I

NVITATION

TO

B
ID

C
ITY

OF

R

ICHMOND
2025-26 GRADE 5 RAA LINE REPLACEMENT PROJECT L
OCATED

IN

R

ICHMOND
, C

ALIFORNIA

Bid Proposal Due Date: April 06, 2026, 2:00 PM

(THIS PAGE LEFT BLANK INTENTIONALLY)
Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 2 CONTENTS Page
Invitation to Bid 5
Mandatory Pre-Bid Meeting 5
Bid Opening 5
Introduction and Background 5 Estimated Project Cost 5 Basis of Project Award 5
Public Records 5
Business License 6 Laws and Regulations 6 Richmond Business Opportunity Ordinance 6
Contractor License 6 Compliance with City Ordinances 6
Questions Concerning Invitation to Bid 7
INSTRUCTIONS TO BIDDERS 8
PROPOSAL FORM 10
SCOPE OF WORK 13
SUPPLEMENTAL BID FORM 15 LIST OF SUBCONTRACTORS 17
NON-COLLUSION AFFIDAVIT 18
BID RETURNABLES 19
ADDITIONAL INSTRUCTION TO BIDDERS 20
INTERPRETATION OF CONTRACT DOCUMENTS 20
POSTPONEMENT OF OPENING 20
OPENING OF BIDS 20
PREPARATION OF BID FORMS 20 BIDDER’S SIGNATURE AND AUTHORITY 21
Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 3 ERASURES & CORRECTIONS 21
BID IRREGULARITIES 21
MODIFICATION OF BID 21
WITHDRAWAL OF BID 21
ADDENDA 21
BID PRICES 22
TIME ALLOWED FOR COMPLETION AND LIQUIDATED DAMAGES 22 QUALIFICATION OF BIDDER 24
REJECTION OF BIDS 23
IRREGULARITIES OF BIDS 23
INSURANCE REQUIREMENTS 24
CONTRACT BONDS (BID BOND, PERFORMANCE, PAYMENT & GUARANTY BOND) 28 WARRANTY FORM 37 VEOLIA’S CONSTRUCTION CONTRACTOR SAFETY HANDBOOK 38

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 4 Date: 02/27/2026 Invitation to Bid for the City of Richmond 2025-26 GRADE 5 RAA LINE REPLACEMENT PROJECT Notice is hereby given that bids for the City of Richmond 2025-25 GRADE 5 RAA LINE

REPLACEMENT

PROJECT

shall

be

submitted

via

the

City’s

secure

online

bidding

system.

All

required

sections

of

the

Bid

must

be

submitted

via

the

website.

The

Contractor

is

solely

responsible

for

“on

time”

submission

of

their

electronic

Bid.

The

Bid

Management

System

will

not

accept

late

Bids

and

no

exceptions

shall

be

made.

Contractors

will

receive

an

e-bid

confirmation

number

with

a

time

stamp

from

the

Bid

Management

System

indicating

that

their

bid

was

submitted

successfully.

The

City

will

only

receive

those

Bids

that

were

transmitted

successfully.

All

bid

forms

must

be

completed

in

full

or

the

bid

will

not

be

considered.

Bids

should

be

submitted

electronically

only

on

BidsOnline.

No

hard

copies

shall

be

accepted.

Public Agency Authority The City of Richmond is the contracting public agency for this Project. Veolia Water West Operating

Services,

Inc.

(“Veolia”)

is

acting

as

the

City’s

authorized

agent

for

purposes

of

bid

administration,

construction

coordination,

and

contract

management.

All

references

to

“OWNER”

or

“Company”

herein

shall

be

understood

to

mean

the

City

of

Richmond,

acting

through

its

authorized

agent,

unless

otherwise

expressly

stated.

Final

award

of

contract

is

subject

to

approval

by

the

Richmond

City

Council.

Mandatory Pre-Bid Meeting All Bidders/Contractors shall attend a mandatory pre-bid meeting on March 11, 2026 at 10:00 AM.

The

pre-bid

meeting

will

be

held

at

the

Richmond

WWTP,

601

Canal

Blvd,

Richmond

CA

94804.

Bid Opening Bids are due and scheduled to be received online on April 06, 2026 at 2 PM. Veolia Water West Operating Services, Inc. reserves the right after opening bids to reject any or all bids,

to

waive

any

informality

(non-responsiveness)

in

a

bid,

or

to

make

award

to

the

lowest

responsive,

responsible

bidder

and

reject

all

other

bids,

as

it

may

best

serve

the

interest

of

Veolia

Water

and/or

the

City

of

Richmond.

If

a

bid

is

accepted,

it

will

be

combined

with

other

project

costs

(especial

inspection

and

testing,

engineering

support

during

construction,

construction

management,

etc.)

and

presented

to

the

City

of

Richmond

for

approval.

Although

we

believe

that

the

City

will

approve

this

project,

there

is

no

guarantee

of

approval

and

this

project

proceeding.

The

Bidder

shall

guarantee

the

Total

Bid

Price

for

a

period

of

120

Calendar

days

from

the

date

of

bid

opening.

Introduction and Background The City of Richmond’s sanitary sewer collection system is periodically CCTVd by Veolia’s Operation

and

Maintenance

staff.

This

information

has

been

assessed

by

The

City

of

Richmond,

Veolia

and

V.W.

Housen

and

Associates,

who

have

identified

several

pipe

segments,

which

are

currently

inaccessible

due

to

obstruction,

line

collapse,

joint

defect

and

other

such

defects

that

are

in

need

of

repairs

and/or

replacement.

Basis of Project Award The project will be awarded based on the Lump Sum Base Bids of full line replacement, manhole installation

and

pipe

replacement

identified

on

Attachment

A

to

the

Scope

of

Work.

In

addition,

the

Bidder

shall

provide

supplemental

bid

cost

prices

for

additional

work

that

may

be

discovered

which

shall

be

brought

to

the

attention

of

Veolia’s

Construction

Manager

upon

discovery.

The

costs

for

all
Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 5 additional work discovered shall be based on supplemental bid cost prices and will be processed as

change

orders.

It

will

be

the

sole

discretion

of

Veolia

and

the

City

of

Richmond

whether

to

authorize

any

additional

work.

Public Records All bids submitted in response to this Invitation to Bid become the property of Veolia Water West Operating

Services,

Inc.

(Veolia)

and

the

City

of

Richmond

and

public

records

and,

as

such,

may

be

subject

to

public

review.

If

clearly

marked

with

the

word

"confidential"

on

each

applicable

page,

Veolia

and

the

City

of

Richmond

will

not

disclose

documents

protected

by

law

from

public

disclosure.

Trade

secrets

may

be

marked

as

confidential

only

to

the

extent

they

meet

the

requirements

of

California

Government

Code

section

6254.7.

Only

information

claimed

to

be

a

trade

secret

at

the

time

of

submittal

to

Veolia

and

the

City

of

Richmond

and

marked

as

“confidential”

will

be

treated

as

a

trade

secret.

As a condition of award, the successful bidder will be required to execute a Veolia subcontract agreement

and

provide

evidence

of

insurance.

Insurance

certificates

shall

list

the

City

of

Richmond

as

additionally

insured.

Automobile

general

liability

and

workers

compensation

insurance

are

required.

Business License The successful firm and subcontractors used in the work will be required to hold or to obtain a City of

Richmond

business

license

for

which

the

fee

will

not

be

waived.

Laws and Regulations Bidder shall give all notices and comply with all Laws and Regulations applicable to the performance

of

the

work.

Except

where

otherwise

expressly

required

by

applicable

law

and/or

regulations,

neither

Veolia,

nor

the

City

of

Richmond,

nor

Engineer

shall

be

responsible

for

monitoring

Bidder’s

compliance

with

any

Laws

or

Regulations.

The successful bidder shall be required to pay prevailing wage and submit certified payrolls to the California

Department

of

Industrial

Relations

(DIR),

per

DIR

requirements.

The successful bidder shall also adhere to the Project Stabilization Agreement for the City of Richmond

if

applicable.

Richmond Business Opportunity Ordinance It is the intent of the City of Richmond to develop and promote economic growth for the community in

which

it

serves.

The

City

desires

to

foster

the

growth

of

small

and

local

emerging

businesses.

It

is

the

policy

of

the

City

to

ensure

full

and

equitable

opportunities

for

Richmond

business

enterprises,

including

small

and

nonprofit

businesses,

to

participate

as

contractors

in

the

provision

of

goods

and

services

to

the

City.

Check

the

City’s

website

for

definition

of

Richmond

Business:
http://ca- Richmond.civicplus.com/1043/Doing-Business-with-the-City-of-Richmond The following rating incentives shall apply to a Richmond Business (a) A five percent (5%) or five point rating incentive to bids submitted by Richmond business,

Richmond

small

business

or

Richmond

nonprofit

business

prime

contractors;

(b) A five percent (5%) or five point rating incentive to bids submitted by Richmond business

joint

ventures

that

utilize

a

minimum

of

twenty-five

percent

(25%)

of

the

total

contract

amount

allocated

to

Richmond

businesses,

Richmond

small

businesses

or

Richmond

nonprofit

businesses;
(c) A five percent (5%) or five point rating incentive to bids submitted with a minimum of Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 6 twenty-five percent (25%) of the total contract dollar amount allocated to Richmond businesses

or

Richmond

nonprofit

businesses

and

ten

percent

(10%)

of

the

total

contract

dollar

amount

allocated

to

Richmond

small

businesses

or

Richmond

small

nonprofit

businesses.

Rating

incentives

shall

not

cumulatively

equal

more

than

ten

percent

(10%)

or

ten

points.

Limitation on Local Preference Local business incentives and preferences described herein apply only to City of Richmond-funded projects

and

shall

be

applied

in

a

manner

consistent

with

applicable

state

law.

Such

incentives

shall

not

apply

where

prohibited

by

funding

source

or

governing

law.

Contractor Licenses Bidders must have either a Class A or a C-34 license to bid this project as a Prime Contractor. Compliance with City Ordinances The Prime Contractor and all subcontractors shall comply with the City of Richmond Nondiscrimination

Clauses

in

City

Contracts

Ordinance

(Richmond Municipal Code (RMC) Chapter

2.28), Business Opportunity Ordinance (RMC Chapter 2.50) as previously mentioned in this Invitation

to

Bid,

Local

Employment

Program

Ordinance

(RMC Chapter 2.56), Living Wage
Ordinance

(RMC Chapter 2.60) and Ordinance Banning the Requirement to Provide Information of Prior

Criminal

Convictions

on

all

Employment

Applications

(“Ban

the

Box”)

(RMC Chapter 2.65), all
of

which

are

incorporated

into

the

Contract

Documents

by

this

reference.

The bid should include all labor, supervision, material, supplies, equipment, inspections, and any other

incidentals

required

for

the

work

as

described

in

the

enclosed

Scope

of

Work,

as

supplemented

by

the

enclosed

drawings

and

specifications.

Bidder’s

firm

is

presumed

to

hold

all

necessary

licenses

and

other

qualifications,

and

the

work

will

be

required

to

meet

all

local,

state

and

federal

codes,

laws,

rules

and

regulations.

Any discrepancies Bidder may discover among the Scope of Work, Contract Documents, drawings, and

applicable

laws,

rules,

codes,

or

regulations

should

be

brought

to

Veolia

Water

West

Operating

Services,

Inc.

attention

with

your

quotation.

For

purposes

of

pricing

the

work,

Bidder

should

assume

that

the

most

stringent

of

the

foregoing

requirements

will

apply

to

Bidder’s

work.

Should

Bidder

be

awarded

a

subcontract,

no

additional

compensation

will

be

granted

for

compliance

with

any

of

these

requirements.

Should Bidder’s review of the Contractor Documents indicate that cost and/or schedule savings might

be

realized

through

the

use

of

alternate

materials,

modified

configurations,

or

more

efficient

layouts

(all

without

compromising

function,

interfaces,

or

quality),

Veolia

Water

West

Operating

Services,

Inc.

may

consider

detailed

alternate

proposals

in

addition

to

the

base-bid

proposal.

No

alternates

will

be

considered

for

the

base

bid

proposal.

Questions Concerning Invitation to Bids – Requests for Information All questions must be submitted via the electronic BidsOnline system on the Q&A tab by March 18, 2026

at

11:00

am

PST.

If

the

City

of

Richmond

or

Veolia

find

it

necessary

to

issue

an

addendum,

prospective

Offerors

will

receive

email

notification

of

addendum.

Otherwise,

answers

to

questions

received

will

be

provided

on

the

Q&A

tab

and

notification

will

be

sent

by

Wednesday,

March

25,

2026.

It

is

the

proposer’s

responsibility

to

periodically

check

the

BidsOnline

website
www.ci.richmond.ca.us/bids for any possible Addenda to the Invitation to Bid that may have been posted. Any party submitting a proposal shall not contact or lobby any City Council member, City official,

employee

(except

those

specified

for

contact)

or

agent

regarding

the

Invitation

to

Bid.

Any

party

attempting

to

influence

or

circumvent

the

Invitation

to

Bid,

bid

submittal,

and

review

process

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 7 may have their proposal rejected for violating this provision of the Invitation to Bid. All work shall be performed in strict accordance and adherence with City’s Sanitary Sewer standard

specifications

for

design

and

construction,

which

can

be

found

at:
https://www.ci.richmond.ca.us/DocumentCenter/View/44223/Sanitary-Sewer-Std-Specs-for-Design--Construction-2017?bidId= Akash Vijay is the Construction Manager at Veolia Water West Operating Services, Inc.’s CPM group,

who

will

assist

with

the

coordination

of

the

construction

repair

work

throughout

the

construction

of

this

project.

He

can

be

contacted

at

(510)

685-2336.

Interested parties may download copies of the above mentioned proposal by visiting the City's web site, www.ci.richmond.ca.us/bids. To download the RFP, new vendors will be required to register. Once the vendor downloads any documents relative to a solicitation, that vendor's name will appear

on

the

Prospective

Bidders

list

for

that

project

and

will

receive

any

addenda

or

notifications

relating

to

the

RFQ.

The City of Richmond and Veolia Water West Operating Services, Inc. are equal opportunity employers.

Minority

business

enterprises

and

women's

business

enterprises

are

encouraged

to

submit

proposals.
----End of Invitation to Bid ----
Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 8 INSTRUCTIONS TO BIDDERS 1. For the purpose of this solicitation the terms “Bidder” and “Contractor” are synonymous.

2. For purposes of this solicitation, the term “Company” refer to Veolia Water West Operating

Services,

Inc.

3. This solicitation shall not create any relationship, contractual, or otherwise, between Company

and

Bidder,

the

Bidder

and

the

City

of

Richmond,

and

neither

Company

nor

the

City

of

Richmond

shall

be

liable

for

any

expenses

incurred

by

Bidder

in

the

preparation

and

submission

of

its

offer

in

response

hereto.

Company

may

accept

any

item

or

group

of

items

of

any

offer.

4. Company reserves the right to accept or reject any offer received before or after the bid

due

and

time

shown

on

the

cover

page.

5. Company agrees that all data submitted to it with this solicitation remains the property

of

Bidder,

shall

be

held

in

strict

confidence

and

shall

be

returned

to

the

Bidder

upon

request,

except

as

otherwise

stated

elsewhere.

6. Bidders are to notify the Company in writing if declining to bid by so annotating, signing

and

returning

the

cover

page.

Failure

to

comply

could

cause

exclusion

of

Bidder

from

future

solicitations.

7. All of the items listed in the returnable section of this request must be supplied with Contractor’s

bid.

8. Bidder is advised that any offer received after the bid due date and time may result in

disqualifying

the

bidder

and

determined

to

be

non-responsive

to

this

bid

solicitation

and

may

disqualify

the

bidder

from

participation

in

future

bid

opportunities.

9. The laws where the work will be performed will govern any resulting subcontract. 10. Unless otherwise noted, Bidder shall include all taxes, licenses, permits, fees, etc. in its

proposed

price(s).

11. Requests for clarifications must be submitted in writing using the BidsOnline question

and

answer

section/tab.

All

clarifications

and

interpretations

to

this

solicitation

will

be

issued

by

written

addenda.

No

interpretation

or

clarification

given

orally

or

separately

will

be

effective

to

alter

or

affect

the

solicitation

documents

unless

confirmed

by

written

addendum.

12. Bidder shall be required to acknowledge the receipt of all addenda, by number and date,

in

their

proposal.

All

addenda

will

be

posted

to

BidsOnline.

13. All responses to this solicitation must be in complete compliance with these and other

attached

instructions.

14. Contractor/Bidders are not required to be prequalified to bid on this project; Subcontractors

contracted

by

Contractor/Bidders

are

also

not

required

to

be

prequalified.

15. Refer to Section 00100 ADDITIONAL INSTRUCTIONS TO BIDDERS for additional project

and

bidding

information.

16. Basis of Award: Award, if made, shall be to the lowest responsive and responsible bidder,

as

determined

in

accordance

with

the

California

Public

Contract

Code

and

applicable

City

of

Richmond

purchasing

and

contracting

requirements.

The

City

reserves

the

right

to

reject

any

or

all

bids,

waive

minor

irregularities,

or

determine

that

it

is

in

the

City’s

best

interest

not

to

award

a

contract.

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 9 PROPOSAL FORM INVITATION TO BID 2025-26 GRADE 5 RAA LINE REPLACEMENT PROJECT LOCATED IN RICHMOND, CA To: Akash Vijay Construction Manager Veolia 601 Canal Blvd. Richmond, CA 94804 Submitted By:
_______________________________ (Legal Name)
_______________________________________________ (Street Address) _______________________________________________ (City, State, and Zip Code) _______________________________________________ (Phone) _______________________________________________ (Date of Quotation) 1. This Proposal Form along with the Supplemental Bid Form shall be completed and submitted

as

required

in

the

Returnable

section

of

this

Invitation

to

Bid.

2. This proposal is submitted in accordance with this Invitation to Bid for the construction of the

2025-26

Grade

5 RAA

Line

Replacement

Project

in

Richmond,

CA.

3. Shipping Cost and Sales Tax – The equipment, chemicals, consumables and other supplies and

services

provided

and

used

in

the

performance

of

the

contract

shall

include

all

shipping

costs

and

sales

taxes

imposed

by

any

governmental

body.

4. Certified payroll and prevailing wages are required as a part of this project and shall be submitted

with

all

progress

payments

that

are

due

each

month.

5. In conformance with the current statutory requirements of California Labor Code Section 1860,

et

seq.,

the

undersigned

confirms

the

following

as

its

certification:

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 10 I am aware of the provisions of Section 3700 of the Labor Code, which require every employer to be

insured

against

liability

for

worker’s

compensation,

or

to

undertake

self-insurance

in

accordance

with

the

provisions,

before

commencing

the

performance

of

the

Work

of

this

Contract.

6. Notice to Proceed A Notice to Proceed will not be issued until Authorization is received from the City of Richmond. Contractor shall commence performance of the work only upon the full execution of the Subcontract

Agreement

with

Veolia

Water

West

Operating

Services,

Inc.

Upon

receipt

of

executed

contract

and

a

Notice

to

Proceed

(NTP),

the

Contractor

shall

promptly

commence

Work,

shall

prosecute

the

Work

diligently

and

shall

complete

all

Work

within

the

agreed

upon

schedule

duration.

7. For the purposes of the proposal, the Contract Documents and scope of work shall include all

documents

and

information

included

as

part

of

this

Invitation

to

Bid,

including

any

and

all

attachments

or

referenced

documents.

8. Addenda The Bidder hereby acknowledges and initials receipt of the following issues of addenda, if any, distributed

by

Veolia

Water

West

Operating

Services,

Inc.

via

the

City

of

Richmond’s

BidsOnline

website.

If any additional addendum were issued, note on a separate sheet. 9. Signatures of Proposal (If an individual, partnership, or non-incorporated organization) Signature: ____________________________________________________________ (Seal) Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 11 Addendum No.:

Dated       Initialed Receipt

Addendum No.:

Dated       Initialed Receipt

Addendum No.:

Dated       Initialed Receipt

Addendum No.:

Dated       Initialed Receipt

Addendum No.:

Dated       Initialed Receipt

Addendum No.:

Dated       Initialed Receipt

Addendum No.:

Dated       Initialed Receipt

Addendum No.:

Dated       Initialed Receipt

Printed Name: _________________________________________________________ Title: ________________________________________________________________ Address of Bidder:

Names and addresses of members of firm:

(If a Corporation) Legal name of Bidder: ___________________________________________ By: __________________________________________________________ Printed name: __________________________________________________ Title of signer: ___________________________________________________________ Business Address:

Incorporated under the Laws of the State of: __________________________________ Names of Officers – President Address

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 12

Secretary Address

Treasurer Address

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 13

SCOPE OF WORK
Veolia Water West Operating Services, Inc. operates and maintains the City of Richmond’s Wastewater

Treatment

Facility

(WWTF)

and

the

associated

sewer

collection

system.

The

work

will

include

pipe

segment

replacement

of

deteriorated

sewer

pipe

segments

within

the

collection

system

using

pipe

bursting,

open

cut,

or

pipe

reaming

as

discussed

further

below.

The

work

shall

include

manhole

installation

and/or

replacement

and/or

full

interior

surface

(e.g.

chimney,

cone,

wall,

bench,

and

channel)

rehabilitation

when

the

adjacent

pipeline

is

replaced,

and

manhole

frames

and

covers

as

necessary.

For

pipe

replacement

work,

pipe

bursting

is

the

preferred

method,

followed

by

open

cut

and

then

pipe

reaming.

The pipe segments to be replaced for this project are identified in Scope of Work Attachment A.

The

line

segments

identified

may

be

modified

from

time-to-time

during

the

project.

The

selected

Contractor

shall

conduct

a

pre-CCTV

of

each

line

segment

to

the

greatest

extent

possible

to

mark

and

locate

the

defects

prior

to

commencement

of

the

Work.

A

complete

NASSCO

graded

post-construction

CCTV

survey

of

the

entire

line

segment

(manhole

to

manhole)

shall

be

completed

upon

completion

of

the

work

(no

later

than

one

week

after

the

repair

or

replacement)

and

provided

to

Veolia.

If

following

the

repair,

the

line

remains

inaccessible,

the

contractor

shall

provide

a

supplemental

repair

cost

proposal

with

the

CCTV

video

for

consideration.

The project scope includes, but is not limited to the following: 1. Contracting with a local Civil Professional Engineer to provide engineering and design

of

each

line

segment

installation,

and

provide

engineering

support

for

the

lines

which

have

utility

conflicts,

or

other

constructability

issues.

The

Engineer

of

Record

shall

submit

an

initial

plan

showing

the

lines

that

will

receive

preliminary

engineering

for

review

and

concurrence,

followed

by

30 percent

design

drawings

clearly

showing

all

conflicting

utilities,

structures,

and

other

field

constraints

and

the

contractor’s

approach

to

addressing

these

constraints

as

needed

to

complete

the

work

.

The

Contractor

shall

be

responsible

for

addressing

all

field

conditions,

whether

included

or

not

included

in

the

30 percent

design

package,

and

whether

shown

or

not

shown

on

the

submitted

design.

The

initial

plan

and

the

30 percent

designs

shall

be

approved

in

concept

by

the

Company.

Separate designs may be provided for individual line segments in order to expedite the work.

2. Submit final as-built drawings and any intermediate design and modifications for all pipelines,

including

those

that

did

not

receive

30 percent

design,

to

the

Company

for

approval.

3. Contractor shall provide a construction project schedule, including weekly schedules with

crew

information

and

locations

as

reasonably

required

by

Veolia.

4. Contractor shall provide weekly updates for progress of pipe replacement/repair work

5. Sheeting, shoring and bracing. 6. Trenching width shall be (Pipe OD + 24” MIN) or (Pipe OD + 36” MAX). 7. Potholing existing utilities based on mandatory USA markings. 8. All USA markings shall be removed from the pavement after work is complete. 9. Traffic control, as necessary per City of Richmond requirements. 10. Pipe replacement by pipe bursting, unless inadvisable or infeasible with Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 14 authorization by Veolia and the City of Richmond. 11. Open Cut techniques permitted only if pipe bursting is not feasible and with authorization

by

Veolia

and

the

City

of

Richmond.

12. Reconnection and/or extension of existing service laterals to new sewer main, as necessary.

13. Extending sewer laterals from the closest point of abandoned sewer mains to new sewer

mains.

Open

cut

or

hand-digging

may

be

required.

14. Removal of existing manholes or cleanouts and construction of new manholes, complete,

as

needed.

15. Rehabilitation of Manholes whenever the adjacent pipeline is replaced, per attached specifications.

Vacuum

testing

of

rehabilitated

brick

manholes

is

not

required.

16. Post Construction cleaning of sewer pipe line segments that were replaced. 17. Post replacement NASSCO graded CCTV of the entire line segment. 18. Post construction NASSCO graded CCTV information shall be submitted no later than

one

week

following

the

line

segment

replacement.

19. Restoration and repair of existing pavement systems shall be T-cut, and the Contractor

shall

be

responsible

for

restoring

surface

improvements

affected

by

the

Work

and

incidentals

for

complete

and

usable

sewer

system.

20. If the Contractor encounters defective private sewer lateral connecting to the mainline,

the

Contractor

shall

replace

up

to

6 feet

of

the

private

sewer

lateral

from

the

mainline.

21. Replace striping with thermoplastic, traffic loops, and fire hydrant markers. 22. Handling and disposal of contaminated material if authorized by the Construction Manager

and

the

City

of

Richmond.

23. Dewatering and obtain appropriate permits, as necessary. 24. Construction shall be Monday thru Friday from 7am to 4pm. Contractor’s request for weekend,

off-hours

and

holiday

work

may

be

considered

on

a

case-by-case

basis

by

Veolia

Construction

Manager.

25. The available PACP reports of the pipe segment to be replaced as part of the project

will

be

shared

with

the

bidders,

but

it

shall

be

used

for

reference

purposes

only.

Bidders

must

verify

existing

conditions

in

the

field.

Collapsed

sections

of

the

pipeline,

previous

point

repairs,

sags

and

other

defects

might

be

encountered

and

shall

not

constitute

a

changed

condition.

It

is

the

bidder’s

responsibility

to

review

all

available

information

and

field

verify

the

existing

conditions.

Except as specifically noted otherwise, provide and pay for: 1. Insurance and bonds. 2. Labor, materials, and equipment. 3. Tools, equipment, and machinery required for construction. 4. Utilities required for construction. 5. Temporary facilities including: traffic control, dewatering, sheeting, shoring, and bracing,

bypass

pumping,

worker

sanitary

facilities,

trench

plates,

and

dust

control

measures.

6. Other facilities and services necessary for proper execution and completion of the Work.

Base Bid Lump Sum (from Scope of Work Attachment A) for $ (in numbers) (in words)
Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 15 SUPPLEMENTAL BID FORM (to be utilized if there is work added to or deleted from this project) Item Description Unit Qty Unit Price Total Price 1 Sheeting, Shoring, and Bracing LF 1 $ 2 OPEN CUT: 6”-8” Pipe replacement with PVC, up to 6’ of mainline and up to 6’ depth FT 1 $
3 OPEN CUT: 6”-8” Pipe replacement with PVC, and greater than 6’ depth FT 1 $
4 OPEN CUT: 10”-12” Pipe replacement with PVC, up to 6’ depth FT 1 $
5 OPEN CUT: 10”-12” Pipe replacement with PVC, greater than 6’ depth FT 1 $
6 Tie-in Lateral to Main (fusing - 6x6x4 Wye) EA 1 $ 7 Lateral replacement exceeding 4’ (including 6x6x4 Wye) FT 1 $
8 Pipe Bursting for 6”-8” Pipe Diameter and up to 6’ depth LF 1 $
9 Pipe Bursting for 6”-8” Pipe Diameter and greater than 6’ depth LF 1 $
10 Pipe Bursting for 10”-12” Pipe Diameter and up to 6’ depth LF 1 $
11 Pipe Bursting for 10”-12” Pipe Diameter and greater than 6’ depth LF 1 $
12 Replacement of Cleanout with new Manhole
EA 1 $
13 Complete Interior Surface Manhole Rehabilitation exceeding 6’ per foot Vertical Foot
1 $
14 Repair & Replace Manhole Frame and Cover
EA 1 $
15 Post Construction Cleaning and CCTV of entire line from Manhole-to-Manhole line segment replaced or repaired LF 1 $
16 Pavement restoration with 6” minimum T-Cut on each side of the trench and/or excavated wall SF 1 $
17 Handling and Disposal of Contaminated Material-As directed by the Construction Manager after City of Richmond approval Cubic Yard
1 $
18 Mobilization/Demobilization Allowance LS 1 $ 19 Provide and install new Manhole up to 8ft deep EA 1 $
20 Provide and install new Manhole 8ft to 14ft deep EA 1 $

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 16 Bidder’s Lump Sum Cost Breakdown

1. For work to be performed for a lump sum price, the Bidder shall submit a price breakdown to the

Construction

Administrator

prior

to

the

first

payment

and

within

ten

(10)

calendar

days

after

Notice

to

Proceed.

The

price

breakdown,

as

revised

and

agreed

upon

by

the

Bidder

and

the

Construction

Administrator,

shall

be

used

for

preparing

future

estimates

for

progress

payments

to

the

Bidder,

or

as

the

basis

for

evaluating

and

pricing

change

orders,

and

shall

list

the

major

items

of

work

with

a

price

fairly

apportioned

to

each

item.

2. The price breakdown shall be, generally, in the same format as the Contract specifications’ divisions

and

subdivisions,

with

major

items

of

work

listed

individually.

The

price

breakdown

shall

be

by

sewer

pipeline

items

and

shall

include

separate

items

for

identifiable

portions

of

the

sewer

pipeline

system

(including

specific

prices

for

different

size

items

within

the

system),

and

other

logical

divisions

of

work.

Measurable

approximate

quantities

of

work

performed

by

the

Bidder

or

its

subcontractors

shall

be

provided.

For

quantities

that

are

the

sum

total

of

several

individual

quantities,

backup

summaries

shall

be

provided

which

list

the

individual

descriptions

and

quantities

(for

instance;

excavation,

dewatering,

pipe

installation,

backfill,

paving,

etc.).

These

summaries

then

will

be

used

1)

to

determine

the

quantities

of

work

in

place

in

subsequent

progress

payment

requests

and

2)

as

the

basis

for

evaluating

and

pricing

change

orders.

3. The above is a statement of the intent of the Contract Documents to provide a moderate level of detail,

acceptable

to

the

Construction

Manager,

to

allow

a

fair

and

reasonable

estimate

to

be

made

of

the

value

of

work

installed.

The

detail

of

the

price

breakdown

must

be

sufficient

to

provide

timely

processing

of

the

monthly

progress

payment

request.

4. The price breakdown will be subject to the approval of the Construction Manager, and upon the request,

the

Bidder

shall

substantiate

the

price

for

any

or

all

items

and

provide

additional

level

of

detail,

including

quantities

of

work

and

supplier’s

and

subcontractor’s

written

cost

quotes.

The

price

breakdown

shall

be

sufficiently

detailed

to

permit

its

use

by

the

Construction

Manager

as

1)

one

of

the

bases

for

evaluating

requests

for

payments

and

2)

as

the

basis

for

evaluating

and

pricing

change

orders.

The

Construction

Manager

shall

be

the

sole

judge

of

the

adequacy

of

the

price

breakdown.

5. The estimated Bid Quantities shown, with the exception of Lump Sum quantities which will be paid

as

bid,

are

provided

for

the

sole

purpose

of

evaluating

bids.

The

nature

of

the

work

is

such

that

pipe

size,

depth,

length,

repair

scope,

and

other

quantities

shown

are

approximate,

and

payment

will

be

made

based

on

the

unit

price

bid

for

the

actual

conditions

that

are

found

in

the

field.

Veolia

Water

does

not

provide

any

assurance

that

the

quantities

shown

for

each

bid

item

will

be

the

quantities

that

are

actually

encountered

in

the

field.

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 17 LIST OF SUBCONTRACTORS The Bidder shall list below the names and location of place of business of each subcontractor who will

perform

work

or

labor

or

who

will

render

service

to

the

Prime

Contractor

in

or

about

the

construction

of

the

Work

or

improvement,

or

a

subcontractor

duly

licensed

who,

under

subcontract

to

the

Prime

Contractor,

specially

fabricates

and

installs

a

portion

of

the

Work

or

improvement

according

to

detailed

drawings

contained

in

the

Contract

Documents,

in

an

amount

in

excess

of

one-half

of

one

percent

of

the

Prime

Contractor’s

total

Bid

or,

in

the

case

of

Bids

or

offers

for

the

construction

of

streets

or

highways,

including

bridges,

in

excess

of

one-half

of

one

percent

of

the

Prime

Contractor’s

total

Bid

or

$10,000,

whichever

is

greater.

After

the

opening

of

Bids,

no

changes

or

substitutions

will

be

allowed

except

as

otherwise

provided

by

law.

The

listing

of

more

than

one

subcontractor

for

each

item

of

Work

to

be

performed

with

the

words

"and/or"

will

not

be

permitted.

Failure

to

comply

with

this

requirement

may

render

the

Bid

as

non-responsive

and

may

cause

its

rejection.

Special Note: The Prime Contractor shall perform not less than 50% of the Work identified in this Bid.

In

the

event

a

Bidder

lists

subcontractors

who

will

perform

Work

under

this

Bid

in

excess

of

50%

of

the

Work

identified

in

this

Bid,

the

Bid

shall

be

considered

non-responsive.

Bidders shall list the total % of Work to be performed by the Prime Contractor here: (Shall not be less than 50%) Work to be Performed Contractor License Number
Percent of Total Contract
Subcontractor’s Name, Address, and Contact Person 1.

2. 3.

4. 5.

BIDDER: ______________________________________________ Signature___________________________________ Date ________________________________________

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 18 NON-COLLUSION AFFIDAVIT (To be executed by Bidder and submitted with Bid) STATE OF CALIFORNIA ) ss. COUNTY OF ) In accordance with Public Contract Code section 7106, (Name) , being first duly sworn, deposes and says that he/she is (Title) of (Company) , the party making the foregoing bid, that the bid is not made

in

the

interest

of,

or

on

behalf

of,

any

undisclosed

person,

partnership,

company,

association,

organization,

or

corporation;

that

the

bid

is

genuine

and

not

collusive

or

sham;

that

Bidder

has

not

directly

or

indirectly

induced

or

solicited

any

other

bidder

to

put

in

a

false

or

sham

bid,

and

has

not

directly

or

indirectly

colluded,

conspired,

connived

or

agreed

with

any

bidder

or

anyone

else

to

put

in

a

sham

bid,

or

that

anyone

shall

refrain

from

bidding,

and

that

the

bidder

has

not

in

any

manner,

directly

or

indirectly,

sought

by

agreement,

communication

or

conference

with

anyone

to

fix

the

bid

price

of

Bidder

or

any

other

bidder,

or

to

fix

any

overhead,

profit

or

cost

element

of

the

bid

price,

or

of

that

of

any

other

bidder,

or

to

secure

any

advantage

against

the

City

of

Richmond,

a

municipal

corporation,

or

anyone

interested

in

the

proposed

contract;

that

all

statements

contained

in

the

bid

are

true;

and

further,

that

Bidder

has

not,

directly

or

indirectly,

submitted

its

bid

price

or

any

breakdown

thereof,

or

the

contents

thereof,

or

divulged

information

or

data

relative

thereto,

or

paid,

and

will

not

pay,

any

fee

to

any

corporation,

partnership,

company

association,

organization,

bid

depository,

or

to

any

member

or

agent

thereof

to

effectuate

a

collusive

or

sham

bid.

Executed under penalty of perjury under the laws of the State of California: Corporate Seal:

Name of firm _____________________________________________ Signature _________________________________________________ Date ______________________
NOTE: If Bidder is a partnership or a joint venture, this affidavit must be signed and sworn to by every

member

of

the

partnership

or

venture.

If Bidder [including any partner or venturer of a partnership or joint venture bidder] is a corporation, this

affidavit

must

be

signed

by

the

Chairman,

President

or

Vice

President

and

by

the

Secretary,

Assistant

Secretary,

Chief

Financial

Officer

or

Assistant

Treasurer.

If Bidder’s affidavit on this form is made outside the State of California, the official position of the person

taking

such

affidavit

shall

be

certified

according

to

law.

Subscribed and sworn to this day of 20___. NOTARY PUBLIC Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 19 BID RETURNABLES INVITATION TO BID 2025-26 GRADE 5 RAA LINE REPLACEMENT PROJECT LOCATED IN RICHMOND, CA Contractor must submit using the BidsOnline portal their quotations of the following by 2 PM on the proposal

due

date:

April

06,

2026.

Addressed to: Akash Vijay Construction Manager Veolia Water West Operating Services, Inc. 601 Canal Blvd. Richmond, CA 94804 Bidding Company Name: ________________________ Date: ________________________________________ 1. Bid Form 2. List of Subcontractors 3. Bid Bond 4. Supplemental Bid Form 5. Non-Collusion Affidavit 6. CONTRACTOR Safety Plan – Table of Contents 7. Sample Insurance Certificate 8. EMR rating on insurance company’s letterhead 9. Preliminary Project Schedule Bar Chart 10. Contractor License information 11. Proof of 5 years direct experience in construction and installation of collection systems and wastewater

treatment

systems.

Provide

a

detailed

summary

of

present

and

past

experience

along

with

references.

12. Agreement to be Bound - Addendum A Exclusion of any required information may be cause for bid rejection.

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 20

ADDITIONAL INSTRUCTIONS TO BIDDERS

INTERPRETATION OF CONTRACT DOCUMENTS
No oral representations or interpretations will be made to any bidder as to the meaning of the Contract

Documents.

Requests

for

an

interpretation

shall

be

made

in

writing

utilizing

the

BidsOnline

question

and

answer

tab.

The RFI submission deadline is March 18, 2026. Veolia Water West Operating Services, Inc. will respond

to

bid

RFIs

no

later

than

March

25,

2026.

Responses

will

be

made

by

addenda

issued

through

BidsOnline.

Requests to clarify possible ambiguous or incomplete statements or designs require issuance of an addendum

by

the

Company

for

the

interpretation

to

become

effective.

All

requests

for

clarifications

shall

be

made

in

writing

via

BidsOnline.

POSTPONEMENT OF OPENING
The Company reserves the right to postpone the date and time for receiving and/or opening of bids at

any

time

prior

to

the

date

and

time

established

in

the

Invitation

to

Bid.

Postponement

notices

shall

be

emailed

to

plan

holders

of

record

in

the

form

of

addenda.

OPENING OF BIDS
All bids shall be submitted using BidsOnline – results of bidding will be available after close of bidding.

Bidders,

their

representatives

and

other

interested

persons

may

access

and

review

the

bids

on

BidsOnline.

Any bids received after the scheduled closing time, as set forth in the Invitation to Bid or as postponed

by

addenda,

will

be

considered

non-responsive

and

will

not

be

opened.

PREPARATION OF BID FORMS
Bid shall be made on the bid forms in the Invitation to Bid must be submitted at the time and place stated

in

the

Invitation

to

Bid.

All

blanks

in

the

bid

forms

must

be

appropriately

filled

in

either

in

ink

or

typed,

and

all

prices

must

be

stated

in

figures.

All

bid

forms

must

be

submitted

in

sealed

envelopes

bearing

on

the

outside

the

name

of

the

bidder,

its

address,

and

the

name

of

the

project

for

which

the

bid

is

submitted.

It

is

the

sole

responsibility

of

the

bidder

to

see

that

its

bid

is

received

in

proper

time.

Any

bid

received

after

the

scheduled

closing

time

for

receipt

of

bids

will

be

returned

to

the

bidder

unopened.

Company shall not be responsible for errors or omissions in the bid. Bidders shall write their names on

each

bid

form

at

the

space

provided.

BIDDER'S SIGNATURE AND AUTHORITY
If the bid is made by an individual, this person's name, signature, and post office address must be shown;

if

made

by

a

firm

or

partnership,

the

name

and

post

office

address

of

the

firm

or

partnership,

a

list

of

the

general

partners,

and

the

signature

of

at

least

one

of

the

general

partners

must

be

shown;

if

made

by

a

corporation,

the

bid

shall

show

the

name

of

the

state

under

the

laws

of

which

the

corporation

is

chartered,

the

name

and

post

office

address

of

the

corporation,

and

the

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 21 title of the person who signs on behalf of the corporation. If the bid is made by the corporation, a certified

copy

of

the

bylaws

or

resolution

of

the

Board

of

Directors

of

the

corporation

shall

be

furnished

showing

the

authority

of

the

officer

signing

the

bid

to

execute

Contracts

on

behalf

of

the

corporation.

If

the

bid

is

made

by

a

joint

venture,

the

bid

shall

be

signed

by

a

representative

of

one

of

the

joint

venture

firms.

Additionally,

the

bid

shall

include

a

copy

of

the

resolution

or

agreement

empowering

the

representative

to

execute

the

bid

and

bind

the

joint

venture.

ERASURES & CORRECTIONS
The bid submitted must not contain any erasure, interlineations, or other corrections unless each such

correction

is

suitably

authenticated

by

affixing,

in

the

margin

immediately

opposite

the

correction,

the

initials

of

the

person

or

persons

submitting

the

bid.

BID IRREGULARITIES
Changes in or additions to the bid form, recapitulations of the Work bid upon, alternative bids, omissions,

or

any

other

modifications

of

the

bid

form

which

are

not

specifically

called

for

in

the

Contract

Documents

may

result

in

rejection

of

the

bid

by

the

Company,

as

not

being

responsive

to

the

Invitation

to

Bid.

No

oral

or

telephonic

modification

of

any

bid

submitted

will

be

considered.

MODIFICATION OF BID
On a written request filed with the Company, a bid already received may be modified or withdrawn at

any

time

prior

to

the

time

established

for

receiving

bids.

The

request

must

be

executed

by

the

bidder

or

its

authorized

representative

as

described

in

BIDDER'S

SIGNATURE

AND

AUTHORITY.

Modifications

shall

be

made

in

writing,

executed,

and

submitted

in

the

same

form

and

manner

as

the

original

bid.

Withdrawal

of

a

bid

does

not

prejudice

a

bidder's

right

to

submit

a

new

bid

within

the

time

designated

for

the

submission

of

bids.

No

bid

may

be

withdrawn

after

the

scheduled

closing

time

except

as

provided

in

WITHDRAWAL

OF

BIDS.

WITHDRAWAL OF BIDS
In accordance with Public Contract Code 5103, within five (5) working days after the opening of bids,

excluding

Saturdays,

Sundays,

and

State

holidays,

a

bidder

may

withdraw

its

bid

providing

the

bidder

can

establish

to

the

Company's

satisfaction

that

a

mistake

was

made

in

preparing

the

bid.

A

bidder

desiring

to

withdraw

shall

give

written

notice

to

the

Company,

specifying,

in

detail,

how

the

mistake

occurred

and

how

the

mistake

made

the

bid

materially

different

than

it

was

intended

to

be.

Withdrawal

will

not

be

permitted

for

mistakes

resulting

from

errors

in

judgment

or

carelessness

in

inspecting

the

site

of

the

Work,

or

in

reading

the

Contract

Documents.

BID PROTEST PROCEDURE
Any bidder may file a written protest concerning the bid process or the recommended award.

Protests

must

be

submitted

in

writing

to

the

City

of

Richmond

within

five

(5)

business

days

following

the

bid

opening.

The

protest

shall

identify

the

specific

grounds

and

supporting

facts

for

the

protest.

The

City

Manager

or

designee

shall

review

the

protest

and

issue

a

written

determination.

The

City’s

determination

shall

be

final.

CLAIMS AND CHANGE ORDERS
Any claims for additional compensation or time shall be submitted in writing in accordance with the requirements

of

the

California

Public

Contract

Code,

including

Sections

22160–22169

and

Section

9204,

as

applicable.

Failure

to

comply

with

statutory

notice

and

documentation

requirements

shall

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 22 constitute a waiver of the claim. Change orders shall be authorized only in writing by the City or its authorized

representative.

ADDENDA
Addenda issued during the time of bidding shall become a part of the documents furnished by bidders

for

the

preparation

of

bids,

shall

be

covered

in

the

bids,

and

shall

be

made

a

part

of

the

Contract.

Each

bid

shall

include

specific

acknowledgment

in

the

space

provided

for

receipt

of

all

Addenda

issued

during

the

bidding

period

via

BidsOnline.

Failure

to

so

acknowledge

may

result

in

the

bid

being

rejected

as

not

responsive.

Failure

of

any

bidder

to

receive

such

Addenda

shall

not

be

grounds

for

noncompliance

with

the

terms

of

the

instructions.

BID PRICES
Bid prices shall include everything necessary for the completion of the Work including, but not limited

to,

providing

the

materials,

equipment,

tools,

plant

and

other

facilities,

and

the

management,

superintendence,

labor

and

services.

Bid

prices

shall

include

allowance

for

all

federal,

state

and

local

taxes.

In the event of a difference between a price quoted in words and a price quoted in figures for the same

quotation,

the

words

shall

be

the

amount

bid.

In

the

event

that

the

product

of

a

unit

price

and

an

estimated

quantity

does

not

equal

the

extended

amount

quoted,

the

unit

price

shall

govern,

and

the

correct

product

of

the

unit

price

and

the

estimated

quantity

shall

be

deemed

to

be

the

amount

bid.

If

the

sum

of

two

or

more

items

in

a

bidding

schedule

does

not

equal

the

total

amount

quoted,

the

individual

item

amounts

shall

govern

and

the

correct

total

shall

be

deemed

to

be

the

amount

bid.

Within One Hundred and Twenty (120) days after the time of opening of the bids, the Company will act

either

to

accept

a

bid,

to

reject

all

bids

or

with

the

consent

of

the

bidders,

to

extend

the

time

in

which

the

Company

may

act.

The

acceptance

of

a

bid

will

be

evidenced

by

a

Notice

of

Award

of

Contract

in

writing,

delivered

in

person

or

by

certified

mail

to

the

bidder

whose

bid

is

accepted.

No

other

act

of

the

Company

will

constitute

acceptance

of

a

bid.

The

issuance

of

a

Notice

of

Award

of

Contract

shall

obligate

the

bidder

whose

bid

is

accepted

to

furnish

evidence

of

insurance,

and

to

execute

the

Agreement

in

the

form

set

forth

in

the

Contract

Documents.

The

Agreement

will

require

the

completion

of

the

Work

according

to

the

Contract

Documents.

TIME ALLOWED FOR COMPLETION AND LIQUIDATED DAMAGES A. Interim Milestones For each portion of the Work is sufficiently complete, as determined by the Construction Administrator

and

the

Company,

that

the

Company

can

fully

occupy

or

utilize

that

portion

of

the

Work

for

each

of

the

intended

uses.

Contractor

shall

achieve

Substantial

Completion

of

each

such

portion

of

the

Work

within

the

corresponding

period

or

by

the

corresponding

date

specified

below.

B. Time Allowed for Substantial Completion Substantial Completion shall mean that the entirety of the Work is sufficiently complete, as determined

by

the

Company,

and

that

the

Company

can

fully

occupy

or

utilize

the

entirety

of

the

Work

for

each

of

the

intended

uses.

Substantial

Completion

shall

include,

but

not

be

limited

to,

full

use

of

the

sanitary

sewer

mains

and

service

laterals,

completion

of

all

sewer

construction

and

point

repairs,

testing

and

acceptance

by

the

Company.

In

accordance

with

the

provisions

of

Paragraph,

Contractor

shall

achieve

Substantial

Completion

of

this

project

by

December

31,

2026.

For

the
Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 23 period of time that each portion of the Work specified, remains unfinished after the time for Substantial

Completion

thereof,

as

modified

by

extensions

of

time

granted

by

the

Company,

it

is

understood

and

agreed

by

the

Contractor

and

the

Company

that

the

Contractor

shall

pay

the

Company

$1500

per

calendar

day

liquidated

damages.

C. Time Allowed for Final Completion
Final Completion shall mean that all Contract Work is complete, as determined by the Company, and

that

the

Company

can

fully

occupy

or

utilize

the

entirety

of

the

Work

for

each

of

the

intended

uses.

Final

Completion,

including

completion

of

all

punch

list

items,

shall

occur

within

30 calendar

days

after

Substantial

Completion.

For

the

period

of

time

that

each

portion

of

the

Work

specified,

remains

unfinished

after

the

time

for

Final

Completion

thereof,

as

modified

by

extensions

of

time

granted

by

the

Company,

it

is

understood

and

agreed

by

the

Contractor

and

the

Company

that

the

Contractor

shall

pay

the

Company

$1000

per

calendar

day

liquidated

damages.

QUALIFICATION OF BIDDER
Each bidder shall be familiar with NASSCO standards and be qualified to perform the work.

Contractor

shall

have

applicable

licenses

for

the

work

being

performed

and

in

good

standing

with

the

State

of

California

Contractors

Licensing

Board,

and

in

a

financially

sound

position

to

perform

the

work.

In

addition,

Bidders

and/or

person(s)

performing

the

work

shall

have

a

minimum

of

5 years

direct

experience

in

the

construction

and

installation

of

sanitary

sewers.

Upon the request of Company, any bidder whose bid is under consideration for the award of the Contract

shall

promptly

submit

satisfactory

evidence

showing

the

bidder's

financial

resources,

its

construction

experience,

and

its

organization's

availability

for

the

performance

of

the

Contract.

For financial references, if requested, the apparent low bidder shall provide a release to its financial

institution(s),

within

one

working

day,

authorizing

the

institution(s)

to

release

financial

information

to

the

Company.

The bidder may be required to establish to the satisfaction of the Company the reliability and responsibility

of

the

persons

or

entities

proposed

to

furnish

and

perform

the

Work

described

in

the

Documents.

DIR Registration Requirement: Pursuant to California Labor Code Section 1725.5, the Contractor and

all

subcontractors

must

be

registered

with

the

California

Department

of

Industrial

Relations

(DIR)

at

the

time

of

bid

submission

and

for

the

duration

of

the

Project.

Proof

of

DIR

registration

shall

be

provided

upon

request

and

failure

to

comply

shall

render

a

bid

non-responsive.

REJECTION OF BIDS
The Company reserves the right, at its sole discretion, to reject any and all bids and further reserves

the

right

to

reject

any

bids

which

are:

a)

non-responsive

(e.g.,

bids

which

are

incomplete,

obscure,

or

irregular;

bids

which

omit

a

bid

on

any

one

or

more

items

on

which

the

bids

are

required;

bids

which

are

unbalanced);

b)

any

bids

from

bidders

who

have

previously

failed

to

perform

properly

or

to

complete

on

time

contracts

of

any

nature

with

the

Company;

or

c)

any

bid

which

fails

to

provide

satisfactory

documentation

of

the

bidder's

qualifications

as

required

by

Paragraph

00100-15.0,
IRREGULARITIES OF BIDS The Company reserves the right to waive irregularities.

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 24 RETENTION AND PAYMENT Retention shall be withheld at five percent (5%) of each progress payment, unless otherwise authorized

by

law,

and

shall

be

released

in

accordance

with

the

California

Public

Contract

Code

following

acceptance

of

the

work.

Progress

payments

shall

be

made

in

compliance

with

applicable

prompt

payment

statutes.

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 25

INSURANCE REQUIREMENTS
Each Subcontractor shall procure and maintain for the duration of the contract insurance against claims

for

injuries

to

persons

or

damages

to

property

which

may

arise

from,

or

in

connection

with,

the

performance

of

the

work

hereunder

by

the

Subcontractor,

its

agents,

representatives,

employees

or

subcontractors.

The

cost

of

such

insurance

shall

be

included

in

the

Subcontractor’s

bid.

Minimum Scope of Insurance a. Without in any way limiting a Subcontractor’s liability hereunder, each Subcontractor shall

maintain

the

following

minimum

limits

of

insurance

at

its

own

expense

during

the

performance

of

the

Work,

with

insurance

companies

rated

A-VII

or

higher

by

A.M.

Best’s,

to

cover

the

risk

of

losses

associated

with

this

Contract:

Coverage Limits (i) Workers Compensation Statutory; including requirements of the Labor Code of the State of California and Employers Liability insurance (ii) Employers Liability $1,000,000 each accident $1,000,000 each employee $1,000,000 policy limit (iii) Commercial General Liability written on ISO CG 00 01 coverage form or its equivalent. No limiting or exclusionary endorsements material to the Subcontractor’s obligations in the Contract may be attached. Coverage shall include a) contractual liability; b) explosion, collapse & underground perils (XCU); c) third-party over action coverage; d) Riggers Liability endorsement for the use of cranes, booms or other rigging equipment, if applicable; and e) amendment of the aircraft exclusion to include coverage for the use of commercial UAVs (drones), if applicable. $5,000,000 each occurrence for property damage and bodily injury (PD/BI) $5,000,000 general aggregate $5,000,000 products/completed operations aggregate (iv) Automobile Liability – covering all owned (if any), hired and non-owned autos (Policy shall be endorsed with MCS-90) $2,000,000 combined single limits – each accident Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 26 Coverage Limits (v) Umbrella/Excess Liability providing coverage at least as broad as the underlying policy(ies) May be utilized to meet limits outlined above
(vi) Property Each Subcontractor shall be solely responsible for protecting and insuring all property owned or leased or used by the Subcontractor in conjunction with the Work during the term of this Contract (vii) Professional Liability (Errors & Omissions), if applicable to the Work – Coverage shall not exclude Technology Errors & Omissions coverage if the Subcontractor will have access to any Veolia Systems (including but not limited to any Veolia-owned or managed IT asset (server or application) wherever it is hosted (the public cloud, Veolia’s AWS instance, Veolia’s data center, etc.) $2,000,000 each claim $2,000,000 annual aggregate
(viii) Subcontractor’s Pollution Liability, if applicable to the Work $5,000,000 each claim $5,000,000 annual aggregate (ix) Valuable Papers Coverage, if applicable to the Work Replacement cost covering “All Risk Perils” for damage to all drawings, specifications, plans, computations, sketches, test data, survey results, photographs, renderings, or other paper or reproductions b. Each Subcontractor’s pollution liability policy in (viii) above shall provide coverage for:

1. Bodily injury, sickness, disease, sustained by any person, including death; 2. Property damage, including physical injury to or destruction of third-party tangible property

including

the

resulting

loss

of

use

thereof;

3. Cleanup costs, and the loss of use of third-party tangible property that has not been physically

injured

or

destroyed

including

diminution

of

value

and

natural

resources

damages;

4. Defense costs, including costs, charges, and expenses incurred in the investigation, adjustment,

or

defense

of

claims;

5. Contractual liability coverage, e.g., coverage for liability assumed by the Subcontractor

under

this

Contract;

and

6. The full scope of such Subcontractor’s operations as described within the scope of Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 27 work for this contract
The pollution liability coverage may not contain restrictions for:

7. Insured versus insured actions (however, exclusions for claims made between insured

within

the

same

economic

family

are

acceptable);

8. Completed operations in any coverage part of the policy for either the insured or additional

insured;

9. Damage to third-party property that cannot be used or is less useful because of operations

of

the

Subcontractor;

or

10. Work performed by the Subcontractor. c. In the event that the state where the Work is to be provided allows an employer to opt

out

of

Workers

Compensation

coverage,

each

Subcontractor

shall

nevertheless

obtain

a

Workers

Compensation

policy

complying

in

all

respects

with

this

provision.
d. Prior to providing any Work under this Contract, each Subcontractor will provide Veolia

with

an

ACORD

certificate

of

insurance

evidencing

that

the

above

described

coverage

are

in

full

force

and

effect.

Each

Subcontractor

will

include

Veolia,

its

parent

companies,

subsidiaries,

affiliates,

and

each

of

their

officers,

directors,

employees,

agents,

representatives

and

Client

(if

applicable),

(collectively

“Veolia’s

Additional

Insured”)

as

additional

insured

with

respect

to

coverage

(iii),

(iv),

and

(viii),

(and

(v)

if

applicable)

above.

All

policies

shall

be

primary

and

non-contributory,

provide

a

full

waiver

of

the

insurer’s

right

of

subrogation

in

favor

of

Veolia

Additional

Insured

and/or

any

Subcontractor

with

respect

to

claims

that

are

covered

or

should

have

been

covered

by

valid

and

collectible

insurance

provided

hereunder

and

said

waiver

will

extend

to

any

deductibles,

co-insurance

or

retentions.

No

Subcontractor

will

permit

any

cancellation

or

non-renewal

of

its

insurance

coverage

to

be

provided

hereunder

without

thirty

(30)

days'

written

notice

to

Veolia.
e. All policies shall be issued on occurrence-based forms, except for coverage (vii) and (viii),

which

may

be

issued

on

a

claims-made

form.

All

claims-made

policies

will

at

least

be

retroactive

to

the

earlier

of

the

date

of

this

Contract

or

the

commencement

of

the

Subcontractor’s

services

in

relation

to

the

Work,

and

shall

be

maintained

for

three

(3)

years

after

the

expiration

or

termination

of

this

Contract.
f. These insurance requirements will not be construed in any matter as waiving, restricting

or

limiting

Veolia’s

rights

or

any

Subcontractor’s

obligations

under

this

Contract.

Veolia

does

not

represent

that

coverage

or

limits

herein

will

be

adequate

to

protect

any

Subcontractor.

Each

Subcontractor

remains

responsible

for

any

liability

not

paid

by

insurance

including

deductibles

and

retentions.

Additional Insurance a. Builders’ Risk Insurance for the full replacement value of the property Each Subcontractor shall purchase and maintain during the life of the Project included below at the Base

insurance

against

loss

to

the

Work

sufficient

to

replace

the

Work.

Such

coverage

shall

be

written

on

an

“all

risk”

cause

of

loss

builders

risk

coverage

form

at

replacement

cost

and

without

a

co-insurance

penalty.

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 28 □ Not limited to the following, policy perils shall include: theft, vandalism, malicious mischief,

testing

and

startup,

earth

movement,

terrorism

(certified

and

non-certified),

delay

in

completion

or

start

up,

mold,

fungus,

collapse,

earth

movement,

flood,

civil

authority,

windstorm,

building

ordinance

and

demolition.
□ Not limited to the following, the policy shall cover: underground work, foundations, sidewalks

and

paving,

landscaping,

falsework,

temporary

buildings,

trailers,

laydown

areas,

supplies,

materials,

machinery,

equipment,

fixtures,

debris

removal,

property

in

transit,

property

stored

offsite,

business

interruption

costs,

extra

expense

costs

and

soft

costs

including

but

not

limited

to

reasonable

compensation

for

professional

fees

and

general

conditions.
□ Losses to the Work shall be replaced by the Subcontractor at no expense to the City or

Veolia.

Any

deductible

or

sub-limited

deductible

shall

not

exceed

$50,000.
□ The insurer shall waive all rights of subrogation against the City or Veolia □ Coverage including permission for temporary occupancy shall be maintained until final

acceptance

by

Veolia

and

final

payment

has

been

made.
□ The policy shall allow for partial utilization of the Work by Veolia □ The policy shall be maintained in effect until final payment is made unless otherwise agreed

to

in

writing

by

Veolia,

Subcontractor,

and

Engineer

with

30 days

written

notice

to

each

other

loss

payee

to

whom

a

certificate

of

insurance

has

been

issued.

Losses shall be adjusted by and made payable to such Subcontractor as fiduciary for the Builders Risk

Insureds.

Each

Subcontractor

shall

pay

its

subcontractors

their

just

shares

of

insurance

proceeds

received

by

such

Subcontractor

and

shall

cause

such

subcontractors

to

make

payments

to

their

sub-subcontractors

in

similar

manner.

Certificates of insurance shall be either emailed in pdf format to: [email protected] or mailed to the following postal address: Morgan Mackay Veolia

North

America

601

Canal

Blvd.

Richmond

CA

94804

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 29

BONDING / LETTER OF CREDIT REQUIREMENTS

CONTRACT BONDS

Before execution of the Contract, the Bidder shall file surety bonds with the Agency to be approved by

the

Board

in

the

amounts

and

for

the

purposes

noted

below.

Bonds

issued

by

a

surety

who

is

listed

in

the

latest

version

of

U.S.

Department

of

Treasury

Circular

570,

who

is

authorized

to

issue

bonds

in

California,

and

whose

bonding

limitation

shown

in

said

circular

is

sufficient

to

provide

bonds

in

the

amount

required

by

the

Contract

shall

be

deemed

to

be

approved

unless

specifically

rejected

by

the

Agency.

Bonds

from

all

other

sureties

shall

be

accompanied

by

all

of

the

documents

enumerated

in

the

Code

of

Civil

Procedure,

Section

995.660

a).

The

Bidder

shall

pay

all

bond

premiums,

costs,

and

incidentals.

Each bond shall incorporate, by reference, the Contract and be signed by both the Bidder and the Surety.

The

signature

of

the

authorized

agent

of

the

Surety

shall

be

notarized.

The Bidder shall provide two good and sufficient surety bonds. The “Payment Bond” (Material and Labor

Bond)

shall

be

for

not

less

than

100

percent

of

the

Contract

Price,

to

satisfy

claims

of

material

suppliers

and

mechanics

and

laborers

employed

by

it

on

the

Work.

The

bond

shall

be

maintained

by

the

Contractor

in

full

force

and

effect

until

the

Work

is

accepted

by

the

Agency

and

until

all

claims

for

materials

and

labor

are

paid,

and

shall

otherwise

comply

with

the

Civil

Code.

The “Performance Bond” shall be for 100 percent of the Contract Price to guarantee faithful performance

of

all

work,

within

the

time

prescribed,

in

a

manner

satisfactory

to

the

Agency,

and

that

all

materials

and

workmanship

will

be

free

from

original

or

developed

defects.

The

bond

must

remain

in

effect

until

the

end

of

all

warranty

periods

set

forth

in

the

Contract

Documents.

Should any bond become insufficient, the Contractor shall renew the bond within 10 days after receiving

notice

from

the

Agency.

Should

any

surety

at

any

time

be

unsatisfactory

to

the

Board,

notice

to

that

effect

will

be

given

to

the

Contractor.

No

further

payments

shall

be

deemed

due

or

will

be

made

under

the

Contract

until

a

new

surety

qualifies

and

is

accepted

by

the

Board.

Changes in the Work or extensions of time, made pursuant to the Contract, shall in no way release the

Contractor

or

the

Surety

from

its

obligations.

Notice

of

such

changes

or

extensions

shall

be

waived

by

the

Surety.

The Contractor shall ensure that its Bonding Company is familiar with all of the terms and conditions

of

the

Contract

Documents,

and

shall

obtain

a

written

acknowledgement

by

the

Bonding

Company

that

said

Bonding

Company

thereby

waives

the

right

of

special

notification

of

any

changes

or

modifications

of

the

Contract,

or

of

time,

or

of

decreased

or

increased

Work,

or

of

cancellation

of

the

Contract,

or

of

any

other

act

or

acts

by

the

City

or

any

of

its

authorized

representatives.

Bonds shall be executed by either: (a) two (2) or more sufficient personal sureties; (b) one sufficient

admitted

surety

insurer;

or

(c)

a

combination

of

sufficient

personal

sureties

and

admitted

surety

insurers.

If

a

corporate

surety

insurer

is

used,

a

County

Clerk’s

certificate

evidencing

that

it

is

an

admitted

surety

insurer

shall

be

submitted

with

the

bonds.

If

a

personal

surety

is

used,

all

requirements

set

out

in

Code

of

Civil

Procedure

Section

995.510

shall

be

met

to

the

satisfaction

of

the

Veolia

Water

West

Operating

Services,

Inc.

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 30

BID BOND

KNOW ALL PERSONS BY THESE PRESENTS,
That_____________________________________________________________________as Principal,

and___________________________________________________________as

Surety,

are

held

and

firmly

bound

unto

Veolia

Water

West

Operating

Services,

Inc.,

hereinafter

called

“Veolia”

in

the

sum

of:______________________________________________________________________dollars

(not less than 10 percent of the total amount of the bid) for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators,

successors,

and

assigns,

jointly

and

severally,

firmly

by

these

presents.

WHEREAS, said Principal has submitted a Bid to Veolia Water West Operating Services, Inc. to perform

the

Work

required

under

the

Bid

Schedule(s)

of

the

Veolia’s

Contract

Documents

entitled:

2025-26 Grade 5 RAA Line Replacement Project
NOW THEREFORE, if said Principal is awarded a Contract by Veolia Water West Operating Services,

Inc., and within the time and in the manner required in the “Notice Inviting Bids” and the “Instructions

to

Bidders” enters into a written Agreement on the Form of Agreement bound with said Contract Documents,

furnishes the required Certificates of Insurance, and furnishes the required Performance Bond and Payment Bond, then this obligation shall be null and void, otherwise it shall remain in full force and effect.

In the event suit is brought upon this Bond by Veolia, and Veolia prevails, said Surety shall pay all costs

incurred by Veolia in such suit, including a reasonable attorney’s fee to be fixed by the court.

SIGNED AND SEALED , this_____________ day of,________________ 20___ .

PRINCIPAL:

Check one: Individual, Partnership, Corporation
(Corporations require two signatures; one from each of the following groups: A. Chairman of Board,

President,

or

any

Vice

President;

AND

B.

Secretary,

Assistant

Secretary,

Treasurer,

Assistant

Treasurer,

or

Chief

Financial

Officer).

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 31 By

Signature (NOTARIZED)
Print Name and Title:

By

Signature (NOTARIZED)
Print Name and Title:

SURETY:

By

Signature (NOTARIZED)
Print Name and Title:

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 32

PERFORMANCE BOND

KNOW ALL PERSONS BY THESE PRESENTS,
That
__________________________________________________________________________as

Subcontractor,

and

______________________________________________________________________________ ___as

Surety,

are

held

firmly bound unto Veolia Water West Operating Services, Inc., organized and incorporated in the State

of

Delaware,

hereinafter

called

“Veolia”,

in

the

sum

of:

______________________________________________________________________________ ____________dollars,

for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators,

successors,

and

assigns,

jointly

and

severally,

firmly

by

these

presents.

WHEREAS said Subcontractor has been awarded and is about to enter into the annexed Agreement

with

Veolia

to

perform

the

Work

as

specified

or

indicated

in

the

Contract

Documents

entitled:

2025-26 Grade 5 RAA Line Replacement Project
NOW THEREFORE, if said Subcontractor shall perform all the requirements of said Contract Documents

required

to

be

performed

on

its

part,

at

the

times

and

in

the

manner

specified

herein,

then

this

obligation

shall

be

null

and

void,

otherwise

it

shall

remain

in

full

force

and

effect.

PROVIDED, that any alterations in the Work to be done or the materials to be furnished, or changes

in

the

time

of

completion,

which

may

be

made

pursuant

to

the

terms

of

said

Contract

Documents,

shall

not

in

any

way

release

said

Subcontractor

or

said

Surety

thereunder,

nor

shall

any

extensions

of

time

granted

under

the

provisions

of

said

Contract

Documents,

release

either

said

Subcontractor

or

said

Surety,

and

notice

of

such

alterations

or

extensions

of

the

Agreement

is

hereby

waived

by

said

Surety.

SIGNED AND SEALED, this______________________ day of ,______ 20__ .

CONTRACTOR:

Check one: Individual, Partnership, Corporation
(Corporations require two signatures; one from each of the following groups: A. Chairman of Board,

President,

or

any

Vice

President;

AND

B.

Secretary,

Assistant

Secretary,

Treasurer,

Assistant

Treasurer,

or

Chief

Financial

Officer).

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 33 By

Signature (NOTARIZED)
Print Name and Title:

By

Signature (NOTARIZED)
Print Name and Title:

SURETY:

By

Signature (NOTARIZED)
Print Name and Title:

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 34

PAYMENT BOND

KNOW ALL PERSONS BY THESE PRESENTS,
That
__________________________________________________________________________as

Subcontractor,

and

______________________________________________________________________________ ___as

Surety,

are

held

firmly bound unto Veolia Water West Operating Services, Inc., organized and incorporated in the State

of

Delaware,

hereinafter

called

“Veolia”,

in

the

sum

of:

______________________________________________________________________________ ____________dollars,

for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators,

successors,

and

assigns,

jointly

and

severally,

firmly

by

these

presents.

WHEREAS said Subcontractor has been awarded and is about to enter into the annexed Agreement

with

Veolia

to

perform

the

Work

as

specified

or

indicated

in

the

Contract

Documents

entitled:

2025-26 Grade 5 RAA Line Replacement Project
NOW THEREFORE , if said Subcontractor, its subcontractors, its heirs, executors, administrators, successors,

or

assigns

shall

fail

to

pay

for

any

materials,

provisions,

provender,

equipment,

or

other

supplies

used

in,

upon,

for,

or

about

the

performance

of

the

Work

contracted

to

be

done,

or

for

any

work

or

labor

thereon

of

any

kind,

or

for

amounts

due

under

the

Unemployment

Insurance

Code,

or

for

any

amounts

required

to

be

deducted,

withheld,

and

paid

over

to

the

Employment

Development

Department

from

the

wages

of

employees

of

the

Subcontractor

and

its

subcontractors

pursuant

to

Section

13020

of

the

Unemployment

Insurance

Code

with

respect

to

such

labor,

all

as

required

by

the

provisions

of

Title

XV,

Chapter

7,

Sections

3247-3252,

inclusive,

of

the

Civil

Code

of

the

State

of

California

and

acts

amendatory

thereof,

and

Sections

of

other

Codes

of

the

State

of

California

referred

to

therein

and

acts

amendatory

thereof,

and

provided

that

the

persons,

companies,

or

corporations

so

furnishing

said

materials,

provisions,

equipment,

or

other

supplies,

appliances,

or

power

used

in,

upon,

for,

or

about

performance

of

the

Work

contracted

to

be

executed

or

performed,

or

any

person,

company,

or

corporation

renting

or

hiring

implements

or

machinery

or

power

for,

or

contributing

to,

said

work

to

be

done,

or

any

person

who

performs

work

or

labor

upon

the

same,

or

any

person

who

supplies

both

work

and

materials

therefore,

shall

have

complied

with

the

provisions

of

said

laws,

then

said

surety

will

pay

the

same

in

an

amount

not

exceeding

the

sum

hereinbefore

set

forth,

and

also

will

pay,

in

case

suit

is

brought

upon

this

bond,

a

reasonable

attorney’s

fee

as

shall

be

fixed

by

the

Court.

This

Bond

shall

inure

to

the

benefit

of

any

and

all

persons

named

in

Section

3181

of

the

Civil

Code

of

the

State

of

California

so

as

to

give

a

right

of

action

to

them

or

their

assigns

in

any

suit

brought

upon

this

bond.

PROVIDED, that any alterations in the Work to be done or the materials to be furnished, or changes

in

the

time

of

completion,

which

may

be

made

pursuant

to

the

terms

of

said

Contract

Documents,

shall

not

in

any

way

release

said

Subcontractor

or

said

Surety

thereunder,

nor

shall

any

extensions

of

time

granted

under

the

provisions

of

said

Contract

Documents

release

either

said

Subcontractor

or

said

Surety,

and

notice

of

said

alterations

or

extensions

of

the

Agreement

is

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 35 hereby waived by said Surety.

SIGNED AND SEALED, this_________________________________________ day of__________

,

20___

.

SUBCONTRACTOR:

Check one: Individual, Partnership, Corporation
(Corporations require two signatures; one from each of the following groups: A. Chairman of Board,

President,

or

any

Vice

President;

AND

B.

Secretary,

Assistant

Secretary,

Treasurer,

Assistant

Treasurer,

or

Chief

Financial

Officer).

By

Signature (NOTARIZED)
Print Name and Title:

By

Signature (NOTARIZED)
Print Name and Title:

SURETY:

By

Signature (NOTARIZED)
Print Name and Title:

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 36

GUARANTY BOND

Any singular reference to SUBCONTRACTOR, Surety, COMPANY or other party shall be considered

plural

where

applicable.

GUARANTEE FOR________________________________________ (SUBCONTRACTOR) SUBCONTRACTOR (Name and Address):

SURETY (Name and Address of Principal Place of Business):

COMPANY (Name and Address):

CONSTRUCTION CONTRACT
Date:_____________________ Amount: ____________________Project (Name and Location):__________________

(SEAL AND NOTARIAL ACKNOWLEDGMENT OF SURETY)

SUBCONTRACTOR AS PRINCIPAL SURETY:

Company: ______________________ Company: ___________________________

Signature: ______________________ Signature:____________________________

Name and Title: ___________________________ Name and Title:_______________________

We hereby guarantee that all Work performed for the Contract Documents entitled:

(Description of Work)

which we have constructed, have been done in accordance with the Contract Documents, and that the

work

as

constructed

will

fulfill

the

requirements

of

SUBCONTRACTOR’s

general

warranty

and

guaranties

included

in

the

Contract

Documents.

We

agree

to

perform

all

work

necessary

to

correct

deficiencies,

errors

or

omissions

in

the

workmanship

or

materials

within

a

period

of

one

(1)

year

from

the

date

of

final

acceptance

of

the

above-named

work

by

the

COMPANY,

pursuant

to

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 37 paragraph 13.07.A of Document 00700, General Conditions, without any expense whatsoever to said

COMPANY,

ordinary

wear

and

unusual

abuse

excepted.

As part of the obligation secured hereby and in addition to the face amount specified therefor, there shall

be

included

costs

and

reasonable

expenses

and

fees,

including

reasonable

attorney’s

fees,

incurred

by

COMPANY.

The Surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the

terms

of

the

agreement

or

to

the

work

to

be

performed

thereunder

or

the

specifications

accompanying

the

same

shall

in

anywise

affect

its

obligations

on

this

bond,

and

it

does

hereby

waive

notice

of

any

such

change,

extension

of

time,

alteration

or

addition

to

the

terms

of

the

agreement

or

to

the

work

or

to

the

specifications.

In the event of our failure to comply with the above-mentioned conditions within ten (10) calendar days

after

being

notified

in

writing

by

the

COMPANY,

we

collectively

or

separately,

do

hereby

authorize

the

COMPANY

to

proceed

to

have

said

defects

repaired

and

made

good

at

our

expense

and

we

will

honor

and

pay

the

costs

and

charges

therefore

upon

demand.

When

correction

work

is

started,

it

shall

be

carried

through

to

completion.

DATED:

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 38 WARRANTY FORM Warranty for 2025-26 GRADE 5 RAA LINE REPLACEMENT PROJECT We hereby guarantee the 2025-26 GRADE 5 RAA LINE REPLACEMENT PROJECT that we have constructed

for

a

period

of

from

the

date

of

acceptance

by

Veolia

Water

West

Operating

Services,

Inc

of

the

Work/Substantial

Completion

or

within

such

a

longer

period

of

time

as

may

be

prescribed

by

law

or

by

the

terms

of

any

applicable

special

guarantee

required

by

the

Contract

Documents.

The following are excluded from the provisions of this warranty:

We agree that if any of the equipment should fail due to any reason other than improper maintenance

or

improper

operation,

if

any

pipe

or

appurtenances

should

develop

leakage,

or

if

any

settlement

of

fill

or

backfill

occurs,

or

should

any

portion

of

the

work

fail

to

fulfill

any

of

the

requirements

of

the

Specifications,

we

will,

within

five

(5)

days

after

receipt

of

written

notice

of

such

defects,

provide

on-site

troubleshooting

services,

and

within

ten

(10)

days

after

receipt

of

written

notice,

commence

to

repair

or

replace

the

same

together

with

any

other

work

which

may

be

damaged

or

displaced

in

so

doing.

In the event of our failure to comply with the above mentioned conditions or should the exigencies of

the

case

require

repairs

or

replacements

to

be

made

before

we

can

be

notified

or

respond

to

notification,

we

do

hereby

authorize

Veolia

Water

West

Operating

Services,

Inc.

to

proceed

to

have

the

defect

repaired

and

made

good

at

our

expense,

and

we

will

pay

the

cost

therefore

upon

demand.

The warranty provided herein shall not be in lieu of, but shall be in addition to any warranties or other

obligations

otherwise

imposed

by

the

Contract

Documents

and

by

law.

Contractor: _________________________________________ Signed: ______________________________________________ Title: ______________________________________________
Signed:________________________________________

Veolia & City of Richmond 2025-26 GRADE 5 RAA – Invitation to Bid Page 39

Veolia Water West Operating
Services,

Inc.

Richmond, CA

CONSTRUCTION CONTRACTOR
SAFETY

HANDBOOK

Compliance
Veolia Water West Operating Services, Inc. (VWWOS) expects each contractor, working at the Richmond WWTP

or

within

the

collections

system

(Including

pump

Stations)

or

working

with

VWWOS/Richmond

employees,

to

conform

to

all

applicable

laws

and

regulations

pertaining

to

safety,

health

and

the

environment.

Contractors

are

also

expected

to

follow

appropriate

industry

consensus

standards

and

work

practices.

Without

prior

documented

approval,

VWWOS

will

not

supply

any

needed

safety

or

health

equipment

as

required

by

a

contractor

to

comply

with

established

safety

regulations.

VWWOS

employees

will

not

assist

contractors

in

the

performance

of

contracted

work

except

to

the

extent

of

providing

information,

orientation,

and

any

emergency

assistance

as

required

or

as

may

be

mutually

agreed

in

advance.

Safety and Health Contacts The following personnel are to serve as contacts for the contractor: Contact Name & Title Phone # Contact For:

Construction Manager Akash Vijay
Cellular: 510-685-2336
General Issues, Contract Administration, liaison with Plant Operations Staff, General Construction, Safety Sign-in Policy The contractor and each of its employees will be required to sign-in daily prior to reporting to the work site.

After

each

workday,

each

employee

will

be

required

to

sign-out

or

at

any

time

they

may

have

completed

the

work

assignment

and/or

leave

the

facility.

The

sign-in

logbook

shall

be

located

in

the

Contractor’s

on-site

office.

Contractor

shall

also

be

required

to

provide

similar

sign

in/out

tracking

for

each

Subcontractor

employee.

Logging

requirements

are

necessary

for

correct

headcount

in

the

event

of

evacuations

or

other

possible

emergencies.

Site Orientation Requirements All contractors, their employees, and sub-contractors must receive site orientation prior to beginning work services.

VWWOS

will

provide

an

initial

orientation

for

the

Contractor’s

designated

staff

members.

This

orientation

will

consist

of

a

meeting

to

brief

the

contractor

on

VWWOS

site

safety

policies

and

expectations

of

the

Contractor’s

safety

practices.

The

review

will

include,

at

a

minimum,

the

following:
● A review of hazardous materials storage locations within the facility ● VWWOS’ Site Personal Protective Equipment rules ● A review of the Richmond Emergency Action Plan ● A review of the Traffic Control Safety Plan ● A review of the site safety policies included in this section: o Confined Space Entry Procedures o Written Hazard Communication Program o Lockout/Tagout Program ● A site tour (including placement of emergency rendezvous areas) The Contractor shall be responsible for performance of site orientation training for all contractor and subcontractor

staff

employed

on

this

project.

Contractor

shall

obtain

signatures

of

all

staff

employed

on

the

project demonstrating the completion of training and shall be required to provide copies of all certifications upon

request.

Training

syllabus

shall

include

all

of

the

above

program

requirements

in

addition

to

that

training

required

by

OSHA

and

the

State

of

California.

Appendix I, Contractor Site Orientation Form, shall be used to document compliance with site orientation health

and

safety

requirements.

Appendix II Contractor Site Orientation Training Log, shall be used to maintain a record of staff members receiving

site

orientation

training.

Appendix

III,

Contract

Worker

General

Information

Form,

shall

be

distributed

to

all

contractor

and

subcontractor

staff

on-site.

Reporting and Investigation of Incidents All contractor or subcontractor incidents must be reported immediately to the Construction Services Manager or

the

Resident

Engineer.

Incidents

include

injuries,

VWWOS

or

City

property

damage,

injury

to

private

citizens

or

citizens'

property,

or

"near

misses”

which

might

have

resulted

in

serious

consequences.

A

VWWOS

representative

will

complete

a

VWWOS

Incident

Report

on

the

incident

and

forward

it

to

regional

and

corporate

safety

staff.

Periodic Submittal of Health and Safety Performance Data VWWOS may occasionally require the submission of injury and illness data and any other health and safety performance

data

by

the

contractor.

Any

submission

may

have

personal

identifiers

deleted

to

maintain

confidentiality.

Medical Care The contractor is required to supply first aid equipment and medical attention as needed to contractor employees.

VWWOS

will

provide

assistance

where

necessary

in

emergency

situations.

The

contractor

is

hereby

notified

that

the

nearest

medical

facility

is:

Concentra Medical Centers 2970 Hilltop Mall Road, Suite 203 Richmond CA (510) 222-8000 Ambulance Request (life threatening) 510-307-1558 or 911 Emergency Plans
The VWWOS/Richmond Project has an Emergency Action Plan (EAP) in place which is available for viewing (see

the

EHS

Manual).

Particulars

of

the

EAP

will

be

reviewed

with

the

Contractor

during

the

site

orientation.

Special Conditions The contractor must provide information to VWWOS of any special conditions or hazards that may be created

as

a

result

of

the

work

services

to

be

provided.

This

information

is

to

be

brought

forward

at

the

time

of

the

pre-job

meeting.

If the contractor is to bring any hazardous chemicals or products on-site, then Material Safety Data Sheets (MSDSs)

for

each

item

will

be

provided

to

the

Construction

Services

Manager

or

Resident

Engineer.

All

MSDS

given

to

VWWOS

will

be

retained

on

site

permanently.

The

contractor

is

thus

informed

not

to

issue

the

lone

copy

of

these

MSDSs.

While

the

hazardous

materials

are

on-site,

the

MSDS

will

be

kept

in

a

binder

provided

by

the

contractor,

and

will

be

retained

for

viewing

along

with

the

existing

Richmond

WWTF

MSDS

file.

Regulatory Agency Inspections Contractors and subcontractors are required to immediately inform the Construction Services Manager or Resident

Engineer

of

any

inspection

or

visit

by

any

regulatory

agency

upon

the

contractor

while

in

locations

within

the

scope

of

this

project.

Independent Contractor Substance Abuse Policy Contractors must maintain a Drug, Alcohol and Controlled Substances Abuse Policy equivalent or exceeding VWWOS

Policies.

The

VWWOS

Policy

is

available

for

controlled

review

by

contacting

the

Construction

Services

Manager.

Copies

of

this

document

may

not

be

provided

to

the

contractor.

Appendix I Contractor Site Orientation Form

CONTRACTOR SITE ORIENTATION
Company Name: Date: _________________________
If Subcontractor, indicate Prime/General Contractor: Address:
_____________________________________________________________________________ Phone: ____________________
Head Office:

On-site: Company Representative: _____________________________ Phone:
____________________
Contractor Safety Representative:

Title: _______________________________________________________ Contractor Site Supervisor: ______________________________________________ I have received orientation in the following: □ A review of hazardous materials storage locations within the facility □ VWWOS’ Site Personal Protective Equipment rules □ A review of the Richmond Emergency Action Plan □ A review of the Traffic Control Safety Plan □ A review of the VWWOS site safety policies included in this section: o Confined Space Entry Procedures o Written Hazard Communication Program o Lockout/Tagout Program □ A site tour (including placement of emergency rendezvous areas) I have received a copy of the site’s Contractor Health and Safety Plan for contract work and accept

the

responsibility

of

informing

all

subcontractors

and

employees

working

for

me

of

those

rules

contained

in

the

Plan.

I

understand

the

rules,

and

our

employees

will

comply

with

those

rules

while

working

at

this

VWWOS

managed

facility.

Contractor Signature:

Contractor Name: Site Orientation given by:

Appendix II
Contractor Site Orientation Training Log

CONTRACTOR SITE ORIENTATION TRAINING LOG
Contractor/Subcontractor Name:

Date: The contractor/sub-contractor hereby certifies that the following staff members have received training

on

the

subjects

listed

below.

□ A review of hazardous materials storage locations within the facility □ VWWOS’ Site Personal Protective Equipment rules □ A review of the Richmond Emergency Action Plan □ A review of the Traffic Control Safety Plan □ A review of the VWWOS site safety policies included in this section: • Confined Space Entry Procedures • Written Hazard Communication Program • Lockout/Tagout Program □ A site tour if necessary The staff members listed below hereby certifies that they have received the above referenced training

on

the

date

indicated

below:

Appendix III Contract Worker General Information Form

Issue one (1) copy to every contractor and subcontractor (all workers) during site orientation (can also

be

used

for

distribution

to

site

visitors).

CONTRACTOR SAFETY INFORMATION

Contractors must adhere to the following procedures unless otherwise instructed, in writing, by VWWOS
In Case of Injury or Vehicle Accident: Any incident, no matter how minor, must be reported immediately to your supervisor. Your supervisor

will

be

responsible

for

reporting

the

incident

to

VWWOS.
(Remain at the scene of any vehicle accident) If you must see a doctor, you should not drive yourself. Your employer will arrange for someone to take

you

to

the

medical

clinic/hospital.

The

closest

emergency

facility

is:

Concentra Medical Centers 2970 Hilltop Mall Road Suite 203 Richmond CA (510) 222-8000 Ambulance Request: 510-307-1558 or 911 In Case of Fire: If you discover a fire, immediately notify your supervisor or any VWWOS employee. In the event of a

serious

fire,

begin

evacuation.

An

attempt

must

be

made

to

notify

VWWOS

if

notification

can

be

done

safely.

You

must

then

begin

evacuation

procedures.

VWNA

employees

will

assess

the

situation

and

respond

accordingly.

If a fire notice is given, you must proceed immediately outside the front gate of the plant. If the fire threatens

that

evacuation

point,

you

must

proceed

to

an

alternate

evacuation

point

as

designated

by

VWWOS

representatives

present.

Under no circumstances are you permitted to discuss any event with media or other off-site persons.

Project

Management

alone

will

make

press

statements

to

ensure

that

accurate

information

is

released.

If

you

are

answering

a

phone

call

during

an

emergency,

record

the

person's

name

and

phone

number.

Provide

no

other

information

-

VWWOS

management

will

return

necessary

calls.

Welcome to the Veolia Water West Operating Services, Inc. Richmond Project. Thank you for your cooperation.

Please

perform

your

work

safely!

VWWOS

is

committed

to

ensuring

your

safety

at

work.

If

you

have

any

concerns,

please

do

not

hesitate

to

ask

any

VWWOS

representative.

The

VWWOS

site

management

and

employees

would

be

pleased

to

provide

answers

to

your

questions.

Addendum A AGREEMENT TO BE BOUND [Date] [Addressee] [Address] Re: City of Richmond Project Stabilization Agreement -- Agreement to be Bound Dear Mr./Ms. ________________: The undersigned confirms that it agrees to be a party to and bound by the City of Richmond Project

Stabilization

Agreement

as

such

Agreement

may,

from

time

to

time,

be

amended

by

the

parties

or

interpreted

pursuant

to

its

terms.

By executing this Agreement to be Bound, the undersigned subscribes to, adopts and agrees to be bound

by

the

written

terms

of

the

legally

established

trust

agreements

as

set

forth

in

Section

9.1,

as

they

may

from

time

to

time

be

amended,

specifying

the

detailed

basis

upon

which

contributions

are

to

be

made

into,

and

benefits

made

out

of,

such

trust

funds,

and

ratifies

and

accepts

the

trustees

appointed

by

the

parties

to

such

trust

funds.

The

undersigned

agrees

to

execute

a

separate

Subscription

Agreement(s)

for

such

trust

funds

when

such

trust

fund(s)

require(s)

such

document(s).

The obligation to be a party to and bound by this Agreement shall extend to all work covered by the City

of

Richmond

Project

Stabilization

Agreement

undertaken

by

the

undersigned.

The

undersigned

shall

require

all

of

its

subcontractors,

of

whatever

tier,

to

become

similarly

bound

for

all

their

work

within

the

scope

of

this

Agreement

by

signing

an

identical

Agreement

to

be

Bound.

This letter shall constitute a subscription agreement, to the extent of the terms of the letter. CONTRACTOR/SUBCONTRACTOR:____________________________________________ California Contractor State License No. or Motor Carrier (CA) Permit No.: ________________ Name of Authorized Person (print): ________________________________________________ Signature of Authorized Person: ___________________________________________________ Title of Authorized Person: ______________________________________________________ Telephone Number of Authorized Person:___________________________________________ Address of Authorized Person:____________________________________________________ State Public Works Registration Number: __________________________________________ 132625\977269 Project Stabilization Agreement for the City of Richmond

ATTACHMENT A - SCOPE OF WORK