Cities Index.
Attachment 5 - Final Coverage Acceptance Test for Contra Costa County.pdf

Richmond City Council
November 18, 2025

Document
Attachment 5 - Final Coverage Acceptance Test for Contra Costa County.pdf
Meeting
November 18, 2025
Body
Richmond City Council
Original file
16.9 MB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.

Submitted to
EBRCSA

Submitted by
AECOM
20715 Timberlake Rd
Suite 106
Lynchburg, VA 24502
June 8, 2012

Final Coverage Acceptance Test
for Contra Costa County West
Simulcast Cell

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
1 Table of Contents

1 Purpose ................................................................................................................................................................................. 4 2  Definition and Process .......................................................................................................................................................... 6

2.1  Channel Performance Criterion (CPC) ........................................................................................... ............................ 6

2.2  Delivered Audio Quality ....................................................................................................... ....................................... 6

2.3  Received Signal Strength Indication ........................................................................................................................... 6

2.4  Bit Error Rate .............................................................................................................................................................. 6

2.5  Service Area and Conditions ................................................................................................... ................................... 6

2.6  Motorola Covered Area Reliability ............................................................................................. ................................. 8

2.7  Validated Service Area Reliability ............................................................................................................................... 9 3  System Test Equipment ...................................................................................................................................................... 10

3.1  The Test Set ............................................................................................................................................................. 10

3.2  The Test Sequences ................................................................................................................................................. 13

3.3  The Test Set Calibration ........................................................................................................................................... 13

3.4  RaCESM Equipment Setup ............................................................................................................... ......................... 13

3.5  EBRCSA Supplied Equipment .................................................................................................................................. 16 4  Test Method ........................................................................................................................................................................ 17

4.1  Test Mode ................................................................................................................................................................. 17

4.2  Test Samples ............................................................................................................................................................ 17

4.2.1  Test Message ....................................................................................................................................................... 17

4.2.2  Valid Test Sample ............................................................................................................. ................................... 17

4.2.3  Inaccessible Tile ................................................................................................................................................... 17

4.2.4  Tile Retries .................................................................................................................. ......................................... 18

4.2.5  Failed Tile ............................................................................................................................................................. 18

4.3  Received Signal Strength Indicator (RSSI) Sample .................................................................................................. 18 5  System Requirements and Impact ...................................................................................................................................... 19

5.1  Testing System Requirements .................................................................................................................................. 19

5.2  Testing an Operational System ............................................................................................................................... .. 19

5.3  Radio Requirements ................................................................................................................................................. 19 6  Test Procedures .................................................................................................................................................................. 20

6.1  Testing System Requirements .................................................................................................................................. 20

6.2  Drive Test Areas ....................................................................................................................................................... 20

6.3  DAQ Measurements/Voice Recording ...................................................................................................................... 20

6.4  Frequencies, Talk Groups, and Control Channels .................................................................................................... 20

6.5  Stationary Unit Locations .......................................................................................................................................... 21

6.6  Stationary Unit Locations .......................................................................................................................................... 23

6.7  Data Collection, Storage and Post-Processing ......................................................................................................... 25 AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
2 6.8  Additional Procedures ............................................................................................................................................... 25

6.9  Post Processing ........................................................................................................................................................ 25

6.10  Inaccessible Tiles ............................................................................................................ ......................................... 25 7  Results ................................................................................................................................................................................ 26

7.1   Test Results ............................................................................................................................................................. 26

7.2  Detailed DAQ Test Results .................................................................................................................. ..................... 27

7.3   RSSI Test Results ............................................................................................................ ....................................... 28

7.4   BER Test Results ............................................................................................................. ....................................... 29

7.5  DAQ Test Data .......................................................................................................................................................... 29 8  Conclusions ................................................................................................................... ..................................................... 31

List of Appendices
Appendix A RaCE SM & Test Vehicle Procedures
Appendix B EBRCSA Supplied Equipment
Appendix C Received Signal Strength threshold Calculations Appendix D Checklists
Appendix E Standard Harvard Phrases
Appendix F Detailed Results

List of Tables
Table 2-1 Delivered Audio Quality Definitions
Table 3-1 Attenuator Calculations
Table 3-2 Attenuator Calculations
Table 6-1 Contra Costa County West Frequencies
Table 6-2 Radio Sites in the Contra Costa County West Simulcast Cell Table 7-1 DAQ Test Results – Covered Area Reliability
Table 7-2 DAQ Test Results – Service Area Reliability
Table 7-3 One-Way DAQ Test Results – Service Area
Table 7-4 One-Way DAQ Test Results – Covered Area
Table 7-5 RSSI Level
Table 7-6 BER Test Results
Table 7-7 Sample Excel Spreadsheet
Table C-1 Portable Radio RSSI Threshold Level Calculations Table C-2 Mobile Radio RSSI Threshold Level Calculation

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
3 List of Figures
Figure 2-1 Contra Costa County West Service Area
Figure 2-2 Motorola Tested Tiles and AECOM Tested Tiles Figure 3-1 Mobile Unit Configuration
Figure 3-2 Stationary Unit Configuration
Figure 3-3 Attenuator Network
Figure 6-1 Relationship between Hotel and Nearest Site
Figure 6-2 Radio Sites in the Contra Costa County West Simulcast Cell Figure 6-3 Photograph of Test Vehicle Setup
Figure 6-4 Photograph of Test Vehicle Antenna Location Figure 7-1 DAQ Score Distribution
Figure 7-2 RSSI Level Distribution
Figure 7-3 Contra Costa County West Medi um Building - Sector 1b Two-Way DAQ Test Figure 7-4 Contra Costa County West Portable On Street Two-Way DAQ Test Figure 7-5 Contra Costa County West Talk-In DAQ Test
Figure 7-6 Contra Costa County West Talk-Out DAQ Test
Figure 7-7 Contra Costa County West RSSI
Figure 7-8 Contra Costa County West Motorola BER
Figure 7-9 Contra Costa County West Channel Grant Failures Figure B-1 EBRCSA Supplied Equipment and Quantity
Figure D-1 Master Checklist
Figure D-2 Inventory Checklist
Figure D-3 Arrival Checklist
Figure D-4 Daily Checklist
Figure D-5 Mobile Unit Software Settings Checklist
Figure D-6 Software Settings Stationary Checklist
Figure D-7 Audio Levels
Figure D-8 Radio Interface Cable
Figure F-1 Contra Costa County West Sectors 1a+1b Two Tile Numbers

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
4 1 Purpose
This Coverage Acceptance Test Report provides the East Bay Regional Communications System Authority (EBRCSA) a detailed report of the radio coverage testing conducted by AECOM in the Contra Costa County West (Contra Costa County West) simulcast cell. This test report describes the coverage testing methods and procedures, provides test documentation and results, the responsibilities AECOM, EBRCSA, and Motorola had during testing, and finally, provides our conclusions and recommendations.

AECOM’s Radio Coverage Evaluator (RaCE
SM
)1 was used to perform the Delivered Audio Quality (DAQ) Portable Outdoor and simulated indoor testing of the service area. DAQ testing collects talk-in and talk-out audio recordings and calculates Delivered Audio Quality (DAQ) values for each recorded test calls. The test evaluated the voice coverage performance under typical operating conditions within the Contra Costa County West service area using a mobile radio to simulate a portable radio operating at hip level. This automated test was conducted concurrently with Received Signal Strength Indication (RSSI) testing conducted by RaCE
SM
. RSSI testing is an additional automated test.

Prior to DAQ testing, Motorola conducted BER testing using their Voyager℠ test equipment. AECOM had planned on collecting BER test data with RaCE, but due to limitations in Motorola’s Simulcast equipment, AECOM was unable to conduct BER testing.

Per the specifications developed by AECOM for EBRCSA, a DAQ of 3 is the minimum acceptable level for two-way voice operations in talk-in and talk-out directions. Motorola performed talk-out only a BER based test, with a BER of 2.6% as the maximum acceptable level. All RSSI testing was conducted for informational purposes only.

The following excerpts from the coverage sections of the EBRCSA Radio System Specifications (dated October 21, 2010) are included as an exhibit:

4.7 Coverage Requirements
“The guaranteed performance of this radio system is 95% coverage in both directions (talk-out and talk-in) within the covered area indicated on the propagation maps provided by Motorola.

“When the entire system is completed and all of the standalone sites are fully integrated with the simulcast systems, a minimum level of 95% coverage of the specified type for both talk-out and talk-in directions, in all of the test sectors, shall be achieved in the “covered areas”. The reliability shall be calculated as a composite value for the two-county radio system by dividing the total number of passed tiles by the total number of tiles tested. In order to be counted as a “passed tile”, both the talk-in and talk-out DAQ values shall be equal or greater than 3.

“4.7.1 Coverage Charts and Analysis
Motorola shall provide coverage charts in the proposal as supporting documentation. The coverage chart will be used as supporting documentation only and shall not be considered a part of confirming or guaranteeing that the system will meet the coverage specifications. Include a detailed description of the propagation models used and the assumptions made in preparation of the coverage charts included in your proposal.

Include an analysis of tower-top amplifier (TTA) system performance for those sites where TTA’s are included in the design.

“Coverage charts shall be provided for each Coverage Test Sector. The predicted coverage shall be overlaid on a map with the specified Coverage Test Sector clearly defined. The coverage chart shall identify all areas within the Coverage Test Sector that do not meet the specified requirement. Identified coverage deficiency areas in the Coverage Test Sector shall be taken into account when constructing the composite 95% boundary. All areas within the defined Coverage Test Sector shall be considered equal when selecting random coverage test locations.

1 U.S. Patent # 7,522,978 B2
AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
5 “4.7.2 Building Loss Factors
All of the Coverage Test Sectors require in-building portable radio coverage. In these Coverage Test Sectors, a Building Loss Factor will be inserted in the test setup to simulate building penetration losses.

Building Loss Factors are defined below:

Building
Characterization
Building Loss
Factor (dB)
Residential 6
Medium Building 15
Heavy Building 20

“4.7.3 Service Area and Coverage Test Sectors
The service area for the EBRCS is defined by the boundaries of Alameda and Contra Costa Counties.

“4.7.3.1 Contra Cost a County West Region
The Contra Costa West Region is bounded on the north, west, and south by the county borders. On the east, the line will run south from Crockett (with Crockett inside the test zone), curving east to fully encapsulate Hercules, and then curving back west to run along the western shore of the San Pablo Reservoir, then south to the border with Alameda County. The region contains two test sectors, which completely cover the region.

Test sector 1a: Contra Costa West, Portable on Street (6 dB loss) – includes the entire region described above minus test sector 1b described below.

Test sector 1b: Richmond, Portable in Medium Building (15 dB loss): includes the Cities of Richmond and El Cerrito. This test sector is defined in the Motorola provided shape files named Contra Costa West 7 (The Jail) and Contra Costa West 13.”
AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
6 2 Definition and Process

2.1 Channel Performance Criterion (CPC)
The channel performance criterion (CPC) is the specified design performance in a faded channel.

2.2 Delivered Audio Quality
Delivered audio quality (DAQ) designations are defined by TIA/EIA TSB-88.1-C and reproduced below in Table 2-1.

Note: DAQ-0 is not defined by TSB-88.1-C: AECOM has added this definition to account for instances where communications failed entirely. For example, a test in which the mobile unit was unable to obtain a channel grant would receive a DAQ score of 0.

Table 2-1 Delivered Audio Quality

2.3 Received Signal Strength Indication
Received signal strength indication (RSSI) is the radio signal strength measured in microvolts (μV) or in decibels in relation to 1 milliwatt at the input to the receiver (dBm). No acceptance criterion for RSSI has been provided for this test.

2.4 Bit Error Rate
Bit Error Rate is the ratio of erroneous bits received to the total number of bits transmitted, usually expressed as a percent.

2.5 Service Area and Conditions
The service area defines or describes the area in which a radio system should provide the desired CPC.

Delivered Audio Quality Performance Definition
Static SINAD equivalent
intelligibility
Not defined within
TIA TSB-88
DAQ-1 Unusable, speech present but unreadable < 8 dB
DAQ-2
Understandable with considerable effort frequent
repetition due to noise and distortion 12 ± 4 dB
DAQ-3
Speech understandable with slight effort;
occasional repetition required due to noise and
distortion; 17 ± 5 dB
DAQ-3.4
Speech understandable with repetition only rarely
required; some noise and distortion; 20 ± 5 dB
DAQ-4
Speech easily understood; occasional noise and
distortion 25 ± 5 dB
DAQ-4.5
Speech easily understood; infrequent noise and
distortion 30 ± 5 dB
DAQ-5 Speech easily understood > 33 dB
DAQ-0 No speech detected
AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
7 The Contra Costa County West service area is divided into two test sectors: 1a and 1b, shown in Figure 2-1. Test sector 1b is a developed area, and requires portable radio in medium building coverage, defined as 15 dB of additional loss when compared with operating a portable radio on the street. To simulate testing inside medium buildings, testing was conducted using a portable-on-street setup with an added 15 dB loss. Test sector 1a was tested as a portable radio on the street.

Figure 2-1 Contra Costa County West Service Area

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
8 2.6 Motorola Covered Area Reliability
Based on their coverage predictions, Motorola has defined an area within Contra Costa County West over which its radio system is predicted to provide 95% area reliability. This is defined as the Motorola Covered Area, and is what was tested for system acceptance. This area is shown as tiles with a red outline in Figure 2-2 (“Motorola Covered Area”). Not all of these tiles are vehicle accessible. In addition to performing DAQ and RSSI testing in the Motorola Covered Area, AECOM tested all accessible tiles within the jurisdictional area. Tiles that AECOM was able to access and gather test data are shown in Figure 2- 2 (“AECOM Tested Tiles”).

Figure 2-2 Motorola Covered Area and AECOM Tested Tiles

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
9 2.7 Validated Service Area Reliability

Coverage testing is a statistical process. Validated service area reliability is determined on the basis of measuring a statistically significant number of random test locations, uniformly distributed throughout the entire service area.

Validated service area reliability is the percentage of locations where talk-in and talk out radio communications meets or exceeds the desired CPC. The validated service area reliability value in percent is calculated by dividing the number of valid test measurements within the defined service area that meet or exceed the required CPC by the total number of valid test measurements.

As the system acceptance is based on the covered area reliability, the validated service area reliability is provided for information only.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
10 3 System Test Equipment

3.1 The Test Set
RaCE
SM
test set consisted of two units: a stationary and a mobile unit. For details on installation, see section 6.

The RaCE
SM
mobile unit (Figure 3-1) consists of the following equipment:
 Mobile radio (700/800MHz APX-7500, supplied by EBRCSA)  Two RSSI Receivers (ICOM, provided with RaCE
SM
)
 Mobile antenna for each of the above radios (supplied by EBRCSA)  GPS receiver and antenna for measuring test vehicle location and establishing universal time  A laptop computer running AECOM’s RaCE
SM
software
 Interconnecting hardware and cables
 An attenuation network consisting of a circulator and se veral attenuators to give the Motorola APX-7500 mobile the simulated characteristics of a portable radio worn on the hip, located either on the street or in medium buildings (depending on the test sector).

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
11 Figure 3-1 Mobile Unit Configuration

The RaCE
SM
stationary unit (Figure 3-2) consists of the following equipment:
 Mobile Radio (700/800MHz APX-7500, supplied by EBRCSA)  Mobile antenna (supplied by EBRCSA)
 A GPS receiver and antenna for timing correlation
 A laptop computer running AECOM’s RaCE
SM
software
 Interconnecting hardware and cables

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
12 Figure 3-2 Stationary Unit Configuration

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
13 3.2 The Test Sequences
The DAQ test sequence was:
 The mobile system keeps track of its loca tion and which tiles have already been tested  When the mobile test system recognizes that it has entered an untested tile, the mobile test system transmits a recorded message to the stationary test system.
 The stationary system receives t he mobile’s message and records it.  After the mobile system finishes transmitting, the stationar y system transmits a recorded message to the mobile system.  The mobile system receives and records the stati onary system’s test message and RSSI measurements.  The mobile system marks the tile as having been tested.

3.3 The Test Set Calibration
Motorola was responsible for the programming and calibration of all mobile radios.

RaCE
SM includes a proprietary algorithm that evaluates DAQ based on added noise or distortion in the received audio of the RaCE
SM
test message. DAQ is not based on signal strength or on bit error rate. Using telecommunication professionals, AECOM has calibrated the effects of noise or distortion on DAQ scores. AECOM then used this input to validate the proprietary algorithm inherent in the RaCE
SM software.

3.4 RaCE SM Equipment Setup
AECOM developed the connector interfaces to the test radios. RaCE SM
uses the input to the microphone as the point at which
to inject the audio signal for the test call. The output to the speakers is the point at which the received audio signal is sent to the RaCE
SM
computer for recording and DAQ scoring. The connector for the test radio contains these points, and served as the interface to the RaCE
SM
mobile and stationary units. We integrated the test radios to the RaCE SM
equipment in our lab, and
adjusted the audio levels for optimum radio performance in a laboratory setting. Standard connectors, supplied with the test radios by BERCSA, enabled us to build the interface cabling between the RaCE SM
stationary and mobile units and the test
radios.

Using the interface cables, we configured the RaCE
SM
mobile unit and the RaCE
SM
stationary unit with an EBRCSA supplied
radio. Mobile radios were used for both the RaCE
SM
mobile and stationary units. We then tested each system (mobile + stationary units) for all required test functions on the bench in our lab.

After the bench testing was complete, the RaCE
SM
mobile and stationary systems were shipped to Contra Costa County, where the mobile was installed in the test vehicle, and the stationary installed in the hotel. The RaCE SM
operator then conducted a
road test lasting approximately two hours. All functions to be used in the coverage test were checked during this road test.

To test portable on street coverage with a mobile radio, AECOM installed an attenuator network in the mobile test unit. The attenuator network was designed to simulate portable radio antenna mounted on the hip and, in the medium building coverage zone, in-building conditions. Figure 3-3 is a diagram of the attenuator network used to emulate portable radio receives (Talk- Out) and transmits (Talk-In) under various coverage levels.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
14 Figure 3-3 Attenuator Network

Table 3-1 provides the calculations for each attenuator for simulating portable-on-street radio performance. It consists of three attenuators. Attenuator 1 is set to compensate for differences in receive system sensitivity of the typical radio being simulated and the test radio. Attenuator 2 is set to compensate for differences in transmit power of the typical radio being simulated and the test radio. Attenuator 3 is set to simulate the level of in-building coverage. When testing Test Sector 1b, which required portable radio in medium building coverage, attenuator 3 was 15 dB, as shown in Table 3-2.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
15 Actual attenuation used during portable on street testing was measured at 8 dB for the talk-in path, and 14 dB for the talk-out path.

Receiver Sensitivity
Portable Radio Being Simulated (XTS 2500) 0.25 µV -119.0 dB Test Radio (XTL 2500) 0.25 µV -119.0 dB
Difference 0.0 dB
Antenna System Gain
Test Set Antenna System
Mobile Antenna 0.0 dB
Mobile Coax -0.8 dB
Circulator -0.5 dB
Total -1.3 dB
Portable Radio Antenna System Being Simulated (Hip-Mounted Portable) -8.5 dB Difference 7.2 dB
Attenuator 1 7.2 dB
Building Attenuation Being Simulated (Attenuator 3) 0.0 dB Total Test Set Receive System Attenuation
(Attenuators 1 + 3 + Circulator) 7.7 dB
Transmit Power
Test Radio (XTL 2500) 10.0 W 40.0 dBm
Portable Radio Being Simulated (XTS 2500) 3.0 W 34.8 dBm Difference 5.2 dB
Antenna System Gain
Test Set Antenna System -1.3 dB
Portable Radio Antenna System Being Simulated (Hip-Mounted Portable) -8.5 dB Difference 7.2 dB
Attenuator 1 + Attenuator 2 12.4 dB
Attenuator 2 5.2 dB
Total Transmit Attenuation
(Attenuators 1 + 2 + 3 + Circulator) 12.9 dB
Table 3-1
Attenuator Calculations
Attenuation Required to Simulate a Portable Radio Transmit (Talk-In) Attenuation Required to Simulate Portable Radio Receive (Talk-Out) AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
16 Actual attenuation used during portable in medium building testing was measured at 20 dB for the talk-out path, and 27 dB for the talk-in path.

3.5 EBRCSA Supplied Equipment
See Appendix C for the list of the EBRCSA supplied equipment used in the Contra Costa County West testing.

Receiver Sensitivity
Portable Radio Being Simulated (XTS 2500) 0.25 µV -119.0 dB Test Radio (XTL 2500) 0.25 µV -119.0 dB
Difference 0.0 dB
Antenna System Gain
Test Set Antenna System
Mobile Antenna 0.0 dB
Mobile Coax -0.8 dB
Circulator -0.5 dB
Total -1.3 dB
Portable Radio Antenna System Being Simulated (Hip-Mounted Portable) -8.5 dB Difference 7.2 dB
Attenuator 1 7.2 dB
Building Attenuation Being Simulated (Attenuator 3) 15.0 dB Total Test Set Receive System Attenuation
(Attenuators 1 + 3 + Circulator) 22.7 dB
Transmit Power
Test Radio (XTL 2500) 10.0 W 40.0 dBm
Portable Radio Being Simulated (XTS 2500) 3.0 W 34.8 dBm Difference 5.2 dB
Antenna System Gain
Test Set Antenna System -1.3 dB
Portable Radio Antenna System Being Simulated (Hip-Mounted Portable) -8.5 dB Difference 7.2 dB
Attenuator 1 + Attenuator 2 12.4 dB
Attenuator 2 5.2 dB
Total Transmit Attenuation
(Attenuators 1 + 2 + 3 + Circulator) 27.9 dB
Table 3-2
Attenuator Calculations
Attenuation Required to Simulate Portable Radio Receive (Medium Building Talk-Out) Attenuation Required to Simulate a Portable Radio Transmit (Medium Building Talk-In) AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
17 4 Test Method

4.1 Test Mode
A gridded test determined test points and collect data for coverage acceptance testing.

In the gridded test mode, the area to be tested was divided into equally sized rectangular tiles. Testing large number of tiles is necessary to provide a statistically valid measurement of the overall system performance.

Motorola provided the shape file2 for the test tiles. The tile size was approximately 0.25 miles x 0.25 miles, with the total area defined as 50 tiles wide (x-axis) numbered 0 through 50, and 98 tiles high (y-axis) numbered 0 through 97. Tile 0,0 was the south-west corner of the grid. These test tiles were used by AECOM for the DAQ and RSSI testing.

During the test, the mobile unit was driven throughout the service area, in an effort to enter every tile. As the mobile unit entered a tile, the RaCE
SM
software established whether that tile had been tested before, and if not, it activated the test sequence beginning with the talk-in transmission. The stationary unit recorded the talk-in transmission and then initiated the talk-out transmission. The mobile unit recorded the talk-out transmission along with RSSI data during the talk-out transmission and waited until a new, untested tile was entered before automatically beginning a new test.

4.2 Test Samples
A RaCE
SM
DAQ test sample for EBRCSA testing is a paired set of talk-in and talk-out audio recordings.

4.2.1 Test Message
Test messages of five to eight seconds were used for coverage testing. Two hundred messages from lists included in Appendix E were selected for use during test. The selected list numbers are: 2, 4, 7, 8, 9, 10, 13, 16, 18, 19, 24, 28, 34, 38, 39, 46, 47, 50, 53, and 56. The randomly sorted messages were half and half male and female voices.

4.2.2 Valid Test Sample
A valid test sample is one in which all of the following conditions apply:
 RaCE
SM
detected entry into a previously untested tile and initiated the test sequence.  No RaCE
SM
hardware or software failures occurred during the test sequence.  No operator errors occurred during the test sequence.  No busy signal occurred during the test sequence.
 No errant GPS data 3 was received and used by RaCE
SM
during the test sequence.

If any of the above conditions were violated, the test sample is invalid and the tile is considered untested.

4.2.3 Inaccessible Tile
For tiles that were accessible but were missed for any reason, AECOM went back and attempted to test the tile.

2 A shape file is a popular geospatial vector data format for geographic information systems software. Shape files can be created and read by ESRI (and other) software. Shape files are actually several related files that convey geospatial data. 3 Obviously errant GPS data is a stated position more than 100 meters (~330 feet) from the actual position. This deviation is based on both the accuracy in the civilian GPS course / acquisition (C/A) code and the potential error in the underlying geographical map data in the vehicle.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
18 4.2.4 Tile Retries
Tile retries were performed only where an invalid test sample was collected (see 4.2.2). In these cases, RaCE SM
operators
invalidated the data, and performed a re-test of the tile.

4.2.5 Failed Tile
A failed tile is any tile in which:
 A valid test sample was collected (see 4.2.2), and;
 Either the talk-out or the talk-in DA Q score is less than 3, or does not exist.

4.3 Received Signal Strength Indicator (RSSI) Sample
RSSI data for the control channel was collected on a per tile basis, concurrent with the DAQ talk-out test.

The mobile test unit had two additional auxiliary receivers and antennas to perform RSSI measurements. During the talk-out test transmission, the RSSI receivers collect samples based on the automatic gain control line from the receiver. Multiple samples are collected in each tile, at an average rate of 57 samples per second. The median value of these samples is used, and then the average of the median value from each of the two receivers is presented as the RSSI value for that tile. The dynamic range of the ICOM receiver is -55 dBm to -120 dBm with a 1 dB resolution.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
19 5 System Requirements and Impact

5.1 Testing System Requirements
During RaCE
SM
testing on a trunked system, interruption by other radio users on the same talk-group during RaCE SM
testing will
disrupt the test results. Therefore, we require a dedicated talk group for testing be programmed into the radios and into the system manager. For additional protection, this test talk group can be partitioned to a single, dedicated working channel. This will eliminate outside influences on the test data (e.g., system “busies”). If the RaCE SM
test is assigned channels randomly
(i.e., non-partitioned), the test results may not be as useful due to the different characteristics of the individual transmitters and antennas. Also, RaCE
SM
performs best when only the RaCE
SM
test talk group is using the partitioned channel, as this eliminates potential blocking or queuing by other users.

Under no circumstances can any work be done at any of the transmitter sites concurrent with the testing. If system failures occur, or if maintenance is required at the radio sites, the coverage testing will be stopped. Re-start of the test will then be coordinated with EBRCSA. It may be that some of the earlier test data was corrupted, and that some or all of the previous testing will have to be repeated.

All of these testing requirements were met, and we experienced none of the issues highlighted above. The test talk group was not partitioned to a specific channel because AECOM was the only user on the system during testing.

5.2 Testing an Operational System
When RaCE
SM
is used in a system without a dedicated channel available, the RaCE SM
units are subject to the same operational
limits as any other radios on the system. The effects on testing and operations can be significant. During this coverage acceptance testing, the dedicated talk-group on the trunked P25 system should not be accessible to any user, even for monitoring. Heavy use of the system by other users also poses the potential for queuing, which will corrupt the coverage test data. Under these circumstances, we will stop the test and coordinate the re-start with EBRCSA.

The system was not in operational use at the time of testing, and we experienced no busy signals.

5.3 Radio Requirements
EBRCSA supplied the radios used by RaCE
SM
. See the equipment list for the radios required. Each radio was programmed with talk-groups that were utilized for the testing and a simplex (talk-around) frequency for diagnostics and setup of the test equipment.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
20 6 Test Procedures

6.1 Testing System Requirements
AECOM deployed one (1) drive test team for the testing. The test team consisted of one AECOM employee to operate the RaCE
SM
equipment. EBRCSA provided the driver and the vehicle. Testing was overseen by an AECOM Engineer in Lynchburg, VA.

AECOM tested from 8 am - 5pm Monday through Friday. Progress reports were provided to EBRCSA on the following day.

6.2 Drive Test Areas
The Contra Costa County West Simulcast Cell was divided into two zones, one portable on street, and one medium building.

Each was tested at the appropriate attenuation level.

The test team tested every accessible tile.

6.3 DAQ Measurements/Voice Recording
The DAQ measurements were collected using one vehicle with RaCE SM
set up as discussed in Section 3-1. RaCE
SM
software
was configured to provide indications on the computer that both talk-in and talk-out test calls were collected in each tile. Tile samples not meeting this requirement were considered not tested by the software, and were retested as described in section

4.2.5. The RaCE
SM
operator continually monitored the GPS-indicated position on the laptops and validated this position by having the driver indicate road intersections. If GPS positions were found to be inaccurate, the tester invalidated the test, performed a manual position update, and then retested the grid.

6.4 Frequencies, Talk Groups, and Control Channels
The Control Channel was on 853.7500 MHz for the duration of the testing. AECOM’s testing was performed on the “AECOM” talk group. The radios were also programmed with “TAC – AECOM T/A” for simplex operation. The AECOM talk group was not limited to any particular working channels. The following frequencies were utilized by the system during testing:

Table 6-1 Contra Costa County West Frequencies

Channel Base TX (MHz) Base RX (MHz) Function
Contra Costa County West Cell Channel 1 853.7500 808.7500 Control Channel / Voice Channel Contra Costa County West Cell Channel 2 853.7375 808.7375 Control Channel / Voice Channel Contra Costa County West Cell Channel 3 853.3000 808.3000 Control Channel / Voice Channel Contra Costa County West Cell Channel 4 853.2875 808.2875 Control Channel / Voice Channel Contra Costa County West Cell Channel 5 852.9375 807.9375 Voice Channel Contra Costa County West Cell Channel 6 852.9250 807.9250 Voice Channel Contra Costa County West Cell Channel 7 852.6215 807.6215 Voice Channel Contra Costa County West Cell Channel 8 852.6000 807.6000 Voice Channel Contra Costa County West Cell Channel 9 851.3625 806.3625 Voice Channel Contra Costa County West Cell Channel 10 851.3500 806.3500 Voice Channel / Base Station Identifier AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
21 6.5 Stationary Unit Locations
The stationary unit was located at the Courtyard Marriott Richmond. This location was selected because of its proximity to the Pearl Ridge Reservoir Site. The RaCE stationary unit was located in room 512, on the fifth floor. During setup, received signal strength of the control channel for the simulcast cell was measured between -56 and -62 dBm, with the received signal from the Pearl Ridge Reservoir site sufficiently stronger than the other sites to provide a capture effect.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
22 Figure 6-1 Relationship between Hotel and Nearest Site

The hotel is located at 37.978N, 122.323W. The distance between the hotel and the Pearl Ridge Reservoir site is 1.51 miles at a heading of 156.61 degrees. The next closest site is Turquoise, which is 3.15 miles away, at a heading of 69.44 degrees.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
23 Figure 6-2 Radio Sites in the CCCO West Simulcast Cell

Table 6-2 Radio Sites in the Contra Costa County West Simulcast Cell

6.6 Stationary Unit Locations
The test vehicle for the mobile installation was a Ford Crown Victoria, provided by EBRCSA. AECOM installed the mobile equipment on June 17, 2011 and performed a checkout test to ensure proper operation. The equipment remained installed for the duration of the testing.

Name Latitude Longitude
Elevation
AMSL (m) ERP (W)
TX Ant
Azimuth (deg) TX Ant Model
TX Ant Ht
to Tip (m)
Turquoise 37-59-35.8 N 122-16-11.4 W 173.4 182.0 N/A Antel BCD-80010-3-25 17.2 El Cerrito PD 37-54-58.7 N 122-18-39.9 W 21.0 218.0 350 Antel BCR-80013-25 15.6 Pearl Ridge Reservoir 37-57-27.2 N 122-18-44.7 W 201.0 182.0 N/A Antel BCD-80010-5-25 21.7 Nickols Knob 37-55-13.0 N 122-22-55.0 W 113.1 75.0 N/A TX RX 101D-90-06-03N 15.1 AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
24 Figure 6-3 Photograph of Test Vehicle Setup

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
25 Photograph showing the roof of the test vehicle with GPS antenna, mobile radio antenna, two RSSI receiver antennas, as well as two permanent antennas not related to RaCE
SM
testing.

Figure 6-4 Photograph of Test Vehicles Antenna Location

6.7 Data Collection, Storage and Post-Processing
At the end of each test day, all RaCE
SM
test data was copied from the mobile and stationary laptops to an external hard drive.

Data also remained on the original laptop computer.

6.8 Additional Procedures
See APPENDIX A: RaCE
SM
PROCEDURES for additional test procedures.

6.9 Post Processing
AECOM listened to any test .wav file with a DAQ score of 3 or lower, and a sample of scores above 3. AECOM recommends that EBRCSA listen to any test .wav files that scored below a 3 DAQ. AECOM also recommends that EBRCSA samples 1% of the .wav files with a DAQ above 3.

6.10 Inaccessible Tiles
Certain tiles inside the test sectors 1a and 1b were inaccessible to vehicles, and were therefore not tested. These include some of the coastal areas, the area southwest of the San Pablo Canal, a large portion of the northern part of the test area, the foothills on the eastern end of the test area, and the Wildcat Canyon Regional Park.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
26 7 Results
Conformance testing relies on statistics over a large area, by measuring a statistically significant number of random test locations, uniformly distributed throughout the defined area. Tests are usually conducted throughout either a service area, which is the entire area where the radio system will be used, or a covered area, which is the area that is predicted to have coverage based on the design. For this test, DAQ and BER results pertaining to the covered area reliability are what determine whether the system passes the test. DAQ results pertaining to the service area reliability and RSSI results are provided for information only.

Reliability is defined as the percentage of locations to and from which radio communications meets or exceeds the desired CPC. For the covered area reliability test, the validated covered area reliability value in percent is calculated by dividing the number of valid test measurements within the covered area that that meet or exceed the required CPC by the total number of valid tests within the covered area. The validated service area reliability value in percent is calculated by dividing the number of valid test measurements within the service area that meet or exceed the required CPC by the total number of valid test measurements in the service area.

7.1 Test Results
From the specifications, the coverage guarantee for the system is a covered area reliability of 95% or higher. In order to meet this, 95% of tests must meet or exceed the Channel Performance Criteria (CPC) of DAQ 3 in both talk-in and talk-out directions. The covered area reliability is shown for both medium building attenuation (test sector 1b) and portable on street attenuation (test sector 1a).

Table 7-1 DAQ Test Results – Covered Area Reliability

Table 7-1 shows the results of the covered area reliability DAQ test. Tiles where a test was attempted but could not be completed due to inability to access the system from that location are included as tested tiles with a DAQ score of 0.

From these results, we see that Motorola has exceeded the specified coverage.

Additional test results are provided below for information only.

Pass Fail Total %
1a 366 1 367 99.7%
1b 257 0 257 100.0%
Test Sector Covered Area Reliability: Two-Way DAQ
AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
27 7.2 Detailed DAQ Test Results

Table 7-2 DAQ Test Results – Service Area Reliability

Table 7-2 shows the results of the Service Area Reliability DAQ test. Tiles where the test system was unable to gain system access were counted as failures. Tiles with an incomplete test sequence, as defined in section 4.2, were omitted from these results.

Table 7-3 One-Way DAQ Test Results – Service Area

Table 7-3 shows the one-way DAQ test results for both test sectors in the service area.

Table 7-4 One-Way DAQ Test Results – Covered Area

Table 7-4 shows the one-way DAQ test results for both test sectors in the covered area only.

Detailed DAQ test results can be found in Appendix F: Composite Results, and are displayed in Figure 7-3 (Medium Building [Sector 1b] Two-way DAQ Test), Figure 7-4 (Portable on Street [Sector 1a] Two-way DAQ Test), Figure 7-5 (RaCE Talk-In Delivered Audio Quality), and Figure 7-6 (RaCE Talk-Out Delivered Audio Quality). Tiles in which DAQ test was attempted but a channel grant could not be obtained are shown in Figure

Figure 7-3 shows only the results from tiles inside the Motorola covered area. The rest of the maps display data from tiles in the service area.

Pass Fail Total %
1a 512 10 522 98.1%
1b 268 0 268 100.0%
Service Area Reliability: Two-Way DAQTest Sector
Pass Fail Total % Pass Fail Total %
1a 514 8 522 98.5% 516 5 521 99.0%
1b 268 0 268 100.0% 268 0 268 100.0%
Test Sector Service Area Reliability: Talk-In DAQ Service Area Reliability: Talk-out DAQ Pass Fail Total % Pass Fail Total %
1a 367 0 367 100.0% 366 1 367 99.7%
1b 257 0 257 100.0% 257 0 257 100.0%
Test Sector Covered Area Reliability: Talk-In DAQ Covered Area Reliability: Talk-Out DAQ AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
28 Figure 7-1 DAQ Score Distribution

Figure 7-1 shows the frequency with which each DAQ score was observed over the entire service area. This chart only includes tests where the mobile unit was able to obtain a channel grant. 99.4% of the scores are DAQ 3.4 or above, and

91.9% of the scores are DAQ 4 or above.

7.3 RSSI Test Results
AECOM’s RSSI data was collected without any added attenuation, to provide measurements as close as possible to the ambient signal level present at that location. In analyzing the data, AECOM has used the following cutoffs to organize the RSSI data: successful mobile radio (using a mobile radio with a receive sensitivity of -119 dBm) communications will generally require a RSSI of at least -108.55 dBm, portable on street will generally require a RSSI of at least -99.18 dBm, portable in light building will generally require a RSSI of at least -93.18 dBm, and portable radio in medium building will generally require a RSSI of at least -84.18 dBm. All of these values are RSSI as measured by a mobile radio outdoors.

Table 7-5 RSSI Level

0 50
100
150
200
250
300
350
400
123 3 . 4 4 4 . 5 5
Frequency
DAQ
DAQ Score Distribution
Talk‐in DAQ Scores
Talk‐Out DAQ Scores
Medium
Building
Light
Building
Portable
on Street
Mobile
Only No Coverage Total
≥-84.18 ≥ -93.18 ≥-99.18 ≥ -108.55 <-108.55
1 a 3 9 2 7 63 11 7 3 5 1 9
1b 265 3 0 0 0 268
Received Signal Strength in dBm
Test Sector
AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
29 Figure 7-2 RSSI Level Distribution

Figure 7-2 shows the distribution of RSSI scores.

Detailed RSSI test results can be found in Appendix F: Composite Results, and are displayed in Figure 7-7, RaCE Receive Signal Strength Indicator.

7.4 BER Test Results
AECOM did not perform BER testing; however, Motorola’s BER test results are included for ease of reference. The BER CPC is that the BER must be equal to or below 2.6%, and Motorola’s coverage guarantee is that 95% of the tests will meet or exceed the CPC.

Table 7-6 BER Test Results

Table 7-6 shows the BER test results collected by Motorola. BER testing was only performed in the Motorola Covered Area.

Detailed BER test results can be found in Appendix F: Composite Results, and are displayed in Figure 7-8, Motorola BER.

7.5 DAQ Test Data
RaCE
SM
data includes:
 Mobile unit latitude and longitude
 Talk-In calculated DAQ (from the mobile) – date and time stamped 0 10
20 30
40 50
60 ‐112
‐110
‐108
‐106
‐104
‐102
‐100
‐98
‐96
‐94
‐92
‐90
‐88
‐86
‐84
‐82
‐80
‐78
‐76
‐74
‐72
‐70
‐68
‐66
‐64
‐62
‐60
‐58
‐56
‐54
‐52
‐50
‐48
‐46
‐44
‐44
Frequency
RSSI Level (dBm)
RSSI Distribution
Pass Fail Total %
1a 365 2 367 99.5%
1b 257 0 257 100.0%
Test Sector
Covered Area
AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
30  Talk-Out calculated DAQ (from the stat ionary position) – date and time stamped  Talk-in and Talk-out received audio records (recorded as .wav files)  Talk-in and Talk-out reference audio records (recorded as .wav files)  Audio message used for each test direction (talk-in and talk-out)  Time the audio file was recorded
 RSSI value collected by AECOM
 Grid Reference number for each gridded test tile
 Which test sector the tile was part of
 Whether the tile was in Motorola’s covered area, or just the service area

Using the data above, the following information is provided for post processing, as shown in the sample Excel spreadsheet in Table 7-7 below.

Table 7-7 Sample Excel Spreadsheet

The data spreadsheet is in Microsoft Excel format. The .wav files contain a link to the collected audio file for that test and will play when selected.

Wave File Direction Start Time Latitude Longitude Grid_Ref_Str DAQ_Score 00001.wav talk-in 2/6/2008 17:24 37.338487 -79.240112 4,4 3.9 00002.wav talk-out 2/6/2008 17:24 37.338475 -79.240138 5,4 3.5 00003.wav talk-in 2/6/2008 17:32 37.342162 -79.23593 5,5 3.4 00004.wav talk-out 2/6/2008 17:32 37.343645 -79.234908 5,6 3.7 00005.wav talk-in 2/6/2008 17:33 37.339798 -79.226513 4,6 3.5 00006.wav talk-out 2/6/2008 17:33 37.338575 -79.223762 4,7 3.8 00007.wav talk-in 2/6/2008 17:33 37.337398 -79.221977 5,7 3.9 00008.wav talk-out 2/6/2008 17:33 37.335903 -79.21969 6,7 3.4 San Francisco
OaklandBerkeley
Vallejo
Richmond
Pinole
Hercules
Albany
El Cerrito
Orinda
San Pablo
El Sobrante
Benicia
RodeoRodeo
CrockettCrockett
TiburonTiburon
KensingtonKensington
Tara HillsTara Hills
Bayview-MontalvinBayview-Montalvin
East Richmond HeightsEast Richmond Heights
RollingwoodRollingwood
Port CostaPort Costa
§¨¦80
§¨¦580
§¨¦80
§¨¦580
UV123
UV4
UV24
UV123
UV4 UV4
UV123
UV123
San Pablo Dam
Richmond
Ohio
Giant
20 San Pablo
23Rd
Cummings
Cedar
Rose
Cutting
Pinole Valley
Solano
Grizzly Peak
6Th
Castro
Marin
Market
Arlington
Barrett
University
Appian
3Rd
34Th
Hilltop
Gilman
37ThGarrard
Alhambra Valley
2Nd
Garvin
Atlas
Pomona
Harbour
M
arina
Parr
Carlson
Potrero
Castro Ranch
Key
Redwood
Blume
Rum
rill
Mcbryde
Crockett
Willow
Valley View
Macdonald
Pablo
Parker
Hopkins
Maricopa
Ashbury
Manila
Bancroft
Colusa
Spruce
Chesley
Fitzgerald
Sanford
1St
22Nd
Rivers
Monterey
Moeser
Dwight
39Th
Buchanan
Vale
San Mateo
Manor
Tehama
13Th
Sycamore
Tara Hills
Rumrill
San Pablo
Marin
Barrett
Potrero
Richmond
20 Castro Ranch
Barrett
San Pabl o
Colusa
2Nd
Arlington
20 Appian
Hilltop
San Pablo
23Rd
Barrett
San Pablo BaySan Pablo Bay
San Francisco BaySan Francisco Bay
Carquinez StraightCarquinez Straight
San Rafael BaySan Rafael Bay
Harbor ChannelHarbor Channel Richmond Inner HarborRichmond Inner Harbor San Pablo ReservoirSan Pablo Reservoir
Briones ReservoirBriones Reservoir
Richmond Marina BayRichmond Marina Bay
San Pablo CanalSan Pablo Canal
Santa Fe ChannelSanta Fe Channel
ReservoirReservoir
Anza LakeAnza Lake
Hilltop LakeHilltop Lake
Swanzy ReservoirSwanzy Reservoir
Maloney ReservoirMaloney Reservoir
Wildcat CreekWildcat Creek
Jewel LakeJewel Lake
Figure 7-3
Medium Building
Two-Way DAQ Test
APPROVED:

TRM- 08 June 2012
DESIGN:

DRAWN:

CHECKED:

REV
DATA SOURCE AND NOTES:

FILE NAME:
.

PROJECT NO: 60175932
CLIENT: EBRCSA
M:\Projects\Radio Projects\60091361_20175 EBRCSA\
Task E.00 RaCE Testing\CCCO West\Maps\
Figure 7-3 Medium Building Two_Way DAQ Test.mxd
FUO - 8 June 2012
KAB - 8 June 2012
GAD - 07 June 2012

DATE APPROVED BY
(434 ) 239-9200 www.aecom.com

TECHNOLOGY SOLUTIONS
AECOM TECHNICAL SERVICES, INC.
20715 TIMBERLAKE ROAD SUITE 106
LYNCHBURG, VA 24502
Legend
Medium Building Sector
Contra Costa West Test Sector
Pass (268) 0 1 2 3 40.5
Miles
Shape File data provided from ESRI
Pass: Tiles containing both a talk-in DAQ score ≥ 3
and a talk-out DAQ score ≥ 3.

Fail: Tiles with a completed test sequence and
either talk-in or talk-out DAQ scores < 3.

San Francisco
OaklandBerkeley
Vallejo
Richmond
Pinole
Hercules
Albany
El Cerrito
Orinda
San Pablo
El Sobrante
Benicia
RodeoRodeo
CrockettCrockett
TiburonTiburon
KensingtonKensington
Tara HillsTara Hills
Bayview-MontalvinBayview-Montalvin
East Richmond HeightsEast Richmond Heights
RollingwoodRollingwood
Port CostaPort Costa
§¨¦80
§¨¦580
§¨¦80
§¨¦580
UV123
UV4
UV24
UV123
UV4 UV4
UV123
UV123
San Pablo Dam
Richmond
Ohio
Giant
20 San Pablo
23Rd
Cummings
Cedar
Rose
Cutting
Pinole Valley
Solano
Grizzly Peak
6Th
Castro
Marin
Market
Arlington
Barrett
University
Appian
3Rd
34Th
Hilltop
Gilman
37ThGarrard
Alhambra Valley
2Nd
Garvin
Atlas
Pomona
Harbour
M
arina
Parr
Carlson
Potrero
Castro Ranch
Key
Redwood
Blume
Rum
rill
Mcbryde
Crockett
Willow
Valley View
Macdonald
Pablo
Parker
Hopkins
Maricopa
Ashbury
Manila
Bancroft
Colusa
Spruce
Chesley
Fitzgerald
Sanford
1St
22Nd
Rivers
Monterey
Moeser
Dwight
39Th
Buchanan
Vale
San Mateo
Manor
Tehama
13Th
Sycamore
Tara Hills
Rumrill
San Pablo
Marin
Barrett
Potrero
Richmond
20 Castro Ranch
Barrett
San Pabl o
Colusa
2Nd
Arlington
20 Appian
Hilltop
San Pablo
23Rd
Barrett
San Pablo BaySan Pablo Bay
San Francisco BaySan Francisco Bay
Carquinez StraightCarquinez Straight
San Rafael BaySan Rafael Bay
Harbor ChannelHarbor Channel Richmond Inner HarborRichmond Inner Harbor San Pablo ReservoirSan Pablo Reservoir
Briones ReservoirBriones Reservoir
Richmond Marina BayRichmond Marina Bay
San Pablo CanalSan Pablo Canal
Santa Fe ChannelSanta Fe Channel
ReservoirReservoir
Anza LakeAnza Lake
Hilltop LakeHilltop Lake
Swanzy ReservoirSwanzy Reservoir
Maloney ReservoirMaloney Reservoir
Wildcat CreekWildcat Creek
Jewel LakeJewel Lake
Figure 7-4
Portable on Street
Two-Way DAQ Test
APPROVED:

TRM - 8 June 2012
DESIGN:

DRAWN:

CHECKED:

REV
DATA SOURCE AND NOTES:

FILE NAME:
.

PROJECT NO: 60175932
CLIENT: EBRCSA
Shape File data provided from ESRI
Pass: Tiles containing both a talk-in DAQ score ≥ 3
and a talk-out DAQ score ≥ 3.

Fail: Tiles with a completed test sequence and
either talk-in or talk-out DAQ scores < 3.

M:\Projects\Radio Projects\60091361_20175 EBRCSA\
Task E.00 RaCE Testing\CCCO West\Maps\
Figure 7-4 Portable on Street Two_Way DAQ Test.mxd
FUO - 8 June 2012
KAB - 8 June 2012
GAD - 8 June 2012

DATE APPROVED BY
(434 ) 239-9200 www.aecom.com

TECHNOLOGY SOLUTIONS
AECOM TECHNICAL SERVICES, INC.
20715 TIMBERLAKE ROAD SUITE 106
LYNCHBURG, VA 24502
Legend
Fail (7)
Pass (512)
Contra Costa West Test Sector 0 1 2 3 40.5
Miles
San Francisco
OaklandBerkeley
Vallejo
Richmond
San Rafael
Pinole
Hercules
Albany
El Cerrito
Orinda
San Pablo
El Sobrante
RodeoRodeo
CrockettCrockett
TiburonTiburon
KensingtonKensington
Tara HillsTara Hills
Bayview-MontalvinBayview-Montalvin
East Richmond HeightsEast Richmond Heights
RollingwoodRollingwood
Port CostaPort Costa
§¨¦80
§¨¦580
§¨¦80
§¨¦580
UV123
UV4
UV13
UV24
UV4
UV123
UV4
UV123
UV123
San Pablo Dam
Richmond
Ohio
Giant
20 Grizzly Peak
San Pablo
23Rd
Dwight
Cedar
Rose
Cutting
Cummings
Pinole Valley
6Th
Solano
Castro
Marin
Market
Arlington
Barrett
University
Claremont
Appian
7Th
3Rd
34Th
Hilltop
Gilman
37ThGarrard
2Nd
Alhambra Valley
Garvin
Atlas
Pomona
Harbour
College
M
arina
Parr
Sacram
ento
Carlson
Potrero
Castro Ranch
Key
Redwood
Blume
Rum
rill
Mcbryde
Crockett
Willow
Valley View
Telegraph
Macdonald
Pablo
Parker
Hopkins
Maricopa
Ashbury
Manila
Bancroft
Colusa
Spruce
Chesley
Fitzgerald
Adeline
Sanford
1St
Skyline
22Nd
Rivers
Monterey
Moeser
39Th
Buchanan
Vale
San Mateo
Manor
Tehama
13Th
Sycamore
Tara Hills
Rumrill
Richmond
Castro Ranch
Barrett
Marin
23Rd
San Pabl o
Arlington
Potrero
Barrett
Colusa
University
2Nd
20 Appian
Hilltop
San Pablo San Pablo
Barrett
San Pablo BaySan Pablo Bay
San Francisco BaySan Francisco Bay
San Rafael BaySan Rafael Bay
Carquinez StraightCarquinez Straight
Harbor ChannelHarbor Channel Richmond Inner HarborRichmond Inner Harbor San Pablo ReservoirSan Pablo Reservoir
Briones ReservoirBriones Reservoir
Richmond Marina BayRichmond Marina Bay
San Pablo CanalSan Pablo Canal
Santa Fe ChannelSanta Fe Channel
ReservoirReservoir
Anza LakeAnza Lake
Hilltop LakeHilltop Lake
Lauritzen ChannelLauritzen Channel
Maloney ReservoirMaloney Reservoir
Wildcat CreekWildcat Creek
Jewel LakeJewel Lake
Figure 7-5
RaCE Talk-In
Delivered Audio
Quality (DAQ)
APPROVED:

GDM - 15 July 2011
DESIGN:

DRAWN:

CHECKED:

REV
DATA SOURCE AND NOTES:

FILE NAME:
.

PROJECT NO: 60175932
CLIENT: EBRCSA
Shape File data provided from ESRI
M:\Projects\Radio Projects\60091361_20175 EBRCSA\
Task E.00 RaCE Testing\CCCO West\Maps\
Figure 7-5 RaCE_Talk-In DAQ.mxd
MJL - 15 July 2011
MJL - 15 July 2011
GDM - 15 July 2011

DATE APPROVED BY
(434 ) 239-9200 www.aecom.com

TECHNOLOGY SOLUTIONS
AECOM TECHNICAL SERVICES, INC.
20715 TIMBERLAKE ROAD SUITE 106
LYNCHBURG, VA 24502
Legend
Medium Building Sector
DAQ < 3 (5)
DAQ ≥ 3 (514)
1 June 8 2012 KAB - 8 June 2012
San Francisco
OaklandBerkeley
Vallejo
Richmond
Pinole
Hercules
Albany
El Cerrito
Orinda
San Pablo
El Sobrante
Benicia
RodeoRodeo
CrockettCrockett
TiburonTiburon
KensingtonKensington
Tara HillsTara Hills
Bayview-MontalvinBayview-Montalvin
East Richmond HeightsEast Richmond Heights
RollingwoodRollingwood
Port CostaPort Costa
EmeryvilleEmeryville
§¨¦80
§¨¦580
§¨¦80
§¨¦580
UV123
UV4
UV13 UV13
UV4
UV123
UV4
UV123
UV123
San Pablo Dam
Richmond
Ohio
Grizzly Peak
Giant
20 San Pablo
23Rd
Dwight
Cummings
Cedar
Rose
Cutting
Pinole Valley
6Th
Solano
Castro
Claremont
Marin
Market
Arlington
Barrett
University
Appian
7Th
3Rd
34Th
Hilltop
Gilman
37Th
Alcatraz
Garrard
Alhambra Valley
2Nd
College
Garvin
Atlas
Pomona
Sacram
ento
Harbour
M
arina
Parr
Carlson
Potrero
Castro Ranch
Telegraph
Key
Redwood
Blume
Rum
rill
Mcbryde
Crockett
Willow
Valley View
Macdonald
Pablo
Parker
Hopkins
Maricopa
Adeline
Ashbury
Manila
Bancroft
Colusa
Spruce
Chesley
Skyline
Fitzgerald
Sanford
1St
22Nd
Cald ecott
Rivers
Monterey
Moeser
39Th
Buchanan
Vale
San Mateo
Manor
Broadway
Tehama
13Th
Sycamore
Chabot
Tara Hills
20 Barrett
Barrett
Rumrill
Colusa
Marin
Hilltop
Potrero
San Pabl o
Castro Ranch
Richmond
23Rd
Barrett
Arlington
Appian
20 2Nd
San Pablo San Pa blo
San Pablo BaySan Pablo Bay
San Francisco BaySan Francisco Bay
San Rafael BaySan Rafael Bay
Carquinez StraightCarquinez Straight
Harbor ChannelHarbor Channel Richmond Inner HarborRichmond Inner Harbor San Pablo ReservoirSan Pablo Reservoir
Briones ReservoirBriones Reservoir
Richmond Marina BayRichmond Marina Bay
San Pablo CanalSan Pablo Canal
Santa Fe ChannelSanta Fe Channel
ReservoirReservoir
Anza LakeAnza Lake
Hilltop LakeHilltop Lake
Maloney ReservoirMaloney Reservoir
Wildcat CreekWildcat Creek
Jewel LakeJewel Lake
Figure 7-6
RaCE Talk-Out
Delivered Audio
Quality (DAQ)
APPROVED:

GDM - 15 July 2011
DESIGN:

DRAWN:

CHECKED:

REV
DATA SOURCE AND NOTES:

FILE NAME:
.

PROJECT NO: 60175932
CLIENT: EBRCSA
Shape File data provided from ESRI
M:\Projects\Radio Projects\60091361_20175 EBRCSA\
Task E.00 RaCE Testing\CCCO West\Maps\
Figure 7-6 RaCE_Talk-Out DAQ.mxd
MJL - 15 July 2011
MJL - 15 July 2011
GDM - 15 July 2011

DATE APPROVED BY
(434 ) 239-9200 www.aecom.com

TECHNOLOGY SOLUTIONS
AECOM TECHNICAL SERVICES, INC.
20715 TIMBERLAKE ROAD SUITE 106
LYNCHBURG, VA 24502
Legend
Medium Building Sector
DAQ < 3 (2)
DAQ ≥ 3 (516)
1 June 8 2012 KAB - 8 June 2012
San Francisco
OaklandBerkeley
Vallejo
Richmond
Pinole
Hercules
Albany
El Cerrito
Orinda
San Pablo
El Sobrante
RodeoRodeo
CrockettCrockett
TiburonTiburon
KensingtonKensington
Tara HillsTara Hills
Bayview-MontalvinBayview-Montalvin
East Richmond HeightsEast Richmond Heights
RollingwoodRollingwood
EmeryvilleEmeryville
Port CostaPort Costa
§¨¦80
§¨¦580
§¨¦80
§¨¦580
UV123
UV4
UV13 UV13
UV4
UV123
UV4
UV123
UV123
San Pablo Dam
Richmond
Ohio
Grizzly Peak
Giant
20 San Pablo
23Rd
Dwight
Cedar
Rose
Cutting
Cummings
Pinole Valley
6Th
Solano
Claremont
Castro
Marin
Market
Arlington
Barrett
University
Appian
Alcatraz
7Th
3Rd
34Th
Hilltop
Gilman
37ThGarrard
Alhambra Valley
College
2Nd
Garvin
Atlas
Pomona
Sacram
ento
Harbour
M
arina
Parr
Carlson
Potrero
Broadway
Telegraph
Castro Ranch
Key
Redwood
Blume
Rum
rill
Mcbryde
Crockett
Willow
Valley View
Macdonald
Pablo
Adeline
Parker
Hopkins
Maricopa
Ashbury
Skyline
Manila
Bancroft
Colusa
Spruce
Chesley
Fitzgerald
Sanford
1St
22Nd
Cald ecott
Rivers
Monterey
Moeser
39Th
Chabot
Buchanan
Vale
San Mateo
Manor
Tehama
13Th
Sycamore
Tara Hills
Arlington
Barrett
Rumrill
Hilltop
Marin
20 Castro Ranch
Potrero
San Pabl o
Colusa
23Rd
Barrett
Appian
Richmond
2Nd
San Pablo San Pablo
Barrett
San Pablo BaySan Pablo Bay
San Francisco BaySan Francisco Bay
San Rafael BaySan Rafael Bay
Harbor ChannelHarbor Channel Richmond Inner HarborRichmond Inner Harbor San Pablo ReservoirSan Pablo Reservoir
Carquinez StraightCarquinez Straight
Briones ReservoirBriones Reservoir
Richmond Marina BayRichmond Marina Bay
San Pablo CanalSan Pablo Canal
Santa Fe ChannelSanta Fe Channel
ReservoirReservoir
Anza LakeAnza Lake
Hilltop LakeHilltop Lake
Lauritzen ChannelLauritzen Channel
Maloney ReservoirMaloney Reservoir
Wildcat CreekWildcat Creek
Jewel LakeJewel Lake
Figure 7-7
RaCE
Receive Signal
Strength Indicator (RSSI)
APPROVED:

TRM - 08 June 2012
DESIGN:

DRAWN:

CHECKED:

REV
DATA SOURCE AND NOTES:

FILE NAME:
.

PROJECT NO: 60175932
CLIENT: EBRCSA
Shape File data provided from ESRI
RSSI alone does not provide an accurate
determination of voice coverage.

Values shown are for Motorola XTS and
XTL radios.

M:\Projects\Radio Projects\60091361_20175 EBRCSA\
Task E.00 RaCE Testing\CCCO West\Maps\
Figure 7-7 RaCE_RSSI.mxd
FUO - 8 June 2012
KAB - 8 June 2012
GAD - 08 June 2012

DATE APPROVED BY
(434 ) 239-9200 www.aecom.com

TECHNOLOGY SOLUTIONS
AECOM TECHNICAL SERVICES, INC.
20715 TIMBERLAKE ROAD SUITE 106
LYNCHBURG, VA 24502
Legend
Medium Building Sector
No Coverage
Mobile Only: ≥ -108.55dBm
Portable On Street: ≥ -99.18 dBm
Light Building: ≥ -93.18 dBm
Medium Building: ≥ -84.18 dBm
San Francisco
OaklandBerkeley
Vallejo
Richmond
Pinole
Hercules
Albany
El Cerrito
Orinda
San Pablo
El Sobrante
Benicia
RodeoRodeo
CrockettCrockett
TiburonTiburon
KensingtonKensington
Tara HillsTara Hills
Bayview-MontalvinBayview-Montalvin
East Richmond HeightsEast Richmond Heights
RollingwoodRollingwood
Port CostaPort Costa
§¨¦80
§¨¦580
§¨¦80
§¨¦580
UV123
UV4
UV24
UV123
UV4 UV4
UV123
UV123
San Pablo Dam
Richmond
Ohio
Giant
20 San Pablo
23Rd
Cummings
Cedar
Rose
Cutting
Pinole Valley
Solano
Grizzly Peak
6Th
Castro
Marin
Market
Arlington
Barrett
University
Appian
3Rd
34Th
Hilltop
Gilman
37ThGarrard
Alhambra Valley
2Nd
Garvin
Atlas
Pomona
Harbour
M
arina
Parr
Carlson
Potrero
Castro Ranch
Key
Redwood
Blume
Rum
rill
Mcbryde
Crockett
Willow
Valley View
Macdonald
Pablo
Parker
Hopkins
Maricopa
Ashbury
Manila
Bancroft
Colusa
Spruce
Chesley
Fitzgerald
Sanford
1St
22Nd
Rivers
Monterey
Moeser
Dwight
39Th
Buchanan
Vale
San Mateo
Manor
Tehama
13Th
Sycamore
Tara Hills
Rumrill
San Pablo
Marin
Barrett
Potrero
Richmond
20 Castro Ranch
Barrett
San Pabl o
Colusa
2Nd
Arlington
20 Appian
Hilltop
San Pablo
23Rd
Barrett
San Pablo BaySan Pablo Bay
San Francisco BaySan Francisco Bay
Carquinez StraightCarquinez Straight
San Rafael BaySan Rafael Bay
Harbor ChannelHarbor Channel Richmond Inner HarborRichmond Inner Harbor San Pablo ReservoirSan Pablo Reservoir
Briones ReservoirBriones Reservoir
Richmond Marina BayRichmond Marina Bay
San Pablo CanalSan Pablo Canal
Santa Fe ChannelSanta Fe Channel
ReservoirReservoir
Anza LakeAnza Lake
Hilltop LakeHilltop Lake
Swanzy ReservoirSwanzy Reservoir
Maloney ReservoirMaloney Reservoir
Wildcat CreekWildcat Creek
Jewel LakeJewel Lake
Figure 7-8
Motorola
Bit Error Rate
(BER) Measurement
APPROVED:

GDM - 15 July 2011
DESIGN:

DRAWN:

CHECKED:

REV
DATA SOURCE AND NOTES:

FILE NAME:
.

PROJECT NO: 60175932
CLIENT: EBRCSA
Shape File data provided from ESRI
M:\Projects\Radio Projects\60091361_20175 EBRCSA\
Task E.00 RaCE Testing\CCCO West\Maps\
Figure 7-8 Motorola BER.mxd
MJL - 15 July 2011
MJL - 15 July 2011
GDM - 15 July 2011

DATE APPROVED BY
(434 ) 239-9200 www.aecom.com

TECHNOLOGY SOLUTIONS
AECOM TECHNICAL SERVICES, INC.
20715 TIMBERLAKE ROAD SUITE 106
LYNCHBURG, VA 24502
Legend
Motorola Median BER
BER <= 2% (625)
BER > 2% <= 5% (1)
BER > 5% (2)
Medium Building Sector
Contra Costa West Test Sector
San Francisco
OaklandBerkeley
Vallejo
Richmond
Pinole
Hercules
Albany
El Cerrito
Orinda
San Pablo
El Sobrante
Benicia
RodeoRodeo
CrockettCrockett
TiburonTiburon
KensingtonKensington
Tara HillsTara Hills
Bayview-MontalvinBayview-Montalvin
East Richmond HeightsEast Richmond Heights
RollingwoodRollingwood
Port CostaPort Costa
§¨¦80
§¨¦580
§¨¦80
§¨¦580
UV123
UV4
UV24
UV123
UV4 UV4
UV123
UV123
San Pablo Dam
Richmond
Ohio
Giant
20 San Pablo
23Rd
Cummings
Cedar
Rose
Cutting
Pinole Valley
Solano
Grizzly Peak
6Th
Castro
Marin
Market
Arlington
Barrett
University
Appian
3Rd
34Th
Hilltop
Gilman
37ThGarrard
Alhambra Valley
2Nd
Garvin
Atlas
Pomona
Harbour
M
arina
Parr
Carlson
Potrero
Castro Ranch
Key
Redwood
Blume
Rum
rill
Mcbryde
Crockett
Willow
Valley View
Macdonald
Pablo
Parker
Hopkins
Maricopa
Ashbury
Manila
Bancroft
Colusa
Spruce
Chesley
Fitzgerald
Sanford
1St
22Nd
Rivers
Monterey
Moeser
Dwight
39Th
Buchanan
Vale
San Mateo
Manor
Tehama
13Th
Sycamore
Tara Hills
Rumrill
San Pablo
Marin
Barrett
Potrero
Richmond
20 Castro Ranch
Barrett
San Pabl o
Colusa
2Nd
Arlington
20 Appian
Hilltop
San Pablo
23Rd
Barrett
San Pablo BaySan Pablo Bay
San Francisco BaySan Francisco Bay
Carquinez StraightCarquinez Straight
San Rafael BaySan Rafael Bay
Harbor ChannelHarbor Channel Richmond Inner HarborRichmond Inner Harbor San Pablo ReservoirSan Pablo Reservoir
Briones ReservoirBriones Reservoir
Richmond Marina BayRichmond Marina Bay
San Pablo CanalSan Pablo Canal
Santa Fe ChannelSanta Fe Channel
ReservoirReservoir
Anza LakeAnza Lake
Hilltop LakeHilltop Lake
Swanzy ReservoirSwanzy Reservoir
Maloney ReservoirMaloney Reservoir
Wildcat CreekWildcat Creek
Jewel LakeJewel Lake
Figure 7-9
RaCE Channel
Grant Failure
APPROVED:

GDM - 15 July 2011
DESIGN:

DRAWN:

CHECKED:

REV
DATA SOURCE AND NOTES:

FILE NAME:
.

PROJECT NO: 60175932
CLIENT: EBRCSA
Shape File data provided from ESRI
M:\Projects\Radio Projects\60091361_20175 EBRCSA\
Task E.00 RaCE Testing\CCCO West\Maps\
Figure 7-9 RaCE_Channel Grant Failure.mxd
MJL - 15 July 2011
MJL - 15 July 2011
GDM - 15 July 2011

DATE APPROVED BY
(434 ) 239-9200 www.aecom.com

TECHNOLOGY SOLUTIONS
AECOM TECHNICAL SERVICES, INC.
20715 TIMBERLAKE ROAD SUITE 106
LYNCHBURG, VA 24502
Legend
Channel Grant Failure (3)
Medium Building Sector
Contra Costa West Test Sector
AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
31 8 Conclusions
AECOM performed two-way DAQ testing in every accessible tile. We listened to all test files with a DAQ score of 3 or lower, and a sampling of the remaining messages. The test results show that the Contra Costa County West simulcast cell meets the coverage requirement of the specifications.

Based on the results AECOM observed, the radio coverage in the Contra Costa County West simulcast cell meets the EBRCSA specifications. Therefore, we recommend that the EBRCS Authority approves the coverage acceptance test of the Contra Costa County West simulcast cell.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
32 Appendix A RaCE
SM & Test Vehicle Procedures
A.1 Pre-Test Procedures
On arrival at the central testing location, the following procedures will be executed:
 Verify installation of approved version of the RaCE
SM
software on all laptops.
 Set and verify audio levels for each installed radio.  Mobile Unit – Ensure that the mobile unit remains in the correct configuration as indicated in Figure 3-1.  Stationary Unit – Reproduce t he stationary configuration established above in Figure 3-2.  Verify the Mobile Unit has the correct Contra Co sta County trunked system frequencies input into RaCE SM
.
 Install mobile RaCE
SM
system into vehicle and verify system operation using the assigned AECOM talk group.  Extract data from RaCE
SM
mobile and stationary units and verify that the data is acceptable in post processing.  Send RaCE
SM
test results and project files to AECOM project engineer for validation.

A.2 Daily Test Procedures
Before commencing testing each day, the following procedures will be executed:
 Visually inspect the RaCE
SM
stationary and mobile unit, ensure all cables are properly connected and verify correct attenuation on the mobile circulator network for the area under test.  Proceed to collect data until each accessible tile has been tested.

A.3 Conclusion of each Day of Testing
At the conclusion of testing each shift, the following procedures will be executed:
 Extract data from the RaCE
SM
mobile and stationary computers and place on the external hard drive.  Note the days’ progress and any other pertinent information necessary and send to AECOM project engineer for review.  Run the RaCE
SM
post-processing software
 Verify that the extracted RaCE
SM
data is properly correlated and merged. If not, contact the AECOM project engineer for troubleshooting.
 Preserve the extracted RaCE
SM
data on the external storage device.

A.4 Conclusion of Testing
At the conclusion of testing the following procedures will be executed:
 Ensure all test data are extracted and preserved.
 Return all AECOM equipment back to Sacramento.
 Return all Motorola and EBRCSA supplied equipment to its owner in Contra Costa County.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
33 Appendix B EBRCSA Supplied Equipment
The following list contains the EBRCSA supplied equipment necessary for the Contra Costa County West testing.

Figure B-1 EBRCSA Supplied Equipment and Quality
Equipment Quantity
Mobile Radio
APX-7500
(control heads mounted on the radio)
Vehicle install Kit
(includes accessory and power cables and mounting
trunion)
Hand Held Microphone 3
Magnetic Mount Antennas
(BNC connectors)
3 3
7 AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
34 Portable Antenna Location Overall Gain
Hip -8.50 dBd
Antenna Radiative Gain (Assumed) 2.15 dBi 0.00 dBd
Antenna Resistive Loss (Assumed) -10.65 dBi -8.50 dBd
Portable Receiver

0.25 µV -119.03 dBm
Static C/N Ratio (from TSB-88.1-C) 6.50 dB
Noise Floor -125.53 dBm
Faded C/N Ratio (from TSB-88.1-C) 15.70 dB
Sensitivity -109.83 dBm
Noise
Effective Noise Bandwidth (from TSB-88-B) 5.50 kHz
Thermal Noise (kTB) -136.57 dBm
Environmental Noise (above kTB) 0.00 dB
Total Noise -136.57 dBm
Noise Figure
Receiver Noise Floor -125.53 dBm
Thermal Noise Floor -136.57 dBm
Receiver Noise Figure 11.04 dBm
System
Total Noise Input -136.57 dBm
Gain Noise Figure
Antenna Resistive Loss -10.65 dB 10.65 dB
Receiver 0.00 dB 11.04 dB
Composite System Gain and Noise Figure -10.65 dB 21.69 dB -125.53 dBm
Faded C/N Ratio 15.70 dB
Sensitivity at Receiver -109.83 dBm
Composite System Gains -10.65 dB
-99.18 dBm
Antenna Radiative Gain 0.00 dBd
System Sensitivity -99.18 dBm
Receiver System Sensitivity -99.18 dBm
Portable Location Attenuation Signal Strength
Outdoor 0.00 dB -99.18 dBm
Light Building 6.00 dB -93.18 dBm
Medium Building 15.00 dB -84.18 dBm
ArcView Display Parameters
Portable Receiver System
Static Sensitivity (from Manufacturer Specification Sheet) Noise at Receiver {No = [Ni + (F - 1) * kTB] * g}
Receiver System Sensitivity (Accounting for Antenna Resistive Appendix C Received Signal Strength Threshold Calculations The following tables show the calculations used to determine the thresholds for various levels of coverage based on RSSI.

Table C-1 Portable Radio RSSI Threshold Level Calculations

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
35 Mobile Antenna Make & Model Gain
-1.00 dBd
Cables Diameter/Type Unit Loss Length Loss
Coax from Antenna to Receiver Low-Loss RG-58 8.51 dB/100 ft 15 ft 1.28 dB Receiver

0.25 µV -119.03 dBm
Static C/N Ratio (from TSB-88.1-C) 6.50 dB
Noise Floor -125.53 dBm
Faded C/N Ratio (from TSB-88.1-C) 15.70 dB
Sensitivity -109.83 dBm
Noise
Effective Noise Bandwidth 5.50 kHz
Thermal Noise (kTB) -136.57 dBm
Environmental Noise (above kTB) 0.00 dB
Total Noise -136.57 dBm
Noise Figure
Receiver Noise Floor -125.53 dBm
Thermal Noise Floor -136.57 dBm
Receiver Noise Figure 11.04 dBm
System
Total Noise Input -136.57 dBm
Gain Noise Figure
Cable -1.28 dB 1.28 dB
Receiver 0.00 dB 11.04 dB
Composite System Gain and Noise Figure -1.28 dB 12.32 dB -125.53 dBm
Faded C/N Ratio 15.70 dB
Sensitivity at Receiver -109.83 dBm
Composite System Gains -1.28 dB
Receiver System Sensitivity -108.55 dB
Antenna Gain -1.00 dBd
System Sensitivity -107.55 dBm
Location Signal Strength
Mobile -108.55 dBm
Static Sensitivity (from manufacturer specification sheet) Noise at Receiver {No = [Ni + (F - 1) * kTB] * g}
Mobile Receiver System

Table C-2 Mobile Radio RSSI Threshold Level Calculation

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
36 Appendix D Checklists
The following Figures are checklists and forms that were used during the Contra Costa County RaCE SM
Automated Coverage
Testing.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
37 Figure D-1 Master Checklist

Client Name
Project Number
RaCE Unit Serial Numbers
Manufacturer & Model
Serial Number
Radios
Manufacturer & Model
Serial Number
RaCE Unit Serial Numbers
Manufacturer & Model
Serial Numbers
Manufacturer & Model
Serial Numbers
Step 1: Determine Radio/System Requirements

1.1 Programming of Radios complete JMK

1.2 System configuration complete JMK

1.3 Hardware requirement complete JMK
JMK
Step 2: Determine or Develop Radio Interface JMK
JMK
GDM
GDM
Step 5: Bench Setup / Setting Audio Levels
JMK
GDM
GDM
GDM
GDM
GDM
GDM
GDM
Name
Signature Date: 8/2/2011
Step 10: Return Customer Equipment 6/24/2011
Step 11: Restock Equipment, Archive & Clear data from Laptops 6/27/2011 Step 8: Daily Checklists 6/17-6/22/2011
Step 9: Final Report 8/2/2011
Step 6: Inventory Sheet 6/13/2011
Step 7: Arriv al Setup Checklist 6/16/2011

5.1 Bench Setup 5/14/2011

5.2 Set Audio Levels 6/16/2011
Step 4: RaCE Software Settings

4.1 Stationary Project File 6/16/2011

4.2 Mobile Project File 6/16/2011

1.4 Sites/Frequencies complete 5/13/2011
5/18/2011
Step 3: Configure Circulator 5/18/2011
656CLZ6496
Date Complete / Initial
5/13/2011
5/13/2011
5/13/2011
M06
Computers
LENOVO T-61
L3 C2113
Radios
Motorola APX 7500
LENOVO T-61
L3 C2104
Motorola APX 7500
656CLZ6480
RaCE Mobile Units
EBRCSA-Contra Costa West
60091361
RaCE Stationary Units
S06
Computers

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
38 Figure D-2 Inventory Checklist

Client Name
Project Number
RaCE Stationary Unit Pirmary Secondary
AC Power Cord
DC Power Cord
RF Power Sensor Cable (RCA)
Radio Control Interface Cable
USB Cables for laptop
Power Cord for Customer Radio
DC Power Supply Adapter
Radio Model XTL5000/Spare
RF Cable from customer radio
Sniffer
RF Attenuator (optional)
Antenna
Adapters to interconnect above items
Laptop
Laptop Power Supply
GPS Receiver
USB extension cord for GPS
RaCE Mobile Unit Primary Secondary
Radio Model XTS2500/Spare
AC Power Cord
DC Power Cord
RF Power Sensor Cable (RCA)
Radio Control Interface Cable
USB Cables for laptop
Power Cord for Customer Radio
DC Power Supply Adapter
Networking Cable
RF Cable from customer radio
Sniffer
Antennas for Radio, RSSI, BER
Optoelectronics Digital Scout (optional if measuring TX Freq.) Scout Data Cable
Scout DC Power Cable
RF Sampler
RF Cable to Sampler
Circulator Network (optional)
Adapters to interconnect above items
Laptop
Laptop Power Supply (DC Adapter)
GPS/DR Receiver
USB extension cord for GPS
BER Radio
60091361
EBRCSA-Contra Costa West

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
39 Figure D-3 Arrival Checklist

Client Name
Project Number
Stationary Unit Setup
RaCE Unit Serial Number
Antenna Mounting Location
Name
Address
City, State
Latitude
Longitude
RaCE Unit Serial Number
Vehicle Year, Make & Model
Antenna Mounting on Vehicle
(-55)-(-60) Measured with Ramsey Comm Analyzer at window.

Name: Gary Mountcastle
60091361

2. Confirm the results of the mobile and stationary units in RaCE Explorer.

Verify .wav file amplitude and timing is correct.

37.97752
-122.32323

3. Assure secondary Jurisdiction radio that is not part of the test, if present, cannot transmit OR receiv e
3150 Garrity Way
S06
Window ledge of hotel room.

Courtyard Marriott
Signature
Pre-Tes t Checklis t

4. Establish location and take reference measurement(s) of local Control Channel(s)
Ford Crown Vic
Mobile-Center front of roof,Icom1-Back left of
roof,Icom2-Back right of roof.

EBRCSA-Contra Costa West

1. Initiate the RaCE self-diagnostic tests to insure that the system is operating correctly.

Notes:

Mobile Unit Setup
Notes: Room 512
Test Set Location
M06
Richmond, CA 94806

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
40 Figure D-4 Daily Checklist

1 2
3 4

5 6
1 2
3 Notes:

Name
Signature Date: 6/17/2011-6/22/2011
End of Shift Checklist
Provide Email to AECOM project engineer indicating number of grids tested, location of testing and any issues encountered.

Assure Jurisdiction radio that is not part of the test, if present, cannot transmit OR receive Deputy Audrey CatwezaDriver(s)
Verify the attenuation is correctly set.

Verify Mobile and Stationary Audio levels and timing are correct.

Verify Control Channel(s) are on expected frequency and at the approximate dBm level.

Forms completed for 6/17/11-6/22/11
Gary Mountcastle
Process the raw data through RaCE Explorer. Review the test results with an emphasis on checking:

1. Stationary and Mobile correlation.

2. Stationary and Mobile wave form timing and amplitude.

Extract data from the mobile and stationary computers and transfer to external hard drive NA
Daily Pre-Test Checklist
Gary Mountcastle
Ford Crown Vic
Client Name
60091361
EBRCSA-Contra Costa West
Test System Operator(s)
Vehicle License Plate #
Vehicle Make & Model
Date
Project Number
All days were sunny and clear. Cool in morning and
evening and warmer during the day.

Manufacturer Representative
Weather Conditions
Configure Mobile Systems for daily operation.

Configure Stationary Systems for daily operation.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
41 Figure D-5 Mobile Unit Software Settings Checklist

RaCE Releas e Number
Client Name
Project Number
Primary Test Unit Secondary Test Unit
Test Type Continuous, by Time Continuous, by Time
Continuous, by Grid Continuous, by Grid
Test Mode TX + RX TX + RX
RX RX + Access
RX + Access RX + Access
Access Access

RSII RSSI
TX + RX TX
Radio System Type Trunked Trunked
Conventional Conventional
Radio System Mode Analog Analog
Digital IMBE Digital IMBE
VOX Activ ation Yes Yes
No No
Collect pre/post - VOX audio? Yes Yes
No No
Minimum Speed to Start Sequence
System Manufacturer
Verify IQS to DAQ Conversion Tables
Verify Primary RSSI Conversion Tables
Verify Secondary RSSI Conversion Tables
Maximum Transmit Duty Cycle % %
Map File
TX/Reference Message Files
RaCE Mobile Project File Name

3.05 EBRCSA-Contra Costa West
60091361
CCC_West_Mobile_Medium Building.5op
CCC_West_Mobile_Portable on Street.5op

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
42 Figure D-6 Software Settings Stationary Checklist

RaCE Release Number
Client Name
Project Number
Test Type Continuous, by Time Continuous, by Time
Continuous, by Grid Continuous, by Grid
Test Mode TX + RX TX + RX
RX RX + Access
RX + Access RX + Access
Access Access

RSII RSSI
TX + RX TX
Radio System Type Trunked Trunked
Conventional Conventional
Radio System Mode Analog Analog
Digital IMBE Digital IMBE
VOX Activ ation Yes Yes
No No
Collect pre/post - VOX audio? Yes Yes
No No
System Manufacturer
Verify IQS to DAQ Conversion Tables
Maximum Transmit Duty Cycle %%
TX/Reference Message Files
RaCE Stationary Project File Name CCC_West_Stationary.5op EBRCSA-Contra Costa West
60091361

3.05 AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
43 Figure D-7 Audio Levels

Client Name
Project Number
Stationary Unit
TX - Audio Setting (Deviation) NA - Digital Modulation
RaCE Interface Switch 2 (0-10)
RaCE Interface Potentiometer 0:00 (Clock Position)
Computer Volume Lock - Speaker 50 (0-100)
Computer Volume Lock - Wave 50 (0-100)
RX - Audio Settings
Customer Radio Volume Setting Upper left corner of control head RaCE Interface Switch 2 (0-10)
RaCE Interface Potentiometer 10:00 ( Clock Position )
Computer Volume Lock - Line In 50 (0-100)
Mobile Unit
TX - Audio Setting (Deviation) NA - Digital Modulation
RaCE Interface Switch 2 (0-10)
RaCE Interface Potentiometer 14:00 (Clock Position)
Computer Volume Lock - Speaker 50 (0-100)
Computer Volume Lock - Wave 50 (0-100)
RX - Audio Settings
Customer Radio Volume Setting Upper left corner of control head RaCE Interface Switch 2 (0-10)
RaCE Interface Potentiometer 1:00 ( Clock Position )
Computer Volume Lock - Line In 50 (0-100)
60091361
EBRCSA-Contra Costa West
AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
44 Figure D-8 Radio Interface

Radio Control Pinout
DB9-Pin Motorola
1 TX Audio - Hi <---------> 3
2 TX Audio - Lo <---------> 4
3 Gnd <---------> 10
4 PTT <---------> 8
5 RX Audio - Hi <---------> Speaker-Hi
6 RX Audio - Lo <---------> Speaker-Lo
Notes:

Pinout numbers in Motorola connector diagram are for reference only.

Cable connects to control head of Motorola APX 7500
Project Number
Client Name
60091361
EBRCSA-Contra Costa West
Molex
Connector
1 10
4 9
5 8
7 6
2 3
AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
45 Appendix E Standard Harvard Phrases

Harvard Sentences
From the appendix of: IEEE Subcommittee on Subjective Measurements IEEE Recommended Practices for Speech Quality Measurements. IEEE Transactions on Audio and Electroacoustics. Vol 17, 227-46, 1969. Also found at CMU site.

Two hundred messages from the Harvard Sentences were used during the coverage testing. The selected phrases used in the messages are shown below. Test messages of five to eight seconds were used for coverage testing, with randomly sorted messages that were half and half male and female voices.

Phrases used for male audio recordings:

List 2

1. The boy was there when the sun rose.

2. A rod is used to catch pink salmon.

3. The source of the huge river is the clear spring.

4. Kick the ball straight and follow through.

5. Help the woman get back to her feet.

6. A pot of tea helps to pass the evening.

7. Smoky fires lack flame and heat.

8. The soft cushion broke the man’s fall.

9. The salt breeze came across from the sea.

10. The girl at the booth sold fifty bonds.

List 4

1. Hoist the load to your left shoulder.

2. Take the winding path to reach the lake.

3. Note closely the size of the gas tank.

4. Wipe the grease off his dirty face.

5. Mend the coat before you go out.

6. The wrist was badly strained and hung limp.

7. The stray cat gave birth to kittens.

8. The young girl gave no clear response.

9. The meal was cooked before the bell rang.

10. What joy there is in living.

List 7

1. We talked of the slide show in the circus.

2. Use a pencil to write the first draft.

3. He ran half way to the hardware store.

4. The clock struck to mark the third period.

5. A small creek cut across the field.

6. Cars and busses stalled in snow drifts.

7. The set of china hit, the floor with a crash.

8. This is a grand season for hikes on the road.

9. The dune rose from the edge of the water.

10. Those words were the cue for the actor to leave

List 8

1. A yacht slid around the point into the bay.

2. The two met while playing on the sand.

3. The ink stain dried on the finished page.

4. The walled town was seized without a fight.

5. The lease ran out in sixteen weeks.

6. A tame squirrel makes a nice pet.

7. The horn of the car woke the sleeping cop.

8. The heart beat strongly and with firm strokes.

9. The pearl was worn in a thin silver ring.

10. The fruit peel was cut in thick slices.

List 9

1. The Navy attacked the big task force.

2. See the cat glaring at the scared mouse.

3. There are more than two factors here.

4. The hat brim was wide and too droopy.

5. The lawyer tried to lose his case.

6. The grass curled around the fence post.

7. Cut the pie into large parts.

8. Men strive but seldom get rich.

9. Always close the barn door tight.

10. He lay prone and hardly moved a limb.

List 10

1. The slush lay deep along the street.

2. A wisp of cloud hung in the blue air.

3. A pound of sugar costs more than eggs.

4. The fin was sharp and cut the clear water.

5. The play seems dull and quite stupid.

6. Bail the boat, to stop it from sinking.

7. The term ended in late June that year.

8. A tusk is used to make costly gifts.

9. Ten pins were set in order.

10. The bill was paid every third week.

List 13

1. Type out three lists of orders.

2. The harder he tried the less he got done.

3. The boss ran the show with a watchful eye.

4. The cup cracked and spilled its contents.

5. Paste can cleanse the most dirty brass.

6. The slang word for raw whiskey is booze.

7. It caught its hind paw in a rusty trap.

8. The wharf could be seen at the farther shore.

9. Feel the heat of the weak dying flame.

10. The tiny girl took off her hat.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
46 List 16

1. The empty flask stood on the tin tray.

2. A speedy man can beat this track mark.

3. He broke a new shoelace that day.

4. The coffee stand is t oo high for the couch.

5. The urge to write short stories is rare.

6. The pencils have all been used.

7. The pirates seized the crew of the lost ship.

8. We tried to replace the coin but failed.

9. She sewed the torn coat quite neatly.

10. The sofa cushion is red and of light weight.

List 18

1. Steam hissed from the broken valve.

2. The child almost hurt the small dog.

3. There was a sound of dry leaves outside.

4. The sky that morning was clear and bright blue.

5. Torn scraps littered the stone floor.

6. Sunday is the best part of the week.

7. The doctor cured him with these pills.

8. The new girl was fired today at noon.

9. They felt gay when the ship arrived in port.

10. Add the store’s account to the last cent.

List 19

1. Acid burns holes in wool cloth.

2. Fairy tales should be fun to write.

3. Eight miles of woodland burned to waste.

4. The third act was dull and tired the players.

5. A young child should not suffer fright.

6. Add the column and put the sum here.

7. We admire and love a good cook.

8. There the flood mark is ten inches.

9. He carved a head from the round block of
marble.

10. She has a smart way of wearing clothes.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
47 Phrases used for female audio recordings:

List 24

1. Try to have the court decide the case.

2. They are pushed back each time they attack.

3. He broke his ties with groups of former friends.

4. They floated on the raft to sun their white backs.

5. The map had an X that meant nothing.

6. Whitings are small fish caught in nets.

7. Some ads serve to cheat buyers.

8. Jerk the rope and the bell rings weakly.

9. A waxed floor makes us lose balance.

10. Madam, this is the best brand of corn.

List 28

1. The horse trotted around the field at a brisk pace.

2. Find the twin who stol e the pearl necklace.

3. Cut the cord that binds the box tightly.

4. The red tape bound the smuggled food.

5. Look in the corner to find the tan shirt.

6. The cold drizzle will halt the bond drive.

7. Nine men were hired to dig the ruins.

8. The junk yard had a mouldy smell.

9. The flint sputtered and lit a pine torch.

10. Soak the cloth and drown the sharp odor.

List 34

1. Nine rows of soldiers stood in line.

2. The beach is dry and shallow at low tide.

3. The idea is to sew both edges straight.

4. The kitten chased the dog down the street.

5. Pages bound in cloth make a book.

6. Try to trace the fine lines of the painting.

7. Women form less than half of the group.

8. The zones merge in the central part of town.

9. A gem in the rough needs work to polish.

10. Code is used when secrets are sent.

List 38

1. It takes a lot of help to finish these.

2. Mark the spot with a sign painted red.

3. Take two shares as a fair profit.

4. The fur of cats goes by many names.

5. North winds bring colds and fevers.

6. He asks no person to vouch for him.

7. Go now and come here later.

8. A sash of gold silk will trim her dress.

9. Soap can wash most dirt away.

10. That move means the game is over.

List 39

1. He wrote down a long list of items.

2. A siege will crack t he strong defense.

3. Grape juice and water mix well.

4. Roads are paved with sticky tar.

5. Fake &ones shine but cost little.

6. The drip of the rain made a pleasant sound.

7. Smoke poured out of every crack.

8. Serve the hot rum to the tired heroes.

9. Much of the story makes good sense.

10. The sun came up to light the eastern sky.

List 46

1. A clean neck means a neat collar.

2. The couch cover and hall drapes were blue.

3. The stems of the tall gl asses cracked and broke.

4. The wall phone rang loud and often.

5. The clothes dried on a thin wooden rack.

6. Turn on the lantern which gives us light.

7. The cleat sank deeply into the soft turf.

8. The bills were mailed prom ptly on the tenth of the
month.

9. To have is better than to wait and hope.

10. The price is fair for a good antique clock.

List 47

1. The music played on while they talked.

2. Dispense with a vest on a day like this.

3. The bunch of grapes was pressed into wine.

4. He sent the figs, but kept the ripe cherries.

5. The hinge on the door creaked with old age.

6. The screen before the fire kept in the sparks.

7. Fly by night and you waste little time.

8. Thick glasses helped him read the print.

9. Birth and death mark the limits of life.

10. The chair looked strong but had no bottom.

List 50

1. A man in a blue sweater sat at the desk.

2. Oats are a food eaten by horse and man.

3. Their eyelids droop for want of sleep.

4. The sip of tea revives his tired friend.

5. There are many ways to do these things.

6. Tuck the sheet under the edge of the mat.

7. A force equal to that would move the earth.

8. We like to see clear weather.

9. The work of the tailor is seen on each side.

10. Take a chance and win a china doll.

List 53

1. Press the pedal with your left foot.

2. Neat plans fail without luck.

3. The black trunk fell from the landing.

4. The bank pressed for payment of the debt.

5. The theft of the pearl pin was kept secret.

6. Shake hands with this friendly child.

7. The vast space stretched into the far distance.

8. A rich farm is rare in this sandy waste.

9. His wide grin earned many friends.

10. Flax makes a fine brand of paper.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
48 List 56

1. The small red neon lamp went out.

2. Clams are small, round, soft, and tasty.

3. The fan whirled its round blades softly.

4. The line where the edges join was clean.

5. Breathe deep and smell the piney air.

6. It matters not if he reads these words or those.

7. A brown leather bag hung from its strap.

8. A toad and a frog are hard to tell apart.

9. A white silk jacket goes with any shoes.

10. A break in the dam almost caused a flood.

AECOM Final Coverage Acceptance Test for
Contra Costa County West Simulcast Cell
52 Appendix F Detailed Results

The detailed results are presented in table format. The table contains the following columns:

 Grid: a X,Y string describing which tile this row’s data is from. See figure F-1 for a map that shows each tile’s X,Y string.
 Test Sector: states whether the t ile was in test sector 1a or 1b.  Area: states if the tile was part of Moto rola’s Covered Area (“Covered Area”). If the tile was not part of it, it’s listed as “Service Area.”
 Talk-In DAQ: the score of the Talk-In DAQ test.
 Talk-Out DAQ: the score of the Talk-Out DAQ test.
 Median BER (%): the median Bit Error Rate (BER) collected by Motorola in the tile.  RSSI: The Received Signal Strength Indication (RSSI) in dBm as measured by AECOM in that tile. The RSSI measurements were conducted on the control channel during the talk-out.

AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-1 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
44,46 1a Service Area 4.5 4 -87.5
45,46 1a Service Area 4.5 4 -89
46,46 1a Service Area 4.5 4.5 -93
41,47 1a Covered Area 4 4.5 0.2 -77.5
42,47 1a Service Area 4.5 4.5 -82.5
43,47 1a Covered Area 4 4.5 0 -83.5
44,47 1a Covered Area 4 3.4 0 -86.5
45,47 1a Covered Area 4 3.4 0 -81.5
40,48 1a Covered Area 4 4 0 -77.5
41,48 1a Service Area 4.5 4.5 -96.5
42,48 1a Service Area 4.5 4 -99
44,48 1a Service Area 4.5 5 -96.5
45,48 1a Covered Area 4.5 4.5 0 -91
40,49 1a Covered Area 4 4 0 -96
41,49 1a Service Area 4.5 4 -97.5
42,49 1a Service Area 4.5 4 -103
43,49 1a Service Area 4 4 -96.5
44,49 1a Service Area 4.5 4.5 -101
24,50 1a Service Area 4 5 -79
39,50 1a Service Area 4 4 -101.5
40,50 1a Covered Area 4.5 4.5 0 -99.5
41,50 1a Service Area 4 4.5 -93.5
42,50 1a Covered Area 3 4 0 -102.5
23,51 1a Service Area 4.5 4.5 -62
24,51 1a Covered Area 4.5 4.5 0 -60
25,51 1a Covered Area 4 4.5 0 -69.5
27,51 1b Covered Area 4.5 4 0 -81.5
28,51 1b Covered Area 4.5 4.5 0 -78
29,51 1b Covered Area 4 4 0 -69
30,51 1b Covered Area 3.4 3.4 0 -77.5
31,51 1b Covered Area 4 4 0 -77.5
32,51 1b Covered Area 4.5 4.5 0 -82.5
33,51 1b Service Area 4 4 -70
38,51 1a Covered Area 4.5 4.5 0 -97.5
39,51 1a Covered Area 4.5 4.5 0 -96
40,51 1a Covered Area 4 4.5 0 -91
41,51 1a Covered Area 4 5 0 -96
43,51 1a Service Area 4 4.5 -89.5
26,52 1b Covered Area 4 4 0.2 -84
27,52 1b Service Area 4 4 -85.5
28,52 1b Covered Area 4.5 4.5 0 -73
29,52 1b Covered Area 4 4 0 -79.5
30,52 1b Covered Area 4.5 4.5 0 -75
31,52 1b Covered Area 4 4 0 -72
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-2 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
32,52 1b Covered Area 4.5 4 0 -77
33,52 1b Covered Area 4 4 0 -71
34,52 1b Service Area 4 4 -78
35,52 1a Covered Area 4 3.4 0 -72
36,52 1a Service Area 4 3.4 -81.5
37,52 1a Service Area 4.5 4 -73
38,52 1a Service Area 4.5 4 -93.5
39,52 1a Service Area 4.5 4.5 -93.5
40,52 1a Service Area 4 3.4 -84
41,52 1a Service Area 3.4 3.4 -83
42,52 1a Service Area 4 5 -82
11,53 1a Service Area 4.5 4 -78
12,53 1a Service Area 4.5 4.5 -75
19,53 1a Service Area 3.4 4 -66
25,53 1b Covered Area 4 4 0.2 -71
26,53 1b Covered Area 4 5 0.39 -78
27,53 1b Covered Area 4 4 0.2 -77
28,53 1b Covered Area 4.5 4.5 0 -70.5
29,53 1b Covered Area 3.4 4 0 -82
30,53 1b Covered Area 4 4 0 -76.5
31,53 1b Covered Area 4 4 0 -78
32,53 1b Covered Area 4 4.5 0 -80
33,53 1b Covered Area 4 3.4 0 -78
34,53 1b Covered Area 4.5 4.5 0 -77.5
35,53 1a Covered Area 4 4.5 0 -74.5
36,53 1a Covered Area 4.5 3.4 0 -87
37,53 1a Covered Area 4.5 4.5 0 -106
38,53 1a Covered Area 4 4 0 -102.5
42,53 1a Service Area 4.5 3.4 -84
9,54 1a Service Area 4 4.5 -70
10,54 1a Covered Area 4.5 4 0 -48
11,54 1a Covered Area 4 4.5 0 -73.5
12,54 1a Covered Area 4.5 4.5 0.2 -67.5
13,54 1a Service Area 4.5 4.5 -61.5
14,54 1a Service Area 4.5 4 -69.5
16,54 1a Covered Area 4 5 0 -56
17,54 1a Covered Area 3.4 5 0 -57.5
19,54 1a Covered Area 4 4 0 -75.5
20,54 1a Covered Area 4.5 4 0 -69.5
24,54 1b Covered Area 4 4 0 -75
25,54 1b Covered Area 4 4 0 -76.5
26,54 1b Covered Area 3.4 3.4 0 -69.5
27,54 1b Covered Area 4 4.5 0 -60
28,54 1b Covered Area 4.5 4.5 0 -72
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-3 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
29,54 1b Covered Area 4.5 4.5 0 -65.5
30,54 1b Covered Area 3.4 4.5 0.39 -75.5
31,54 1b Covered Area 4.5 4.5 0 -68.5
32,54 1b Covered Area 4 4.5 0 -77
33,54 1b Covered Area 4.5 4.5 0 -85.5
34,54 1b Covered Area 4 4.5 0 -82
35,54 1a Covered Area 4.5 4 0 -83
36,54 1a Covered Area 4 4.5 0 -88
10,55 1a Covered Area 4 4.5 0 -46
13,55 1a Covered Area 4.5 3.4 0 -61
14,55 1a Service Area 4 4.5 -60.5
16,55 1a Covered Area 3.4 4.5 0 -66
17,55 1a Covered Area 4.5 4 0 -69
18,55 1a Covered Area 4.5 4.5 0.2 -70.5
19,55 1a Covered Area 4 4.5 0 -67
20,55 1a Covered Area 4 4.5 0.2 -62
22,55 1a Covered Area 4 4.5 0 -58
23,55 1b Covered Area 4.5 4.5 0.39 -67
24,55 1b Covered Area 5 4.5 0 -54.5
25,55 1b Covered Area 3.4 4 0 -46.5
26,55 1b Covered Area 4.5 4.5 0 -50.5
27,55 1b Covered Area 3.4 4 0 -48.5
28,55 1b Covered Area 4.5 4.5 0 -64
29,55 1b Covered Area 4.5 4 0 -69
30,55 1b Covered Area 4.5 4.5 0.2 -69.5
31,55 1b Covered Area 4.5 4.5 0 -68.5
32,55 1b Covered Area 4.5 4 0 -82
33,55 1b Covered Area 4 5 0 -85
10,56 1a Covered Area 4.5 4 0 -66
12,56 1a Covered Area 4.5 4.5 0 -52.5
13,56 1a Covered Area 4 4.5 0 -58
15,56 1a Service Area 4 4 -60.5
16,56 1a Covered Area 4.5 4.5 0 -67.5
17,56 1a Covered Area 4 4 0 -55.5
18,56 1a Covered Area 4 4 0 -53
19,56 1a Covered Area 5 4 0 -70.5
20,56 1a Covered Area 5 4 0 -68
21,56 1b Covered Area 4.5 4 0 -67
22,56 1b Covered Area 4.5 4.5 0 -67.5
23,56 1b Covered Area 4 4 0.39 -57.5
24,56 1b Covered Area 4.5 4.5 0 -61.5
25,56 1b Covered Area 4 4.5 0 -51
26,56 1b Covered Area 4.5 4 0 -55
27,56 1b Covered Area 4 4 0 -44.5
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-4 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
28,56 1b Covered Area 4 4 0 -60
29,56 1b Covered Area 4 4.5 0 -58.5
30,56 1b Covered Area 4.5 4 0 -81.5
31,56 1b Covered Area 4.5 4.5 0 -77
32,56 1b Covered Area 4 4.5 0.2 -72
33,56 1b Service Area 4 4 -75.5
9,57 1a Service Area 4 4.5 -68.5
10,57 1a Covered Area 4 5 0 -48.5
11,57 1a Covered Area 3.4 4 0 -61.5
14,57 1b Covered Area 4 4.5 0 -52.5
15,57 1b Covered Area 4 4.5 0.2 -52
16,57 1b Covered Area 4.5 5 0 -59.5
17,57 1b Covered Area 4.5 4.5 0 -49.5
18,57 1b Covered Area 4 4 0 -59.5
19,57 1b Covered Area 4.5 4 0 -60
20,57 1b Covered Area 4 4 0.2 -68
21,57 1b Covered Area 4.5 4 0 -65.5
22,57 1b Covered Area 4 4 0 -59.5
23,57 1b Covered Area 4.5 4.5 0 -64
24,57 1b Covered Area 4 4.5 0 -59.5
25,57 1b Covered Area 4.5 4 0 -55.5
26,57 1b Covered Area 4.5 4 0 -45.5
27,57 1b Covered Area 4 4.5 0 -53
28,57 1b Covered Area 4.5 4.5 0 -51
29,57 1b Covered Area 3.4 4 0 -68
30,57 1b Covered Area 4.5 4 0 -83
31,57 1b Covered Area 4 4 0 -80.5
32,57 1b Service Area 4.5 4.5 -81.5
8,58 1a Service Area 4 4 -80.5
9,58 1a Covered Area 4.5 4 0.39 -63.5
10,58 1b Covered Area 4 4 0 -55
11,58 1b Covered Area 4.5 4 0 -64
12,58 1b Covered Area 4 3.4 0 -44.5
13,58 1b Covered Area 4 4.5 0 -47.5
14,58 1b Covered Area 4 4.5 0 -49
15,58 1b Covered Area 4 4 0 -52.5
16,58 1b Covered Area 5 4.5 0 -54.5
17,58 1b Covered Area 3.4 3.4 0 -65.5
18,58 1b Covered Area 5 5 0 -62.5
19,58 1b Covered Area 4 4 0 -62.5
20,58 1b Covered Area 4.5 4.5 0 -61
21,58 1b Covered Area 4 4 0 -62
22,58 1b Covered Area 4 4 0 -61
23,58 1b Covered Area 4.5 4.5 0 -60
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-5 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
24,58 1b Covered Area 4 4 0 -48
25,58 1b Covered Area 4 4 0 -52
26,58 1b Covered Area 4 3.4 0 -44.5
27,58 1b Covered Area 4.5 4.5 0 -58
28,58 1b Covered Area 4 4.5 0 -44.5
29,58 1b Covered Area 4 4 0 -75.5
30,58 1b Covered Area 3.4 4 0 -74
31,58 1b Covered Area 4.5 4 0 -82
6,59 1a Service Area 4 4 -86.5
7,59 1a Service Area 4 4 -76
8,59 1a Covered Area 4.5 4 0.2 -71.5
9,59 1b Covered Area 3.4 4.5 0 -61.5
10,59 1b Covered Area 4 4.5 0 -47
11,59 1b Service Area 5 4 -48.5
12,59 1b Covered Area 4.5 4 0 -55
13,59 1b Covered Area 4.5 4.5 0 -49
14,59 1b Covered Area 4 3.4 0 -53.5
15,59 1b Covered Area 4.5 4.5 0 -62
16,59 1b Covered Area 4.5 5 0 -59
17,59 1b Covered Area 4 4.5 0 -61.5
18,59 1b Covered Area 4 4.5 0 -54.5
19,59 1b Covered Area 4 4 0 -65.5
20,59 1b Covered Area 4 4.5 0 -65.5
21,59 1b Covered Area 4.5 4.5 0 -66.5
22,59 1b Covered Area 4.5 4 0 -58.5
23,59 1b Covered Area 4.5 4.5 0.39 -57
24,59 1b Covered Area 3.4 3.4 0 -55
25,59 1b Covered Area 4.5 4.5 0 -61.5
26,59 1b Covered Area 4 4 0 -49.5
27,59 1b Covered Area 4 4.5 0.2 -72.5
28,59 1b Covered Area 4 4 0 -75
29,59 1b Covered Area 4 4.5 0 -75
30,59 1b Covered Area 4.5 4.5 0 -76
31,59 1a Covered Area 4 4.5 0 -88
4,60 1a Service Area 4 3.4 -83
5,60 1a Covered Area 4.5 4.5 0 -63
6,60 1a Service Area 4 4.5 -76
11,60 1b Covered Area 5 4 0 -45.5
12,60 1b Covered Area 4.5 5 0 -51.5
13,60 1b Covered Area 4.5 4.5 0 -60
14,60 1b Covered Area 4 4 0.2 -66
15,60 1b Covered Area 4.5 4 0 -64
16,60 1b Covered Area 4 4.5 0 -65.5
17,60 1b Covered Area 4 4 0 -69.5
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-6 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
18,60 1b Covered Area 4.5 4.5 0.2 -65
19,60 1b Covered Area 4.5 4.5 0 -57.5
20,60 1b Covered Area 4.5 4.5 0 -62
21,60 1b Covered Area 4 4 0 -62.5
22,60 1b Covered Area 4 4 0 -60
23,60 1b Covered Area 4 4 0 -61
24,60 1b Covered Area 4.5 4.5 0.2 -68.5
25,60 1b Covered Area 4.5 4.5 0 -66
26,60 1b Covered Area 4.5 4 0 -69
27,60 1b Covered Area 4 4.5 0 -62.5
28,60 1b Service Area 4.5 4 -57
29,60 1a Service Area 4.5 4.5 -75.5
30,60 1a Covered Area 4.5 5 0 -74.5
4,61 1a Service Area 4.5 3.4 -86
11,61 1b Covered Area 4.5 4.5 0.39 -53
12,61 1b Covered Area 3.4 4 0.2 -56
13,61 1b Covered Area 4.5 4 0 -62.5
14,61 1b Covered Area 4.5 4 0.2 -64
15,61 1b Covered Area 4.5 4.5 0.2 -63
16,61 1b Covered Area 4 4 0 -63.5
17,61 1b Covered Area 4 4 0 -63.5
18,61 1b Covered Area 4.5 4 0 -60
19,61 1b Covered Area 4 4 0 -64.5
20,61 1b Covered Area 4.5 4 0 -65
21,61 1b Covered Area 4 4.5 0 -65.5
22,61 1b Covered Area 3.4 4 0 -58.5
23,61 1b Covered Area 4.5 4.5 0 -51.5
24,61 1b Covered Area 4 4 0 -65.5
25,61 1b Covered Area 4.5 4 0 -65.5
26,61 1b Covered Area 4 4 0 -68
27,61 1b Covered Area 4.5 4.5 0.1 -68
28,61 1a Covered Area 4 4 0 -67.5
29,61 1a Service Area 4.5 3.4 -73.5
38,61 1a Service Area 4 4 -100.5
4,62 1a Service Area 4.5 4 -94
12,62 1b Covered Area 4.5 4.5 0 -53
13,62 1b Covered Area 4 4 0 -58
14,62 1b Covered Area 4.5 4.5 0 -63
15,62 1b Covered Area 4.5 4.5 0 -67
16,62 1b Covered Area 4.5 4.5 0 -59
17,62 1b Covered Area 4.5 4 0 -63
18,62 1b Covered Area 4 4.5 0 -65.5
19,62 1b Covered Area 4 4.5 0 -61.5
20,62 1b Covered Area 4 4.5 0 -63.5
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-7 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
21,62 1b Covered Area 4 4 0 -56.5
22,62 1b Covered Area 4.5 4 0 -60
23,62 1b Covered Area 3.4 4 0 -57
24,62 1b Covered Area 5 4.5 0 -62
25,62 1a Covered Area 4 4 0 -51.5
26,62 1a Covered Area 4.5 4.5 0 -62.5
27,62 1a Covered Area 3.4 4.5 0 -62.5
37,62 1a Service Area 3.4 4.5 -97
38,62 1a Service Area 3.4 4 -99
3,63 1a Service Area 4.5 4 -84.5
4,63 1a Service Area 4 4 -89
12,63 1b Covered Area 4 4 0 -57
13,63 1b Covered Area 4.5 4.5 0.2 -55.5
14,63 1b Covered Area 4 4 0.39 -63
15,63 1b Covered Area 4.5 4.5 0 -58.5
16,63 1b Covered Area 4.5 5 0 -62
17,63 1b Covered Area 4 4.5 0 -64.5
18,63 1b Covered Area 4 3.4 0 -64.5
19,63 1b Covered Area 4.5 4 0 -61
20,63 1b Covered Area 5 5 0 -59.5
21,63 1b Covered Area 4 4 0 -57
22,63 1b Covered Area 4 4.5 0 -59
23,63 1b Covered Area 4.5 4 0 -62
24,63 1b Covered Area 4 4 0 -60
25,63 1a Covered Area 4 4 0 -67.5
26,63 1a Covered Area 4 4 0 -56
36,63 1a Service Area 3 4.5 -101.5
37,63 1a Service Area 4 4 -102
3,64 1a Service Area 3.4 3.4 -99.5
13,64 1b Covered Area 3.4 3.4 0.2 -54.5
14,64 1b Covered Area 4.5 4.5 0.1 -69.5
15,64 1b Covered Area 4 4 0 -61.5
16,64 1b Covered Area 4 4.5 0 -66.5
17,64 1b Covered Area 4.5 4 0 -59
18,64 1b Covered Area 4 4 0 -60.5
19,64 1b Covered Area 4.5 4 0 -59.5
20,64 1b Covered Area 4 4.5 0 -56
21,64 1b Covered Area 4.5 5 0 -58.5
22,64 1b Covered Area 4 4.5 0 -49.5
23,64 1b Covered Area 4.5 4.5 0 -50.5
24,64 1a Covered Area 4.5 4.5 0 -66.5
25,64 1a Covered Area 4.5 4 0 -65
26,64 1a Covered Area 4.5 5 0 -48
36,64 1a Service Area 4 4 -101.5
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-8 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
2,65 1a Service Area 5 3.4 -96.5
3,65 1a Service Area 4 3.4 -95.5
11,65 1b Service Area 4 4 -56.5
12,65 1b Covered Area 4 4 0.39 -66
13,65 1b Covered Area 4.5 4.5 0 -63.5
14,65 1b Covered Area 5 5 0 -56
15,65 1b Covered Area 4 4.5 0 -56.5
16,65 1b Covered Area 4 4.5 0 -64
17,65 1b Covered Area 3.4 4 0 -66
18,65 1b Covered Area 4 4 0.2 -49
19,65 1b Covered Area 4 4.5 0 -58.5
20,65 1b Covered Area 3.4 3.4 0 -65.5
21,65 1b Covered Area 4.5 4.5 0 -60.5
22,65 1b Covered Area 3.4 4 0 -64
23,65 1b Covered Area 4.5 5 0 -69.5
24,65 1a Covered Area 4 4 0 -68.5
25,65 1a Covered Area 4 4 0 -60
33,65 1a Service Area 4.5 4 -90.5
34,65 1a Service Area 3.4 4 -94
35,65 1a Service Area 4.5 3.4 -92
36,65 1a Service Area 4.5 4 -97.5
1,66 1a Service Area 3.4 3 -95.5
2,66 1a Service Area 3.4 3 -89
12,66 1b Service Area 4.5 4.5 -66.5
13,66 1b Covered Area 4.5 5 0 -69
14,66 1b Covered Area 4.5 4.5 0 -64
15,66 1b Covered Area 4.5 4.5 0 -66.5
16,66 1b Covered Area 4 4 0 -57.5
17,66 1b Covered Area 4 4.5 0 -69
18,66 1b Covered Area 4 4.5 0 -55
19,66 1b Covered Area 4 4.5 0 -61
20,66 1b Covered Area 4 4 0 -67
21,66 1b Covered Area 4.5 4.5 0 -67.5
22,66 1b Covered Area 4 4.5 0.2 -65.5
23,66 1b Covered Area 4.5 4.5 0 -65.5
24,66 1a Covered Area 3.4 4 0 -61.5
25,66 1a Covered Area 4.5 5 0 -59.5
32,66 1a Service Area 4 4 -85
33,66 1a Covered Area 4 4.5 0.2 -85.5
34,66 1a Covered Area 4 4.5 0.39 -89
35,66 1a Covered Area 4 4 0 -82.5
36,66 1a Covered Area 4.5 4 0 -90.5
37,66 1a Service Area 4.5 4 -89
40,66 1a Service Area 4 4.5 -88.5
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-9 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
41,66 1a Covered Area 4 4 0 -76
1,67 1a Service Area 3.4 4 -99.5
12,67 1b Covered Area 4.5 4.5 0 -61.5
13,67 1b Covered Area 4.5 4.5 0 -66
14,67 1b Covered Area 4.5 5 0 -69.5
15,67 1b Covered Area 4 4 0 -68.5
16,67 1b Covered Area 5 4.5 0 -61
17,67 1b Covered Area 3.4 4 0 -56
18,67 1b Covered Area 4.5 4.5 0 -51
19,67 1b Covered Area 4 4.5 0 -66.5
20,67 1b Covered Area 4.5 4 0 -53
21,67 1b Covered Area 4.5 4 0 -66.5
22,67 1b Covered Area 4 4 0.2 -64.5
23,67 1b Covered Area 4 4 0 -68.5
24,67 1a Covered Area 4.5 4 0 -64.5
25,67 1a Covered Area 3.4 3.4 0 -60
26,67 1a Covered Area 4 4 0 -67.5
27,67 1a Covered Area 4.5 4 0 -53
28,67 1a Covered Area 4.5 5 0 -64.5
29,67 1a Covered Area 4 4 0 -74.5
30,67 1a Covered Area 4.5 4 0 -76.5
31,67 1a Covered Area 4 4 0 -81.5
32,67 1a Covered Area 4.5 4.5 0.2 -83
33,67 1a Covered Area 4.5 4.5 0 -78.5
34,67 1a Service Area 4 4.5 -75.5
35,67 1a Service Area 4 4.5 -73.5
36,67 1a Service Area 4 4 -82.5
37,67 1a Service Area 4.5 4.5 -63
38,67 1a Service Area 4.5 5 -92.5
39,67 1a Service Area 4.5 4.5 -94.5
40,67 1a Service Area 4.5 4.5 -88
41,67 1a Covered Area 4.5 4.5 0 -85.5
12,68 1b Covered Area 4 4.5 0.2 -67
13,68 1b Covered Area 4.5 4.5 0 -62
14,68 1b Covered Area 3.4 3.4 0 -57
15,68 1b Covered Area 4.5 4.5 0 -63.5
16,68 1b Covered Area 4 4 0 -67
17,68 1b Covered Area 4.5 3.4 0 -67
18,68 1b Covered Area 4 4 0 -69
19,68 1b Covered Area 4.5 4.5 0 -67.5
20,68 1b Service Area 4.5 4 -63
21,68 1b Covered Area 3.4 3.4 0 -62
22,68 1b Covered Area 4 4.5 0 -56.5
23,68 1a Covered Area 4 4 0 -51.5
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-10 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
24,68 1a Covered Area 4 4.5 0 -54.5
25,68 1a Covered Area 4.5 4.5 0 -50.5
26,68 1a Covered Area 4 5 0 -66.5
27,68 1a Covered Area 4.5 5 0 -55.5
28,68 1a Covered Area 3.4 4 0 -44.5
29,68 1a Covered Area 4.5 4.5 0 -57.5
30,68 1a Covered Area 4.5 4 0 -66
31,68 1a Covered Area 4 4 0 -67
32,68 1a Covered Area 4 4.5 2.15 -73.5
33,68 1a Covered Area 4.5 4.5 0 -85
34,68 1a Covered Area 4 4.5 0 -67.5
35,68 1a Service Area 4 4 -65.5
36,68 1a Service Area 4.5 4.5 -69.5
38,68 1a Service Area 4.5 4.5 -92
39,68 1a Service Area 4.5 4.5 -90.5
40,68 1a Covered Area 4.5 4 0 -93.5
41,68 1a Covered Area 4.5 4.5 0 -86.5
42,68 1a Covered Area 4.5 4 0 -70
12,69 1b Covered Area 3.4 4 0 -58
13,69 1b Covered Area 5 4.5 0.2 -54.5
14,69 1b Covered Area 4 4 0 -70.5
15,69 1b Covered Area 4.5 4.5 0 -57
16,69 1b Covered Area 4.5 4 0 -60
17,69 1b Covered Area 4 5 0 -70
18,69 1b Covered Area 4.5 5 0 -70
19,69 1b Covered Area 4.5 4.5 0 -64.5
20,69 1a Covered Area 4.5 4.5 0 -74.5
21,69 1a Covered Area 4.5 4 0.2 -52
22,69 1a Covered Area 4 4 0 -51.5
23,69 1a Covered Area 5 4 0 -64
24,69 1a Covered Area 4 4 0 -56
25,69 1a Covered Area 4 4.5 0 -77.5
26,69 1a Covered Area 4.5 4.5 0 -55.5
27,69 1a Covered Area 4.5 4.5 0 -53.5
28,69 1a Covered Area 4.5 4.5 0.2 -64
29,69 1a Covered Area 4 4 0 -50.5
30,69 1a Covered Area 4.5 4 0 -67.5
31,69 1a Covered Area 4 4.5 0 -59
32,69 1a Covered Area 5 4 0 -68
33,69 1a Covered Area 4.5 4.5 0.78 -72
34,69 1a Covered Area 4 4 0.78 -75
35,69 1a Service Area 4 4.5 -79.5
36,69 1a Covered Area 4 4 0 -83
38,69 1a Service Area 4 4.5 -90
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-11 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
39,69 1a Service Area 3.4 4 -89.5
40,69 1a Service Area 4.5 4 -97
42,69 1a Covered Area 4.5 4.5 0 -73.5
13,70 1b Covered Area 4 4.5 0 -56
14,70 1b Covered Area 5 4.5 0 -59
15,70 1b Covered Area 4 4 0 -56
17,70 1b Covered Area 4 4.5 0 -62
18,70 1b Covered Area 4 4 0 -69.5
19,70 1b Covered Area 4 4.5 0 -62.5
20,70 1a Covered Area 4 4.5 0 -66.5
21,70 1a Covered Area 5 4.5 0 -52
22,70 1a Covered Area 3.4 4 0 -58.5
23,70 1a Covered Area 4.5 4 0 -61.5
24,70 1a Covered Area 4 4.5 0 -69.5
25,70 1a Covered Area 4 4 0 -57
26,70 1a Covered Area 4 4 0 -67.5
27,70 1a Covered Area 4.5 4.5 0 -50
28,70 1a Covered Area 4.5 4.5 0 -58
29,70 1a Covered Area 4 4 0 -53
30,70 1a Covered Area 4.5 4 0 -59.5
31,70 1a Covered Area 5 4.5 0 -57
32,70 1a Covered Area 4.5 4.5 0 -78.5
33,70 1a Service Area 4 4 -81.5
34,70 1a Service Area 4 5 -72.5
35,70 1a Service Area 4.5 4.5 -81
36,70 1a Service Area 4.5 4.5 -53.5
40,70 1a Covered Area 4.5 4.5 0 -68.5
41,70 1a Covered Area 4 4 0 -60.5
42,70 1a Covered Area 4 4.5 0 -78.5
43,70 1a Service Area 4 3.4 -90.5
44,70 1a Covered Area 3.4 4 7.44 -91.5
45,70 1a Service Area 4 4.5 -85.5
46,70 1a Service Area 4 3.4 -93.5
14,71 1b Covered Area 4 4.5 0 -55
17,71 1b Covered Area 4 4.5 0 -66
18,71 1b Covered Area 4 4 0 -70
19,71 1b Covered Area 4 4 0 -65.5
20,71 1a Covered Area 4 4 0 -77.5
21,71 1a Covered Area 4.5 4.5 0 -71
22,71 1a Covered Area 4.5 4.5 0 -72.5
23,71 1a Covered Area 4.5 4.5 0.2 -76
24,71 1a Covered Area 4 4.5 0.39 -72
25,71 1a Covered Area 4.5 4.5 0 -62.5
26,71 1a Covered Area 5 4 0 -67.5
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-12 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
27,71 1a Covered Area 4 4.5 0 -66.5
28,71 1a Covered Area 4 4.5 0 -72.5
29,71 1a Covered Area 4 4.5 0 -55.5
30,71 1a Covered Area 4 5 0 -72
31,71 1a Covered Area 4 4.5 0 -66
32,71 1a Covered Area 4 4.5 0.98 -80
33,71 1a Service Area 4.5 4 -86.5
34,71 1a Service Area 4 4 -59
35,71 1a Service Area 2 4.5 -65.5
37,71 1a Covered Area 4.5 4 0 -57.5
38,71 1a Covered Area 4 5 0 -68
39,71 1a Covered Area 4 4 0 -68.5
40,71 1a Covered Area 4.5 4.5 0 -78.5
17,72 1b Covered Area 4 3.4 0.39 -62.5
18,72 1a Covered Area 4 4 0 -63.5
19,72 1a Covered Area 4.5 4.5 0.39 -75
20,72 1a Covered Area 3.4 4 0 -71.5
21,72 1a Covered Area 5 4.5 0.39 -72.5
22,72 1a Covered Area 4.5 4.5 0 -70
23,72 1a Covered Area 4 4.5 0.1 -71.5
24,72 1a Covered Area 4 5 0.2 -78.5
25,72 1a Covered Area 4 4.5 0.39 -63.5
26,72 1a Covered Area 4.5 4 0 -78
27,72 1a Covered Area 4 4 0 -88.5
28,72 1a Covered Area 4 4.5 0 -78
29,72 1a Covered Area 4.5 4.5 0 -79
30,72 1a Covered Area 4.5 4.5 0.2 -80
31,72 1a Covered Area 4.5 4.5 0 -67.5
32,72 1a Covered Area 3.4 4.5 0 -77
33,72 1a Covered Area 4 3.4 0 -65
34,72 1a Covered Area 4 4 0 -49.5
35,72 1a Covered Area 4.5 4.5 0 -49.5
36,72 1a Covered Area 4 4 0 -66.5
37,72 1a Covered Area 4 5 0 -75
38,72 1a Covered Area 5 4.5 0 -75
39,72 1a Covered Area 4 4.5 0 -71
16,73 1a Covered Area 4.5 4 0 -75
17,73 1a Covered Area 4 4 0 -68
18,73 1a Covered Area 4 4 0 -77
19,73 1a Covered Area 4.5 4 1.075 -76.5
20,73 1a Covered Area 4.5 4 0.2 -72
21,73 1a Covered Area 4.5 4.5 0.2 -71
22,73 1a Covered Area 4.5 4.5 0 -60.5
23,73 1a Covered Area 4 4 0 -60.5
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-13 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
24,73 1a Covered Area 4.5 4.5 0 -67.5
25,73 1a Covered Area 4.5 4 0.39 -70.5
26,73 1a Covered Area 4 4.5 0 -68.5
27,73 1a Covered Area 4.5 5 0 -82
28,73 1a Covered Area 4.5 4.5 0 -75.5
29,73 1a Covered Area 4.5 4.5 0 -81.5
30,73 1a Covered Area 3.4 4 0 -77
31,73 1a Covered Area 4.5 4 0 -66
32,73 1a Covered Area 4.5 4 0 -67.5
33,73 1a Covered Area 4.5 4 0 -48.5
34,73 1a Covered Area 4.5 4 0 -59
35,73 1a Covered Area 4 3.4 0 -57
36,73 1a Covered Area 4 4.5 0 -58.5
37,73 1a Covered Area 4 4.5 0 -61
38,73 1a Covered Area 4.5 4.5 0 -73
39,73 1a Covered Area 4 4.5 0 -74.5
40,73 1a Service Area 3.4 5 -80.5
41,73 1a Service Area 3.4 4 -83
16,74 1b Service Area 4 4 -75
17,74 1b Covered Area 4 4.5 0 -73.5
19,74 1a Covered Area 4.5 4.5 0 -78
20,74 1a Covered Area 4 4.5 0 -76
21,74 1a Covered Area 4 4 0 -68
22,74 1a Covered Area 4.5 4 0 -72
23,74 1a Covered Area 4.5 4.5 0 -72
24,74 1a Covered Area 4 3.4 0.2 -72.5
25,74 1a Covered Area 4.5 4.5 0 -72.5
26,74 1a Covered Area 4 4 0.59 -53
27,74 1a Covered Area 4 4 0 -66.5
28,74 1a Covered Area 4 4 0 -80
29,74 1a Covered Area 4.5 5 0 -67.5
30,74 1a Covered Area 4 4.5 0 -70
31,74 1a Covered Area 4.5 4 0 -59
32,74 1a Covered Area 4.5 4.5 0 -48.5
33,74 1a Covered Area 4 4 0 -66
34,74 1a Covered Area 4.5 4.5 0 -65.5
35,74 1a Covered Area 4 4 0 -65
36,74 1a Covered Area 4.5 4.5 0 -56.5
37,74 1a Covered Area 4 4 0 -51.5
38,74 1a Service Area 4.5 4 -60.5
40,74 1a Service Area 4.5 4.5 -89
43,74 1a Service Area 0 4 -110.5
44,74 1a Service Area 4 4.5 -99
45,74 1a Service Area 4.5 4.5 -103.5
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-14 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
17,75 1b Covered Area 4.5 4.5 0.2 -75
18,75 1a Service Area 4.5 4.5 -68.5
19,75 1a Service Area 5 4.5 -76
20,75 1a Covered Area 5 5 0 -67.5
21,75 1a Covered Area 4 4.5 0 -74.5
22,75 1a Covered Area 4 4.5 0 -63
23,75 1a Covered Area 4.5 4 0 -90
24,75 1a Covered Area 4 4.5 0 -90
25,75 1a Covered Area 4.5 4.5 0 -79.5
26,75 1a Covered Area 4.5 4.5 0 -80.5
27,75 1a Covered Area 4.5 4.5 0 -70.5
28,75 1a Covered Area 4.5 4 0 -62.5
29,75 1a Covered Area 3.4 4.5 0 -65.5
30,75 1a Covered Area 4.5 4 0 -57
31,75 1a Covered Area 4 4 0 -53.5
32,75 1a Covered Area 4.5 4 0 -58
33,75 1a Covered Area 4.5 4.5 0 -60.5
34,75 1a Covered Area 4.5 4.5 0 -79
36,75 1a Covered Area 4.5 4 0 -44.5
37,75 1a Covered Area 4.5 4.5 0 -53.5
38,75 1a Covered Area 4 4.5 0 -46
42,75 1a Service Area 4.5 4.5 -90.5
43,75 1a Service Area 3.4 4 -93
44,75 1a Service Area 4 4 -91.5
45,75 1a Service Area 4 4 -86
17,76 1b Covered Area 4 4.5 0 -78
18,76 1b Covered Area 4.5 4.5 0.2 -77
19,76 1a Covered Area 4.5 4.5 0 -74.5
20,76 1a Covered Area 4.5 4.5 0 -77
21,76 1a Covered Area 4 3.4 0 -81
22,76 1a Covered Area 5 3.4 0 -77.5
23,76 1a Covered Area 4 4.5 0 -66.5
24,76 1a Covered Area 4.5 4.5 0 -82
25,76 1a Covered Area 4 4.5 0 -76.5
26,76 1a Covered Area 4.5 4.5 0 -87.5
27,76 1a Covered Area 4.5 4 0 -86
28,76 1a Covered Area 4 4 0 -76.5
29,76 1a Covered Area 4.5 4.5 0 -62
30,76 1a Covered Area 3.4 3.4 0 -69.5
31,76 1a Covered Area 4.5 5 0 -63.5
32,76 1a Covered Area 4.5 4.5 0 -80
33,76 1a Covered Area 5 4.5 0 -79
34,76 1a Covered Area 4.5 4.5 0 -56
35,76 1a Covered Area 3.4 5 0 -52.5
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-15 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
36,76 1a Covered Area 4 4 0 -44.5
37,76 1a Covered Area 4.5 4 0 -60.5
38,76 1a Covered Area 4 4.5 0 -48
39,76 1a Covered Area 4 4 0 -83.5
40,76 1a Covered Area 4 4.5 0.59 -85
41,76 1a Covered Area 4 4 11.055 -90.5
42,76 1a Covered Area 4 4 0 -100.5
43,76 1a Service Area 3.4 4 -91.5
21,77 1a Covered Area 4.5 4.5 0 -79
22,77 1a Covered Area 5 4.5 0 -90.5
23,77 1a Service Area 3.4 4 -82
24,77 1a Covered Area 4 4.5 0.39 -82.5
25,77 1a Covered Area 4 4 0 -87
26,77 1a Covered Area 4.5 4.5 0 -65
27,77 1a Covered Area 4 3.4 0 -78
28,77 1a Service Area 4 4 -75
29,77 1a Covered Area 4 4 0 -52
30,77 1a Covered Area 4 4 0 -64.5
31,77 1a Covered Area 4 4 0 -61.5
32,77 1a Covered Area 4 4 0 -61.5
33,77 1a Covered Area 4.5 5 0 -55.5
34,77 1a Covered Area 4.5 4 0 -53.5
35,77 1a Service Area 4 4 -54.5
36,77 1a Covered Area 4.5 4.5 0 -68
37,77 1a Covered Area 4.5 4 0 -46
38,77 1a Covered Area 4 4.5 0 -63
39,77 1a Covered Area 4.5 4.5 0 -72
40,77 1a Covered Area 4.5 4 0 -85.5
41,77 1a Covered Area 4.5 4.5 0 -78
42,77 1a Covered Area 3.4 4.5 0 -74.5
43,77 1a Covered Area 4.5 4 0 -71
44,77 1a Service Area 3.4 4 -60
23,78 1a Service Area 4.5 4 -78.5
24,78 1a Covered Area 4 4.5 0 -76
25,78 1a Covered Area 3.4 3.4 0 -79
26,78 1a Covered Area 4.5 4 0 -83
27,78 1a Covered Area 4 4 0 -54.5
28,78 1a Covered Area 4 4.5 0 -64.5
29,78 1a Covered Area 4 4 0 -70.5
30,78 1a Covered Area 4 4 0 -63.5
31,78 1a Covered Area 4 4.5 0 -63
32,78 1a Covered Area 4 4 0 -65.5
33,78 1a Covered Area 4.5 4 0.2 -56.5
34,78 1a Covered Area 4 4.5 0 -60
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-16 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
35,78 1a Covered Area 4.5 3.4 0 -53.5
36,78 1a Covered Area 4.5 4.5 0 -52
37,78 1a Covered Area 5 5 0 -76.5
38,78 1a Covered Area 4 4.5 0 -75.5
39,78 1a Covered Area 4 4 0 -72.5
40,78 1a Covered Area 4 4 0 -77
41,78 1a Covered Area 4 4.5 0 -71
42,78 1a Covered Area 4 4.5 0 -51
43,78 1a Service Area 4 3.4 -73
24,79 1a Service Area 4 4 -79
25,79 1a Covered Area 5 4.5 0 -82
26,79 1a Covered Area 4.5 5 0 -78.5
27,79 1a Covered Area 3.4 4 0 -74.5
28,79 1a Covered Area 4 4 0 -82
29,79 1a Covered Area 4.5 5 0 -72.5
30,79 1a Covered Area 4.5 4.5 0 -70
31,79 1a Covered Area 4.5 4 0 -62
32,79 1a Covered Area 4 4.5 0 -61.5
33,79 1a Covered Area 4 3.4 0 -66
34,79 1a Service Area 4 4 -52
35,79 1a Covered Area 4 4.5 0 -65
36,79 1a Covered Area 4.5 4.5 0 -54.5
37,79 1a Covered Area 4.5 4.5 0 -49.5
38,79 1a Covered Area 4 4.5 0 -67.5
39,79 1a Covered Area 4.5 4.5 0 -59
40,79 1a Covered Area 4.5 3.4 0 -45
41,79 1a Covered Area 5 4.5 0 -75
42,79 1a Service Area 4 4.5 -73.5
45,79 1a Service Area 4.5 4 -92.5
46,79 1a Service Area 4 4 -92
47,79 1a Service Area 4 4 -98.5
48,79 1a Service Area 3.4 4 -98.5
49,79 1a Service Area 4 4.5 -90.5
26,80 1a Service Area 4.5 4.5 -70.5
30,80 1a Covered Area 4.5 4.5 0 -60
31,80 1a Covered Area 4 4 0 -76.5
32,80 1a Covered Area 5 4.5 0 -66
33,80 1a Service Area 4.5 4.5 -54
34,80 1a Covered Area 4 4.5 0 -64
35,80 1a Covered Area 4.5 4 0 -60
36,80 1a Covered Area 4 5 0 -51
37,80 1a Covered Area 4.5 4 0 -70.5
38,80 1a Covered Area 4.5 4 0 -59
39,80 1a Covered Area 4.5 4.5 0 -50
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-17 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
40,80 1a Service Area 4.5 4.5 -63
41,80 1a Service Area 4 4.5 -78
43,80 1a Service Area 4.5 4.5 -79.5
44,80 1a Service Area 4 4.5 -88
31,81 1a Covered Area 3.4 4 0 -54.5
32,81 1a Covered Area 4 4 0 -72
33,81 1a Covered Area 5 5 0 -68
34,81 1a Service Area 4.5 4.5 -52.5
35,81 1a Covered Area 4 4.5 0 -46
36,81 1a Covered Area 4 4.5 0 -60.5
37,81 1a Covered Area 3.4 3.4 0 -70.5
38,81 1a Covered Area 4 4 0 -75.5
39,81 1a Covered Area 4.5 4.5 0 -66
40,81 1a Covered Area 5 4.5 0 -52
41,81 1a Covered Area 4.5 4.5 0 -80.5
42,81 1a Covered Area 4 4.5 0.2 -91
43,81 1a Service Area 4 3.4 -77
32,82 1a Covered Area 4.5 4.5 0 -81
34,82 1a Covered Area 4.5 4.5 0 -45
35,82 1a Covered Area 4 4.5 0 -53.5
36,82 1a Covered Area 4 4 0.39 -88.5
38,82 1a Covered Area 4.5 4 0 -87
39,82 1a Covered Area 4 4.5 0 -63
40,82 1a Covered Area 4.5 4.5 0 -54.5
34,83 1a Covered Area 4 4 0 -71.5
35,83 1a Covered Area 4.5 4.5 0 -64
36,83 1a Covered Area 4.5 4.5 0 -70
37,83 1a Covered Area 4.5 4.5 0 -88.5
38,83 1a Covered Area 3 4.5 0 -81.5
39,83 1a Covered Area 4 4 0 -72
40,83 1a Covered Area 4 4.5 0 -65.5
41,83 1a Covered Area 4 4.5 0 -69.5
42,83 1a Covered Area 4 4.5 0 -52.5
35,84 1a Service Area 4 4.5 -77.5
36,84 1a Covered Area 4.5 4.5 0 -81
37,84 1a Covered Area 4 4.5 0 -84.5
38,84 1a Covered Area 4 4.5 0 -60.5
39,84 1a Covered Area 4.5 3.4 0 -62.5
40,84 1a Covered Area 4 5 0 -69
41,84 1a Covered Area 4.5 4.5 0 -54.5
42,84 1a Covered Area 4.5 4 0 -71.5
35,85 1a Covered Area 4.5 4.5 0 -59
36,85 1a Covered Area 5 4.5 0 -73.5
37,85 1a Covered Area 4 4.5 0 -65.5
AECOM Final Coverage Acceptance Test for Contra Costa County West Simlcast Cell F-18 Grid
Test
Sector Area
Talk-In
DAQ
Talk-Out
DAQ
Median
BER (%)
RSSI
(dBm)
38,85 1a Covered Area 4 4 0 -77
39,85 1a Covered Area 4 4.5 0 -69.5
35,86 1a Covered Area 4 4 0 -67.5
36,86 1a Covered Area 4 4 0 -86
37,86 1a Service Area 4 4.5 -77.5
38,86 1a Covered Area 4 4 0 -86.5
48,86 1a Service Area 4.5 5 -101.5
35,87 1a Service Area 4 4 -71
36,87 1a Covered Area 3.4 3.4 0 -78
37,87 1a Covered Area 4 4.5 0 -78.5
38,87 1a Covered Area 4.5 4 0 -75
47,87 1a Service Area 3.4 3.4 -97.5
48,87 1a Service Area 4 2 -99
38,88 1a Covered Area 4 4.5 0 -74.5
43,88 1a Service Area 4.5 4 -77.5
44,88 1a Service Area 4.5 5 -77
45,88 1a Service Area 4 3.4 -89
46,88 1a Service Area 4 4.5 -79
47,88 1a Service Area 4.5 4 -85.5
38,89 1a Covered Area 4.5 4 0 -60.5
39,89 1a Covered Area 4.5 4 0 -61.5
40,89 1a Service Area 4 4.5 -96
41,89 1a Service Area 5 4 -88.5
42,89 1a Service Area 4 4.5 -87
43,89 1a Covered Area 4 4.5 0.2 -76
46,89 1a Service Area 0 1 -110.5
47,89 1a Service Area 1 3.4 -110.5
39,90 1a Service Area 4 4 -91
40,90 1a Service Area 4 5 -89.5
41,90 1a Service Area 4.5 4 -87
42,90 1a Service Area 4 4 -85
43,90 1a Service Area 3.4 4.5 -85.5
44,90 1a Service Area 4 3.4 -83.5
45,90 1a Service Area 4 3.4 -85
46,90 1a Service Area 1 4.5 -104.5
42,91 1a Service Area 5 4.5 -85
43,91 1a Service Area 3.4 4.5 -88
44,91 1a Service Area 4 4 -93
45,91 1a Service Area 4 4 -99
1,67
1,66 2,66
2,65 3,65
3,64
4,633,63
4,62
4,61
4,60 6,605,60
9,598,597,596,59
8,58 9,58
9,57
9,54
11,65
11,61
11,60
11,59
11,58
11,57
11,54
11,53
42,91 45,9144,9143,91
46,9045,9044,9043,9042,9041,9040,9039,90
47,8946,8943,8942,8941,8940,8939,8938,89
38,88 47,8846,8845,8844,8843,88
35,87 48,8747,8742,8738,8737,8736,87
36,86 38,8635,86 48,8640,8637,86
39,8538,8537,8536,8535,85
35,84 42,8441,8440,8439,8438,8437,8436,84
42,8341,8340,8339,8338,8337,8336,8335,8334,83
32,82 40,8239,8238,8237,8236,8235,8234,82
41,8136,81 43,8142,8140,8139,8138,8137,8135,8134,8133,8132,8131,81 41,8036,8032,8031,8026,80 44,8043,8040,8039,8038,8037,8035,8034,8033,8030,80 49,7948,7947,7946,7945,7942,7941,7940,7939,7938,7937,7936,7935,7934,7933,7932,7931,7930,7929,7928,7927,7926,7925,7924,79 43,7842,7841,7840,7839,7838,7837,7836,7835,7834,7833,7832,7831,7830,7829,7828,7827,7826,7825,7824,7823,78 44,7743,7742,7741,7740,7738,7737,7736,7735,7734,7733,7732,7731,7730,7729,7728,7727,7726,7725,7724,7723,7722,7721,77 39,77 43,7642,7641,7640,7639,7638,7637,7636,7635,7634,7633,7632,7631,7630,7629,7628,7627,7626,7625,7624,7623,7622,7621,7620,7619,7618,7617,76 45,7544,7543,7542,7532,7530,7529,7528,7527,7526,7525,7524,7523,7522,7521,7520,7519,7518,75 38,7537,7536,7534,7533,7531,7517,75 45,7444,7443,7440,7438,7437,7436,7435,7434,7433,7432,7431,7430,7429,7428,7427,7426,7425,7424,7423,7422,7421,7420,7419,7417,7416,74 41,7340,7339,7338,7337,7336,7335,7334,7333,7332,7331,7330,7329,7328,7327,7326,7325,7324,7323,7322,7321,7320,7319,7318,7317,7316,73 39,7238,7237,7236,7235,7234,7233,7232,7231,7230,7229,7228,7227,7226,7225,7224,7223,7222,7221,7220,7219,7218,7217,72 40,7139,7138,7137,7135,7134,7133,7132,7131,7130,7129,7128,7127,7126,7125,7124,7123,7122,7121,7120,7119,7118,7117,7114,71 46,7045,7044,7043,7042,7041,7040,7036,7035,7034,7033,7032,7031,7030,7029,7028,7027,7026,7025,7024,7023,7022,7021,7020,7019,7018,7017,7015,7014,7013,70 30,69 33,6932,6922,6921,6920,6919,69 42,6940,6939,6938,6936,6935,6934,6931,6912,69 13,69 14,69 15,69 16,69 17,69 18,69 23,69 24,69 25,69 26,69 27,69 28,69 29,69 29,68 42,6827,6822,68 41,6840,6839,6838,6836,6835,6834,6833,6832,6831,6830,6828,6826,6825,6824,6823,6821,6820,6819,6818,6817,6816,6815,6814,6813,6812,68 41,6740,6739,6738,6737,6736,6735,6734,6733,6732,6731,6730,6729,6728,6727,6726,6725,6724,6723,6722,6721,6720,6719,6718,6717,6716,6715,6714,6713,6712,67 41,6640,6637,6636,6635,6634,6633,6632,6625,6624,6623,6622,6621,6620,6619,6618,6617,6616,6615,6614,6613,6612,66 36,6535,6534,6533,6525,6524,6523,6522,6521,6520,6519,6518,6517,6516,6515,6514,6512,65 13,65 36,6426,6425,6424,6423,6422,6421,6420,6419,6418,6417,6416,6415,6414,6413,64 23,6322,6320,6319,6318,6317,6316,6315,6314,6313,6312,63 37,6336,6326,6325,6324,6321,63 38,6237,6227,6226,6225,6224,6223,6222,6221,6220,6219,6218,6217,6216,6215,6214,6213,6212,62 38,6129,6128,6127,6126,6125,6124,6123,6122,6121,6120,6119,6118,6117,6116,6115,6114,6113,6112,61 39,6038,6030,6029,6028,6027,6026,6025,6024,6023,6022,6021,6020,6013,6012,60 19,6018,6017,6016,6015,6014,60 39,5931,5930,5929,5928,5927,5926,5925,5924,5923,5922,5921,5920,5919,5918,5917,5916,5915,5914,5913,5912,5910,59 31,5828,5825,5822,5819,5816,5813,5810,58 30,5829,5827,5826,5824,5823,5821,5820,5818,5817,5815,5814,5812,58 32,5731,5730,5729,5728,5727,5726,5725,5724,5723,5722,5721,5720,5719,5718,5717,5716,5715,5714,5710,57 33,5632,5631,5630,5629,5628,5627,5626,5625,5624,5623,5622,5621,5620,5619,5618,5617,5616,5615,5613,5612,5610,56 33,5528,5523,5518,5517,5513,55 32,5531,5530,5529,5527,5526,5525,5524,5522,5520,5519,5516,5514,5510,55 36,5435,5434,5433,5432,5431,5430,5429,5428,5427,5426,5425,5424,5420,5419,5417,5416,5414,5413,5412,5410,54 42,5338,5337,5336,5335,5334,5333,5332,5331,5330,5329,5328,5327,5326,5325,5319,5312,53 42,5241,5240,5239,5238,5237,5236,5235,5234,5233,5232,5231,5230,5229,5228,5227,5226,52 43,5141,5140,5139,5138,5137,5133,5132,5131,5130,5129,5128,5127,5125,5124,5123,51 42,5041,5040,5039,5029,5024,50
40,49 44,4943,4942,4941,49
45,4844,4842,4841,4840,48
44,4742,47 45,4743,4741,47
42,46 46,4645,4644,46
San Francisco
OaklandBerkeley
Vallejo
Richmond
Pinole
Hercules
Albany
Orinda
El Cerrito
San Pablo
El Sobrante
Benicia
RodeoRodeo
CrockettCrockett
TiburonTiburon
KensingtonKensington
Tara HillsTara Hills
Bayview-MontalvinBayview-Montalvin
East Richmond HeightsEast Richmond Heights
Port CostaPort Costa
§¨¦580
UV123
UV24
UV123
San Pablo Dam
Giant
San Pablo
Cummings
Cedar
Rose
Solano
6Th
Marin
Arlington
University
Gilman
Alhambra Valley
Pomona
Key
Crockett
Pablo
Hopkins
Bancroft
Spruce
Monterey
Dwight
Buchanan
Marin
Angel Island State ParkAngel Island State Park Eastshore State ParkEastshore State Park Cesar Chavez State ParkCesar Chavez State Park
San Pablo BaySan Pablo Bay
San Francisco BaySan Francisco Bay
Carquinez StraightCarquinez Straight
San Rafael BaySan Rafael Bay
Richmond Inner HarborRichmond Inner Harbor
San Pablo ReservoirSan Pablo Reservoir
Harbor ChannelHarbor Channel
Briones ReservoirBriones Reservoir
Richmond Marina BayRichmond Marina Bay
San Pablo CanalSan Pablo Canal
Santa Fe ChannelSanta Fe Channel
ReservoirReservoir
Anza LakeAnza Lake
Hilltop LakeHilltop Lake
Lauritzen ChannelLauritzen Channel
Swanzy ReservoirSwanzy Reservoir
Maloney ReservoirMaloney Reservoir
Parr-Rich CanalParr-Rich Canal
Jewel LakeJewel Lake
Figure F-1
Tile Numbers
APPROVED:

GDM - 15 July 2011
DESIGN:

DRAWN:

CHECKED:

REV
DATA SOURCE AND NOTES:

FILE NAME:
.

PROJECT NO: 60175932
CLIENT: EBRCSA
Shape File data provided from ESRI
M:\Projects\Radio Projects\60091361_20175 EBRCSA\
Task E.00 RaCE Testing\CCCO West\Maps\
Figure F-1 Two_Way DAQ Test with Tile Numbers.mxd
MJL - 15 July 2011
MJL - 15 July 2011
GDM - 15 July 2011

DATE APPROVED BY
(434 ) 239-9200 www.aecom.com

TECHNOLOGY SOLUTIONS
AECOM TECHNICAL SERVICES, INC.
20715 TIMBERLAKE ROAD SUITE 106
LYNCHBURG, VA 24502
Medium Building
Portable on the Street

About AECOM

AECOM (NYSE: ACM) is a global provider of
professional technical and management support
services to a broad range of markets, including
transportation, facilities, environmental, energy, water and government. With approximately 45,000 employees
around the world, AECOM is a leader in all of the key
markets that it serves. AECOM provides a blend of
global reach, local knowledge, innovation, and
collaborative technical excellence in delivering solutions that enhance and sustain the world’s built, natural, and social environments. A Fortune 500 company, AECOM
serves clients in more than 100 countries and has
annual revenue in excess of $6 billion.

More information on AECOM and its services can be
found at www.aecom.com.

20715 Timberlake Rd
Suite 106
Lynchburg, VA 24502
434.239.9200

← All documents from this meeting