Applicants Panelist 1 Panelist 2 Panelist 3
Total
Score
Final
Average
Score Rank
Gordon Huether 20 20 20 60 20 1
Eric Powell 16 14 15 45 15 2
Archie Held 13 13 18 44 14.6666667 3
James Moore 16 8 13 37 12.3333333 4
Sean Orlando 9 8 16 33 11 5
IMTT Sculpture Scoring Matrix
Panelist 1 Panelist 2 Panelist 3 Total Avg.
Concept Proposal 5 5 5 15 5
Thematic Direction & Commumity Benefit 5 5 5 15 5
Installation/Maintenace/Durability 5 5 5 15 5
Experience/Past Performance 5 5 5 15 5
Total 20 20 20 60 20
Panelist 1 Panelist 2 Panelist 3 Total Avg.
Concept Proposal 4 3 4 11 3.666667
Thematic Direction & Commumity Benefit 4 3 3 10 3.333333 Installation/Maintenace/Durability 4 4 4 12 4
Experience/Past Performance 4 4 4 12 4
Total 16 14 15 45 15
Panelist 1 Panelist 2 Panelist 3 Total Avg.
Concept Proposal 3 2 4 9 3
Thematic Direction & Commumity Benefit 3 2 5 10 3.333333 Installation/Maintenace/Durability 3 4 5 12 4
Experience/Past Performance 4 5 4 13 4.333333
Total 13 13 18 44 14.667
Panelist 1 Panelist 2 Panelist 3 Total Avg.
Concept Proposal 4 0 4 8 2.666667
Thematic Direction & Commumity Benefit 4 0 1 5 1.666667 Installation/Maintenace/Durability 4 5 4 13 4.333333
Experience/Past Performance 4 3 4 11 3.666667
Total 16 8 13 37 12.333
Panelist 1 Panelist 2 Panelist 3 Total Avg.
Concept Proposal 2 1 4 7 2.333333
Thematic Direction & Commumity Benefit 2 1 5 8 2.666667 Installation/Maintenace/Durability 2 3 3 8 2.666667
Experience/Past Performance 3 3 4 10 3.333333
Total 9 8 16 33 11
Sean Orlando
Scoring Matrix Scoring Charts
Archie Held
Gordon Huether
Eric Powell
James Moore
Applicants
50K
Budget Notes RACC IMTT Artisit Total
Score
Final
Average
Score Rank
Sonnikson 59,037.00$
Compreshensive Quote,
expressed knowledge of Public Art
installations, managable
exclusons.
2 2 2
6 2 1
Azul Works, Inc. $ 82,500.00 Tncomplete quote and costly exclusions. The 1 0 1 2 0.6666667 2
Goebel Construction Inc. $ 97,077.00 Cost is to high, although minimal exclusions 0 1 0 1 0.3333333 3
IMTT Installation Sculpture Scoring Matrix