WV
GENERAL WAREHOUSE
REMOVE GRAFFITI FROMCONCRETE AND APPLYANTI-GRAFFITI COATING SEE ABC
D EF1C-2
REMOVE GRAFFITI FROMCONCRETE AND APPLYANTI-GRAFFITI COATING SEE1C-2 REMOVE GRAFFITI FROMCONCRETE AND APPLYANTI-GRAFFITI COATING SEE2C-2REMOVE GRAFFITI FROMCONCRETE AND APPLYANTI-GRAFFITI COATING SEE2C-2
FACE OF LOADING DOCKLOADING DOCK
FACE OF LOADING DOCKLOADING DOCK
RAMP
LOADING DOCK
FACE OFLOADING DOCK
FACE OFLOADINGDOCK
PHOTOGRAPH APHOTOGRAPH BPHOTOGRAPH CPHOTOGRAPH D
PHOTOGRAPH E
PHOTOGRAPH F
MARINAWAY S
MACDONALD AVERICHMONDPKWY
HALLAVE
FORD CHANNEL
CANAL BLVD
CUTTING BLVD
W. OHIO AVE.I-580
HARBOUR WAY
CASTRO ST
CLIFFDORNAN DR
WHARFST
SEADR.
SANTA FE CHANNEL
HARBOR CHANNEL
BNSF RRBNSF RR
VICINITY MAPNTS
HARBOR CHANNELRICHMOND INNERHARBOR
WASTEWATERTREATMENTPLANT
PROJECT LOCATION
GENERAL WAREHOUSE GRAFFITI REMOVAL
SITE PLAN1"=20'
CONSTRUCTION NOTES1.CONTRACTOR TO REMOVE GRAFFITI FROM BUILDING AND DOCKFACE INCLUDING DOORS, WINDOWS, AND APPURTENANCES.NOTE THIS INCLUDES NON TREATED CONCRETE AND METALSURFACES.2.CONTRACTOR TO FIELD VERIFY CONDITIONS PRIOR TO BID.PHOTOGRAPHS DO NOT SHOW ALL AREAS OF GRAFFITI.3.CONTRACTOR MAY USE A PAINT REMOVAL PRODUCT PROVIDEDIT IS LEGAL FOR USE IN THE STATE OF CALIFORNIA.4.CONTRACTOR MAY POWER WASH TO REMOVE GRAFFITI.HOWEVER, THE PRESSURE SHALL BE REDUCED TO PREVENTDAMAGE TO THE CONCRETE SURFACE.5.CONTRACTOR TO PREVENT STAINING OF SURFACES DURINGPOWER WASHING.6.CONTRACTOR SHALL VACUUM ALL WATER AND DEBRIS. ALLREMOVED MATERIAL SHALL BE DISPOSED LEGALLY.7.SEE TECHNICAL PROVISIONS FOR ADDITIONAL REQUIREMENTS.
Prepared Under the Direction of:CaliforniaState OfContra CostaCounty OfRIchmondCity Of
PORT OF RICMONDGRAFFITI REMOVALGENERAL WAREHOUSE
110.20.2025BID ADDENDUM 1RCSRCSRCSP:\Shared\Projects\2023\2300125 Port of Richmond\01-PPMT\GW-Graffiti\graffiti.dwg 03/23/2026 - 04:40 PM sterc 1:1 C-1Sheet
Plan File:Project Number:D-XXXX-XX20235125-10Scale:Date:AS SHOWN03.23.2026 RevDateDescriptionDesignedDrawnChecked 121 PARK PLACERICHMOND, CA 94801415.883.9850©2024
ENGINEERING LANDSCAPE ARCHITECTURESURVEYINGURBAN PLANNINGWWW.CSWST2.COM Graphic Scale (in feet)20 400 201 inch = 20 ft.
1 2 3 4 5 6 7 8 9 10 11 12 13 14
18'-6"2ND FLOOR
3'-0"1ST FLOOR
32'-6"3RD FLOOR
46'-6"4TH FLOOR
62'-6"TOP OF PARAPET
69'-6"MAX HEIGHT
20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0" 10'APPLY ANTI-GRAFFITI COAT(4,000 SF)
A B C D E F G H
18'-6"2ND FLOOR
3'-0"1ST FLOOR
32'-6"3RD FLOOR
46'-6"4TH FLOOR
62'-6"TOP OF PARAPET
69'-6"MAX HEIGHT
20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"
APPLY ANTI-GRAFFITI COAT(2,000 SF)
DETAIL 1: TYPICAL EAST/ WEST ELEVATIONNO SCALE
Prepared Under the Direction of:CaliforniaState OfContra CostaCounty OfRIchmondCity Of
PORT OF RICMONDGRAFFITI REMOVALGENERAL WAREHOUSE
110.20.2025BID ADDENDUM 1RCSRCSRCSP:\Shared\Projects\2023\2300125 Port of Richmond\01-PPMT\GW-Graffiti\graffiti.dwg 03/23/2026 - 04:40 PM sterc 1:1 C-2Sheet
Plan File:Project Number:D-XXXX-XX20235125-10Scale:Date:AS SHOWN03.23.2026 RevDateDescriptionDesignedDrawnChecked 121 PARK PLACERICHMOND, CA 94801415.883.9850©2024
ENGINEERING LANDSCAPE ARCHITECTURESURVEYINGURBAN PLANNINGWWW.CSWST2.COM DETAIL 2: TYPICAL NORTH/SOUTH ELEVATIONNO SCALE