrees to abide by the terms and conditions of said policies.

16. INTEGRATED CONTRACT:

The Recitals and exhibits are a material part of this Contract and are expressly incorporated herein. This Contract represents the full and complete understanding of every kind or nature whatsoever between the parties hereto, and all preliminary negotiations and agreements of whatsoever kind or nature are merged herein. No verbal agreement or implied covenant shall 7033

Contract No: For the Contract between the City of
Richmond and
be held to vary the provisions hereof. Any modification of this Contract will be effective only by written execution signed by both the City and Contractor.

17. CONFLICTING PROVISIONS:

In the event of a conflict between these General Conditions and those of any Exhibit or attachment hereto, these General Conditions shall prevail; provided, however, that any Special Condition as set forth in Exhibit E shall prevail over these General Conditions. In the event of a conflict between the terms and conditions of any two or more Exhibits or attachments hereto, those prepared by City shall prevail over those prepared by the Contractor, and the terms and conditions preferred by the City shall prevail over those preferred by the Contractor.

18. FORCE MAJEURE:

Neither party hereto shall be considered in default in the performance of its obligations hereunder to the extent that the performance of such an obligation is prevented or delayed by reason of acts of God, strikes, boycotts, lock-outs, inability to procure materials not related to the price thereof, failure of power, restrictive governmental laws and regulations enacted after the date of this Contract, riots, civil unrest, acts of terrorism, insurrection, war, declaration of a state or national emergency or other reasons of a like nature not within the reasonable control of such party.

19. CONFLICT OF LAW:

This Contract shall be interpreted under, and enforced by the laws of the State of California without regard to any choice of law rules which may direct the application of laws of another jurisdiction. The Contract and obligations of the parties are subject to all valid laws, orders, rules, and regulations of the authorities having jurisdiction over this Contract (or the successors of those authorities). Any suits brought pursuant to this Contract shall be filed with the courts of the County of Contra Costa, State of California.

20. CLAIMS:

Any claim by Contractor against City hereunder shall be subject to Government Code §§ 800 et seq. The claims presentation provisions of said Act are hereby modified such that the presentation of all claims hereunder to the City shall be waived if not made within six months after accrual of the cause of action.

21. INTERPRETATION:

This Contract shall be interpreted as if drafted by both parties.

22. WARRANTY:

If any product is be provided to the City as part of this Contract, Contractor warrants as follows: Contractor possesses good title to the product and the right to transfer the product to 7033

Contract No: For the Contract between the City
of Richmond and
City; the product shall be delivered to the City free from any security interest or other lien; the product meets any specifications contained herein; the product shall be free from material defects in materials and workmanship under normal use for a period of one (1) year from the date of delivery; and the product shall be fit for its intended purpose(s). Notwithstanding the foregoing, consumable and maintenance items (such as light bulbs and batteries) shall be warranted for a period of one hundred and eighty (180) days from the date of delivery. All repairs during the warranty period shall be promptly performed by Contractor, at Contractor's expense, including shipping.

23. SEVERABILITY:

In the event that any of the provisions or portions or applications thereof of this Contract are held to be unenforceable or invalid by any court of competent jurisdiction, City and Contractor shall negotiate an equitable adjustment in the provisions of the Contract with a view toward effecting the purpose of this Contract, and the validity and enforceability of the remaining provisions or portions or applications thereof, shall not be affected thereby.

24. AUTHORITY:

City warrants and represents that the signatory hereto (the Mayor of the City of Richmond or the City Manager) is duly authorized to enter into and execute this Contract on behalf of City.

The party signing on behalf of Contractor warrants and represents that they are duly authorized to enter into and execute this Contract on behalf of Contractor, and shall be personally liable to City if they are not duly authorized to enter into and execute this Contract on behalf of Contractor.

25. WAIVER:

The waiver by City of any breach of any term or provision of this Contract shall not be construed as a waiver of any subsequent breach. Inspections or approvals, or statements by any officer, agent or employee of the City relating to the Contractor’s performance, or payment therefore, or any combination of these acts, shall not relieve the Contractor’s obligation to fulfill this Contract as prescribed; nor shall the City be thereby stopped from bringing any action for damages or enforcement arising from any failure to comply with any of the terms and conditions of this Contract.

26. COUNTERPARTS:

This Contract may be executed in any number of counterparts (including by fax, PDF, DocuSign, or other electronic means), each of which shall be deemed an original, but all of which shall constitute one and the same instrument.

27. SANCTUARY CITY CONTRACTING ORDINANCE (SCCO):

The Richmond Sanctuary City Contracting Ordinance No. 12-18 prohibits the City from granting and or retaining contracts with any person or entity that provides Data Broker or Extreme Vetting services to the U.S. Immigration and Customs Enforcement Division of the 7033

Contract No: For the Contract between the City
of Richmond and
United States Department of Homeland Security (“ICE”). Contractor must submit the Sanctuary City Compliance Statement, attached hereto as Exhibit G. 7033

Contract No: For the Contract between the City
of Richmond and

EXHIBIT E

SPECIAL CONDITIONS
The General Conditions are hereby amended to include the following modifications and/or provisions (if applicable, otherwise please state “NONE”):
7033

Contract No: For the Contract between the City
of Richmond and

EXHIBIT F

INSURANCE PROVISIONS
___ Check here if Risk Management has approved waiving insurance requirements for this contract.
a. Before the commencement of the terms of this Contract, and during the entire term of this Contract and any extension or modification thereof, Contractor shall furnish the City’s Risk Manager with certificates showing the type, amount, class of operations covered, effective dates and dates of expiration of insurance coverage in compliance with Sections 10.b. (1) through (5) Such certificates, which do not limit Contractor’s indemnification, shall also contain substantially the following statement:
“Should any of the above insurance covered by this certificate be canceled or coverage reduced before the expiration date thereof, the insurer affording coverage shall provide thirty (30) days’ advance written notice to the City of Richmond. Attention: Risk Manager.” Contractor shall maintain in force at all times during the performance of this Contract all appropriate coverage of insurance required by this Contract with an insurance company licensed to offer insurance business in the State of California with a current A.M. Best’s rating of no less than A:VII or Standard & Poor’s Rating (if rated) of at least BBB unless otherwise acceptable to the City. Contractor shall deliver updated insurance certificates to the City at the address described in Section 17.f. prior t o the expiration of the existing insurance certificate for the duration of the term of Contract. Endorsements naming the City, its City Council, boards, commissions, officials, employees, agents, and volunteers as additional insured shall be submitted with the insurance certificates.
b. COVERAGE REQUIREMENTS:

Contractor shall maintain insurance coverage and limits at least as broad as:
(1) Workers’ Compensation:

Statutory coverage as required by the State of California. (2) Liability:

Commercial general liability coverage in the following minimum limits:

Bodily Injury: $1,000,000 each occurrence
$2,000,000 aggregate - all other
Property Damage: $1,000,000 each occurrence
$2,000,000 aggregate
If submitted, combined single limit policy with per occurrence limits in the amounts of $2,000,000 and aggregate limits in the amounts of $4,000,000 will be considered equivalent to the required minimum limits shown above. Additional 7033

Contract No: For the Contract between the City
of Richmond and
Insured Endorsement naming the City, its City Council, boards, commissions, officials, employees, agents, and volunteers is required. (3) Automotive:

Comprehensive automobile liability coverage (any auto) in the following minimum limits:

Bodily injury: $1,000,000 each occurrence
Property Damage: $1,000,000 each occurrence
or
Combined Single Limit: $2,000,000 each occurrence
Additional Insured Endorsement naming the City, its City Council, boards, commissions, officials, employees, agents, and volunteers is required. (4) Professional Liability:

Professional liability insurance which includes coverage appropriate for the professional acts, errors and omissions of Contractor’s profession and work hereunder, including, but not limited to, technology professional liability errors and omissions if the services being provided are technology -based, in the following minimum limits:
$2,000,000 each occurrence
Technology professional liability errors and omissions shall include, or be endorsed to include: property damage liability coverage for damage to, alteration of, loss of, or destruction of electronic data and/or information “property” of the City in the care, custody, or control of Contractor. If not covered under Contractor’s liability policy, such “property” coverage of the City may be endorsed onto Contractor’s Cyber Liability Policy as covered property as follows: cyber liability coverage in an amount sufficient to cover the full replacement value of damage to, alteration of, loss of, or destruction of electronic data and/or information “property” of the City that will be in the care, custody, or control of Contractor. (5) Cyber Liability:

Coverage shall be sufficiently broad to respond to the duties and obligations as are undertaken by Contractor in this Contract and shall include, but not be limited to, claims involving infringement of intellectual property, copyright, trademark, trade dress, invasion of privacy violations, information theft, damage to or destruction of electronic information, release of private information, alteration of electronic information, extortion and network security. The policy shall provide coverage for breach response costs as well as regulatory fines and penalties as well as credit monitoring expenses with limits sufficient to respond to these obligations with the following minimum limits:
$2,000,000 per occurrence or claim.
7033

Contract No: For the Contract between the City
of Richmond and
As to commercial general liability and automobile liability insurance, such insurance will provide that it constitutes primary insurance with respect to claims insured by such policy, and, except with respect to limits, that insurance applies separately to each insured against whom claim is made or suit is brought. Such insurance is not additional to or contributing with any other insurance carried by or for the benefit of the City.
c. SUBROGATION WAIVER:

Contractor hereby agrees to waive rights of subrogation that any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether the City has received a waiver of subrogation endorsement from the insurer.

The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by Contractor, its employees, agents and subcontractors. d. FAILURE TO SECURE:

If Contractor at any time during the term hereof should fail to secure or maintain the foregoing insurance, the City shall be permitted to obtain such insurance in Contractor’s name or as an agent of Contractor and shall be compensated by Contractor for the costs of the insurance premiums at the maximum rate permitted by law and computed from the date written notice is received that the premiums have not been paid.
e. ADDITIONAL INSUREDS:

The City, its City Council, boards, commissions, officials, employees, agents, and volunteers shall be named as additional insured(s) under all insurance coverages, except workers’ compensation and professional liability insurance. The naming of an additi onal insured shall not affect any recovery to which such additional insured would be entitled under this policy if not named as such additional insured. An y additional insured named herein shall not be held liable for any premium, deductible portion of any loss, or expense of any nature on this policy or any extension thereof. Any other insurance held by an additional insured shall not be required to contribute anything toward any loss or expense covered by the insurance provided by this policy.

Additional Insured coverage under Contractor’s policy shall be primary and non-contributory and will not seek contribution from the City’s insurance or self -insurance. Any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits shall be available to the additional insured(s). f. SUFFICIENCY OF INSURANCE:

The insurance limits required by the City are not represented as being sufficient to protect Contractor. Contractor is advised to consult Contractor’s insurance broker to determine adequate coverage for Contractor. The coverage and limits shall be (1) the minimum coverage and limits specified in this Contract; or (2) the broader coverage and maximum limits of the coverage carried by or available to Contractor; whichever is greater. 7033

EXHIBIT G

SANCTUARY CITY COMPLIANCE STATEMENT

The undersigned, an authorized agent of (hereafter
"Contractor"), has had an opportunity to review the requirements of City of Richmond Ordinance 12-18 (hereafter "Sanctuary City Contracting Ordinance" or “SCCO”). Contractor understands and agrees that the City may choose with whom it will maintain business relations and may refrain from contracting with any person or entity that provides Data Broker or Extreme Vetting services to the U.S. Immigration and Customs Enforcement Division of the United States Department of Homeland Security (“ICE”). Contractor understands the meaning of the following terms used in the SCCO:
a. "Data Broker” means either of the following:
i. The collection of information, including personal information about consumers, from a wide variety of sources for the purposes of reselling such information to their customers, which include both private-sector business and government agencies; ii. The aggregation of data that was collected for another purpose from that for which it is ultimately used.
b. “Extreme Vetting” means data mining, threat modeling, predictive risk analysis, or other similar services."
Contractor understands that it is not eligible to receive or retain a City contract if at the time the Contract is executed, or at any time during the term of the Contract, it provides Data Broker or Extreme Vetting services to ICE.

Contractor further understands and agrees that Contractor's failure to comply with the SCCO shall constitute a material default of the Contract and the City Manager may terminate the Contract and bar Contractor from bidding on future contracts with the City for five (5) years from the effective date of the contract termination.

By executing this statement, Contractor certifies that it complies with the requirements of the SCCO and that if at any time during the term of the Contract it ceases to comply, Contractor will promptly notify the City Manager in writing. Any person or entity who knowingly or willingly supplies false information in violation of the SCCO shall be guilty of a misdemeanor and subject to a $1,000 fine.

Based on the foregoing, the undersigned declares under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this day of , 20 , at , California.

Printed Name: Title:

Signed: Date:

Business Entity:

45950 HOTCHKISS ST.  FREMONT, CA 94539  TEL: (510) 651-8289  FAX: (510) 651-8937 http://www.du-all.com  E-mail: [email protected]

May 6, 2024

Laura Marquez, Risk Manager
City of Richmond – Human Resources Department
P.O. Box 4046
450 Civic Center Plaza
Richmond, CA 94804

Ms. Marquez,

Thank you for the opportunity to reply to the City of Richmond’s Request for Proposal for Safety/Loss Prevention Programs and Administration. The services requested in this RFP match the services that we currently offer the City of Richmond and many other California Municipalities.

During the past 19 or so years, the Du-All Safety Team, directed by Jim Thomas, has developed, implemented and managed the City of Richmond’s safety programs, including all of the regularly required Cal/OSHA compliance activities, e.g. employee training, safety inspections, record keeping, safety committee meetings, work group observations and assessments, accident investigations, written program updates, safety policy review, the development of facility maps and work procedure development/ updates.

This successful experience was key to developing strong working relationships and fostering trust with many of the hardworking managers and employees of the City of Richmond. These relationships enable Jim and his Du-All Safety team of specialists to address issues, while keeping the appropriate Richmond management team and employees informed and safe while the issue is being mitigated.

Du-All Safety continues to be the leader in the industry of Municipality Safety Compliance Support. This vast experience working closely with similar clients gives us the ability to apply proven solutions to EH&S compliance issues as they arise. When you then consider Jim Thomas’s almost 20 years of successfully managing the City’s Safety Programs, you have a pretty strong case for continuing with Du-All Safety.

I speak for Jim Thomas and the entire Du-All Safety Team when I say that we look forward to continuing our successful business relationship with the City of Richmond.

Sincerely,

Michael Connelly
Chief Operating Officer

Prepared by:
2024
Du-All Safety, LLC Fed. Tax ID.: 943317296 Michael Connelly Chief Operating Officer 45950 Hotchkiss Street Fremont, California 94539 [email protected] (510) 651-8289; www.du-all.com Rev. 5/10/24 Safety/Loss Prevention Program and Administration

Table of Contents

1.0 2.0

3.0 4.0

5.0 6.0

7.0 8.0 9.0
ORGANIZATION OF FIRM .................................................................................... 1 STAFFING ................................................................................................................. 1 EXPERIENCE..................................................................................................................2 INSURANCE ........................................................................................................................ 4 REPORTS ...................................................................................................................................4 CONTRACTUAL REQUIREMENTS ............................................................................5 SCOPE OF WORK ..........................................................................................................5 APPENDICES ..................................................................................................................7 PROPONENT’S FEE SCHEDULE .................................................................................7

Appendices

A RESUMES

B ORGANIZATIONAL FLOW CHART

C PUBLIC AGENCY REFERENCES

D SAMPLE REPORT AND SAMPLE TRAINING SCHEDULE

E SAMPLE SAFETY ARTICLE
Proposal to Provide Safety/Loss Prevention Programs and Administration for City of Richmond RFP P a g e | 1 Prepared by Du-All Safety, LLC - 05.06.2024

1.0 ORGANIZATION OF FIRM
a) Du-All Safety is located at 45950 Hotchkiss Street, Fremont, California, and was established in 1989. b) Du-All Safety became a California LLC in 1999.
c) Terry McCarthy – Non-managing majority Owner 51%
Michael Connelly - Chief Operating Officer 49%
d) No relationship to a parent company or subsidiary.
e) Michael Connelly, Chief Operating Officer, 510-651-8289 (office); 510-684-4076 (cell) f) 22 Full time staff; 4 Part time staff

2.0 STAFFING
a) Du-All Safety's staff has the qualifications, training and experience to perform the services listed in this RFP. Firm qualifications include: Certified Safety Professional, Certified Ergonomist, Certified Playground Inspector, Certified 1st Aid/CPR Instructor, Certified Hazardous Materials Management Professional, Certified Safety Inspector, and World Class Heavy Equipment Specialist. The complete depth of our key personnel to be assigned is provided in firm resumes included as Appendix A. Jim Thomas has the educational background equivalent to that listed in the RFP and works under the direction of Richard DeBusk, CSP. Jim Thomas will continue to manage and support the City of Richmond, as he has for many years. There will be no interruption of services as he will hit the ground running. Jim's salary is $150,000. b) An outline of Du-All's organizational structure is provided as Appendix B. Du-All Safety's Account Managers are supported by each other on technical issues and by our Office Manager and Administrative Assistants for all clerical, supply, and scheduling needs. Information Technology (IT) support is contracted to Valley Technical Services. c) Michael Connelly, listed above, will act as the contract administrator. d) All programs and files will be located and managed at our headquarters, 45950 Hotchkiss Street, Fremont, CA 94539. e) Employees keep their certifications current and are encouraged to attend training sessions that interest them, at Du-All Safety's expense. Instructors are also required to attend at least one Du-All Safety instructor-based training every six months to evaluate other instructors and to learn new effective presentation techniques.

Proposal to Provide Safety/Loss Prevention Programs and Administration for City of Richmond RFP P a g e | 2 Prepared by Du-All Safety, LLC - 05.06.2024

Du-All Safety employees are involved in profit sharing, which serves as a constant incentive to ensure that our clients are satisfied. Client satisfaction is also part of our employee review process, which is important for promotion and salary increases. f) In response to an increase in demand for safety support services, Du-All Safety has added four salaried positions in the last 2 years. This provides us with the depth necessary to support current clients, while planning for continued growth and expansion. Two employees have retired from salaried positions but are available for part-time work as needed.

3.0 EXPERIENCE
a) Du-All Safety currently acts as the outsourced safety department to approximately 80 California Municipalities, including its 19th successful year supporting the City of Richmond. Du-All Safety is a full-service environmental health and safety consulting firm established in 1989 and headquartered in Fremont, California. The scope of services detailed in the City of Richmond Request for Proposal for Safety/Loss Prevention Programs and Administration closely matches the core competencies required of the Safety Support Services that Du-All Safety (Du- All) provides to our Municipality Support clients. This experience supporting a multitude of municipalities is invaluable while managing projects and recognizing/mitigating hazards that are unique to Municipalities, especially in high hazard departments like: Public Works, Water and Wastewater Treatment, and Utilities. We have found that most safety-related issues that arise for a client have already been identified, analyzed and solved with another Du-All client. This dramatically reduces the time required to resolve issues and implement solutions, resulting in lower consulting costs for proven solutions.

Du-All has been conducting Safety/Loss Prevention Support for over 20 years. This comprehensive experience allows us to anticipate potential problems and issues and to prevent significant safety crises through a Design-for-Safety approach. We have established close working relationships with key Richmond managers and staff, while utilizing formal but concise management and reporting tools to ensure that management is aware and comfortable with the progress of the improvements we are helping to implement.

Du-All employees 22 health and safety specialists that develop and implement high-hazard safety programs for operations identical to those performed by City of Richmond personnel. We not only assess and develop written programs and procedures for these operations, we provide the required level of hands-on support to implement and maintain them. Our experience working with other municipal operations is extremely beneficial to the success of all Municipality Support clients, as our programs and recommendations continue to improve with the experiences gained with each client. A perfect example of synergism.

Proposal to Provide Safety/Loss Prevention Programs and Administration for City of Richmond RFP P a g e | 3 Prepared by Du-All Safety, LLC - 05.06.2024

Du-All Safety’s proven Account Management model relies firmly on an assigned Account Manager, supported by a team of health and safety specialists. The Account Manager's goal is to keep the client in compliance with Cal/OSHA, while facilitating an agreed upon Safety Plan of Action, allowing the client to operate their business while continually improving their safety program in a disciplined and cost-effective manner. Scheduled activities are assigned to Du-All subject matter specialists, effectively avoiding wasted time with a safety generalist coming up to speed with current requirements. As unexpected safety- related issues occur, the Account Manager evaluates the problem and assigns the appropriate specialist(s) to resolve the issue, effectively demonstrating the client's required due diligence. Jim Thomas has successfully managed the City of Richmond's safety program for almost 20 years. He has built many relationships with management and staff and takes pride in assisting the City achieve its safety goals. Jim will continue to act as the Du-All Safety Account Manager to the City of Richmond.

During the 20 years of providing Safety/Loss Prevention Programs and Administration services to The City of Richmond, Du-All Safety has developed safety programs, training matrices, policies, permits, and provided training to meet every compliance need. Being extremely familiar with these programs allows us to concentrate on the regular activity and best management practices required to promote safety awareness among employees and management, while maintaining Cal/OSHA and other enforcement agency's compliance requirements. Understanding that the City of Richmond is responsible for many critical functions for its citizenry, we will do our best to provide multiple availabilities for services, so as not to impede upon the very important role City staff has in the lives of the community they serve. b) The list of public entity references that we have performed Safety and Loss Prevention administration services can be found as Appendix C. c) Du-All Safety has not lost a client to our competition or dissatisfaction during the last two years. d) Du-All Safety will continue to provide full-service Safety Support to the City of Richmond, which is our most demanded service. We will continue to manage the required written safety programs we developed specifically for the City, including the required updates. We will continue to conduct training on all of the required topics, as authorized by the City. Our robust inspection schedule will continue, while responding to the safety concerns of employees and management.

Proposal to Provide Safety/Loss Prevention Programs and Administration for City of Richmond RFP P a g e | 4 Prepared by Du-All Safety, LLC - 05.06.2024

4.0 INSURANCE
Du-All Safety currently holds insurance coverage as listed in this RFP, including certificates with the City of Richmond listed and additionally insured. Current insurance certificates will be submitted upon being awarded this contact.

5.0 REPORTS
a) Plan of Action and Sample Reports are included as Appendix D. b) Our learning management system is a proprietary Du-All internet-based system with record management capabilities for assigned administrators. Du-All Safety provides reports to the City, as requested or required. Reports are then stored on Du-All’s secure server. Du-All Safety will make all client reports available in Word and PDF formats unless otherwise specified. Reports include all materials developed specifically for the client and/or tailored to client operations. These reports include written programs & policies, site inspections and assessments, a safety plan of action, safety training matrices, surveys, maps, chemical inventories, and more. The system includes record management for both in-person and on-demand e-learning courses.

c) The Du-All Safety learning portal documents training certifications for all City staff and can be accessed by City of Richmond administrators 24/7. All written programs and reports are located on the Du-All Safety secure server and can be accessed by any employee upon City of Richmond request. d) Du-All has developed several training programs due to client-specific needs. One such training program is our pre-recorded training program. This enables the client to train employees at times that are convenient, while including the specifics of the client’s required written programs and policies. Typically, a live training is recorded and put into our learning portal system. Clients are given login credentials and passwords to be used by employees. Certificates are generated at the successful completion of the training, or upon completion of any required hands-on modules.

While instructor-based training is preferred by most of our clients, this option has proven to be a cost-effective alternative, especially for shorter duration, low hazard trainings.

We also developed a training program for clients that have employees operating small boats as part of their job duties. We developed a classroom session, a hands-on session and as needed refresher training. The program continues to improve over time, with new ideas from in-class experience and discussion. We now have a trailering module for the training as well. A sample City of Richmond Plan of Action/Training Schedule is found in Appendix D.

e) Sample Article found in Appendix E.

Proposal to Provide Safety/Loss Prevention Programs and Administration for City of Richmond RFP P a g e | 5 Prepared by Du-All Safety, LLC - 05.06.2024

6.0 CONTRACTUAL REQUIREMENTS
Du-All Safety has no exceptions to the City of Richmond’s standard contract.

7.0 SCOPE OF WORK
Du-All Safety, working within the current safety structure developed for the City of Richmond, will provide the following Safety Support Services:
a) Provide assessments of, development of, or updates to, written safety programs, policies, and procedures. These have been tailored to the City of Richmond's operations and written in a format consistent with the IIPP. Programs, plans, and policies include, but are not limited to:

• Aerosol Transmissible Diseases (ATD), 8 CCR 5199
• Bloodborne Pathogen, 8 CCR 5193
• Codes of Safe Practices, 8 CCR 1509
• Crane and Hoist, 8 CCR 4884
• Emergency Action Plan, 8 CCR 3220, 40 CFR 68
• Electrical Safety, 8 CCR 2299-2589 (Low Voltage), 8 CCR 2700-2989 (High Voltage) NFPA 70E (ARC Flash) • Fire Prevention and Protection, 8
CCR 3221
• Hazardous Waste Operations and Emergency Response, 8 CCR 5192 • Heat Illness Prevention, 8 CCR 3395
• Hot Work, 8 CCR 4848
• Lockout & Tagout, (Control of Hazardous Energy) 8 CCR 3314 • Respiratory Protection, 8 CCR 5144
• Trenching/Shoring/Excavation, 8 CCR 31541, GC 4216

• Asbestos & Carcinogenic Exposure, 8 CCR 1529 and 8 CCR 5208 • Chemical Hygiene Plan, .8 CCR 5191
• Construction Safety, 8 CCR 1500-1938
• Confined Space, 8 CCR 5157
• Driver Safety, 8 CCR 3203
• Ergonomics, 8 CCR 5110
• Fall Protection, 8 CCR 1669
• Forklift (Industrial Trucks), 8 CCR 3649
• Hazard Communication, 8 CCR 5194
• Hearing Conservation, 8 CCR 5099
• Injury & Illness Prevention, 8 CCR 3203
• Personal Protective Equipment (PPE), 8
CCR 3380
• Rigging, 8 CCR 4999
• SOP & Codes of Safe Practices 8 CCR 1509
• Temporary Traffic Control and Flagger Safety
• Workplace Violence, 8 CCR 3203

b) Assist with the following safety recordkeeping requirements and provide up-to-date documents for safety coordinators, managers, and supervisors. Recordkeeping and documents include, but are not limited to:

• Accident Investigations
• Inspection Checklists
• Safety Training Records
• Respiratory Fit-testing
Proposal to Provide Safety/Loss Prevention Programs and Administration for City of Richmond RFP P a g e | 6 Prepared by Du-All Safety, LLC - 05.06.2024

• Forklift Pre-shift Inspection
• Forklift Proficiency Evaluation
• Contractor Safety Checklist
• Self-Assessment Forms
• JSA & JHA Forms
• OSHA 300 Log
• Employee Communications
• Safety Committee Meeting Minutes
• Respiratory Medical Surveillance
• Hepatitis B Declination Forms
• Personal Protective Equip. Matrix
• Driver Evaluation Forms
• Lockout/tagout Assessment Forms
• Arc Flash Engineering Assessments
c) Conduct facility health and safety inspections and develop inspection schedule for the City of Richmond. Inspection findings will be provided in a checklist format, risk assessment format, and recommended corrective actions. Reports will be sent to the client within a week of the inspection. d) Provide training at the direction of the City of Richmond. Topics may include:• Aerosol Transmissible Disease • Automotive Lift Safety
• Asbestos
• Back Safety
• Bloodborne Pathogen
• Bug bites & Animals
• Confined Spaces
• Mobile & Overhead Crane
• DOT Requirements
• Driver Safety/Defensive Driving
• Earthquake
• Electrical Safety & Arc Flash
• Emergency Response
• Ergonomics
• Fall Protection
• Fire Extinguisher
• First Aid/CPR/AED
• Forklift-Certification
• Hazard Communication (including GHS)
• Hazardous Waste
• HAZWOPER (FRA, FRO, and Technician)
• Heat Illness
• Hearing Conservation
• Heavy Equipment
• Hot Work
• Injury & Illness Prevention
• Ladder Safety
• Lead Handling
• Lockout /Tagout
• Machine Tools
• Utility Location
• Personal Protective
Equipment
• Pesticide Safety
• Lawn Mowers
• Respiratory Protection
• Rigging
• Scaffolding Safety
• SEMS/NIMS
• Spill Response
• Traffic and Flagger
Safety
• Trenching & Shoring
• Workplace Violence
Proposal to Provide Safety/Loss Prevention Programs and Administration for City of Richmond RFP P a g e | 7 Prepared by Du-All Safety, LLC - 05.06.2024

e) Maintain copies of training records and prepare safety training outlines and materials. f) Required signs, labels, tags, certificates, licenses, postings, etc. will be provided at no cost during the course of this agreement. g) Develop/maintain a twelve-month plan of action for the City of Richmond that identifies and prioritizes the update of safety programs. h) Develop division-specific safety training schedule that is based on a twelve- month cycle. i) Facilitate scheduled safety committee meetings and/or assist with tailgate meetings in a capacity that is beneficial to the City of Richmond's program. j) Coordinate and evaluate emergency drills.
k) Perform risk assessments and/or Job Hazard Analysis and develop COSPs/SOPs as requested. 1) Assist with regulatory agency inspections (i.e. Cal/OSHA, CUPA (Contra Costa County Department of Environmental Health), Fire Department, etc.). m) Du-All Safety consultants will be immediately available to support pressing client issues Monday-Friday, 7:00 AM to 5:00 PM, excluding holidays. Response time is expedited for pressing issues such as serious accident investigations and regulatory agency visits. The Account Manager will be available 24/7, including weekends and holidays to provide technical support after hours.

8.0 APPENDICES

All appendices are attached at the end of this document and are listed as follows:

Appendix A: Resumes
Appendix B: Organizational Flow Chart
Appendix C: Public Agency References
Appendix D: Sample Report and Sample Training Schedule
Appendix E: Sample Safety Article

9.0 PROPONENT’S FEE SCHEDULE

Du-All Safety’s fee schedule form follows this explanation of our fee structure.

Pricing for this contract, for all services, will be $167.00 per hour. This rate will not increase for the duration of this contract. Services are ultimately determined by the client. No projects will take place without prior approval of the client. When a request is received by the Account Manager, an estimated not to exceed number of hours is given, as well as an estimated project Proposal to Provide Safety/Loss Prevention Programs and Administration for City of Richmond RFP P a g e | 8 Prepared by Du-All Safety, LLC - 05.06.2024

completion date. Project assignment takes place once approval is received by the appropriate client contact.

Du-All successfully utilizes this invoicing protocol with all of its clients. Invoices are sent out at the end of each month, for services that took place that month, net 30 days.

Based upon our experience, the City usually requires a minimum of 60 hours of support. This number can increase, depending on approved requests, but is easily managed.

Our standard Satisfaction Guarantee is included with all work performed. If, for any legitimate reason, you are unsatisfied with a service, you will not be charged for the unsatisfactory work.

This process is initiated by contacting your Account Manager, Jim Thomas, or Chief Operating Officer, Mike Connelly.

APPENDIX A

RESUMES

Steven Pierre
General Manager
B.Sc., Exercise Science,
Sports Medicine, 1993
Concordia University, Montreal, Canada
Medic First Aid Instructor and Instructor
Trainer
STOP® Certified Instructor
Certified Playground Safety Inspector
American Safety and Health Institute
Instructor
Heat and Cold Illness Prevention
Summer Safety
Emergency Action Plans
Fire Extinguisher
Safety Responsibilities for Managers
Accident Investigation
Driver Safety
Bloodborne Pathogens and Aerosol
Transmissible Diseases
Workplace Violence
Injury and Illness Prevention Programs
Hazard Communication
Personal Protective Equipment
Silica
Back Safety and Ergonomics
COVID-19
Steven Pierre has 33 years of teaching experience in
the military and civilian fields, and has been working
with Du-All Safety for over 20 years. His specialty is
developing strong safety programs to meet federal,
state and local regulations. He has specific expertise in several fields including the development and application of Exposure Control Plans and Aerosol Transmissible
Diseases Programs.

Along with developing strong rapports while working
with police and fire departments, Mr. Pierre chairs
several safety committees for both the private and
public sectors.

In addition to his teaching and management
experience, Mr. Pierre conducts facility inspections to ensure they meet OSHA and Fire Code standards.

Mr. Pierre maintains competent understanding of health
and safety requirements promulgated by Cal-OSHA and
California Health & Safety Code regulations.

Experience

Automated External Defibrillation Program Administrator American Red Cross Santa Clara Valley Chapter
Developed and administered the automated external defibrillation program so that AEDs would be accessible to visitors and employees visiting or working in the facility associated with the Red Cross.

Ensured that the AEDs were properly inspected and maintained and that a sufficient number of trained individuals were immediately available in case of an emergency.

Emergency Response Instructor
Multiple Municipalities (including Police and Fire) in California Trained and continues to train thousands of employees on current guidelines for CPR, Automated External Defibrillation and first aid. Instrumental in the purchase and access to public defibrillation which, in turn, has led to the successful resuscitation of several individuals. Ensures that training is exciting and relevant.

Health and Safety Compliance Management
Multiple Private and Public Facilities in California
Operations included developing and chairing safety committees, job safety assessments and hazard analysis, development of written programs and procedures in the areas of exposure to bloodborne pathogens, aerosol transmissible diseases, emergency evacuation, and ergonomic safety. Managed the delegation of environmental issues including hazardous waste, wastewater, storm water, general hazardous material management and safety issues as they pertained to Cal/OSHA.

Safety Program Development and Management
Ridge Vineyards, California
Mr. Pierre developed the entire safety program to meet all relevant aspects of Title 8 of the California Code of Regulations to ensure that all employees and management were protected during all tasks and hazards associated with vineyard operations. Ensured that all training was conducted in the appropriate language to the students’ understanding.

Richard DeBusk
CSP, General Industry Division
Director
Master of Public Administration
Virginia Tech, Blacksburg, Virginia
Bachelor of Science, Business
Virginia Tech, Blacksburg Virginia
Certified Safety Professional
(CSP) #17915
American Society Safety Engineers
Sacramento Chapter
Member
Former Chapter President
Richard DeBusk is an account manager and safety
specialist. He has a broad range of experience and can
respond to most client safety needs. Mr. Debusk is a
safety generalist but has specialized training and
experience in electrical safety, lockout/tagout, crane
and rigging safety, confined space entry, excavation,
trenching and shoring safety, heavy equipment
operations, aerial and scissors lifts, construction safety, traffic and flagger safety, accident investigation,
respiratory protection, fall protection (including ladders and scaffolds), and hazardous waste operations
(HAZWOPER).

Mr. DeBusk manages a number of Du-All Safety Client
accounts, including: OSHA, several cities, city public
works departments, city utilities departments, public
utilities, waste water plants, water treatment plants and several electrical contractors. He is also an OSHA
Instructor for Electrical Safety and Construction (10-
hour and 30-hour Construction Safety Certificates).

Mr. DeBusk is veteran with 4 years of active service
and 5 years of reserve service with experience in
Search and Rescue and Boating Safety.

Experience
Consultant - Safety Engineer and Instructor
Du-All Safety in Fremont, California from 2007 to present Mr. DeBusk provides safety services, including safety program development, safety instruction, and program audits to support safety improvements. Some specific projects he has worked on include:

 Development of a qualified electrical worker program for San Leandro Water Pollution Control Plant.
 Development of a comprehensive lockout/tagout program for the Central Contra Costa Sanitary District.
 Development of an electrical safety, mobile and overhead crane and rigging safety and lockout/tagout program including training for the Tuolumne Utilities District.  Development of heavy equipment operation (excavator and backhoe) and mobile and overhead crane periodic inspection qualification and training programs for Alameda County Public Works Agency.
 Long-term safety program development and support for the Oakland Public Works Agency including safety training, program development and auditing.  Traffic and Flagger Safety training for over 25 agencies and companies in the greater Bay Area.

Safety Manager
CH2M Hill Hanford Group in Richland, Washington from 1999 to 2007 Mr. DeBusk served as the Safety Manager for Hanford Tank Farms. He led the safety and health program for this 1,500-employee Department of Energy Hazardous Waste Cleanup Project in Washington State. Accomplishments included:

 Helped build an effective partnership between management and unions through Joint Safety Committees. One result of this collaborative effort was recognition for safety excellence (VPP STAR) under the Voluntary Protection Program for the 222-S Laboratory in 2004.  Collaborated with operations, industrial hygienists, and worker representatives to develop and implement an industrial hygiene tank vapor monitoring program for a wide variety of toxic chemicals and mixed chemical/radiological hazards.

Emergency Preparedness Manager
Fluor Hanford, INC. in Richland Washington from 1997 to 1999 Mr. DeBusk led the overall corrective action response to the Plutonium Reclamation Facility (PRF) fire in early 1997. Accomplishments included:

 Negotiated with state environmental regulators for significant changes in the Hanford Site RCRA Permit. These corrective actions dramatically improved environmental compliance in six months and led to the early and safe restart of the PRF.
 Secured funding and constructed a new Emergency Operations Center (EOC).

Jose M. Mora

Director Construction Division

CPR/AED & First Aid Instructor
American Safety & Health Institute

OSHA 500 Construction Outreach Instructor
OSHA U.S Department of Labor
Chabot College

OSHA 520 Standards for the Construction
Industry

OSHA 5109 – Cal/OSHA Standards for the
Construction Industry

USACE Construction Quality Management for
Contractors #784

OSHA Training Institute Education Center
California State University Dominguez Hills

Construction Management
California State University East Bay

Principles Occupational Safety and Health
National Safety Council

Safety Management Techniques
National Safety Council

OSHA 10-HR General Industry
National Safety Council

Fluent Spanish Speaker and Writer
Jose Mora has a depth of experience in local, state and federal regulations as they relate to the management of construction and general industry safety issues. He is
fluent in both English and Spanish.

Mr. Mora has worked with clients in the manufacturing,
retail, construction, wineries, vineyards and
municipality, advising them on regulatory issues such
as confined space entry, fall protection, heavy
equipment operation, control of hazardous energies and
general safety practices. Mr. Mora has also worked
with Cal-OSHA Consultation pursuing and earning three
Cal/OSHA Golden Gate partnership recognition
certificates for pervious employers.

Working in the role of Safety Director, he managed a
team of safety professionals to provide an effective
safety program for a staff of over 500 employees
located in California and Nevada.

Mr. Mora has developed employee-management safety
committees, performed accident investigations,
conducted safety inspections and hazard assessments.

Mr. Mora maintains competent understanding of health
and safety requirements promulgated by Cal-OSHA, the
U.S. EPA, Federal OSHA, Uniform Fire Code (UFC),
Reclamation Health and Safety Standards, U.S. Army
Corps of Engineers EM-385-1-1 Standards, California
Health & Safety Code regulations, and Construction
Management.

Jose M. Mora

Experience
Director of Safety
Roofing, Waterproofing and Solar Construction for California and Northern Nevada Mr. Mora managed the company’s written safety policies including Fleet Safety Program, Field/Facility Safety, Security, Subcontractor Safety Programs, Occupational Lead Poisoning Prevention, Environmental fees and Hazardous Materials Business Plans. He was the representative on all OSHA related compliance issues, claims, violations and consultation services. Mr. Mora worked closely with builders and contractors on all residential and commercial safety programs and conducted the required Safety Trainings as mandated by OSHA for the high hazard industry. Mr. Mora also conducted and coordinated weekly safety meetings and training for Division Managers, General Supervisors, Fleet Supervisors and Fleet Drivers.

District Safety Manager
Home Improvement
Mr. Mora oversaw the execution of Safety Programs within his assigned district to reduce the frequency of injuries and accidents to both employees and customers. He successfully deployed re-engineering projects, responsibilities and key accountability through advising and counseling upper management and loss prevention on the correct execution of the safety policy. Mr. Mora conducted regulatory compliance audits and quarterly safety performance evaluations throughout his district.

Corporate EHS Ergonomics
Technology Industry
Mr. Mora performed office ergonomics including one-on-one evaluations of employee work areas, writing detailed individual reports and tracking performance status. He also identified risks, made recommendations for changes and assured the recommendations were implemented.

Compliance Specialist
Environmental Compliance and Remediation
Mr. Mora conducted initial and refresher training for Hazardous Materials Communication Programs, Fire and Emergency Response, Injury and Illness Prevention Program, Forklift, Hearing Conservation, respiratory Protection and CPR/First Aid. He also performed walkthrough facility audits, facility evacuation maps, Hazardous Material inventories and storage certification.

Household Hazardous Waste Program
County Department of Environmental Health
Mr. Mora provided educational support to residents and small businesses about the proper management of Household Hazardous Waste. He provided technical support at collection events, conducted surveys, organized manifest and reports and worked closely with the Lead Hazardous Material Technician.

Luis Canales
Environmental Health & Safety
Specialist II

COVID-19 Infectious Disease Prevention
Specialist
Certified Ergonomic Assessment
Specialist
Medic First Aid Instructor
Pediatric First Aid Instructor
American Heart BLS Instructor
American Safety and Health Institute
Instructor
Disaster and First Aid Supplies Specialist
Technology Implementation Consultant
Aerosol Transmissible Diseases Plans
Respiratory Protection Plans
Emergency Action Plans
Exposure Control Plans
Injury and Illness Prevention Plans
National Academy of Sports and Medicine
OSHA 10 Construction
Fluent Spanish Speaker and Writer
Luis Canales has 13 years of teaching experience in
the manufacturing, semiconductor, bio-tech,
automotive, healthcare and municipality sectors, as well as considerable experience in the field of environmental health and safety. He is an expert in preparing policies and procedures, and is fluent in both English and
Spanish.

Mr. Canales has eight years of operational experience
in diverse safety companies. In addition to his teaching and management, Mr. Canales conducts facility
inspections to ensure they meet OSHA and Fire Code
standards.

Mr. Canales maintains competent understanding of
health and safety requirements promulgated by Cal-
OSHA and California Health & Safety Code regulations.

Experience
Operations & Sales Director
ICE Safety Solutions Inc.

Developed and administered all aspects of company workflow and structure. Including the development of Safety Class content and their respective presentations. Training and management of safety Instructors and their development. Management of Automated external defibrillator programs and training.

Safety equipment implementation and training for large disaster-prone sectors; earthquake, fire, hurricanes, and floods.

Medic First Aid & ASHI Instructor
Multiple locations in California
Trained and continues to train hundreds of employees on current guidelines for CPR, Automated External Defibrillation and first aid. Instrumental in the purchase and access to public defibrillation which, in turn, has led to the successful resuscitation of several individuals. Ensures that training is exciting and relevant.

Basic Life Support Instructor for Healthcare
American Heart Association in California
Trained and continues to train hundreds of employees on current guidelines for CPR, Automated External Defibrillation and first aid. Instrumental in the purchase and access to public defibrillation which, in turn, has led to the successful resuscitation of several individuals. Ensures that training is exciting and relevant.

Technology Implementation and Training
Multiple locations in California
Mr. Canales develops internal software and training for the coordination of Safety programs. The use of a Customer Relationship Management System, to meet the needs of the different safety and training programs.

Certified Ergonomic Assessment Specialist
Multiple locations in California
Identify where the body is susceptible to injuries and analyze the causes, signs and symptoms of musculoskeletal disorders. Apply the OSHA ergonomics jobsite analysis forms W-1, D-2 and WAC in performing multiple task ergonomics assessments. Identify and apply effective methods for controlling risk factors. Analyze and construct injury prevention strategies. Design ergonomics problem solving solutions.

COVID-19 Infectious Disease Prevention Specialist (IDS) Multiple locations in California
Prepare companies for a pandemic and how to build an Infectious Disease Preparedness and Response Plan. Implement risk reduction strategies to lower transmission rates of infectious disease in the workplace and provide a variety of methods to reduce employee exposure.

Jon La Commare
Safety Specialist III
Authorized OSHA Outreach Trainer,
Construction Industry
OSHA 10 & 30 Hour Training,
Construction Industry
Powered Industrial Truck
Train the Trainer
40-Hour Hazardous Water Operations
and Emergency Response Trainer
EPA Certified Lead Renovator
EPA Certified Asbestos Contractor
Supervisor
Competent Person Confined Space
Entry/Non-Entry Rescue Trainer
Competent Person Fall Protection Trainer
Competent Person Trenching &
Excavation Trainer
Medic First Aid, Adult/Pediatric CPR, First
Aid and AED, Certified Instructor
American Safety & Health Institute
Wilderness Emergency Care Instructor
American Heart Association BLS
Instructor
Jon La Commare has been a professional safety
consultant and trainer since 2008 specializing in
Construction and General Industry safety, emergency
response and emergency management, and lead and
asbestos worker training. Mr. La Commare is
considered to be a master trainer and delivers engaging and informative safety training. He also has expertise
in the development, administration and recordkeeping
requirements of over 20 occupational safety and health
subject areas.

Mr. La Commare has worked with clients in the
construction, semiconductor, manufacturing,
automotive, bio-tech, medical and education industries, and municipalities, advising them on regulatory issues
such as written plan compliance, employee safety
training programs and requirements, safety committee
development, incident investigation, mock OSHA safety
inspections and job hazard assessment and reporting.

Mr. La Commare is authorized by OSHA to facilitate 10-
and 30-hour training for the construction industry and
has expertise in training asbestos maintenance
workers, lead renovators, HAZWOPER workers, CERT,
MERT and Emergency Response Team members.

Mr. La Commare maintains competent understanding of
health and safety requirements promulgated by Cal-
OSHA, Federal OSHA, the US EPA, California
Department of Toxic Substances Control (DTSC), US
Department of Transportation (DOT), and Bay Area Air
Quality Management District (BAAQMD), and included
in Title 22, 49 CFR, Title 8, Uniform Fire Code (UFC),
and California Health & Safety Code regulations

Experience
As an OSHA Safety Specialist III, Mr. La Commare specializes in the following areas:

 Injury & Illness Prevention
 Emergency Action Planning and Drills
 Personal Protective Equipment
 Hazard Communication
 Hazardous Waste Management
 Lockout/Tagout
 Fire Prevention and Fire Extinguisher Safety
 Powered Industrial Truck Operator Training
 Hearing Conservation
 Respiratory Protection
 HAZWOPER
 Exposure Control/BBP
 Temporary Traffic Control/Lane Closure
 Fall Protection/Ladder Safety
 Heat Illness Prevention and Summer Safety
 Hot Work Safety
 Cold Stress
 Spill Prevention, Control and Countermeasures
 Workplace Violence
 Safety for the Veteran Worker
 Safety Responsibilities for Supervisors
 Pesticide Handler Safety
 Chainsaw Safety and Tree Work
 Elevated Work Platforms

Jim Thomas
Safety Specialist III
Retired US Coast Guard
Chief Petty Officer
Fire Protection and Life Safety Code
Maritime Confined Space Practices
Shore Confined Space and Rescue
40 Hour Hazardous Waste Operations
and Emergency Response
Train-the-Trainer
Hazardous Waste Operations &
Emergency Response 8 Hour Supervisory
Certification Course
AHERA Building Inspector
AHERA Management Planner
Lead Related Construction
Inspector Assessor
OSHA Respiratory Protection and
Personnel Protection
OSHA Ventilation for Control of
Airborne Contaminates
OSHA Machinery and Machine Guarding
OSHA 521 Guide to Industrial Hygiene
Unit Safety Coordinator
Hazardous Waste Management 40 Hour,
Coast Guard Course
Leadership and Management
Alaska Department of Public Safety
Sea Survival
Mr. Thomas has been employed with Du-All Safety
since June 2001. Prior to that he was enlisted in the
United States Coast Guard for 21 years, achieving the
rank of Chief Petty Officer. He has a strong background in Safety and Environmental Health including safety
program assessments; program development; safety
inspections; lockout / tagout, including development of equipment-specific procedures; hot work; portable fire
extinguisher use; selection of required and
recommended personal protective equipment; machine
guarding requirement; and program implementation
through training. He provides guidance to upper
management for prioritizing actions and choosing
courses of action that ensure timely resolution of
deficiencies.

Mr. Thomas has worked with clients in a broad range of
fields, including wastewater, water, public works, parks, city and county, electronics, wineries, metal and plastic fabrication and bio-tech industries, advising them on
regulatory issues such as program deficiencies,
required training, safety inspection requirements and
findings, hazard mitigation, and supporting employee
training programs. He also heads safety committee
meetings and assists in implementing required safety
programs through training tailored to client needs.

Mr. Thomas has developed written equipment specific
lockout/tagout procedures for numerous water
treatment plants, wastewater treatment plants, aquatics facilities and city owned facilities. He has assisted
agencies in identifying machine guarding issues, and in the design and installation of machine guards. He has
also been involved in numerous initial regulatory
reviews/assessments and inspections to assist clients
in determining the status of required safety and
environmental health programs, necessary updates,
and implementation strategies.

Mr. Thomas maintains a competent understanding of
health and safety regulations promulgated by Cal-
OSHA, Uniform Fire Code (UFC), Uniform Building and
Mechanical Code and California Health & Safety Code.

Experience
Safety Inspections
Wastewater Treatment Districts throughout Marin County
Mr. Thomas was the primary inspector for a contract that involved conducting initial safety audits and inspections at seven wastewater treatment facilities and numerous lift/pump stations located throughout Marin county in order to identify hazards, regulatory deficiencies, employee exposure and safety program needs. The project was completed in a timely manner and provided critical information to management so a plan of action and time estimate could be developed in order to develop required safety programs, mitigate identified hazards and implement the programs through training.

Equipment Specific Written Procedures for Lockout/Tagout Wastewater Treatment Plants, Water Treatment Plants and other clients throughout California Mr. Thomas has developed equipment specific written procedures as required by OSHA for numerous wastewater and water treatment plants, water pumping stations, flood control pumping stations, drawbridges, lighthouses, public works agencies and equipment maintenance shops. The procedures included identification of all energy sources and types of energy present, proper shut down of equipment, identification of isolation points, type of locking device to be installed on isolation points and methods to dissipate store energy once it has been isolated. Mr. Thomas has also developed locking devices and methods for difficult isolation areas and when a readymade device is not able to be located.

Safety Program Development
Utility Districts and Public Works Facilites throughout California Mr. Thomas routinely develops Lockout/Tagout, Hearing Conservation, Hot Work, Personal Protective Equipment, Documented Personal Protective Equipment Assessments, Emergency Action Plans and other safety and health related programs for clients. Mr. Thomas ensures that the written programs are developed to the specific client needs and has worked with clients to develop identified programs in a determined time frame in order to have them implemented through training in a timely manner.

Code of Safe Practice Development
Utility Districts and Public Works Facilites throughout California Mr. Thomas has developed client and machinery specific Codes of Safe Practices for equipment located at numerous wastewater and water treatment plants, water pumping stations, Sewer lift stations, flood control pumping stations, public works agencies and equipment maintenance shops Mr. Thomas has a very strong mechanical and engineering background that works to his advantage when developing Codes of Safe Practices for new equipment or very hazardous operations.

Account Manager
Utility Districts and Public Works Facilites throughout California Mr. Thomas has been an Account Manager for Cities, Utilities Districts, Manufacturing Companies and Wineries for the entire time he has been employed at Du-All Safety. As an account manager Mr. Thomas assists the client with program oversight, program development and implementation, conducts safety inspections, conducts safety meeting, plans and delivers required safety training, conducts hazard assessments and provides recommendations on how to mitigate hazards that have been identified, schedules meetings, develops plans of actions and assists in keeping the entire safety program up and running.

Henry Fockler
CEAS, Safety Specialist III

Accident
Investigation

Aerosol
Transmissible Disease

Asbestos
Awareness

Back Safety/Safe
Lifting

Bloodborne
Pathogens

Chainsaw & Tree
Work
Maintenance/Removal
Confined Space
CPR/AED/First Aid
Certified

Overhead & Mobile
Crane Truck & Rigging

Defensive Driver
Safety

Elevating Work
Platforms

Emergency Action
Plan

Henry Fockler is a safety Specialist II with a broad
range of experience and can respond to many client safety needs. Henry is a Certified Ergonomic Assessment
Specialist. Henry is also OSHA 30-Hour Construction
Certified. Henry was a Certified Crane Operator and has training and experience in Commercial Truck Driving,
Heavy Equipment Operations, Power Lawn Mowers, Slope
Mowing, Tree Work Maintenance and Removal and much
more.

Henry is a Limited Access Specialist in Field Operations.

Henry has led Major Flood Control Levee Raising
Projects.

Henry has been knowledgeable about Large- and Small-
Scale Homeless Encampment Removal since 1990.

Mr. Fockler has over 28 years of experience in County.

Public Works with 2 large Northern California Government Agencies. Henry has practical and supervisory experience in maintenance and operations for road and flood control departments, from routine maintenance to special projects involving city, county, state and federal agencies. Many of these projects have strict safety guidelines. Henry has over 28 years of experience as a Disaster Service Worker from a field to management perspective including Emergency
Operations Center (EOC) and Department Operation
Center (DOC) experience.

Henry has also worked on a special County project that
had major cultural significance which won the J. Michael Walford Team of the Year Award.

Association of Public Works Agencies (APWA)
Supervisory and Management 90 – hour National
Certification Program Graduate.

County Government Manager Development Training
Program Graduate.

Excavation,
Trenching & Shoring

Fall Protection

Forklift & Powered
Industrial Trucks

Hearing Conservation

Heat Illness
Prevention

Portable Ladder
Safety
Additional Training and Experience Skill Set:

Cold Safety, Defensive Driver Safety, Ergonomics,
Fire Extinguisher, Hand and Portable Powered Tools and
Equipment, HazComm/GHS, Hexavalent Chromium, Hot
Work, Injury and Illness Prevention Plan, Lead Awareness, Lockout/Tagout, Machine Guarding, New Hire Safety
Orientation, Personal Protective Equipment, Powder
Actuated Tools, Respiratory Protection, Safety for the
Veteran Employee, Safety Responsibilities for
Supervisors, Silica Dust, Slip, Trips and Falls, Summer Safety, Traffic Control and Flagger Safety, Trailering
Operations, Warehouse Safety and Workplace Violence.

Fritz Garcia
Safety Specialist II
Aims Community College, 2000-2003
Greeley, CO

Board of Certified Safety Professionals
CHST - #12956
Expires 12/31/2020

OSHA 500 Trainer (10/30 Hour
Construction)
Certified in Adult CPR/First Aid/AED
Crane and Rigging Competent Person
Scaffold User/Erector Competent Person
Hilti Tool Competent Person
Swing Stage Competent Person
Trenching, Excavation, & Shoring
Competent Person
Elevated Work Platform (Scissor/Boom
Lift) Trainer
Power Industrial Truck Trainer
Fritz Garcia is an enthusiastic, self-motivated
individual with excellent communication and
relationship skills and the ability to think creatively as well as independently; experience in various office
technologies. Fritz Garcia has managed CCIP/ OCIP.
traditional insurance projects in the healthcare field, research facilities, commercial buildings, and parking
structures.

Mr. Garcia’s role, and responsibilities on projects
include development of site specific Job Site Safety
Plans; Safety Orientation; Safety Culture; Obtain Cal
OSHA job specific project permits, dealing with both
Cal OSHA consultation/enforcement, and building
relationships with clients, subcontractors, and project staff.

Managed multiple sites, workers comp claims,
reviewed all accident reports and corrective
measures. Conducted field inspections, and
coordinated activities with field safety personnel, and project personnel including implementation of SWPP
requirements.

Mr. Garcia is fluent in English, and Spanish.

Experience
Safety Manager, McCarthy Building Companies, Inc., Oakland, CA 2007 - 2018  Kaiser Oakland Hospital Replacement Program Phase 2 Central Utility Plant, Oakland, CA; 34,545, 2-story central utility plant supporting the hospital and health services building.  Kaiser Oakland Specialty Medical Office Building, Oakland, CA; 229,000, 5 level (including basement) medical office building.
 Kaiser Oakland Hospital Replacement Program Phase 2 Hospital, Oakland, CA; 650,000 sf, 319-bed replacement hospital that is the second phase of the program which includes new hospital, hospital support building and central utility plant.
 Dignity Health Mercy Medical Center Merced, Merced, CA; $166.7million, 286,000 sf, 8-story, 185-bed replacement hospital and central utility plant. Departments include: ER, ICU, newborn nursery, pharmacy, helipad and cafeteria.  Other projects worked on: Chukchansi Coarse-gold Resort, Stanford Medical Center Replacement Hospital and Parking Structure, Westfield Mall Parking Structure, and Marin General Hospital and Parking Structure.

Safety Manager, KHS&S Builders, Concord CA, 2005-2007
 The California Academy of Sciences, San Francisco, CA; aquarium, Planetarium, natural history museum and a 4-story rainforest all under one roof.
 Kaiser Permanente Antioch Medical Center, Antioch, CA; Safety Coordinator, Webcor Builders, San Francisco CA, 2003 - 2005  The Lucas Digital Arts Center in the Presidio

Ed Loyd
Safety Specialist III
B.S., Criminal Justice and California
Teaching Credential, 1989
U.C. Berkeley, California
40-Hour SCATS Training (Nevada OSHA)
and Emergency Response training
First Aid, Adult CPR, Certified
Certified Safety Technician
Homeland Security Instructor
Ergonomics and Body Mechanics
Instructor
Health Care Joint Commission Physical
Safety and Security Program Certified
Inspector
Course Instruction:

Certified Lift Truck Instructor
Heat and Cold Illness Prevention
Summer Safety
Emergency Action Plans
Fire Extinguisher
Safety Responsibilities for Managers
Accident Investigation
Driver Safety
Bloodborne Pathogens and Aerosol
Transmissible Diseases
Workplace Violence
Injury and Illness Prevention Programs
Back Safety and Ergonomics
Incident Command Certified
Confined Space
Hazardous Materials (GHS)
Crane safety and Rigging
Work Zone Safety
California Boating Safety Certified
Mr. Loyd has diverse background in safety and security
management at local, State, and federal levels. He has
a strong background in the management of
environmental health and safety issues in multiple
industries, with skills in the development, application, and documentation of, Hazardous Materials Business
Plans (HMBPs) and Risk Management Plans.

Mr. Loyd has work experience in the semiconductor,
manufacturing, hospitality, health care and bio-tech
industries, advising them on regulatory issues such as
Process Safety Management, hazardous waste
management, and supporting employee training
programs pertaining to safety and security.

He has worked with senior management within facilities, to develop several Injury, Illness Prevention Plans;
participated in employee-staffed safety committees;
assisted with accident investigations; provided safety
inspections; investigated worker compensation claims,
authorized Workplace Violence program and identified
and supported hazardous waste minimization efforts.

Mr. Loyd maintains competent understanding of health
and safety requirements promulgated by Cal-OSHA, the
US EPA, US Homeland Security, US Department of
Transportation (DOT), and Bay Area Air Quality
Management District (BAAQMD), Certified Unified
Program Agencies (CUPA) and included in Title 22, 49
CFR, Title 8, Uniform Fire Code (UFC), and California
Health & Safety Code regulations.

He has been featured in Fortune 500 and ASIS
Management magazines on articles related to
Workplace Violence and Internal Investigations.

He served on the Advisory board for Contra Costa
County Sheriff’s Office and Oro Valley Police
Department.

Experience
Air Permit
San Lorenzo, California
Mr. Loyd provided air permitting assistance to conduct air sampling activities to identify contaminates from a food manufacturing site. Responsible for evaluating public notifications requirements and completed permit application for submittal to the Bay Area Air Quality Management District.

Environmental Health and Safety Compliance
Multiple Manufacturing Facilites in California
Developed and maintained the Injury and Illness Prevention Program and Job Safety Assessments.

Conducted safety inspections, led safety committee meetings, provided onsite safety training for employees and management, managed the hazardous waste program, managed the security program and developed safety training lessons specific to the operations at the facility. Acted as company liaison for regulatory inspectors on issues concerning hazardous materials storage and industrial wastewater discharge. Conducted numerous internal investigations into employee misappropriation of company property and testified in court to support findings.

Process Safety Coordinator
Multiple Manufacturing Facilites in California
Oversaw and managed the company’s Process Safety Management (ammonia refrigeration) programs and conducted all safety training, inspections and reviews of regulatory requirements related to PSM.

Environmental areas covered in these audits included hazardous waste, emergency response to releases, and general hazardous material management. Safety compliance covered by the audit included blood borne pathogens, hearing conservation, hazard communication, proper use of PPE and general compliance with Title 8 of the California Code of Regulations (T 8 CCR). His responsibilities included compiling the findings into an audit report for each manufacturing facility’s corporate review.

Hazardous Materials Business Plan
Multiple Sites in California
Developed Hazardous Materials Business Plans (HMBPs) for multiple facilities, including food manufacturing, hospitals, biotechnology, semiconductor, hospitality, and dry goods manufacturing. The HMBPs were required for hazardous materials use and storage exceeding threshold quantities described in Section 6.95 of the California Health and Safety Code. Each plan included the required Emergency Response/Contingency Plan with information specific to the location. Oversaw various sites to verify hazardous material inventories and conduct mapping activities to be included in the plan.

Briana Lipka, QISP, CHMM
Environmental Director

B.A., Environmental Studies, 2015
San Jose State University
Hazardous Materials Business Plans
Hazardous Waste Management Training
Spill Prevention, Control and
Countermeasure Plans
Stormwater Pollution Prevention Plan
Emergency Response / Contingency
Plans
Injury and Illness Prevention Programs
Emergency Action Plans
Briana Lipka has worked in the field of health and safety for twelve years. Her specialty is developing health and safety programs to meet federal, state and local
regulations. She has expertise in creating Hazardous
Materials Business Plans for a variety of industries,
particularly for municipalities, and ensuring compliance with the State of California and local CUPAs and
regulatory agencies.

She is a Qualified Industrial Stormwater Practitioner
dedicated to reducing industrial pollutants in our
California waterways. Ms. Lipka conducts stormwater
assessments including writing and assisting with the
implementation of industrial Stormwater Pollution
Prevention Programs.

Ms. Lipka is a Certified Hazardous Material Manager
accredited through IHMM. She conducts hazardous
materials inspections for a variety of industries and
works with local, state and federal agencies to
maintain compliance and safety to all employees
working with hazardous materials.

Ms. Lipka has conducted numerous site inspections
and performed various types of environmental sampling
throughout the Bay Area, including sampling for silica, asbestos, mold, lead, indoor air quality and water
quality. She has conducted environmental and
hazardous materials inspections of municipal
operations, school districts and a variety of other
industries throughout California.

Ms. Lipka maintains competent understanding of
environmental health and safety requirements
promulgated by Cal/OSHA and California Health &
Safety Code regulations. She maintains an
understanding of current Department of Toxic
Substances Control (DTSC) regulations and State
Water Resources Control Board (SWRCB) regulations,
as well as of the individual regions associated with
them.

Experience
Program Director
Santa Clara County Creeks Coalition
Conducted and coordinated volunteer events to clean up Coyote Creek in San Jose, California.

Worked closely with schools to involve students in the importance of water quality and environmental programs. Presented to high schools and colleges throughout the Bay Area for education purposes. Ensured compliance of the non-profit with state and federal regulations.

Industrial Hygienist
The Cohen Group
Performed air quality assessments, mold investigations, water quality testing and site safety inspections and various locations throughout the Bay Area. Wrote investigation reports of findings, health and safety plans, emergency action plans, injury and illness prevention programs, bloodborne pathogens programs and various other health and safety programs.

Ron Gordon
Safety Specialist
510-917-4758
[email protected]

B.S., Administration of Justice,
San Jose State University
Medic First Aid Instructor
Medic First Aid 1st Aid/CPR/AED
Instructor
CA Full-time Teaching Credential
31 years Law Enforcement
10 years College Faculty
Active Shooter Training Instructor
Hostage Negotiations Trainer
Live Scenario Training Instructor
Workplace Violence
Hazard Communication
De-Escalation Trainer
Sexual Harassment Training
Heat and Cold Illness Prevention
Summer Safety
Emergency Action Plans
Fire Extinguisher
Safety Responsibilities for Managers
Accident Investigation
Driver Safety
Bloodborne Pathogens and Aerosol
Transmissible Diseases
Injury and Illness Prevention Programs
Personal Protective Equipment
Ron Gordon has 31 years of law enforcement
experience and upon retiring he began teaching
Criminal Justice at a private college for another 10
years. He has 40 years of teaching experience in law
enforcement, college and high school, and has been
working with Du-All Safety for over 6 years. His
specialty is developing strong safety programs to meet
federal, state and local regulations. He has specific
expertise in several fields including the development
and application of Driver Safety and Personal Safety
Programs.

Along with developing strong rapports while working
with police and fire departments, Mr. Gordon has been
on several safety committees for both the private and
public sectors.

In addition to his teaching and management
experience, Mr. Gordon conducts facility inspections to ensure they meet OSHA and Fire Code standards.

Mr. Gordon maintains competent understanding of
health and safety requirements promulgated by Cal-
OSHA and California Health & Safety Code regulations.

Experience

PROFESSIONAL EXPERIENCE

Carrington College, 5883 Rue Ferrari #125, San Jose CA 95138 408-960-0161

2017-2023
OSHA Safety / Instructor (part-time 2017-2023, Full time 2023-Present) Fremont, CA

Carrington College, 5883 Rue Ferrari #125, San Jose CA 95138 408-960-0161

2017-2023
Criminal Justice Program Director / Instructor
San Jose, CA

Eden Area ROP, 26316 Hesperian Blvd., Hayward CA 94545 510-293-2900 2017-2018
Substitute Instructor
Hayward, CA

Heald College, (Closed) 25500 Industrial Blvd., Hayward CA 94545 510-783-2100 2012-2015
Administration of Justice Instructor
Hayward, CA

Milpitas Police Department (Retired) 1275 N. Milpitas Blvd., Milpitas CA 95035 408-586-2400

1981-2012 Patrol Sergeant, Detective Sergeant, Field Training, & Crime Prevention Milpitas, CA  Field Supervisor & Watch Commander
 Conducted patrol briefings
 Supervised, Evaluated, and Trained Subordinates
 Gang Intelligence & Suppression as Milpitas High School Police Science instructor  Investigate major/minor incidents as assigned
 Conduct crime scene investigations when needed
 Interact with various Federal, State, and County agencies  Train, evaluated, trained, and mentored new officers
 Directly supervised assigned trainees
 Implemented first D.A.R.E. program amongst MPD as Lead Instructor

PROFESSIONAL DEVELOPMENT

Baton Instructor’s Course, Capitola POST Mar. 2020
Defensive Tactics Instructor’s Course, Sacramento-A.S.E.T.-STC Oct. 2019 Background Investigations, Santa Rosa Junior College POST Dec. 2011 Sherman Block Supervisory Leadership Institute, POST Sept. 2002 Sergeant as Performance Evaluator and Trainer, Just. Trng. Inst. Oct. 1996 Advanced Hostage Negotiation, S.J.S.U. Jun. 1995
P.O.S.T. Supervisory Course, Evergreen Valley College May 1995

James Powers
Account Manager
and Assistant Account
Manager
916-708-8323
[email protected]
Safety Training
LOTO
Heavy Equipment
Power Tools
Trenching/Shoring
Ladder Safety
Fall Protection
Electrical Safety
Heat Illness Prevention
Emergency Action Plan
Bloodborne Pathogens
Traffic Control/Flagger
Portable Fire
Extinguisher
Boating Safety
Safety Inspections
General Industry
Construction
James Powers started his career in the trades in 2001.

He worked his way up through the ranks, performing
nearly all construction tasks along the way. Mr. Powers realized there was a gap in safety as he witnessed
many jobsite injuries. James wanted to be part of the
change and decided to get into safety and put himself
through college via online classes. In 2015 he landed a job as a Safety Coordinator for the safest construction company in California, Rudolph and Sletten. During
that time, he worked on several hospital projects
including a Kaiser MOB which cleared over 1,000 days
with no injuries. When James completed his OSHA
500, he moved up as a Safety Manager, then on to Du-
all Safety when he completed his CSHO (Certified
Safety and Health Officer). Mr. Powers is very
passionate about safety and has a strong desire to use
his experience to help everyone achieve a safe and
successful career.

A big part of safety is being able to predict, identify and mitigate hazards. James is very good at this due to his experience and knowledge. Mr. Powers leads by example and makes corrections before they become a problem. James ensures that instructors and subject matter specialist perform as expected at clients he manages or assists in managing.

Experience

Education and Certifications
Columbia Southern – BS
Chabot – Las Positas Community College – CSHO (Certified Safety and Health Officer), Electrical Safety, Trenching Shoring and Excavation safety, Fall Protection Safety, HAZWOPER 40 hr., OSHA 500, OSHA 30 hr., OSHA 510, Permit Required Confined Space, Ergonomics

Account Manager and Assistant Account Manager
July 2023 - Present
Assistant Account Manager and Account Manager for Du-All Safety.

Managing or assisting in managing accounts with City of Davis Public Works, City of Fairfield Public Works, City of Richmond and City of Yuba City Public Works, Water Treatment and Wastewater Treatment Plants. Scheduling and conducting safety training, scheduling, and conducting safety inspections of facilities, scheduling and conducting safety committee meetings, developing written safety programs specific to clients, including lockout/tagout equipment specific written procedures, conducting noise level surveys to be included in hearing conservation programs for clients.

Conducting safety inspections and safety training at other Du-All Safety clients when requested by account managers.

Safety Manager
January 2015 – June 2023
Safety Manager – Rudolph and Sletten
Responsibilities: Preparing safety committee meeting agendas, conducting/attending safety meetings, performing safety inspection audits, facilitating, and scheduling required safety trainings, coordinate safety plan of action with colleagues, ensure safety plan of actions being followed, identifying safety shortfalls and develop plan of actions to resolve them, Identify jobsite safety hazards and issues, work to resolve them.

References
Superintendent, Louie Cimo 707-396-1044
Superintendent, Nick Martin 209-275-2507
Superintendent, Brent Newcom 916-521-5089
Account Manager Du-All Safety, James Thomas 530-570

Logan Dulaney
EH&S Specialist
910-987-2479
[email protected]

B.Sc., Environmental & Occupational
Management, 2017

Methodist University, Fayetteville, NC
Heat and Cold Illness Prevention
Summer Safety
Emergency Action Plans
Fire Extinguisher
Accident Investigation
Driver Safety
Lone Worker Safety
Chainsaw Safety
Bloodborne Pathogens and Aerosol
Transmissible Diseases
Workplace Violence
Injury and Illness Prevention Programs
Hazard Communication
Hazardous Waste Management
Personal Protective Equipment
Back Safety and Ergonomics
COVID-19
Job Hazard Analysis
Work Site Safety Inspections
Program Development
Environmental Management
Logan Dulaney has 6 years of training experience in the civilian fields and has been working with Du-All Safety as of May 1, 2023. His specialty is developing strong
safety programs to meet federal, state, and local
regulations. He has specific expertise in several fields including the development and application of
environmental compliance programs.

Along with developing strong rapports while working
with clients, Logan delivers effective individualized
training, to ensure the employees take home the
knowledge that will keep them safe.

In addition to his teaching and management
experience, Mr. Dulaney conducts facility inspections to ensure they meet Cal/OSHA, OSHA, & Health/Fire
Code standards.

Mr. Dulaney maintains a competent understanding of
health and safety requirements promulgated by Cal-
OSHA and California Health & Safety Code regulations.

Logan Dulaney Page 2
Experience

Contract Utility Forester for Duke Energy
Duke Energy Florida: Southern, & Coastal Regions
Conducted inspections in remote locations determining tree work needs for transmission lines. Performed safety inspections on tree crews ensuring company policy compliance as well as OSHA & ANZI compliance. Enforced policies & provided on-site coaching & corrective action. He was the primary trainer for all new employees on the contract. Mr. Dulaney also headed the special equipment team’s logistics & safety during disaster response, as well as aerial damage assessment. Notable storms worked: Hurricane Michael (CAT 5, 2018), Hurricane Florence (CAT 4, 2018) Refusal Specialist (Contract Utility Forester for PG&E) PG&E San Jose Region
During his time providing services for PG&E, Logan was the Refusal Specialist for the San Jose region.

On top of conducting distribution line inspections, & being the primary trainer for new employees, he was sent to work with any disgruntled &/or aggressive customers. This consisted of de-escalation in all cases, and conflict resolution. Mr. Dulaney had a 100% success rate, never needing to cut power as a forceful last resort.

Health and Safety Compliance Management
Multiple Private and Public Facilities in California
Operations included developing job safety assessments and hazard analysis, development of written programs and procedures in the areas of exposure to bloodborne pathogens, Heat Illness, IIPP, SPCC, SWPPP & emergency evacuation. Manages the delegation of environmental issues including hazardous waste, wastewater, storm water, general hazardous material management and safety issues as they pertained to Cal/OSHA.

Safety Program Development
City of Campbell, California
Mr. Dulaney developed the safety program to meet all relevant aspects of Title 8 of the California Code of Regulations to ensure that all employees and management were protected during all tasks and hazards associated with city operations.

Cleanroom, Pharmacy, & Laboratory Certification
Silicon Valley Bay Area
Performed detailed analysis of cleanrooms, pharmacies, laboratories & all the safety equipment within, across the SF bay area. This included particle counting, airflow visualization studies, airflow velocity profiles, HEPA integrity testing, viable sampling, & equipment maintenance, calibration, & certification. All in accordance to the appropriate standards: Cal/OSHA Title 8, USP 797/800, EU Annex A, USP 1116, IEST RP CC 002, IEST RP CC 006, IEST-34, ISO 14644-1, NSF/ANZI 49.

APPENDIX B

ORGANIZATION STRUCTURE
Terry McCarthy
President
Richard DeBusk
Director of General
Industry
Jim Thomas
Sr. Safety Specialist
James Powers
Safety Specialist
Paul Loscavio
Safety Specialist
Jose Mora
Construction
Director
Fritz Garcia
Compliance Specialist
Briana Lipka
Environmental
Director
Logan Dulaney
EH&S Specialist
Steven Pierre
General Manager
Michael Connelly
Chief Operating
Officer
Jennifer Thomas
Office Manager
Megan McCarthy
Administrative
Assistant
Henry Fockler
Sr. Safety Specialist
Jon LaCommare
Sr. Safety Specialist
Eric Fujiwara
Safety Specialist
Luis Canales
IT/ Safety Specialist
Ron Gordon
Safety Specialist

APPENDIX C

PUBLIC AGENCY REFERENCES

Public Agency References City of Richmond

Client Work Performed Logo
Las Gallinas Valley Sanitary District
300 Smith Ranch Road San Rafael, CA 94903 Contact: Greg Pease [email protected] (415) 472-1734 2008-Current
Developed and implemented all written EH&S programs for the District, conduct monthly safety training, provide all environmental permits, conducts regular site safety inspections.

City of Yuba City
701 Northgate
Yuba City, CA 95991 Contact: Kevin Bradford [email protected] (530) 822-4637 2006-Current
Developed and implemented all written EH&S programs for the Public Works including; Parks, Fleet, Water, and Wastewater treatment plant. We conduct monthly safety training, provide all environmental permits; conducts monthly safety committee meetings and conduct regular site safety inspections.

City of Oakland
250 Frank H. Ogawa Plaza Suite 4314
Oakland, CA 94612 Contact: Greg Elliot [email protected] (510) 238-4993 2005-Current
Developed and implemented all written EH&S programs for the Public Works Department, conduct monthly safety training, provide all environmental permits, conducts monthly safety committee meetings and conduct regular site safety inspections.

Alameda County General Services Agency 1401 Lakeside Drive 10th floor Oakland, CA 94612 Contact: Doug Bond [email protected] (510) 208-9700 2000- Current Developed and implemented all written EH&S programs for the General Services Agency. Conducts regular safety training, assistance with permits and conducts monthly safety committee meetings and regular site safety inspections.

Municipality Clients
Below is a partial list of Du-All Safety municipality clients.

City of Alameda
Alameda County GSA
Alameda County Fire Department
Alameda County Public Works
City of Antioch
City of Benicia
City of Berkeley
City of Brisbane
California City
Carmel-by-the-Sea
City of Ceres
City of Concord
Town of Danville
City of Davis
City of East Palo Alto
EBMUD
City of Fairfield
City of Fremont
City of Gilroy
City of Hayward
Town of Hillsborough
City of Hollister
Las Gallinas Valley Sanitary District
City of Lathrop
City of Livermore
City of Lodi
Marin Municipal Water District
City of Menlo Park
City of Millbrae
City of Milpitas
City of Modesto
City of Monterey
City of Morgan Hill
City of Napa
City of Oakland
City of Pacifica
City of Palo Alto
City of Pleasant Hill
City of Pleasanton
City of Redwood City
City of Richmond
City of Riverbank
City of San Carlos
City of San Leandro
City of San Mateo
Santa Clara County
City of Santa Clara
City of Saratoga
Sausalito-Marin City Sanitary District
City of Scotts Valley
City of Sonoma
City of South San Francisco
City of Sunnyvale
City of Tracy
City of Union City
City of Watsonville

APPENDIX D

SAMPLE INSPECTION REPORT

AND SAMPLE TRAINING PLAN OF ACTION

Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 1 of 18 ends

City of Richmond
Plunge Swim Center
Inspection Findings

Date of Inspection: 2/1/2024
Locations Inspected: Plunge Swim Center
Point(s) of Contact: Ranjana Maharaj and Carl Capistrano Inspected By: Jim Thomas, Du-All Safety

In accordance with the City of Richmond’s desire to maintain a safe work environment, a safety inspection was performed of the location(s) listed above. Areas in noncompliance have been indicated and a photo of the hazard may also be included. Items reported may not be in compliance with the City of Richmond’s Injury and Illness Prevention Program, safety regulations enforced by Cal/OSHA, or are recommended best management practices. These conditions require corrective action to provide a safe and healthful workplace for employees.

The inspection table on the following pages can be used to track the hazard corrections for each finding. Initial the box and note the date the hazard was corrected.

This report is based upon the information, conditions, and practices observed and provided at the time of the visit. This report does not include a review of the safety programs, policies, permits, or employee training. This report is not an engineering study, nor is there any review of the structural integrity of facilities, constructed fixtures, or equipment provided. This report may not identify all hazards or unsafe practices or to indicate other hazards or unsafe practices do not exist. It is the management’s responsibility to conduct periodic inspections and correct unsafe conditions in a timely manner. This inspection and any recommendations made are designed to assist the City of Richmond in the management of their own safety/environmental responsibilities. Du-All Safety assumes no responsibility for the control or correction of conditions or practices existing within the City of Richmond facility.

As this report is based on observations at the time of inspection and materials, facilities, and conditions change, this report is valid for 30 days.

Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 2 of 18 ends

See the bottom of each page for an explanation of the Risk Codes.

Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 3 of 18 ends

Item Hazard Identified Risk
Code
Date
Corrected
Assigned
To Initials
General

1. Work to resolve newly identified items and the
32 previously identified items. Very little
progress with resolving identified items was
observed. Failure to resolve/mitigate identified
hazards in a timely manner is a liability for the
City of Richmond.

N/A
Front Office

2. Maintain adequate walkways free of
obstructions and tripping hazards. Maintain a
minimum 24-inch-wide walkways and protect
wires from damage.

2 3.

Install a soft bridge or other suitable device to
protect the electrical wire from damage and
from being a tripping hazard. See photo
above.

2 Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 4 of 18 ends

Pool Deck

4. Have the portable fire extinguisher inspected,
serviced, and certified. The pin has been
pulled.

3 Upstairs Employee Room

5. Maintain the microwave oven in a clean and
sanitary condition. Improperly maintained
appliances like microwave ovens can become
the source of a foodborne illness that could
potentially make many employees sick.

2 Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 5 of 18 ends

6. Keep the access door secured in the closed
position. Someone climbing the ladder could
potentially hit it when climbing the roof access
ladder.

2 Front Entrance

7. Ensure that the distance from the leading
edge to the dirt in the planter does not exceed
40 inches. At 40 inches elevation safety rails
are required. Several years ago, top soil had
to be added to obtain adequate
measurements.

2 Pump/Machinery Room

8. Properly label all containers of potentially
hazardous substances.

3 Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 6 of 18 ends

Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 7 of 18 ends

The following items were previously
identified and still need to be resolved. See
Item Column for original finding date and
original item number.

Item Hazard Identified Risk
Code
Date
Corrected
Assigned
To Initials
General
4/13/2018
#1.

Ensure that the fire suppression sprinkler
systems are inspected and current. Unable to
determine if the five-year certification is up to
date. Picture is from the 2/2024 inspection.

2 4/13/2018
#3.

Properly secure all shelving, cabinets, lockers
and other items 5 feet high or higher from
tipping or falling. Pictures are from the 2/2024
inspection.

2 4/13/2018
#4.

Test, inspect and maintain all illuminated exit
signs and emergency lights. Several of the
emergency lights did not work when tested.

Picture is from the 2/16/2023 inspection.
2 Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 8 of 18 ends

5/17/2019
#3.

Ensure that all portable fire extinguishers are
identified by a sign, sticker or placard as
required. Most were identified and some were
not. Picture is from the 2/2024 inspection.

3 4/14/2020
#2.

Ensure that only the items identified by the
City of Richmond are being provided. If items
differ from the authorized items provide a letter
from a licensed healthcare provider that
indicates the items are authorized.

Recommend participating in the existing
contract that the rest of the City is using for 1st
aid supplies.
2 4/14/2020
#3.

Replace expired items in 1st aid kits. Pictures
are from the 2/2024 inspection.

2 Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 9 of 18 ends

2/22/2022
#2.

Conduct and document required monthly
inspections of portable fire extinguishers.

Picture is from the 2/2024 inspection.

3 2/16/2023
#2.

Ensure that all backflow prevention devices at
this facility have been inspected and certified
as required. The device in the
pump/machinery room was leaking, this is an
indication that it has failed. Employee present
indicated that the company that tests the
valves is aware of the situation and plans to
repair/replace the device soon. 2/2024
inspection note: Unable to verify all devices
were inspected and certified as required.

Picture is from the 2/2024 inspection.

2 Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 10 of 18 ends

2/16/2023
#3.

Recommend having the Fire Marshal inspect
the facility to ensure adequate exits and
egresses are available. The areas outside of
the west egress doors appear to be very
narrow. 2/2024 inspection note: Unable to
verify at the time of the inspection. Pictures
are from the 2/2024 inspection.

2 Roof Access Ladders
4/14/2020
#8.

Post signs by the roof access ladders
indicating that they are only to be used by
authorized personnel.
2 Public Area Behind The Facility
5/17/2019
#5.

Label the valve pit and sump as permit
required confined spaces and treat them
accordingly. Picture is from the 2/2024
inspection.

2 Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 11 of 18 ends

Pump/Machinery Room
4/4/2017
#11.

Install a guard in the small storage closet on
the N/E corner of the room. Milt recommended
installing a modern fixture or removing the
existing one as the closet is very small. Picture
is from the 2/2024 inspection.

2 2/4/2021
#9.

Maintain required 36 inches of clearance in
front of and 18 inches to the side of electrical
panels. Picture is from the 2/2024 inspection.

2 2/4/2021
#10.

Properly label the day tank. Picture is from the
2/2024 inspection.

3 Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 12 of 18 ends

2/22/2022
#4.

Post a sign indicated low head room at the
entrance to the new parts storage area.

Picture is from the 2/2024 inspection.

2 2/16/2023
#4.

Properly label all access points to permit
required confined spaces. Some are labeled
and some are not. The resent updates to the
confined space program and plans to begin
conducting entries make this an issue. Picture
is from the 2/2024 inspection.

3 2/16/2023
#5.

Properly discard the old 1st aid kit. Many items
do not have expiration dates and some items
contained in the kit are prohibited. This was
discussed in detail at the time of the
inspection. Picture is from the 2/2024
inspection.

2 Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 13 of 18 ends

2/16/2023
#6.

Ensure that the Lockout/Tagout equipment
specific written procedures have been updated
to cover the new water heaters.

2 Janitors Closet
4/4/2017
#17.

Repair or replace the shelving unit. The
shelving unit is leaning. Picture is from the
2/2024 inspection.

2 4/4/2017
#18.

Replace the electrical plug on the vacuum
cleaner as the ground prong is missing.

Pictures are from the 2/2024 inspection.

2 Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 14 of 18 ends

2/16/2023
#17.

Keep containers of chemicals closed as
required. One open container was observed.

Picture is from the 2/2024 inspection.

2 Upstairs Observation Deck
2/16/2023
#15.

Discontinue use of the electrical extension
cord in excess of 30 days. Install adequate
electrical outlets or use an authorized
electrical power strip with a cord that is long
enough. Pictures are from the 2/2024
inspection.

3 2/16/2023
#16.

Install adequate soft bridges on the electrical
cords to protect them from damage and from
being a tripping hazard. See photo above.
2 Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 15 of 18 ends

Upstairs Employee Room
2/16/2023
#12.

Maintain the areas near the roof access
ladders free of obstructions that could
potentially impede anyone using them. 2/2024
inspection note: Discontinue placing items
behind the ladder too. Anything that could
potentially interfere with someone using the
ladder is prohibited. Picture is from the 2/2024
inspection.

2 Fenced Utility Area Behind Facility
4/14/2020
#4.

Maintain required 36 inches of clearance in
front of and 18 inches to the side of electrical
panels. See picture below.
2 4/13/2018
#8.

Maintain adequate walkways that are free of
obstructions and tripping hazards. Picture is
from the 2/2024 inspection.

2 Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 16 of 18 ends

Outside Walkways
2/16/2023
#19.

Grind or otherwise make transitions, cracks,
and upheavals smooth. The uneven surfaces
are tripping hazards in a public area. Pictures
are from the 2/2024 inspection.

2 Front Door
4/13/2018
#12.

Install the missing bar on the door or remove
the piece of the bracket that has sharp edges.
2/2024 inspection note: Tape was put over the
sharp edges. Picture is from the 2/2024
inspection.

2 Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 17 of 18 ends

Pool Deck East Side
3/19/2015.
#6.

Repair or replace the damaged headrest on
the mobility impaired access chair. 4/4/2017
inspection note: The headrest has been
removed and a foam pad installed on the
support arm. Install the headrest as designed.
4/14/2020 inspection note: Both chairs were
observed to have the headrests removed and
foam installed. 2/16/2023 inspection note: The
installed foam is in a position that will not
provide any protection to a person using the
chairs.

Pictures are from the 2/2024 inspection.

2 Pool Deck
2/16/2023
#8.

Maintain unobstructed, immediate access to
all portable fire extinguishers. Picture is from
the 2/2024 inspection.

3 Risk Assessment Class
Class 1 - Critical (may cause death, serious injury, significant environmental impact, or substantial financial losses) and/or is likely to occur soon. Immediate action required.

Class 2 - Serious (may cause injury, occupational illness, or environmental or property damage) and/or probably will occur in time. Initial action within 5 days; Resolution within 30 days.

Class 3 - Minor (probably would not affect personnel or environmental safety or health, but is a violation of specific criteria, or a business continuity concern). 90 days.

Page 18 of 18 ends

2/16/2023
#10.

Repair the out of service exit door. Occupancy
load is determined by available exits. Consult
with the Fire Marshal if this exit is to remain
out of service. Picture is from the 2/2024
inspection.

2 2/16/2023
#11.

Replace the missing cover on the
weatherproof/water resistant electrical outlet.

Picture is from the 2/2024 inspection.

2 Keep one copy of these findings and use a copy as a working correction aid.

Required correction notes include:

1. Who corrected the hazard. 2. The date of the correction.

 2024 Du-All Safety, LLC (510) 651-8289

Safety Plan of Action 2024
Rev. 05/03/2024
Date Safety Activity Facilitator Location &
Time
May,2024
5/1 Safety Committee Meeting Jim Richmond
Room
1:30-2:30
5/1 Heat Illness Prevention Training James 440 CCP
7:30 to 9:00,
9:15 – 10:45
TBD Safety Inspections As Per Tracking Log Jim/James TBD 5/6 Begin Workplace Violence Program Development Jim N/A TBD De-Escalation Training Paul TBD
TBD Mindfulness Safety Paul TBD
TBD 1st Aid/CPR Paul TBD
Jun,2024
6/5 Safety Committee Meeting Jim/James Richmond
Room
1:30-2:30
6/5 Portable Fire Extinguisher James 440 CCP
7:30 -8:30,
8:45-9:45,
6/5 Employee Emergency Action Plan Training James 10:00-11:30 TBD Safety Inspections As Per Tracking Log Jim/James TBD 6/7 Finalize Workplace Violence Program Development Jim N/A TBD De-Escalation Training Paul TBD
TBD Workplace Violence Training TBD TBD

 2024 Du-All Safety, LLC (510) 651-8289

6/5 Begin Review And Update Of Hearing Conservation
Program Including Noise Level Surveys
Jim/James Various
Jul,2024
N/A No S/C meeting in July N/A N/A N/A
TBD Safety Inspections As Per Tracking Log Jim/James TBD TBD Workplace Violence Training N/A
De-Escalation Training Paul TBD
7/11 1st Aid/CPR Paul TBD
TBD Mindfulness Safety Paul TBD
TBD Woodchipper & Chainsaw Safety: Henry TBD
7:30-2:00
7/3 Continue Review And Update Of Hearing Conservation
Program Including Noise Level Surveys
Jim/James Various
Aug,2024
8/7 Safety Committee Meeting Jim/James Richmond
Room
1:30-2:30
TBD Safety Inspections As Per Tracking Log Jim/James TBD 8/7 Finalize Review And Update Of Hearing Conservation
Program Including Noise Level Surveys
Jim/James Various
8/27 HazWOPER 8 Hour Operational Logan 440 CCP
7:00-3:00
8/28 HazWOPER 8 Hour Operational Logan 440 CCP
7:00-3:00
8/29 HazWOPER 8 Hour Operational Logan 440 CCP
7:00-3:00
8/7 Begin Review And Update Bloodborne Pathogens
Program
Jim Various
Sep, 2024

 2024 Du-All Safety, LLC (510) 651-8289

9/4 Safety Committee Meeting Jim/James 1:30-2:30
TBD Safety Inspections As Per Tracking Log Jim/James TBD 9/4 Hazardous Waste with treated wood element Logan 440 CCP 7:30 -11:30
12:00-4:00
9/5 1st Aid/CPR Paul TBD
9/30 HazWOPER 8 Hour Operational Logan 440 CCP
7:00-3:00
9/4 Finalize Review And Update Bloodborne Pathogens
Program
Jim Various
Oct, 2024
10/2 Safety Committee Meeting Jim/James Richmond
Room
1:30-2:30
10/2 Forklift Training James 7:30-12:30
TBD Safety Inspections As Per Tracking Log Jim/James TBD TBD Begin Review And Update Lockout/Tagout Program James Various 10/2 Begin Review Of LoTo Equipment Specific Written
Procedures
CoR Various
Nov, 2024
11/6 Safety Committee Meeting Jim/James Richmond
Room
1:30-2:30
11/6 Lockout/Tagout Program Training James 7:30-9:00
9:15-10:45
TBD Safety Inspections As Per Tracking Log Jim/James TBD 11/5 1st Aid/CPR Paul TBD
11/6 Finalize Review And Update Lockout/Tagout Program James N/A 11/6 Finalize Review Of LoTo Equipment Specific Written CoR N/A

 2024 Du-All Safety, LLC (510) 651-8289

Procedures
11/6 Draft Annual Review Letters For LoTo Equipment
Specific Written Procedures
CoR
James
N/A
11/6 Begin Review And Update Hot Work Program James N/A Dec, 2024
12/4 Safety Committee Meeting James Richmond
Room
1:30-2:30
12/4 Railroad Safety Training Henry 7;30-9:30
9:45:11:45
TBD Homeless Camp Cleanup TBD 7:30-11:30
12/4 Begin Review And Update Respiratory Protection
Program
Henry N/A
12/4 Complete Annual Review Of Effectiveness Of
Respiratory Protection Program. Complete
Documentation By Each Department Using Respirators
CoR
Henry
Various
TBD Safety Inspections As Per Tracking Log Jim/James TBD 12/4 Finalize Review And Update Hot Work Program James Various 12/4 Begin Review And Update Personal Protective
Equipment Program
TBD Various
Jan, 2025
N/A No Safety Committee Meeting Jan Jim/James Richmond Room
1:30-2:30
TBD Safety Inspections As Per Tracking Log Jim/James TBD 1/8 Finalize Respiratory Protection Program Update Henry N/A TBD 1st Aid/CPR Paul TBD
1/27
1/29
Hot Work James 440 CCP
7:00-8:15

 2024 Du-All Safety, LLC (510) 651-8289

1/27
1/29
Portable Fire Extinguisher
Personal Protective Equipment
James 440 CCP
8:30-9:30
1/27
1/29
Hazard Communications James 440 CCP
11:00-12:00
1/27
1/29
Respiratory Protection James 440 CCP
12:30-2:45
1/29
1/29
Back/Lifting James 440 CCP
7:00-8:15
1/28
1/30
Hearing Conservation James 440 CCP
8:30-9:30
1/28
1/30
Heat Illness Prevention James 440 CCP
9:45-10:45
1/28
1/30
Bloodborne Pathogens James 440 CCP
11:00-12:00
1/28
1/30
Portable Ladder James 440 CCP
12:30-1:30
1/28
1/30
Crystaline Silica James 440 CCP
1:45-3:00
1/28
1/30
Finalize Review And Update Personal Protective
Equipment Program
TBD Various
1/2 Begin Review And Update Fall Protection Program
Including Assessments
TBD Various
Feb, 2025
2/5 Safety Committee Meeting Jim/James Richmond
Room
1:30-2:30
TBD Safety Inspections As Per Tracking Log Jim/James TBD TBD Aerial Lift/Bucket Truck W/Fall Protection TBD 7:30-2:00 N/A Continue Review And Update Fall Protection Program TBD Various

 2024 Du-All Safety, LLC (510) 651-8289

Including Assessments
Mar, 2025
3/5 Safety Committee Meeting Jim/James Richmond
Room
1:30-2:30
TBD Safety Inspections As Per Tracking Log Jim/James TBD 3/5 Traffic Control/Flagger James 440 CCV
7:30-2:30
TBD 1st Aid/CPR Paul TBD
3/5 Finalize Review And Update Fall Protection Program TBD Various 3/5 Begin Review And Update Hazard Communication
Program
Logan Various
Apr, 2025
4/2 Safety Committee Meeting Jim/James Richmond
Room
1:30-2:30
TBD Safety Inspections As Per Tracking Log James TBD
4/2 Finalize Review And Update Hazard Communication
Program
Logan Various
4/2 Fall Protection Competent Person Henry 7:30-2:30
4/2 Begin Drafting Annual Plan Of Action James N/A

APPENDIX E

SAMPLE SAFETY ARTICLE
Safety Update
November 2023
OSHA Intensifies Silica Safety Measures
In a recent development, OSHA has launched a rigorous enforcement initiative aimed at strengthening health and safety standards for respirable crystalline silica (RCS) exposure within stone cutting, fabrication, and installation industries. The

workplaces. High-concentration areas will see increased inspections. OSHA's new RCS enforcement plan focuses on comprehensive RCS hazard assessments during inspections, encompassing tasks like stone cutting, finishing, and material handling.

The memo outlines applicable OSHA standards and warns of expanded inspections should additional safety hazards be identified. Employers are encouraged to invest in silica safety training to ensure compliance and safeguard worker health. Contact us at Du-All Safety to set up your training today!
Stay informed and prioritize safety!
Significant Changes to the 2024 IATA DGR
Get ready for some major changes in the world of air transport! Starting January 1, 2024, the IATA Dangerous Goods Regulation (DGR) will see significant modifications.

These revisions are set to include the introduction of water capacity limits for non- refillable cylinders containing flammable gas, clearer guidelines for marking overpacks with dry ice, and a reference to "equipment" in IATA PI 952. Additionally, the updated regulations will provide greater clarity on UN specification marks for dangerous goods packages and emphasize that there's no need to display inner packaging details within combination packaging on the Shippers' Declaration. Expect updates to state and operator variations, as well as limitations on dangerous goods carried by airline passengers or crew.

Contact us!
Click here to read more about the new 2024 IATA DGR standards

Hazardous Waste Regulation Violation
Fine Increases Significantly in 2024
Important news from the Department of Toxic Substances Control (DTSC)! They've unveiled innovative concepts to revamp California's Code of Regulations, Title 22 (22 CCR), Sections 66272.60-66272.69, concerning the assessment of administrative penalties for hazardous waste control law violations. These concepts aim to ensure consistency in penalty assessments and prioritize robust enforcement against serious offenders in communities facing environmental challenges. Stakeholder feedback has been crucial, leading to a focus on clarity, transparency, well-defined penalties, increased fines for severe and repeated violations, and reduced penalties for small businesses.

Click below to schedule a training today!
Du-All Website

Robots to the Rescue: Cleaning Lake Tahoe's
Depths
Lake Tahoe's trash problem is getting a high-tech solution, thanks to the Restoring the Lake Depths Foundation. While local nonprofit Clean Up the Lake has made strides in pulling over 61,000 pounds of debris from the lake since 2018, depths beyond scuba divers' reach have remained a challenge. Enter the foundation, using a deep-water robot to extract refuse from the lake's depths. In summer 2023 alone, they hauled nearly 5 tons of hazardous materials, including lead-laden alcohol bottles and discarded drones.

The presence of toxic chemicals like lead and copper in the lake poses risks to human health and marine life. The foundation plans to introduce a second robot for even deeper clean-up as soon as a long enough tether is secured. Their efforts extend to other lakes in winter, and they're enhancing their robots' recognition skills with AI. An amazing initiative to safeguard Lake Tahoe's pristine beauty! Winter Road Safety
Are you and your car winter road ready? Take a minute to read these winter safety tips! Click here to read more!

Also check the date-code located on the side of the tire. It shouldn't be older than three years to achieve the rated performance value.

Ensure that your windshield wiper blades are good and have been changed within the past two years.

Please drive safe.

Instructor Spotlight: Jim Thomas
I am Jim Thomas, an Account Manager at Du-All Safety, bringing 22 years of dedicated service to the organization. Prior to joining Du-All Safety, I served for 21 years on active duty in the US Coast Guard. In my current position, I oversee accounts in Northern California and the Bay Area. My specialization lies in Lockout/Tagout, Safety Inspections, and various other safety-related initiatives. Beyond my work life, I am actively engaged in the operation of a working farm where we raise meat animals for consumption and sale. Additionally, I value quality time spent hunting and fishing with family and friends.

Copyright © 2023 Du-All Safety, All rights reserved.

You are receiving this email because you opted in via our website.

Our mailing address is:

Du-All Safety
45950 Hotchkiss St

← All documents from this meeting