Cities Index.
Attachment 1 - Location Map.pdf

Richmond City Council
July 28, 2026

Document
Attachment 1 - Location Map.pdf
Meeting
July 28, 2026
Body
Richmond City Council
Original file
543 KB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.

NO PARKING

NO PARKING
Sheet Title
Stamp

BOORMAN PARK
P:\Shared\Projects\2023\2300013 Boorman Park Project\DWG\Sheets\L-BOORMAN CD 2024.dwg 02/20/2025 - 11:58 AM Brian G 1:3.5602 Sheet
Sheet Number:

Project Number: 2300013
Scale:

Date: December 20, 2024
Rev Date Description Designed Drawn Checked
OF 41
SOUTH 25th & MAINE STREET
RICHMOND CA, 94805

REVITALIZATION PROJECT
230006
12/20/2024 PERMIT SET BB BG MV
02/21/2025 BID SET MV BG MV
Stamp
Marcia D.Vallier
-No. 3293
STATE
O
FCA
L

IFORNI A
Signature
Renewal Date
Date

L I C E NSED LANDSCAPE

ARCHITECT
02/12/2025
03/31/2026
121 Park Place
Richmond, CA 94801
415.533.1864CSWST2.com
Engineering
Landscape Architecture
Surveying
Urban Planning
TS1.0

COVER SHEET

VICINITY MAP

APPROVED FOR CONSTRUCTION
LANDSCAPE ARCHITECT:

DESCRIPTION

INDEX OF DRAWINGS

SHEET DRAWING
NO.

DATE
DATE
MARCIA VALLIER, PLA #3293 CSWST2

LOCATION

PROJECT

USACALL

TWO WORKING DAYS

TOLL FREE

BEFORE YOU DIG
800-642-2444
OR DIAL 811
TS1.0

COVER SHEET
ROBERT ARMIJO, P.E.

DEPUTY PUBLIC WORKS DIRECTOR / CITY ENGINEER
C1.0 GENERAL NOTES, ABBREVIATIONS, LINETYPES & SYMBOLS
LEGEND - PATH OF TRAVEL:

ACCESSIBLE PATH OF TRAVEL

PATH OF TRAVEL

NOT TO SCALE

MAINE AVENUE

LOCATION MAP
25TH STREET
NOTES:

1.PATH OF TRAVEL (P.O.T.) AS INDICATED IS A BARRIER FREE ACCESS ROUTE WITHOUT ANY ABRUPT VERTICAL CHANGES EXCEEDING 12" BEVELED AT 1:2 MAX. SLOPE EXCEPT THAT LEVEL CHANGES DO NOT EXCEED 14" VERTICAL AND IS AT LEAST 48" WIDE. SURFACE IS SLIP RESISTANT, STABLE, FIRM AND SMOOTH. CROSS SLOPE DOES NOT EXCEED 2%, AND SLOPE IN THE DIRECTION OF TRAVEL DOES NOT EXCEED 5%. P.O.T. SHALL BE MAINTAINED FREE OF OVERHANGING OBSTRUCTIONS TO 80" MINIMUM AND PROTRUDING OBJECTS GREATER THAN 4" PROJECTION FROM WALL AND ABOVE 27" AND LESS THAN 80". CONTRACTOR TO VERIFY THAT BARRIERS IN THE PATH OF TRAVEL HAVE BEEN REMOVED.

2.ENTRY/EXIT DOORS - DIRECTLY CONNECTED TO ACCESSIBLE PATH OF TRAVEL, 32" CLEAR MIN. WIDTH AND WITH ACCESSIBILITY CONFORMING

DOOR HARDWARE
(5 LBS. MAX. CLOSURE EFFORT)

3.ALL GRATE OPENINGS SHALL NOT EXCEED 12" IN DIRECTION OF TRAVEL.

INSTALL GRATE PERPENDICULAR TO DIRECTION OF TRAVEL.

4.ALL EXTERIOR ENTRANCES AND EXITS ON THIS PLAN ARE ACCESSIBLE AND COMPLY WITH THE FOLLOWING:

A. 32" CLEAR WIDTH
B. REQUIRED STRIKE CLEARANCE AT PULL SIDE OF DOOR (24" FOR FRONT & LATCH, 36" FOR HINGE APPROACH)
C. LEVEL LANDING (2% MAX. EACH WAY)
D. ACCESSIBLE THRESHOLD, HARDWARE, CLOSER
E. ROOM/BUILDING I.D. (TACTILE) & ISA ON EXT. SIDE OF ENTRANCE F. TACTILE EXIT SIGNAGE ON INTERIOR SIDE OF EXIT DOOR, AS

REQUIRED

RESTROOM

LOCATION

PROJECT

BOORMAN PARK REVITALIZATION PROJECT
SOUTH 25TH STREET AND MAINE AVENUE

RICHMOND, CALIFORNIA
PROJECT TEAM:

LANDSCAPE ARCHITECT, CIVIL
AND ELECTRICAL ENGINEERING:

CSWST2, Inc.
121 Park Place
Richmond, CA 94801
Phone: (510) 237-7745
STRUCTURAL ENGINEERING:

Ware Associates
440 Grand Avenue, Suite 250
Oakland, CA 94610
Phone: (510) 922-9888
COST ESTIMATING:

Mack5
322 Harbour Way, Suite 16
Richmond, CA 94801
Phone: (510) 215-1541
PARK AREA:

TOTAL BUILDING AREA:

FLOOR-TO-AREA-RATIOS:

NUMBER OF BUILDING STORIES:

BUILDING HEIGHTS:

PERCENT LOT COVERAGE:

PERCENT LANDSCAPE AREA:

PERCENT OPEN SPACE:

TOTAL IMPERVIOUS SURFACE AREA:

PARKING BY TYPE:

4.0 ACRES
738 SF

1.2%
1 - PREFABRICATED RESTROOM

9.5' TALL

1.2%

82.5%
100%

17.5%

STREET PARKING ONLY
TWO (2) ON-STREET ACCESSIBLE

STALLS PROVIDED
C2.0 ROUGH GRADING PLAN
C2.1 ROUGH GRADING PLAN
C3.0 GRADING PLAN
C3.1 GRADING PLAN
C4.0 STORMWATER CONTROL PLANS
C4.1 STORMWATER CONTROL PLANS
C5.0UTILITY PLAN
C5.1 UTILITY DETAIL SHEET
C6.0 LIGHTING PLAN
C6.1 LIGHTING PLAN
C7.0 EROSION & SEDIMENT CONTROL PLANS
C7.1
C8.0 DETAIL SHEET

EROSION & SEDIMENT CONTROL PLANS
L0.0CONSTRUCTION LEGEND
L0.1NOTES
L1.0KEY SITE PLAN
L1.1CONSTRUCTION AND LAYOUT PLAN
L1.2CONSTRUCTION AND LAYOUT PLAN
L2.0PLAY AREA LAYOUT PLAN
L3.0CONSTRUCTION DETAILS
L3.1CONSTRUCTION DETAILS
L3.2CONSTRUCTION DETAILS
L3.3CONSTRUCTION DETAILS
L3.4CONSTRUCTION DETAILS
L3.5CONSTRUCTION DETAILS
L3.6CONSTRUCTION DETAILS
L3.7CONSTRUCTION DETAILS
L3.8CONSTRUCTION DETAILS
L3.9CONSTRUCTION DETAILS
L4.0IRRIGATION LEGEND AND NOTES
L4.1IRRIGATION PLAN
L4.2IRRIGATION PLAN
L4.3IRRIGATION DETAILS
L4.4IRRIGATION DETAILS
L4.5IRRIGATION DETAILS
L4.6IRRIGATION DETAILS
L5.0PLANT LIST, PLANTING NOTES AND

PLANTING DETAILS
L5.1PLANTING PLAN
L5.2PLANTING PLAN
DESCRIPTION OF WORK:

THIS PROJECT IS PRECEDED BY REMEDIAL ACTION PLAN (RAP) WORK IN

COMPLIANCE WITH THE DEPARTMENT OF TOXIC SUBSTANCES CONTROL (DTSC) APPROVALS. THE CONTRACTOR SHALL CONDUCT A SURVEY OF THE SITE AS

DELIVERED TO DETERMINE THE ACTUAL SUBGRADE ELEVATION AND PROVIDE THAT INFORMATION TO THE CITY'S REPRESENTATIVE. PROJECT IMPROVEMENTS

ABOVE SUBGRADE WILL CONSTITUTE PART OF THE FINAL CAP ABOVE A

DEMARCATION MATERIAL INSTALLED BETWEEN THE IMPACTED SOILS LEFT IN PLACE AT APPROXIMATELY 36" BELOW FINISH GRADE AS DESCRIBED BY THE

CONTRACT DOCUMENTS AND THE REMEDIAL DESIGN AND IMPLEMENTATION PLAN (RDIP).

IN GENERAL, THE WORK INCLUDES FINISH GRADING, PLANTING, IRRIGATION,

BOOSTER PUMP, LIGHTING, HARDSCAPE ELEMENTS AS WELL AS THE

INSTALLATION OF RESTROOM, SHADE STRUCTURE, PLAYGROUND EQUIPMENT,

SITE FURNISHINGS AND SPORTS EQUIPMENT, WALLS AND FOR ALL OTHER

WORK, ITEMS OR DETAILS REASONABLY INFERRED OR NOT MENTIONED ABOVE

THAT ARE REQUIRED BY THE DRAWINGS, STANDARD SPECIFICATIONS, OF

THESE SPECIAL PROVISIONS OR DETAILS REASONABLY INFERRED OR NOT

MENTIONED ABOVE THAT ARE REQUIRED BY THE WORK, PLANS, STANDARD SPECIFICATIONS, AND PROJECT SPECIFICATIONS.

PROJECT INFORMATION:
1 OF 41

← All documents from this meeting