Cities Index.
Att 3 - Piggyback Approval Form with documents_Signed.pdf

Richmond City Council
October 22, 2024

Document
Att 3 - Piggyback Approval Form with documents_Signed.pdf
Meeting
October 22, 2024
Body
Richmond City Council
Pages
6
Original file
7.7 MB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.

REQUEST FOR

PROPOSALS

City of Pinole
Community Development Department
2131 Pear Street
Pinole, CA 94965

Plan Check and
On-Call Staffing Services

Issue Date: September 30, 2022
Response Deadline: 5pm, October 25, 2022
Anticipated 4-Year Contract Award: November 15, 2022
Anticipated Start Date of Contract: December 2022

PAGE 2

REQUEST FOR PROPOSALS

PLAN CHECK AND ON - CALL STAFFING SERVICES

I. INTRODUCTION
The City of Pinole (“City”) is inviting competitive proposals from qualified firms (“Consultants”) to provide two types of comprehensive professional services supporting the Community Development Department:

1. Professional Contract Staffing, on an “as-needed” basis: Building Official, Combination Building Inspector(s), Permit Technician(s), and Code Enforcement Officer(s).

2. Professional Contract Plan Check Services on a routine basis: Review and provide corrections for requested building, plumbing, electrical, and mechanical plans for commercial and residential construction or reconstruction projects consistent with the California Building Codes.

These services are requested to complement and support the Building Division. The City’s intent is to minimize response time, create staff efficiencies and enhance customer service.

Pinole is a bayfront community of just over 19,000 residents in Contra Costa County, incorporated on June 25, 1903. The City has a land area of more than five square miles and is bordered by Hercules to the North, San Pablo and Richmond to the South, and the unincorporated areas of Tara Hills and El Sobrante to the southeast and southwest of the City. The City is divided by Interstate 80 (I-80) in that approximately 60 percent of the 7,106 total housing units are located on the north of I-80 and 40 percent of the housing units are located on the south of I -80. Pinole is known for its 'big box' shopping opportunities and has over 50 major retailers and restaurants situated within Pinole shopping centers.

Pinole has a well-defined, historic downtown, and a range of residential neighborhoods transitioning from older single-family and mixed residential districts on a traditional street grid around the downtown, to more typically suburban neighborhoods arranged around cul-de-sacs and curvilinear residential streets.

Higher density apartment townhome complexes, interspersed with commercial sites, are generally located along and near major arterials.

The City operates on the City Council-City Manager system of local government with five elected council members serving four-year terms with a rotating mayor. City Hall hours of operation are 8:00 am to 4:30 pm, Monday through Thursday. City Hall is closed to the public on Fridays.

II. BACKGROUND
The mission of the Community Development Department is to guide orderly growth and development in Pinole, consistent with the General Plan and priorities of the City Council, and to protect the quality of life, health, safety, and welfare of residents in Pinole. The Community Development Department is comprised of the following divisions:

Building Planning Code
Enforcement
Affordable
Housing
Economic
Development
Redevelopment
Successor

PAGE 3

The Building Division issues building permits and provides building, electrical, mechanical, plumbing, Title- 24 and accessibility inspections for new construction, additions, and alterations of commercial, residential, and public projects to ensure a safe environment for the Pinole community. The Division performs rental housing inspections on a recurring basis and business license inspections on an as-needed basis. The Division is staffed with a full time Building Official (currently under contract, City is undergoing recruitment efforts for in-house Building Official), a Building Inspector I/II (currently under contract, City is undergoing recruitment efforts for in-house Building Inspector I/II), and two Permit Technician I/II/III (currently one Permit Tech I and one Permit Tech III). See the organizational chart in Figure I, below.

Figure 1: Community Development Department Organization

Over the past five years, the Building Division has seen high level of activity through various economic cycles with several major development projects at different stages in the pipeline. Building permit and inspection activity is noted in Figures 2-7 and major development projects in various stages are noted in Table 1 of Attachment A.

The Building Division current contracts out most plan review to third-party consultants. Additionally, as noted above, several key positions will be transitioned in the Fall of 2022 from contract staffing (notably, Building Official and Building Inspector) to in-house City staff. As the in-house team becomes more robust, the volume of minor permits we will plan check in-house is expected grow modestly (i.e., generator, EV chargers, swimming pool/space equipment change outs/replastering, window/sliding glass door retrofit/repair).

Periodically, the City receives major applications for development projects in which there might not be Community Development
Department
Community Development
Director
Building Division
Building Official
Building Inspector I/II
Permit Tech I/II/III
Permit Tech I/II/III
Planning Division
Planning Manager
Senior Planner (contract)
Code Enforcement
Division
Code Enforcement Officer I/II
Seasonal Code Enforcement
Officer (contract)
Economic Development
Division
Comm. Development
Director, City Manager,
Consultants, Partners
Affordable Housing
Division
Comm. Development
Director, Consultants
Redevelopment Successor
Agency Division
Comm. Development
Director, Consultants
PAGE 4

availability of limited Building Division staff to conduct the volume of inspections required, or specialized certifications are required (e.g., Certified Access Specialist, or CASp). To maintain a consistent level of service and ensure the safety of the residents and the community the City recognizes the need for third party assistance in performing inspection services on an as-needed basis, when the level of development in the City increases and/or when major development occurs.

The Building Division operates a “one-stop” permitting processing operation responsible for coordinator of application and plan review by other City divisions, including the Planning Division, Public Works/Sewer Division, Fire Department and outside agencies. The City has partially transitioned to Bluebeam software for plan review, and is also in the process of upgrading and migrating the existing in-house electronic permit tracking system (TRAKiT) to a new web-based paperless system (Central Square Technologies Community Development Suite) to automate workflow, provide online portal capabilities, status tracking, mobile solutions, and other seamless modern technology upgrades. The expected go-live timeframe is Spring of 2023.

The City recently completed a user fee study and adopted new user and regulator fees effective September 1, 2022

1. Notably, Building plan review, permit processing and field inspection fees were restructured to enhance the correlation between services provided and fees collected, to account for economies of scale achieved as the project size grows. The fee methodology now scales to allow for lower fees for less complex projects and higher fees for more complex projects.

The City contracts out for Fire Code Compliance and necessary inspections. The City is currently in the midst of discussions with the Contra Costa County Fire Protection District (CCCFPD, “Con Fire”) regarding a potential contract for service in which Con Fire would assume responsibility for development review. If agreed to by the Local Agency Formation Commission (LAFCO) and agreed to by all parties, the expected transition period is in the Spring of 2023.

As mentioned above, the City is undergoing a recruitment for the Code Enforcement Officer I/II position, which is currently provided through a contract but will be staffed in-house beginning in Fall of 2022. The City is seeking seasonal assistance on a contract basis with weed abatement code enforcement activities, including but not limited to providing education to the public, issuing notices, performing field inspections, issuing citations, arranging for abatement warrants and organizing abatement work.

III. THIS RFP AND TIMELINE
The purpose of the RFP is to evaluate responses to select Consultants to provide services in the Scope of Services. Consultants may respond to all or specific Scopes of Services. The following is information on the review process, selection criteria and timeline associated with the RFP.

A. Letter of Intent to Respond
All interested Consultants are encouraged to submit a Letter of Intent to Respond. The deadline to submit the letter is October 7, 2022. Submitting a letter does not guarantee or replace the formal proposal process, nor does the failure to submit a letter prevent an interested firm in submitting a proposal.

All written questions received about the RFP will be distributed in writing to all firms that submitted a Letter of Intent to Respond. Letters must be uploaded to the google form here:
https://forms.gle/mnzr3tmKYWfS81rC6. Contact [email protected] if you have any questions or issues uploading your Letter.

1 https://www.ci.pinole.ca.us/city_government/finance/master_fee_schedule PAGE 5

B. Proposal Content
Each response to this RFP shall include the information described in the Proposal Content section of this RFP.

C. Questions and Inquires
All questions and inquiries must be submitted via email to Lilly Whalen at [email protected]. The deadline to submit questions is October 11, 2022. One comprehensive response to all submitted questions will be distributed to all firms that submitted a Letter of Intent to Respond.

Do not contact other individuals or City departments in this regard. Information provided by anyone other than the above contact may be invalid and proposals which are submitted in accordance with such information may be declared non-responsive.

D. Timeline
The following table is an outline of the anticipated schedule for the proposal review and contract award. Schedule is subject to change. The selected Consultants must be available to commence work as soon as December 1, 2022 as outlined in the Timeline below, and work effectively to transition workload from current Consultant, as applicable.

Milestone Date
RFP Released for Project September 30, 2022
Deadline to submit a letter to respond October 7, 2022
Deadline to submit questions and requests for clarifications October 11, 2022 Answers to consultant questions and requests for
clarifications posted
October 18, 2022
RFP Closing Date October 25, 2022
Proposals Reviewed by City Staff October 26-28, 2022
Virtual Interviews with Consultants, if required November 1, 2022 City Council Contract Award (anticipated) November 15, 2022 Work Commences for up to a four-year term December, 2022

E. Selection Criteria
The Director of Community Development will evaluate the proposals and determine if the proposal meets the criteria. A selection team may be formed to complete the review in order to assist the Director. All responses to this RFP will be reviewed and evaluated based on the information contained in the respective responses. The City may prepare an analysis of all proposals depending upon the number and quality of responses. Interviews with top Consultants may be scheduled. The City Council will make the final determination in the selection process.

The criteria to be used consist of the following:

1. Understanding of The Scope of Work to be Performed (15%) a. Demonstrated understanding of the scope of work
b. Consultant’s approach to accomplishing the scope of work c. Consultant’s timetable for rendering services, with a focus on flexibility and expedited service options

2. Consultant’s Methods and Procedures to be Used (15%) a. Consultant’s general approach to evaluating the issues b. Complete description of the procedures and analytical methods to be utilized PAGE 6

c. Ability to deliver services using technology and computers d. Consultant’s demonstrated ability to seamlessly provide service on behalf of the City

3. Management, Personnel and Experiences (30%)
a. Qualifications of each participant and overall skills for the firm b. Experience and performance of services of a similar nature c. Ability to provide the City with sufficient experienced personnel who are qualified to undertake the work needed
d. Information obtained by contacting references
e. Consultant’s demonstrated focus on quality customer service

4. Consultant’s Consultation and Coordination with the City (20%) a. Procedures to be used to ensure close contact between the consultant and the City b. Demonstrated experience in working with local governmental agencies

5. Cost Estimates (20%)
a. Cost for providing the proposed scope of services
b. Quality of work to be delivered based on consultant’s fee

IV. SCOPE OF SERVICES
This scope of services will enable the City of Pinole to obtain professional and technical assistance on a regular basis (plan check) and on short notice on an on-call, as-needed basis (staffing services) from the selected consultants. At its discretion, the City of Pinole intends to select two or more Consultants with whom the City of Pinole will contract for services.

The City of Pinole will appoint designated consultants to provide contract support services under the direction of the Building Official. For staffing, the consultants must be able to provide a broad range of specialized construction services and staff to complete task project orders issued by the City of Pinole by direct assignment of its own personnel.

The services to be provided would be on an ongoing/regular and as-needed basis, as noted below.

Contracts will be awarded for a four-year term, beginning in December, 2022. Consultants may respond to all or only specific Scopes of Services. Consultant’s proposal shall clearly identify the specific Scopes of Service Consultant is responding to.

A. Plan Review
The City’s intent is to select one or more Consultants with whom the City of Pinole will contract for independent plan check services on a routine basis. It will be at the City’s sole discretion to determine how plan check will be assigned to each on-contract Consultant. Consultant shall demonstrate in proposal who they will comply with the following:

1. Plan check shall be performed remotely and not at City offices.

2. Consultant shall assign personnel who are professionally qualified to perform commercial and/or residential construction document plan review as determined by the City. Non-Residential plan reviews including Multi-Family Dwellings shall be reviewed for accessibility compliance by a Certified Access Specialist (CASp).

3. Consultant shall identify ability to provide plan check for Fire compliance, during what is anticipated to be a transition period through the Spring of 2023 until ConFIRE takes over Fire plan check.

Consultant shall indicate ability to provide Fire plan check services beyond Spring of 2023, in the case of the ConFIRE arrangement not being agreed to by both parties and/or LAFCO.

4. Consultant shall designate one individual as the responsible contact for all communications between the City and consultant.

PAGE 7

5. Consultant shall furnish assigned personnel with all necessary materials, resources and training to conduct plan review, including a current copy of applicable City amendments, policies, procedures, ordinances and forms.

6. Consultant, upon request of the City, shall attend meetings connected with the plan review for high- priority projects, as needed, and as specified in the fee structure for plan check section of this RFP.

7. Plan review approval shall not be recommended to the City until all code compliance issues are resolved to the best of consultant’s knowledge and all permit issuance requirements of the City Building Division and Community Development Department are satisfied. Consultant shall contact City if there are questions or other arrangements are requested.

8. Consultant shall retrieve, perform and submit plan review electronically, through the City’s new permitting system (Central Square Technology’s Community Development Suite), which is expected to go-live in Spring of 2023. Until such time, Consultant shall offer an reliable electronic portal/system for filesharing/notification of plan review. Consultant shall conduct each plan review in a timely manner and within time-frame guidelines agreed upon (consultant shall identify all time-frames associated with plan review). Upon completion of each plan review, the consultant shall return the reviewed documents to the City and provide an electronic copy of the plan review comments. Upon completion of the plan review where approval of the documents is recommended, the consultant shall provide a complete set of all final review documents annotated as approved to the City of Pinole, Building Division. A complete and final invoice for the project being recommended shall be provided with the returned document/plans. A building data sheet including data as agreed to by the City and Consultant (including but not limited to occupancy classification, occupancy load, type of construction, is the building equipped with fire sprinklers, number of stories, building area by floor, etc.) shall also accompany the returned documents. Ongoing multiple services can be invoiced monthly.

9. Plan review comment letters shall be completed in an approved electronic format and provided directly to the City electronically.

10. Consultant to provide a weekly status report on all City plan review projects in progress.

11. Consultant shall conduct and coordinate all communications with the City’s representative. As directed, Consultant shall send a copy of the plan review comments to the designer of record for the project and respond to designer questions. The consultant shall not contact the applicant when plans are approved. The City will notify the applicant when the permit is ready to issue.

12. Code interpretations are subject to final review and approval by the Chief Building Official. All plan review comments are subject to the review of the City as requested.

13. Consultant shall be available within one (1) business day to respond to questions from the City that may be generated during field inspection for each authorized plan check that is subsequently issued a permit for construction.

14. The consultant must have the ability to provide plan check staff with ICC certifications.

B. Professional Staffing Services
This professional services contract will enable the City of Pinole to obtain professional and technical assistance on short notice on regular or as-needed basis from the selected consultants (as noted below).

At its discretion, the City of Pinole intends to select one or more Consultants with whom the City of Pinole will contract for services on an as-needed basis. The City of Pinole will appoint designated consultants to provide contract support services under the direction of the Building Official. The consultants must be able to provide a broad range of specialized construction services and staff to complete task project orders issued by the City of Pinole by direct assignment of its own personnel, including, but not limited to, consultation, planning, administration, specialized analytical studies, construction support, and other miscellaneous municipal report writing. Task project orders may be directly assigned to the selected consultant or assigned after review of competitive letter proposals from the selected Consultants who will be on contract with the City of Pinole. The task project may include, but is not limited to:

PAGE 8

1. Building Field Inspection Services
The consultant shall, at the request of the City, perform field inspection services on an as-needed basis (e.g., during periods of high inspection activity, through the construction of a major development project, and/or during in-house staff absences/recruitments). The inspection services shall be provided to enforce compliance with Conditions of Approval, provisions of the City’s building regulations and the code requirements set forth on the approved plans for which a permit was issued. In the performance of such duties the Contractor shall observe each project at the completion of the various stages of construction for compliance with the appropriate City and State codes. Consultant shall comply with the following:
i. All field inspections shall be performed through the City’s Community Development Department, Building Division and under the direction of the Chief Building Official or other designated staff. ii. Consultant shall assign personnel who are professionally qualified as determined by the City to perform commercial and/or residential construction inspection or Accessibility inspection. All materials, resources, tools, iPads, phones and training shall be supplied by the consultant. iii. Projects under construction by permit from the City shall be inspected for compliance with adopted State of California Building, Mechanical, Plumbing, Electrical, Energy and Fire Codes, as amended by the City and as designated by the City as well as other Codes and regulations adopted by City Ordinance. This shall include policies and interpretations of said Codes adopted by the City.

2. Permit Counter Services
The Consultant shall, at the request of the City, assign permit technician or other permit counter staffing to assist customers at the Permit Counter, including but not limited to plan intake, over the counter permit issuance, assistance with questions on building and planning code requirements, etc.

3. Code Enforcement Services
The Consultant shall, at the request of the City, assign code enforcement staffing to assist with code enforcement activities, including but not limited to providing education to the public, issuing notices, performing field inspections, issuing citations, arranging for abatement warrants, organizing abatement work.

V. PROPOSAL CONTENTS
All proposals shall be submitted in the format outlined herein. Any proposal that does not comply with the requirements in the sole opinion of the City, may be rejected. The City of Pinole will receive competitive proposal from the consultants having specific experience and qualifications in the areas identified in this RFP. Under competitive negotiations procedures, the terms of the service contract, the price of service, the method of service delivery and the conditions of performance are all negotiable. A negotiated contract will be awarded to the vendor that best meets the proposed needs at a reasonable price, not necessarily the lowest price. To be considered for selection, submit the following information in keeping with the following format and identifying each item by number and letter:

A. Table of Contents
For organization purposes, prepare a table of contents that identifies the page numbers of where to find the various sections included in the proposal.

PAGE 9

B. Cover Letter
Provide a Cover Letter d escribing the Consultant’s experience, providing a statement of qualifications for performing the requested services, and a summary of the respondent’s understanding of the scope of services, in addition to the following:
• Firm Information: State the name, address, telephone number, website address • Year Firm Established: List the year the firm was established. • Primary Contacts within the Firm: List the firm’s owner and the primary contacts within the company.

Include title, telephone number and e-mail address for each. Indicate which person will be the contact for the RFP process.
• Number of Employees in Firm: Indicate total number of employees for all locations of the firm. • Consultant Specialties: List the type(s) of work the firm specializes in. • Electronic Plan Review: Describe your abilities to accept and conduct reviews on electronic plan review submittals.
• Qualifications and Personnel: Professional background and qualifications, including Consultant’s resources, experience and demonstrated ability to perform the scope of work. This section must include an organizational chart to identify the staff who will perform the required work, corresponding resumes and professional licenses.

C. Experience, Qualifications and References
List up to five (5) projects, starting with the most recent, that the professional personnel of your firm have worked within the past 5 years. Provide the year the project was performed, the name of the municipality and location (city or county), the owner’s name, address, and contact name and phone number, and the scope of work performed. Other related experience may be included. Provide a summary of Consultant’s experience in providing these or similar services. Provide a minimum of three (3) references for projects or services similar in nature and scope that Consultant’s team members have completed in the last five (5) years. Include brief descriptions of the projects, dates, client names and contact persons’ names, addresses and telephone numbers. Include the contract amount, final cost, time to completion, and identify if the contract is active. Describe any other facets of the Firm’s experience that are relevant to this proposal that warrants consideration.

D. Services Understanding
Based on the available information, supplemental research, field observations, and experience with similar services, provide a narrative describing Consultant’s understanding of the services requested in this RFP, the general approach and any major challenges to achieving the City’s stated goals. Include any issues that Consultant believes will require special consideration. Also identify any unique approaches or strengths that Consultant may have related to the services proposed.

Provide the following information on your approach to completing the scope of services:

1. The tasks and narrative of Consultant will comply with the scope of work, and what special services and products Consultant requires to meet City needs.

2. A description of how Consultant provides the desired services and quality control to assure adequate level of service and successful project completion and management.

3. A statement indicating the firm is independent, properly licensed to practice in California, and has no conflict of interest with regard to any other work performed by the firm for the City.

PAGE 10

4. A discussion shall be included on the transitioning of the work from the City’s current Consultant to new Consultant(s), if applicable.

5. A discussion of how after-office hours or emergency response services will be provided, if required.

6. A discussion of the breadth of plan check services that the firm has to offer (e.g. building, plumbing, electrical, mechanical, grading and drainage, industrial waste).

7. Provide a Service Plan for plan check services which describes the process for, tracking submittals, routing plans, reviewing plans, and communicating with applicants and staff.

8. List typical notification time required for the Consultant to provide staffing augmentation for the City.

9. Indicate the turnaround time in terms of working days for a first-cycle check and subsequent cycles of review. The turnaround time should be measured from the time a plan is received and sent back. A table similar to the following shall be submitted:

Type of Project Turnaround
Time – First
Cycle of
Review
Turnaround
Time –
Second Cycle
of Review
Turnaround
Time – Third
Cycle of
Review
Turnaround
Time – Forth
Cycle of
Review (and
so on)
Residential
New Construction –
Single Family
[#] Working
Days
[#] Working
Days
[#] Working
Days
[#] Working
Days
New Construction –
Multifamily
[#] Working
Days
[#] Working
Days
[#] Working
Days
[#] Working
Days
Addition [#] Working
Days
[#] Working
Days
[#] Working
Days
[#] Working
Days
Remodel [#] Working
Days
[#] Working
Days
[#] Working
Days
[#] Working
Days
Non-
Residentia

New Construction [#] Working
Days
[#] Working
Days
[#] Working
Days
[#] Working
Days
Addition [#] Working
Days
[#] Working
Days
[#] Working
Days
[#] Working
Days
Remodel/ Tenant
Improvement
[#] Working
Days
[#] Working
Days
[#] Working
Days
[#] Working
Days

E. Cost, Rate and Service Structure
Provide a fee schedule for all products and services to be delivered, and a breakdown of costs delineated by tasks as described in your service plan. Define any reimbursable expenses requested to be paid by the City. Include the following, as applicable in responding to various scopes of work in this proposal:

1. Plan Check: Indicate fee as a percentage of the City’s collected plan check fee of a first cycle plan check plus additional rounds of plan check (indicate number of rounds inclusive in fee). i. This fee should include all applicable fees, including use of electronic routing software, shipping and courier service (if applicable).
ii. This fee should include allowance for a meeting with plan check staff, applicant and City staff, at the Building Official’s discretion, if plan check goes beyond the number of rounds inclusive in fee.

For example, if the plan check fee includes three rounds of review, upon conclusion of the third round, if comments are still outstanding, the Building Official may organize a meeting with the applicant and plan check staff to discuss remaining comments in order to expedite fourth cycle of review, and the fee structure should allow for this meeting without additional fees from the PAGE 11

applicant.
iii. Fee Option for Expedited Plan Check: Indicate additional options for expedited plan check, including fee and turnaround time for each type of project. iv. Include all related fees for Fire Plan check.

2. Fee Structure for ICC Certified Building Inspectors or other contractual building services including code enforcement or permit counter services. This rate shall be an all-inclusive rate. Overtime policies should be clearly listed.

F. Required Statements/Documents
Include statements of assurance regarding the following requirements:

1. Disclose any actual, apparent, direct or indirect, or potential conflicts of interest that may exist with respect to the firm, management, or employees of the firm relative to the services to be provided under the Agreement. Consultant must disclose any real or apparent conflict of interest associated with this project or with working for the City of Pinole. If a Consultant has no conflicts of interest, a statement to that effect shall be included in the Proposal.

2. Ability and agreement to fulfill the indemnification and insurance requirements contained in the sample contract.

3. A statement that nothing contained in the submitted proposal will be proprietary.

4. Acknowledgement that the Consultant understands that all documents submitted to the City in connection with the proposal are subject to the California Public Records Act and may be disclosed without notice to the Consultant.

5. A description of any and all proposed exceptions, alterations or amendments to the Scope of Services or other requirements of this RFP, including the Sample Contract (Attachment B).

6. List and explain any pending bankruptcies, liens, stop payment notices, judgments, lawsuits, arbitrations, mediations, foreclosures, and any similar actions filed or resolved in the past seven (7) years. Please indicate whether a client has ever terminated a contract for breach, and if so, please explain.

VI. GENERAL TERMS AND CONDITIONS

1. The City is not liable for any expenses incurred by any proposer prior to issuing the contract.

2. The consultant, once selected, is required to submit monthly billings.

3. The consultant selected for the project must obtain a City business tax certificate and maintain liability and workers compensation insurance coverage in accordance with the City Professional Services Agreement template, attached.

4. All work product generated by the Agreement will be owned by the City.

5. This solicitation for proposals does not commit the City to enter a contract or to pay any costs incurred in the preparation of the proposal.

6. The City reserves the right to accept or reject any and all proposals, and to negotiate with any and all qualified consultants, or to cancel in part or in its entirety this RFP.

7. The City reserves the right to accept any proposal received, to reject any or all proposals, in whole or in part, to waive irregularities, formalities, or both, as deemed appropriate, to request PAGE 12

clarification of any submittal, and to negotiate with the preferred Consultant to provide the requested services.

8. The City hereby notifies all consultants that no person will be excluded from participation in, denied any benefits of, or otherwise discriminated against in connection with the award and performance of any contract on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, or veteran status.

9. Once the consultant is selected, the City and the consultant will execute the City’s Professional Services Agreement, which will set forth the scope of work, the estimated time schedule, and the applicable rates and reimbursements.

10. All proposals submitted in response to this RFP will become the property of the City upon submission and a matter of public record pursuant to applicable law (including the California Public Records Act, Government Code section 6250 and following). The City reserves the right to make copies of all proposals available for inspection and copying by interested members of the public as records of the City and the City will be under no obligation to the consultant to withhold such records. Insofar as a proposals contains information that the consultant regards as proprietary and confidential, it is the responsibility of the consultant (and not the City) to specifically identify which items of information are proprietary and clearly identify in writing which specific pieces of information are proprietary.

It will be insufficient for the consultant to merely identify the entire proposal or an entire page or set of pages of proprietary information. Not-to-exceed sums, hourly rates and the like that may be set forth in the proposal will not constitute proprietary information nor will any information readily available to the general public or any other information not regarded as proprietary and confidential under federal or state law.

ADDRESS PROPOSALS AND QUESTIONS TO:

Lilly Whalen
Community Development Director
[email protected]
(510) 724-9832

All proposals must remain firm for a period of ninety (90) days following the last day to accept proposals.

PROPOSALS ARE DUE ON October 25, 2022 BY 5PM
SUBMIT VIA EMAIL ONLY TO:

[email protected]
ATTACHMENT A: City of Pinole Historical Permitting Data

ATTACHMENT A: City of Pinole Historical Permitting Data

Figure 2: Total Building Permits Applications by
Calendar Year

Figure 3: Distribution of Major Building Permit
Application Types by Calendar Year

Figure 4: Distribution of Permit Application Types in by Calendar Year and Quarter

624 631
796
604
761
0 100
200
300
400
500
600
700
800
900
2017 2018 2019 2020 2021

NUMBER OF PERMIT APPLICATIONS

CALENDAR YEAR
Total Building Permit Applications
614
562
722
555
721
10 69 74 49 40
0 100
200
300
400
500
600
700
800
2017 2018 2019 2020 2021
Number of Building Permits

CALENDAR YEAR
Residential
Commercial
23 14 13 11 19 10 16 10 16 20 27 16 13 22 25 26 28 12
70 145
72 105 82
112
65 119
97 123 142
95 66 52
89 73 79 83 84
90 12
7 19
17 25
6 23
19 24
38 27
25 16
27 26 30 25 29
23 17
10 18
18 24
21 25
26 27
37 21
18 17
18 25 19 13 26
283
2 3
9 8
6 15
8 11
16 12
18 13
19 26 20 24 17
35 0
50 100
150
200
250
300
Jan-Mar
Apr-Jun
Jul-Sep
Oct-Dec
Jan-Mar
Apr-Jun
Jul-Sep
Oct-Dec
Jan-Mar
Apr-Jun
Jul-Sep
Oct-Dec
Jan-Mar
Apr-Jun
Jul-Sep
Oct-Dec
Jan-Mar
Apr-Jun
Jul-Sep
2017 2018 2019 2020 2021
number of permits

CALENDAR YEAR AND QUARTER
Solar
Building
Mechanical
Plumbing
Electrical

ATTACHMENT A: City of Pinole Historical Permitting Data Figure 5: Total Project Valuation by Calendar Year

Figure 6: Number of Third-Party Projects Plan Checked by Calendar Year

Figure 7: Number of Building Inspections by Calendar Year

$13,161,968.13
$8,663,716.96
$9,792,429.13
$11,431,448.57
$10,450,567
$0.00
$2,000,000.00
$4,000,000.00
$6,000,000.00
$8,000,000.00
$10,000,000.00
$12,000,000.00
$14,000,000.00
2017 2018 2019 2020 2021

PROJECT VALUATION

CALENDAR YEAR
106
109
73 0 20 40 60 80 100 120
2020
2021
2022 (through mid-September)

NUMBER OF THIRD-PARTY PROJECTS PLAN CHECKED

CALENDAR YEAR
1368
2384 2295
1778
2314
0 500
1000
1500
2000
2500
3000
2017 2018 2019 2020 2021

NUMBER OF INSPECTIONS CALENDAR YEAR
Number of Inspections
ATTACHMENT B: Major Development Projects in Pipeline

ATTACHMENT B: Major Projects in Pipeline

Project
Name
Address Use Status No. of
Stories
No.
of
Units
Notes
Vista Woods
Apartments
600
Roble
Avenue
Residential Entitled, building
permit issued
and in
construction; pre-
leasing
expected in
early 2024
4 179 100% Senior,
100%
affordable. 16
studio
apartments, 127
one-bedroom
apartments, 34
two-bedroom
apartments and
two manager
apartments.

Appian
Village
Condominiums
2151
Appian
Way
Residential Entitled, issuance
of demolition
permit is
pending;
building permit
submittal
pending
(expected in
winter
2022/23);
anticipated that
construction will
begin in
Spring/Summer
of 2023 and
continue for a
duration of 3
years
3 154 Ownership units,
20%
affordability.

The project
consists of the
demolition of the
existing vacant
Doctors Medical
Center Pinole
Campus buildings
and all
associated
improvements
and the
development of
26 new three-
story residential
buildings
containing 154
units, as well as
associated site
improvements on

7.38-acre site.

BCRE Mixed-
Use Office
and
Residential
2801
Pinole
Valley
Road
Residential/
Office/
Commercial
Entitled,
applicant is
working on
construction
documentation,
anticipate
building permit
to be applied
for in late 2022
or early 2023
5 29 Mixed use
project,
apartments will
have 15%
affordability.

Project includes
an addition to
the existing
office commercial
building and a
new multifamily
apartment
building
containing 29
units, as well as
associated
improvements, at
the rear of 1.74-
acre lot.

ATTACHMENT B: Major Projects in Pipeline

Project
Name
Address Use Status No. of
Stories
No.
of
Units
Notes
SAHA
Veteran’s
Housing
811 San
Pablo
Avenue
Residential Entitled,
applicant is
working on
financing and
construction
documentation;
anticipate
building permit
to be applied
for early in
2023, with
construction
possibly in 2024
4 33 33-unit
affordable
housing apartment
complex, as well
as associated site
improvements on

0.61-acre site.

Pinole
Vista
Apartments
1500
Fitzgerald
Residential Not entitled. City
Council will
review
entitlements on
October 18 and
may take action
at that point
5 223 Demolition of the
existing vacant K-
Mart building and
development of a
new five-story
residential
building
containing 223
units, as well as
associated site
improvements on

5.93-acre site.
15%
affordability.

Pinole
Shores II
830-848
San
Pablo
Avenue
Industrial/
Warehousing
Not entitled.

Project is in
completeness
review with
Planning.

Entitlement
hearings
expected in
January –
February 2023
with construction
documentation
following
2 n/a Construction of
two industrial
buildings totaling
approximately
118,312 square
feet

ATTACHMENT C: Sample Professional Services Contract

Sample Consulting Services Agreement between City of Pinole and [CONSULTANT]

[DATE]

CONSULTING SERVICES AGREEMENT

BETWEEN THE CITY OF PINOLE AND
[NAME OF CONSULTANT]

THIS AGREEMENT for consulting services is made by and between the City of Pinole (“City”) and (“Consultant”) (together sometimes referred to as the “Parties”) as of , 20 (the “Effective Date”) in Pinole, California.

Section 1. SERVICES. Subject to the terms and conditions set forth in this Agreement, Consultant shall provide to City the services described in the Scope of Work attached as Exhibit A at the time and place and in the manner specified therein. In the event of a conflict in or inconsistency between the terms of this Agreement and Exhibit A, the Agreement shall prevail.

1.1 Term of Services. The term of this Agreement shall begin on the Effective Date and shall end on , and Consultant shall complete the work described in Exhibit A by that date, unless the term of the Agreement is otherwise terminated or extended, as provided for in Section 8. The time provided to Consultant to complete the services required by this Agreement shall not affect the City’s right to terminate the Agreement, as provided for in Section 8.

1.2 Standard of Performance. Consultant shall perform all services required pursuant to this Agreement in the manner and according to the standards observed by a competent practitioner of the profession in which Consultant is engaged in the geographical area in which Consultant practices its profession. Consultant shall prepare all work products required by this Agreement in a professional manner and shall conform to the standards of quality normally observed by a person practicing in Consultant's profession.

1.3 Assignment of Personnel. Consultant shall assign only competent personnel to perform services pursuant to this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the reassignment of any such persons, Consultant shall, immediately upon receiving notice from City of such desire of City, reassign such person or persons.

1.4 Time. Consultant shall devote such time to the performance of services pursuant to this Agreement as may be reasonably necessary to meet the standard of performance provided in Section 1.1 above and to satisfy Consultant’s obligations hereunder.

Section 2. COMPENSATION. City hereby agrees to pay Consultant an amount not to exceed , for all work set forth in Exhibit A and all reimbursable expenses incurred in performing the work. In the event of a conflict between this Agreement and Consultant’s proposal regarding the amount of compensation, the Agreement shall prevail. City shall pay Consultant for services rendered pursuant to this Agreement at the time and in the manner set forth herein. The payments specified below shall be the only payments from City to Consultant for services rendered pursuant to this Agreement.

Sample Consulting Services Agreement between City of Pinole and [CONSULTANT]

[DATE]

Consultant shall submit all invoices to City in the manner specified herein. Except as specifically authorized by City, Consultant shall not bill City for duplicate services performed by more than one person.

Consultant and City acknowledge and agree that compensation paid by City to Consultant under this Agreement is based upon Consultant’s estimated costs of providing the services required hereunder, including salaries and benefits of employees and subcontractors of Consultant. Consequently, the parties further agree that compensation hereunder is intended to include the costs of contributions to any pensions and/or annuities to which Consultant and its employees, agents, and subcontractors may be eligible. City therefore has no responsibility for such contributions beyond compensation required under this Agreement.

2.1 Invoices. Consultant shall submit invoices, not more often than once a month during the term of this Agreement, based on the cost for services performed and reimbursable costs incurred prior to the invoice date. Invoices shall contain the following information:

▪ Serial identifications of progress bills; i.e., Progress Bill No. 1 for the first invoice, etc.;
▪ The beginning and ending dates of the billing period; ▪ A Task Summary containing the original contract amount, the amount of prior billings, the total due this period, the balance available under the Agreement, and the percentage of completion;
▪ At City’s option, for each work item in each task, a copy of the applicable time entries or time sheets shall be submitted showing the name of the person doing the work, the hours spent by each person, a brief description of the work, and each reimbursable expense;
▪ The total number of hours of work performed under the Agreement by Consultant and each employee, agent, and subcontractor of Consultant performing services hereunder, as well as a separate notice when the total number of hours of work by Consultant and any individual employee, agent, or subcontractor of Consultant reaches or exceeds 800 hours, which shall include an estimate of the time necessary to complete the work described in Exhibit A;
▪ The Consultant’s signature.

2.2 Monthly Payment. City shall make monthly payments, based on invoices received, for services satisfactorily performed, and for authorized reimbursable costs incurred. City shall have 30 days from the receipt of an invoice that complies with all of the requirements above to pay Consultant.

2.3 Final Payment. City shall pay the last 10% of the total sum due pursuant to this Agreement within sixty (60) days after completion of the services and submittal to City of a final invoice, if all services required have been satisfactorily performed.

2.4 Total Payment. City shall pay for the services to be rendered by Consultant pursuant to this Agreement. City shall not pay any additional sum for any expense or cost whatsoever

incurred by Consultant in rendering services pursuant to this Agreement. City shall make no payment for any extra, further, or additional service pursuant to this Agreement.

Sample Consulting Services Agreement between City of Pinole and [CONSULTANT]

[DATE]

In no event shall Consultant submit any invoice for an amount in excess of the maximum amount of compensation provided above either for a task or for the entire Agreement, unless the Agreement is modified prior to the submission of such an invoice by a properly executed change order or amendment.

2.5 Hourly Fees. Fees for work performed by Consultant on an hourly basis shall not exceed the amounts shown on the following fee schedule attached hereto as Exhibit B.

2.6 Reimbursable Expenses. Reimbursable expenses are specified in Exhibit B, and shall not exceed ($ ). Expenses not listed in Exhibit B are not chargeable to City. Reimbursable expenses are included in the total amount of compensation provided under this Agreement that shall not be exceeded.

2.7 Payment of Taxes. Consultant is solely responsible for the payment of employment taxes incurred under this Agreement and any similar federal or state taxes.

2.8 Payment upon Termination. In the event that the City or Consultant terminates this Agreement pursuant to Section 8, the City shall compensate the Consultant for all outstanding costs and reimbursable expenses incurred for work satisfactorily completed as of the date of written notice of termination. Consultant shall maintain adequate logs and timesheets in order to verify costs incurred to that date.

2.9 Authorization to Perform Services. The Consultant is not authorized to perform any services or incur any costs whatsoever under the terms of this Agreement until receipt of authorization from the Contract Administrator.

Section 3. FACILITIES AND EQUIPMENT. Except as set forth herein, Consultant shall, at its sole cost and expense, provide all facilities and equipment that may be necessary to perform the services required by this Agreement. City shall make available to Consultant only the facilities and equipment listed in Exhibit C, and only under the terms and conditions set forth therein.

Section 4. INSURANCE REQUIREMENTS. Before beginning any services under this Agreement, Consultant, at its own cost and expense, shall procure the types and amounts of insurance specified herein and maintain that insurance throughout the term of this Agreement. The cost of such insurance shall be included in the Consultant’s bid or proposal. Consultant shall be fully responsible for the acts and omissions of its subcontractors or other agents.

4.1 Workers’ Compensation. Consultant shall, at its sole cost and expense, maintain Statutory Workers’ Compensation Insurance and Employer’s Liability Insurance for any and all persons employed directly or indirectly by Consultant in the amount required by applicable law. The requirement to maintain Statutory Workers’ Compensation and Employer’s Liability Insurance may be waived by the City upon written verification that Consultant is a sole proprietor and does not have any employees and will not have any employees during the term of this Agreement.

4.2 Commercial General and Automobile Liability Insurance.

Sample Consulting Services Agreement between City of Pinole and [CONSULTANT]

[DATE]

4.2.1 General requirements. Consultant, Consultant, at its own cost and expense, shall maintain commercial general and automobile liability insurance for the term of this Agreement in an amount not less than TWO MILLION DOLLARS ($2,000,000) per occurrence and FOUR MILLION DOLLARS ($4,000,000) aggregate, combined single limit coverage for risks associated with the work contemplated by this Agreement.

4.2.2 Minimum scope of coverage. Commercial general coverage shall be at least as broad as Insurance Services Office Commercial General Liability occurrence form CG 0001 (most recent edition) covering comprehensive General Liability on an “occurrence” basis. Automobile coverage shall be at least as broad as Insurance Services Office Automobile Liability form CA 0001 (most recent edition) covering any auto (Code 1), or if Consultant has no owned autos, hired (code 8) and non- owned autos (Code 9). No endorsement shall be attached limiting the coverage.

4.2.3 Additional requirements. Each of the following shall be included in the insurance coverage or added as a certified endorsement to the policy:

a. The Commercial General and Automobile Liability Insurance shall cover on an occurrence basis.
b. City, its officers, officials, employees, agents, and volunteers shall be covered as additional insureds for liability arising out of work or operations on behalf of the Consultant, including materials, parts, or equipment furnished in connection with such work or operations; or automobiles owned, leased, hired, or borrowed by the Consultant. Coverage can be provided in the form of an endorsement to the Consultant’s insurance at least as broad as CG 20 10 11 85, or both CG 20 10 10 01 and CG 20 37 10 01. c. For any claims related to this Agreement or the work hereunder, the Consultant’s insurance covered shall be primary insurance as respects the City, its officers, officials, employees, agents, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, agents or volunteers shall be excess of the Consultant’s insurance and non-contributing.
d. The policy shall cover inter-insured suits and include a “separation of Insureds” or “severability” clause which treats each insured separately. e. Consultant agrees to give at least 30 days prior written notice to City before coverage is canceled or modified as to scope or amount.

4.3 Professional Liability Insurance.

4.3.1 General requirements. Consultant, at its own cost and expense, shall maintain for the period covered by this Agreement professional liability insurance for licensed professionals performing work pursuant to this Agreement in an amount not less than ONE MILLION DOLLARS ($1,000,000) per occurrence or claim covering the Consultant’s errors and omissions.

4.3.2 Claims-made limitations. The following provisions shall apply if the professional liability coverage is written on a claims-made form:

a. The retroactive date of the policy must be shown and must be before the date of the Agreement.

Sample Consulting Services Agreement between City of Pinole and [CONSULTANT]

[DATE]

b. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the Agreement or the work.

c. If coverage is canceled or not renewed and it is not replaced with another claims-made policy form with a retroactive date that precedes the date of this Agreement, Consultant must provide extended reporting coverage for a minimum of five (5) years after completion of work under this Agreement.

d. A copy of the claim reporting requirements must be submitted to the City prior to the commencement of any work under this Agreement.

4.4 All Policies Requirements.

4.4.1 Submittal Requirements. Consultant shall submit the following to City prior to beginning services:
a. Certificate of Liability Insurance in the amounts specified in this Agreement; and
b. Additional Insured Endorsement as required for the General Commercial and Automobile Liability Polices.

4.4.2 Acceptability of insurers. All insurance required by this section is to be placed with insurers with a Bests' rating of no less than A:VII.

4.4.3 Deductibles and Self-Insured Retentions. Insurance obtained by the Consultant shall have a self-insured retention or deductible of no more than ONE HUNDRED THOUSAND DOLLARS ($100,000).

4.4.4 Wasting Policies. No policy required herein shall include a “wasting” policy limit (i.e. limit that is eroded by the cost of defense).

4.4.5 Waiver of Subrogation. Consultant hereby agrees to waive subrogation which any insurer or contractor may require from Consultant by virtue of the payment of any loss. Consultant agrees to obtain any endorsements that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

4.4.6 Subcontractors. Consultant shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein, and Consultant shall ensure that City, its officers, officials, employees, agents, and volunteers are covered as additional insured on all coverages.

4.4.7 Excess Insurance. If Consultant maintains higher insurance limits than the minimums specified herein, City shall be entitled to coverage for the higher limits maintained by the Consultant.

Sample Consulting Services Agreement between City of Pinole and [CONSULTANT]

[DATE]

4.5 Remedies. In addition to any other remedies City may have if Consultant fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, City may, at its sole option: 1) obtain such insurance and deduct and retain the amount of the premiums for such insurance from any sums due under the Agreement; 2) order Consultant to stop work under this Agreement and withhold any payment that becomes due to Consultant hereunder until Consultant demonstrates compliance with the requirements hereof; and/or 3) terminate this Agreement.

Section 5. INDEMNIFICATION AND C ONSULTANT’S R ESPONSIBILITIES.

5.1 General Indemnification. To the fullest extent permitted by law, Contractor shall defend, indemnify and hold City, its officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity, to property or persons, including wrongful death, in any manner arising out of or incident to any alleged negligent acts, omissions or willful misconduct of Contractor, its officials, officers, employees, agents, subcontractors and subcontractors arising out of or in connection with the performance of the Services, the Project or this Agreement, including without limitation the payment of all consequential damages, attorneys’ fees and other related costs and expenses.

Contractor shall defend, at Contractor's own cost, expense and risk, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against City, its directors, officials, officers, employees, agents or volunteers.

Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or its directors, officials, officers, employees, agents or volunteers, in any such suit, action or other legal proceeding. Contractor shall reimburse City and its directors, officials, officers, employees, agents and/or volunteers, for any and all legal expenses and costs, including reasonable attorneys’ fees, incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by City or its directors, officials, officers, employees, agents or volunteers. Notwithstanding the foregoing, to the extent Contractor's Services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor. This Section 5.1 shall survive any expiration or termination of this Agreement.

5.2 PERS Indemnification. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Section 6. STATUS OF CONSULTANT.

Sample Consulting Services Agreement between City of Pinole and [CONSULTANT]

[DATE]

6.1 Independent Contractor. At all times during the term of this Agreement, Consultant shall be an independent contractor and shall not be an employee of City. City shall have the right to control Consultant only insofar as the results of Consultant's services rendered pursuant to this Agreement and assignment of personnel pursuant to Subparagraph 1.3; however, otherwise City shall not have the right to control the means by which Consultant accomplishes services rendered pursuant to this Agreement. Notwithstanding any other City, state, or federal policy, rule, regulation, law, or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing services under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any and all claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in the California Public Employees Retirement System (PERS) as an employee of City and entitlement to any contribution to be paid by City for employer contributions and/or employee contributions for PERS benefits.

6.2 Consultant No Agent. Except as City may specify in writing, Consultant shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent. Consultant shall have no authority, express or implied, pursuant to this Agreement to bind City to any obligation whatsoever.

Section 7. LEGAL REQUIREMENTS.

7.1 Governing Law. The laws of the State of California shall govern this Agreement.

7.2 Compliance with Applicable Laws. Consultant and any subcontractors shall comply with all laws applicable to the performance of the work hereunder.

7.3 Other Governmental Regulations. To the extent that this Agreement may be funded by fiscal assistance from another governmental entity, Consultant and any subcontractors shall comply with all applicable rules and regulations to which City is bound by the terms of such fiscal assistance program.

7.4 Licenses and Permits. Consultant represents and warrants to City that Consultant and its employees, agents, and any subcontractors have all licenses, permits, qualifications, and approvals of whatsoever nature that are legally required to practice their respective professions. Consultant represents and warrants to City that Consultant and its employees, agents, any subcontractors shall, at their sole cost and expense, keep in effect at all times during the term of this Agreement any licenses, permits, and approvals that are legally required to practice their respective professions. In addition to the foregoing, Consultant and any subcontractors shall obtain and maintain during the term of this Agreement valid Business Licenses from City.

7.5 Pinole Business License. Consultant shall obtain a City of Pinole business license according to the terms of Title 5 of the City of Pinole Municipal Code and deliver to City proof of such business license prior to beginning work under this Agreement. Work under this Agreement cannot begin until the City receives proof that Consultant has obtained a City of Pinole business license.

7.6 Nondiscrimination and Equal Opportunity. Consultant shall not discriminate, on the basis of a person’s race, religion, color, national origin, age, physical or mental handicap or Sample Consulting Services Agreement between City of Pinole and [CONSULTANT]

[DATE]

disability, medical condition, marital status, sex, or sexual orientation, against any employee, applicant for employment, subcontractor, bidder for a subcontract, or participant in, recipient of, or applicant for any services or programs provided by Consultant under this Agreement. Consultant shall comply with all applicable federal, state, and local laws, policies, rules, and requirements related to equal opportunity and nondiscrimination in employment, contracting, and the provision of any services that are the subject of this Agreement, including but not limited to the satisfaction of any positive obligations required of Consultant thereby.

Consultant shall include the provisions of this Subsection in any subcontract approved by the Contract Administrator or this Agreement.

Section 8. TERMINATION AND MODIFICATION.

8.1 Termination. City may cancel this Agreement at any time and without cause upon written notification to Consultant.

In the event of termination, Consultant shall be entitled to compensation for services performed to the effective date of termination; City, however, may condition payment of such compensation upon Consultant delivering to City any or all documents, photographs, computer software, video and audio tapes, and other materials provided to Consultant or prepared by or for Consultant or the City in connection with this Agreement.

8.2 Extension. City may, in its sole and exclusive discretion, extend the end date of this Agreement beyond that provided for in Subsection 1.1. Any such extension shall be specified in writing by the City. Consultant understands and agrees that if City issues such an extension, City shall have no obligation to provide Consultant with compensation beyond the maximum amount provided for in this Agreement. Similarly, unless authorized

by the City, City shall have no obligation to reimburse Consultant for any otherwise reimbursable expenses incurred during the extension period.

8.3 Amendments. The parties may amend this Agreement only by a writing signed by all the parties.

8.4 Assignment and Subcontracting. City and Consultant recognize and agree that this Agreement contemplates personal performance by Consultant and is based upon a determination of Consultant’s unique professional competence, experience, and specialized professional knowledge. Moreover, a substantial inducement to City for entering into this Agreement was and is the personal reputation and competence of Consultant. Consultant may not assign this Agreement or any interest therein without the prior written approval of the City. Consultant shall not subcontract any portion of the performance contemplated and provided for herein, other than to the subcontractors noted in the proposal, without prior written approval of the City.

8.5 Survival. All obligations arising prior to the termination of this Agreement and all provisions of this Agreement allocating liability between City and Consultant shall survive the termination of this Agreement.

Sample Consulting Services Agreement between City of Pinole and [CONSULTANT]

[DATE]

8.6 Options upon Breach by Consultant. If Consultant materially breaches any of the terms of this Agreement, City’s remedies shall included, but not be limited to, the following:

8.6.1 Immediately terminate the Agreement;

8.6.2 Retain the plans, specifications, drawings, reports, design documents, and any other work product prepared by Consultant pursuant to this Agreement;

8.6.3 Retain a different consultant to complete the work described in Exhibit A not finished by Consultant; or

8.6.4 Charge Consultant the difference between the cost to complete the work described in Exhibit A that is unfinished at the time of breach and the amount that City would have paid Consultant pursuant to Section 2 if Consultant had completed the work.

Section 9. KEEPING AND STATUS OF RECORDS.

9.1 Rec ords Created as Part of Consultant’s Performan ce. All reports, data, maps, models, charts, studies, surveys, photographs, memoranda, plans, studies, specifications, records, files, or any other documents or materials, in electronic or any other form, that Consultant prepares or obtains pursuant to this Agreement and that relate to the matters covered hereunder shall be the property of the City. Consultant hereby agrees to deliver those documents to the City upon termination of the Agreement. It is understood and

agreed that the documents and other materials, including but not limited to those described above, prepared pursuant to this Agreement are prepared specifically for the City and are not necessarily suitable for any future or other use. City and Consultant agree that, until final approval by City, all data, plans, specifications, reports and other documents are confidential and will not be released to third parties without prior written consent of both parties.

9.2 Consultant’s Books and Rec ords. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services or expenditures and disbursements charged to the City under this Agreement for a minimum of three (3) years, or for any longer period required by law, from the date of final payment to the Consultant to this Agreement.

9.3 Inspection and Audit of Records. Any records or documents that Section 9.2 of this Agreement requires Consultant to maintain shall be made available for inspection, audit, and/or copying at any time during regular business hours, upon oral or written request of the City. Under California Government Code Section 8546.7, if the amount of public funds expended under this Agreement exceeds TEN THOUSAND DOLLARS ($10,000.00), the Agreement shall be subject to the examination and audit of the State Auditor, at the request of City or as part of any audit of the City, for a period of three (3) years after final payment under the Agreement.

Sample Consulting Services Agreement between City of Pinole and [CONSULTANT]

[DATE]

Section 10 MISCELLANEOUS PROVISIONS.

10.1 Attorneys’ Fees. If a party to this Agreement brings any action, including an action for declaratory relief, to enforce or interpret the provision of this Agreement, the prevailing party shall be entitled to reasonable attorneys’ fees in addition to any other relief to which that party may be entitled. The court may set such fees in the same action or in a separate action brought for that purpose.

10.2 Venue. In the event that either party brings any action against the other under this Agreement, the parties agree that trial of such action shall be vested exclusively in the state courts of California in the County of Contra Costa or in the United States District Court for the Northern District of California.

10.3 Severability. If a court of competent jurisdiction finds or rules that any provision of this Agreement is invalid, void, or unenforceable, the provisions of this Agreement not so adjudged shall remain in full force and effect. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of this Agreement.

10.4 No Implied Waiver of Breach. The waiver of any breach of a specific provision of this Agreement does not constitute a waiver of any other breach of that term or any other term of this Agreement.

10.5 Successors and Assigns. The provisions of this Agreement shall inure to the benefit of and shall apply to and bind the successors and assigns of the parties.

10.6 Use of Recycled Products. Consultant shall endeavor to prepare and submit all reports, written studies and other printed material on recycled paper to the extent it is available at equal or less cost than virgin paper.

10.7 Conflict of Interest. Consultant may serve other clients, but none whose activities within the corporate limits of City or whose business, regardless of location, would place Consultant in a “conflict of interest,” as that term is defined in the Political Reform Act, codified at California Government Code Section 81000 et seq.

Consultant shall not employ any City official in the work performed pursuant to this Agreement. No officer or employee of City shall have any financial interest in this Agreement that would violate California Government Code Sections 1090 et seq.

Consultant hereby warrants that it is not now, nor has it been in the previous twelve (12) months, an employee, agent, appointee, or official of the City. If Consultant was an employee, agent, appointee, or official of the City in the previous twelve months, Consultant warrants that it did not participate in any manner in the forming of this Agreement. Consultant understands that, if this Agreement is made in violation of Government Code §1090 et.seq., the entire Agreement is void and Consultant will not be entitled to any compensation for services performed pursuant to this Agreement, including reimbursement of expenses, and Consultant will be required to reimburse the City for any sums paid to the Consultant. Consultant Sample Consulting Services Agreement between City of Pinole and [CONSULTANT]

[DATE]

understands that, in addition to the foregoing, it may be subject to criminal prosecution for a violation of Government Code § 1090 and, if applicable, will be disqualified from holding public office in the State of California.

Consultant will comply with all conflict of interest laws and regulations including, without limitation, City’s Conflict of Interest Code (on file in the City Clerk’s Office). It is incumbent upon the Consultant or Consultant’s firm to notify the City pursuant to section 10.10 Notices of any staff changes relating to this Agreement.

a. In accomplishing the scope of services of this Agreement, all officers, employees and/or agents of Consultant(s), unless as indicated in Subsection b., will be performing a very limited and closely supervised function, and, therefore, are unlikely to have a conflict of interest arise. No disclosures are required for any officers, employees, and/or agents of Consultant, except as indicated in Subsection b.

Initialed by City Attorney’s Office

b. In accomplishing the scope of services of this Agreement, Consultant(s) will be performing a specialized or general service for the City, and there is substantial likelihood that the Consultant’s work product will be presented, either written or orally, for the purpose of influencing a governmental decision. As a result, the following Consultant(s) shall be subject to the Disclosure Category “1-5” of the City’s Conflict of Interest Code:

10.8 Solicitation. Consultant agrees not to solicit business at any meeting, focus group, or interview related to this Agreement, either orally or through any written materials.

10.9 Contract Administration. This Agreement shall be administered by who shall act as the City’s representative. All
correspondence shall be directed to or through or his or her designee.

10.10 Notices. Any written notice to Consultant shall be sent to:

Any written notice to City shall be sent to:

Sample Consulting Services Agreement between City of Pinole and [CONSULTANT]

[DATE]

10.11 Professional Seal. Where applicable in the determination of the City, the first page of a technical report, first page of design specifications, and each page of construction drawings shall be stamped/sealed and signed by the licensed professional responsible for the report/design preparation.

10.12 Integration; Incorporation. This Agreement, including all the exhibits attached hereto, represents the entire and integrated agreement between City and Consultant and supersedes all prior negotiations, representations, or agreements, either written or oral.

All exhibits attached hereto are incorporated by reference herein.

10.13 Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be an original and all of which together shall constitute one agreement.

The Parties have executed this Agreement as of the Effective Date.

CITY OF PINOLE CONSULTANT

Attest:

OCTOBER 25, 2022

PROPOSAL TO PROVIDE

PLAN CHECK AND

ON-CALL STAFFING SERVICES

FOR THE

CITY OF PINOLE

COMMUNITY DEVELOPMENT DEPARTMENT
Submitted By:

EXHIBIT B
102 of 1216
OCTOBER 25, 2022

PROPOSAL TO PROVIDE

PLAN CHECK AND ON-CALL STAFFING SERVICES

FOR THE

CITY OR PINOLE

SECTION A

TABLE OF CONTENTS
103 of 1216

SECTION A
Table of Contents

1 SECTION B
Cover Letter
 Resumes

2‐6

SECTION C
Experience, Qualifications and References

7‐11

SECTION D
Services Understanding

12‐19

SECTION E
Cost, Rate and Service Structure

20‐23

SECTION F
Required Statements / Documents

24 104 of 1216
OCTOBER 25, 2022

PROPOSAL TO PROVIDE

PLAN CHECK AND ON-CALL STAFFING SERVICES

FOR THE

CITY OR PINOLE

SECTION B

COVER LETTER
 RESUMES
105 of 1216

Engineering  Construction Management  Inspection  Plan Check  Planning

2126 Rheem Drive  Pleasanton, CA 94588  Phone (925) 462-5959  Fax (925) 462-5958 8896 North Winding Way  Fair Oaks, CA 95628  Phone (916) 965-0010  Fax (916) 965-0013

City of Pinole  October 25, 2022
Community Development Department
2131 Pear Street
Pinole, CA 94965
Attn: Lilly Whalen, Community Development Director

RE: Proposal to Provide Plan Check and On‐Call Staffing Services.

Dear Ms. Whalen,

4LEAF, Inc. (4LEAF), a California “C” Corporation established in 1999 and incorporated in 2001, is pleased to present our proposal to provide Plan Check and On‐Call Staffing Services to the City of Pinole (City). 4LEAF’s has grown to more than 400 personnel and has been providing these services to clients, incl uding for the City, throughout California for more than 21 years and is looking forward to the opportunity to renew our current contract with the City. 4LEAF is the ideal choice for the following reasons:

 Familiar Consultant
4LEAF  has  been  providing  Plan  Review,  Inspection,  and  Staff  Augmentation  Services  to  the  City  of Pinole since 2014. Our staff and project managers have established a collaborative working relationship with  the  City’s Community  Development  Department  and  understands  the  City’s  processes  and procedures.  4LEAF  would  be  humbled  to  extend  our  curr ent   contract  and  continue  to  provide professional, quality services to the City.

 Local Presence
4LEAF  works  with  multiple  local  municipalities  providing  the  requested  services.  We  have  the  local personnel ready to service the City and are supplying services to nearby municipalities such as:
 City of Benicia
 City of Vallejo
 City of San Pablo
 City of Richmond
 City of Conco rd
 City of Pleasant Hill
 City of Walnut Creek
 City of Antioch
 City of Pittsburg
 City of Napa
 City of Fairfield
 County of Solano
 County of Contra Costa
 County of Alameda
 County of San Joaquin
 Approach
Our staff incorporates the right combination of experience, education, certifications, and registrations, allowing the 4LEAF team to provide a wide range of resources customized to the specific requirements of  each  client  and  project.  You  can  be  confident  that  your  team  will  be  partnering  with  staff  that understands your department and service protocols. Our approa ch to providing professional services to the City is straight forward:
 Provide qualified professionals who know how to partner successfully with the City  Supply proven resources and innovative ideas
 Offer resource reliability and flexibility
 Communicate with the City, Developers, Contractors, Architects, and homeowners

106 of 1216
Proposal to Provide Plan Check and On‐Call Staffing Services to the City of Pinole 2126 Rheem Drive  Pleasanton, CA 94588  Phone (925) 462-5959  Fax (925) 462-5958 8896 North Winding Way  Fair Oaks, CA 95628  Phone (916) 965-0010  Fax (916) 965-0013

 Full‐Service Firm
As a full‐service firm, 4LEAF can provide departmental services to aid with high project workloads that require additional staff assistance. We provide jurisdictions with Building, Planning, Public Works, and Fire Department services and have the qualified staff available to serve the City with remote, on‐site, part‐ti me,  or full‐time project needs. For the scope of this contract, our services include:
o Plan Review: 4LEAF is an industry leader in Plan Review services and has a team of Structural Engineers,  Green  Building,  Geotechnical,  Solar,  Accessibility  Specialists  (CASp),  and Mechanical/Electrical/Plumbing/Fire  Plans  Examiners.  Our  team  has  experience  working  on projects including single‐ and multi‐family, commercial and industrial, tenant improvements, and additions and remodels. We provide courier services that guarante e less than 24‐hour pickup and delivery and offer electronic and expedited plan review services upon request. o Permit Technician: 4LEAF’s pool of talented professionals includes qualified and experienced permit  technicians  capable  of  providing  all  permit  processing  and  counter  services.  4LEAF  can deploy such staff on short notice and offer training programs for department staff, if required. o CASP Plan Review and Inspection: 4LEAF has nine Certified  Access Specialists on staff. We have  performed  CASp  inspection  and  plan  review  projects  and  have  consulted  on  num erous
construction projects for accessibility questions and advice for a number of our clients. o Building Inspection:  We  have  over  200  inspectors  on  staff  who  specialize  in  Residential, Commercial, Industrial, Energy, Fire, ADA, Solar, and Public Works projects. We have a history of providing inspectors as‐needed for long‐ or short‐term projects, including one day assignments to cover staff training, sick days, vacation days, or spikes in perm it  activity. o Fire: Our team is comprised of Fire Protection Engineers, Fire Plans Examiners, Fire Marshals, and other experts who specialize in Fire Life Safety Plan Review, Inspection, and Disaster Recovery. o Code Enforcement: 4LEAF staff have the experience working with property owners and other responsible parties to bring properties and conditions into compliance. Our Code Enforcement team is skilled in using processes including issuing administrative citations to establish whether violations of law exist on a property and ensuring compliance.  Electronic Plan Review
4LEAF  has  successfully  implemented  and  used  Bluebeam  for  electronic  review  of  files  to  help eliminate the use of paper and take the plan review workflow to a whole new level. 4LEAF’s offices are equipped with large scale monitors for easy review of plans. Bluebeam Revu combines powerful PDF editi ng,  markup, and collaboration technology with reliable file creation.

 4LEAF Management Team
President, Authorized to sign: Kevin J. Duggan
Phone: (925) 462‐5959
Email: [email protected]
Executive Project Manager: Craig Tole
Phone: (925) 580‐4055
Email: [email protected]
Director of Jurisdictional Services: Raylee Glasser, CBO Phone: (925) 708‐4209
Email: [email protected]
Director of Inspections: Mike Leontiades, CBO
Phone: (925) 681‐8842
Email: [email protected]
Director of Code Enforcement: Pete Roque
Phone: (562) 569‐0098
Email: [email protected]
Director of Planning: Daniel Hortert, AICP
Phone: (925) 708‐4209
Email: [email protected]
107 of 1216
Proposal to Provide Plan Check and On‐Call Staffing Services to the City of Pinole 2126 Rheem Drive  Pleasanton, CA 94588  Phone (925) 462-5959  Fax (925) 462-5958 8896 North Winding Way  Fair Oaks, CA 95628  Phone (916) 965-0010  Fax (916) 965-0013

 Key Personnel
4LEAF understands that our role is to be an advocate on behalf of the City and represent the City ’s best interests. 4LEAF’s team will function as an extension of your staff, seamlessly integrating with the personnel and practices established by the City while adding the perspective and expertise tha t only 4LEAF can offer. Our goal is to have our staff integrate with yours and be accepted as an essential part of the City . Our team includes:

Craig Tole – Director of Development Services/Executive Project Manager Craig Tole has been the Director of the 4LEAF Development Services team for the past 16 years. He is responsible for municipal  client  management including staff recruitment, hiring, and placing for all building department personnel for positions such as  Permit/Counter  staff, Building  Officials, Plans Examiners,  Residential and Commercial Inspectors, and Inspection se rvices  for complex commercial developer funded projects.

Raylee Glasser, CBO – Director of Jurisdictional Services/Project Manager Raylee  is  an  ICC  Certified  Residential  Building/Fire/Plumbing  Inspector,  Plans Examiner, and Permit Technician with 17+ years of Municipal Building Department experience. Raylee is responsible  for training, mentoring,  and placing  staff to Building and Fire Departments.  She currently manages a team of over twenty.

Mike Leontiades, CBO – Director of Plan Review and In
spection
As  a  former  Building  Official  of  the  Town  of  Danville,  Mike  understands  the municipal  environment.  Mike  is  responsible  for  a  team  that  has  collectively performed more than $16 billion of Building & Safety work. Mike will manage all Building  Department  requests  and  assist  the  Plan  Review  team  on  all  requests made by the City.

Pete Roque – Director of Code Enforcement
Pete is a Code Enforcement expert with over 17 years of experience in the field and has served as Code Enforcement Administrator, Code Enforcement Manager, and Community Development Inspector II for multiple public agencies. Pete is skilled in Code Compliance, Emergency Management, Law Enforcement, Disaster Response, and Plan Review.

 Professionals
Title Staff # Title Staff #
ICC Certified Plans Examiners  60+  ICC Certified Inspectors & IORs  200+ ICC Certified Building Officials  30+  Registered Architects  5+ Registered Engineers (PE, SE)  20+  ICC Permit Technicians  70+ Code Enforcement Staff (PC832)  25+  CASp  14
Construction Managers/Inspectors   40+   Fire Plans Examiners & Inspectors  30+

108 of 1216
Proposal to Provide Plan Check and On‐Call Staffing Services to the City of Pinole 2126 Rheem Drive  Pleasanton, CA 94588  Phone (925) 462-5959  Fax (925) 462-5958 8896 North Winding Way  Fair Oaks, CA 95628  Phone (916) 965-0010  Fax (916) 965-0013

Marcus J
t Manager
 Organization Chart

Additional Staff Available

More than two hundred additional staff Available
Plan Review Engineers/AIA
Melissa Mennucci, S.E.

Anastasios Hionis, M.E., E.E.

Beng Low, M.E., S.E.

Albert Kong, S.E.

Scott Martin, P.E.

Melissa Bridges, P.E.

Stephanie Hionis, P.E.

Kathy Bucciarelli, P.E.

Albert Nissan, P.E
Ali Hekmat, P.E.

Davison Chanda, PE
Joseph Nicolas, P.E.

Sareh Deyhimi, P.E.

Liberty Jensen, P.E.

Jay Shih, P.E. CBO, CASp
Scott Johnson, S.E., CASp
Youseff A
bdou, P.E.

Yousef Marmosh, M.E.

Plans Examiners
Peter Lim, CBO
Derek Poe
Eriselda Nanchy
Ingeborg Vriend
Jerome Hoberg
Khuong Le
Jacob Padilla
Karimullah Kamran
Steve Kim
James Johnson

Permit Technicians
Chelsey Serafino
Shantelle Fuentes
Caitlin Glasser
Chelsea Serafino
Lisa Felicano
Alyssa Mendoza
Ana Ortiz
Building Inspectors
Bernie Zipay, CBO
Brent Hipsher, CBO
Chris Fowler, CBO
Bernard Zipay, CBO
Nick Henderson, CBO
Bradley Fliehmann, CBO
Liam Tierney
Jose Ramirez
Bassem Kodeih
Serafino Perrone
Farris Hix
Chuck Venook
John Riddell
Chris Wilson
Brad Fields
Mark Sherwood
Wladyslaw Grobelny
Kiely Ricardo
CASp
Brent Hipsher, CBO, CASp
David Rashe, CBO, CASp
Steven Raney CBO, CASp
Scott Johnson, S.E., CASp
Jay Shih, P.E. CBO, CASp
Doug Martin, CASp

Code Enforcement
Sarrah Patton
Anthony Mullins
Dominique Cordoba
James Casner
John (JB) Juarez
Matthew Couch
Pam Miller
Andrea Nance‐Sevilla
Eric Stephens
Jennifer Keleher
JorDann Crawford
Raylee Glasser, CBO
Project Manager /
Director of Jurisdictional Services
Mike Leontiades, CBO
Director of Operations /
Inspection Services
Craig Tole
Executive Project Manager /
Director of Development Services
Pete Roque
Director of
Code Enforcement
109 of 1216
Proposal to Provide Plan Check and On‐Call Staffing Services to the City of Pinole 2126 Rheem Drive  Pleasanton, CA 94588  Phone (925) 462-5959  Fax (925) 462-5958 8896 North Winding Way  Fair Oaks, CA 95628  Phone (916) 965-0010  Fax (916) 965-0013

 Leadership / Primary Contact
The contract with the City of Pinole will be managed by Craig Tole. Craig has a proven record of success working cities and counties throughout California. Craig can be contacted at:

President
4LEAF, Inc.

Executive Project Manager/
Director of Development Services
4LEAF
Local Office
Kevin J. Duggan
Office: (925) 462‐5959
Email: [email protected]
Craig Tole
Office: (925) 462‐5959
Mobile: (925) 580‐4055
Email: [email protected]
2126 Rheem Drive
Pleasanton, CA 94588
Phone: (925) 462‐5959
Website: 4LEAFINC.COM
We appreciate this opportunity to present our proposal. This proposal shall remain firm for a period of ninety (90) days following the last day for
proposals to be accepted. Should you have any questions, please do not hesitate to reach out using the contact information above.

Respectfully submitte d,
Kevin J. Duggan
President
110 of 1216

Raylee Glasser, CBO
Director of Jurisdictional Services

1 of 2

Experience Summary
Raylee is an ICC Certified Building Official, Residential Building/Fire/Plumbing Inspector, Plans Examiner, and Permit Technician with ICC. With 18+ years of Municipal Building Department experience, Raylee has promoted throughout the ranks of the Building Department to include Permit Technician, Permit Center Manager, Building Inspector, and Building Official. Raylee also created 4LEAF’s internal EZPlan Review Portal used by our clients and spearheaded the creation and implementation of our process improvement and staff augmentation scope.

Select Work Experience

4LEAF, Inc. – Pleasanton, CA
Director of Jurisdictional Services
9/2017 - Present
Raylee has been 4LEAF ’s Director of Jurisdictional Services since 2017 where she handles management of plan review, inspection, and consulting services for numer ous 4LEAF clients. She also spearheads 4LEAF ’s effort to train, mentor, and place Permit and Engineering Technicians to Building and Public Works Departments through out Northern Ca lifornia.

Raylee has even consulted with different cities to better organize their department and develop required hand -outs, policies, procedures, and permit s oftware implementation in preparation of a large spike of development activity. In addition, she also oversee s our Pro cess Mapping services that ensure each jurisdiction is assessed in or der to better help them fill their needs, Permit Tech program, as well as creating new programs to help streamline specific scopes for jurisdictio ns such as ADU, 5G, and Solar to name a few.

4LEAF, Inc. – Pleasanton, CA (continued)
Process Mapping
9/2017 - Present
In the changing landscape of Dev elopment Servic es Divisions, Raylee has worked with a mu ltitude of jurisdict ions to enhance the service levels of Building, Planning, Public Works, and F ire Experience
20+ years

Education
Diablo Valley College
- Construction Management

Certifications
ICC Certified Residential Plumbing
Inspector
ICC Certified Residential Building
ICC Certified Fire Inspector I
ICC Certified Residential Plans
Examiner
ICC Certified Permit Technician
ICC Certified Building Official
ICC Certified Permit Specialist
SAP Disaster Service Worker

Technical Abilities
iWorQ
CRW
EZPlan Review
Acella Permits Plus
Energov
Metroscan
Geomedia
Microsoft Office
Microsoft Windows
Notary Public

Professional Affiliations
International Code Council
ICC East Bay Chapter
Danville LEAD Leadership Committee
Danville Employee Recognition
Committee Chair

111 of 1216

2 of 2
Raylee Glasser, CBO
Departments , providing a nalysis of the municipa lities current systems (including software implem entation) and work with staff to find efficiencies in th eir w orkflow. To date, Raylee has worked with various juri sdictions including the foll owing:

➢ City of Rohnert Park
➢ City of Sausalito
➢ City of El Cerrito Solar
➢ City of Half Moon Bay

➢ City of San Juan B autista
➢ City of Hollister
➢ City of Sand City
➢ City of Pacific Grove

➢ City of Larkspur
➢ City of Greenfield
➢ City of Sacramento 5G
➢ City of Oakland 5G
Town of Danville, CA
Plans Examiner/Permit Center Manager
5/2014 - 8/2017
Raylee was p romoted to this pos ition with additional responsibilities that include d conducting plan check reviews, inspections , and increase d field work. She i ncorporated leadership and inspire d staff while managi ng the operations of the building permit center, fees, and structure. Raylee also provided verbal and written communication to design professionals, contractors , and residents to streamline the per mit process. She f acilitated and mediate d all Build ing Co de Enforcement assignments, managed the Building Division website, and implemented goals, objectives, and policies.

Town of Danville (continued)
Lead Development Services Technician
7/2007 - 5/2014
Raylee was p romoted into this position with additi onal duties and responsibilities to include the supervision of all building permit center staff. She p erformed over -the-counter plan review , coordinated int er-department al review s to ensure timely completion of the development revi ew process, and issued Certificates of Occupancy.

Town of Danville (continued)
Development Services Technician
1/2001 - 7/2007
In her first of many roles with the Town, Raylee’s responsibili ties included issuing building permits, performing zoning rev iews, and interpretati ng the Town’s municipal ordinances. She was instrumental in developing the Town’s “One -Stop Shop” permit process and facilitated uniform customer service standards for the department.
112 of 1216

Mike Leontiades, CBO
Director of Inspection

1 of 2

Experience Summary
Mike  is  a  proven  successful  leader  with  over  37  years  of  construction skills  and  knowledge,  plus  16  years  of  experience  in  local  government.

Mike is self‐motivated and driven to provide excellent customer service delivery  and  is  proficient  at  coordinating  and  leading  teams  to  benefit mutual  growth  and  success.  As  a  Chief  Buil ding  Official,  Mike demonstrated the ability to build and maintain strong relationships with all  public  contacts,  design  professionals,  elected  officials,  and  property owners.

Mike  also  possesses  the  knowledge  to  examine  plans  and  inspect  for code  compliance  for  Residential  and  Commercial  projects  to  ensure conformance with California Building, Mechanical, Plumbing, Electrical, Energy  Codes  and  Green  Building  Standards,  regulations,  and ordinances.

Select Professional Experience

4LEAF, Inc.

Director of Inspections
2016 ‐ Present
Mike’s responsibilities include:
 Recruiting and interviewing prospective employees.
 Mentoring and developing plan review, building inspectors, and permit staff.  Managing the placement of inspection staff including the tracking of customer service delivery.  Tracking each inspectors’ active certifications.
 Providing quality answers to code‐relate d or situational questions.  Managing the plan review and support teams.
 Handling the workflow and distribution of plan reviews.  Performing plan reviews and inspections on as‐needed basis.

Town of Danville, CA.

Chief Building Official
7/2006 ‐ 9/2016
Mike  supervised  and  led  his  team  of  staff  members  in  the  Building  Division.  He  was  responsible  for managing and directing the operations of the Town’s Building Division. He provided quality reports to the  Development  Services  Director.  Mike  also  performed  the  duties  of  the  Senior  Buildi ng  Inspector Experience
37 + years

Education
Ashworth College
Construction Management
College of San Mateo
Building Inspection Technology
Los Medanos College

Certifications
ICC, Plumbing Inspector
ICC, Mechanical Inspector
ICC, Building Official
ICC, Residential Building Inspector
ICC, Combination Inspector
ICC, Mechanical Inspector
ICC, Residential Plans Examiner
113 of 1216

2 of 2
Mike Leontiades, CBO

from  2007  to  2015.  He  was  responsible  for  creating  numerous  staff  reports  for  Council  Meetings regarding  Building  Division  related  matters,  including  ordinances,  nuisance  abatement  hearings,  and the  triennial  code  adoption  process.  Mike  excels  at  forming  a  partnership  approach  with  all  of  his contacts,  including  design  professionals,  contractors,  and  homeowners.  One  of  his  strengths  was  his ability to resolve dispu
tes and complaints. He strived to achieve a win‐win scenario in every situation.

Some of Mike’s accomplishments included:
 Creating and updating informational handouts
 Reducing the turn‐around timeframe for plan reviews
 Sustaining high morale within the division
 Implemented IVR automa ted  inspection line
 Launched and maintained a Customer Satisfaction Survey Form  Established numerous Town ordinances
 Leadership of the Year Award, 2004
 Town Manager’s Customer Service Award, 2012
 Employee of the Year Award, 2014
 Graduate of Contra Costa County Leadership Academy, 2016

Town of Danville, CA (c ontinued)
Senior Building Inspector
2003 ‐ 2006
Mike was responsible for overseeing the daily operation of the entire inspection process. He handled complaints,  inspected  emergency  situations  including  structure  fires,  vehicles  or  tree  collisions  with buildings, and other life safety incidents. Mike provided quality training to his inspection team and also created and sent le
tters regarding code violations.

Town of Danville, CA (continued)
Building Inspector
2000 ‐ 2003
Mike was responsible for providing building inspections on residential construction including large sub‐ divisions.  He  kept  accurate  records,  worked  to  resolve  problems  before  they  arose  and  created  a helpful approach while achieving code compliance .

Riccomi Construction Services, S.F. CA. 1992 ‐ 2000
Construction Supervisor

114 of 1216

Melissa Mennucci, S.E.

Structural Plan Review Engineer

1 of 1

Experience Summary
Melissa is a Registered Structural Engineer in the State of California with more than 16 years of industry experience including more than 10 years of design experience. Melissa is currently managing all plan reviews from our UC Davis client as well as performing Structural Plan Reviews from 4LEAF’s Fair Oaks office . She also provides technical guidance to the plan review s and is experienced with a wide array of project and construction types.

Select Professional Experience

4LEAF, Inc.

Structural Plan Review Engineer
August 2016 - Present
Melissa is responsible for co ordinating and managing all plan reviews from 4LEAF for the client UC Davi s, including meeting with key personal when needed. She is also preforming Structural Plan Reviews in 4LEAF’s Fair Oaks office for various clientele including such cities as Sacramento, Rocklin, Folsom, Roseville, Stockton, and numerous private clients as assigned.

Buehler & Buehler Structural Engineers
Project Engineer
March 2005 - July 2016
For more than 10 years, Melissa worked as a Project Engineer with this prestigious Design Firm located in Sacramento, CA. Melissa was responsible for managing and designing structural projects using all building material s (steel, concrete, masonry, & wood) and evaluating and retrofitting existing buildings. Melissa routinely collaborated with AMEP consultants on DBB and DB projects using BIM. She also practiced LEAN construction techniques that include pull planning and ISD. In addition, she performed construction administration tasks that include submittal review, RFI response, site visits, field reports, record drawings, etc. as well as managed the new employee training program.

Melissa’s projects included:
- Commercial, Re sidential, School s, Hospitals & Government Facilities
Experience
16 + years

Education
University of California, San Diego
Bachelor of Science – Structural
Engineering
University of California, Davis
Masters of Science – Civil &
Environmental Engineering

Registrations
State of California Licensed
Professional Engineer, Structural,
#5677

State of California Licensed
Professional Engineer, Civil,
#72245

Computer Applications
ETABS
SAP
SAFE
RAM
Revit
Bluebeam
Adobe
Excel

Associations
SEOACC

115 of 1216
Beng H. Low, MS, SE
Senior Structural and Civil Plan Review Engineer
1 of 2
Experience Summary
Beng is a r egistered Structu ral and Civil Engineer with more than 30 years of experience in the analysis and design of multi-story buildings including schools, commercial, industrial, and residential. His experience in the design of var ious struc tural syst ems includ es special reinforced concrete shear walls, steel special moment frames, steel special concentrically braced frames, steel buckling- restrained braced frames, and wood -frame shear walls. He has e xtensive experience in respons e spectra dynamic analysis , seismic design, and seismic retrofit design .

Beng is also p roficient in the latest design requirements of concrete, steel, masonry, concrete tilt-up, cold-formed steel, and wood structures with up-to-date working knowledge of many design codes.

On
behalf of 4LEAF, Beng works with the City of Oakland on their 5G project where he performs fiber pull and small c ell plan reviews and works on their monument survey. He is familiar with analysis and design software such as ETABS, SAFE, SAP2000, RISA-3D, RAM, STAADPro, and Enercalc and is skilled in AutoCAD, Bluebeam Studio, and REVIT.

Select Project Experience
4LEAF, Inc. – Pleasanton, CA
Senior Structural Plan Review Engineer
2021 - Present
Beng joined 4LEAF as a Senior Structural Plan Review Engineer and is responsible for the review of commercial and residential structures , conducting quality control of 4LEAF plan review personnel, and assisting with civil plans reviews . Beng currently works on behalf of 4LEAF with the City of Oakland to perform structural calculations, develop plans, and provide engineering estimates and specifications for the construction of 5G towers.

SO
HA Engineers – San Francisco, CA
Senior Structural Plan Review Engineer
2017 - 2021
Some of Beng’s projects with SOHA Engineers included:
• Fourth and Folsom Transit Oriented Development, 266 Fourth Street San Francisco, California o Performed 3 -D ETABS analysis, design calcula tions, and prepared schematic design drawings and specifications for 8-story family housing project. The structural system for the upper story consists of steel special concentric braced frame structure (SCBF) Experience
30+ years
Education
M.S., Structural Engineering
Ohio State University
B.S., Civil Engineering
Uni
versity of Roorkee (India)
Certifications
ICC Building Plans Examiner
Registrations
State of California Licensed
Professional Engineer, C48412
State of California Licensed Structural
Engineer, S4973
116 of 1216
2 of 2
Beng H. Low, MS, SE
o Provided 3-D ETABS analysis and prepared structural design calculations for the retrofit an existing single -story concrete podium structure. The podium structural syste m includes post -tensioned slab, concrete wall, and CMU walls. The podium supports several 2 to 3-story wood-framed apartment buildings.

Structus, Inc. – San Francisco, CA
Structural Plan Review Engineer
2010 - 2013
Some of Beng’s projects with Structus included:
• Marine Emergency Response Facility, San Francisco International Airport o Performed 3 -D ETABS an alysis and prepared structural design calculations for a new 4,500-square-foot single -story marine facility and a 100-foot-long concrete causeway.

The desi gn for this deep- pile foundation structure is based on ASCE -41 performance- based non-linear step by step push-over analysis.
• SFMTA Central Subway, San Francisco, California
o Participated in the design of this $1.2 billion SFMTA’s Central Subway Pr oject (Design Packages 3). Performed structural design calculations for the following: design of a new surface station at 4th and Brannan; design of structural concrete inverts and walkways for the 2.5 miles of TBM subway tunnels; design of seismic bracing of jet fans, electronic signs, and equipment; tenant improvement of Operation Control Center. Beng prepared a full set of construction documents and specifications. • AC Transit Transportation Building and Bus Maintenance Facility, Emeryville, California. o Provided seismic evaluation based on ASCE31 procedure for this maintenance facility.

The Transportation Building is a 2 -story 16,000 square -foot pentagon-shaped structure which serves as an administrative building and break room. The Bus Maintena nce Facility consist s of 3 separate structures with a total area of 46,000 square foot. The buildings were cons tructed of CMU walls, concrete moment frames, and concrete Precast-T roof.

Kinno
e Structural Engineers – Dublin, CA
Structural Plan Review Engineer
2005 - 2010
Some of Beng’s projects with Kinnoe Structural Engineers included:
• UC Santa Cruz Cooling Tower Building
o Provided structural engineering for a 2-story tower with structural steel moment frames and steel braced frames. Th e tower is to house the cool ing tower and associated equipment and utilities . Beng p repared a full set of construction documents and specifications.
• Fresh & Easy Supermarket, Hayward, California
o Provided structural engineering and drawings to seismic upgrade of a masonry building with wood diaphragm. The upgrade includes a new steel platform with concrete deck, a new entrance steel canopy, and foundation works for equipment deck and freezer. • Orange County Sanitation District, Odor Control Facilities, Fountain Valley, CA o Provided struc tural enginee ring and drawings for 2 steel platforms for scrubbe rs, moment frame pipe supports, and 3 chemical area foundations. 117 of 1216

Scott Martin, P. E.

Civil, Structural & MEP Plan Review Engineer

1 of 2

Experience Summary
Scott has more than 22 years of structural engineering experience. Scott has performed a multitude of plan reviews for many different disciplines including OSHPD 3, DSA Projects, and various municipal reviews for clients throughout California. Scott’s day -to-day activities inc lude the review of plans submitted to local jurisdictions, creation and submission of plan check letter s, and constant communication with all project stakeholders.

In addition, Scott is often tasked with the education of building code to applicants. He is instrumental in establishing the new templates for all new clients to establish the City/Counties preferences for commercial and residential plan check and makes an asset to any team, project, and jurisdiction he is assigned.

Select Professional Experience

4LEAF, Inc.

MEP Plan Check Engineer
2014 - Present
Since 2014, Scott has been 4LEAF’s Senior Plan Check Engineer with a focus on Structural review. Scott has worked on a plethora of 4LEAF’s largest commercial reviews. Currently, Scott is reviewing the Zuckerberg Chen School for the City of East Palo Alto and several large Commercial Projects for the County of San Mateo’s Project Development Unit including a $120 Million Medical Office Building and two large County facility buildings.

4LEAF, Inc. (City of Palo Alto)
Structural Plan Check Engineer
2012 - 2013
Starting in December of 2013, Scott has recently accepted a position to perform and manage plan reviews in the Central Valley and Central Coast for many of 4LEAF’s clientele. Since 201 2, Scott has worked for 4LEAF as a structural plans examiner and has been tasked to the City of Palo Alto. Scott was often assigned to the counter to work with the public and architects to answer building code related questions and to provide excellent customer service. In addition, Scott performed many large -scale plan reviews for the City including:

Experience
22+ years

Education
University of California, Irvine
B.S. Civil Engineering

Certifications
California Registered Civil Engineer
License # 59091
Nevada Registered Civil Engineer
License # 019922
California Building Plans Examiner
(exp. 07/26/2022)
Professional Affiliations
ICC – International Code Council
Structural Engineers of Northern
California (SEAOC)
ASCE

118 of 1216

2 of 2
Scott Martin, P.E.
• Workday Campus (6 Stories) - $50 Million
• Stanford Medical Center (6 Stories) $32 Million
• VM Ware HTE Tenant Improvement $ 25Million
• Hilton Hotel and Underground Parking $18 Million
• VM Ware Parking Structure 2 $14 Million
• Stanford Hospital Site Development $13 Million
• 260 California (3 Story mixed-use & underground parking) $10 M • Thermal Vacuum Chamber $9.7 Million
• VM Ware Parking Structure (4 Levels) $6.8 Million
• 4 Story Tenant Improvement for Survey Monkey $6.1 Million

Willdan Engineering – Fresno, CA
Structural Plan Check Engineer
2007 - 2010
Scott performed structural plan reviews on behalf of Wi lldan Engineering for numerous jurisdictions throughout California. Scott was tasked with the plan review, creation of the plan check letter, communicating with project stakeholders, and educating the applicants on current building codes and standards. Some of Scott’s projects included:
• CSU Humboldt Student Center Expansion; Arcata, CA
• Park Place: Res/Office/Retail over Parking; Paso Robles, CA • CalRENEW-1 Solar Power Farm; Mendota, CA
• City of Winters Police/Fire Complex; Winters, CA
• UC Davis Hyatt Place Hotel; Davis, CA

Advanced Structural Design, Inc. – Fresno, CA
Project Engineer
1998 - 2007
Scott was a Project Engineer for nearly ten years with Advanced Structural Design out of Fresno. Scott was responsible for engineering design, drafting (Auto CAD & hand), shop drawing review, and coordination with clients.
• Mt. Whitney Classroom Buildings; Visalia CA (DSA #02-107633) • Plumber's Union Expansion; Fresno, CA
• Oak Valley New Admin; Tulare Co., CA
• Paul Evert's RV Expansion and New Canopies; Fresno, CA • Grizzlies Stadium; Fresno, CA
119 of 1216
Sareh Deyhimi, P.E., CBO, CASp
Plan Review Engineer/ICC Certified Plans Examiner

Experience Summary
Sareh is a Registered Civil Engineer in the State of California, a Certified Access Specialist and an ICC Certified Plans Examiner. Sareh has nearly 10- years of structural engineering design and as a result is proficient plan reviewing structural systems of all types . She is knowledgeable about all materials of construction including timber, steel, concrete and masonry. She has over 5 -years experience as a Plans Examiner reviewing complex commercial, residential and industrial projects for not only s tructural systems but Fire & Life Saf ety and Accessibility aspects of a building design as well. Sareh is proficient at reviewing plans for conformance with the International Building Codes and Standards and ASCE-7. As a plans examiner with 4LEAF she is currently working to be a true “unicorn”, eagerly learning the plumbing, mechanical and electrical codes as well.

Sa
reh has over 15 -years of experience and is very passionate about her profession. Because she has spent a number of years as a designer, she has a keen eye for calling code deficiencies that effect occupant safety. Designers appreciate her experience and collaboration as she is a valuable partner in an effort to getting a project to success, yet maki ng tough comments that are necessary to assure the occupants of a building are safe.

Select Professional Experience
4L
EAF, Inc., Fair Oaks, CA
Plan Review Engineer
For more than 5-years Sareh has worked as a Plan Review Engineer on behalf of 4LEAF reviewing plans for Aerojet, the City of Sacramento, the County of Sacramento, the City of Roseville, the City of Rocklin, the City of Rancho Cordova, the City of Lodi, the City of Galt, UC Davis, and the City of Davis just to name a few. Sareh reviews structural, fire & life safety, accessibility for commercial buildings and is proficient at reviewing structural and non-structural aspects of residential construction.

Cor
e Structure – Costa Mesa, CA
Project Engineer
For almost 10-years of Sareh’s career she worked as a Project Engineer for private design firms. Her roles and responsibilities included:
• Provided analysis and design of multi-story structural seismic and gravity systems of commercial and residential structures.
• Ran computer models for lateral and gravity elements of a building. • Performed structural observation required by the building code for her designs.

E xp eri en ce
15+ years
Certifications / Registration
State of California Licensed
Professional Civil Engineer #83354
CASp Certification #876
ICC C
ertified Building Official
ICC Certified Plans Examiner
Education
Persian Gulf University
Bachelors of Science, Civil
120 of 1216

David J. Rashé, CBO, CASp
Building Official/Certified Access Specialist/MWELO Plans Examiner

1 of 2

Experience Summary
David is a dedicated and proficient code professional with more than 28 years of experience working within Northern California Building Departments. David has held various positions in the building department industry including the p ositions of Chief Building Official, Permit Center Manager and Program Coordinator. As a Building Official David successfully managed the annual building division budget to include monthly activity and reconciliation and oversaw the daily operations in the Permit Center and the Building Division to include the permit technician, plan review, inspection, code enforcement, and building division administrative support staff.

Select Professional Experience

4LEAF, Inc.

Building Official, Combination Building Inspector, Plans Examiner 2016 – Present
David joined 4LEAF to work in a number of different capacities including Building Official, Plans Examiner, Building Inspector , and Certified Access Specialist (CASp). Currently, David is working on behalf of 4LEAF providing Plan Review and CA Sp services for many clients of 4LEAF ’s including San Jose State University. David is also experienced with MWELO Reviews, where h e is currently providing these services to the Counties of Santa Clara and San Mateo. Previously he was the interim Building Official at the City of Lathrop and from 2016 -2017 he served the Sandia National Laboratories in Livermore ma naging 4LEAF’s inspection tasks and performing combination inspections on numerous construction projects and quality assurance inspections in conformance with the plans and specificatio ns and the California Bui lding Code (CBC) and the National Fire Protect ion Agency (NFPA). Da vid has handled the management of larger projects for 4LEAF such as Building 926 and has assisted Sandia in managing the quality of work by preparing:
• Final Punch List of Deficiencies
• Monitor Construction Progress (Schedules)
• Prepare and Maintain Inspection Reports
Experience
28 + years

Education
Saint Mary’s College, Moraga, CA
Bachelor of Arts; Management
Chabot College, Hayward, CA,
Associate of Arts; Construction
Inspection
Chabot College, Hayward, CA,
Associate of Arts; Architectural
Technology
California State University, Hayward,
CA

Certifications
ICC Certified Building Inspector
Expires 2/18/2026
ICC Certified Building Plans Examiner
Expires 2/18/2026
ICC Certified Building Official
Expires 2/18/2026
ICC Certified Combination Inspector
Expires 02/18/2026
ICC Certified Combination Inspector -
Legacy Expires 02/18/2026
ICC Certified Electrical Inspector
Expires 02/18/2026
ICC Certified Mechanical Inspector
Expires 02/18/2026
Certified Mechanical Inspector UMC
Expires 02/18/2026
ICC Certified Plumbing Inspector
Expires 02/18/2026
Certified Plumbing Inspector UPC
02/18/2026
ICC Certified Residential Combination
Inspector Expires 02/18/2026
Certified Access Specialist
# CASp-213 Expires 6/23/2022
Certified (IS-00100.b, ICS-100),
IS-00700.a, IS-00800.b
(2014 FEMA Emergency
Management Institute)

121 of 1216

2 of 2
David J. Rashé, CBO, CASp

City of Livermore, Livermore, California
Community and Economic Development Department
Chief Building Official
2014 – 2016 (Retired)
• Oversaw the daily operations in the Permit Center and the Building Division to include the permit technician, plan review, inspection, code enforcement, a nd building division administrative support staff.
• Developed and maintained the annual bu ilding division budget to include monthly activity and reconciliation.
• Implemented and managed consultant contracts for plan review and inspection services. • Maintained contract services for providing plan revie w and insp ection services to Sandia National Laboratories in Livermore.
• Solved development related code questions as well as expl ained city standards and policy questions, while interacting with planning, engineering, housing, and inspection. • Consulted with architects, engineers, contractors, and prop erty owners regarding proper design and the methods and materials to be used for building construction in the City. • Coordinated projects with other City departments.
• Maintained accurate up-to-date records of all plan reviews, plans, inspections, and construction. • Made public presentations to City Council, public agencies, business and civic groups and other organizations.
• Maintained the City Building Codes in compliance with latest model codes and State regulations. • Prepared wrote reports and requests for City Council or staff regarding ordinance changes, and establishment of City policy related to building requirements.

City of Livermore, Livermore, California
Community and Economic Development Department
Permit Center Manager
2004 – 2014
• Oversaw the daily operations of the Permit Center to include administrative and support staff, permit technicians, planners, engineers, plan reviewers, and inspectors. • Developed, implemented, and provided sustaina bility efforts for projects and programs related to customer services and permit streamlining strategies for the Permit Center. • Coordinated major development projects through the regulatory processes to include pl anning, zoning, plan review, and engineering.
• Coordinated dev elopment projects with architects, d evelopers, engineers, owners, and the general public with interagency teams to facilitate comprehensive reviews. • Wrote Council staff reports and Resolutions / Ordinances for public policy. • Prepared Req uest for Proposals (RFP) for plan review and structura l engineering contract services; met with contractors and awarded contracts.
• Reviewed, interpreted, analyzed, and approved design and construction plans, speci fications, and reports for conformity to relevant codes, regulations, and policies.

122 of 1216
1 of 1
Ingeborg Vriend
Senior Plans Examiner
Experience
11+ years
Education
PsyD, Clinical Psychology
University of Queensland, St. Lucia, Qld
Certifications
Accessibility Inspector/Plans Examiner
Residential Plans Examiner
Building Plans Examiner
Experience Summary
Ingeborg in an ICC Certified Residential Plans Examiner, Accessibility Inspector/Plans Examiner, and Building Plans Examiner. She brings with her expert-level experience in managing and reviewing a wide range of residential projects and is well versed in reading, reviewing , and interpreting State and local regulations to complete plans examinations for residential and accessibility facilities for the USA and Australia. She provides quality results and the highest level of service to all clients as well as excellent leadership, communication, top-notch plan reviews, and relationship building skills.

Additionally, Ingeborg speaks four different languages including: English, Dutch, German, and Indonesian.

Select Professional Experience
4LEAF, Inc.

Senior Plans Examiner
9/2018 - Present
Ingeborg is currently performing off-site plan review services for the Town of Corte Madera and provides plan reviews for additional clients on an as-needed basis to help with heavy workloads.

CS
G Consultants
Residential Plans Examiner
8/2017 - 4/2018
In her past role, Ingeborg r eviewed residential plans to verify minimum compliance to California Code Regulations Title 24, Building codes for Residential, Electrical, Mechanical, Plumbing, Energy, Green Building, and local municipal codes. Additional responsibilities included:
• Reading, interpreting, and applying current California Residential Code , and California Electrical, Plumbing, and Mechanical code requirements including the California Title 24 Building Energy Efficiency standards.
• Reading and interpreting site, architectural, and structural plans. • Explaining technical information and code requirements verbally, in writing, and by graphical means. • Evaluating whether residential plans were in accordance with all applicable City, State, and Federal guidelines, as well as applicable discipline-specific codes. • Establishing and maintaining great working relationships with employees, applicants, builders, designers, engineers, and the public.
• Experience in the use of BlueBeam and online plan reviews. 123 of 1216

Gib Moush, FPE
Fire Protection Engineer / Plans Examiner

1 of 1

Experience Summary
Gib has more than 18 years of engineering experience, 10 of whi ch have been in Fire  and Life‐Safety.    He is a  certified Professional  Engineer in Fire  Protection  Engineering  in  the  state  of  California,  and  hol ds  a Bachelor  of  Science  degree  in  Mechanical  Engineering  from  Louisiana State University.

Gib has supervised the engineering of fire alarms for high rise  buildings which  have  included  residential,  commercial  and  multi‐occupancy structures.    He  has  designed  voice  evacuation,  smoke  control,  f ire d e p a r t m e n t  c o m m u n i c a t i o n s  a n d  c e n t r a l  c o m m a n d  c e n t e r s .    H e  h a s also designed special water‐based suppression water mist systems.

Gib’s experience as a designer and fire plan reviewer gives him  a unique understanding of code compliance through the eyes of a designer.

Select Project Experience

County of Santa Clara, Facilities and Fleet / City of Gilroy Fire Plans Examiner
Gib has been assisting the County of Santa Clara Facilities and Fleet Division and City of Gilroy through 4LEAF with various fire reviews including Sprinklers, Alarms, e tc. per the 2010 California Fire Code.  Gib works in‐house at the City of Gilroy one day per week.  With the County, Gib has performed a collection of large fire reviews including:
• Main Jail North Fire Panel Replacement
• Malech Road Water Supply
• San Jose Downtown Health Center
• The San Antonio Valley Maintenance Facility
• VMC Receiving and Support Center

Livermore Pleasanton Fire Department
Fire Plans Examiner
Gib  has  been  assisting  the  Livermore  Pleasanton  Fire  Department t h r o u g h  4 L E A F  w i t h  v a r i o u s  f i r e reviews including Sprinklers, Alarms, etc. per the 2010 Califor nia Fire Code.  Gib has completed more t h a n  f i f t y  p r o j e c t s  i n c l u d i n g  s e v e r a l  f i r e  r e v i e w s  f o r  t h e  P a r a g o n  O u t l e t s  i n  L i v e r m o r e  a n d  t h e  n e w retirement community in Pleasanton.

St. Joseph’s Parrish, Rio Vista, CA
Senior Plans Examiner
This 15,000 square foot church in Rio Vista is an occupancy cla ssification B, Type V‐B, fully sprinklered structure.  Gib completed the fire alarm review using the 2010 California Fire Code, the 2010 California Building Code and all applicable NFPA Codes and Standards.

Experience
18 years

Education
BS, Mechanical Engineering
Louisiana State University

Certifications
Registered California Professional
Engineer, Fire Protection Engineering

124 of 1216

Rebecca Lauricella
Fire Plans Examiner/Fire Inspector

1 of 2

Experience Summary
Rebecca  is  a  Certified  State  Fire  Marshall  with  more  than  32  years  of Public  Safety  experience.  Her  experience  includes  being  a  Fire Prevention  Officer,  Fire  Inspector,  Fire  Marshal,  and  Fire  Code Consultant  for  many  Bay  Area  jurisdictions  working  directly  for  t h e public entity and as a third‐party private consultant.

Select Work Experience

4LEAF, Inc. Pleasanton, CA
Fire Inspector/Fire Plans Examiner
September 2018 to present
Rebecca joined 4LEAF as Fire Inspector and Fire Plans Examiner.  She brings her many years of experience as she serves many of 4LEAF ’s clients.

CSG Consultants, Foster City, CA
Fire Prevention/Operations/Fire Code Consultant
July 2017 to September 2018
Serving  as  Fire  Inspector  (DFM)  for  the  Cities  of  Pinole  and  Albany (Other cities within the Bay Area as contracted)
 All related duties as described below for local Fire Departments.

County of Maui Civil Defense Agency
Emergency Management Officer/Plans & Operations Officer 2009 to 2011
 Developed,  reviewed  and  maintained  plans  and  coordinated activities of a large number of personnel.
 Supervised  training  and  operations  of  a  large  number  of personnel to cope with emergency and disaster situations.  Developed,  maintained  and  was  accountable  for  the  fiscal budget and annual report.
 Accountable  to  the  Local,  State  and  Federal  government department  heads.  Speaking  effectively  and  maintained cooperative working relationships with members of a variety of agencies achieving desired results.
 Adapted to diverse environments and worked effectively with a variety of nationalities, races and cultures.

Experience
32+ years

Education
California State Fire Marshal
Training Academy, BA,
Emergency Management, 2009

College of San Mateo
AS, 2007 Fire Science Technology
CA Emergency Medical Technician:

CA State Fire Office -Certified
#E0072222 National Registry EMT
- Certified #E3031605

Napa Valley College Administration
of Justice / Communications/
Business Management, 1991-1994

Santa Barbara College General
Education / 1981-1983

Certificates & Achievements
(California State Fire Academy)
CFSTES certified State Fire
Marshal #460-0458, 10/12/07
CFSTES certified Plans Examiner
#360-0458, 10/20/05
CFSTES certified Fire Protection
Specialist #072105-3, 07/21/05
CFSTES certified Fire Prevention
Officer #000050, 05/30/03
CFSTES certified Fire Prevention
Public Education Officer I/II
#072105-4, 07/21/05
Fire Management 1, 2A, 2B, 2D,
2E, (120hrs.)
CSFTES/FSTEP Regional
Instructor for teaching SFM
classes (09/16/04)
Fire Instructor 2B (40hrs.)
Fire Prevention 1A, 1B, 1C, 2A, 2B,
3A, 3B, (200hrs.)
CFSTES certified Fire Investigator I
#130-0458, 12/01/05
Fire Investigation 1A, 1B, 2A, 2B,
PC 832 Arrest & Control
CSTI Hazardous Material First
Responder Awareness and
Operations
ICS I-100, I-200, I-300, I-400 series:

Basic, Interim & Advanced Incident
Command
ICS I-120 Introduction to Exercises
& ICS I-235 Emergency Planning
ICS S-203 Incident Information Officer
ICS S-401 Safety Officer 12/02/04
(40hrs)
125 of 1216

2 of 2
Rebecca Lauricella
Redwood City Fire Department, CA
Fire Prevention Officer/Fire Investigator Acted as a Deputy to the Fire Chief 2003 to 2009
 Ability to command with respect, treating people with respect a nd dignity at all times with the outcome of the desired result. Worked effectively with Command Staff and all City Dept’s.  Responsible for developing, implementing and managing Fire Code Enforcement.  Operated  the  City’s  EOC  (Emergency  Operation  Center)  FEMA  compl iance.  (on  call  for  all emergencies and fire investigations.) Adapted to diverse enviro nments working with a variety of nationalities, races and cultures.

Town of Hillsborough Fire Department, CA
Fire Marshal/Fire Inspector
1999 to 2003
 W o r k e d  e f f e c t i v e l y  w i t h  t h e  C o m m a n d  S t a f f ,  C i t y  A t t o r n e y  a n d  o perations  of  the  Town’s  EOC ( E m e r g e n c y  O p e r a t i o n  C e n t e r )  i n  c o m p l i a n c e  w i t h  F E M A .   S i m i l a r  to  Redwood  City  Fire Department Duties.

Menlo Park Fire Protection District, CA
Fire Prevention Officer Acted as a DFM to the Fire Chief 1997 to 1999
 Worked  effectively with the Comma nd Staff and all City Departme nts and maintained the Fire Prevention and Code Enforcement divisions.
 Assisted with the operations of the City’s EOC (Emergency Opera tion Center) in compliance with FEMA.  Similar to Redwood City Fire Department duties.

Napa County Sheriff’s Department, CA
Sheriff’s Specialist
1989 to 1991
 Responsible for knowledge of CAD, CLETS and the NCIC computer systems.  Communicated, planed and coordinated operations with; Dispatch,  Emergency Services and Fire in  the  EDC  /  EOC  (Emergency  Dispatch/Operations  Center)  and  was o n  c a l l  f o r  E D C  a n d  E O C emergencies.
 Prepared  the  court  calendar  and  was  responsible  for  accurate  record  keeping  of  confidential information.

Santa Barbara Police Department, CA
Police/Fire Communications
1986 to 1989
 Responsibilities; similar to those listed for Napa County Sheriff’s Department.

Additional Certificates
 Photovoltaic Systems – Fundamentals/Fire Operations, CSFM, 07/29/08  ICC International Code Council‐ CFC Uniform Fire Code certification 97 transition (WFCA‐ICC) / 03/15/06
 CFC Inspector/NCSA National Code Services/#CFC0105.07, 08/08/06, WFCA  CFC Inspector/Uniform Fire Code Association/#500390‐00,02/14/06, WFCA  CFC Inspector/Uniform Fire Code Association/#500390‐00,02/14/03, WFCA  NFPA Code Change/IFC Code Review / Bay Alarm Inc., 01/10/08, NFPA 126 of 1216
Bernard (Bernie) Zipay, MCP
Building Official
1 of 3

Experience Summary
Bernie is an experienced Inspector of Record with more than 23 years in the construction industry as a n Inspector for both residential and commercial projects . He has inspected large commercial, industrial, and institutional projects and obtained numerous ICC certifications, as well as a California contractor license and California OES Evaluator license. Bernie has worked on multi-million-dollar projects such as the Napa Valley Estate , which spanned 21 acres . In addition, he is well known for his excellent customer service approach with the building community and fellow inspectors.

Select Professional Experience
4LEAF, Inc.

Lead Inspector/Inspector of Record
2021 - Present
Bernie is currently working for 4LEAF as a Lead Inspector/Inspector of Record, where he performs all trade inspections for commercial and residential projects. He monitors and performs inspection services in accordance with the approved plans and specifications.

County of Napa – Napa, CA
Building Inspector III
2016 – 2021
• Assigning of inspections, dealing with customer complaints, and communications with the department director as well as other city departments.
• Provided mentoring and technical assistance to the staff regarding commercial, industrial, and residential building projects throughout the county.
• Reviewed construction plans for conformance to the applicable codes.

Experience
23+ years
Education
A.S. in Construction/Building Inspection
Diablo Valley College
Mechanical Engineering Technology
Pennsylvania State University
Certifications
ICC Residential Energy Inspector/Plans
Examiner
ICC Residential Mechanical Inspector
ICC Spray Applied Fire Proofing Special
Inspector
ICC Commercial Combination Inspector
ICC Residential Electrical Inspector
ICC Commercial Energy Inspector
ICC Commercial Electrical Inspector
ICC Residential Combination Inspector
ICC Residential Building Inspector
ICC Residential Plans Examiner
ICC Commercial Energy Plans Examiner
ICC Commercial Mechanical Inspector
ICC Accessibility Inspector/Plans Examiner
ICC Residential Plumbing Inspector
ICC Residential Fire Sprinkler Inspector
ICC Combination Inspector
ICC Commercial Building Inspector
ICC Fuel Gas Inspector
ICC Commercial Plumbing Inspector
ICC Building Plans Examiner
ICC Fire Plans Examiner
ICC Electrical Inspector
ICC Mechanical Inspector
ICC Plumbing Inspector
ICC Master Code Professional
ICC Certified Building Official
ICC Building Code Specialist
ICC Building Codes and Standards Module
ICC Building Inspector
IAPMO Certified Plumbing Inspector 2015 UPC
#N99696
California OES (SAP) Evaluator ID #72924
California Contractor CSLB #817037, B-
General, C-5, C-6, C-10
127 of 1216

2 of 3
Bernard (Bernie) Zipay, MCP
Diablo Valley College – Pleasant Hill, CA
Adjunct Faculty/Civil/Construction Management Technology 2017 - 2021
• Taught variety of courses in the program including Introduction to construction methods and practices construction materials, basic estimating, print reading, AutoCAD applications in construction management, BIM, project management, building systems and safety.

City of American Canyon - CA
Planning Commissioner
2015 - 2019
• Regulated the use and appearance of buildings, structures, and land. • Made land use decisions consistent with the policies and plans formally adopted by the city council.
• Regulated location, height, and size of buildings and structures, the size and use of lots, yards, courts, and other open spaces and the percentage of a lot which may be occupied by a building or structure along with the intensity of land use.

Town of Danville - CA
Senior Building Inspector
2014 - 2016
• Conducted field inspections of industrial, commercial, and residential buildings during various phases of construction and remodeling to assure compliance with all local, state, and federal building codes.
• Reviewed plans and conferred with architects, engineers, contractors, developers, and other interested parties, and explain, interpret, and provide guidance regarding all applicable codes within area of responsibility.
• Maintained records of building and inspection activities and completed related reports. • Issued certificate and permits as appropriate.
• Assisted in researching problems and complains regarding commercial and residential buildings, building construction, and code compliance.

Interwest Consulting Group – Roseville, CA
Building Inspector
2013 - 2014
• Inspected, evaluated, and determined the structural soundness and quality of buildings and other projects including remodels, add -ons, an d other construction overseeing plumbing, heating, and electrical installations to ensure they are conducted safely and according to laws, regulations, and standards.
• Enforcing all aspects of architectural projects follow zoning regulations, building codes , and contract specifications according to federal, state, and local ordinances.

Ledcor Construction Inc - Napa, CA
Project Carpenter
2011 - 2013
• Installed wooden structures such as roofing frames, rafters, partitions, joists, and stud work. • Designed and installed cabinets, shelving, fitted furniture, drywall, and insulation. 128 of 1216

3 of 3
Bernard (Bernie) Zipay, MCP
• Read blueprints and designs to work to specifications prepared by other construction professionals, architects, and building code recommendations.

Ryan Associates – San Francisco, CA
Project Foreman
2005 - 2008
• Coordinate tasks according to priorities and plans and schedule/monitor attendance of crew. • Supervise and train workers and tradespeople and allocate general and daily responsibilities. • Reviewed all project activities, work equipment and sites every day to ensure everything is performed to company standards as well as to the latest OSHA regulations and standards. • Met with other managers/supervisors and necessary personnel as required to fully resolve conflicts, complications, and other issues according to company and client standards/requirements.

Fisher Development GAP Inc., Builder – San Francisco, CA Superintendent
1997 - 1998
• Ensured all required materials, equipment, and inspections occur to support the project schedule.
• Responsible for site safety and ensure the overall jobsite is safe for workers and visitors as well as manage compliance with established company safety policies. • Reviewed and managed project plans, specif ications, and manufacturer’s data and execute project based upon said documentation.
• Generate RFI’s as required to ensure completeness of the project documents and identifying and clarifying any discrepancies.

United States Marine Corps
Active Duty
1984 – 1994
• Warrant Officer/Nuclear-Biological-Chemical Operations Officer/Project Manager Natural Resources & Environmental Affairs.

129 of 1216

Brent Hipsher, CBO, CASp
Combination Building Inspector / Fire Inspector / Inspector of Record

1 of 2

Experience Summary
Brent is a certified Building Official with nearly 25 years of construction related experience; ICC Certified Combination Building Inspector as well as two college certificates in Building Inspection, Construction Management, and has a Certified Access Specialist Certification (CASp #422). Brent has worked with a number of different jurisdictions including the Town of Portola Valley, City of Milpitas, City of Dublin, and the City of Palo Alto where he has served in positions as Buildin g Official, Plans Examiner, and Combination Building Inspector.

Select Experience

4LEAF, Inc.

Combination Building Inspector / CASp / Building Official / IOR 2016 - Present
Brent is a key member of 4LEAF’s Inspection team as he serves in a number of different capacities including; Combination Building Inspector, Certified Access Specialist, Inspector of Record, and As - Needed Building Official. Brent has worked with numerous 4LEAF clientele including the cities of Emeryville, Newark, Hollister, Pleasanton, and Fremont to assist with any as -needed building inspections ranging from residential to commercial for all trades. Brent also performed IOR services at San Jose State University on 23 different miscellaneous campus projects. Most recently Brent was assigned to be the Interim Chief Building Official for the County of San Benito. Brent supervised the Building Division staff which included Building Inspectors, Code Enforcement, and Front Counter staff as well as the $1 Billion Panoche Solar Farm Project.

Regional Operations Center (County of San Mateo)
Inspector of Record
2016 - Present
Currently Brent is working on behalf of
4LEAF at the County of San Mateo’s
Regional Operations Center as the
Inspector of Record. This $37 Million
project is set to establish the C ounty
with one of the top 911 Emergency
Dispatch Centers in the Nation.

Experience
25 years

Certifications
DSA CASp # 422
ICC Certified Combination Building
Inspector
ICC Certified Building Official
ICC Certified Combination Inspector
ICC Certified Electrical Inspector
ICC Certified Mechanical Inspector
ICC Certified Plumbing Inspector
Fire Inspector 1A-1D & 2A-2D

Education
California State University, San Jose
Building Inspection Certificate
College of San Mateo
A.S. Degree Inspection Certificate
A.A. Degree Inspection Certificate

Professional Affiliations
International Code Council

ICC Peninsula Chapter – Past President

IAPMO Current Chair
IAPMO Research and Testing
Committee
IAPMO Answers and Analysis

CALBO California Certification
Committee

130 of 1216

2 of 2
Brent Hipsher, CBO, CASp
The project includes a new 9 -1-1 dispatch center, which will be housed on the second floor. The call center is currently housed in the county’s jury room, which can hold no more than 100 people. The new call center will be roughly double that size, accommodate up to 350 employees and contain nine additional workstations. Once constructed, this LEED Gold project will allow cities within the County of San Mateo Count y to share the new call center and it will meet the state and national goals of consolidated systems and operations, which will provide opportunities for all public safety agencies to take advantage of the state-of-the-art facility and the new technology we will use.

City of San Mateo | 2014 - Present
Deputy Building Official/Fire Inspector
For approximately one year, Brent worked at the City of San Mateo in the Building Services division as a Deputy Building Official and Counter Manager where he managed t he inspection, plan check, and front counter personnel. Brent also spent several months working with San Mateo Fire as a City Fire Inspector.

Kutzmann and Associates – City of Palo Alto | 2007 -2014 Building Inspector/Plans Examiner
For approximately seve n years Brent worked with the City of Palo Alto as a consultan t inspector and plans examiner. Initially, Brent worked in the office as a plans examiner and facilitated customer service related to code questions and over-the-counter plan checks at the Buil ding Counter. Previously, Brent has served the City on a number of residential and commercial inspection projects including:

• HP Executive Center
• Arbor Real (250-unit multi-family)
• Tesla

131 of 1216

John Lyons
Building Inspector I

1 of 1

Experience Summary
John  is  an  ICC  Certified  Building  Inspector  and  a  certified  Uniform Mechanical Code Inspector possessing nearly 40 years of experience in the construction industry. While working for 4LEAF, John has performed building  inspections  on  behalf  of  numerous  jurisdictions  including Folsom,  Fremont,  Rio  Vista,  Modesto,  Rocklin,  Galt,  Livingston,  and Brentwood.

John’s  experience  includes  inspecting  workmanship  and  materials  in construction  projects  for  conformance  with  relevant  plans  and specifications, preparing and maintaining inspection reports, performing basic plan reviews, issuing permits, and performing fee calculations.

Quite notably, John was a journeyman‐level sheet metal worker and was previously responsible for installing HVAC systems for new construction projects.  As  such,  John’s  work  background  provides  him  a  unique technical edge during his inspections of these systems.

Select Project Experience

4LEAF, Inc.

Building Inspector I
John is currently providing Building Inspection services for 4LEAF. In this role, John has been responsible for identifying  and enforcing a variety  of codes, ordinances, and  standards violations for conformance with plans and specifications. John’s other duties involve working with diagrams, specifications, plans, and similar documents; reading and interpreting building ocnstructio n and engineering plan specifications and codes;  and  interfacing  with  architects,  engineers,  contractors,  builders,  homeowners,  and  tenants  to ensure they understand the requirements and restrictions of their project.

Western Allied
Sheet Metal Worker
Prior to joining 4LEAF, John was a sheet metal worker  for Western Allied.  His job involved working at various jobsites, installing HVAC systems for construction projects.

Aire Sheet Metal Inc.

Sheet Metal Worker
During his apprenticeship and journeyman years, John worked for Aire Sheet Metal Inc. During his with the company, he was responsible for running a series of small projects for the company, primarily those dealing with HVAC installations.

Experience
40 years
Registrations
ICC Certified Building Inspector
#8232365
Uniform Mechanical Code Inspector
N91509

132 of 1216

George Cortez
Building Inspector

1 of 2

Experience Summary
George is a building inspector with nearly 30 years of experience in the industry. In the past, h e has overseen the construction of numerous single-family homes. As an owner of a construction company, he was responsible for managing and dire cting trade partners through these projects from beginning to end. As part of his duties, George frequently consulted and collaborated with , engineers, architects, and city officials to ensure that the final product met their expectations.

George’s time in the business has honed his sense of urgency and the drive that is required to survive in this fast -paced and competitive work environment. His experience and passion for working in the industry, combined with his time management and leadership skills, makes George a great fit for the inspection industry.
__________________________________________________________________________________ Select Project Experience

4LEAF, Inc.

Building Inspector l
February 2017 - Present
George has been performing residential inspections on new residential sub-divisions as well as alterations and additions to complex dwellings. He has a great demeanor and uses the “partnership approach” while working with his customers to maintain progress while ensuring a safe structure. George has been successfully assigned to the cities of Fremont, Union City, Cupertino, Gilroy and Hollister.

Cortez Construction
Owner/Contractor
2000 - 2017
As the owner of a construction company, George successfully followed safety regulations while ensuring that the work was completed on time and on budget. He acted as the site supervisor, scheduled the labor and materials, and estimated construction projects.

Acosta Plaza Apartments
Apartment Manager
1995 - 2002
George managed all aspects of the apartment complex. He ha ndled the day to day operations while he maintained a safe environment in each unit ensuring that all of the residents were satisfied with his prompt service.

Experience
29 years

Education
Technical Training Center, Campbell
CA

Certifications
CSLB B & C8
ICC Residential Building Inspector
ICC Commercial Building Inspector
ICC Combination Inspector

Aspirations to be a residential
combination inspector by early
2018

133 of 1216

Mark Hoadley
Senior Combination Building Inspector

1 of 2

Experience Summary
Mark  is  a  certified  combination  commercial  and  residential  Building Inspector.  Mark  has  more  than  20  years  of  construction  experience including  work  as  an  electrician,  Superintendent,  Quality  Control Inspector, and Inspector of Record. Mark has most recently worked for the City of Dublin for approximately five years on behalf of 4LEAF. Prior to that, Mark has spent 12 years as an In
spector of Record where he has
inspected  project  between  $3  Million  to  $90  Million.  Projects  include Courthouses,  Schools, and Commercial  Construction. Mark has worked throughout  the  Bay  Area  and  has  been  a  reputable  IOR  capable  of completing large projects individually or as a me mber of a team.

Select Professional Experience

4LEAF, Inc.

Senior Combination Building Inspector
2015 ‐ Present
Mark is currently working for 4LEAF and was
most recently assigned to the City of Dublin
for the past five years. Mark has worked on
multi‐family,  residential,  commercial,  and
OSHPD  3  projects.  Most  recently,  Mark
helped  complete  the  OSHPD  3  Kaiser
Medical Center located adjacent to I58 0 where he worked hand‐in‐hand with McCarthy Building group.

Douglas Hahn Inspection Services, Inc.

Inspector of Record for Administrative Office of the Courts 2012 ‐ 2015
Mark  worked  for  more  than  three  years  as  an  Inspector  of  Record  for Douglas  Hahn  on  multiple  Administrative  Office  of  the  Courts  projects including:
‐ Hayward Hall of Justice Remodel
‐ South  County  Justice  Center  Courthouse  ($62  Million),  Porterville, CA
‐ Yolo County S
uperior Courthouse ($90 Million), Woodland, CA
Experience
20+ years

Education
ABC Training Program, Electrical
Norte Vista High School, Riverside,
CA, 1991
Certifications
ICC Certified Combination Building
Inspector
ICC Certified Commercial Building
Inspector
ICC Certified Commercial Electrical
Inspector
ICC Certified Commercial Mechanical
Inspector
ICC Certified Commercial Plumbing
Inspector
ICC Combination Residential
Inspector
ICC Certified Residential Building
Inspector
ICC Certified Residential Mechanical
Inspector
ICC Certified Residential Electrical
Inspector
ICC Certified Residential Plumbing
Inspector
DSA 2
134 of 1216

2 of 2
Mark Hoadley
KCI
Inspector of Record for San Francisco Unified School District Projects 2011‐2015
Mark worked on behalf of KCI providing Inspector of Record services for numerous San Francisco Unified District Projects including:
‐ Spring Valley Elementary School Modernization ($5 Million) ‐ Downtown High School ($5 Million)
‐ Cabrillo Elementary School ($3 Million)
‐ Spring Valley Eleme
ntary Structural Renovation and Masonry Repair ($3 Million)

Eagle Enterprises
Inspector of Record

Mark  worked  for  Eagle  Enterprises  for  more  than  seven  years  as  an  Assistant  Inspector  of  Record, Quality Control Inspector, and Inspector of Record.  Mark worked on a number of projects including:

Inspector of Record
‐ San Fran
cisco City College Alemany Civic Center and Downtown Campus ($10.5 Million) – 2008‐2010

QC Inspector
‐ Kaiser Hospital Replacement, Vallejo, CA ($350 Million) – 2006‐2008

Assistant Inspector of Record – 2003‐2006
‐ Santa Clara Valley Medical Center ($3 Million)
‐ Franklin McKinley Ambulatory Center, San Jose
‐ Hazel Haw
kins Memorial Hospital MRI Wing Addition
‐ Dianne Feinstein Elementary School ($15 Million)
‐ San Francisco City College Wellness Center ($45 Million)

GC Superintendent/Electrician
1998‐2003
Commercial: Restaurant Remodels, carpentry, electrical, mechanical, plumbing, tile, drywall

Electrician
1992‐1998
Commercial  and Residential: Schools, Banks, Data Centers, Warehouses,  office, Luxury Condominiums, Multi‐Family, etc.

135 of 1216

Shenandoah Culp
Permit Technician

1 of 1
Experience Summary
Shenandoah is a highly organized Permit Technician with over 6 years of  experience  in  customer  service.  Her  background  has  instilled  her with skills to be highly proficient in data integration, organization, and communications.  Her  excellent  interpersonal  skills  have  heightened her capacity to build rapport with customers. Shenandoah is proficient in  the  analysis  and  interpretation  of  dat a,  which  contributes  to  her ability to explain rules and regulations to permit applicants clearly and concisely.  She  has  a  remarkable  drive  to  excel,  and  routinely  offers motivation and support to colleagues who need extra encouragement making her a valuable team member to any jurisdiction.

Select Professional Experience

4LEAF Inc.

Permit Technician
2022 – Present
Shenandoah  is  responsible  for  serving  the  public  at  the  Building  Department  counter  for  various jurisdictions, which has included the City of Folsom. Some of her duties include accepting plans for plan check, verifying accuracy and completeness of information, calculating permit fees, filing, and acting as support staff to others in the Departme
nt.

Wine and Roses Café – Lodi, CA
Barista
2021 ‐ 2022
Shenandoah worked as the closing barista and was responsible for preparing and handling food, handling money, and providing reliable customer service.

Sherwin‐Williams – Lodi, CA
Paint Handler
2019 – 2020
Responsible for answering phones with proper customer service, lifting an d  mixing  paint  buckets with
attention to detail and care, matching paint colors, and providing dependable customer service.

Day‐O Espresso and Smoothies – Lodi, CA
Shift Supervisor/Barista
2018 – 2019
Experience
6+ Years

136 of 1216
Cindy Lucas
Senior Permit Technician / Trainer
1 of 1
Experience Summary
Cindy is an ICC Certified Permit Technician and Trainer with over 10 years of experience managing projects in various industries. Her experience in these areas have supported her role as a Permit Technician for variou s municipalities. C indy excels as a Permit Technician and Trainer as she delivers the “partnership approach” mindset and provides excellent customer service delivery to all her contacts.

Select Professional Experience
4LEAF, Inc., Pleasanton CA
Sr. Permit Technician/Trainer
January 2020 – Present
Cindy excels in the role of Sr. Permit Technician and also provides quality training to staff who are developing their skills as a Permit Technician. She is highly skilled at performing the technical and clerical duties to support the development process. She is able to review development applications for completeness and accuracy, properly directs development questions to appropriate personnel, and is able to calculate, collect , and document fees associated with development applications. Cindy understands the importance of building and maintaining positive working relationships with co-workers, other staff, and the public using principles of superior customer service. 4LEAF, Inc., Pleasanton CA
Proposal Coordinator
April 2018 – January 2020
Ci
ndy has produced and ensure d the delivery of top quality, on -tim e and effective proposals,
qualification packages, presentations, etc. She a ssisted with the overall pursuit process to ensure that the overall theme, technical scope, staff qualifications, and project experience are accurate, up to date, well written, and graphically pleasing. Ci ndy supported with the development, design, coordination, production, editing, proofing, and delivery of high -qu ality submittals and accompanying marketing
materials.

Experience
10 + years of project management
Education
CA State University Chico
BA – Graphic Arts
Butte College - AA
Certificates
ICC Certified Permit Technician
137 of 1216

Sarrah Patton
Code Enforcement Officer

1 of 2

Experience Summary
Sarrah has more than 10 years of staff management experience, 5 of which are centered around Code Enforcement and housin g laws . Her academic exp erience focused on Fair Housing and has aided in the development of her professional career ende avors as she entered the Code Enforcement industry. Her skills include Case Management, Habitability Codes, Municipal Client Relations, Landlord & Tenant Rights, Conflict Resolution, and Enforcing Municipal Codes with an emphasis on Planning Re gulations. Sarrah’s background in Real Estate and Fair Housing make her a strong Code Enforcement Officer as she is able to enforce municipal codes and violations that lead to the preven tion of public nuisance s and provide a safe and compliant environment fo r jurisdictional residents.

Professional Experience

4LEAF, Inc.

Code Enforcement Officer
2022 - Present
Sarrah performs the following Code Enforcement duties for our clients:
• Inspect land, structures, vehicles, and stored materials for compliance with applicable planning, zoning, and other codes and laws.
• Respond to complaints regarding municipal and other code violations, laws, or statutes where enforcement authority is defined.
• Issue citations to property owners and worked with them to bring property into compliance. • Compile notes and photographs on assigned cases and researched property ownership. • Prepare inspection and abatement warrants for approval. • Investigate codes, licenses, and fee violations and issue appropriate warnings and citations.

Pacific Union (DBA: COMPASS) – City of Napa, CA
Operations Manager
6/2019 - 9/2021
In her prior ro le, Sarrah’s responsibilities included o perations and office management, supply ordering and organization, equipment management and troubleshooting, A/R delegation, and marketing collateral assistance, creation, and distribution . She also manage d a team o f 21 agents, which helped advance her skills in m ulti-tasking and leadership —qualities that she has continued to develop Experience
5+ years

Education
Fair Housing
National Fair Housing Alliance
Fundamentals, Testing Coordination
Denver Metro Fair Housing Center
Accounting & Communications
East Central University

Certifications/Licenses
Certified Transaction Coordinator
Certified Typist
Licensed Real Estate Agent

138 of 1216

2 of 2
Sarrah Patton
throughout her career . Her experience in Fair Housing and Case Management allowed Sarrah to accomplish her duties as Operations Manager and led to her interest in a career in Code Enforcement.

Fair Housing Napa Valley – City of Napa, CA
Intake Specialist, Fair Housing Specialist II
7/2015 - 5/2019
As an Intake and Fair Housing Specialist, Sarrah ’s duties centered a round case management, advocacy for protected classes , code enforcement, database entry, and HUD (Housing and Urban Development) grant reporting. She upheld processes outlined by the National Fair Housing Alliance, Share the Care, and Born to Age organizations to ensure equal rights for protected classes in regard to potential discrimination concerning housing situations. This role progressed Sarah’s interest in the detection and prevention of building code violations.

South Napa Earthquake Recovery Group
Case Manager
3/2015 - 7/2015
Sarrah’s experience as a Case Manager introduced her to working with residents and clients who ha d been affected by a devastating situation and allowed her to explore housing co des while working to identify the needs of cli ents impacted by the 2014 earthquake . In her role, Sarrah procured resources and referred clients to necessary FEMA, City, and County programs . She also assisted clients with applying for resources.
139 of 1216

Jennifer Keleher
Code Enforcement Officer

1 of 2

Experience Summary
Jennifer has over 16 years of staff management experience. She acquired a breadth of municipal knowledge and skills in h er time working at the City of Santa Rosa and has exceptional skills in conflict resolution. Jennifer is excellent at communicatin g and enforcing municipal codes and violations to prevent public nuisances and provide a safe and compliant environment for jurisdictional residents.

In her recent placements providing Code Enforcement services to the City of Larkspur and the City of Pinole, Jennifer ensures that inspections and evaluations for both residential and commercial structures are compliant and follow the appropriate codes and regulations.

Professional Experience

4LEAF, Inc.

Code Enforcement Officer
2022 - Present
Jennifer performs the following Code Enforcement duties for our clients:
• Inspects and evaluates residential and co mmercial buildings and structures for compliance with the appropriate codes, other applicable regulations, and approved plans and specifications. • Responds to complaints regarding munic ipal and other code violations, laws, or statutes where enforcement autho rity is defined and work with property owners issued citations to bring property into compliance.
• Compiles notes and photographs on assigned cases and researches property ownership. • Prepares inspection and abatement warrants for approval. • Investigates codes, licenses, and fee violations and issues appropriate warnings and citations.

Artizen Staffing Agency, City of Santa Rosa Code Enforcement Senior Administrative Assistant
1/2022 - 6/2022
• Produced and edited electronic letters, memoranda, reports, and other materials. • Understood, interpreted, and p rovided specific information regarding department services or policies to the public or other city employees, in person, over the phone, or by mail. • Prepared d ocuments such as agenda, memorand a, bid specifications, permits, legal notices, personnel actio n forms, pur chasing requisitions, pay ment requests, evaluations, and other materials.

Experience
16+ years

Education
Certified Dental Assistant
College of San Mateo

Skills
MS Office Suite
Accela
Data Ticket
Google Suite
Canva
Adobe Acrobat Pro
Hansen

140 of 1216

2 of 2
Jennifer Keleher
• Proofread, coded, checked, and recorded information.
• Established and maintained alphabetical, numerical, index, and cross-reference files. • Composed routine correspondence and reports on behalf of managerial and professional staff.

City of Santa Rosa Finance Department (Parking Division) Senior Administrative Assistant
2020 - 2021
• Composed routine correspondence and reports on behalf of managerial and professional staff. • Gathered and recorded financial statements as well as made daily cash deposits, received and recorded fees for permits and citations, and performed arithmetical calculations. • Created, modif ied, and revised forms, computer applications, and other related material and processes.
• Created and distributed financial reports to various departments.

National Indian Justice Center
Administrative Assistant / Training Coordinator
2017 - 2020
• Provided s upport for o n-site training including participant registration, distribut ing training materials and evaluations, and preparing and printing training manuals. • Managed hotel contracts from start to finish including negotiation of meeting space, audio/visual coordination, room block reservation, and food and beverage orders. • Coordinated travel for staff and consultants, entered all payments into QuickBooks, and created expense reports for the Finance Manager.
• Tracked and updated grant tasks/budgets and created financial reports for grant reporting. • Assisted with creating job descriptions and performed general office duties.

Sonoma State University, School of Science and Technology Administrative Assistant II
2016 - 2017
• Supported senior advancement staff with cal endar appointments per directio n fr om VP of Advancement and/or senior executives.
• Served as receptionist for the main off ice providing customer service to students , faculty, staff, family, and community members as well as directed visitors, and verified appointments. • Processed and prepared do cuments, records, and forms , gathered data, com pleted data entry, and prepared standard reports.

Social Finance (SoFi)
Office Manager
2015 - 2017
• Served as a li aison between teams and worked with departments across the company promoting communication and collaboration as a culture carrier. • Prepared and facilitated department events.
• Scheduled and set up meeting rooms as well as scheduled meetings and travel. 141 of 1216
OCTOBER 25, 2022

PROPOSAL TO PROVIDE

PLAN CHECK AND ON-CALL STAFFING SERVICES

FOR THE

CITY OR PINOLE

SECTION C

EXPERIENCE, QUALIFICATIONS

AND REFERENCES
142 of 1216

Proposal to Provide Plan Check and On-Call Staffing Services to the City of Pinole Page 7 Section C: Experience, Qualifications and References October 25, 2022 SECTION C: EXPERIENCE, QUALIFICATIONS AND REFERENCES
City of Pinole, CA
Code Enforcement, Plan Review, Inspection, and Chief Building Official

4LEAF has been working with the City of Pinole in several capacities including Plan Review, Code Enforcement  Programs,  Inspections,  and  providing  an  Interim  Chief  Building  Official.  These services assist the community in updating their construction to be in compliance with the current codes, especially for residents who did not go through a formal p ermitting  process.

Housing Program – Code Enforcement
4LEAF  is  currently  providing  inspection  and  project  administration  support services  to  residents  of  the  City  who  have  completed  work  without  going through  a  formal  permitting  process.  Through  strong  organization  and effective  communication,  the  community  has  been  very  receptive  to  getting their properties up to the current codes and standards and avoiding life‐safety construction  hazards  to  the  comm
unity.  Both  our  Inspectors  are  working
diligently  to  maintain  a  database  of  cases  and  track  permitting  progress  on properties  that  need  inspections  to  verify  their  property  meets  current residential health and safety code and the adopted California Building Codes.

Interim Chief Building Official
4LEAF provided the City with an Interim Chief Building Official. Lucas Chapman, CBO was with the City of Pinole on  behalf  of  4LEAF  for  more  than  one  year.  Lucas  routinely  performed  plan  reviews  and  inspections  on  large commercial  and  important  City  projects.  Lucas  also  helped  manage  up  to  two  Permit  Technicians  and  one Building Insp
ector.

CRW Permitting System Automation
4LEAF  recently  provided  the  City  of  Pinole  with  Administration  assistance  for  the  upgrades  to  their  CRW Permitting System. Our staff helped organize and administer workarounds to allow staff to successfully navigate the permitting system, integrate with other departments, and interface with the community to process permits in a reasonable time frame.

Building Inspection Services and Emergency Response Team 4LEAF provides all the inspection services for the City to include residential and commercial inspections for all trades  including  Building,  Mechanical,  Electrical,  and  Plumbing.  Our  firm  provides  after  hours  and  weekend response  to  emergency  life‐safety  situations  due  to  fire,  weather  damage,  or  power  loss  to  determine  if  the residences were safe to resu me  occupancy.

Client Name:  City of Pinole
Project Location:   Pinole, CA
Client Contact:   Tamara Miller, Public Works Director
Client Address:  2131 Pear St, Pinole, CA 94564
Client Phone:  (510) 724‐9010
Contact Email:  [email protected]
143 of 1216

Proposal to Provide Plan Check and On-Call Staffing Services to the City of Pinole Page 8 Section C: Experience, Qualifications and References October 25, 2022 City of San Pablo, CA
Code Enforcement, Plan Review, Inspection Services, and Chief Building Official

For  the  past  4  years,  4LEAF  has  been  working  with  the  City  of  San  Pablo  in  several  different capacities  including  Code  Enforcement,  Plan  Review,  Inspections,  and  Interim  Chief  Building Official to assist the community in helping its customers update their construction to maintain compliance with the current codes, especially those who di d  not go through a formal permitting process.

Housing Program – Code Enforcement
4LEAF  is  currently  providing  inspection  and  project  administration  support services  to  City  of  San  Pablo  residents  who  have  completed  work  without going through a formal permitting process. Through strong organization and effective communication, the community has been receptive to getting their properties up to the current codes and standards and avoiding construction hazards. Both of our Inspectors, Steve
n Mello and Greg Adams, are working
diligently  to  maintain  a  database  of  cases  and  track  permitting  progress  on properties  that  need  inspections  to  verify  their  property  meets  the  current residential health and safety code and the current adopted California Building Codes. Our Project Administrator works both on‐site and off‐site coordina
ting, managing, and assigning inspections regarding this program.

Interim Chief Building Official
4LEAF  has  provided  the  City  with  an  Interim  Chief  Building  Official  for  more  than  two  years  in  this  capacity. 4LEAF’s  Building  Official  routinely  performs  Plan  Reviews  and  Inspections  on  large  commercial  and  important City  projects  and  has  helped  manage  up  to  two  Permit  Technicians,  one  Building  Inspector,  and  three  Permit Technicians.

Building Inspection Services
4LEAF provides all the inspection services for the City to include residential and commercial inspections for all trades including Building, Mechanical, Electrical, and Plumbing. 4LEAF personnel is responsible for inserting all the inspection results into the City’s permitting system CRW.

Client Name:  City of San Pablo
Project Location:   San Pablo, CA
Client Contact:   Charles Ching, Assistant CM
Client Address:  13831 San Pablo Ave., San Pablo

Client Phone:  (510) 215‐3031
Contact Email:  [email protected]

144 of 1216

Proposal to Provide Plan Check and On-Call Staffing Services to the City of Pinole Page 9 Section C: Experience, Qualifications and References October 25, 2022 Project Development Unit (PDU) ‐ County of San Mateo, CA Building and Fire Plan Check, Fire Inspection, and Inspector of Record Services

4LEAF is currently performing Plan Check and Inspector of Record services for multiple projects on  behalf  of  the  County  of  San  Mateo’s  Project  Development  Unit.  This  $1  Billion  program consists of up to 18 projects over the course of more than five years. 4LEAF is responsible for the combination inspections and in spection  reports related to all projects including:

Regional Operations Center
The  new  37,000  square  foot,  two‐story  Regional  Operations  Center  (ROC)  will  be located on the County Center campus where the motor pool was once located. On a daily  basis,  the  Center  will  house  9‐1‐1  Public  Safety  Dispatchers,  an  Emergency Operations Center, and the Office of Emergency Services. More importantly, the ROC will serve as a hub for pu
blic safety responders during major catastrophic events. The building  will  achieve  LEED  Silver  certification  from  the  U.S.  Green  Building  Council and is the largest project funded to date by Measure K.

Skylonda Fire Station #58
This  project  consists  of  a  barracks/office  building  consolidating  the  functions  and operations  of  two  existing  structures  into  a  single  structure.  The  barracks/office building  will  contain  administrative  offices  and  related  support  spaces,  conference and  training  rooms,  a  kitchen  and  dining  room,  dayroom,  dorm  rooms,  fitness rooms, showers, and restrooms.  A new primary vehi cular  access connection shall be provided  to  Skyline  Boulevard  to  facilitate  improved  traffic  sightlines  and  vehicle turning radiuses.

Animal Shelter
The County of San Mateo is constructing a new animal shelter that will be located at the  Coyote  point  site  of  the  current  animal  shelter  to  replace  the  existing  shelter buildings.  This  Design‐Build  project  will  contain  programmed  space  for  a  variety  of mandated  animal  care  services,  limited  community  services,  clinic  service s,   and administrative  services.  The  project  currently  underway  will  replace  the  existing facility with a new approximately 27,000 square foot animal shelter facility.

Additional Projects:
• County Office Building #3   • Parking Structure #2     • Portola House • Cordilleras     •  San Mateo Medical Center   • Pescadero Fire Station • South San Francisco Health Center  • La Honda Fire Station     • Pine Street Project • Sanchez Adobe Visitors Center  • Maple Street Homeless Shelter

Client Name:   County of San Mateo, PDU
Project Location:  County of San Mateo, CA
Client Contact:   Adam Ely, Director
Client Telephone:  (650) 599‐9063
Client Email:  [email protected]
Completion Date:  Varies by Project
Total Program Cost:  ~$1 Billion

145 of 1216

Proposal to Provide Plan Check and On-Call Staffing Services to the City of Pinole Page 10 Section C: Experience, Qualifications and References October 25, 2022 City of Cupertino, CA
On‐Call Plan Review, Fire Plan Check, and Inspection Services

4LEAF performs on‐call building inspection, plan review, and fire plan review services for the City of Cupertino. 4LEAF has completed numerous residential and commercial plan reviews.

Apple Campus 2
4LEAF  provided  the  Building,  Fire,  and  Public  Works  Department  Inspection services on the largest private commercial construction project in the Country. 4LEAF  was  tasked  with  mobilizing  a  project  team  of  more  than  20  Building, Fire,  and  Public  Works  Inspectors,  Project  Administration  Staff,  and Engineering team for this more than $6 Billion pr oject . 4LEAF was responsible for coordinating the inspections in relation to the City’s permits and ultimately packaging  milestones  of  the  project  for  occupancy  approval  from  the  City’s Chief Building Official. The project included:

 Main  Building  –  The  Main  Building  accommodates  up  to  12,000 employees and comprises approximately 2.8 million sf.
 Corporate Fitness Center – Comprising approximately 100,000 sf.  Corporate Auditorium – Comprising approximately 120,000 sf and will hold up to 1,000 people.
 North  and  South  Parking  Structures  –  Two  above‐grade  parking structures of approximatel
y 6,000 spaces.
 Central  Utility  Plant  –  Integrated  parking  structure  and  serves  all buildings on the Main Building site.
 Phase 2 Research and Development Buildings – 600,000 sf of office, research,  and  development  and  two  separate  above  ground  parking garages.

Vallco
4LEAF  was  also  selected  to  perform  inspections  for  the  $2.2  Billion  Vallco project, which will provide approximately 430,939 sf of new retail along with 2,402  residential  units  and  1,981,447  sf  of  office  with  eleven  (11)  22‐story mixed‐use high‐rise buildings connected by a 30‐acre green roof spanning the majority of th
e Vallco property.

4LEAF  performed  a  review  on  the  Main  Street  Cupertino  Project.  The  17.4 acre Downtown Cupertino project includes 130,000 square feet of retail space, 100,000  sf  of  office  space,  and  160  units  of  high‐end  senior  Housing,  and  a 250‐room hotel.

Agency Name:   City of Cupertino
Project Dates:   2010 ‐ 2018
Client Contact:   Albert Salvador, P.E., C.B.O., Chief Building Official Client Telephone:   Office: (408) 777‐3328
Client Address:   10300 Torre Ave, Cupertino, CA 95014
Contact Email:   [email protected]

146 of 1216

Proposal to Provide Plan Check and On-Call Staffing Services to the City of Pinole Page 11 Section C: Experience, Qualifications and References October 25, 2022 City of Palo Alto, CA
Building Inspection, Permit Technician, Plan Review

Since 2007, 4LEAF has provided several combination inspectors to assist the City staff with routine daily  inspections  for  commercial  and  residential  properties  located  throughout  Palo  Alto.  Our inspection services vary from full‐time to temporary part‐time staff.

On‐Site Plans Examiners
Since  2010,  4LEAF  has  provided  on‐site  plans  examiners  for  the  City  of  Palo  Alto.  All   Plans  Examiners  are registered  Engineers  in  the  State  of  California  and  are  responsible  for  reviewing  larger  projects  between $100,000 to $50,000,000 under the direction of the Chief Building Official. In addition, they will also assist th e Permit Counter with over‐the‐counter plan reviews and general questions from the public.  Some of the most recently  reviewed  projects  include  Skype,  Stanford  Medical  Center,  Technology  Credit  Union,  and  VMware. 4LEAF is currently reviewing and inspecting the following projects

Stanford Biomedical Innovation Building – $126 Million
New  research  laboratory  building  for  Stanford  University  School  of  Medicine.  Four‐ story  above  garage  and  one  below  grade  for  a  total  of  216,647  SF.  Wet‐bench research  laboratories  and  associate  support  spaces,  faculty  offices  and  open  office spaces workstations, conference rooms and staff amenity spaces.

2600 El Camino Real – $13.5 Million
New four‐story  62,616 SF office building over one level of basement garage parking (36,957 SF) office is structurally connected to a two‐story above grade parking garage (24,059 SF)

City of Palo Alto Public Safety Building – $84 Million
New three‐story, 136,873 SF City of Palo Alto Public Safety Building will have 2 levels of underground parking and will house the Police Department, 911 Emergency Dispatch Center, the Emergency Operations Center, the Office of Emergency Services, and the administration needs of the Fire Department.

744 San Antonio Rd. – $42 Million
Courtyard by Marriott and an AC Hotel by Marriott. Two, five‐story  hotels (164,764 SF) hotels offering a combined 294 rooms with surface and underground parking.

ISO 1 Rating
With  approximately  13  full‐time  personnel  working  at  the  City  of  Palo  Alto,  4LEAF  was instrumental in the program put in place to achieve an ISO 1 Rating.   In March of 2015, Palo Alto became the 8th City in the Country out of 14,000 Building Departments to achieve this status.

Client Name:   City of Palo Alto
Project Dates:   2007 ‐ Present
Client Contact:   George Hoyt, CBO, Chief Building Official Client Telephone:   Office: (650) 329‐2368
Client Address:   285 Hamilton Ave.  Palo Alto, CA 94301 Contact Email:    George.Hoyt @CityofPaloAlto.org

147 of 1216
OCTOBER 25, 2022

PROPOSAL TO PROVIDE

PLAN CHECK AND ON-CALL STAFFING SERVICES

FOR THE

CITY OR PINOLE

SECTION D

SERVICES UNDERSTANDING
148 of 1216

Proposal to Provide Plan Check and On-Call Staffing Services to the City of Pinole Page 12 Section D: Services Understanding October 25, 2022
SECTION D: SERVICES UNDERSTANDING
The City of Pinole is seeking qualified firms to provide a variety of technical building support services on an as‐ needed  basis.  Given  the  volume  of  permit  activity  and  development  in  the  City  of  Pinole,  the  Community Development  Department  may  require  additional  professional  expertise  to  maintain  existing  levels  of  service across several of its core functions. 4LEAF can provide the City th e following as‐needed services:

Plan Review Services
4LEAF  will  provide  Plan  Review  for  any  type  of  structure  to  ensure  compliance  with  all  adopted  codes,  local ordinances  (including  Tier  1  of  Cal  Green,  if  required)  and  State  and  federal  laws  that  pertain  to  Building  and Safety,  and  for  compliance  with  the  adopted  International  Code  Council  (ICC)  Building,  Plumbing,  Electrical, Mechanical,  National  Fir
e  Protection  codes  and  standards,  and  the  Accessibility  and  Noise  and  Energy Conservation  requirements  as  mandated  by  the  State  of  California  Title  24,  State  of  California  Water  Efficient Landscape  Ordinance,  the  State  of  California  Certified  Access  Specialist  (CASp)  compliance,  and  all  other applicable ordinances. The types of projects we pr ovide  these services for include Single‐Family Dwellings, large Multi‐Family Mixed‐Use Dwelling Units, Commercial, and Industrial.

Approach
We understand that the specific building plan review responsibilities will include, but are not limited to:
 Examining plans, drawings, specifications, computations documents, soils reports, and additional data.  Ascertaining  whether  projects  are  in  accordance  with  applicable  building  and  fire  codes,  and  City ordinances, including but not limited to Title 24 and Title 25.  Performing such reviews as structural, MEP, green building, fire and life safety, grading and drainage.  Reviewing plans to ensure conformity to the required strengths, stresses, strains, loads, and stability as per the applicable laws.
 Reviewing  plans  to  ensure  conformity  with  use  and  occupancy  classification,  general  building  heights and  areas,  ty pes   of  construction,  fire  resistance  construction  and  protection  systems,  means  of  egress, accessibility, structural design, soils and foundations, and masonry.  Providing additional plan review services as requested by the City.  Conducting all plan review at the City  Department or at a site mutually agreed upon in writing and.  Supplyi
ng all plan review staff with all code books and other basic professional references.

On‐ and Off‐Site Review
4LEAF can supply Registered Professional Engineers to the City  to work on‐site performing structural plan review and non‐structural reviews at the jurisdiction’s discretion. Our experience includes checking for compliance with the structural, life‐safety, accessibility, plumbing, mechanical, electrical, fire, and local codes/ordinances.

Process Mapping
4LEAF  aims  to  bring  departmental  processes  together  by  identifying  and  eliminating  obstacles  to  streamline processes.  Our  subject‐matter  experts  visit  each  department  within  a  jurisdiction  to  conduct  an  analysis  of existing processes, identify how best to streamline separate departmental processes to improve workflow,  and provide guidance and recommendations on an improved work plan. 149 of 1216

Proposal to Provide Plan Check and On-Call Staffing Services to the City of Pinole Page 13 Section D: Services Understanding October 25, 2022
Plan Review QA/AC Review Process
Task 1 – Project Tracking Set‐up
The first step of our process will be to set up the project in our system to enable 4LEAF and the City of Pinole each  to  track  the  progress  of  the  review.  Our  plan  tracking  procedures  are  designed  to  track  each  submittal throughout the review pr ocess  and maintain accurate and comprehensive records for each submittal.

Task 2 ‐ Complete Submittal Review
Upon  receiving  the  plans  from  the  City  ,  4LEAF  will  triage  (preliminary  plan  review  performed  by  4LEAF  plan review  project  lead)  the  submittal  to  verify  that  the  submittal  received  is  complete  (i.e.,  all  pertinent  plans, calculations,  reports,  and  other  related  documents)  in  order  that  we  can  beg in   our  review.  If  the  submitted package is incomplete, we will communicate with the City  to discuss the deficient documents needed to proceed with our review.

Task 3 ‐ Plan Review Assignment
After the triage process is performed and a complete package is verified, the project will be assigned to the most qualified  Plans  Examiner  and  a  turnaround  time  will  be  established.  We  will  log  each  application  into  our database the same day the plans are received to assure that the y are routed in a timely manner and to allow for daily project tracking.

Task 4 ‐ Plan Review
4LEAF will provide the project contact (Developer, Contractor, Architect, or Engineer) desired by the City of Pinole with a list of any items needing correction and clarification to comply with applicable building codes, ordinances, and regulations. A correction list will be created based on the missing codes and ordinances.

Task 5 ‐ Quality Control
Prior to submitting the plan review correction list to the City , the designated plan review project lead will review the correction list for adherence to applicable codes and ordinances as well as for accuracy and completeness.

After completion of our quality control review a correction list w ill  be e‐mailed to a designated staff member at the City of Pinole or as directed by the City .

The correction list and a 4LEAF transmittal form will include the following information: a description of the work, type of construction, occupancy group, square footage, number of floors, and sprinkler requirements.

Task 6 ‐ Plan Review Rechecks
Plans received for rechecks will be reviewed for conformance. Our goal is to actively work with the designers to resolve all unresolved issues after our second review. If it appears that there are complicated issues that might cause a project to go beyond our second review, we will comm unicate directly with the designer to resolve these concerns.

Task 7 ‐ Project Approval
Once the final plan reviews are completed and ready for approval, 4LEAF will organize the plans and supporting documents per the City of Pinole processing requirements and return them to the City , along with our letter of completion.

150 of 1216

Proposal to Provide Plan Check and On-Call Staffing Services to the City of Pinole Page 14 Section D: Services Understanding October 25, 2022
Turn‐Around Times
4LEAF has a tremendous reputation for completing projects on‐time and under budget. 4LEAF’s plan review team is widely recognized for quick turn‐around times and prompt service. Off‐site plan reviews are performed at our office, with plans transmitted by personal delivery or overnight service. The standard turn‐around time is within 10 business days for residential pla
n reviews and within 10 days for commercial/industrial plan reviews; however, these timeframes are negotiable based on your needs. 4LEAF also provides Fire Plan Review services.

Type of
Plans
Transportation
Pick up & Delivery
Initial
Review
Resubmittal
Review
Resubmittal
Review #2
Expedited
Review
Expedited
Resubmittal
Residential  < 24 Hours   < 10 Days  < 5 Days  < 5 Days  < 5 Days  < 3 Days Multi‐
Family  < 24 Hours   < 10 Days  < 5 Days  < 5 Days  < 5 Days  < 3 Days Residential
Remodel   < 24 Hours  < 10 Days  < 5 Days  < 5 Days  < 5 Days  < 3 Days Residential
Addition  < 24 Hours  < 10 Days  < 5 Days  < 5 Days  < 5 Days  < 3 Days Commercial  < 24 Hours   < 10 Days  < 5 Days  < 5 Days  < 5 Days  < 3 Days Commercial
Addition  < 24 Hours  < 10 Days  < 5 Days  < 5 Days  < 5 Days  < 3 Days Commercial
Remodel  < 24 Hours  < 10 Days  < 5 Days  < 5 Days  < 5 Days  < 3 Days Commercial
> 15,000 s.f.  < 24 Hours   Negotiable  Negotiable  Negotiable   Negotiable   Negotiable *Larger complex plan reviews can be negotiated to achieve the best possible pricing. 4LEAF has a proven track record of working with municipalities to provide expedited reviews with special discounted pricing.

Pick‐up  of  all  plans  will  be  performed  by  4LEAF  staff  within  24  hours  of  the  City’s phone  call  or  e‐mail.  4LEAF prefers  to  pick‐up  and  deliver  the  plans  in  person  to  communicate  information  that  may  be  pertinent  to  the project and maintain consistent communication. At no additional cost, 4LEAF st aff  will transport the plans to and from the City upon a phone call to the 4LEAF office or simply e‐mail for “pick‐up” to [email protected].

4LEAF’s EZPlan Review
EZPlan Review is our in‐house tracking software that acts as  a  communication  tool  between  4LEAF  and  the
jurisdictions  we  work  with.  The  use  of  EZPlan  makes communication  easy.  This  web  portal  allows  users
visualize  project  due  dates,  notes,  and  status  updates  so that  projects  can  be  followed  from  start  to  finish.

Additionally,  4LEAF  provid
es  electronically  stamped  and
uploaded copies of approved project plans, a value which saves clients time and resources. With the use of EZPlan, 4LEAF  hopes  to  provide  a  level  of  ease  and  transparency during the off‐site plan review process.

151 of 1216

Proposal to Provide Plan Check and On-Call Staffing Services to the City of Pinole Page 15 Section D: Services Understanding October 25, 2022
Document Control
When  plans  and  documents  are  received  for  review,  4LEAF’s  Plan  Review  Manager  and  Document  Control Technician analyze the project, creates a job number, and completes a Job Setup Sheet. This form highlights both the jurisdiction, applicable contact information, and all  project  specific design criteria and notes. Jobs are then transmitted  through  4LEAF’s  easily  accessed  EZPlan  Revie w  Portal  which  tracks  initial  and  subsequent  reviews and is open for view by the client. The City  and their customers can view 4LEAF’s plan review control log through 4LEAF’s EZPlan Review Portal.

Plans then get distributed for review to a 4LEAF team consisting of Plan Review Engineers, Architect (a licensed state  professional)  and/or  an  ICC  Certified  Plans  Examiner,  as  applicable.  Our  staff  then  performs  his  or  her function  of  analyzing  the  plans  and  documentation  for  effective  conformance  to  the  state  codes,  referenced construction  standards,  and  City  am endments.  4LEAF’s  code  review  methodology  is  “The  Effective  Use  of  the Codes”  reinforced  through  proprietary  and  jurisdictional  checklists.  When  complete,  the  Plan  Review  Manager overviews  the  project  for  quality  control  purposes  and  forwards  comments  or  approvals  to  the  client’s  pre‐ designated contacts.

Off‐Site Electronic Plan Review
Digital plan review allows 4LEAF the ability to review, markup and transport plans of any size electronically. We strongly  encourage  this  service  for  our  clients.  This  process  delivers  a  high  degree  of  cost  effectiveness,  time efficiency  and  a  “green”  and  environmentally  friendly  system.  Through  our  strong  focus  on  utilizing  this  digital capability, we offer full access to all 4LEAF en
gineers and plans examiners company‐wide, from any of our office locations.  A  protected  online  portal  will  be  established  to  allow  property  owners,  contractors,  developers, businesses, designers, and stakeholders to submit plans electronically for review. Access to the online portal will be given to City staff for imm ediate access to information regarding project status during the review process.

4LEAF has successfully implemented and used Bluebeam for electronic review of files to help eliminate the use of paper  and  take  the  plan  review  workflow  to  a  whole  new  level.  4LEAF’s  offices  are  equipped  with  large  scale monitors  for  easy  review  of  plans.  Bluebeam  Revu  combines  powerful  PDF  editing,  markup,  and  collaboration tech
nology with reliable file creation. Bluebeam integrates flawlessly with our Green Line approach for electronic and timely turnarounds resulting in permit issuance within 5‐7 business days.

Additional Technologies
Having served more than 350 jurisdictions, 4LEAF and our staff are knowledgeable and have experience working with  a  variety  of  different  technologies  for  Electronic  Plan  Review,  Permit  Tracking,  and  Building  Inspections. 4LEAF’s experience with tracking technologies includes, but is not limited to:

Structural Only Review
Upon request, 4LEAF will perform “structural only” reviews for the City. 4LEAF can communicate directly with the designers  via  email,  in‐person  meetings,  and  through  our  EZPlan  Review  system.  4LEAF  prefers  PDF  files  for “structural  only”  reviews  as  they  allow  several  Structural  Engineers  to  review  plans  together  should  there  be design‐relate d  questions. The majority of 4LEAF’s plan review engineers have a design background and work well with project designers.

152 of 1216

Proposal to Provide Plan Check and On-Call Staffing Services to the City of Pinole Page 16 Section D: Services Understanding October 25, 2022
Certified Access Specialist (CASp)
4LEAF  has  performed  CASp  inspections,  plan  review  projects,  and  have  consulted  on  numerous  construction projects for accessibility questions and advice.

Building Department Staffing Services
4LEAF  has  a  proven  track  record  of  providing  Permit  Technician/Counter  staff  and  Building  Officials  to jurisdictions.  4LEAF  can  deploy  such  staff  on  short  notice  and  offer  training  programs  for  department  staff,  if required. Our staff encompasses the right combination of experience, education, and certifications.

Permit Technician
4LEAF  Permit  Technician  Staff  must  be  experienced  and  dedicated  to  serving  the  public  at  the  Planning  and Building  Department  counter.  4LEAF  has  numerous  of  Permit/Counter  Technicians  on  staff,  many  who  are currently  assigned  to  Building  Departments  throughout  the  state.  All  staff  will  have  the  materials,  resources, tools, and training required to perform the job. Ty pical Permit Technician duties include:
 Accepting plans for plan check
 Verification that plans are accurate and complete
 Calculating permit fees
 Explaining ordinances and procedures to owners, contractors, developers, architects, and the public  Assisting with preparation of permit applications
 Receiving plans for Planning and Buildi ng permits and route to various agencies (if requested)  Accepting complaints on code violations, process, and record complaints  Answering phone calls for field and office staff
 Processing inspection requests
 Maintaining files for building permits
 Operating the Building Department’s computerized information system  Inputting a va riety  of information, including building permits and inspections  Completing related duties and responsibilities as assigned by Building Official and Senior staff members

Building Official
4LEAF  Interim  Building  Officials  can  provide  in‐house  plan  reviews  to  the  City,  limiting  the  amount  of  projects distributed to outside consultants and helping the City achieve significant cost savings. The Building Official will act  as  an  adjunct  staff  member  to  the  City  and  work  with  City  personnel  and  various  departments  to  perform professional building services i
ncluding but not limited to plan review, permit technician, building inspection, and code enforcement. Staff qualifications for this role include evaluating and documenting projects for compliance with applicable building standards and housing codes, on‐ and off‐site plan review, staff augmentation, and other building department related tasks. Proposed staff for this role will be appropriately train ed and certified for all work.

Placement Schedule

Building Department Staff Interim Full‐Time
Permit Technician (ICC Certified)  < 2 Days  < 5 Days
Assistant Permit Technician/ Counter Staff  < 2 Days  < 5 Days Building Official  < 2 Days  < 15 Days
153 of 1216

Proposal to Provide Plan Check and On-Call Staffing Services to the City of Pinole Page 17 Section D: Services Understanding October 25, 2022
Fire Plan Review Services
Our Fire team is comprised of experienced Fire Plan Reviewers, Fire Protection Engineers, Fire Marshals, and Fire Chiefs.  4LEAF’s  fire  inspectors  are  all  ICC  and/or  OSFM  Certified  and  experienced  working  within  a  municipal work environment. Our fire plan review and inspection processes similarly follow the procedures and timelines outlines in our Building pla n  review and inspection sections. We have worked on several high‐profile contracts for fire prevention services and recovery programs including:
 University of California, Davis – Fire Plan Review
 City of Folsom – Fire Plan Review
 Lathrop/Manteca Fire District – Fire Plan Review
 County of Sacramento – Fir e Plan Review
 County of Placer – Fire Plan Review
 Solano County – Fire Recovery Program
 Sonoma County – Fire Recovery Program
 Town of Paradise – Fire Recovery Program
 Livermore Pleasanton Fire Department – Fire Review and Inspection Services  City of Oakland Fire Department – Fir e Plan Review Services

Fire Plan Review
4LEAF can provide plan review services for all types of occupancies and construction types to ensure compliance with all adopted codes, local ordinances and state and federal laws, ordinances, regulations, and standards that pertain to Fire Life Safety Including, but not limited to:
 CA Title 24, Parts 2, 3, 4, and 9
 NFPA 13, 13R, 13D, 24, and 72
 Local am
endments to the California Building and Fire Codes
 California Health and Safety Code
 Municipal Fire Standards & Municipal Codes
 National Fire Protection Referenced Standards
4LEAF  is  one  of  the  Fire  Life  Safety  industry’s  leaders  in  Plan  Review  Services.  Our  Fire  Plan  Review  Services include:
 Compliance for Site Acc
ess Requirements
 Compliance for Fire Flow Requirements
 Review  of  Fire  Prevention,  Suppression,  and
Detection Systems
 Sprinkler,  Standpipe,  Alarm,  Notification
Systems, and Fire Pump Code Compliance
 Hazardous Occupancies, High Piled Storage, and
Smoke Control Systems
 Review of Al
ternate Means
 Review of Methods Requests
 Annual Business Inspections
 Complete Fire Prevention Services
 New Construction Inspections
 Fire Alarm/Sprinkler Inspections
 Special Event Permits
 Hazardous Materials Inspections
 In‐House Plan Review
 Off‐Site Plan Review
 Code and Standards
 Public Education and Safety Trainin

154 of 1216
Proposal to Provide Plan Check and On-Call Staffing Services to the City of Pinole Page 18 Section D: Services Understanding October 25, 2022
Building Inspection Services
4LEAF  has  a  team  of  more  than  200  ICC  Certified  Building  Inspectors,  OSHPD/DSA  Inspectors  of  Record,  Fire Personnel, and Construction Inspectors working on various contracts. 4LEAF has a team committed to work in Southern  California  who  will  remain  for  the  duration  of  projects  to  ensure  we  capture  the  goals  and performance that have made our inspection system successful.

We maintain the largest database of qualified inspectors of varied qualifications. Inspectors vary from current full‐time  inspection  staff,  idle  staff  (temporarily  between  assignments),  and  pre‐qualified  staff  which  include inspectors who are available subject to client demand. 4LEAF’s inspectors are all ICC Certified and experienced working  within  a  municipal  work  environment.  4LEAF  will  provide  inspectors  with  all  the  necessary  tools, equipment, and current code books sufficient to facilitate all required inspections. 4LEAF can provide interim or full‐time  inspectors  same‐day  or  within  one  business  day— simply  call,  email,  or  text  our  assigned  Project Manager for an immediate response. Our on‐call database is utilized for all our clients for as‐needed requests.

Periodic Inspection Services  Available Next Day
4LEAF can fulfill inspection requests immediately upon request including same day. 4LEAF has a wealth of local and available inspectors ready to serve the City. In addition, 4LEAF has a proven track record of providing such services to several different building departments.

Part‐Time Inspection Services  Available Next Day
4LEAF will provide the City with part‐time inspectors upon request. 4LEAF can provide part‐time staff within 24 hours  of  request  for  any  duration  of  time.  4LEAF’s  Project  Manager  will  work  closely  with  the  department  to identify the right personnel and determine the appropriate work schedule.

Full‐Time Inspection Services  Available Two Days or Less 4LEAF  can  provide  full‐time  inspectors  upon  request.  4LEAF  provides  this  service  regularly  to  many  clients throughout  Southern  California,  Northern  California,  Central  Coast,  Sacramento  Valley,  Peninsula/South  Bay, East Bay, North Bay, and Central Valley.

Project Specific Inspection Services  Available Two Days or Less 4LEAF  is  often  tasked  with  providing  inspection  services  to  large  projects  on  behalf  of  municipalities.  4LEAF currently  handles  large‐scale  projects  for  such  clients  as  the  City  of  Palo  Alto,  City  of  Cupertino,  etc.  These projects are developer funded into a separate City account which is distributed to 4LEAF using a separate invoice and contract number. This is particularly helpful to fast paced projects looking for continuous inspection services over a short period of time (i.e., 6 ‐ 36 Months).
155 of 1216

Proposal to Provide Plan Check and On-Call Staffing Services to the City of Pinole Page 19 Section D: Services Understanding October 25, 2022
Code Enforcement Services
4LEAF can provide the City with experienced Code Enforcement services for to address current and upcoming project needs. Services provided to the City shall include but not be limited to:

Inspections
4LEAF  can  provide  certified  and  qualified  staff  to  perform  Code Enforcement inspections in a lawful manner that respects the reasonable expectations  of  privacy  and  security  of  residents  and  their  properties.

Inspections conducted will determine if conditions on the properties being inspected are compliant with applicable sections of the current editions of the  Internati
onal  Property  Maintenance  Code,  City  Code,  CA  Building Code, and any Code adopted by reference by the City.

4LEAF  staff  will  be  qualified  to  verify  that  onsite  conditions  are  consistent  with  the  City’s  records  for development  approvals,  square  footage,  setbacks,  heights,  and  other  requirements  that  may  be  applicable. 4LEAF staff are qualifie d to do the following:
 Perform inspections for violations of Building Codes and Ordinances as adopted by the City.  Research properties for prior approvals, permits, and general information relating to violations.  Investigate  and  take  necessary  action  when  a  violation  of  City  Code  exists,  and  consulting  with  City Counsel as required when requeste
d by the Code Enforcement Chief.
 Comply with the City’s procedures for reporting inspection results and deficiencies.  Using City inspection correction forms.
 Making appropriate entries in City records.
 Conduct follow‐up inspections as needed.
 Notify the responsible parties of other ag ency  approvals prior to closing a code enforcement action.  Maintain records as needed for the efficient and effective operation of the City.  Meet with members of the public and City staff daily as needed.

Enforcement
4LEAF  staff  have  the  experience  in  working  cooperatively  with  property owners and other responsible parties to bring properties and/or conditions into  compliance  with  applicable  bodies  of  law.  Our  team  will  be  able  to determine  when  voluntary  compliance  is  not  forthcoming  from  property owners  or  responsible  parties.  4LEAF  staff  has  experience  in  using administrative  processes  i
ncluding  the  issuance  of  administrative  citations
to  credibly  establish  at  the  administrative  level  that  violations  of  law  exist on  a  property.  4LEAF  Code  Enforcement  Officers  have  experience  in  writing  criminal  citations  and  in  working with  legal  counsel  to  assist  in  the  successful  prosecution  of  Code  Enforcement  cases either  in  cr iminal   or  civil court when necessary.

156 of 1216
OCTOBER 25, 2022

PROPOSAL TO PROVIDE

PLAN CHECK AND ON-CALL STAFFING SERVICES

FOR THE

CITY OR PINOLE

SECTION E

COST, RATE AND SERVICE

STRUCTURE
157 of 1216
Cost, Rate and Service Structure December 12, 2022
202 2-2023 FEE SCHEDULE & BASIS OF CHARGES

FOR THE CITY OF PINOLE
All Rates are Subject to Basis of Charges

PLAN REVIEW COST STRUCTURE NOTES
Complete Plan Review Percentage Cost: 65%
(Inclusive of all disciplin es except Fire and Civil, which are billed on an hourly basis.)
Hourly Plan Review: $130 Non-Structural Review
$155 Structural Review
Fee includes:
 Initial review and two (2) rechecks. Ho urly
charges appl y af ter three (3) or more
rechecks. Meetings regarding plan checks.
 Shipping and courier service.

PROJECT MANAGEMENT
Principal-in-charge ................................................................................................................. $1 95/hour Project Manager .................................................................................................................... $1 70/hour

BUILDING & FIRE
Interim Chief Building Official .................................................................................................. $1 70/hour Senior Combination Building Inspector (Building Inspector III) .................................................. $135/hour Commercial Building Inspector (Building Inspector II) ............................................................... $120/hour Residential Building Inspector (Building Inspector I) ................................................................. $ 105/hour OSHPD Inspection/Review ...................................................................................................... $155/hour Administrative Support........................................................................................................... $70 /hour Permit Technician ................................................................................................................... $85/hour Senior Permit Technician ........................................................................................................ $95 /hour On-Site Structural Plan Review Engineer.................................................................................. $155/hour On-Site Non-Structural Plans Examiner .................................................................................... $1 30/hour Civil Plan Review (Grading, Improvement Plans) ...................................................................... $165/hour Fire Protection Engineer (FPE)................................................................................................. $ 189/hour Fire Plan Examiner.................................................................................................................. $140/hour Fire Prevention Officer ........................................................................................................... $142 /hour Fire Inspector I ....................................................................................................................... $1 20/hour Fire Inspector II ...................................................................................................................... $135/hour Public Works Inspector ........................................................................................................... $1 55/hour CASp Inspection/Review......................................................................................................... $175/hour Permit/Counter Manager ....................................................................................................... $110/hour GoFormz Software ....................................................................................................... $50/user monthly Hourly overtime charge per inspector............................................................................... 1.5 x hourly rate Mileage (for inspections performed within the City) .............................................................IRS Rate + 20% 158 of 1216

Cost, Rate and Service Structure December 12, 2022

CODE ENFORCEMENT
Project Manager .................................................................................................................... $ 185/hour Director of Code Enforcement ................................................................................................ $ 150/hour Senior Code Enforcement Officer ............................................................................................ $130/hour Code Enforcement Officer ...................................................................................................... $110/hour

PLANNING
Principal-in-Charge ................................................................................................................. $2 80/hour Housing Policy Director ........................................................................................................... $ 225/hour Planning Director.................................................................................................................... $ 205/hour Principal/Planning Manager .................................................................................................... $175/hour Senior Planner........................................................................................................................ $160/hour Associate Planner ................................................................................................................... $140/hour Assistant Planner ................................................................................................................... $115/hour Planning Technician ................................................................................................................ $95/hour

BASIS OF CHARGES
Rates are inclusive of “tools of the trade” such as forms, telephones, and consumables. • All invoicing will be submitted monthly.
• Staff Augmentation work (excluding plan review) is s ubject to 4-hour minimum charges unless stated otherwise. Services billed in 4-hour increments.
• Most plan reviews will be done in 10 business days or less and 5 business days or less for re-checks. This is not inclusive of holidays or the day of the pick-up of plans. • Expedited reviews will be billed at 1.5x the plan review fee listed in the fee schedule. Return time will be within five (5) days or less on regular plan checks and seven (7) days on larger projects upon receipt of the plans from the City. The same term will apply for all plan review cycles. • Plan review of deferred submittals & revisions will be billed at the hourly rates listed. • Larger complex plan reviews can be negotiated to achieve the best possible pricing. • All plan review services will be subject to 2-hour minimum fee. • All plan review services are billed on a percentage basis and includes the initial review and 2 rechecks. - Plan reviews will be billed on an hourly basis only after the initial review and 2 rechecks unless otherwise agreed upon on a case-by-case basis.
- Fire and Civil Reviews are billed on an hourly ba sis and are not included in our plan review percentage.
• 4LEAF assumes that these rates reflect the 2022- 2023 contract period. 3% escalation for 2023-2024, 2024-2025, and 2025-2026 is negotiable per market conditions. • Over time and Premium tim e will be charged as follows:
- Regular time (work begun after 5AM or before 4PM) 1 x hourly rate - Nighttime (work begun after 4PM or before 5AM) 1.125 x hourly rate - Overtime (over 8-hour M-F or Saturdays) 1.5 x hourly rate 159 of 1216

Cost, Rate and Service Structure December 12, 2022
- Overtime (over 8 hours Sat or 1st 8-hour Sun) 2 x hourly rate - Overtime (over 8 hours Sun or Holidays) 3 x hourly rate • Overtime will only be billed with prior authorization of the Director or other designated City personnel. • All work with less than 8 hours rest between shifts will be charged the appropriate overtime rate. • Mileage driven during the course of Inspections will be charged at cost plus 20%. • Payment due on receipt. All payments over 30 days will be assessed a 1.5% interest charge. • Client shall pay attorneys’ fees, or other costs incurred in collecting delinquent amounts. • Client agrees that 4LEAF’s liability will be limited to the value of services provided. • In accordance with California’s Meal Break and Rest Break Law requirements, Client will be billed one (1) additional hour pe r day at the regula r rate for each missed meal or rest break due to Client-directed tasks or requirements. Client should allow 4LEAF’s non-exempt, hourly employees the opportunity to take their entitled rest and meal breaks during each work shift. • If 4LEAF is requested or o therwise required to conform to Client ’s alternative work wee k schedule (“AWW”), Client hereby agrees to compensate or reimburse 4LEAF for all overtime paid to its employees who work an AWW.
- If 4LEAF’s affected employment group approves an AWW election and the same is registered, the overtime compensation/reimbursement shall not be required.

BASIS OF CHARGES – PREVAILING WAGE
• Rates shown assume the project s will require compliance with California Prevailing Wage rate requirements and assum es the Client will be filing a PWC -100 Form to the California Department of Industrial Relations (DIR) for the projects.
• Rates for prevailing wage categories are subject t o annual escalations in accordance with the bi-annual wage determinations from the California DIR.
• Per the new requirements being enforced under SB 854 and because it is assumed that a PWC-100 Form will be filed by the Client to the CA DIR for each project , 4LEAF is required to notify an authorize d Apprenticeship Committee through submitta l of a DAS -140 form. We are then required to make an official request to an authorized Apprenticeship Committee for an apprentice by submitting a DAS-142 form. We are not assured the apprenticeship committee will be able to provide a suitable / qualified apprentice for the project. Per the apprenticeship requirements, the hours worked by the apprentice must be in a ratio of 1:5 for apprentice to journeyman hours. 4LEAF will not know the labor classification of the Public Works Apprentice until an Apprentice is dispatched to the site; therefore, the rates for the five Periods listed under the California DIR’s Wage determination for Building Construction Inspector were used to determine the range of hourly rates for Public Works Inspector Apprentice. • Pre-approved Overtime and Pr emium hours for labor categories subject to Prevailing Wage requirements will be charged per the following:
 Nighttime (work begun after 4PM or before 5AM) 1.125 x hourly rate  Overtime (over 8 hours M-F or Saturdays) 1.35 x hourly rate  Overtime (over 8 hours Sat or 1
st 8 hours Sun) 1.85 x hourly rate
 Overtime (over 8 hours Sun or Holidays) 2.35 x hourly rate 160 of 1216

Cost, Rate and Service Structure December 12, 2022
• All invoicing will be submitted monthly.
• All work with less than 8 hours rest between shifts will be charged the appropriate overtime rate. • In accordance with California’s Meal Break and Rest Break Law requirements, Client will be billed one (1) additional hour per day at the regular time rate f or each missed meal or rest break due to Client - directed tasks or requirements. Client should allow 4LEA F’s non -exempt, hourly employees the opportunity to take their entitled rest and meal breaks during each work shift. • Subconsultant Invoices will be assessed a 10% Administrative Processing Fee. • Project-related mileage for inspections will be billed at the allowable IRS Rate. • Payment due on receipt. All payments over 30 days will be assessed a 1.5% interest charge. • Client shall pay attorneys’ fees, or other costs incurred in collecting delinquent amounts. • Client agrees that 4LEAF’s liability will be limited to the value of services provided.

161 of 1216
OCTOBER 25, 2022

PROPOSAL TO PROVIDE

PLAN CHECK AND ON-CALL STAFFING SERVICES

FOR THE

CITY OR PINOLE

SECTION F

REQUIRED STATEMENTS /

DOCUMENTS
162 of 1216

Proposal to Provide Plan Check and On-Call Staffing Services to the City of Pinole Page 24 Section F: Required Statements / Documents October 25, 2022 SECTION F: REQUIRED STATEMENTS / DOCUMNETS
Conflict of Interest
4LEAF has no actual, apparent, direct, or indirect, or potential conflicts of interest that may exist with respect to our firm, management, or employees of the firm relative to the services to be provided under the Agreement.

4LEAF has no real or apparent conflict of interest associated with working for the City of Pinole.

Insurance Requirement
4LEAF as the ability and agrees to fulfill the indemnification and insurance requirements contained in the sample contract.

Proprietary
Nothing contained in this submitted proposal is proprietary.

California Public Records Act
4LEAF Acknowledges and understands that all documents submitted to the City in connection with this proposal are subject to the California Public Records Act and may be disclosed without notice.

Exceptions
4LEAF  takes  no  exceptions,  alterations  or  amendments  to  the  Scope  of  Services  or  other  requirements  of  the RFP to  provide Plan Check and On‐Call Staffing Services, including the Sample Contract (Attachment B).

Actions Filed or Resolved
4LEAF does not have any pending bankruptcies, liens, stop payment notices, judgments, lawsuits, arbitrations, mediations, foreclosures, or have had any similar actions filed or resolved in the past seven (7) years. Never has a client terminated a contract for breach.

163 of 1216

PINOLE CITY COUNCIL

MEETING AGENDA

CITY COUNCIL

Devin T. Murphy, Mayor
Maureen Toms, Mayor Pro Tem
Cameron Sasai, Council Member
Anthony Tave, Council Member
Norma Martínez-Rubin, Council Member

TUESDAY
January 17, 2023
5:00 P.M
Please note: HYBRID MEETING FORMAT
Attend in Person: PINOLE CITY COUNCIL CHAMBERS - 2131 PEAR STREET OR
Attend VIA ZOOM TELECONFERENCE – Details provided below

Please note: Updated COVID-19 safety protocols will be posted outside the City Council Chambers. Please review this information before entering the Council Chambers.

How to Submit Public Comments:

In Person: Attend meeting at the Pinole City Council Chambers, fill out a yellow public comment card and submit it to the City Clerk.

Via Zoom:

Members of the public may submit a live remote public comment via Zoom video conferencing. Download the Zoom mobile app from the Apple Appstore or Google Play. If you are using a desktop computer, you can test your connection to Zoom by clicking here. Zoom also allows you to join the meeting by phone.

From a PC, Mac, iPad, iPhone or Android:
https://us02web.zoom.us/j/89335000272
Webinar ID: 893 3500 0272
By phone: +1 (669) 900-6833 or +1 (253) 215-8782 or +1 (346) 248-7799 • Speakers will be asked to provide their name and city of residence, although providing this is not required for participation.
• Each speaker will be afforded up to 3 minutes to speak (subject to modification by the Mayor)
• Speakers will be muted until their opportunity to provide public comment.

When the Mayor opens the comment period for the item you wish to speak on, please use the “raise hand” feature (or press *9 if connecting via telephone) which will alert staff that you have a comment to provide and press *6 to unmute. To comment with your video enabled, please let the City Clerk know you would like to turn your camera on once you are called to speak.

CORONAVIRUS ADVISORY
INFORMATION:

CLICK HERE for City Updates

CLICK HERE for County Updates
1 of 1216
City Council
Agenda – January 17, 2023

Page 2 ends

Written Comments: All comments received before 3:00 pm the day of the meeting will be posted on the City’s website on the agenda page (Agenda Page Link) and provided to the City Council prior to the meeting. Written comments will not be read aloud during the meeting.

Email comments to [email protected] Please indicate which item on the agenda you are commenting on in the subject line of your email.

Please note: Updated COVID-19 safety protocols will be posted outside the City Council Chambers. Please review this information before entering the Council Chambers.

OTHER WAYS TO WATCH THE MEETING

LIVE ON CHANNEL 26. They are retelecast th e following Thursday at 6:00 p.m. The Community TV C hannel 26 schedule is published on the city’s website at www.ci.pinole.ca.us.

VIDEO-STREAMED LIVE ON THE CITY’S WEBSITE, www.ci.pinole.ca.us. and remain archived on the sit e for five (5) years.

If none of these options are available to you, or you need assistance with public comment, please contact the City Clerk, Heather Bell at (510) 724-8928 or [email protected] .

Americans With Disabilities Act: In compliance with the Amer icans Wit h Disabilities Act of 1990, if you need special assistance to par ticipate in a City Meeting or you need a copy of the agenda, or the a genda packet in an appropriate alternative format, please contact the City Clerk’s Office at (510) 724-8928. Notification at least 48 hours prior to the meeting or time when services are needed will assi st the City staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting or service.

Note: Staff reports are available for inspection on the City Website at www.ci.pinole.ca.us. You may also contact the City Clerk via e-mail at [email protected] .

Ralph M. Brown Act. Gov. Code § 54950. In enacting this chapter, the Legislature finds and declares that the public commiss ions, boards and counc ils and the other public agencies in thi s State exist to aid in the conduct of the people's busi ness. It is the i ntent of the law that their actions be taken openly and that their deliberations be conducted openly. The people of this State do not yield their soverei gnty to the agencies, which serv e them. Th e peopl e, in del egating authority, do not g ive their public servants the right to decide what is good for the people t o know and what is not good for them to know. The people ins ist on remaining informed so that they may retain control over the instruments they have created.
2 of 1216

Pinole City Council
Agenda –January 17, 2023

Page 3 ends

1. CALL TO ORDER & PLEDGE OF ALLEGIANCE IN HONOR OF THE US MILITARY TROOPS

2. LAND ACKNOWLEDGMENT
Before we begin, we would like to acknowledge the Ohlone people, who are the traditional custodians of this land. We pay our respects to the Ohlone elders, past, present, and future, who call this place, Ohlone Land, the land that Pinole sits upon, their home. We are proud to continue their tradition of coming together and growing as a community. We thank the Ohlone community for their stewardship and support, and we look forward to strengthening our ties as we continue our relationship of mutual respect and understanding.

3. ROLL CALL, CITY CLERK’S REPORT & STATEMENT OF CONFLICT An official who has a conflict must, prior to consideration of t he decision: (1) publicly identify in detail the financial interest that causes the conflict; ( 2) recuse himself /herself from di scussing and voti ng on the matter; and (3) leave the room until after the decision has been made, Cal. Gov't Code § 87105.

4. C ONVENE TO A CLOSED SESSION
Citizens may address the C ouncil regarding a Closed Session item prior to t he Council adjourning into the Closed Session, by first providing a speaker card to the City Clerk.

1. CONFERENCE WITH REAL PROPERTY NEGOTIATORS
Gov. Code § 54956.8
Property: 612 Tennent

2. CONFERENCE WITH LEGAL COUNSEL—EXISTING LITIGATION
Gov. Code § 54956.9 (d)(1)
Name of Case: MVP Construction

5. RECONVENE IN OPEN SESSION TO ANNOUNCE RESULTS OF CLOSED SESSION

6. CITIZENS TO BE HEARD (Public Comments)
Citizens may speak under any item not listed on the Agenda. The time limit is 3 minutes and is subject to modification by the Mayor . Individuals may no t share o r offer tim e to another speaker. Pursuant t o provisions of the Brown Act, no action may be taken on a matter unless it is l isted on the agend a, or unless certain emergency or special circumstances exist. The City Council may direct staff to investigate and/or schedule cer tain matters for c onsideration a t a future Council me eting. PL EASE SEE THE

COVERSHEET OF THE AGENDA FOR INSTRUCTIONS ON HOW TO SUBMIT PUBLIC COMMENTS

7. REPORTS & COMMUNICATIONS

A. Mayor Report

1. Anno uncements

B. Mayoral & Council Appointments

C. City Council Committee Reports & Communications

D. Council Requests for Future Agenda Items

E. City Manager Report / Department Staff

3 of 1216
City Council
Agenda – January 17, 2023

Page 4 ends

F. City Attorney Report

8. RECOGNITIONS / PRESENTATIONS / COMMUNITY EVENTS

A. Proclamations

1. Police Officer of the Year

2. Firefighter of the Year

3. Dr. Martin Luther King Jr. Day

4. Lunar New Year

B. Presentations

1. WestCAT Presentation

9. CONSENT CALENDAR
All matters under the Consent Calendar are considered to be rout ine and noncontroversial. These items will be enacted by one motion and witho ut discussion. If, however, any interested party or Council member(s) wishes to comment on an item, they may do so before action is taken on the Consent Calendar. Following comm ents, if a Council member wishes to discuss an item, it will be removed from the Consent Calendar and taken up in order after adoption of the Consent Calendar.

A. Approve the Minutes of the December 20, 2022 meeting.

B. Receive the December 17, 2022 – January 17, 2023 – List of Warrants in the Amount of $ 889,198.62 and the December 23, 2022 Payroll in the Amount of $582,466.02 and the January 6, 2023 Payroll in the Amount of $641,289.79.

C. Resolution Continuing Authorized Remote Teleconferenc e Meetings Pursuant t o AB 361 [Action: Adopt Resolution per Staff Recommendation (Casher)]

D. Report on the Impact of Governor Newsom’s February 28, 2023 End to the California State of Emergency Related to Covid -19
[Action: Receive Report
(Casher)]

E. Adopt a Resolution Approving t he Recognized Obligation Payment Schedule f or July 1, 2023 – June 30, 2024 ( ROPS 23-24) for t he Successor Agency i n the Amount of $4,743,203
[Action: Adopt Resolution per Staf f Recommendation
(Guillory)]

F. Ordinance of the City Council of the City of Pinole Adding Chapter 2.64 “Criminal Background Checks” t o the Municipal Code Relating to Access to State a nd Federal Level Summary Criminal History Information [Action: Waive 2nd Reading and Adopt Ordinance per Staff Recommendation (Casher)]

G. Second Reading of an Ordinance Adding Chapter 2.62 “Code of Ethics and Conduct” to the Pinole Municipal Code [Action: Waive 2nd Reading and Adopt Ordinance per Staff Recommendation (Casher)]

4 of 1216
City Council
Agenda – January 17, 2023

Page 5 ends

H. Adoption of Resolution Authorizing the City Manager to Execute Agreements for Building Permit Plan Check Services and On-Call Building and Code Enforcement Staff Augmentation with 4leaf Inc., Interwest Consulting Group, Inc., SHUMS Coda Associates and TRB And Associates, Inc and Authorizes a Total of $800,000 from Planning and Building Fund to Support Professional Building and Code Enforcement Services over a Four-Year Period [Action: Adopt Resolution per Staff Recommendation (Whalen)]
I. Award a Contract to West Valley Construction Company, Inc. to Provide Engineering Design Services f or Pinon-Phase 1 Sanitary Sewer Project (C IP Project #Ss2201) [Action: Adopt Resolution per Staff Recommendation (Mishra)]

10. PUBL

IC HEARINGS
Citizens wishing to speak regarding a Public Hearing item should fill out a speaker card prior to the completion of the presentation, by fi rst p roviding a speaker card to t he C ity Clerk. A n official who en gaged in an ex parte communication that is the subject of a Public Hearing must disclose the communication on the r ecord prior to the start of the Public Hearing.

A. Adoption Of The 2023-2031 Housing Element a nd Approval o f a Notice of Exemption Pursuant t o C EQA Guidelines Section 15061(b)(3) [Action: Adopt Resolution per Staff Recommendation (Whalen)]

11. OL

D BUSINESS
N
one

12. NEW

BUSINESS
A. Counc
il Meeting Format [Action: Discuss and Provide Direction by Minute Order (Bell)]
B. Receive And Accept the Annual Comprehensive Financial Report (ACFR) for the Fiscal Year (FY) Ended June 30, 2022 [Action: Receive Report (Guillory)]

13. CITIZENS TO BE HEARD (Continued from Item 6) (Public Comments) Open only to members of the public who did not speak under the first Citizens to Be Heard, Agenda Item 6
Citizens may speak under any item not listed on the Agenda. The time limit is 3 minutes for C ity Council items and is subject to modification by the Mayor. Individuals may not share or offer time to anot her speaker. Pursu ant to provisions of the Brown Act, no action may be taken on a matter unless it is listed on the agenda, or unless certain emergency or special circumstances exist. Th e City Council may direct staff to investigate and/or schedule certain matters for consideration at a future meeting.

14. ADJOURNMENT to the Regular City Council Meeting of February 7, 2023 in Remembrance of Amber Swartz.

I hereby certif y under the laws of the State o f California that the f oregoing Agenda was posted on the bulletin board at the m ain entrance of Pinole City Hall, 2131 Pear Street Pinole, CA, and on the City’s website, not less than 24 hours prior to the meeting date set forth on this agenda.
5 of 1216
City Council
Agenda – January 17, 2023

Page 6 ends

________________________
Heather Bell, CMC
City Clerk
POSTED: January 13, 2023 at 11:00A.M.
6 of 1216

CITY COUNCIL
REPORT
9H
DAT
E: JANUARY 17, 2023
TO:

MAYOR AND COUNCIL MEMBERS
FR
OM: LILLY WHALEN, COMMUNITY DEVELOPMENT DIRECTOR
SUBJECT: ADOPTION OF RESOLUTION AUTHORIZING THE CITY MANAGER TO

EXECUTE AGREEMENTS FOR BUILDING PERMIT PLAN CHECK

SERVICES AND ON- CALL BUILDING AND CODE ENFORCEMENT
STAFF AUGMENTATION WITH 4LEAF INC., INTERWEST
CONSULTING GROUP, INC., SHUMS CODA ASSOCIATES AND TRB
AND ASSOCIATES, INC AND AUTHORIZES A TOTAL OF $800,000

FROM PLANNING AND BUILDING FUND TO SUPPORT

PROFESSIONAL BUILDING AND CODE ENFORCEMENT SERVICES

OVER A FOUR-YEAR PERIOD

RECOMMENDATION
St
aff recommends that the City Council adopt the attached resolution (Attachment A) that:
1- Aut
horizes the City Manager to execute four -year on- call Consultant Services Agreements for Building Permit plan check services in an amount not to exceed $400,000 per firm and on-call Building and Code Enforcement staff augmentation services on a task order basis to 4Leaf Inc., Interwest Consulting Group, Inc. (Interwest), Shums Coda Associates (SCA) and TRB and Associates, Inc.; and 2- Aut
horizes $800,000 from the Planning and Building fund to support professional Building and Code Enforcement services over a four -year period (January 2023- January 2027)

BACKGROUND
The Com
munity Development Department relies on professional services from the private sector to assist in the delivery of projects and services. The services required in the Building and Code Enforcement Divisions include routine plan check (review of building, plumbing, electrical, and mechanical permits/plans for commercial and residential construction or reconstruction projects consistent with the California Building Codes), and as-needed inspection and administrative support (i.e., building inspectors, permit technicians, code enforcement officers and hearing officers).

The use of
third- party plan review and on- call consultant services has been a long- standing practice of the City, given the unpredictable timing and varying nature of the 79 of 1216
City Council Report
January 17, 2023 2

projects/work. Currently the need continues to have on -call consultant services readily available to aid in project delivery, minimize response time, create staff efficiencies and enhance customer service. With the exception of the contract with the City’s current plan check firm, which was extended to provide service during the contracting period, most of the current on- call service contracts for the Building and Code Enforcement Divisions expired in November 2022.

On September 30, 2022 staff issued a Request for Proposals (RFP) for plan check and on-call staffing services to complement and support the Building Division

1. The RFP was
posted to the City’s website, emailed directly to consulting firms and posted to Public Purchase.

DISCUSSION AND ANALYSIS

The City received nine proposals in response to the RFP. An Evaluation Committee composed of the Community Development Director, Finance Director, Public Works Director and Assistant to the City Manager was convened to review and rate the proposals based on the criteria in the RFP. Following that review, seven firms were invited to interview with the Community Development Director. Following interviews, the Community Development Director has identified the following four consulting firms as the most qualified to provide services as requested in the RFP:

• 4Leaf Inc. (proposal in Attachment A - Exhibit B)
• Interwest Consulting Group, Inc. (proposal in Attachment A - Exhibit C) • Shums Coda Associates (proposal in Attachment A - Exhibit D) • TRB and Associates, Inc. (proposal in Attachment A - Exhibit E)

Each firm will serve as a team of consultants from which the City may select from to provide building inspection services. The City has sole discretion and decision- making power in its assignment of building support services, including plan check firm review(s) and inspections. In efforts to maintain an appearance of propriety and in avoidance of any conflict of interest, consultants may not be selected to provide inspections services for any project on which it provided plan firm reviews. The City will select and assign services based upon several factors, including but not limited to, the size of the project, the current volume of work assigned to a consultant, and the nature of the project.

The City’s standard Consulting Agreement (Attachment A – Exhibit A) will be utilized for each contract, with the following additional provision applicable to each firm related to the City’s authority and discretion in the assignment of services:

1 Located online: https://cdn5-
hosted.civiclive.com/UserFiles/Servers/Server_10946972/File/City%20Government/Building/RFPs/RFP% 20-%20Building%20Services%20-%20Pinole%20Sept%2030-2022.pdf 80 of 1216
City Council Report
January 17, 2023 3

Consultant acknowledges and agrees that it is not entitled to deliver any specific amount of materials or services or any materials or services at all under this Agreement and acknowledges and agrees that the Scope of Services will be requested by the City on an as needed basis and at the sole discretion of the City. City does not agree to use Consultant exclusively, nor does the City agree to offer any minimum amount of work to Consultant. Consultant shall provide only Services specifically requested by the City and in accordance with the terms of this Agreement.

The City continues to negotiate the terms of the consulting agreement with Interwest Consulting Group, Inc. related to the firm’s indemnity obligations, by and through the City Attorney’s Office in substantially the same form as the City’s standard Consulting Agreement.

Scope of Services
This scope of services will enable the City of Pinole to obtain professional and technical assistance on a regular basis (plan check) and on short notice on an on- call, as-needed basis (staffing services) from the selected consultants.

Plan Check Services. Each firm is able to perform independent plan check services of Building Permit applications on a routine basis. Rates for routine plan check services have been negotiated to be standardized as much as possible, and are all a percentage of the plan check fee paid by the applicant. Plan check services are completely cost-recoverable to the City. Each firm will charge a maximum of 65% of the required plan check fee paid by the applicant; depending on the type of project, this fee may be less. There are some differences in hourly rates for projects that exceed three rounds of review. Included in the fee, all firms will hold a pre- application coordination meeting with large development projects and have committed to meeting with the applicant and staff if a plan check is approaching three or more rounds of review. It will be at the City’s sole discretion to determine how plan check will be assigned to each contracted firm.

Professional Staffing Services. The City of Pinole’s Building Division is staffed by one full time Building Official, one full time Building Inspector and two full time Permit Technicians. The City’s Code Enforcement Division is staff by one full time Code Enforcement Officer. Periodically, the City receives major applications for development projects in which there might not be sufficient Building Division staff to conduct the volume of inspections required, or specialized certifications are required (e.g., Certified Access Specialist, or CASp). To maintain a consistent level of service and ensure the safety of the residents and the community the City recognizes the need for third party assistance in performing services on an as-needed basis, when the level of development in the City increases and/or when major development occurs. Each firm will be able to provide the City of Pinole with professional and technical assistance on short notice on a regular or as-needed basis for the services listed below.

• Building Field Inspection Services. The Building Inspector’s primary role is to perform construction inspections, supported by the Building Official, to enforce provisions of the City’s building regulations and the code requirements set forth on 81 of 1216
City Council Report
January 17, 2023 4

the approved plans for which a permit was issued. However, during periods of high inspection activity, through the construction of a major development project, and/or during in-house staff vacations/absences/recruitments, it is critical to have on -call contract building field inspection services. Building Permit fees are structured to pay for inspection services —in general, when permit volume is high fees have been paid to account for increased need for inspection service.

• Permit Counter Services. The Permit Technician’s role is to assist customers at the Permit Counter, including but not limited to plan intake, overseeing the counter permit issuance, and assistance with questions on building and planning code requirements. However, during periods of high permitting activity and/or during in- house staff vacations/absences/recruitments, it is critical to have on- call contract permit counter services. Building Permit fees are structured to pay for permit intake and issuance services—in general, when permit volume is high fees have been paid to account for increased need for counter/processing service.

• Code Enforcement Services. The Code Enforcement Officer’s role is to provide education to the public, issue notices, perform field inspections, issue citations, organize and prepare for appeal and show cause hearings, arrange for abatement warrants, and organize abatement work. However, during in- house staff vacations/absences/recruitments, it is critical to have on- call contract code enforcement services. Furthermore, seasonally, there is need for part time vegetation abatement enforcement. Additionally, on an as -needed basis, there is a need for a Hearing Officer to hear citation appeals and order abatements. Except for work done under an abatement, which is completely cost recoverable, these costs are not typically recoverable in a meaningful way from applicants.

FISCAL IMPACT

Plan Check Services. Trends show that on a fiscal year basis the City spends approximately $77,000 on average on third party plan check services for routine building permit processing. Due to the recently adopted new user and regulator fees effecti ve September 1, 2022, it is anticipated that revenue accounts for both plan check and building permit fees will increase modestly in the current and subsequent fiscal years.

Additionally, the City received one major building permit application for multifam ily housing in FY21/22 (accounting for approximately $142,000 in plan check fees), two major building permit applications for multifamily housing projects in FY22/23 (accounting for approximately $180,000 total in plan check fees) and anticipates receiving two additional major building permit applications in FY22/23 and FY23/24 (accounting for an anticipated $340,000 total in plan check fees).

For these reasons, staff anticipates $800,000 in costs for plan check services over the four-year contract term. Through the annual budget review and approval staff will propose a budget amount for plan checking services on a fiscal year basis. Each firm’s agreement will be limited to an amount not to exceed $400,000 over four years to allow flexibility in how staff assigns plan checks to each firm. However, the combination of work performed 82 of 1216
City Council Report
January 17, 2023 5

by any or all the firms will not exceed the total authorized contract amount of $800,000 over the four -year period, unless authorized by the Council. Plan check services are completely cost-recoverable to the City.

Professional Staffing Services. When professional services are required, a task order will be authorized outlining the scope and the amount of the service. Through the annual budget review and approval staff will propose a budget amount for professional staffing services on a fiscal year basis.

As indicated in this report, Building Permit fees are structured to pay for inspection and counter intake/processing services. Except for work done under an abatement, Cod e Enforcement fees are not typically recoverable in a meaningful way from applicants.

ATTACHMENTS

A. Resolution
Exhibit A - Consultant Services Agreements
Exhibit B - Proposal from 4Leaf Inc., dated October 25, 2022 Exhibit C - Proposal from Interwest Consulting Group, Inc., dated October 25, 2022 Exhibit D - Proposal from Shums Coda Associates, dated October 25, 2022 Exhibit E - Proposal from TRB and Associates, Inc, dated October 25, 2022

83 of 1216
RESOLUTION NO. 2023-XX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PINOLE AUTHORIZING

THE CITY MANAGER TO AWARD AND EXECUTE A FOUR- YEAR PROFESSIONAL

SERVICE CONTRACTS FOR BUILDING PERMIT PLAN CHECK SERVICES AND ON

CALL BUILDING AND CODE ENFORCEMENT STAFF AUGUMENTATION WITH 4LEAF INC., INTERWEST CONSULTING GROUP, INC., SHUMS CODA ASSOCIATES AND TRB AND ASSOCIATES, INC. EACH IN THE AMOUNT NOT TO EXCEED $400,000 AND IN THE TOTAL AGGREGATED AMOUNT NOT TO EXCEED $800,000 WHEREA
S, the Community Development Department relies on professional services from the private sector to assist in the delivery of projects and services; and WHEREA
S, the services required in the Building and Code Enforcement Divisions include routine plan check (review of building, plumbing, electrical, and mechanical permits/plans for commercial and residential construction or reconstruction projects consistent with the California Building Codes), and as -needed inspection and administrative support (i.e., building inspectors, permit technicians, code enforcement officers and hearing officers); and
WHEREA
S, code enforcement services and building plan check, inspection and coordination services are essential City functions; and WHEREA
S, on September 30, 2022 Staff issued a Request for Proposals (RFP) for plan check and on- call staffing services to complement and support the Building Division; and
WHEREA
S, nine proposals were received, reviewed and analyzed based on the criteria in the RFP and interviews with the top seven firms; and WHEREA
S, 4Leaf Inc., Interwest Consulting Group, Inc., Shums Coda Associates and TRB and Associates, Inc. were the lowest cost bidders, the most responsive and the most qualified to provide services as requested in the RFP in order to enhance customer service, deliver quality products and create staff efficiencies; and WHEREA
S, each firm will serve as a team of consultants from which staff may select from on an as-needed basis to provide plan check and on-call staffing services to complement and support the Building Division; and
WHEREA
S, the total anticipated cost for third-party plan check services for routine building permit processing is $800,000 over the four-year contract term.

NOW THEREFORE, BE IT RESOLVED, that the above recitals are true and correct and made part of this resolution.

BE IT
FURTHER RESOLVED that the City Council of the City of Pinole approves and authorizes the City Manager to execute a four -year on call professional service

ATTACHMENT A
84 of 1216
contracts for routine plan check services and on call staff augmentation services with 4Leaf Inc., Interwest Consulting Group, Inc., Shums Coda Associates and TRB and Associates, Inc. each in an amount not to exceed $400,000 , and a total aggregated amount not to exceed $800,000, in a form approved by the City Attorney, and attached hereto as Exhibit A upon the associated scopes of work and rates as follows:

Exhibit B
4Leaf Inc. scope of work and rates
Exhibit C Interwest Consulting Group, Inc. scope of work and rates Exhibit D Shums Coda Associates scope of work and rates Exhibit E TBR and Associates, Inc. scope of work and rates

BE IT FURTHER RESOLVED that the City Manager is authorized to execute the Agreement with Interwest Consulting Group, Inc. substantially in the form presented in Exhibit A with minor revisions as shall be approved by the City Attorney.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Pinole held on the 17th day of January, 2023 by the following vote:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:

I, hereby certify that the foregoing resolution was regularly introduced, passed, and adopted on the 17th day of January, 2023

____________________________________
Heather Bell, CMC
City Clerk
85 of 1216

← All documents from this meeting