Cities Index.
Attachment 7 - Project Concept Map.pdf

Richmond City Council
March 11, 2025

Document
Attachment 7 - Project Concept Map.pdf
Meeting
March 11, 2025
Body
Richmond City Council
Original file
1.3 MB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.

Install Bike Lanes
Reduce 4 Lanes to 2
Add Center Turn Lane
or Medians
Install Bike Lanes
Reduce 4 Lanes to 2
Add Center Turn Lane
or Medians
Install Bike Lanes
Reduce 4 Lanes to 2
Add Center Turn Lane
or Medians
Install Protected Bike Lanes
Build Curb Extensions
to Shorten Crosswalks
at Skewed Intersections
Close Gap in Sidewalk
Install Crosswalks
And Traffic Calming
Install ADA-Compliant Curb Ramps
On Entire Corridor
EAST

RICHMOND

HEIGHTS
80 SAN PABLO AVENUE

PRIORITY DEVELOPMENT AREA

SAN PABLO

R I C H M O N D

WILDCAT CANYON

REGIONAL PARK

AMADOR ST

ANDRADE AVE

NATALIE CT

CASINOAVE

MCBRYDE AVE

SAN PABLO AVE

BERNHARDAVE

HUMBOLDT ST

GLENN AVE

MONTOYA AVE

PARK AVE

ARLINGTONBLVD

YUBAAVE

KIRK LN

VENTURA ST
RAMP

RALSTON
AVE

ESMOND AVE
MARIN
AVE

MCLAUGHLIN ST
SONOM
A ST

LASSEN ST

SHASTAAVE
37TH ST
W

ILSON AVE

BROOKSIDE AVE

JOEL CT

KERN ST
YUBA
ST

GERALD AVE

RIVERSIDE

ELEMENTARY
SCHOOL

SAINT DAVIDS

ELEMENTARY
SCHOOL

WILDCAT CREEK

WILDCAT CREEK

RICHMOND WILDCAT
CANYON
McBryde Ave Safe-Routes-To-Parks Project Concept
1 Inch = 325 Feet
0 200 400
Feet
Proposed Curb Extension
Proposed Traffic Circle
Existing Speed Hump
ADA Compliant
Needs Detectable Warning Surface
Build Curb Ramp
Rebuild Non-Compliant Ramp
New Trees
Traffic Signal
City Boundaries
Watercourse
PDA
Parcel Owner
EBRPD
WCCUSD
Existing Bikeways
Class 2 Lane
Class 3 Sharrow
The goal of this project is to provide a safe and comfortable walking and biking route from Wildcat Canyon Regional Park to the amenities and bus service along San Pablo Ave and an existing crosstown bike route on 37th St. Project will improving pavement condition, calm traffic, add audible pedestrian signals, restripe the roadway with bike lanes, and build curb ramps, high visibility crosswalks, and other pedestrian improvements. If funded, design will be finalized with community input, and additional protected bike lanes are possible.

← All documents from this meeting