Rheem Creek Ecological Solutions
SITE PLAN
Restoration Design Group Inc.
12 JUNE, 2020
CONCEPT PLAN | 1”=60’
CHANNEL PROFILE | 1”=60’
TYPICAL SECTION (LOOKING DOWNSTREAM) ILLUSTRATIVE SECTION OF PROPOSED CONDITIONS (LOOKING DOWNSTREAM) 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 60 70
80 90
60 70
80 90
STATION
ELEVATION
FORDHAM ST
ANNAPOLIS
AVEEXISTING THALWEG (CHANNEL BOTTOM) ASSUMED ORIGINAL PROJECT AS-BUILT PROFILE FUTURE CHANNEL THALWEG
MOYERS RD
SHANE DR
DUKE AVE
maintenance
access route
GREENWOOD DR
FORDHAM ST
ANN
APOLIS
AV
E
GONZAGA AVE
GR
EENWOOD DR
16+00
21+00
26 +00
31+00
constructed sediment basin
channel restoration area
Rheem creek centerline
parcel boundary
LEGEND
120
FT
06 0
EXISTING GROUND
PROPOSED GROUND
4-6’
1.5-2.8’
RELATIVE ELEVATION
1 2
3 4
5 6
7 0+10 0+25 0+50 0+60
0 STATION
existing fence
xisting fence
existing utility pole
(EXAGGERATED VERTICAL)