Cities Index.
Attachment 1 - Project Location.pdf

Richmond City Council
April 22, 2025

Document
Attachment 1 - Project Location.pdf
Meeting
April 22, 2025
Body
Richmond City Council
Original file
855 KB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.

VICINITY MAP

DESCRIPTION

INDEX OF DRAWINGS

SHEET DRAWING
NO.

DATE
DATE

LOCATION

PROJECT

USACALL

TWO WORKING DAYS

TOLL FREE

BEFORE YOU DIG
800-642-2444
OR DIAL 811
TS1.0 TITLE SHEET

LOCATION MAP
L0.0LEGEND AND NOTES
L1.0 DEMOLITION PLAN
L2.0CONSTRUCTION PLAN
L3.0CONSTRUCTION DETAILS
L3.1CONSTRUCTION DETAILS
NOTES:

1. PATH OF TRAVEL (P.O.T.) AS INDICATED IS A BARRIER FREE

ACCESS ROUTE WITHOUT ANY ABRUPT VERTICAL CHANGES
EXCEEDING 12" BEVELED AT 1:2 MAX. SLOPE EXCEPT THAT
LEVEL CHANGES DO NOT EXCEED 14" VERTICAL AND IS AT
LEAST 48" WIDE. SURFACE IS SLIP RESISTANT, STABLE, FIRM AND SMOOTH. CROSS SLOPE DOES NOT EXCEED 2%, AND
SLOPE IN THE DIRECTION OF TRAVEL DOES NOT EXCEED 5%.

P.O.T. SHALL BE MAINTAINED FREE OF OVERHANGING
OBSTRUCTIONS TO 80" MINIMUM AND PROTRUDING OBJECTS
GREATER THAN 4" PROJECTION FROM WALL AND ABOVE 27"
AND LESS THAN 80". CONTRACTOR TO VERIFY THAT
BARRIERS IN THE PATH OF TRAVEL HAVE BEEN REMOVED.

ENCLOSURE TO MEET ACCESSIBILITY STANDARD PER
CBC 11B-206.2.2 AND 11B-206.2.8 AND CBC 11B-404.2.3-2.10 LEGEND - PATH OF TRAVEL:

FIELD

ACCESSIBLE PATH OF TRAVEL

PATH OF TRAVEL

NOT TO SCALE
TS1.0

AS NOTED

TITLE SHEET
L3.2CONSTRUCTION DETAILS
L3.3CONSTRUCTION DETAILS
L3.4CONSTRUCTION DETAILS
L4.0IRRIGATION PLAN
L4.1IRRIGATION DETAILS
L2.1 LAYOUT PLAN

SHIELDS - REID PARK
11/18/2024 PERMIT SET
P:\Shared\Projects\2023\2300051 Richmond Parks Assessment\Shields Reid Park\DWG\Sheets\TS-Shields Reid Park.dwg 11/19/2024 - 07:20 PM Brian G 1:3.56 Sheet
Plan File:

Project Number: 2300051
Scale:

Date: NOVEMBER 18,2024
Rev Date Description Designed Drawn Checked
121 Park Place
Richmond, CA 94801
tel: 510-367-6166
Engineering
Planning
Landscape Architecture
Land Surveying
Mapping
1410 KELSEY STREET
Stamp FIELD RENOVATION
Sheet Title

PROJECT
11/18/2024 BID SET

MV BG MV

MV BG MV
RICHMOND, CA 94805
Marcia D. Vallier -No. 3293
STATE
O
FCA
L

IFORNI A
Signature
Renewal Date
Date

L I C ENSED LANDSCAPE

ARCHITECT
11/18/2024
03/31/2025

NOT TO SCALENOT TO SCALE

LOCATION

PROJECT

CHESLEY AVENUE

KELSEY STREET

CHERRY STREET

ALAMO AVENUE
C1.0 GRADING AND DRAINAGE PLAN
C2.0 LIGHTING PLAN
C3.0 STORMWATER CONTROL PLAN
C3.1
C4.0
C0.1 CIVIL ABBREVIATIONS, LEGEND, & GENERAL NOTES

ACCEPTED BY THE CITY OF RICHMOND
MARCIA D. VALLIER, LANDSCAPE ARCHITECT, CA#3294
CSWST2
ROBERT ARMIJO, P.E.

DEPUTY PUBLIC WORKS DIRECTOR / CITY ENGINEER
C5.0 EROSION CONTROL PLAN

CONSTRUCTION DETAILS

STORMWATER CONTROL DETAILS
C2.1 LIGHTING DETAILS

GENERAL NOTES

NOT ALL EXISTING UTILITIES AREA SHOWN ON THE PLANS

AND THOSE IDENTIFIED ARE SHOWN IN THEIR APPROXIMATE
LOCATIONS. EXISTING UTILITY LOCATIONS ARE AVAILABLE

FOR REVIEW ON AS-BUILT TO BE OBTAINED FROM THE CITY
OF RICHMOND. CONTRACTOR TO VERIFY LOCATIONS.

1. IT SHALL BE CONTRACTOR'S RESPONSIBILITY TO FIELD
VERIFY LOCATIONS, ELEVATIONS, ETC. OF EXISTING

FACILITIES AND TO IMMEDIATELY NOTIFY THE ENGINEER IN
WRITING OF ANY FIELD CONFLICTS OR OMISSIONS.

2. ALL CONSTRUCTION MUST BE TO THE CITY OF RICHMOND

STANDARDS AND ACCEPTED BY THE PUBLIC WORKS
INSPECTOR. STANDARD PLANS ARE AVAILABLE AT THE
OFFICE OF THE PUBLIC WORKS INSPECTOR.

3. CONTRACTOR SHALL MEET WITH CITY OF RICHMOND FOR A
PRE-CONSTRUCTION CONFERENCE AT LEAST 1 WEEK PRIOR
TO START OF CONSTRUCTION.
24 HOURS NOTICE REQUIRED ON ALL INSPECTIONS.

4. CONTRACTOR IS RESPONSIBLE TO MAKE ALL

ARRANGEMENTS FOR SITE INSPECTIONS AND INSURE THAT

ALL CURRENT STANDARDS FOR THE CITY OF RICHMOND

ARE FOLLOWED PRIOR TO BEGINNING ANY PHASE OF
CONSTRUCTION WORK.

5. CONSTRUCTION SHALL BE LIMITED TO BETWEEN THE
HOURS OF 8:00 A.M. AND 5:00 P.M., MONDAY THRU FRIDAY

AND INSPECTION REQUESTS SHALL BE LIMITED TO NORMAL
CITY BUSINESS HOURS: 8:00 A.M. TO 5:00 P.M., MONDAY
THRU FRIDAY. ARRANGEMENTS FOR ANY OVERTIME

INSPECTION SERVICES AND PAYMENTS OF FEES FOR SAME
SHOULD BE MADE 48 HOURS IN ADVANCE AND ARE SUBJECT

TO INSPECTION AVAILABILITY AND APPROVAL BY THE
OWNER'S REPRESENTATIVE.

6. DUST CONTROL DURING ALL PHASES OF CONSTRUCTION IS
THE RESPONSIBILITY OF THE CONTRACTOR. IT IS ALSO THE

CONTRACTOR'S RESPONSIBILITY TO MAINTAIN GOOD

HOUSEKEEPING OF THE EXISTING IMPROVED STREETS IN
THE CONSTRUCTION AREA.

7. WATER FOR DUST CONTROL MAY BE PURCHASED FROM

THE APPROPRIATE AGENCY PRIOR TO START OF ANY WORK,

AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR FOR
ANY FEES OR DEPOSITS.

8. PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, THE

CONTRACTOR SHALL SUBMIT FOR APPROVAL THE PROPOSED
ROUTE(S) FOR ALL CONSTRUCTION TRAFFIC ON PROJECT.

UPON APPROVAL, THE CONTRACTOR SHALL STRICTLY

ADHERE TO THAT ROUTE(S) ONLY, UNLESS WRITTEN

PERMISSION IS OBTAINED TO CHANGE THE ROUTE(S)

9. THE CONTRACTOR SHALL MAINTAIN ACCESS TO RESIDENCES

AND BUSINESSES AT STAGING AREA, ON PUBLIC STREETS AND

SIDEWALKS THE GREENWAY TRAIL THROUGHOUT THE LIFE OF
THE CONTRACT AS SPECIFIED IN THE SPECIAL PROVISIONS.

10. CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICES ALERT (U.S.A.) 800-227-2600 (OR DIAL 811), TWO (2) WORKING DAYS PRIOR TO START OF ANY EXCAVATION OR DEMOLITION OF IMPROVEMENTS.

11. EXISTING FACILITIES AND IMPROVEMENTS INCLUDING BUT NOT LIMITED

TO TREES, LANDSCAPING, IRRIGATION, FENCES, WALLS, SIDEWALK AND

OTHER PAVEMENT SURFACES SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE. CONTRACTOR SHALL RESTORE ANY AND ALL PAVEMENT AND

OTHER FACILITIES OUTSIDE LIMITS OF WORK AFFECTED BY THE CONSTRUCTION OPERATIONS AT NO ADDITIONAL COST. IT IS THE

CONTRACTORS RESPONSIBILITY TO VIDEOTAPE OR DOCUMENT

EXISTING CONDITIONS PRIOR TO START OF WORK TO SUBSTANTIATE ANY PREVIOUS DAMAGES, ETC.

12. TRAFFIC CONTROL DURING CONSTRUCTION SHALL BE THE

CONTRACTOR'S RESPONSIBILITY AND IN ACCORDANCE
WITH AN APPROVED TRAFFIC CONTROL PLAN. SUBMIT PLAN
TO THE CITY FOR REVIEW AND APPROVAL. THE

CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS,

BARRICADES, FLAGMEN AND OTHER DEVICES TO PROVIDE

FOR SAFE PASSAGE OF PUBLIC VEHICULAR AND
PEDESTRIAN TRAFFIC.

THE CONTRACTOR SHALL EXERCISE CARE TO PROTECT THE EXISTING OVERHEAD AND UNDERGROUND UTILITIES DURING CONSTRUCTION.

THE CONTRACTOR SHALL IDENTIFY THESE UTILITIES PRIOR TO START OF WORK AND PROTECT THEM DURING CONSTRUCTION. METHOD OF PROTECTION SHALL BE APPROVED BY THE ENGINEER. THE COST OF

REPAIR WORK DUE TO FAILURE OF THE CONTRACTOR TO EXERCISE CARE WILL BE INCURRED BY THE CONTRACTOR. ANY DAMAGES TO THE

CITY OF RICHMOND SHIELDS - REID PARK
FIELD RENOVATION PROJECT 1410 KELSEY STREET

RICHMOND, CA
L5.0PLANTING PLAN AND DETAIL ST-1
ST-2 SYNTHETIC TURF DETAILS

SYNTHETIC TURF GRADING & DRAINAGE
1STADIUM LIGHT INFORMATION
2STADIUM LIGHT INFORMATION
3STADIUM LIGHT INFORMATION
4STADIUM LIGHT INFORMATION
NOVEMBER 18, 2024
Docusign Envelope ID: 2D665953-586A-4827-B9EB-854C0E45878A 11/20/2024

← All documents from this meeting