3 TASK
City of
) VEOLIA AUTHORIZATION Mielmore
[Nevin Avenue and Wilson Avenue Pipeline Realignment Project Date: June 18, 2025
tivity Classificatic
heck applicabl
VWNA Project #: TBD
Administration
Engineering
Planning
Design
Construction Proposed by Chand aseke Punktraman, Volia Water West Operating Sen Construction
Reviewed by:
Authorized City Dept. Rep. (PO verification)
P0. 26200272 the l
Wastewater
City of Riohmond, Finance Department
Other (specify below) swon N Laby
Approved by:
Tawfic N. Halaby, PE
City of Richmond, Deputy Director of Public Works
3/5 -/2026
Approval Date:
Original Line Item Approved Cost: 230,550.00
Approved Markup/MarginS 38.040.75
Previously Authorized Amount: $0.00 Total Authorized Amt.: 268,590.75 Scope of Services
Line segment H13MH253_H13MH243 (between Nevin Avenue and Macdonald Avenue in the City of Richmond) exhibits severe structural deterioration, including multiple cracks and fractures. Due to its critical location directly beneath the Caltrans on-ramp, conventional rehabilitation methods such as pipe bursting or open cut replacement are not feasible. Therefore, a comprehensive redesign and realignment strategy is required for this section to ensure continued service. The project will be called the Nevin Avenue and Wilson Avenue Pipeline Realignment Project.
Per the City's direction, V.W. Housen & Associates (VWHA) has been selected as the design engineer to develop comprehensive design and construction documents for this work. One of the City's preapproved design engineers, VWHA contains specialized knowledge of the City's Collection System. For this project, they have provided a proposed scope of work which includes a topographic survey, geotechnical investigation, utility inspections, complete design, preparation of bid documents, bid period services, engineering services during construction, and preparation of as-built drawings.
This project includes engineering and design for the installation of approximately 1,150 lineal feet of new 12-inch diameter PVC sewer pipe on Wilson Avenue from Barrett Avenue to Macdonald Avenue. The project also removes and replaces approximately 800 lineal feet of 8-inch VCP pipe with new 8-inch PVC sewer pipe on 46th Street from Barrett to Nevin and on Nevin Avenue from 46th Street to Wilson. In addition, nine manholes will be installed or replaced along these alignments.
Finally, the existing deteriorated line segment H13MH253_H13MH243 within the Caltrans right-of-way between Nevin Avenue and Macdonald Avenue will be abandoned.
WHA's proposal (Design/Bid Period Services plus Engineering Services During Construction, ("ESD) is attached for eference. The total authorization amount of this TA is a not-to-exceed cost of $268,590.75, which includes Veolia's 16.5% markup.
Nevin Avenue and Wilson Avenue Pipeline Realignment Project Veolia Markup Bids/Estim. SUBTOTAL 16.50% TOTAL
Design & Bid Period V.W. Housen
Services Assoc. 186,938 186,938 30,845 217,783
V.W. Housen
ESDC Assoc. 43,612 43,612 7,196 50,808
-
IOTAL 230,550 230,550 38,041 268,591