Cities Index.
Attachment 1 - Original NT Contract 6736_FE.pdf

Richmond City Council
December 16, 2025

Document
Attachment 1 - Original NT Contract 6736_FE.pdf
Meeting
December 16, 2025
Body
Richmond City Council
Original file
6.2 MB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.

CITY OF RICHMOND

STANDARD CONTRACT

Department: Project Manager:

Project Manager E-mail:

Project Manager Phone No:

PR No: Vendor No: Contract No/P.O:

Description of Services:

The parties to this STANDARD CONTRACT do mutually agree and promise as follows:

1. Parties.

The parties to this Contract are the City of Richmond (herein referred to as the “City”) and the following named Contractor:

Company Name:

Street Address:

City, State, Zip Code:

Contact Person:

Telephone: Email:

Business License No: / Expiration Date:

A California [ ] corporation, [ ] limited liability corporation [ ] general partnership, [ ] limited partnership, [ ] individual, [ ] non-profit corporation, [ ] individual dba as [specify:] , [ ] other [specify:]

2. Term.

The effective date of this Contract is and it terminates unless terminated as provided herein.

3. Payment Limit.

City’s total payments to Contractor under this Contract shall not exceed $ . City shall not pay for services that exceed the Contract Payment Limit unless a contract amendment has been approved by the City Council or City Manager.

4. Contractor’s Obligations.

Contractor shall provide those services and carry out
that work described in the Service Plan (Exhibit A) which is attached hereto and is incorporated herein by reference, subject to all the terms and conditions contained or incorporated herein.

5. City's Obligations.

City shall make to the Contractor those payments described in the Payment Provisions (Exhibit B) which are attached hereto and are incorporated herein by reference, subject to all the terms and conditions contained or incorporated herein.

Public Works
Wendy Wellbrock
[email protected]
(510) 307-8108
16178
6736 /
Architectural design services for the seismic retrofit and Revitalization of the Historic Richmond Main Library Project.

Noll and Tam Architects
729 Heinz Avenue #7
Berkeley, CA 94710
Chris Noll
(510) 542-2211
[email protected]
June 30, 2027
2,987,156
✔
October 18, 2023
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A 40065163 December 31, 2023 DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

6. Authorized Representatives and Notices. This Contract is subject to the Authorized Representatives and Notices Provisions (Exhibit C) which are attached hereto and are incorporated herein by reference.

7. General Conditions. This Contract is subject to the General Conditions (Exhibit D) which are attached hereto and are incorporated herein by reference, subject to all the terms and conditions contained or incorporated herein.

8. Special Conditions
. This Contract is subject to the Special Conditions (Exhibit E) (if any) which are attached hereto and are incorporated herein by reference, subject to all the terms and conditions contained or incorporated herein. (Note:
other than Public Works contracts, the City will agree to Special Conditions only in unusual circumstances.)

9. Insurance Provisions.

This Contract is subject to the Insurance Provisions
(Exhibit F) which are attached hereto and are incorporated herein by reference.

10. Signatures. These signatures attest the parties' Contract hereto:

CITY OF RICHMOND CONTRACTOR:
a municipal corporation

By:
(* The Corporation Chairperson of the Board,
President or Vice President should sign below)

Title: By:

I hereby certify that this Contract Title:
has been approved by City Council.

Date Signed:

B y :

City Clerk

(* The Corporation Chief Financial Officer,
Secretary or Assistant Secretary should sign below)
Approved as to form:

B y :

B y : T i t l e :

City Attorney
Date Signed:

(NOTE: Pursuant to California Corporations
Code Section 313, if Contractor is a corporation
or nonprofit organization, this Contract (1) must
be signed by (a) the Chairperson of the Board,
President or Vice-President and
(b) the
Secretary any Assistant Secretary, the Chief
Financial Officer or any Assistant Treasurer.

LIST OF ATTACHMENTS:

Service Plan Exhibit A
Payment Provisions Exhibit B
Authorized Representatives and Notices Exhibit C
General Conditions Exhibit D
Special Conditions Exhibit E
Insurance Provisions Exhibit F
Standard Contract/EJ/TE 9-26-07
Noll and Tam Architects
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A 10/24/2023
Principal
DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 Director of Public Works
Mayor

For the Contract between the City of
Richmond and

EXHIBIT A

SERVICE PLAN

Contractor shall, to the satisfaction of the , perform the following services and be compensated as outlined below:

Noll and Tam Architects
Public Works Department
See attached.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

PROPOSAL

ARCHITECTURAL

DESIGN SERVICES FOR

THE REVITALIZING THE

HISTORIC RICHMOND MAIN

LIBRARY PROJECT

CITY OF RICHMOND
11 AUGUST 2023
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

CONTENTS

1. COVER LETTER 2

2. PROPOSED APPROACH AND SCOPE OF SERVICES 4

3. RELATED PROJECT EXPERIENCE AND EXPERTISE 9

4. QUALIFICATIONS OF KEY PERSONNEL 14

5. SUBCONSULTANTS 17

6. PROPOSED PRELIMINARY SCHEDULE 19

7. REFERENCES 21

8. FEE PROPOSAL
(SUBMITTED SEPARATELY)
APPENDIX A: RESUMES
APPENDIX B: LETTERS OF COMMITMENT
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 729 Heinz Avenue #7 | Berkeley CA 94710 | 510.542.2211 | [email protected] August 11, 2023
Wendy Wellbrock, Senior Civil Engineer
City of Richmond Public Works
450 Civic Center Plaza, 2nd Floor
Richmond, CA 94804
RE: Architectural Design Services for the Revitalizing the Historic Richmond Main Library Project Dear Ms. Wellbrock and Selection Committee:

Noll & Tam Architects is delighted to present a proposal for the remodel of the Richmond Main Library.

We are familiar with the library through our prior work evaluating the building and preparing documents for the City of Richmond’s Building Forward grant application, and we look forward to working successfully with you again.

Our firm was founded and based in Berkeley since 1992. Since that time, Noll & Tam has been continuously in business as a licensed design professional and has grown into a studio of 44 talented architects and designers focused on public work, community engagement, beautiful design, and sustainability.

We have planned and designed more than 60 library projects—including new construction, complex renovations, and furniture/finish refreshes. Recent projects include renovations for the Berkeley Central Library and the Santa Clara Mission Branch Library, and new libraries for the cities of Hayward, Half Moon Bay, and Capitola. We are currently working on two complex historic renovation and expansion library projects in Portland, Oregon, and multiple furniture and finishes refreshes in Petaluma, Healdsburg, and all branches of the Marin County Free Library system.

We are skilled in managing and designing complex renovation projects within strict time deadlines and budget parameters. The Richmond Library project will present many challenges, and the methodologies we have developed will allow us to deal with them effectively. In particular, at project initiation we will establish a detailed and accurate scope and carefully defined budget using an interactive scope/cost spreadsheet to give you more control over the prioritization process. We have a reputation for working collaboratively with librarians, project administrators, and community stakeholders to ensure that we incorporate the needs of the community into the designs while respecting the budget and schedule.

Community outreach will be key to the success of this project. We are pleased to be teamed with Contigo Communications , community engagement specialists, who recently worked with the City of Richmond on a Community Needs Assessment to prioritize ARPA investments, with a lens for those most disproportionately impacted by the COVID-19 pandemic. For this assessment, Contigo conducted 11 focus groups involving Richmond’s Latinx/Spanish-speaking, Black, Asian American, immigrant, youth, and senior communities.

With this depth of knowledge, Contigo is excited to partner with us for the renovation of the Richmond Main Library to enhance the resources available to residents of the city. We are currently teamed together on a needs assessment for an expansion of the downtown library for the City of Redwood City, for which Contigo is conducting a robust public outreach process aimed at gathering input from previously hard-to-reach Latinx and non-English speaking communities.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 03
Along with Contigo, our consultant team (outlined in our organization chart on page 15 of this proposal) includes a comprehensive group of experts, all located in the Bay Area with extensive public-works project experience in the region, and with whom we have long-standing and successful working relationships. Our core team includes ZFA Structural Engineers (structural engineering), Taylor Engineers (mechanical engineering, plumbing, and fire protection), O’Mahony & Myer (electrical engineering and lighting), [Frederic] Knapp Associates (historic architecture), TBD Consultants (cost estimating), BKF Engineers (civil engineering), and BASE (landscape architecture). Nine other firms support us to provide the full slate of services requested under this contract. Letters of commitment from all subconsultants are included in Appendix B. Noll & Tam and its subconsultants are registered as required with the California Department of Industrial Relations (DIR).

Our subconsultants and their staff qualify our team for the five (5) bonus points (per page 2 of Addendum 2) offered for this project. ZFA has an office and key staff member (Mark Moore) located at 126 Crest Avenue, Richmond, CA 94801, and BKF Engineers has an office located at 322 Harbour Way #23, Richmond, CA 94801.

I, Chris Noll, will lead this project, bringing 35 years of experience in developing forward-thinking library facilities. Alyson Yarus, our project manager, has extensive historic renovation experience, including Carnegie libraries in the cities of Alameda and San Rafael and work at Berkeley Central Library. Amy Watson, our project architect, also has experience with complex renovations and library projects (Capitola and a revitalization of the Sonoma State Library). Trina Goodwin is our library space planner, and Nadia Colquiett will focus on the interiors. We are offering you our best team, one that has worked closely together on many prior library and interior renovation projects.

I am authorized to bind Noll & Tam contractually to this proposal, which is a firm offer for a 120-day period.

We acknowledge receipt of all addenda to the RFP, and accept the terms of the City of Richmond’s contract template. We look forward to the next steps in this process.

Respectfully submitted,
Chris Noll, FAIA, LEED AP, Principal
Noll & Tam Architects
[email protected]
510.542.2211
Department of Industrial Relations (DIR)
Registration #10002750 (Expiration 6/30/2025)
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 04

2. PROPOSED APPROACH & SCOPE OF SERVICES

PROJECT APPROACH
The following represents our
understanding of the City of
Richmond Revitalizing the Historic
Richmond Main Library Project and
the key considerations our team will
engage with as we conduct the work.

The Library is ready to be brought
back to a level of modern usefulness,
sustainability, and “shine” that will
allow it to take its rightful place
in the Richmond Civic Center. We
have decades of experience making
historic buildings work well for
their modern uses, enhancing their
historic fabric and preserving it for
future generations while creating an
inspiring and forward-thinking place
for the Library to thrive.

A LIBRARY FOR THE
21ST CENTURY
The Richmond Main Library project is
an exciting opportunity to transform
a venerable library into an improved
and more valuable resource for the
people of the City of Richmond.

The project will build upon the
historic character of the original 1949
building, bringing new life to the aged
spaces and building systems, making
it fully accessible, and allowing for a
modernized approach to delivering
library services.

Our goal for this project is to create
library spaces for the 21st century—
spaces designed specifically to
respond to the needs of the people
who live here and that provide
welcoming places to gather, learn,
socialize, and play. Noll & Tam will
apply our considerable experience
with libraries and complex renovation
projects to identify creative ways
to improve operations and the user
experience while also meeting your
budget and schedule constraints.

Due to changes both in technology
and community expectations,
libraries are no longer just a place
where you go to borrow a book;
instead, they have become the hub
of the local community. To meet
community expectations for the
library of today and also to anticipate
the demands of tomorrow, Noll &
Tam will listen carefully to hear what
the community’s needs are so that
we can address them in programming
and design. We will design flexible
spaces that can be used in multiple
ways throughout the day and that
can adapt and evolve as programs
and service delivery methods change.

The City has put a good deal of
thought and energy into identifying
the tasks needed to meet the
project goals while providing the
most value for the City. We will start
with this task outline and apply our
expertise to help you understand
what is possible within the budget
and schedule, building on the work
already done, gathering community
input, discussing your options, and
directing a thorough design process
to produce a better experience for
patrons, improved functionality for
staff, and a facility that responds to
the needs of the community.

KEY CONSIDERATIONS

COLLABORATIVE

DESIGN PROCESS
A key element of our successful
partnership with public clients is the
ability to facilitate a collaborative
design process that responds directly
to concerns of all stakeholders
in the community. We will work
closely with City and Library staff to
identify important project priorities
and develop tangible design
strategies to achieve these priorities.

In particular, we will organize a
community engagement process
that could include such techniques
as task force meetings, surveys,
a web site, individual interviews,
focus groups, large community
meetings, and pop-up events in
order to establish a meaningful
and trusting relationship with this
community. We will determine what
makes the most sense with you.

We recently completed a deep
community engagement process for
two branch libraries in Northeast
Portland, which is an historically
disadvantaged community that has
suffered significant trauma over
the last 80 years. We developed a
process that specifically focused on
the most disadvantaged members
of this community to make sure
we addressed everyone’s needs
equitably, and the results were
remarkable in how they translated
into the design.

A LIBRARY FOR (ALL) THE AGES
Successful library spaces must
balance flexibility with the need to
create distinctive, memorable spaces.

We look to community history,
culture, and identity to curate a
unique sense of place, which along
with modern amenities will create a
library specific to this community.

Spaces for kids, teens, and families
are central to the library’s role in the
community because of their ability to
foster lifelong positive experiences.

CHILDREN’S AREA
Children’s areas must be charming
and capture childhood imaginations
yet must also be tough and durable,
welcoming hundreds of users
each day and facilitating a wide
range of activities. In addition to
providing a welcoming destination
for generations of children and their
families, the programming these
spaces provide can be a launch
pad to early childhood literacy and
preparation for a lifetime of learning.

TEENS
Increasingly, teens rely on library
spaces and access to technology
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 05
to support school requirements.

And, as most parents can attest,
teens rarely do only one thing at a
time—they may socialize, listen to
music, use a computer, send text
messages, and study simultaneously.

For teens to have their needs met
while co-existing with other library
users, dedicated spaces are needed.

Collections, seating, acoustical
separation, visual control, and a sense
of a place all factor into the success
of teen spaces.

STAFF SPACES AND

FUNCTIONALITY
Our design approach centers on
creating a public library that is as
functional as it is welcoming. How
will the design reduce barriers to
access to the facility, its resources,
and its services? In what ways will the
building strengthen the community?
With these touchstones in mind, we
will consider the needs of library staff,
through incorporating automated
material handling systems, book
drops, and accessible storage and
handling areas. The design will
incorporate clear sightlines, flexible
wiring systems, wireless technology,
changeable service desks, adaptable
lighting, mobile shelving, and
moveable walls.

SECURITY
Security is a key issue for most
libraries these days. We will work
with library staff to develop designs
that consider safety without being
exclusionary.

INTERIORS DESIGN
Noll & Tam’s work in libraries
and community centers involves
creating dynamic spaces that are
comfortable for all age groups,
provide clear wayfinding, and
incorporate a beautiful palette of
colors and finishes. We understand
how to satisfy all types of interior
space needs and how to incorporate
flexibility that allows for multiple
uses/accommodation of different
users over time. We work closely
with our clients and representatives
to select finishes that are durable as
well as aesthetically pleasing.

HISTORIC DESIGN
We have a flexible, intelligent,
and respectful attitude toward
improvements to historic buildings.

Required upgrades to building
systems and necessary accessibility
interventions must be compatible
and appropriate to what is already
there, and choices will need to be
made along the way to make the
facilities work well for their modern
uses. Solutions will be innovative and,
where possible, invisible; and if they
cannot be invisible, we will suggest
ways to make modern upgrades
compatible with the existing
architecture and in conformance
with the Secretary of the Interior’s
Standards for Treatment of Historic
Properties.

With Knapp Architects, our
historic architect, we will study the
historic structure reports provided,
conduct our own research and site
observations in order to understand
how—and how much—each
feature and material of the existing
building contributes to its historical
significance. We will prepare
diagrams, annotated drawings, and
photographs to share this information
with the Library and the City.

Often, aspects of a historic property
that are most vital to its integrity
are known only to locals. Our
public outreach process will help
us understand which parts of
the building and its site are most
appreciated and important to
Richmond residents. Simultaneously,
we will work with the Library to
determine project goals and the
desired program. Together, we will
develop constructive solutions to
the areas where sensitive portions of
the building must be affected—and
where new design initiatives need to
be inserted that must be compatible
with the character of the facility.

COST & BUDGET
A key task will be to balance the
practical with the aspirational—
developing a design that meets
your expectations for both fiscal
responsibility and community vision.

An early and important effort in
the programming phase will be to
reconcile the scope of the project
with the budget. This is a common
situation with public renovation
projects, as it is difficult to know in
advance of any detailed planning
work how much a building renovation
will cost.

To address this issue, we have
developed specific and objective
methodologies to bring the project
requirements into focus for our
clients. We will work closely with TBD
Consultants, our cost estimator, and
the City very early in the conceptual
design process to develop a shopping
list of the various potential scopes
and building upgrades, including the
complete construction cost for each
scope element. We will then work
closely with City and Library staff
to identify and prioritize the project
scope so we can establish a realistic
and achievable task scope that fits
the budget. We will continue to
monitor costs throughout the design
process to ensure that the scope and
budget are in alignment throughout.

A limited budget doesn’t necessarily
decree a limited project. We will
develop solutions that stretch the
budget and improve the spirit
and character of the facility while
maximizing functionality and solving
other programmatic needs. We view
ourselves as partners with the City
in stewarding limited dollars in an
appropriate and thoughtful manner,
and we will look for ways to put
construction dollars where they have
the most benefit.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 06

SCOPE OF SERVICES
TASK 1 – DATA COLLECTION

AND ANALYSIS
Task 1 Scope
This task will contain the site
investigation with preparation of a
field survey, Geotechnical Report,
Seismic Analysis and Hazardous
Materials Report.
*We will also conduct investigation
of the existing building envelope
with our waterproofing consultant to
inform the project treatment of the
historic building fenestration.

Task 1 Deliverables
Field Survey, Geotechnical Report,
Tier 1 & 2 Seismic Evaluation, HazMat
Report
TASK 2 – ENVIRONMENTAL /

CEQA SUPPORT
Task 2 Scope
Our team will validate the City’s
assertion that the project will qualify
for a Class 31 Categorial Exemption.

Task 2 Deliverables
Class 31 Categorial Exemption
Documentation
TASK 3 – PLANNING AND

CONCEPTUAL DESIGN, AND

COST ESTIMATES
Subtask 3A Scope - Space Needs
Assessment and Programming
Our team of architects and engineers
will tour the Library and meet with
stakeholders and selected staff to
identify current facility needs and
projected requirements. We will
establish the project goals which
will be used to make decisions
throughout the project. From
those meetings, we will develop
an architectural program that
addresses areas, adjacencies, spatial
qualities, security, major utility and
equipment requirements. We will
review the program and subsequent
space bubble diagrams with the
City of Richmond Project Team and
incorporate their feedback.

Furniture: We will work with City staff
to identify FF&E needs and make
recommendations for space planning,
and prepare an FF&E schedule
that can be incorporated with the
program elements.

Temporary Facility Study: Our team
will work with City staff to determine
the needs for a temporary facility and
site during the library construction.

We will prepare a feasibility study for
two possible locations identified by
City staff and provide cost estimates
for each.

Authorities Having Jurisdiction:

Our team will review regulatory
constraints for both building and
planning.

Site: Our team will assess current
parking conditions and delivery and
loading vehicle needs.

Subtask 3B Scope - Preliminary
Concept Plans
Our team will prepare a minimum of
two concept design (building/site)
to meet the programmatic needs
identified in Programming. Concept
design will incorporate feedback from
the Community Outreach efforts. We
will explore if an addition is a viable
or desired strategy in conjunction
with the concept cost estimate as
well insuring compliance with City
and State regulations. These ideas
along with the positive features and
limitations of each concept will be
communicated back in subsequent
City Staff meetings and Community
Engagement events.

Historic Building Consideration:

The proposed concept designs will
conform to Secretary of Interior
Standards for the Treatment of
Historic Properties.

Budget Alignment: Our team
believes that educating the
Community about all the costs of a
project is imperative to managing
expectations of the final building
outcome. Our concept cost estimates
will include market conditions,
pre-construction, mitigation work,
temporary library facilities, hazardous
materials abatement, construction,
contingencies, and escalation.

Subtask 3C Scope - Community
Outreach and Public Engagement
Contigo will be our community
engagement consultant and they
have recently completed an extensive
community outreach through the
Public Needs Assessment for ARPA
funds in Richmond in Summer
2022. Noll & Tam also has extensive
public library experience and we
recently published a white paper on
community engagement practices.

We plan to facilitate five community
meetings to gather input from the
public regarding the project. We
will also meet in a few small group
settings with City Stakeholders to
facilitate political support for the
project.

Meeting Schedule: 1. Two meetings
prior to conceptual design; One
meeting to present two conceptual
design options and gather feedback
on the preferred plan; One meeting
presenting the conceptual design;
and One meeting presenting the
schematic design.

Task 3 Deliverables
Draft and Final Program Spreadsheet,
Spacing Diagrams, Requirements
and Space Usage Summary, FF&E
Cost Estimate, Feasibility Study for
Temporary Relocation Site including
cost estimate; Two preliminary
conceptual plans with estimated
costs for construction, Presentation
Boards, PowerPoint Presentation,
Surveys, Agendas, and Minutes for
each community meeting.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 07
TASK 4 – DETAILED DESIGN

PLANS, SPECIFICATIONS, AND

COST ESTIMATES
Subtask 4A Schematic Design
(SD) Scope
We will develop the City’s preferred
concept design after meeting with
the City of Richmond Project Team
and our consultants to review project
parameters. This will be the first
opportunity for our consultants
not involved in previous tasks to
visit the site and perform field
investigations. The design prepared
will communicate how the spaces will
meet operational and programmatic
needs and be in line with the
project budget and City staff review
comments. We will assist the City
in presenting this information to
Stakeholders and the public. Quality
Control reviews will take place at the
end of each of the Task 4 sub-tasks –
SD, DD and 90% CD. *We will engage
a signage consultant and elevator
consultant starting in Task 4 to insure
project success.

Furniture: Our team will refine
furniture types and locations and
illustrate options for the aesthetics.

We will coordinate the necessary
infrastructure locations with our
engineers.

Authorities Having Jurisdiction/
Utilities: Our team will conduct
preliminary meetings with affected
agencies and utilities to prepare for a
successful approval process.

Site: Site improvement solutions
including parking, vehicle circulation,
path of travel, shading, trash
enclosure, lighting, landscaping,
stormwater treatment, utilities, will
be developed including Municipal
Regional Stormwater Regional
Permit (MRP) regulations specific to
Provision C.3 for redevelopment.

Budget Alignment: Our team will
submit documents and cost estimate
to the City’s Project Team for review.

We will re-visit the project goals
and project priorities established
by the Community and Stakeholder
Engagement process. Factors such
as the value of optional materials,
durability, life cycle costs, building
systems and equipment will be
discussed in relation to the program,
budget, and aesthetics of the design.

Sustainability: Our team will conduct
the LEED charrette, develop the
LEED score card, register the project
with USGBC, and ensure the project
meets the minimum LEED Silver
certification requirement. This scope
will also include developing the
commissioning plan, determining if
enhanced commissioning is needed
and determining if an initial study is
needed for CEQA.

Subtask 4A Schematic Design
(SD) Deliverables
Schematic Design Documents – Site
Layout, Landscape and Improvement
Plans, Floor, Furniture and Roof Plans,
Exterior Elevations, Building Sections,
Engineering Plans and Narratives,
and Solar modeling diagrams;
construction cost estimates, FF&E
schedule and cost estimate, LEED
score card and Project Schedule.

Subtask 4B Design Development
(DD) Scope
Our team will meet City of Richmond
Project Team and all Consultants
to discuss the status of the Project,
goals, scope, expectations, schedule,
and budget and further develop
Schematic Design Documents to
Design Development Documents.

Furniture: Further refine the FF&E
schedule, specifications, and cost
estimate.

Authorities Having Jurisdiction/
Utilities: Our team will assist City
staff with submitting a Planning
Application and facilitate the
Historic and Design Reviews to
obtain Planning Department. We
will also assist City staff with utility
permit applications, coordinate the
application process, and attend
meetings as needed.

Budget Alignment: The N&T team
will establish final optional building
and site enhancements and materials
to be considered for cost control and
bid alternates.

Presentations: We will meet with
key stakeholders to reconfirm the
direction of the Project and gather
comments and additional feedback
including assisting City staff with
the presentation of the Design
Development Documents to key
stakeholders.

Sustainability: We will obtain
CEQA notice of determination and
clearance and update the LEED score
card to LEED Silver certification
requirements including updating the
commissioning plan.

Subtask 4B Design Development
(DD) Deliverables
Design Development Documents –
Update SD documents with Interior
Elevations, typical construction
details, preliminary structural, MEP,
elevator, landscaping, data, telecom,
and audio visual plans added; 100%
DD construction estimate, preliminary
technical specifications, FF&E cost
estimate, LEED score card, CEQA
documents and project schedule.

Subtask 4C Construction
Documents (CD) Scope
The N&T Team will complete the
site, building, sustainability and FF&E
design and technical components
of the Project in this Task. We will
submit Construction Documents
and Cost Estimates at 50%, and 90%
intervals in preparation for Permit
Submittal and make adjustments
to the final design to align with the
City’s construction budget.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 08
Subtask 4C Construction
Documents (CD) Deliverables
50% and 90% Construction
Documents sets – Updated DD
documents to finalize construction
details and specifications; 50% and
90% construction cost estimates, final
cost estimate for FF&E, and LEED
score card.

TASK 5 – BUILDING PERMIT

SUBMITTAL, BIDDING SUPPORT
& CONFORMED SET
The 100% Construction Documents
– drawings and specifications-
will be revised to incorporate
any permit conditions to form
the Bid Set of documents. A final
cost estimate (90% CDs) shall be
provided with updated estimated
costs for construction, construction
contingencies, escalation.

Our team will support the City’s
bidding process by responding to
bidders’ questions pertaining to
the final plans and specifications,
attending the pre-bid conference and
site visit, and preparing bid document
addenda if clarifications are needed.

A conformed set of stamped
construction Contract Documents will
be created after construction bids are
received for use during construction.

Task 5 Permit/Bid Deliverables
Deliverables: 100% Construction
Document/Building Permit Set, final
cost estimate, technical specifications,
conformed set, final cost estimate for
FF&E, LEED score card, LEED design
credits
TASK 6 – CONSTRUCTION

AND CONSTRUCTION

ADMINISTRATION SUPPORT
Our team will conduct Construction
Administration Services including
attending the pre-construction
meeting and weekly construction
OAC meetings (virtual and on site),
conducting monthly periodic site
observations, observing construction
progress, issuing site visit reports,
and notifying the City and contractor
of defects and deficiencies. We
will respond to Requests for
Information, review substitution
requests, submittals (construction
and furniture), and shop drawings,
address design changes, errors and
omissions, and design coordination
issues, assist the City with ASIs and
change order review. Our team will
review contractor pay applications
and LEED documentation. We will
lead punch walks and create the
punch list. We will assist the City in
project closeout including providing
record documents, completing
commissioning and reviewing
Contractor as-builts.

Task 6 Construction
Administration Deliverables
Record Drawings, CAD files, LEED
documentation
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 09

3. RELATED PROJECT EXPERIENCE/EXPERTISE
Noll & Tam is a leader in thinking
about what a library can be, and we
are passionate about our work! We
have planned and designed more
than 30 renovations/expansions,
16 new libraries, and 25 concept
design studies and master plans. We
will provide the expertise to extend
the life of the Historic Richmond
Main Library with new systems and
services, and to design its spaces for
contemporary and future users.

SELECTED LIBRARY RENOVATIONS & EXPANSIONS
American Canyon Library
Bay Farm Island Branch, Alameda
Berkeley Central Library Improvements
Carmichael Branch Library, Sacramento
Contra Costa College Library Renovation
De Anza College Library Renovation
Freedom Branch Library, Watsonville
Golden Gate Branch Library, Oakland
Guerneville Library Refresh
Las Positas College Library Improvements
Live Oak Library Annex, Santa Cruz
MLK Jr. Branch Library, Oakland
Menlo Park Library Lobby
Mission Branch Library, Santa Clara
Mountain View Library
Multnomah County Albina and North
Portland Libraries, Oregon
Napa County Main Library
North Highlands-Antelope Branch
Library, Sacramento
Petaluma Library Refresh
Rockridge Branch Library TeenZone,
Oakland
Santa Cruz County Live Oak Library Annex
Southgate Branch Library, Sacramento
Sylvan Oaks Branch Library, Sacramento
Stanford University Rumsey Map Center
Temescal Branch Library, Oakland
UC Berkeley Bancroft Library, Doe
Library Annex
UC Berkeley Haviland Hall Student
Commons & Library Renovation
UC Berkeley Moffitt Library West Terrace
Canopy
UC Berkeley Doe Library Surge Renovation
University of Redlands Armacost Library
Renovation
Weekes Branch Library, Hayward
West End Branch, Alameda
West Oakland Branch Library

NEW CONSTRUCTION
Cañada College Library & SRC
Capitola Branch Library
Castro Valley Library
Felton Library Interior Design
Half Moon Bay Library
Hayward Library/Learning Center
Laney College Library & Learning
Resource Center
Los Gatos Library
Marina Branch Library
Morgan Hill Library
Portola Branch Library, San Francisco
Rohnert Park Library
Sacramento Valley Hi-North Laguna
Library
Saint Mary’s College of California Library
& Learning Commons
San Leandro Mulford-Marina Branch
Library
Solano College Library & LRC

KEY FEATURES
„ URBAN CONTEXT
„ COMMUNITY MEETING &

LEARNING CENTER
„ CHILDREN’S/TEEN AREAS
„ MAKERSPACE & MEDIA LAB
„ TEEN OUTREACH PROCESS
„ COMPLEX STRUCTURAL

SYSTEM (ON FAULT-LINE)
„ FF&E
„ LEED PLATINUM/ZNE

PROJECT INFORMATION
Location: Hayward, CA
Size: 58,000 SF
Construction Cost: $51.8M
Client: City of Hayward
Date Completed: Sept. 2019
Team Members: Chris Noll,
Trina Goodwin

HAYWARD LIBRARY &

COMMUNITY LEARNING CENTER
This new three-story library on an urban site adjacent to Heritage Plaza is an innovative resource for Hayward’s diverse community. The 58,000 SF library includes two homework centers and classrooms and educational spaces for an adult learning center. It is one of the largest Zero Net Energy public libraries in the country and has a rainwater catchment system that saves and recycles 500,000 gallons of water per year. In terms of design, sustainability, technology, and service delivery, this is truly a 21st century library.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 10

KEY FEATURES
„ HISTORIC BUILDING

RENOVATION
„ URBAN CONTEXT
„ SPACE PLANNING
„ MULTI-GENERATIONAL
SPACES
„ TEEN ZONE & COMMUNITY

PROCESS
„ RESTORATION OF HISTORIC

READING ROOM
„ FF&E

PROJECT INFORMATION
Location: Berkeley, CA
Size: 16,000 SF
(area of renovation)
Client: Berkeley Public Library
Date Completed: June 2021
Team Members: Chris Noll,
Alyson Yarus, Amy Watson,
Trina Goodwin

BERKELEY CENTRAL LIBRARY RENOVATION
Noll & Tam Architects improved the public spaces in the historic Berkeley Central Library by providing space planning and design services. A study was conducted in 2014 to suggest cost-effective alternatives and solutions to improve the interior public spaces without substantial structural modifications. Initially, the renovations were planned to be phased in order to keep the library operational. The first phase in 2018 completed a Library Lounge area on the first floor. While the library was closed due to COVID-19, a variety of improvements were made on the first and second floors, including a new Teen Room (designed with community input), new service desks, and gender-neutral restrooms.

KEY FEATURES
„ HISTORIC RENOVATION

OF CARNEGIE LIBRARIES
„ EXTENSIVE COMMUNITY

OUTREACH
„ NEW ADMINISTRATIVE

HEADQUARTERS FOR

COUNTY LIBRARY
„ SIGNIFICANT EXPANSION

PROJECT INFORMATION
Location: Portland, OR
Client: Multnomah County
Public Library
Construction Budget:

Albina $28M
North Portland $6.8M
Size: Albina 30,000 SF
North Portland 9,044 SF
Completion Date: In Progress
Team Members: Chris Noll,
Trina Goodwin, Nadia Colquiett

MULTNOMAH COUNTY LIBRARY RENOVATIONS
Noll & Tam and LEVER Architecture are working with Multnomah County to expand and renovate two historic Carnegie library buildings in Northeast Portland: the North Portland Library and the Albina Branch Library. The projects have involved extensive community engagement efforts (with more than a dozen engagement activities conducted, including a YODA [Youth Opportunity Design Approach] teen process) to seek feedback from BIPOC and marginalized communities to ensure equitable and just outcomes without compromising the historic integrity of the buildings. The library’s new Black Community Cultural Center was conceived in response to community voices during the engagement process.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 11

KEY FEATURES
„ RENOVATION OF MID-

CENTURY MODERN

LIBRARY
„ COMMUNITY ROOM
„ INTERIORS/FF&E
„ CONNECTION TO OUTDOOR
SPACE
„ LEED SILVER
„ ADA UPGRADES
„ STUDY ROOMS

PROJECT INFORMATION
Location: Santa Clara, CA
Client: City of Santa Clara
Construction Cost: $4.2M
Size: 8,400 SF
Date Completed: Aug. 2018
Team Members: Chris Noll,
Trina Goodwin

SANTA CLARA MISSION BRANCH LIBRARY
Noll & Tam was hired to complete the remodel and expansion of the Mission Branch Library in Santa Clara. Working collaboratively with library staff and patrons, Noll & Tam created a design which updated both the library’s exterior and interior with the goals of improving accessibility, increasing access to technology, improving energy efficiency, and creating a modern, vibrant space that reflects the community. We updated the Community Room, Reading Room, kitchen, restrooms, staff area, mechanical room, server room, and existing exterior patios and pathways. Additionally, we added four new study rooms, a new patio adjacent to the Community Room.

KEY FEATURES
„ EXTENSIVE COMMUNITY

ENGAGEMENT PROCESS
„ NATIONAL AIA/ALA

LIBRARY BUILDING AWARD
WINNER (2019)
„ FLEXIBLE COMMUNITY
ROOM
„ CHILDREN’S/TEEN AREAS
„ MAKERSPACE
„ FF&E
„ INDOOR-OUTDOOR

CONNECTION
„ LEED PLATINUM/ZNE

PROJECT INFORMATION
Location: Half Moon Bay, CA
Size: 22,000 SF
Construction Cost: $18.9M
Client: City of Half Moon Bay
Date Completed: June 2018
Team Members: Chris Noll,
Alyson Yarus, Trina Goodwin

HALF MOON BAY LIBRARY
Noll & Tam worked with the City of Half Moon Bay on the design of a new 22,000 SF library that replaced an existing 7,285 SF facility. The library, a regional branch of San Mateo County Libraries, is a hub of community activity that serves all age ranges and diverse user needs. Noll & Tam’s design honors the coastal and agricultural roots of the community while serving current and future technology needs. The library features daylit interior spaces, outdoor reading plazas, acoustically separated areas for teen activities, quiet reading spaces, and a flexible makerspace. The library opened to great celebration in August 2018.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 12

KEY FEATURES
„ NEW CONSTRUCTION
„ OUTREACH PROCESS WITH

COMMUNITY ADVISOR

TASKFORCE
„ COMMUNITY MEETING
SPACE
„ CHILDREN’S/TEEN AREAS
„ FF&E
„ SENSE OF PLACE/

COMMUNITY IDENTITY
„ QUIET READING ROOM
„ OUTDOOR CONNECTION

PROJECT INFORMATION
Location: Capitola, CA
Size: 11,700 SF
Construction Cost: $13.2M
Client: City of Capitola
Date Completed: June 2021
Team Members: Chris Noll,
Amy Watson, Trina Goodwin

CAPITOLA BRANCH LIBRARY
Noll & Tam worked with Santa Cruz Public Libraries and the City of Capitola to design the new Capitola Library. A strong public outreach process, with presentations and discussions with the community, client stakeholder group, and at city council meetings, helped us develop the right program and library for the community and the neighborhood. The library features flexible, modern spaces in a building that feels unique to Capitola through the use of site-specific materials, local art, and whimsical furniture that gives personality and reinforces a sense of place. Reflecting the city’s natural setting and beauty, the design incorporates quiet, outdoor reading spaces and a pedestrian connection to a nearby creek.

FACILITATION OF PUBLIC MEETINGS & CONSENSUS BUILDING
Noll & Tam and Contigo have
extensive experience in building
consensus and working with diverse
communities.

COMMUNITY ENGAGEMENT

TOOL KIT
As a firm specializing in public
buildings, Noll & Tam engages with
community groups on nearly all of
our work. Over the past 30 years,
on more than 70 public projects,
we have hosted nearly 300 unique
engagement activities. We have
documented this work in a Design
Engagement Tool Kit (which can
be viewed/downloaded at the link
below). Through this work, we have
hosted large-scale community
meetings, focus group discussions,
one-on-one interviews, and
numerous pop-ups.

Design Engagement Tool Kit
Link to download

HALF MOON BAY LIBRARY
For the Half Moon Bay Library,
the Noll & Tam team worked with
a diverse community that had
competing interests about how public
funds should be spent. Through
an open and sometimes difficult
process, we were able to come to
a compromise solution that the
community ultimately embraced.
“Ensuring that the community feels
represented is important for the
success of the project; activities
that allow for public feedback can
help develop a sense of trust in the
project team, as well as community
ownership of the project overall.”
—Annie Mailey, Branch Manager,
Half Moon Bay Library

MULTNOMAH COUNTY

LIBRARY RENOVATIONS
Noll & Tam’s work in Portland,
Oregon, to restore and expand
two historic Carnegie libraries in a
traditionally Black neighborhood
incorporated more than a dozen
public engagements. As one outcome
of this process, the Library elected
to create a Black Community
Cultural Center—a special new
area of the library to celebrate and
honor the Black experience in the
neighborhood.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 13
OUR PARTNER: CONTIGO
For the Richmond Main Library
project, we are joined by Contigo
Communications, who worked
recently with the City of Richmond
on a Community Needs Assessment
for prioritizing ARPA (American
Rescue Plan Act) funds. This work
included nearly a dozen focus
groups with citizens in Richmond,
as well as meetings with individual
stakeholders. As a result, our
team brings direct experience
with outreach to the Richmond
community.

RANKING/

PRIORITIZING NEEDS
We have direct and extensive
experience in ranking and prioritizing
project needs vis-a-vis construction
budget limitations. Given the high
cost of construction recently and
the inflationary period we have been
experiencing, we enage in proactive
and thoughtful management
approaches on all of our projects to
ensure budgets are met.
• Comprehensive Building
Evaluations: We believe in doing
our homework up front the more
we can uncover early in the process
the better we are able to address
challenges.
• Accurate Cost Estimating: Working
with our cost estimator we
gather costs for each essential
problem from accessibility and
code upgrades to understanding
the building system costs, and
upgrades to interior finishes.

Each item must reflect necessary
contingencies and escalation.
• Targeted Interventions: We can
then work with the city through
the “must do” items and things that
will make the biggest impact on
refreshing the building. Through
this process we come up with a
plan for moving forward. that fits
the construction budget.
• Tools for Understanding Choices:

We use multiple tools, we create
a “shopping list” of options so
stakeholders can understand the
cost implications of choices, and
a “lookbook” of options showing
renderings so people can visualize
the “what ifs” of options.

MANAGEMENT

APPROACH
Over many years of preparing
documents for public bids, Noll
& Tam has developed a rigorous
approach to ensure quality and
thoroughness of construction
documents, plans, and specifications.

Starting with highly experienced
staff, we carefully plan our work
and the products we will deliver
at each project milestone and
incorporate independent quality
assurance reviews in each phase. At
each milestone submittal, a senior
Noll & Tam architect not directly
involved with the project conducts
an in-house peer review to test areas
of the documents for any needed
improvement. This is our standard
process, and our review extends
to the documents prepared by
our subconsultants to help assure
that drawings, specifications, and
estimates are consistent, complete,
well-coordinated, and clear.

ABILITY TO MEET

SCHEDULE/BUDGET
Schedule Control. Noll & Tam
has a strong track record of
meeting schedule commitments
and managing project staffing
and delivery. We carefully plan a
realistic and achievable schedule
at the outset and commit our
full design team—including all
subconsultants—to meeting this
schedule, and we monitor progress
carefully throughout. We have chosen
our subconsultant team based on
existing trusted relationships with
them over the course of multiple
previous successful projects. We work
only with subconsultants that have
proven themselves reliable.

Cost Control. All design decisions
have cost implications, and all
projects have finite budgets. At the
beginning of each of our projects, the
Noll & Tam design team reviews and
confirms the project’s program and
budget. For most of our projects, we
initiate an interactive process with
our cost estimator at the start of a
project and produce detailed cost
estimates at appropriate points in
the design process. As we progress
through the subsequent design
phases with our cost estimator, we
test and fine tune the program and
budget and incorporate feedback
from building users and staff.

We carefully review the estimates,
and ask that our consultants do so
as well. The estimate detail helps
us understand how a bidder will
interpret our drawings, and gives
us insight into ways the documents
can be made more concise. We are
also able to identify areas where the
scope of the project can be adjusted
to bring costs into alignment with the
budget.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 14
Noll & Tam Architect Architecture; FF&E
ZFA Structural Engineers Structural Engineering
Taylor Engineers Mechanical Engineering; Plumbing; Fire Protection; Mechanical LEED Modeling
O’Mahony & Myer (OMM Consulting) Electrical Engineering; Lighting; Fire Alarm Contigo Communications Community Engagement
Knapp Architects Historic Architecture
TBD Consultants Cost Estimating
BKF Engineers Civil Engineering; Survey
Base Landscape Architecture Landscape Architecture
Salter, Inc. Acoustics; Audiovisual; Low Voltage/Security Red Car Analytics Commissioning
Brightworks Sustainability LEED Certification
Wiss, Janney, Elstner Associates, Inc. Waterproofing
Langan Engineering and Environmental
Services, Inc.

Geotechnical
LSA Associates CEQA Support
Q&A Consulting LLC Hazardous Materials
E Sellen Consulting, LLC Elevator
Matthew Williams Design Signage/Wayfinding

4. QUALIFICATIONS OF KEY PERSONNEL
Our design team brings together the
talents of experts who understand
public libraries. Below are bios of
the key individuals from the core
team of Noll & Tam and Contigo
Communications who are proposed
to work on this project. Our full
consultant team and key staff are
shown in the organizational chart
on page 15. All of these key staff
have the availability to work on the
Richmond Library project and will be
committed to the project throughout
its duration. Each firm has the ability
to draw upon other in-house staff
if additional resources are needed.

Resumes of all key staff members are
included Appendix A.

CHRIS NOLL, FAIA, LEED AP

PRINCIPAL IN CHARGE
15% PROJECT AVAILABILITY
Chris brings
strong skills in
collaborating
with clients and
directing projects
through all phases
of design while
remaining sensitive to the needs and
concerns of library stakeholders and
users throughout the process. His
role will be to lead the renovation
design process and keep a sharp eye
on the budget. Chris is very familiar
with the needs of 21st century library
facilities and is adept at building
consensus among diverse interest
groups. He has led all of Noll &
Tam’s public library projects and
understands the important factors
that create successful library spaces.

Through his close relationships
with public librarians throughout
the state, Chris stays on top of new
trends in librarianship, and brings a
visionary perspective to the entire
process. Recently, Chris was involved
in the extensive public outreach
process for two branch libraries in
historically Black and underserved
neighborhoods in the Multnomah
County (Oregon) library system.

ALYSON YARUS

PROJECT MANAGER
35% PROJECT AVAILABILITY
Alyson is a
registered
architect and
LEED Accredited
Professional with
more than 28 years
of experience. She
has been with Noll & Tam since 1997
and is an associate principal of the
firm. Alyson’s ability to listen carefully
to clients and user groups while
keeping all aspects of the project
well-organized has enabled her to
continually deliver complex projects
on time and on budget. Alyson
has served as project manager for
many renovation projects that have
involved balancing the needs of
multiple user groups and project
stakeholders with the constraints
of existing infrastructure and strict
project schedules.

AMY WATSON

PROJECT ARCHITECT
35% PROJECT AVAILABILITY
Amy has a strong
background in
space planning,
programming and
interior design,
including furniture
selection. Amy led
the visioning for the Sonoma State
Library Revitalization, and was an
integral part of the Capitola Library
team. She also was project architect
for the Midpeninsula Regional Open
Space District Office Headquarters,
a complex renovation of an older
building that integrates the client’s
vision into their new space. Amy’s
design and visioning skills are
complemented by a strong technical
background. She is able to bring
disparate user groups to consensus
and move projects forward.

TRINA GOODWIN, LEED AP

LIBRARY SPACE PLANNER/

INTERIORS ARCHITECT
30% PROJECT AVAILABILITY
Trina is not only an
experienced and
adept facilitator
of community
engagement, she
offers the unique
perspective of
an architect and interior designer
specializing in space planning and
FF&E. Over the past 25 years she
has developed a specialization in
designing joyful and energizing
community spaces and library spaces.

She will work side by side with Chris,
Alyson, Amy, and Nadia, participating
in all phases of the project and
ensuring that the recommendations
are budget conscious and
appropriate to the context and
community. Trina was heavily
involved in recent branch library
projects for the Multnomah County
Library, engaging in outreach and
translation of input received into the
physical space of the libraries. She
also specializes in selecting durable,
functional and beautiful furniture and
finishes for high-use public spaces.

NADIA COLQUIETT
FF&E
40% PROJECT AVAILABILITY
Nadia Colquiett
is an integral
part of Noll &
Tam’s interiors
team, working on
interior design
options, including
functional, flexible fixture and
furniture elements, for library
renovations/refreshes and tenant
improvement projects. Bringing five
years of experience, Nadia excels at
creating fun, vibrant environments
while being mindful of the budgets
of public clients. She is committed to
the creation of inclusive, accessible
design and expanding diversity in the
design industry.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 15
in a wide range of HVAC design
project types, including office
buildings, laboratories, high-rise
residential, commercial kitchens, and
cultural buildings.

Pieter Colenbrander, P.E., LEED AP,
Principal, Electrical Engineering,
OMM (20% Availability). Pieter
Colenbrander is a licensed
professional engineer with over 35
years of experience in the field. Pieter
has served as electrical principal-
in-charge and project manager for
many library projects, both new
construction and modernizations,
as well as building assessments and
master planning efforts.

Amy Muhl, Cost Estimating
Principal, TBD (25% Availability).

Amy Muhl has over 20 years of
experience in providing a full range
of cost management and cost
control services throughout all
design phases, including advising
on construction and overall project
costs, establishing project budgets,
performing value engineering
services, benchmarking and bid
analysis.

Jonathan Tang, PE, LEED AP,
QSD/P, Civil Engineering Principal-
in-Charge, BKF (20% Availability).

With 21 years of civil engineering
design and construction experience,
Jonathan specializes in projects
including community development,
residential, commercial, educational,
utility infrastructure, and railroad
grade separation projects for local
municipalities and private sector
clients.

Patricia Algara, RLA, ASLA,
Principal Landscape Architect,
BASE (20% Availability). Patricia
is a recognized leader in coalition
building and community-driven
design. She creates landscapes that
immerse children and families of all
backgrounds and abilities in learning,
exploration and play.

SUSANA RAZO

PUBLIC OUTREACH LEAD
30% PROJECT AVAILABILITY
Susana is principal
and founder of
Contigo. Susana
has worked in
community and
stakeholder
engagement her entire professional
career, and in a consulting capacity
for 15+ years. She specializes in
conducting meaningful community
engagement of diverse hard-to-
reach communities, and in strategic
communications while prioritizing
racial equity principles. Susana is a
first generation Mexican American
who was born and raised in San
Francisco’s Outer Mission/Ingleside
and Bayview neighborhoods, and
was the first in her family to attend
college. Susana is fluent in Spanish.

MILTON REYNOLDS

PUBLIC OUTREACH

FACILITATOR
25% PROJECT AVAILABILITY
Milton is part of
the Contigo team
and the founder
of Reynolds
Consulting,
a nationally
recognized equity and inclusion
firm. Milton has three decades of
experience in diversity, equity and
inclusion work. He engages with
a wide range of institutions to
translate aspirations toward equity
into actionable steps. His historical
knowledge base, critical race theory
rooted practice and pedagogical
mastery enable him to design
learning experiences that predictably
expand participants’ knowledge
base, increase their capacity to
communicate across perceived
differences, and equip them with
skills to translate new learning into
sustainable and transformative
actions. Milton grew up in the Bay
Area and lives in San Leandro. He
serves on the board of the Paul K.

Longmore Institute on Disability.

JADE DEFRANCIA

PUBLIC OUTREACH

COMMUNICATIONS MANAGER
40% PROJECT AVAILABILITY
As a marketing and
creative manager
for Contigo, Jade
understands the
importance of
conveying a clear
message to project stakeholders. Her
ability to communicate effectively
helps her to build strong relationships
with team members, clients, and
target audiences. Jade’s passion for
DE&I (Diversity, Equity & Inclusion)
work shows her commitment to
creating inclusive and equitable
environments, and her eye for
design and creative communications
strategies results in visually
appealing and engaging content that
resonates with audiences.

OTHER CORE STAFF
Frederic Knapp, Historic Architect
(25% Availability) . Frederic Knapp
has 37 years of experience in historic
preservation architecture. Registered
in California and Arizona, he has
worked in all phases of architectural
practice, from pre-design and
programming to post-occupancy and
forensic investigation.

Ryan Bogart, SE, Structural
Project Manager, ZFA (30%
Availability). Over the past 14 years,
Ryan has served in the role of
structural engineer of record, project
manager, and design engineer for
a wide variety of projects, including
as-needed services for the City of
Richmond.

David Heinzerling, PE, Mechanical
Principal, Taylor (10% Availability).

David Heinzerling is a registered
Mechanical Engineer with experience
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 16

NOLL & TAM ARCHITECTS
Prime Architect
Chris Noll, FAIA, LEED AP
Principal in Charge
Alyson Yarus,

LEED AP
Project Manager
Amy Watson, AIA,

LEED AP
Project Architect
Trina Goodwin,

LEED AP
Library Space Planner
Nadia Colquiett
FF&E

CITY OF RICHMOND

ORGANIZATION CHART

SUBCONSULTANTS

CONTIGO COMMUNICATIONS
Community Engagement
Susana Razo
Engagement Principal & Project Lead
Milton Reynolds
Engagement Facilitator, Racial Equity Advisor
Jade Defrancia
Engagement Marketing &
Communications Manager

ZFA STRUCTURAL ENGINEERS
Structural Engineering
Mark A. Moore, SE, LEED AP
Structural Principal-in-Charge
Ryan Bogart, SE
Structural Project Manager

TAYLOR ENGINEERS
Mechanical / Plumbing / Fire
Protection
David Heinzerling, PE
Mechanical Principal
Lavanya Muttayan, PE, CPD,
LEED AP BD+C
Plumbing & Fire Protection Principal
O’MAHONY & MYER
Electrical Engineering / Lighting
Pieter Colenbrander, PE, LEED AP
Electrical Principal
David Orgish, MIES, LEED AP
Lighting Design Principal

KNAPP ARCHITECTS
Historic Architecture
Frederic Knapp
Principal

TBD CONSULTANTS
Cost Estimating
Amy Muhl
Cost Estimating Principal

BKF ENGINEERS
Civil Engineering / Surveying
Jonathan Tang, PE, LEED AP, QSD/P
Civil Principal-in-Charge
Walter Stemberga
Survey Manager
BASE
Landscape Architecture
Patricia Algara, RLA, ASLA
Landscape Principal
Martha Clifford
Landscape Project Manager
SALTER
Audiovisual / Acoustics / Telecom /
Low Voltage / Security
Jeremy Decker, PE
Salter Project Manager
Ryan Raskop, AIA, RCDD, PSP, LEED AP
Low Voltage Technology Lead

RED CAR ANALYTICS
Commissioning
Michele Sagehorn, CEM, LEED AP
Commissioning Authority
WJE
Waterproofing
Lee K. Eckert
Waterproofing Project Manager

BRIGHTWORKS
LEED Energy Modeling / Certification
Lauren Fakhoury, LEED AP BD+C, O+M
Sustainable & Healthy Buildings Lead
Alan Cabral, LEED AP BD+C, O+M,

CPM, BCXP
Commissioning & Energy Specialist

LANGAN ENGINEERING &

ENVIRONMENTAL SERVICES
Geotechnical Engineering
Elana Ayers, PE, GE
Geotechnical Engineer

LSA ASSOCIATES
CEQA Support
Matthew Wiswell, AICP
Senior Environmental Planner

Q&A CONSULTING LLC
Hazardous Materials
Que Alicea
Project Manger
Tedd Kattchee
Monitoring & Field Consultant

JE SELLEN CONSULTING
Elevator
Edwin Essary
Elevator Consultant

MATTHEW WILLIAMS DESIGN
Wayfinding / Signage
Matthew Williams
Graphic Design & Wayfinding Consultant
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 17

5. SUBCONSULTANTS

COMMUNITY ENGAGEMENT

CONTIGO
https://www.contigo-partners.com/
Contigo is a minority woman-
owned business with over 25
years of experience in strategic
communications, community
outreach, and meaningful
engagement of diverse groups
and hard-to-reach communities.

Contigo’s work includes DEI capacity
building, infrastructure and public
space planning, school projects, real
estate mixed-use developments,
environmental cleanups, strategic
planning and racial equity consulting.

Contigo recently worked with the
City of Richmond on a Community
Needs Assessment to prioritize ARPA
investments.

STRUCTURAL

ZFA ENGINEERS
https://www.zfa.com/
ZFA (located in Richmond) has
50 years of experience includes
providing feasibility studies, seismic
and safety upgrades for the retrofit
and revitalization of existing
structures, and sustainable design for
new construction. ZFA has extensive
experience providing rehabilitation
and remodels to dozens of California
public libraries and provided the
initial structural/seismic evaluation
and development of the 2018
Building Data Sheet for Richmond
Historic Main Library.

MECHANICAL, PLUMBING,

FIRE PROTECTION

TAYLOR ENGINEERS
https://www.taylorengineers.com/
Founded in 1995, Taylor Engineers
is a nationally recognized
engineering firm specializing in
building mechanical systems design,
energy conservation and energy
analysis, energy management and
control system design, and system
commissioning. Taylor has built a
national reputation as experts in
HVAC, plumbing, and fire sprinkler
systems design. Taylor Engineers
addresses critical industry challenges
by utilizing a broad range of analysis
capabilities to effectively enhance
building design and performance.

Through building energy simulation,
Taylor can better inform decisions,
conduct life cycle cost analyses, and
support code and LEED evaluations.

ELECTRICAL, LIGHTING
O’MAHONY & MYER
https://www.ommconsulting.com/
Founded in 1979, O’Mahony &
Myer (OMM) provides full-service
electrical engineering and lighting
design services. OMM has designed
electrical lighting, power, and signal
systems for hundreds of public
libraries, community centers, and
civic centers throughout California.

OMM is proficient in designing state-
of-the-art electrical and lighting
systems for libraries, to accommodate
the ever-growing technological
requirements of modern civic
buildings. OMM is also a leader in
sustainable design principles, finding
innovative solutions that significantly
minimize energy consumption and
pave the way for achieving LEED
certification.

HISTORIC ARCHITECTURE

KNAPP ARCHITECTS
https://knapp-architect.com/
Knapp Architects specializes in
historic architecture, conservation
services, research, and preservation
consulting. Many of the firm’s
projects have included review under
local standards and guidelines as
well as the National Environmental
Policy Act (NEPA), the California
Environmental Quality Act (CEQA),
the National Historic Preservation
Act (Section 106), and the Federal
Historic Preservation Incentives
Program (federal preservation tax
credits).

COST ESTIMATING

TBD CONSULTANTS
https://www.tbdconsultants.com/
TBD Consultants is a certified small
business providing construction
cost management and project
management services to owners
and professional consultants.

TBD specializes in developing
construction cost estimates based
on the most conceptual information
as well as the detailed and complex
later stages of design. TBD’s team
members are experts in project
delivery, schedule analysis, and
project delivery, schedule analysis,
and project controls services. TBD
provides clients with defensible and
reliable information at all stages of a
project, and lends expertise to control
time and budget, and manage risks
from project inception to completion.

CIVIL, SURVEY

BKF ENGINEERS
https://www.bkf.com/
For over 100 years BKF (located in
Richmond) has successfully planned,
designed, surveyed, and implemented
complex projects. The firm provides
civil engineering, land surveying, and
land planning service for many types
of clients, facilitating the permitting
and expertise requirements of each
project. BKF provides specialty
services such as agency permit
expediting, sustainable infrastructure,
site accessibility, hydrology/
hydraulics, traffic handling designs,
utility location services, automated
construction surveying monitoring
and 3D laser scanning.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

NOLL & TAM ARCHITECTS
HISTORIC RICHMOND MAIN LIBRARY 18

LANDSCAPE ARCHITECTURE
BASE
https://www.baselandscape.com/
BASE is a woman-owned, minority
business enterprise providing
full-service landscape architecture
services. BASE works with local
communities to ensure that individual
stories are threaded into the fabric of
each project. The team are practiced
leaders in bilingual (English/Spanish
and English/Cantonese) facilitation
and community engagement and
facilitation. BASE emphasizes
sustainable landscapes of learning
and innovation, with measurable
positive impacts on productivity,
health, and well-being.

AV, ACOUSTICS, TELECOM,

LOW VOLTAGE, SECURITY
SALTER
https://www.salter-inc.com/
Salter provides acoustics, audiovisual,
telecom, low voltage, and security
consulting. Founded in 1975,
Salter has consulted on over 800
renovation and historical reuse
projects and thousands of civic
projects varying from libraries,
community centers, event spaces,
and educational facilities.

COMMISSIONING

RED CAR ANALYTICS
https://redcaranalytics.com/
Red Car Analytics offers building
energy advisory and commissioning
services. The team is on a mission
to find reliable carbon neutral
building solutions that scale and
make buildings high functioning,
healthy environments for people
and the planet. Red Car’s experts are
committed and collaborative, and
involved from the beginning to the
end of the project.

LEED ENERGY MODELING &

CERTIFICATION

BRIGHTWORKS
https://brightworks.net/
Brightworks Sustainability, a LEED
Proven Provider of the U.S. Green
Building Council, offers time-tested
approaches to leading project teams
through a certification process.

Brightworks has more than 30 staff
who operate exclusively to manage
LEED and other green building
programs. The firm has managed the
successful certification of over 400
LEED projects.

WATERPROOFING
WJE
https://www.wje.com/
WJE is an interdisciplinary firm of
architects, engineers, and material
scientists providing a wide range of
consulting and research services in
all areas of construction technology.

The firm combines state-of-the-
art laboratory and testing facilities,
nationwide offices, and knowledge-
sharing systems to provide solutions
for both new and existing structures.

GEOTECHNICAL
LANGAN
https://www.langan.com/
Founded in 1970, Langan provides
geotechnical, site/civil, environmental,
and earthquake engineering services
in support of land development
projects, winning awards from the
American Society of Civil Engineers,
Urban Land Institute, California
Preservation Foundation, and the US
Environmental Protection Agency.

CEQA SUPPORT

LSA ASSOCIATES
https://lsa.net/
LSA Associates, established in 1976,
is an employee-owned environmental
consulting firm providing multi-
disciplinary environmental
planning, land use planning, and
regulatory permitting services. LSA
provides expertise in CEQA and
NEPA documentation, biological
resources, wetland permitting,
cultural resources, water quality,
transportation, air quality, global
climate change, and noise.

HAZARDOUS MATERIALS

Q&A CONSULTING
https://www.qaconsulting-llc.com/
Founded in 2020, Q&A Consulting
LLC is a Black American Owned
and Woman Owned business with
extensive experience providing
hazardous materials testing, including
asbestos, mold, lead, soil, and water.

ELEVATOR

JE SELLEN
https://jesellen.com/
JE Sellen Consulting, Inc. specializes
in passenger and freight elevators,
escalators, material lifts, and
handicapped access lifts. The firm
provides new system design and
analysis, modernization, technical
specifications, construction
management, audits, equipment
assessment, and planning related to
vertical transportation equipment.

WAYFINDING, SIGNAGE

MATTHEW WILLIAMS
DESIGN
https://www.matthewwilliamsdesign.
com/
Matthew Williams has over 20
years of experience in designing,
developing, and producing
environmental graphics and
signage programs for a variety of
environments. He has worked with
Noll & Tam on signage and branding
systems for the Hayward Library and
Heritage Plaza Park, Capitola Library,
and Los Gatos Library projects.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 Firm Name: Noll & Tam Architects 10/4/2023
Project Title: Richmond Library Renovation
Construction Budget $21,000,000

DISCIPLINE FIRM NAME
TASK 1 DATA

COLLECTION
FEE
TASK 2 CEQA
FEE
TASK 3A

PROGRAM
FEE
TASK3B

CONCEPT
FEE
TASK 3C

COMMUNITY

ENGAGEMENT
TASK4A
SD FEE
TASK4B DD
FEE
TASK 4C CD
FEE
TASK 5

PERMIT/BID
FEE
TASK 6 CA
FEE
TOTAL

DESIGN FEE

REIMBURS-
ABLES

TOTAL DESIGN

FEE WITH

REIMBURSE-
ABLES
BASIC SERVICES:

ARCHITECTURAL Noll & Tam 30,620 $ 5,180 $ 62,120 $ 59,200 $ 68,360 $ 165,000 $ 178,080 $ 277,760 $ 52,940 $ 334,480 $ 1,233,740 $ 15,000 $ 1,248,740 $
STRUCTURAL ZFA 16,560$ 2,280$ 2,280$ 12,080$ 2,280$ 20,600$ 30,520$ 45,340$ 10,880$ 32,400$ 175,220$ 175,220$ MECHANICAL Taylor -$ -$ -$ -$ -$ 20,110$ 32,850$ 39,750$ 13,470$ 25,700$ 131,880$ 131,880$ PLUMBING Taylor -$ -$ -$ -$ -$ 6,600$ 11,100$ 12,900$ 5,100$ 9,000$ 44,700$ 44,700$

ELECTRICAL/
FIRE ALARM (DESIGN-BUILD) OMM - $ - $ - $ - $ - $ 14,840 $ 37,040 $ 81,760 $ 4,140 $ 16,840 $ 154,620 $ 154,620 $ CIVIL BKF 3,000$ 3,200$ -$ 4,000$ -$ 12,800$ 14,400$ 21,800$ 9,000$ 13,600$ 81,800$ 81,800$ LANDSCAPE BASE 6,200$ -$ 4,640$ 12,090$ -$ 12,070$ 21,070$ 25,000$ 3,960$ 7,520$ 92,550$ 92,550$ SUB-TOTAL $ 56,380 $ 10,660 $ 69,040 $ 87,370 $ 70,640 $ 252,020 $ 325,060 $ 504,310 $ 99,490 $ 439,540 $ 1,914,510 $ 1,929,510 SUPPORT SERVICES:

ACOUSTIC Salter 4,200 $ - $ 2,375 $ 2,650 $ - $ 5,300 $ 8,075 $ 12,075 $ 1,550 $ 10,850 $ $ 47,075 47,075 $ CEQA: EVALUATION
LSA -$ 14,750$ -$ -$ -$ -$ -$ -$ -$ -$ $ 14,750 14,750$ COMMISSIONING Red Car -$ -$ -$ -$ -$ 1,500$ 3,000$ 4,500$ -$ 27,000$ $ 36,000 36,000$ COMMUNITY ENGAGEMENT Contigo -$ -$ -$ -$ 96,386$ -$ -$ -$ -$ -$ $ 96,386 $ 7,935 104,321$ COST ESTIMATING TBD -$ -$ 5,640$ 15,040$ -$ 18,800$ 22,560$ 50,760$ -$ -$ $ 112,800 112,800$ ELEVATOR Sellen 3,835$ -$ -$ -$ -$ -$ 6,320$ 5,015$ 3,835$ 4,130$ $ 23,135 23,135$ FF&E
Noll & Tam
Architects 2,120 $ - $ 5,240 $ 11,120 $ - $ 15,360 $ 15,360 $ 21,880 $ 19,080 $ 12,200 $ $ 102,360 102,360 $

FIRE PROTECTION
(DESIGN-BUILD) Taylor - $ - $ - $ - $ - $ 1,200 $ 1,500 $ 600 $ 300 $ 1,500 $ $ 5,100 5,100 $ GEOTECHNICAL Langan 15,600$ -$ -$ -$ -$ -$ 7,050$ -$ -$ -$ $ 22,650 $ 9,250 31,900$ HAZMAT INVESTIGATION Q & A 3,800$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $ 3,800 $ 1,370 5,170$ HISTORIC ARCHITECTURE Knapp 2,700$ 9,225$ 900$ 3,825$ 4,500$ 9,000$ 4,950$ 11,250$ 1,800$ 21,150$ $ 69,300 69,300$ LEED Brightworks 760$ -$ 760$ -$ -$ 6,780$ 16,700$ 14,780$ 6,310$ 23,060$ $ 69,150 69,150$

LOW VOLTAGE/SECURITY/
AUDIOVISUAL Salter 6,525 $ - $ 6,400 $ 8,625 $ - $ 14,925 $ 28,075 $ 42,050 $ 1,550 $ 14,925 $ $ 123,075 123,075 $

MECH LEED ENERGY
MODELING Brightworks - $ - $ - $ 1,800 $ - $ 7,200 $ 12,600 $ 12,600 $ 4,500 $ - $ $ 38,700 38,700 $ SIGNAGE M Williams -$ -$ 1,200$ 2,400$ -$ 7,800$ 12,600$ 10,000$ 3,000$ 11,000$ $ 48,000 48,000$ SURVEY BKF 23,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ $ 23,000 23,000$ WATERPROOFING WJE 8,860$ -$ -$ -$ -$ 5,940$ 9,830$ 15,160$ 4,310$ 16,860$ $ 60,960 60,960$

STRUCTURAL DESTRUCTIVE
TESTING ZFA $ 30,000 $ 30,000 30,000 $ ENHANCED COMMISSIONING RED CAR $ 500 $ 5,500 $ 6,000 6,000$ TIER 3 SEISMIC ZFA $ 30,000 $ 30,000 30,000$ PV REPLACEMENT DESIGN OMM $ 6,250 $ 6,250 $ 2,500 $ 15,000 15,000$

RESILIENCY/GENERATOR
DESIGN - ELECTRICAL OMM/NT $ 9,550 $ 9,550 $ 2,500 $ 21,600 21,600 $

LEED CERTIFICATION
ACOUSTICAL SUPPORT Salter $ 6,000 $ 6,000 6,000 $ ACOUSTIC TESTING Salter $ 5,000 $ 5,000 5,000$

WIRELESS ACCESS POINT
DESIGN Salter/NT $ 9,900 $ 4,400 $ 4,950 $ 19,250 19,250 $

TITLE REPORT AND
DEED/BOUNDARY ANALYSIS BKF $ 10,000 $ 10,000 10,000 $ SUB-TOTAL $ 111,400 $ 23,975 $ 22,515 $ 45,460 $ 100,886 $ 93,805 $ 204,320 $ 221,370 $ 51,235 $ 164,125 $ 1,039,091 $ 18,555 $ 1,057,646 GRAND TOTAL $ 167,780 $ 34,635 $ 91,555 $ 132,830 $ 171,526 $ 345,825 $ 529,380 $ 725,680 $ 150,725 $ 603,665 $ 2,953,601 $ 18,555 $ 2,987,156 CEQA INITIAL STUDY LSA/NT $ 30,600 30,600$

HISTORIC RESEARCH
EVALUATION Knapp $ 15,075 15,075 $

FULL FIRE ALARM DESIGN
SCOPE OMM $ 20,000 20,000 $
ERRCS Salter/NT $ 3,300 $ 9,900 $ 5,500 $ 18,700 18,700$ SUB-TOTAL $ - $ - $ - $ - $ - $ 3,300 $ 9,900 $ 5,500 $ - $ - $ 84,375 $ - $ 84,375 Exclusions:

Cost estimates and value engineering other than requested in the RFP Furniture Services: inventory of existing furniture; management of physical mock-ups, furniture bid process, & furniture order paperwork/payment; scheduling of furniture installation, on-site furniture delivery/installation support; move coordination Public Art/Artist selection and coordination; Donor Recogition Life cycle cost analysis; New Generator Design
Phased Construction – all construction work to be completed in a single phase Arborist Report; Environmental Noise Study; SWPPP/NOI Documentation shall be the General Contractor's responsibility Services listed above may be provided as an additional service.

REQUESTED ADDITIONAL SERVICES:

ARCHITECT S
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 For the Contract between the City of
Richmond and

EXHIBIT B

PAYMENT PROVISIONS

{PLEASE NOTE THAT THE CITY OF RICHMOND SHALL NOT PAY FOR SERVICES

THAT EXCEED THE CONTRACT PA YMENT LIMIT UNLESS A CONTRACT

AMENDMENT HAS BEEN APPROVED BY THE CITY COUNCIL OR THE CITY MANAGER}

1. Provided Contractor is not in default under this Contract, Contractor shall be compensated as provided below.

2. Any and all payments made pursuant to this Contract shall be subject to the Contract Payment Limit. The Payment Limit includes expenses (phones, photo copying, meals and travel etc). Invoices, shall be adequately detailed, based on accurate records, and be in a form reasonably satisfactory to the City. Contractor may be required to provide back-up material upon request.

3. Contractor shall submit timely invoices to the following address:

Attention: City of Richmond, Finance Department - Accounts Payable Project Manager: Department:

PO Box 4046
Richmond, CA 94804-0046

4. All invoices that are submitted by Contra ctor shall be subject to the approval of the City’s Project Manager, before payments shall be authorized.

5. The City will pay invoice(s) within 45 days a fter completion of services to the City’s satisfaction. The City shall not pay late fees or interest.

6. A Richmond business license shall be obtained before any payment under this Contract shall be authorized and the business license must be kept current during the term of this Contract for payments to continue to be authorized.

7. All insurance coverage required by this Contract shall be provided by the Contractor before this Contract shall be executed by the City. The insurance coverage must be kept current during the term of this Contract for payments to continue to be authorized.

Wendy Wellbrock
Noll and Tam Architects
Public Works
Wendy Wellbrock
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 For the Contract between the City of
Richmond and

EXHIBIT C

AUTHORIZED REPRESENTATIVES AND NOTICES

1. Notices
. All notices, demands, statements, or communications provided for by this Contract shall be in writing and may be delivered by deposit in the United States mail, postage prepaid. Notices to the City shall be addressed to the Department Head and (as delineated below in section 1.1) to the project manager responsible for the administration of or the supervision of the scope of work under this Contract. Notices to the Contractor shall be addressed to the party designated by Contractor (as delineated below in section 1.2). Notice shall be deemed delivered (a) upon personal delivery; (b) as of the fifth business day after mailing by United States certified mail, postage prepaid, addressed to the proper party; or (c) as of 12:00 p.m. on the second business day immediately after the day it is deposited with and accepted by Federal Express, or a similar overnight courier service, addressed to the proper party and marked for next business day morning delivery. For the purposes of this Contract, a "business day" means any day Monday through Friday that is not a holiday recognized by the federal government or the State of California.

1. 1 CITY hereby designates as its Authorized Representative the Project Manager whose name and address are as follows:

City of Richmond

Richmond, CA 94804-0046

1. 2 CONTRACTOR hereby designates as its Authorized Representative the Project Manager whose name and address are as follows:

Noll and Tam Architects
Wendy Wellbrock
450 Civic Center Plaza
Noll and Tam Architects
729 Heinz Avenue #7
Berkeley, CA 94710
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 General Conditions/EJ/TE 01-19-11 1 of 13

EXHIBIT D

GENERAL CONDITIONS

1. Independent Contractor . Contractor acknowledges, represents and warrants that Contractor is not a regular or temporary employee, joint venturer or partner of the City, but rather an independent Contractor. This Contract shall not be construed to create an agency, servant, employee, partnership, or joint venture relationship. As an independent Contractor, Contractor shall have no authority to bind City to any obligation or to act as City's agent except as expressly provided herein. Due to the independent Contractor relationship created by this Contract, City shall not withhold state or federal income taxes, the reporting of which shall be Contractor's sole responsibility.

2. Brokers . Contractor acknowledges, represents and warrants that Contractor has not hired, retained or agreed to pay any entity or person any fee, commission, percentage, gift, or any other consideration, contingent upon or resulting from the award or making of this Contract.

3. City Property . The rights to applicable plans, drawings, reports, calculations, data, specifications, videos, graphics or other materials prepared for or obtained pursuant to this Contract, which, upon request, are to be delivered to City within a reasonable time, shall be deemed assigned to City. If applicable, Contractor shall prepare check prints upon request. Notwithstanding the foregoing, Contractor shall not be obligated to provide to City proprietary software or data which Contractor has developed or had developed for Contractor's own use; provided, however, that Contractor shall, pursuant to Section 15 below, indemnify, defend and hold harmless City from and against any discovery or Public Records Act request seeking the disclosure of such proprietary software or data.

4. Patents, Trademarks, Copyrights and Rights in Data
. Contractor shall not
publish or transfer any materials, discoveries, developments, concepts, designs, ideas, know how, improvements, inventions and/or original works of authorship resulting from activities supported by this Contract without the express prior written consent of the City Manager. If anything resulting from activities supported by this Contract is patentable, trademarkable, copyrightable or otherwise legally protectable, City reserves the exclusive right to seek such intellectual property rights. Notwithstanding the foregoing, Contractor may, after receiving City's prior written consent, seek patent, trademark, copyright or other intellectual property rights on anything resulting from activities supported by this Contract. However, City reserves, and Contractor irrevocably grants, a nonexclusive, fully paid-up, royalty-free, assumable, perpetual, worldwide license, with the right to transfer, sublicense, practice and exploit said license and the right to make, have made, copy, modify, make derivative works of, use, sell, DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 General Conditions/EJ/TE 01-19-11 2 of 13

import, and otherwise distribute under all applicable intellectual properties without restriction of any kind said license.

Contractor further agrees to assist City, at City's expense, in every proper way to secure the City’s rights in any patents, trademarks, copyrights or other intellectual property rights relating thereto, including the disclosure to City of all pertinent information and data with respect thereto. Contractor shall also assist City in the execution of all applications, specifications, oaths, assignments, recordations, and all other instruments which City shall deem necessary in order to apply for, obtain, maintain and transfer such rights, or if not transferable, to waive such rights. Contractor shall further assist City in the execution of all applications, specifications, oaths, assignments, recordations and all other instruments which City shall deem necessary in order to assign and convey to City, and any assigns and nominees the sole and exclusive right, title and interest in and to any patents, trademarks, copyrights or other intellectual property rights relating thereto. Contractor further agrees that its obligation to execute or cause to be executed, when it is in Contractor's power to do so, any such instruments or papers shall continue during and at all times after the end of Contractor's services and until the expiration of the last such intellectual property right. Contractor hereby irrevocably designates and appoints City, and its duly authorized officers, agents and servants, as its agent and attorney-in-fact, to act for and in its behalf and stead to execute and file any such applications and to do all other lawfully permitted acts to further the application for, prosecution, issuance, maintenance or transfer of letters of patents, copyright and other registrations. This power of attorney is coupled with an interest and shall not be affected by Contractor's subsequent incapacity.

5. Inspection
. Contractor's performance, place of business and records pertaining to this Contract are subject to monitoring, inspection, review and audit by authorized representatives of the CITY, the State of California, and the United States Government.

If the project or services set forth in Exhibit A shall be performed on City or other public property, City shall have the right to inspect such work without notice. If such project or services shall not be performed on City or other public property, City shall have the right to inspect such work upon reasonable notice.

6. Services
. The project or services set forth in Exhibit A shall be performed to the full satisfaction and approval of City. In the event that the project or services set forth in Exhibit A are also itemized by price, City, in its sole discretion, may, upon notice to Contractor, delete certain items or services set forth in Exhibit A, in which case there shall be a corresponding reduction in the amount of compensation paid to Contractor.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 General Conditions/EJ/TE 01-19-11 3 of 13

Contractor shall, at its own cost and expense, furnish all facilities and equipment necessary for Contractor to complete the project or perform the services required herein, unless otherwise provided in Exhibit A.

7. Records . Contractor shall keep and make available for inspection and copying by authorized representatives of the City, the State of California, and the United States Government, the Contractor's regular business records and such additional records pertaining to this Contract as may be required by the City.

Contractor shall retain all documents pertaining to this Contract for a period of five (5) years after this C ontract's termination (or for any further period that is required by law) and until all Federal or State audits are complete and exceptions resolved for this contract's funding period. Upon request, CONTRACTOR shall make thes e records available to authorized representatives of the CITY, the State of California, and the United States Government.

Contractor shall keep full and detailed accounts, maintain records, and exercise such controls as may be necessary for proper financial management under this Contract. The Contractor’s accounting and control systems shall be satisfactory to City. Contractor's accounting systems shall conform to generally accepted accounting principles and all records shall provide a breakdown of total costs charged under this Contract, including properly executed payrolls, time records, utility bills, invoices and vouchers. The City shall be afforded prompt access to Contractor's records, books, and Contractor shall preserve such project records for a period of at least five (5 years after the termination of this Contract , or for such longer period as may be required by law.

Contractor shall permit City and its authorized representatives and accountants to inspect, examine and copy Contractor's books, records, accounts, correspondence, instructions, drawings, receipts, subcontracts, purchase orders, vouchers, memoranda and other data relating to the project or services set forth in Exhibit A, and any and all data relevant to this Contract at any reasonable time for the purpose of auditing and verifying statements, invoices, or bills submitted by Contractor pursuant to this Contract and shall provide such assistance as may be reasonably required in the course of such inspection. Contractor shall also allow City access to the record keeping and accounting personnel of Contractor.

City further reserves the right to examine and re-examine said books, records, accounts, and data during the five (5 year period following the termination of this Contract; and Contractor shall in no event dispose of, destroy, alter, or mutilate said books, records, accounts, and data in any manner whatever for five (5 years after the termination of this Contract.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 General Conditions/EJ/TE 01-19-11 4 of 13

Pursuant to California Government Code § 10527, the parties to this Contract shall be subject to the examination and audit of representatives of the Auditor General of the State of California for a period of three (3) years after final payment under this Contract. The examination and audit shall be confined to those matters connected with the performance of this Contract including, but not limited to, the cost of administering this Contract.

8. Changes and Extra Work . All changes and/or extra work under this Contract shall be performed and paid for in accordance with the following:

Only the City Council or the City Manager may authorize extra and/or changed work. Contractor expressly recognizes that other City personnel are without authorization to either order extra and/or changed work or waive contract requirements. Failure of Contractor to secure the authorization for such extra and/or changed work shall constitute a waiver of any and all right to adjustment in contract price due to such unauthorized work and Contractor thereafter shall be entitled to no compensation whatsoever for performance of such extra and/or changed work.

If Contractor is of the opinion that any work which Contractor has been directed to perform is beyond the scope of this Contract and constitutes extra work, Contractor shall promptly notify City of the fact. The City shall make a determination as to whether or not such work is, in fact, beyond the scope of this Contract and constitutes extra work. In the event that City determines that such work does constitute extra work, City shall provide extra compensation to Contractor on a fair and equitable basis. A change order or Contract Amendment providing for such compensation for extra work shall be negotiated between City and Contractor and executed by Contractor and the appropriate City official.

In the event City determines that such work does not constitute extra work, Contractor shall not be paid extra compensation above that provided herein and if such determination is made by City staff, said determination may be appealed to the City Council; provided, however, a written appeal must be submitted to the City Manager within five (5) days after the staff's determination is sent to Contractor. Said written appeal shall include a description of each and every ground upon which Contractor challenges the staff's determination.

9. Additional Assistance
. If this Contract requires Contractor to prepare
plans and specifications, Contractor shall provide assistance as necessary to resolve any questions regarding such plans and specifications that may arise during the period of advertising for bids, and Contractor shall issue DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 General Conditions/EJ/TE 01-19-11 5 of 13

any necessary addenda to the plans and specifications as requested. In the event Contractor is of the opinion that City's requests for addenda and assistance is outside the scope of normal services, the parties shall proceed in accordance with the changes and extra work provisions of Section 8 of these General Conditions.

10. Professional Ability
. Contractor acknowledges, represents and warrants
that Contractor and its employees are skilled and able to competently provide the services hereunder, and possess all professional licenses, certifications, and approvals necessary to engage in their occupations.

City has relied upon the professional ability and training of Contractor as a material inducement to enter into this Contract. Contractor shall perform in accordance with generally accepted professional practices and standards of Contractor's profession. In the event that City, in its sole discretion, desires the removal of any person employed or retained by Contractor to perform services hereunder, such person shall be removed immediately upon receiving notice from City.

11. Business License
. Contractor shall obtain a Richmond Business License
before performing any services required under this Contract. The failure to so obtain such license shall be a material breach of this Contract and grounds for immediate termination by City; provided, however, that City may waive the business license requirement in writing under unusual or extraordinary circumstances without necessitating any modification of this Contract to reflect such waiver.

12. Termination Without Default
. Notwithstanding any provision herein to the
contrary, City may, in its sole and absolute discretion and without cause, terminate this Contract at any time prior to completion by Contractor of the project or services hereunder, immediately upon written notice to Contractor. Contractor may terminate this Contract at any time in its sole and absolute discretion and without cause upon 30 days' written notice to City. In the event of termination by either party, Contractor shall be compensated for: (1) all authorized work satisfactorily performed prior to the effective date of termination; (2) necessary materials or services of others ordered by Contractor for this Contract, prior to receipt of notice of termination, irrespective of whether such materials or services of others have actually been delivered, provided that Contractor is not able to cancel such orders. Compensation for Contractor in such event shall be determined by City in accordance with the percentage of the project or services completed by Contractor; and all of Contractor's finished or unfinished work product through the time of the City's last payment shall be transferred and assigned to City. Additionally, in the event of such termination, the City may proceed with the work in any reasonable manner it chooses.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 General Conditions/EJ/TE 01-19-11 6 of 13

13. Termination in the Event of Default. Should Contractor fail to perform any of its obligations hereunder, within the time and in the manner provided or otherwise violate any of the terms of this Contract, City may immediately terminate this Contract by giving written notice of such termination, stating the reasons for such termination. Contractor shall be compensated as provided in Section 12 of these General Conditions; provided, however, there shall be deducted from such amount the amount of damage, including attorney's fees, expert witness fees and costs, if any, sustained by City by virtue of Contractor's breach of this Contract. Additionally, in the event of such termination, the City may proceed with the work in any reasonable manner it chooses.

14. Conflict of Interest
. Contractor acknowledges, represents and warrants
that Contractor shall avoid all conflicts of interest (as defined under any federal, state or local statute, rule or regulation, or at common law) with respect to this Contract. Contractor further acknowledges, represents and warrants that no City official or employee has any economic interest, as defined in Title 2, California Code of Regulations §§ 18703.1 through 18703.5, with Contractor that would invalidate this Contract. Contractor acknowledges that in the event that Contractor shall be found by any judicial or administrative body to have any conflict of interest (as defined above) with respect to this Contract, all consideration received under this Contract shall be forfeited and returned to City forthwith. This provision shall survive the termination of this Contract for one (1) year.

15. Indemnification
.

(a) If this Contract is a contract for design professional services subject to California Civil Code Section 2782.8(a) and Contractor is a design professional, as defined in California Civil Code Section 2782.8(b)(2), Contractor shall hold harmless, defend and indemnify the City, its officers, agents, employees, and volunteers from and against any and all claims, damages, losses, and expenses including attorneys’ fees arising out of, or pertaining to, or relating to the negligence, recklessness, or willful misconduct of the Contractor, except where caused by the active negligence, sole negligence, or willful misconduct of the City. To the fullest extent permitted by law, Contractor shall immediately defend and indemnify the City and its officers, agents, employees, and volunteers from and against any and all liabilities, regardless of nature or type, that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor, or its employees, agents, or subcontractors.

Liabilities subject to the duties to defend and indemnify include, without limitation, any and all claims, losses, damages, penalties, fines, and judgments; associated investigation and administrative expenses; defense costs, including but not limited to reasonable attorneys’ fees; court costs; and costs of alternative dispute resolution. Contractor’s obligation to DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 General Conditions/EJ/TE 01-19-11 7 of 13

indemnify applies unless it is finally adjudicated that the liability was caused by the sole active negligence or sole willful misconduct of an indemnified party.
(b) If this Contract is not a contract for design professional services subject to California Civil Code Section 2782.8(a) or Contractor is not a design professional as defined in California Civil Code Section 2782.8(b)(2), Contractor shall indemnify, defend, and hold harmless the City, its officers, agents, employees and volunteers from any and all claims, suits, or actions of every name, kind and description, brought forth on account of injuries to or death of any person or damage to property arising from or connected with the willful misconduct, negligent acts, errors or omissions, ultra-hazardous activities, activities giving rise to strict liability, or defects in design by Contractor or any person directly or indirectly employed by, or acting as, the agent for Contractor in the performance of this Contract, including the concurrent or successive passive negligence of the City, its officers, agents, employees or volunteers.
(c) It is understood that the duty of Contractor to indemnify and hold harmless includes the duty to defend as set forth in Section 2778 of the California Civil Code. Contractor shall be obligated to defend, in all legal, equitable, administrative, or special proceedings, with counsel approved by the City, the City and its officers, agents, employees, and volunteers, immediately upon tender to Contractor of the claim in any form or at any stage of an action or proceeding, whether or not liability is established. An allegation or determination that persons other than Contractor are responsible for the claim does not relieve Contractor from its separate and distinct obligation to defend under this Section 15. The obligation to defend extends through final judgment, including exhaustion of any appeals. The defense obligation includes an obligation to provide independent counsel if Contractor asserts that liability is caused in whole, or in part, by the negligence or willful misconduct of an indemnified party. (d) The review, acceptance or approval of the Contractor’s work or work product by any indemnified party shall not affect, relieve or reduce the Contractor’s indemnification or defense obligations. This Section 15 survives completion of the services or the termination of this Contract.

The provisions of this Section 15 are not limited by, and do not affect, the provisions of this Contract relating to insurance.
(e) Acceptance of insurance certificates and endorsements required under this Contract does not relieve Contractor from liability under this Section

15. This Section 15 shall apply whether or not such insurance policies are determined to be applicable to any such damages or claims for damages.

16. Safety
. Contractor acknowledges that the City is committed to the highest standards of workplace safety. Contractor shall perform all work hereunder in full compliance with applicable local, state and federal safety requirements including but not limited to Occupational Safety and Health Administration requirements, and shall assume sole and complete DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 General Conditions/EJ/TE 01-19-11 8 of 13

responsibility for the safety of Contractor's employees and any subContractor's employees. If a death, serious personal injury or substantial property damage occurs in connection with the performance of this Contract, Contractor shall immediately notify the City by telephone.

17. Insurance. Insurance requirements are set forth in Exhibit F to this Contract. Contractor shall abide by the insurance requirements set forth in said Exhibit F.

18. Non-Liability of Officials and Employees of the City. No official or employee of the City shall be personally liable for any default or liability under this Contract.

19. Compliance with Laws. Contractor shall comply with all federal, state and local laws, statutes, ordinances, rules and regulations, and the orders and decrees of any courts or administrative bodies or tribunals, with respect to this Contract, including without limitation environmental laws, employment discrimination laws and prevailing wage laws. Compliance under this provision includes compliance with all provisions of the Richmond Municipal Code ("Municipal Code"), including Chapters 2.50, 2.52, 2.56, and 2.60, if applicable.

Contractor acknowledges that under § 2.60.070 of the Municipal Code ("Living Wage Ordinance"), Contractor shall promptly provide to City documents and information verifying its compliance with the Living Wage Ordinance. Also as prescribed in § 2.60.070, Contractor shall notify each of its affected employees with regards to the wages that are required to be paid pursuant to the Living Wage Ordinance.

Contractor shall comply with § 2.28.030 of the Municipal Code, obligating every Contractor or subcontractor under a contract or subcontract with the City for public work or for goods or for services to refrain from discriminatory employment or subcontracting practices on the basis of race, color, sex, sexual orientation, religious creed, national origin or ancestry of any employee, any applicant for employment or any potential subcontractor.

Contractor acknowledges that the City’s Drug Free Workplace Policy, Violence in the Workplace Policy and the Policy Against Workplace Harassment, are available on the City’s website at
http://www.ci.richmond.ca.us/workplacepolicies
. Contractor agrees to
abide by the terms and conditions of said policies.

20. Limitations upon Subcontracting and Assignment. This Contract binds the heirs, successors, assigns and representatives of Contractor. The Contractor shall not enter into subcontracts for any work contemplated DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 General Conditions/EJ/TE 01-19-11 9 of 13

under this Contract and shall not assign this Contract, nor any portion hereof or monies due or to become due, without the prior written consent of the City Council or its designee.

Contractor acknowledges that the services which Contractor shall provide under this Contract are unique, personal services which, except as otherwise provided herein, Contractor shall not assign or sublet to any other party without the prior written approval of City, which approval may be withheld in City's sole and absolute discretion. In the event that City, in writing, approves any assignment or subletting of this Contract or the retention of subcontractors by Contractor, Contractor shall provide to City upon request copies of each and every subcontract contract prior to the execution thereof by Contractor and subcontractor. Any assignment by Contractor of any or all of its rights under this Contract without first obtaining City's prior written consent shall be a default under this Contract.

The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Contractor (if applicable), or of the interest of any general partner or joint venturer or syndicate member if Contractor is a partnership or joint-venture or syndicate, which shall result in a change of control of Contractor, shall be deemed an assignment. For this purpose, control shall mean fifty percent or more of the voting power or twenty-five percent or more of the assets of the corporation, partnership or joint-venture.

21. Integration
. This Contract constitutes the entire agreement between the parties concerning the subject matter hereof and supersedes any previous oral or written agreement; provided, however, that correspondence or documents exchanged between Contractor and City may be used to assist in the interpretation of the Exhibits to this Contract.

22. Modifications and Amendments. This Contract may be modified or amended only by a change order or Contract Amendment executed by both parties and approved as to form by the City Attorney.

23. Conflicting Provisions. In the event of a conflict between these General Conditions and those of any Exhibit or attachment hereto, these General Conditions shall prevail; provided, however, that any Special Conditions as set forth in Exhibit E shall prevail over these General Conditions. In the event of a conflict between the terms and conditions of any two or more Exhibits or attachments hereto, those prepared by City shall prevail over those prepared by the Contractor, and the terms and conditions preferred by the City shall prevail over those preferred by the Contractor.

24. Non-exclusivity
. Notwithstanding any provision herein to the contrary, the services provided by Contractor hereunder shall be non-exclusive, and DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 General Conditions/EJ/TE 01-19-11 10 of 13

City reserves the right to employ other Contractors in connection with the project.

25. Exhibits. All Exhibits hereto are made a part hereof and incorporated herein by reference; provided, however, that any language in Exhibit A which does not pertain to the project description, proposal, scope of services, or method of compensation (as applicable) , or any corresponding responsibilities of City, shall be deemed extraneous to, and not a part of, this Contract.

26. Force Majeure. Neither party hereto shall be considered in default in the performance of its obligations hereunder to the extent that the performance of such an obligation is prevented or delayed by reason of acts of God, strikes, boycotts, lock-outs, inability to procure materials not related to the price thereof, failure of power, restrictive governmental laws and regulations enacted after the date of this Contract, riots, civil unrest, acts of terrorism, insurrection, war, declaration of a state or national emergency or other reasons of a like nature not within the reasonable control of such party.

27. Time of the Essence
. Time is of the essence of this Contract. Contractor and City agree that any time period set forth in Exhibit A represents their best estimates with respect to completion dates and both Contractor and City acknowledge that departures from the schedule may occur.

Therefore, both Contractor and City will use reasonable efforts to notify one another of changes to the schedule. Contractor shall not be responsible for performance delays caused by others, or delays beyond Contractor's control, and such delays shall extend the times for performance of Contractor's work.

28. Confidentiality
. Contractor agrees to comply with, and to require its employees, agents and partners to comply with, all applicable State or Federal statutes or regulations respecting confidentially, including but not limited to, the identity of persons served under this Contract, their records, or services provided them, and assures that:

All applications and records concerning any individual made or kept by Contractor or any public officer or agency in connection with the administration of or relating to services provided under this Contract will be confidential, and will not be open to examination for any purposes not directly connected with the administration of such service.

No person will publish or disclose or permit or cause to be published or disclosed, any list of persons receiving services, except as may be required in the administration of such service.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 General Conditions/EJ/TE 01-19-11 11 of 13

29. Third Parties. Nothing herein shall be interpreted as creating any rights or benefits in any third parties. For purposes hereof, transferees or assignees as permitted under this Contract shall not be considered "third parties."

30. Governing Law. This Contract shall be construed in accordance with the law of the State of California without regard to principles of conflicts of law.

This Contract is made in Contra Costa County, California, and any action relating to this Contract shall be instituted and prosecuted in the courts of Contra Costa County, California.

31. Nonrenewal
. Contractor understands and agrees that there is no
representation, implication, or understanding that the services provided by Contractor under this Contract will be purchased or renewed by the City under a new contract following expiration or termination of this Contract, and waives all rights or claims to notice or hearing respecting any failure by City to continue the purchase of all or any failure to continue purchase of all or any such services from Contractor.

32. Claims. Any claim by Contractor against City hereunder shall be subject to Government Code §§ 800 et seq. The claims presentation provisions of said Act are hereby modified such that the presentation of all claims hereunder to the City shall be waived if not made within six months after accrual of the cause of action.

33. Interpretation. This Contract shall be interpreted as if drafted by both parties.

34. Warranty. In the event that any product shall be provided to the City as part of this Contract, Contractor warrants as follows: Contractor possesses good title to the product and the right to transfer the product to City; the product shall be delivered to the City free from any security interest or other lien; the product meets any specifications contained herein; the product shall be free from material defects in materials and workmanship under normal use for a period of one (1) year from the date of delivery; and the product shall be fit for its intended purpose(s). Notwithstanding the foregoing, consumable and maintenance items (such as light bulbs and batteries) shall be warranted for a period of one hundred and eighty (180) days from the date of delivery. All repairs during the warranty period shall be promptly performed by Contractor, at Contractor's expense, including shipping.

35. Severability
. In the event that any of the provisions or portions or applications thereof of this Contract are held to be unenforceable or invalid by any court of competent jurisdiction, City and Contractor shall negotiate an equitable adjustment in the provisions of the Contract with a view DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 General Conditions/EJ/TE 01-19-11 12 of 13

toward effecting the purpose of this Contract, and the validity and enforceability of the remaining provisions or portions or applications thereof, shall not be affected thereby.

36. Authority. City warrants and represents that the signatory hereto (the Mayor of the City of Richmond or the City Manager) is duly authorized to enter into and execute this Contract on behalf of City. The party signing on behalf of Contractor warrants and represents that he or she is duly authorized to enter into and execute this Contract on behalf of Contractor, and shall be personally liable to City if he or she is not duly authorized to enter into and execute this Contract on behalf of Contractor.

37. Waiver. The waiver by City of any breach of any term or provision of this Contract shall not be construed as a waiver of any subsequent breach.

Inspections or approvals, or statements by any officer, agent or employee of the City relating to the Contractor’s performance, or payments therefore, or any combination of these acts, shall not relieve the Contractor’s obligation to fulfill this Contract as prescribed; nor shall the City be thereby stopped from bringing any action for damages or enforcement arising from any failure to comply with any of the terms and conditions of this Contract.

38. Possessory Interest
. If this Contract results in the Contractor having
possession of, claim to or right to the possession of land or improvements, but does not vest ownership of the land or improvements in the same person, or if this Contract results in the placement of taxable improvements on tax exempt land (Revenue and Taxation Code 107), such interest or improvements may represent a possessory interest subject to property tax, and Contractor may be subject to the payment of property taxes levied on such interest.

39. Performance and Final Acceptance
.

Contractor represents that it is experienced, qualified, registered, licensed, equipped, organized and financed to perform the services under this Contract.

Contractor shall perform the services under this Contract with that degree of skill and judgment normally exercised by professional firms performing services of a similar nature in the State of California, and shall be responsible for the professional quality, technical accuracy and coordination of the services it performs under this Contract. In addition to the other rights and remedies which City may have, Contractor shall, at its own expense, correct any services which fail to meet the above standard.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 General Conditions/EJ/TE 01-19-11 13 of 13

City shall provide Contractor an opportunity to cure errors and omission which may be disclosed during the review of submittals, with no increase in the authorized Contract Payment Limit. Should Contractor fail to make necessary corrections in a timely manner, such corrections shall be made by the City and the cost thereof shall be charged to Contractor.

If warranted, City shall determine, and Contractor may request such determination, that Contractor has satisfactorily completed performance of this Contract. Upon such determination, City shall issue to Contractor a written Notice of Final Acceptance, after which Contractor shall not incur further costs under this Contract. Contractor shall respond to such Notice of Final Acceptance by executing and submitting to City a Release and Certificate of Final Payment.

40. Survival
. The rights and obligations of the parties which by their nature survive termination or completion of the services covered by this Contract shall remain in full force and effect after termination or completion.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 For the Contract between the City of
Richmond and

EXHIBIT E

SPECIAL CONDITIONS

The General Conditions are hereby amended to include the following modifications and/or provisions (if applicable):

Sanctuary City Contracting Ordinance (SCCO) -- The Richmond Sanctuary City Contracting Ordinance No. 12-18 prohibits the City from granting and or retaining contracts with any person or entity that provides Data Broker or Extreme Vetting services to the U.S. Immigration and Customs Enforcement Division of the United States Department of Homeland Security (“ICE”).

Contractor must submit the Sanctuary City Compliance Statement, attached hereto, prior to the execution of this Agreement.

Noll and Tam Architects
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

CITY OF RICHMOND
Sanctuary City Compliance Statement

The undersigned, an authorized agent of (hereafter
"Contractor"), has had an opportunity to review the requirements of City of Richmond Ordinance 12-18 (hereafter "Sanctuary City Contracting Ordinance" or “SCCO”). Contractor understands and agrees that the City may choose with whom it will maintain business relations and may refrain from contracting with any person or entity that provides Data Broker or Extreme Vetting services to the U.S. Immigration and Customs Enforcement Division of the United States Department of Homeland Security (“ICE”). Contractor understands the meaning of the following terms used in the SCCO:

a. "Data Broker” means either of the following:

i. The collection of information, including personal information about consumers, from a wide variety of sources for the purposes of reselling such information to their customers, which include both private-sector business and government agencies;

ii. The aggregation of data that was collected for another purpose from that for which it is ultimately used.

b. “Extreme Vetting” means data mining, threat modeling, predictive risk analysis, or other similar services."

Contractor understands that it is not eligible to receive or retain a City contract if at the time the Contract is executed, or at any time during the term of the Contract, it provides Data Broker or Extreme Vetting services to ICE.

Contractor further understands and agrees that Contractor's failure to comply with the SCCO shall constitute a material default of the Contract and the City Manager may terminate the Contract and bar Contractor from bidding on future contracts with the City for five (5) years from the effective date of the contract termination.

By executing this Statement, Contractor certifies that it complies with the requirements of the SCCO and that if at any time during the term of the Contract it ceases to comply, Contractor will promptly notify the City Manager in writing. Any person or entity who knowingly or willingly supplies false information in violation of the SCCO shall be guilty of a misdemeanor and subject to a $1,000 fine.

Based on the foregoing, the undersigned declares under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this day of , 20 , at , California.

Printed Name: Title:

Signed: Date:

Business Entity:

Vendor SCCO Compliance Statement (Augt2020)
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A Chris Noll Principal
24 Berkeley
Corporation
10/24/2023
October
Noll & Tam Architects
2023
DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 For the Contract between the City of
Richmond and

EXHIBIT F

INSURANCE PROVISIONS

During the entire term of this Contract and any extension or modification thereof, the CONTRACTOR shall keep in effect insurance policies meeting the insurance requirements specified in the insurance provisions which are attached hereto and incorporated herein by this reference.

Noll and Tam Architects
DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 Type 2 – Page 1 of 3
Revised: September 2011

City of Richmond - Insurance Requirements - Type 2:

Professional Services

In all instances where CONTRACTOR or its representatives will provide professional services (architects, engineers, construction management, counselors, medical professionals, hospitals, clinics, attorneys, consultants, accountants, etc.) to the City of Richmond (City), the City requires the following MINIMUM insurance requirements and limits.

CONTRACTOR shall procure and maintain for the duration of the contract, agreement, or other order for work, services or supplies, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder and the results of that work by the CONTRACTOR, its agents, representatives, employees or subcontractors. Maintenance of proper insurance coverage is a material element of the contract. Failure to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of contract.

CONTRACTOR agrees that in the event of loss due to any of the perils for which it has agreed to provide Commercial General Liability insurance, CONTRACTOR shall look solely to its insurance for recovery.

CONTRACTOR hereby grants to CITY, on behalf of any insurer providing Commercial General Liability insurance to either CONTRACTOR or CITY with respect to the services of CONSULTANT herein, a waiver of any right to subrogation which any such insurer of said CONTRACTOR may acquire against the CITY by virtue of the payment of any loss under such insurance.

Original, signed certificates and original, separate policy endorsements, naming the City as an additional insured for general liability coverage, as well as a waiver of subrogation for Workers’ Compensation insurance, shall be received and approved by the City before any work may begin. However, failure to do so shall not operate as a waiver of these insurance requirements.

City reserves the right to modify or require additional coverages for specific risk exposures depending on scope of CONTRACTORS work.

Minimum coverage is detailed below. The policy limits of coverage shall be made available to the full limits of the policy. The minimum limits stated herein shall not serve to reduce the policy limits of coverage of CONTRACTOR.

Minimum Scope of Insurance – the following forms shall be provided and coverage shall be at least as broad as the following:

1. Insurance Services Office Commercial General Liability coverage (ISO Occurrence Form CG 0001), and including coverage for bodily and personal injury, property damage, and products and completed operations (if applicable).

2. Insurance Services Office Automobile Liability coverage (ISO Form CA 0001, Code 1, Any Auto).

3. Original and Separate Additional Insured Endorsem ent for General Liability (ISO Form CG 20 10 11/85 or its equivalent) with primary and non-contributory language.

4. Workers’ Compensation Insurance as required by the State of California including Employer’s Liability coverage.

5. Original and Separate Waiver of Subrog ation for Workers’ Compensation insurance.

6. Professional Liability or Erro rs & Omissions Liability Insurance appropriate to the CONTRACTOR’s profession (if required.)

Required Coverage Minimum Limits
Workers’ Compensation and
Employers’ Liability
Statutory limits as required by the State of California including $1 million Employers’ Liability per accident, per employee for bodily injury or disease. If CONTRACTOR is self-insured, provide a certificate of Permission to Self- Insure, signed by the California Department of Industrial Relations and Self- Insurance. If contractor is a sole proprietor (has no employees) than contractor must sign “Contractor Release of Liability” found at:
http://www.ci.richmond.ca.us/index.aspx?nid=61.

General Liability
(primary and excess limits
combined)
$2,000,000 per occurrence for bodily injury, personal injury and property damage. If the policy includes a ge neral aggregate, either the general aggregate shall apply separately to this project, service or location or the minimum required aggregate limit shall be twice the per occurrence limit ($4 million aggregate limit).

Policy shall be endorsed to name the City of Richmond as an additional insured per the conditions detailed below.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 Type 2 – Page 2 of 3
Revised: September 2011

City of Richmond - Insurance Requirements - Type 2:

Professional Services

Automobile Liability $1,000,000 per occurrence for bodily injury and property damage.

Professional Liability or Errors &
Omissions Liability –
Required for all professionals
including architects, engineers,
consultants, construction
management, counselors, medical
professionals, hospitals, clinics,
attorneys and accountants, & other
consultants as may be required by
the City.

PROJECT COST
$0 - $1 million
$1 million - $5 million
Over $5 million

REQUIRED LIMIT
$1 million p/o
$2 million p/o
$5 million p/o

Required Policy Conditions
Additional Insured Endorsement Applicable to General Liability coverage.

The City of Richmond, its officers, officials, employees, agents and volunteers are to be named as additional insureds for all liability arising out of the operations by or on behalf of the named insured including bodily injury, deaths and property damage or destruction arising in any respect directly or indirectly in the performance of this contract.

ISO form CG 20 10 (11/85) or its equivalent is required. If the Contractor is supplying their product or providing a service then the endorsement must not exclude products and completed operations coverage. If it does, then CG 20 37 (10/01) is also required.

SAMPLE Endorsements can be found at
http://www.ci.richmond.ca.us/index.aspx?nid=61.

Primary and Noncontributory The contractor’s insurance coverage must be primary coverage as it pertains to the City, its officers, officials, employees, agents and volunteers. Any insurance or self insurance maintained by the City is wholly separate from the insurance of the contractor and in no way relieves the contractor from its responsibility to provide insurance.

Waiver of Subrogation
Endorsement Form
Contractor’s insurer will provide a Waiver of Subrogation in favor of the City for Workers’ Compensation Insurance during the life of this contract.

SAMPLE Endorsements can be found at
http://www.ci.richmond.ca.us/index.aspx?nid=61.

Deductibles and Self-Insured
Retentions
Any deductible or self-insured retention must be declared to and approved by the City. At the option of the City either the insurer shall reduce or eliminate such deductibles or self-insured retention as respects the City or the CONTRACTOR shall procure a financial guarantee in an amount equal to the deductible or self-insured retention guaranteeing payment of losses and related investigations, claims administration and defense expenses.

Contractor is responsible for satisfaction of the deductible and/or self-insured retention for each loss.

A. M. Best Rating A:VII or Better. If the A.M. Best Rating falls below the required rating, CONTRACTOR must replace coverage immediately and provide notice to City.

Umbrella/Excess Liability Policies
If an Umbrella or Excess Liability Policy is used to meet the liability limits, coverage shall be as broad as specified for underlying coverage’s and cover those insured in the underlying policies.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266 Type 2 – Page 3 of 3
Revised: September 2011

City of Richmond - Insurance Requirements - Type 2:

Professional Services

Claims-Made Policies
If any insurance policy is written on a claims-made form: 1) the retroactive date must be shown, and must be before the date of the contract or the beginning of contract work. 2) Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work. 3) If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective date, the Contractor must purchase an extended period coverage for a minimum of five (5) years after completion of contract work.

Subcontractors
CONTRACTOR shall include all subcontractors as insured under its policies or shall furnish to the City for review and approval, separate certificates and endorsements for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated herein.

CONTRACTOR agrees to defend and indemnify the City of Richmond for any damage resulting to it from failure of either CONTRACTOR or any subcontractor to take out or maintain the required insurance policies. The fact that insurance is obtained by CONTRACTOR, and/or CONTRACTOR’s subcontractors, will not be deemed to release or diminish the liability of CONTRACTOR, including, without limitation, liability under the indemnity provisions of this contract. Damages recoverable by CITY from CONTRACTOR or any third party will not be limited by the amount of the required insurance coverage.

Verification of Coverage
All original certificates and endorsements shall be received and approved by the City before work may begin.

The City of Richmond reserves the right to require complete, certified copies of all required insurance policies including endorsements affecting the coverage at any time.

Original insurance certificates and required policy endorsements shall be mailed or delivered to the Designated Project Manager for the City of Richmond.

Insurance certificates and endorsements may be faxed to the Designated Project Manger. However, CONTRACTOR must mail the original certificates and endorsements to Designated Project Manager once faxed.

Continuous Coverage
CONTRACTOR shall maintain the required insurance for the life of the contract. Should the CONTRACTOR cease to have insurance as required during this time, all work by the CONTRACTOR pursuant to this agreement shall cease until insurance acceptable to the City is provided. In the event that CONTRACTOR fails to comply with the City’s insurance requirements, the City may take such action as it deems necessary to protect the City’s interests. Such action may include but is not limited to termination of the contract, withholding of payments, or other actions as the City deems appropriate.

If services or the scope of work extend beyond the expiration dates of the required insurance policies initially approved by the City, CONTRACTOR must provide updated certificates and endorsements indicating that the required coverage, terms and conditions are still in place. Renewal certificates and updated endorsements shall be mailed to the Designated Project Manager.

Cancellation
CONTRACTOR shall ensure that coverage shall not be cancelled, reduced or otherwise materially changed except after thirty (30) days’ prior written notice has been given to the City.

Reporting Requirements
Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the City, its officers, officials, employees or volunteers.

Consistent with Public Policy
The insuring provisions, insofar as they may be judged to be against public policy shall be void and unenforceable only to the minimum extent necessary so that the remaining terms and provisions herein may be consistent with public policy and thus enforceable.

DocuSign Envelope ID: 1488ABC7-8A6F-4B14-BC49-BFFE1876A97A DocuSign Envelope ID: ACAD5070-9B2F-4ACA-A571-ADC71ADFA266

← All documents from this meeting