Cities Index.
Attachment 2 - Proposed Change Order.pdf

Richmond City Council
March 17, 2026

Document
Attachment 2 - Proposed Change Order.pdf
Meeting
March 17, 2026
Body
Richmond City Council
Original file
2.6 MB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.

Date:

VWNA Project #:

Administration
Engineering
Planning
Design
Construction X Proposed by:

Construction Chandrasekar Venkatraman, Veolia Water West Oper Services Sanitary Sewer
Storm Sewer Reviewed by:

Sanitary P.S. X Mary Phelps, Authorized City Dept. Rep. (PO verification) Storm P.S.

Wastewater Reviewed by:

City of Richmond, Finance Department
Other (specify below)
Approved by:

Daniel Chavarria
City of Richmond, Public Works Director
Approval Date:

Original Line Item Approved Cost: 2,039,740$
Approved markup (16.5%) 336,557
Previous Approved COs 356,445
Change Order 3 120,520
Previously Authorized Amount: $2,732,742.00 Approved markup (9%) 10,847 Total Authorized Amt.: 2,864,108$
Scope of Services
Attachments
The Ferry Point Sewer Pump Station project is nearing completion. The initial portion of the project was completed in 2023. After months of close coordination with the engineer of record and the General Contractor, the City of Richmond was able to successfully redesign a pump station that is both functional and acceptable to the residents; Final Completion is anticipated by mid-October.

When construction started up again this past June, the City and Veolia were resolved to complete the project with the remaining authorized funding, and Veolia worked with the Contractor to keep within the remaining Council authority. As negotiations continued, however, the added scope of construction costs were higher than anticipated (see attached Change Order 2 cost summary). The Contractor submitted a credit for their remaining contract amount of $136,050 to offset the change order cost. Veolia accepted this credit offer with the understanding that it would enable the project to remain within existing authorization. However, after the change order was executed, it was discovered that while the credit offset the change order costs, the amount of $136,050 still remained in the original contract value. As a result, the project cost has exceeded the original project authority by $131,366.80.

Therefore, in order to complete the project, we respectfully request an increase in project authority by that amount, augmenting the total authorization from $2,732,742 to $2,864,108.

Change Order 2 Cost Summary (page 1)
Previously executed TAs
TASK

AUTHORIZATION
Ferry Point Sewer Pump Station Replacement - Change Order 3 August 21, 2025