November 18, 2025

Economic Development
Richmond Housing Authority

DATE: November 18, 2025
TO: Chair Martinez and Members of the Board of
Commissioners of the Richmond Housing Authority
(RHA)
FROM:

Antoinette Terrell, RHA Executive Director
Nannette Beacham, Director of Economic Development
Gregory Palomino, Administrative Assistant
Subject:

Contract with Bay Hawk, Inc. for Pavement, Curbing,
Sidewalk and Walkway Restoration Services
FINANCIAL IMPACT: The proposed total two-year contract not-to-exceed $275,200 will be funded through a combination of
Housing and Urban Development (HUD) Capital Fund
Grant, RHA’s annual allocation of operating subsidy and rental income from Public Housing Tenants.

Fiscal Year (FY) 2026: $200,000
Fiscal Year (FY) 2026: $75,200
(Account String: 42141191-500536)

PREVIOUS COUNCIL
ACTION:

None.

STATEMENT OF THE
ISSUE:

The sidewalks and walkways at Nystrom Village and the
Hacienda Excess Lot are deteriorating and require
significant repairs and replacements to maintain safe and accessible conditions for residents and visitors.

AGENDA
REPORT

Page 2 of 3 ends

November 18, 2025
RECOMMENDED ACTION:

ADOPT a resolution and APPROVE a two-year contract
with Bay Hawk, Inc. for pavement, curbing, sidewalk, and walkway restoration in an amount not to exceed
$275,200, commencing November 19, 2025, and ending
November 19, 2027 – Richmond Housing Authority
(Antoinette Terrell/Greg Palamino/Nannette Beacham
510-621-1300).

DISCUSSION:

The Richmond Housing Authority (RHA) has identified a pressing need to restore and replace deteriorating sidewalks, walkways, curbing, and pavement at Nystrom Village and the Hacienda Excess Lot. These conditions pose safety concerns for residents and visitors, particularly related to accessibility and trip hazards.

On July 15, 2025, RHA released a Request for Proposals (RFP) for pavement, curbing, sidewalk, and walkway restoration services (Attachment 1). The RFP was due on August 19, 2025. A total of nine-hundred two (902) vendors were notified, and twenty- six (26) prospective bidders downloaded the solicitation package (Attachment 2). A mandatory pre-bid meeting and site walk was held on July 31, 2025, at 10:00 a.m., with eleven (11) contractors in attendance.

Despite the outreach and the initial interest only one valid bid was received by the submission deadline. Staff reviewed the proposal and determined the bid to be reasonable based on the current market rates for this type of work.

Following the bid submission, staff conducted additional site measurements with the vendor. It is estimated that approximately 7,200 square feet of sidewalks and walkways between Nystrom Village and the Hacienda Excess Lot require replacement, all eight (8) curb ramps near the parking lots need to be replaced, and approximately 80 linear feet of sidewalk must be ground down to mitigate trip hazards.

The vendor’s bid established the following cost estimates in the table below:

Item Quantity / Calculation Cost per Unit Subtotal
Sidewalk & walkway replacements 7,200 sq. ft. × $30/sq. ft. $30/sq. ft. $216,000 Curb ramp replacements 8 curbs × $7,000/curb $7,000/curb $56,000 Sidewalk grinding 80 LF × $40/LF $40/LF $3,200
Total Project Cost $275,200

Therefore, staff are requesting that the Board of Commissioners adopt a resolution to approve the contract with Bay Hawk, Inc. in the amount not to exceed $275,200, and commencing November 19, 2025, and terminating November 19, 2027 (Attachment 4 and 5).

Page 3 of 3 ends

November 18, 2025

DOCUMENTS ATTACHED:

Attachment 1 – Sidewalk RFP
Attachment 2 – BidSummary131889 (Sidewalks)
Attachment 3 – Bay Hawk, Inc. Bid
Attachment 4 – RHA Sidewalk Resolution
Attachment 5 – Proposed Contract