ATTACHMENT #2
FACT SHEET: UNITED HECKATHORN SUPERFUND SITE COMMUNITY CLEANUP PLAN PROVIDED BY THE RICHMOND SHORELINE ALLIANCE, SF BAYKEEPER & SIERRA CLUB SF BAY

CHAPTER

The Facts ●

Richmond is an environmental justice community: nearly 15% of residents live below the

poverty

line

and

approximately

80%

identify

as

people

of

color.
●

The United Heckathorn Superfund Site spans 20 acres in the Richmond Inner Harbor:

five

acres

of

land

and

15 acres

of

marine

sediments

in

the

Lauritzen

Channel

and

Parr

Canal.
●

From 1944 to 1966, chemical companies at the site formulated, packaged, and shipped

toxic

pesticides—including

DDT

and

dieldrin—allowing

pesticide

spillage,

wash

water,

and

residues

to

drain

directly

into

the

channel

and

seep

into

the

ground

unchecked.
●

In 1990, the U.S. EPA declared United Heckathorn a Superfund site and placed it on the

National

Priorities

List.
●

In the mid-1990s the U.S. EPA oversaw a cleanup that never fully met its compliance goals.

The

agency’s

first

post-remediation

monitoring

event

in

January

1998

(nine

months

after

dredging

was

completed

in

April

1997)

already

showed

DDT

and

dieldrin

levels

in

the

marine

area

exceeded

cleanup

goals.

This

was

documented

and

confirmed

in

the

first

Five-Year

Review

(September

2001)

and

subsequent

reviews.
●

Samples collected in 2013 and 2016 found DDT and dieldrin at concentrations up to 3,800

times

higher

than

acceptable

standards.
●

A ' Do Not Eat' advisory for fish caught in and near the channel, although posted in the

affected

area,

has

not

been

made

enforceable

nor

is

voluntary

compliance

monitored.

Notwithstanding,

people

continue

to

frequently

fish

in

the

area.
●

The Lauritzen Channel now has more DDT than before the mid-1990s cleanup .

Fish

sampled

from

the

channel

show

DDT

levels

hundreds

of

times

higher

than

fish

caught

elsewhere

in

San

Francisco

Bay.

Why the First Cleanup Failed ●

The first cleanup failed due to 1) a flawed cleanup plan, 2) inadequate oversight and quality

control,

and

3)

minimal

community

involvement.

As

a

result,

contaminated

materials

were

left

behind,

resulting

in

DDT

and

dieldrin

leaching

into

the

marine

environment

nonstop

for

nearly

30 more

years.
●

Moreover, intermittent seeps and groundwater intrusion have been identified as ongoing

sources

of

DDT

re-entering

the

channel—a

contamination

pathway

the

first

cleanup

never

addressed
.

The Health Threat ●

DDT and dieldrin are classified by the U.S. EPA as probable human carcinogens.

Both

are

banned

from

use

in

the

United

States

(DDT

since

1972;

dieldrin

since

1974).

●

These chemicals are associated with liver cancer, premature birth, respiratory illness, and

type

2 diabetes

in

humans.
●

DDT and dieldrin severely damage the nervous system, liver, and reproductive health of

fish,

birds,

and

other

wildlife.
●

The primary route of human exposure is eating fish, shellfish, or other wildlife contaminated

by

DDT

or

dieldrin

that

have

migrated

out

of

the

channel

to

nearby

fishing

sites.
●

Richmond residents who rely on local fishing for food face the greatest direct health risk,

a

serious

environmental

justice

concern

that

demands

urgent

action.

Nearly 30 years of EPA Indifference and Inaction ●

Even after repeated EPA Five-Year reviews showed the first cleanup didn’t work, the U.S.

EPA

only

began

developing

a

new

cleanup

plan

in

2012—now

nearly

30 years

of

delay

while

contamination

persists

and

worsens.
●

EPA has stated it will not share cleanup options until the formal public comment period

begins,

contradicting

its

own

policy

of

including

community

input

during

the

planning

process.
●

EPA's proposed cleanup plan is anticipated in late August 2026. Without strong community

and

City

Council

pressure,

there

is

a

real

risk

of

another

inadequate

remedy

that

repeats

the

failures

of

the

first

cleanup.

Climate Change Makes This More Urgent ●

Sea level and groundwater rise were not considered in the 1990s cleanup, a critical omission

the

new

plan

must

correct.
●

Climate change is expected to accelerate erosion of contaminated upland areas, potentially

spreading

DDT

and

dieldrin

further

into

San

Francisco

Bay.
●

Any cleanup plan that leaves contaminated materials in place will be undermined by rising

seas

and

increased

storm

intensity,

risking

another

failed

cleanup
.

The Community Cleanup Plan: What We're Asking For ●

ISOLATE AND DRAIN THE CHANNEL : Build a temporary waterproof barrier (caisson)

across

the

mouth

of

the

Lauritzen

Channel

and

pump

out

the

water

so

crews

can

work

in

relatively

dry

conditions—avoiding

underwater

dredging

which

spreads

contamination

and

contributed

to

the

first

cleanup's

failure.
●

COMPLETELY REMOVE ALL CONTAMINATED MATERIALS : Remove all pile supported

structures/wharfs,

pilings,

rip-rap

material

and

debris,

contaminated

sediment,

and

contaminated

soil

from

the

channel

sidewalls

and

upland

areas.

Excavate

the

sidewalls

until

clean

material

is

reached,

adding

supports

to

prevent

potential

cave-ins.

Remove

any

structure

on

higher

ground

that

has

contamination

underneath

and

remove

corresponding

contamination.

Locate

and

remove

any

pipes

that

could

leak

potential

residual

contamination

back

into

the

channel.

Remove

and

sample

any

underground

cavities

and

buried

debris

discovered

during

excavation.
●

ADDRESS SEEPS AND GROUNDWATER : Construct a continuous perimeter concrete

barrier/retaining

wall

around

the

Lauritzen

Channel

(3

sides).

Behind

the

continuous

perimeter

barrier,

construct

a

comprehensive

groundwater

collection

and

treatment system to prohibit further uncontrolled groundwater contamination from reaching

the

channel.
●

DISPOSE OFFSITE : All contaminated materials must be removed and disposed of offsite.

Leaving

capped

material

in

place

is

not

a

permanent

solution.
●

RIGOROUS POST-CLEANUP MONITORING : Implement a rigorous post-cleanup monitoring

program

including

shellfish

tissue

sampling

on

transects

from

the

cleanup

site

to

San

Francisco

Bay,

and

tissue

testing

of

fish

species

commonly

caught

by

fishers,

to

monitor

the

cleanup’s

long-term

effectiveness

and

the

safety

of

local

fishing.
●

PROTECT WORKERS : Under CERCLA (the federal Superfund law), Responsible Parties

are

legally

obligated

to

cover

all

costs

of

cleanup,

which

should

include

fair

compensation

for

workers

whose

employment

is

affected

by

work

stoppages

during

remediation.

Worker

protection

is

part

of

the

cost

of

cleanup.

Who Are the Responsible Parties? ●

Under CERCLA, the companies responsible for contaminating a site are legally required

to

pay

for

its

cleanup—
not

taxpayers,

not

workers,

and

not

the

community
.

Why the City Council Should Act Now ●

The U.S. EPA is expected to issue its proposed cleanup plan by late August 2026.

The

City

Council's

endorsement

of

a

complete

cleanup

now

will

send

a

powerful

signal

before

a

new

proposed

plan

is

formally

issued.
●

Richmond's residents have waited more than 30 years for the U.S. EPA to do its job and

fully

clean

up

the

United

Heckathorn

site,

and

over

80 years

since

cancer-causing

DDT

and

dieldrin

have

contaminated

the

surrounding

area

and

the

San

Francisco

Bay.

The

City

Council

has

a

powerful

and

impactful

voice

to

demand

nothing

less

than

a

complete

and

lasting

remedy.
●

A strong City Council resolution demonstrates to EPA that the full weight of local government

stands

with

the

community's

demand

for

a

cleanup

that

is

complete,

equitable,

and

built

to

last.
●

A complete and thus extensive cleanup will set the stage to redevelop and modernize this

area

to

open

new

opportunities

for

the

Port

and

the

City

of

Richmond,

increased

revenue,

and

employment.
●

Environmental cleanup doesn’t prohibit reuse; it facilitates and enhances reuse.