60" DIA TURNING CIRCLE
60" DIA TURNING CIRCLE

VICINITY MAP

GENERAL NOTES

ACCEPTED BY THE CITY OF RICHMOND
MARCIA D. VALLIER, LANDSCAPE ARCHITECT, CA#3294

DESCRIPTION

INDEX OF DRAWINGS

SHEET DRAWING
NO.

DATE
DATE
CSWST2

LOCATION

PROJECT

USACALL

TWO WORKING DAYS

TOLL FREE

BEFORE YOU DIG
800-642-2444
OR DIAL 811
TS1.0 TITLE SHEET

LOCATION MAP
ROBERT ARMIJO, P.E.

DEPUTY PUBLIC WORKS DIRECTOR / CITY ENGINEER

NOT ALL EXISTING UTILITIES AREA SHOWN ON THE PLANS

AND THOSE IDENTIFIED ARE SHOWN IN THEIR APPROXIMATE
LOCATIONS. EXISTING UTILITY LOCATIONS ARE AVAILABLE

FOR REVIEW ON AS-BUILT TO BE OBTAINED FROM THE CITY
OF RICHMOND. CONTRACTOR TO VERIFY LOCATIONS.

1. IT SHALL BE CONTRACTOR'S RESPONSIBILITY TO FIELD
VERIFY LOCATIONS, ELEVATIONS, ETC. OF EXISTING

FACILITIES AND TO IMMEDIATELY NOTIFY THE ENGINEER IN
WRITING OF ANY FIELD CONFLICTS OR OMISSIONS.

2. ALL CONSTRUCTION MUST BE TO THE CITY OF RICHMOND

STANDARDS AND ACCEPTED BY THE PUBLIC WORKS
INSPECTOR. STANDARD PLANS ARE AVAILABLE AT THE
OFFICE OF THE PUBLIC WORKS INSPECTOR.

3. CONTRACTOR SHALL MEET WITH CITY OF RICHMOND FOR A
PRE-CONSTRUCTION CONFERENCE AT LEAST 1 WEEK PRIOR
TO START OF CONSTRUCTION.
24 HOURS NOTICE REQUIRED ON ALL INSPECTIONS.

4. CONTRACTOR IS RESPONSIBLE TO MAKE ALL

ARRANGEMENTS FOR SITE INSPECTIONS AND INSURE THAT

ALL CURRENT STANDARDS FOR THE CITY OF RICHMOND

ARE FOLLOWED PRIOR TO BEGINNING ANY PHASE OF
CONSTRUCTION WORK.

5. CONSTRUCTION SHALL BE LIMITED TO BETWEEN THE
HOURS OF 8:00 A.M. AND 5:00 P.M., MONDAY THRU FRIDAY

AND INSPECTION REQUESTS SHALL BE LIMITED TO NORMAL
CITY BUSINESS HOURS: 8:00 A.M. TO 5:00 P.M., MONDAY
THRU FRIDAY. ARRANGEMENTS FOR ANY OVERTIME

INSPECTION SERVICES AND PAYMENTS OF FEES FOR SAME
SHOULD BE MADE 48 HOURS IN ADVANCE AND ARE SUBJECT

TO INSPECTION AVAILABILITY AND APPROVAL BY THE
OWNER'S REPRESENTATIVE.

6. DUST CONTROL DURING ALL PHASES OF CONSTRUCTION IS
THE RESPONSIBILITY OF THE CONTRACTOR. IT IS ALSO THE

CONTRACTOR'S RESPONSIBILITY TO MAINTAIN GOOD

HOUSEKEEPING OF THE EXISTING IMPROVED STREETS IN
THE CONSTRUCTION AREA.

7. WATER FOR DUST CONTROL MAY BE PURCHASED FROM

THE APPROPRIATE AGENCY PRIOR TO START OF ANY WORK,

AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR FOR
ANY FEES OR DEPOSITS.

8. PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, THE

CONTRACTOR SHALL SUBMIT FOR APPROVAL THE PROPOSED
ROUTE(S) FOR ALL CONSTRUCTION TRAFFIC ON PROJECT.

UPON APPROVAL, THE CONTRACTOR SHALL STRICTLY

ADHERE TO THAT ROUTE(S) ONLY, UNLESS WRITTEN

PERMISSION IS OBTAINED TO CHANGE THE ROUTE(S)

9. THE CONTRACTOR SHALL MAINTAIN ACCESS TO RESIDENCES

AND BUSINESSES AT STAGING AREA, ON PUBLIC STREETS AND

SIDEWALKS THE GREENWAY TRAIL THROUGHOUT THE LIFE OF
THE CONTRACT AS SPECIFIED IN THE SPECIAL PROVISIONS.

10. CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICES ALERT (U.S.A.) 800-227-2600 (OR DIAL 811), TWO (2) WORKING DAYS PRIOR TO START OF ANY EXCAVATION OR DEMOLITION OF IMPROVEMENTS.

11. EXISTING FACILITIES AND IMPROVEMENTS INCLUDING BUT NOT LIMITED

TO TREES, LANDSCAPING, IRRIGATION, FENCES, WALLS, SIDEWALK AND

OTHER PAVEMENT SURFACES SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE. CONTRACTOR SHALL RESTORE ANY AND ALL PAVEMENT AND

OTHER FACILITIES OUTSIDE LIMITS OF WORK AFFECTED BY THE CONSTRUCTION OPERATIONS AT NO ADDITIONAL COST. IT IS THE

CONTRACTORS RESPONSIBILITY TO VIDEOTAPE OR DOCUMENT

EXISTING CONDITIONS PRIOR TO START OF WORK TO SUBSTANTIATE ANY PREVIOUS DAMAGES, ETC.

12. TRAFFIC CONTROL DURING CONSTRUCTION SHALL BE THE

CONTRACTOR'S RESPONSIBILITY AND IN ACCORDANCE
WITH AN APPROVED TRAFFIC CONTROL PLAN. SUBMIT PLAN
TO THE CITY FOR REVIEW AND APPROVAL. THE

CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS,

BARRICADES, FLAGMEN AND OTHER DEVICES TO PROVIDE

FOR SAFE PASSAGE OF PUBLIC VEHICULAR AND
PEDESTRIAN TRAFFIC.

THE CONTRACTOR SHALL EXERCISE CARE TO PROTECT THE EXISTING OVERHEAD AND UNDERGROUND UTILITIES DURING CONSTRUCTION.

THE CONTRACTOR SHALL IDENTIFY THESE UTILITIES PRIOR TO START OF WORK AND PROTECT THEM DURING CONSTRUCTION. METHOD OF PROTECTION SHALL BE APPROVED BY THE ENGINEER. THE COST OF

REPAIR WORK DUE TO FAILURE OF THE CONTRACTOR TO EXERCISE CARE WILL BE INCURRED BY THE CONTRACTOR. ANY DAMAGES TO THE L0.0CONSTRUCTION LEGEND
L1.0 DEMOLITION PLAN
L2.0CONSTRUCTION LAYOUT PLAN BASE BID
L3.0CONSTRUCTION DETAILS
L3.1CONSTRUCTION DETAILS NOTES:

1. PATH OF TRAVEL (P.O.T.) AS INDICATED IS A BARRIER FREE

ACCESS ROUTE WITHOUT ANY ABRUPT VERTICAL CHANGES
EXCEEDING 12" BEVELED AT 1:2 MAX. SLOPE EXCEPT THAT
LEVEL CHANGES DO NOT EXCEED 14" VERTICAL AND IS AT
LEAST 48" WIDE. SURFACE IS SLIP RESISTANT, STABLE, FIRM AND SMOOTH. CROSS SLOPE DOES NOT EXCEED 2%, AND
SLOPE IN THE DIRECTION OF TRAVEL DOES NOT EXCEED 5%.

P.O.T. SHALL BE MAINTAINED FREE OF OVERHANGING
OBSTRUCTIONS TO 80" MINIMUM AND PROTRUDING OBJECTS
GREATER THAN 4" PROJECTION FROM WALL AND ABOVE 27"
AND LESS THAN 80". CONTRACTOR TO VERIFY THAT
BARRIERS IN THE PATH OF TRAVEL HAVE BEEN REMOVED.

ENCLOSURE TO MEET ACCESSIBILITY STANDARD PER
CBC 11B-206.2.2 AND 11B-206.2.8 AND CBC 11B-404.2.3-2.10 LEGEND - PATH OF TRAVEL:

FIELD

ACCESSIBLE PATH OF TRAVEL

PATH OF TRAVEL

NOT TO SCALE
TS1.0

AS NOTED

TITLE SHEET
L3.2CONSTRUCTION DETAILS
L3.3CONSTRUCTION DETAILS
L3.4CONSTRUCTION DETAILS
L4.0IRRIGATION PLAN
L4.1IRRIGATION LEGEND AND DETAILS
L2.1
C1.0 GRADING AND DRAINAGE PLAN BASE BID
C2.0 UTILITY PLAN BASE BID
C3.0 CONSTRUCTION DETAILS

NOT TO SCALENOT TO SCALE

LOCATION

PROJECT
WENDELL PARK 10/28/2024 PERMIT SET
P:\Shared\Projects\2023\2300051 Richmond Parks Assessment\Wendell Park Field Renovation\DWG\Sheets\TS Wendell Park.dwg 10/31/2024 - 11:44 AM Brian G 1:3.56 Sheet
Plan File:

Project Number: 2300051
Scale:

Date: NOVEMBER 2024
Rev Date Description Designed Drawn Checked
121 Park Place
Richmond, CA 94801
tel: 510-367-6166
Engineering
Planning
Landscape Architecture
Land Surveying
Mapping
RICHMOND, CA 94805
Stamp FIELD RENOVATION
Sheet Title

PROJECT
24th STREET & WENDELL AVENUE
10/28/2024 BID SET

MV BG MV
Marcia D. Vallier
-No.3293
STATE
O
FCA
L

IFORNI A
Signature
Renewal Date
Date

L I C ENSED LANDSCAPE

ARCHITECT
10/30/2024
03/31/2025

NORTHNORTH
C1.1 GRADING AND DRAINAGE PLAN ALTERNATE #1
C2.1 UTILITY PLAN BASE ALTERNATE #1
C3.1 CONSTRUCTION DETAILS
C4.0 EROSION CONTROL PLAN
C0.1 CIVIL ABBREVIATIONS, LEGEND, & GENERAL NOTES
26TH STREET

ESMOND AVENUE

WENDELL AVENUE
ALT. #1 -

PLAY AREA &

RESTROOM

TO AC TRANSIT
LINE 74 ON
23RD STREETBASE BID

RESTROOM
L0.1GENERAL NOTES
L2.2
CONSTRUCTION LAYOUT PLAN ALTERNATE #1
L3.5CONSTRUCTION DETAILS
L3.6CONSTRUCTION DETAILS
L3.7CONSTRUCTION DETAILS
L4.2IRRIGATION DETAILS
L4.3IRRIGATION DETAILS
L4.4IRRIGATION DETAILS
L5.0PLANTING PLAN, PLANT LIST AND DETAIL

CITY OF RICHMOND

WENDELL PARK FIELD RENOVATION PROJECT
26th STREET & WENDELL AVENUE RICHMOND, CA
CONSTRUCTION LAYOUT PLAN ALTERNATE #1E0.1SYMBOLS LIST AND GENERAL NOTES E1.1SITE PLAN - ELECTRICAL