Fiscal Year 2026 - 2027 SB 1 RMRA Project List
2026 Paving Project Base Repair Blitz
StreetID Street Name SectionID Beginning End Functional Class
Surface
Type
Length
(ft) Lanes Width
(ft)
Area
(sf) PCI Date PCI Treatment*
2026 BR
Unit Cost,
$/SY
2026 Base
Repair Cost
22NDST 22ND STREET 010 N/O CARLSON S/O MCDONALD Arterial AC 940 2 36 33,840 10/25/2023 60 8" Base Repair 14.50$ 54,520$ 22NDST 22ND STREET 020 N/O MACDONALD S/O ROOSEVELT Arterial AC/AC 1,560 2 36 56,160 10/25/2023 55 8" Base Repair 14.50$ 90,480$ 23RDST 23RD STREET 010 N/O CARLSON S/O BISSELL Arterial AC 568 3 32 18,176 10/25/2023 52 8" Base Repair 14.50$ 29,284$ 23STNB 23RD STREET (N/B) 040 PCC SECTION BISSELL Arterial AC 232 2 37 8,584 10/25/2023 71 8" Base Repair 3.00$ 2,861$ 23STNB 23RD STREET (N/B) 080 N/O RHEEM N CITY LIM (230' N/O RHEEM) Arterial AC 230 2 26 5,980 10/25/2023 42 8" Base Repair 14.50$ 9,634$ 23STSB 23RD STREET (S/B) 010 N CITY LIM (230' N/O RHEEM) N/O RHEEM Arterial AC 230 2 26 5,980 10/25/2023 42 8" Base Repair 14.50$ 9,634$ 42NDST 42ND STREET 010 MACDONALD END Arterial AC 180 3 49 8,820 10/26/2023 75 8" Base Repair 3.00$ 2,940$ 7THST 7TH STREET 050C N/O BARRETT PENNSYLVANIA Arterial AC/AC 1,455 4 49 66,146 10/24/2023 58 8" Base Repair 14.50$ 106,569$ 7THST 7TH STREET 102 500 N/O LINCOLN HENSLEY Arterial AC/AC 400 4 63 25,200 10/24/2023 35 8" Base Repair 14.50$ 40,600$ 7THST 7TH STREET 105 HENSLEY FACTORY Arterial AC/AC 460 4 63 28,980 10/24/2023 46 8" Base Repair 14.50$ 46,690$ 7THST 7TH STREET 110 FACTORY 300' S/O CASTRO Arterial AC/AC 395 3 54 21,330 10/24/2023 56 8" Base Repair 3.00$ 7,110$ 7THST 7TH STREET 120 RR TRACKS (221' S/O CASTRO) CASTRO Arterial AC/AC 221 2 40 8,840 10/24/2023 60 8" Base Repair 3.00$ 2,947$ AMADOR AMADOR AVENUE 030 SOLANO MCBRYDE Arterial AC/AC 2,020 2 30 60,600 10/27/2023 71 8" Base Repair 3.00$ 20,200$ AMADOR AMADOR AVENUE 040 MCBRYDE N CITY LIM (150' N/O MCBRYDE) Arterial AC 150 2 29 4,350 10/27/2023 65 8" Base Repair 3.00$ 1,450$ ATLAS ATLAS ROAD 020 GIANT N/O RICHMOND PKWY Arterial AC 4,604 4 60 276,240 10/18/2023 50 8" Base Repair 14.50$ 445,053$ BARRET BARRETT AVENUE 010C E/O SAN PABLO DIMM STREET @ 720' Arterial AC 720 4 57 41,040 10/15/2024 64 8" Base Repair 7.50$ 34,200$ BARREB BARRETT AVENUE (E/B) 010 W/O 6TH STREET W/O HARBOUR WAY Arterial AC/AC 1,081 3 37 39,997 10/24/2023 59 8" Base Repair 3.00$ 13,332$ BARREB BARRETT AVENUE (E/B) 020 E/O HARBOUR WAY 30' E/O MARINA Arterial AC/AC 1,131 3 37 41,847 10/24/2023 38 8" Base Repair 14.50$ 67,420$ BARREB BARRETT AVENUE (E/B) 090 W/O 27TH STREET W/O 37TH STREET Arterial AC/AC 2,540 2 29 73,660 10/24/2023 66 8" Base Repair 3.00$ 24,553$ BARREB BARRETT AVENUE (E/B) 100 W/O 37TH STREET W/O I-80 EAST SI Arterial AC/AC 2,200 2 29 63,800 10/24/2023 74 8" Base Repair 3.00$ 21,267$ BARREB BARRETT AVENUE (E/B) 110 I-80-EAST SI W/O SAN PABLO Arterial AC/AC 294 2 36 10,584 10/24/2023 80 8" Base Repair 3.00$ 3,528$ BARRWB BARRETT AVENUE (W/B) 010 W/O SAN PABLO I-80-WEST SI Arterial AC 660 2 24 15,840 10/24/2023 71 8" Base Repair 3.00$ 5,280$ BARRWB BARRETT AVENUE (W/B) 020 W/O I-80-WEST SI W/O 37TH STREET Arterial AC/AC 1,838 2 29 53,302 10/24/2023 68 8" Base Repair 3.00$ 17,767$ BARRWB BARRETT AVENUE (W/B) 030 W/O 37TH STREET W/O 27TH STREET Arterial AC/AC 2,540 2 29 73,660 10/24/2023 70 8" Base Repair 3.00$ 24,553$ BARRWB BARRETT AVENUE (W/B) 040 W/O 27TH STREET 24TH STREET Arterial AC/AC 1,017 2 33 33,561 10/24/2023 71 8" Base Repair 3.00$ 11,187$ BARRWB BARRETT AVENUE (W/B) 100 E/O MARINA E/O HARBOUR WAY Arterial AC/AC 1,131 3 37 41,847 10/24/2023 61 8" Base Repair 3.00$ 13,949$ BARRWB BARRETT AVENUE (W/B) 110 W/O HARBOUR WAY 6TH STREET Arterial AC/AC 980 3 37 36,260 10/24/2023 68 8" Base Repair 3.00$ 12,087$ BLUMNB BLUME DRIVE (N/B) 010 HILLTOP GARRITY Arterial AC/AC 582 2 42 24,444 10/18/2023 53 8" Base Repair 14.50$ 39,382$ BLUMNB BLUME DRIVE (N/B) 020 GARRITY N/O AUTO PLAZA (S) Arterial AC/AC 1,717 2 31 53,227 10/18/2023 49 8" Base Repair 14.50$ 85,755$ BLUMSB BLUME DRIVE (S/B) 030 AUTO PLAZA (S) GARRITY Arterial AC/AC 1,717 2 31 53,227 10/18/2023 59 8" Base Repair 7.50$ 44,356$ BLUMSB BLUME DRIVE (S/B) 040 GARRITY N/O HILLTOP Arterial AC/AC 582 2 49 28,518 10/18/2023 61 8" Base Repair 7.50$ 23,765$ BROADW BROADWAY 010C N/O 23RD STREET S/O MACDONALD Arterial AC/AC 1,620 4 52 84,240 11/1/2023 63 8" Base Repair 3.00$ 28,080$ CANLNB CANAL BOULEVARD (N/B) 010 WHARF RXR SO. CUTTING Arterial AC 2,585 1 27 69,795 10/26/2023 69 8" Base Repair 7.50$ 58,163$ CANLNB CANAL BOULEVARD (N/B) 020 RXR SO. CUTTING CUTTING Arterial AC 249 3 40 9,960 10/26/2023 41 8" Base Repair 14.50$ 16,047$ CANLSB CANAL BOULEVARD (S/B) 030 CUTTING RXR SO. CUTTING Arterial AC 128 2 27 3,456 10/26/2023 66 8" Base Repair 3.00$ 1,152$ CANLSB CANAL BOULEVARD (S/B) 040 RXR SO. CUTTING WHARF Arterial AC 2,718 1 27 73,386 10/26/2023 63 8" Base Repair 3.00$ 24,462$ CARLNB CARLSON BOULEVARD (N/B) 010 SO CITY LIMIT VAN FLEET Arterial AC 375 2 28 10,500 10/23/2023 82 8" Base Repair 3.00$ 3,500$ CARLNB CARLSON BOULEVARD (N/B) 020 VAN FLEET TEHAMA Arterial AC 3,754 2 30 112,620 10/23/2023 75 8" Base Repair 3.00$ 37,540$ CARLSB CARLSON BOULEVARD (S/B) 100 N/O TEHAMA VAN FLEET Arterial AC 3,754 2 30 112,620 10/23/2023 78 8" Base Repair 3.00$ 37,540$ CARLSB CARLSON BOULEVARD (S/B) 110 VAN FLEET SO CITY LIMIT Arterial AC 375 2 28 10,500 10/23/2023 75 8" Base Repair 3.00$ 3,500$ CENTEB CENTRAL AVENUE (E/B) 010 ISABEL RYDIN Arterial AC 1,804 1 24 43,296 10/30/2023 58 8" Base Repair 3.00$ 14,432$ CENTEB CENTRAL AVENUE (E/B) 020 RYDIN W/O 580 OVERPASS Arterial AC 675 1 30 20,250 10/30/2023 46 8" Base Repair 14.50$ 32,625$ CENTWB CENTRAL AVENUE (W/B) 010 W/O 580 OVERPASS RYDIN Arterial AC 675 2 42 28,350 10/30/2023 48 8" Base Repair 14.50$ 45,675$ CENTWB CENTRAL AVENUE (W/B) 020 RYDIN ISABEL Arterial AC 1,874 1 24 44,976 10/30/2023 43 8" Base Repair 14.50$ 72,461$ COLLAV COLLINS AVENUE 020 MORTON S/O GIANT (N) Arterial AC/AC 866 2 32 27,712 10/18/2023 41 8" Base Repair 14.50$ 44,647$ CUTTEB CUTTING BOULEVARD (E/B) 050 W/O CANAL W/O HOFFMAN Arterial AC 4,095 2 34 139,230 10/19/2023 80 8" Base Repair 3.00$ 46,410$ CUTTEB CUTTING BOULEVARD (E/B) 060 W/O HOFFMAN W/O 580 OVERPASS (W) Arterial AC/AC 217 2 29 6,293 10/19/2023 64 8" Base Repair 14.50$ 10,139$ CUTTEB CUTTING BOULEVARD (E/B) 080 E/O 580 OVERPASS (E) HARBOUR WAY Arterial AC 628 2 50 31,400 10/19/2023 38 8" Base Repair 14.50$ 50,589$ CUTTEB CUTTING BOULEVARD (E/B) 090C HARBOUR SO 23RD STREET / MARINA WAY PKWY Arterial AC/AC 3,527 2 36 126,972 10/19/2023 56 8" Base Repair 3.00$ 42,324$ CUTTEB CUTTING BOULEVARD (E/B) 110 SO 23RD STREET / MARINA WAY PKWY SO 26TH STREET Arterial AC 855 2 30 25,650 10/19/2023 49 8" Base Repair 14.50$ 41,325$ 1 Fiscal Year 2026 - 2027 SB 1 RMRA Project List
2026 Paving Project Base Repair Blitz
StreetID Street Name SectionID Beginning End Functional Class
Surface
Type
Length
(ft) Lanes Width
(ft)
Area
(sf) PCI Date PCI Treatment*
2026 BR
Unit Cost,
$/SY
2026 Base
Repair Cost
CUTTEB CUTTING BOULEVARD (E/B) 120 SO 26TH STREET SO 29TH STREET (W) Arterial AC 775 2 30 23,250 10/19/2023 52 8" Base Repair 14.50$ 37,458$ CUTTEB CUTTING BOULEVARD (E/B) 130 SO 29TH STREET (W) E/O SPRING Arterial AC 897 2 30 26,910 10/19/2023 51 8" Base Repair 14.50$ 43,355$ CUTTEB CUTTING BOULEVARD (E/B) 140 E/O SPRING CARLSON Arterial AC 250 3 33 4,950 10/19/2023 76 8" Base Repair 3.00$ 1,650$ CUTTEB CUTTING BOULEVARD (E/B) 180 SO 41ST STREET SO 45TH STREET Arterial AC/AC 1,007 2 23 23,161 10/19/2023 76 8" Base Repair 3.00$ 7,720$ CUTTEB CUTTING BOULEVARD (E/B) 190 SO 45TH STREET SO 49TH STREET Arterial AC/AC 1,039 2 23 23,897 10/19/2023 67 8" Base Repair 3.00$ 7,966$ CUTTEB CUTTING BOULEVARD (E/B) 200 SO 49TH STREET CITY LIMITS Arterial AC 830 2 24 19,920 10/19/2023 44 8" Base Repair 14.50$ 32,093$ CUTTWB CUTTING BOULEVARD (W/B) 010 E CITY LIMIT SO 49TH STREET Arterial AC 830 2 24 19,920 10/19/2023 38 8" Base Repair 14.50$ 32,093$ CUTTWB CUTTING BOULEVARD (W/B) 020 SO 49TH STREET SO 45TH STREET Arterial AC/AC 1,039 2 23 23,897 10/19/2023 66 8" Base Repair 3.00$ 7,966$ CUTTWB CUTTING BOULEVARD (W/B) 030 SO 45TH STREET SO 41ST STREET Arterial AC/AC 1,007 2 23 23,161 10/19/2023 75 8" Base Repair 7.50$ 19,301$ CUTTWB CUTTING BOULEVARD (W/B) 040 SO 41ST STREET SO 37TH STREET Arterial AC/AC 1,050 2 33 34,650 10/19/2023 71 8" Base Repair 3.00$ 11,550$ CUTTWB CUTTING BOULEVARD (W/B) 050 SO 37TH STREET STEGE / 34TH STREET Arterial AC/AC 738 2 31 22,878 10/19/2023 71 8" Base Repair 3.00$ 7,626$ CUTTWB CUTTING BOULEVARD (W/B) 060 STEGE / 34TH STREET CARLSON Arterial AC 333 2 38 12,654 10/19/2023 75 8" Base Repair 3.00$ 4,218$ CUTTWB CUTTING BOULEVARD (W/B) 080 E/O SPRING SO 29TH STREET Arterial AC 897 2 29 26,013 10/19/2023 67 8" Base Repair 3.00$ 8,671$ CUTTWB CUTTING BOULEVARD (W/B) 090 SO 29TH STREET SO 26TH STREET Arterial AC 775 2 29 22,475 10/19/2023 58 8" Base Repair 3.00$ 7,492$ CUTTWB CUTTING BOULEVARD (W/B) 100 SO 26TH STREET SO 23RD STREET Arterial AC/AC 855 2 29 24,795 10/19/2023 59 8" Base Repair 3.00$ 8,265$ CUTTWB CUTTING BOULEVARD (W/B) 110C SO 23RD STREET HARBOUR WAY Arterial AC/AC 3,567 2 33 111,671 10/19/2023 61 8" Base Repair 3.00$ 37,224$ CUTTWB CUTTING BOULEVARD (W/B) 140 HARBOUR E/O 580 OVERPASS (E) Arterial AC 628 3 38 23,864 10/19/2023 46 8" Base Repair 14.50$ 38,448$ CUTTWB CUTTING BOULEVARD (W/B) 160 W/O 580 OVERPASS (W) W/O HOFFMAN Arterial AC/AC 217 2 30 6,510 10/19/2023 64 8" Base Repair 3.00$ 2,170$ CUTTWB CUTTING BOULEVARD (W/B) 170 W/O HOFFMAN W/O CANAL Arterial AC 4,095 2 34 139,230 10/19/2023 75 8" Base Repair 3.00$ 46,410$ FACTOR FACTORY STREET 010 N/O HENSLEY END Arterial AC/AC 1,004 2 42 42,168 10/27/2023 48 8" Base Repair 14.50$ 67,937$ FACTOR FACTORY STREET 020 7TH STREET END Arterial AC/AC 661 2 42 27,762 10/27/2023 64 8" Base Repair 3.00$ 9,254$ FREDJA FRED JACKSON 010 N/O CASTRO S/O DUBOCE Arterial AC 750 3 40 30,000 10/27/2023 54 8" Base Repair 14.50$ 48,333$ FREDJA FRED JACKSON 020 S/O DUBOCE N/O GERTRUDE Arterial AC 524 3 40 20,960 10/27/2023 34 8" Base Repair 14.50$ 33,769$ FREDJA FRED JACKSON 030 N/O GERTRUDE CHESLEY Arterial AC 221 3 34 7,514 10/27/2023 40 8" Base Repair 14.50$ 12,106$ GARREB GARRITY WAY (E/B) 010 HILLTOP MALL RD W/O BLUME Arterial AC 358 3 40 14,320 10/18/2023 62 8" Base Repair 3.00$ 4,773$ GARRWB GARRITY WAY (W/B) 010 BLUME HILLTOP MALL RD Arterial AC 358 2 23 8,234 10/18/2023 77 8" Base Repair 7.50$ 6,862$ GARVIN GARVIN AVENUE 050 E/O 23RD STREET E/O 29TH STREET Arterial AC 2,332 2 39 90,948 10/26/2023 81 8" Base Repair 3.00$ 30,316$ HALLAV HALL AVENUE 010 HARBOUR WAY MARINA WAY Arterial AC 1,048 2 36 37,728 10/19/2023 65 8" Base Repair 3.00$ 12,576$ HARSSB HARBOUR WAY SOUTH (S/B) 040 HALL END Arterial AC 1,500 2 25 37,500 10/19/2023 73 8" Base Repair 3.00$ 12,500$ HENSAV HENSLEY AVENUE 010 CASTRO 500' E/O CASTRO Arterial AC/AC 500 2 62 31,000 10/24/2023 48 8" Base Repair 14.50$ 49,944$ HILLTO HILLTOP DRIVE 010 340' W/O PARK CENTRAL PARK CENTRAL Arterial AC/AC 340 1 53 18,020 10/31/2023 81 8" Base Repair 3.00$ 6,007$ HILLEB HILLTOP DRIVE (E/B) 030 E/O MOYERS W/O I-80 OVERPASS Arterial AC/AC 1,146 3 34 38,964 10/31/2023 73 8" Base Repair 3.00$ 12,988$ HILLEB HILLTOP DRIVE (E/B) 050 E/O I-80 OVERPASS 340' W/O PARK CENTRAL Arterial AC/AC 980 1 38 37,240 10/31/2023 76 8" Base Repair 3.00$ 12,413$ HILLWB HILLTOP DRIVE (W/B) 010 340' W/O PARK CENTRAL E/O I-80 OVERPASS Arterial AC/AC 900 1 30 27,000 10/31/2023 80 8" Base Repair 3.00$ 9,000$ HILLMA HILLTOP MALL ROAD 010C HILLVIEW GARRITY Arterial AC 3,140 5 60 176,310 10/18/2023 56 8" Base Repair 14.50$ 284,055$ HILLMA HILLTOP MALL ROAD 030 GARRITY KLOSE Arterial AC/AC 1,160 5 52 60,320 10/18/2023 59 8" Base Repair 3.00$ 20,107$ HILLVI HILLVIEW DRIVE 030 NORTHRIDGE HILLTOP DRIVE Arterial AC 500 4 54 27,000 10/18/2023 42 8" Base Repair 14.50$ 43,500$ IMPERI IMPERIAL AVENUE 020 SAN JOAQUIN CARLSON Arterial AC 200 2 27 5,400 10/30/2023 45 8" Base Repair 14.50$ 8,700$ JACUZZ JACUZZI STREET 010 CENTRAL SO CITY LIMIT Arterial AC/AC 1,248 2 30 37,440 10/30/2023 51 8" Base Repair 14.50$ 60,320$ KEY KEY BOULEVARD 010CA SO CITY LIMIT S/O MACDONALD Arterial AC/AC 455 2 35 15,925 10/26/2023 48 8" Base Repair 14.50$ 25,657$ KEY KEY BOULEVARD 010CB N/O MACDONALD N/O NEVIN Arterial AC/AC 640 2 42 26,880 10/26/2023 61 8" Base Repair 3.00$ 8,960$ MACDEB MACDONALD AVENUE (E/B) 030C E/O HARBOUR WAY 293' E/O 16TH Arterial AC/AC 1,940 2 22 41,712 10/24/2023 48 8" Base Repair 14.50$ 67,203$ MACDEB MACDONALD AVENUE (E/B) 065 22ND STREET W/O 23RD STREET Arterial AC/AC 325 2 26 8,450 10/24/2023 56 8" Base Repair 3.00$ 2,817$ MACDEB MACDONALD AVENUE (E/B) 070 W/O 23RD STREET W/O 27TH STREET Arterial AC/AC 1,361 2 26 35,386 10/24/2023 50 8" Base Repair 14.50$ 57,011$ MACDEB MACDONALD AVENUE (E/B) 080 W/O 27TH STREET W/O 37TH STREET Arterial AC/AC 2,544 2 26 66,144 10/24/2023 48 8" Base Repair 14.50$ 106,565$ MACDEB MACDONALD AVENUE (E/B) 090 W/O 37TH STREET W/O 41ST STREET Arterial AC/AC 1,015 2 26 26,390 10/24/2023 48 8" Base Repair 14.50$ 42,517$ MACDEB MACDONALD AVENUE (E/B) 110 W/O 44TH STREET E/O WILSON Arterial AC/AC 1,061 2 28 29,708 10/24/2023 64 8" Base Repair 3.00$ 9,903$ MACDEB MACDONALD AVENUE (E/B) 120 E/O WILSON W/O SAN PABLO Arterial AC/AC 291 3 42 12,222 10/24/2023 40 8" Base Repair 14.50$ 19,691$ MACDWB MACDONALD AVENUE (W/B) 030 W/O SAN PABLO AVENUE W/O WILSON Arterial AC/AC 291 2 24 6,984 10/24/2023 50 8" Base Repair 14.50$ 11,252$ MACDWB MACDONALD AVENUE (W/B) 040 E/O WILSON W/O 44TH STREET Arterial AC/AC 1,061 2 28 29,708 10/24/2023 62 8" Base Repair 3.00$ 9,903$ 2 Fiscal Year 2026 - 2027 SB 1 RMRA Project List
2026 Paving Project Base Repair Blitz
StreetID Street Name SectionID Beginning End Functional Class
Surface
Type
Length
(ft) Lanes Width
(ft)
Area
(sf) PCI Date PCI Treatment*
2026 BR
Unit Cost,
$/SY
2026 Base
Repair Cost
MACDWB MACDONALD AVENUE (W/B) 050 W/O 44TH STREET W/O 41ST STREET Arterial AC/AC 750 4 26 19,500 10/24/2023 56 8" Base Repair 7.50$ 16,250$ MACDWB MACDONALD AVENUE (W/B) 060 W/O 41ST STREET W/O 37TH STREET Arterial AC/AC 1,015 2 26 26,390 10/24/2023 51 8" Base Repair 14.50$ 42,517$ MACDWB MACDONALD AVENUE (W/B) 070 W/O 37TH STREET W/O 27TH STREET Arterial AC/AC 2,544 2 26 66,144 10/24/2023 46 8" Base Repair 14.50$ 106,565$ MACDWB MACDONALD AVENUE (W/B) 080 W/O 27TH STREET W/O 23RD STREET Arterial AC/AC 1,361 2 26 35,386 10/24/2023 55 8" Base Repair 14.50$ 57,011$ MACDWB MACDONALD AVENUE (W/B) 100C 293' E/O 16TH E/O HARBOUR WAY Arterial AC 1,940 2 22 41,712 10/24/2023 80 8" Base Repair 3.00$ 13,904$ MACDWB MACDONALD AVENUE (W/B) 90A W/O 23RD STREET W/O 22ND STREET Arterial AC 325 2 26 8,450 10/24/2023 35 8" Base Repair 14.50$ 13,614$ MBAYNB MARINA BAY PKWY (N/B) 040 S/O MEEKER N/O POTRERO Arterial AC 1,653 3 42 69,426 10/19/2023 43 8" Base Repair 14.50$ 111,853$ MBAYNB MARINA BAY PKWY (N/B) 050 POTRERO CUTTING Arterial AC 390 3 42 16,380 10/19/2023 50 8" Base Repair 14.50$ 26,390$ MBAYSB MARINA BAY PKWY (S/B) 010 CUTTING POTRERO Arterial AC/AC 390 2 30 11,700 10/19/2023 54 8" Base Repair 14.50$ 18,850$ MBAYSB MARINA BAY PKWY (S/B) 020 N/O POTRERO S/O MEEKER Arterial AC 1,653 2 42 59,472 10/19/2023 56 8" Base Repair 14.50$ 95,816$ MARSNB MARINA WAY SOUTH (N/B) 010 HALL WRIGHT Arterial AC 2,660 2 22 58,520 10/19/2023 81 8" Base Repair 3.00$ 19,507$ MARSSB MARINA WAY SOUTH (S/B) 030 END PCC WRIGHT Arterial AC 135 2 31 4,185 10/19/2023 53 8" Base Repair 14.50$ 6,743$ MARSSB MARINA WAY SOUTH (S/B) 040 WRIGHT HALL Arterial AC 2,660 2 22 58,520 10/19/2023 67 8" Base Repair 3.00$ 19,507$ MARINE MARINE STREET 040 HWY 580 OFF-RAMP CHEVRON WAY Arterial AC 525 4 52 27,300 10/31/2023 53 8" Base Repair 14.50$ 43,983$ PIERCE PIERCE STREET 010 SO CITY LIMIT CENTRAL Arterial AC/AC 1,228 2 36 44,208 10/30/2023 72 8" Base Repair 3.00$ 14,736$ RHEEM RHEEM AVENUE 030C E/O 23RD STREET W/O 32ND STREET Arterial AC 3,038 2 40 121,520 10/26/2023 65 8" Base Repair 3.00$ 40,507$ RHEEM RHEEM AVENUE 050 E/O 32ND STREET CITY LIMITS Arterial AC 1,140 2 40 45,600 10/26/2023 70 8" Base Repair 3.00$ 15,200$ RPKYEB RICHMOND PKWY EB 020 N/O REDWOOD N/O MILLS Arterial AC/AC 1,770 2 33 58,410 9/1/2021 62 8" Base Repair 3.00$ 19,470$ GARRNB RICHMOND PKWY EB 020 MACDONALD BARRETT Arterial AC 1,100 2 32 35,200 10/18/2023 72 8" Base Repair 3.00$ 11,733$ RPKYEB RICHMOND PKWY EB 030 N/O MILLS N/O GENERAL CHEMICAL ENTR Arterial AC/AC 3,340 2 33 110,520 9/1/2021 51 8" Base Repair 14.50$ 178,060$ RPKYEB RICHMOND PKWY EB 040 N/O GENERAL CHEMICAL ENTR N/O HENSLEY Arterial AC/AC 2,170 2 33 71,610 9/1/2021 63 8" Base Repair 3.00$ 23,870$ RPKYEB RICHMOND PKWY EB 050 N/O HENSLEY 2,277' @ CASTRO MERGE Arterial AC/AC 2,275 2 34 77,350 9/1/2021 62 8" Base Repair 3.00$ 25,783$ RPKYEB RICHMOND PKWY EB 090 W/O GOODRICK W/O PKWY BRIDGE Arterial AC 2,080 2 35 72,800 10/18/2023 62 8" Base Repair 3.00$ 24,267$ RPKYEB RICHMOND PKWY EB 110 E/O PKWY BRIDGE S/O HILLTOP Arterial AC/AC 4,700 4 55 258,500 10/18/2023 61 8" Base Repair 3.00$ 86,167$ RPKYEB RICHMOND PKWY EB 120 S/O HILLTOP S/O ATLAS Arterial AC 1,760 3 50 88,000 10/18/2023 52 8" Base Repair 14.50$ 141,778$ RPKYEB RICHMOND PKWY EB 130 S/O ATLAS W/O SAN PABLO Arterial AC 1,085 3 60 65,100 10/18/2023 44 8" Base Repair 14.50$ 104,883$ RPKYEB RICHMOND PKWY EB 160C E/O LAKESIDE W/O BLUME Arterial AC/AC 3,710 3 41 161,920 10/18/2023 70 8" Base Repair 7.50$ 134,933$ RPKYEBOF RICHMOND PKWY EB - OFF RAMP 010 RICHMOND PKWY EB RICHMOND PKWY WB - OFF RAMP Arterial AC/AC 1,640 2 24 39,360 9/1/2021 62 8" Base Repair 3.00$ 13,120$ RPKYEBON RICHMOND PKWY EB - ON RAMP 010 RICHMOND PKWY WB - ON RAMP RICHMOND PKWY EB Arterial AC/AC 1,208 2 25 30,200 9/1/2021 74 8" Base Repair 3.00$ 10,067$ GARRSB RICHMOND PKWY WB 020 BARRETT N/O MACDONALD Arterial AC 1,100 2 32 35,200 10/18/2023 63 8" Base Repair 3.00$ 11,733$ RPKYWB RICHMOND PKWY WB 020C E/O SIERRA RIDGE E/O LAKSIDE DRIVE Arterial AC/AC 3,165 2 30 94,950 10/18/2023 70 8" Base Repair 3.00$ 31,650$ RPKYWB RICHMOND PKWY WB 040 E/O LAKESIDE DRIVE WIDTH CHANGE (630' E/O SAN PABLO) Arterial AC/AC 680 2 31 21,080 10/18/2023 48 8" Base Repair 14.50$ 33,962$ GARRSB RICHMOND PKWY WB 040 MACDONALD W OHIO Arterial AC/AC 2,380 2 32 76,160 10/18/2023 54 8" Base Repair 14.50$ 122,702$ RPKYWB RICHMOND PKWY WB 050 WIDTH CHANGE (630' E/O SAN PABLO) W/O SAN PABLO Arterial AC/AC 630 3 62 39,060 10/18/2023 59 8" Base Repair 3.00$ 13,020$ RPKYWB RICHMOND PKWY WB 060 W/O SAN PABLO S/O ATLAS Arterial AC 1,085 3 60 65,100 10/18/2023 52 8" Base Repair 14.50$ 104,883$ RPKYWB RICHMOND PKWY WB 070 S/O ATLAS S/O HILLTOP Arterial AC 1,760 3 45 79,200 10/18/2023 50 8" Base Repair 14.50$ 127,600$ RPKYWB RICHMOND PKWY WB 080 S/O HILLTOP E/O PKWY BRIDGE Arterial AC 4,744 3 48 218,592 10/18/2023 64 8" Base Repair 3.00$ 72,864$ RPKYWB RICHMOND PKWY WB 100 W/O PKWY BRIDGE W/O GOODRICK Arterial AC 2,080 2 35 72,800 10/18/2023 47 8" Base Repair 14.50$ 117,289$ RPKYWB RICHMOND PKWY WB 180 400 N/O REDWOOD N/O REDWOOD Arterial AC/AC 550 2 54 29,700 9/1/2021 51 8" Base Repair 14.50$ 47,850$ RPKYWBOF RICHMOND PKWY WB - OFF RAMP 010 RICHMOND PKWY WB MARKOVICH LN Arterial AC/AC 2,350 2 27 63,450 9/1/2021 61 8" Base Repair 14.50$ 102,225$ RPKYWBOF RICHMOND PKWY WB - OFF RAMP 020 MARKOVICH LN GIANT RD Arterial AC/AC 841 2 24 20,184 9/1/2021 55 8" Base Repair 14.50$ 32,519$ RPKYWBON RICHMOND PKWY WB - ON RAMP 010 GIANT RD RICHMOND PKWY WB Arterial AC/AC 1,791 2 26 46,566 9/1/2021 61 8" Base Repair 14.50$ 75,023$ ROBMNB ROBERT MILLER DRIVE (N/ 010 SAN PABLO HILLTOP Arterial AC/AC 3,000 3 40 120,000 10/18/2023 55 8" Base Repair 14.50$ 193,333$ ROBMNB ROBERT MILLER DRIVE (N/ 020 HILLTOP HILLTOP MALL RD Arterial AC/AC 400 2 23 9,200 10/18/2023 75 8" Base Repair 3.00$ 3,067$ ROBMSB ROBERT MILLER DRIVE (S/ 010 HILLTOP MALL RD HILLTOP Arterial AC/AC 400 3 34 13,600 10/18/2023 73 8" Base Repair 3.00$ 4,533$ ROBMSB ROBERT MILLER DRIVE (S/ 020 HILLTOP SAN PABLO Arterial AC/AC 3,000 2 32 96,000 10/18/2023 55 8" Base Repair 14.50$ 154,667$ SANJOA SAN JOAQUIN STREET 020C HUNTINGTON IMPERIAL Arterial AC/AC 2,582 2 30 80,952 10/30/2023 53 8" Base Repair 14.50$ 130,423$ SNPBNB SAN PABLO AVENUE (N/B) 040 S/O I-80 (SO SIDE) S/O SOLANO (E SIDE) Arterial AC/AC 1,961 2 31 60,791 10/25/2023 63 8" Base Repair 3.00$ 20,264$ SNPBNB SAN PABLO AVENUE (N/B) 050 S/O SOLANO (E SIDE) S/O ESMOND (W SIDE) Arterial AC/AC 1,215 2 31 37,665 10/25/2023 39 8" Base Repair 14.50$ 60,683$ SNPBNB SAN PABLO AVENUE (N/B) 060 S/O ESMOND (W SIDE) S/O MCBRYDE (E SIDE) Arterial AC/AC 780 2 31 24,180 10/25/2023 50 8" Base Repair 14.50$ 38,957$ 3 Fiscal Year 2026 - 2027 SB 1 RMRA Project List
2026 Paving Project Base Repair Blitz
StreetID Street Name SectionID Beginning End Functional Class
Surface
Type
Length
(ft) Lanes Width
(ft)
Area
(sf) PCI Date PCI Treatment*
2026 BR
Unit Cost,
$/SY
2026 Base
Repair Cost
SNPBNB SAN PABLO AVENUE (N/B) 070 S/O MCBRYDE CITY LIMITS Arterial AC/AC 784 2 31 24,304 10/25/2023 42 8" Base Repair 14.50$ 39,156$ SNPBNB SAN PABLO AVENUE (N/B) 100 500' S/O LA PUERTA STANTON Arterial AC 1,390 2 29 40,310 10/25/2023 53 8" Base Repair 14.50$ 64,944$ SNPBNB SAN PABLO AVENUE (N/B) 110 STANTON 740' S/O HILLTOP Arterial AC/AC 1,373 2 31 42,563 10/25/2023 47 8" Base Repair 14.50$ 68,574$ SNPBNB SAN PABLO AVENUE (N/B) 120 740' S/O HILLTOP 175' N/O RICHMOND PKWY Arterial AC/AC 2,835 2 25 70,875 10/25/2023 52 8" Base Repair 14.50$ 114,188$ SNPBSB SAN PABLO AVENUE (S/B) 010 175' N/O RICHMOND PKWY 740' S/O HILLTOP Arterial AC 2,835 2 32 90,720 10/25/2023 73 8" Base Repair 7.50$ 75,600$ SNPBSB SAN PABLO AVENUE (S/B) 020 740' S/O HILLTOP STANTON Arterial AC/AC 1,373 2 27 37,071 10/25/2023 58 8" Base Repair 3.00$ 12,357$ SNPBSB SAN PABLO AVENUE (S/B) 060 CITY LIMITS S/O MCBRYDE (E SIDE) Arterial AC/AC 725 2 32 23,200 10/25/2023 48 8" Base Repair 14.50$ 37,378$ SNPBSB SAN PABLO AVENUE (S/B) 070 S/O MCBRYDE (E SIDE) S/O ESMOND (W SIDE) Arterial AC/AC 782 2 31 24,242 10/25/2023 41 8" Base Repair 14.50$ 39,057$ SNPBSB SAN PABLO AVENUE (S/B) 080 S/O ESMOND (W SIDE) SOLANO (E SIDE) Arterial AC/AC 1,220 2 31 37,820 10/25/2023 43 8" Base Repair 14.50$ 60,932$ SNPBSB SAN PABLO AVENUE (S/B) 090 S/O SOLANO (E SIDE) S/O CLINTON Arterial AC/AC 646 2 31 20,026 10/25/2023 49 8" Base Repair 14.50$ 32,264$ SNPBSB SAN PABLO AVENUE (S/B) 100 S/O CLINTON I-80 (NO SIDE) Arterial AC/AC 1,034 2 37 38,258 10/25/2023 52 8" Base Repair 14.50$ 61,638$ S23ST SO 23RD STREET 100 OHIO PCC SECTION Arterial AC/AC 130 4 74 9,620 10/23/2023 68 8" Base Repair 3.00$ 3,207$ S23ST SO 23RD STREET 200 CUTTING OHIO Arterial AC/AC 1,980 4 60 118,800 10/23/2023 63 8" Base Repair 7.50$ 99,000$ S2NDST SO 2ND STREET 020 FLORIDA OHIO Arterial AC 475 2 40 19,000 10/23/2023 34 8" Base Repair 14.50$ 30,611$ SOLANO SOLANO AVENUE 070 AMADOR YUBA ST Arterial AC 570 2 32 18,240 10/27/2023 45 8" Base Repair 14.50$ 29,387$ Total 220,723 7,687,251 7,096,199$
*Base repair will be improving the pavement section better than what it is currently and repairing the failed pavement section. Without this important step to rebuild the failed pavement structure prior to pavement rehabilitation, the future pavement rehabilitation will prematurely fail within months to a year following treatment. Base repair will itself last longer than the surrounding pavement, but for simplicity it probably adds on the order of 10 years of pavement life to the overall sections that receives treatment. 4
Attachment 2- Citywide arterial base repair list.pdf
Richmond City Council
May 19, 2026
- Document
- Attachment 2- Citywide arterial base repair list.pdf
- Meeting
- May 19, 2026
- Body
- Richmond City Council
- Original file
- 252 KB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.