Cities Index.
Attachment 2 - Project Maps.pdf

Richmond City Council
March 25, 2025

Document
Attachment 2 - Project Maps.pdf
Meeting
March 25, 2025
Body
Richmond City Council
Original file
3.8 MB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.

El Cerrito Del Norte TOD
Complete Streets Project
Resurface Potrero Ave
Replace Sharrows
with Bike Lanes
Build Bicycle Boulevards
With Traffic Calming
Install ADA-Compliant Curb Ramps
Throughout Project
Repair & Improve
Existing Paths
Build Bicycle Boulevard
With Traffic Calming
Install Buffered
or Protected
Bike Lanes
Install Protected Bike Lanes
on I-580 Overpass
Bay Trail Access

SOUTH RICHMOND PDA

SAN PABLO
AVENUE

CORRIDOR
PDA
580
80 BOOKER T

ANDERSON

JR PARK

CRESCENT
PARK

BAYVIEW
BRANCH
El Cerrito
Richmond

KENNEDY
HIGH
SCHOOL
STEGE

ELEMENTARY
SCHOOL

EL CERRITO

DEL NORTE

SOUTHWEST

RICHMOND
ANNEX

PARKVIEW

EASTSHORE

RICHMOND
ANNEX

PANHANDLE
ANNEX

LAUREL PARK
PARK
PLAZA

CORTEZ/STEGE
MARINA
BAY
BNSF

UNION PACIFIC
BNSF

AT & SF
SPT CO
S
51ST
ST

BAYVIEW
AVE
S 47TH ST

POTRERO AVE

CYPRESS AVE
ELLS
ST

ELLS LNCARLSON BLVD

SAN PABLO AVE

CUTTING BLVD
S 48TH ST

MEADE ST

HARTNETT
AVE
S 55TH ST
S 45TH ST
S 56TH ST

E MONTGOMERY AVE

SEAPORT AVE

BERK AVE

EGRET W
AY

FLEMING AVE

EASTSHORE BLVD

BERK PL

SANTA CLARA ST

FALL AVE
S 46TH ST

CASTILLA AVE
NUNNST

CARL AVE

SAN JOAQUIN ST
S 41ST ST
CAM

PBELL ST

HILL ST

FALLON AVE
JAY W
AY

ROBIN DR

MONTEREY ST

STATE CT

REID CT

ARNO CT
S 50TH ST
S
49TH
ST

FRAY AVE

CREELY AVE

GATELY AVE

MARIPOSA ST
EXIT 15

STATE AVE
EXIT11
0 0.06 0.12
Miles
1 Inch = 600 Feet
New Trees
City Limits
Existing Bikeways
Class 1 Path
Class 2 Lane
Class 3 Sharrow
ADA Compliant
Needs Detectable Warning Surface
Build Curb Ramp
Rebuild Non-Compliant Ramp
Potential Stormwater Planter
Priority Development Area

BAYVIEW TO BART PROJECT
This project idea envisions a safe
and comfortable walking and
biking route connecting the Del
Norte BART station to the Bay
Trail. It capitalizes on existing
multi-use paths, ties into El
Cerrito's Transit Oriented
Development Complete Streets
Project, improves conditions
around parks and schools, and
implements elements of the
South Richmond Transportation
Connectivity Plan.

Install Bike Lanes
Reduce 4 Lanes to 2
Add Center Turn Lane
or Medians
Install Bike Lanes
Reduce 4 Lanes to 2
Add Center Turn Lane
or Medians
Install Bike Lanes
Reduce 4 Lanes to 2
Add Center Turn Lane
or Medians
Install Protected Bike Lanes
Build Curb Extensions
to Shorten Crosswalks
at Skewed Intersections
Close Gap in Sidewalk
Install Crosswalks
And Traffic Calming
Install ADA-Compliant Curb Ramps
On Entire Corridor
EAST

RICHMOND

HEIGHTS
80 SAN PABLO AVENUE

PRIORITY DEVELOPMENT AREA

SAN PABLO

R I C H M O N D

WILDCAT CANYON

REGIONAL PARK

AMADOR ST

ANDRADE AVE

NATALIE CT

CASINOAVE

MCBRYDE AVE

SAN PABLO AVE

BERNHARDAVE

HUMBOLDT ST

GLENN AVE

MONTOYA AVE

PARK AVE

ARLINGTONBLVD

YUBAAVE

KIRK LN

VENTURA ST
RAMP

RALSTON
AVE

ESMOND AVE
MARIN
AVE

MCLAUGHLIN ST
SONOM
A ST

LASSEN ST

SHASTAAVE
37TH ST
W

ILSON AVE

BROOKSIDE AVE

JOEL CT

KERN ST
YUBA
ST

GERALD AVE

RIVERSIDE

ELEMENTARY
SCHOOL

SAINT DAVIDS

ELEMENTARY
SCHOOL

WILDCAT CREEK

WILDCAT CREEK

RICHMOND WILDCAT
CANYON
McBryde Ave Safe-Routes-To-Parks Project Concept
1 Inch = 325 Feet
0 200 400
Feet
Proposed Curb Extension
Proposed Traffic Circle
Existing Speed Hump
ADA Compliant
Needs Detectable Warning Surface
Build Curb Ramp
Rebuild Non-Compliant Ramp
New Trees
Traffic Signal
City Boundaries
Watercourse
PDA
Parcel Owner
EBRPD
WCCUSD
Existing Bikeways
Class 2 Lane
Class 3 Sharrow
The goal of this project is to provide a safe and comfortable walking and biking route from Wildcat Canyon Regional Park to the amenities and bus service along San Pablo Ave and an existing crosstown bike route on 37th St. Project will improving pavement condition, calm traffic, add audible pedestrian signals, restripe the roadway with bike lanes, and build curb ramps, high visibility crosswalks, and other pedestrian improvements. If funded, design will be finalized with community input, and additional protected bike lanes are possible.
580

ST ART OF BAY TRAIL TO

RICHMOND-SAN RAFAEL BRIDGE

AND POINT MOLATE

RICHMOND-

SAN FRANCISCO

FERRY TERMINAL
580
Richmond Greenway
Bay Trail
Bay Trail
Bay Trail
To San Rafael
To North Richmond
& Pt Pinole
Chevron Refinery
& Technology Center
580

NYSTROM
SCHOOL

LINCOLN

ELEMENTARY

W OHIO AVE
San Francisco Bay
Rosie the
Riveter NHP
BNSF
Railyard
Richmond
Multimodal
Station
JUDGE

CARROLL

PA R KS GARR

ARD BLVD

CANAL BLVD
Keller
Beach
2ND ST

NEVIN AVE

OHIO AVE
Pt Molate
Beach Park

PROJECT

LOCATION

PROTECTED BIKEWAY

CONSTRUCTION TO START
JANUARY 2022

BELDING/
WOODS

CORONADO

SANTA FE
IRON

TRIANGLE

ATCHISON

VILLAGE
POINT

RICHMOND
13TH ST

BARRETT AVE

HARBOUR WAY

CUTTING BLVD

HARBOUR WAY S

HOFFMAN
W

CUTTING
BLVD

MACDONALD AVE

CASTRO ST

RICHMOND PKWY
PERES

ELEMENT ARY

MILLER-KNOX

REGIONAL

SHORELINE
Legend
Completed Bay Trail
Incomplete Bay Trail
Schools
Communities of Concern
Highest
High
1 Inch = 2,000 Feet
00 . 2 0 . 4
Miles
NeighborhoodsSANTA
FE
West Branch
Library
The Plunge

WASHINGTON AVE

TEWKSBU
RY
W RIC

HMOND AVE

S GARRARD BLVD

CYCLE TRACK
AVE

CYCLE TRACK

PEDESTRIAN

IMPROVEMENTS
580
580

← All documents from this meeting