Cities Index.
Attachment 1 - Location map.pdf

Richmond City Council
March 17, 2026

Document
Attachment 1 - Location map.pdf
Meeting
March 17, 2026
Body
Richmond City Council
Original file
2.5 MB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.

Prepared Under the Direction of:CaliforniaState OfContra CostaCounty OfRichmondCity OfRICHMONDHARBOUR AND WRIGHT SECTION 130 RAIL CROSSING P:\Shared\Projects\2023\2300292-Section-130\DWG\Sheets\C0-Titlesheet.dwg 11/13/2025 - 10:27 AM alisson 1:3.56 Sheet
Plan File:Project Number:2300292Scale:Date:AS SHOWN11/13/25 RevDateDescriptionDesignedDrawnChecked121 Park PlaceRichmond, CA 94801415.533.1864CSWST2.comEngineering Landscape ArchitectureSurveyingUrban Planning C0TITLE SHEET
RICHMOND, CONTRA COSTA COUNTY, CALIFORNIAOCTOBER, 2025CITY OF RICHMONDHARBOUR WAY SOUTH AND WRIGHT AVENUE SECTION 130 RAIL CROSSINGDOT 015342U / STPLR-7500(282)MILEPOST 1190.969 / RICHMOND INNER HARBOR SUBDIVISION

VICINITY MAPNOT TO SCALE

RICHMONDPROJECTSITEOCEANPACIFIC

NEVADACALIFORNIASAN FRANCISCOOREGONCALIFORNIA

CIVIL ENGINEER

LOCATION MAPNOT TO SCALE
CSWST2121 PARK PLACERICHMOND, CA 94801CONTACT: MICHAEL VIDRAPHONE: 925-787-4982 Know what'sbelow.before you dig.Call
R
TRAFFIC ENGINEERFEHR & PEERS100 PRINGLE AVENUE, SUITE 600WALNUT CREEK, CA 94596CONTACT: MARK HOWARD

PROJECTLOCATION
SHEET INDEXSHEETNUMBERSHEET TITLEC0TITLE SHEETC1EXISTING CONDITIONSC2DEMOLITION PLANC3HORIZONTAL LAYOUT PLANC4STRIPING AND SIGNAGE PLANC5GRADING AND DRAINAGE PLANC6FIBER OPTIC PLANC7CONSTRUCTION DETAILSTS1TRAFFIC SIGNAL PLANTS2CONDUCTOR SCHEDULETS3CALTRANS STANDARD DETAILES-P1TS4CALTRANS STANDARD DETAILES-P2 100% SUBMITTALNOT FOR CONSTRUCTION
BNSF RAILWAY740 EAST CARNEGIE DRIVESAN BERNARDINO, CA 92408CONTACT: DIONISIO MARTINEZPHONE: 909-386-4474

PROJECT TEAM
NOTES1.UNLESS STATED OTHERWISE, ALL UTILITY STRUCTURES WITHIN THEPROJECT AREA SHALL BE PROTECTED IN PLACE.2.CONTRACTOR SHALL RETAIN PRIVATE UTILITY LOCATOR TO FIND ALLCITY-OWNED UTILITIES WITHIN PROJECT AREA, INCLUDING CITY FIBEROPTIC NETWORK ALONG HARBOUR WAY SOUTH.3.CONTRACTOR SHALL COORDINATE WITH BNSF RAILWAY PRIOR TOINITIATING ANY ACTIVITIES WITHIN BNSF PROPERTY RIGHT-OF-WAY ORCONDUCTING WORK THAT MAY IMPACT GRADE CROSSING OPERATIONS.ABBREVIATIONSFGFINISH GRADEFLFLOW LINEFOFIBER OPTICHDPEHIGH-DENSITY POLYETHYLENEKPIKILOPOUNDS PER SQUARE INCHLFLINEAR FEETLPLOW POINTLTLEFTMINMINIMUMMXMATCH EXISTINGNTSNOT TO SCALEPSIPOUNDS PER SQUARE INCHRTRIGHTSDSTORM DRAINSDRSTANDARD DIMENSION RATIOSTASTATIONTCTOP OF CURBTRTOP OF RAILTYPTYPICAL CITY OF RICHMOND REQUESTS 26 SECONDS OF PREEMPTION FROM THERAILROAD, WHICH INCLUDES:A. 16 SECONDS FLASHING "DON'T WALK".B. 4 SECONDS YELLOW CHANGE INTERVAL.C. 6 SECONDS ALL RED.TRAIN MAY PROCEED UNDER THE "STOP AND WAIT" PROCEDURE.PREEMPTION TIME

← All documents from this meeting