Cities Index.
Agenda packet

Rio Dell City Council
March 21, 2023

Document
Agenda packet
Meeting
March 21, 2023
Body
Rio Dell City Council
Original file
5.1 MB
Text extracted from the city's file for reading and search. Open the original on www.cityofriodell.ca.gov. That file is the official record.

REV DRAWN CHECKED APPROVED

DAT H DESCRIPTION
CLORTEC 100-C (100 LBS/DAY)
08/02/2021 INITIAL RELEASE RAM JPM
FINISH: POWDER COATED CARBON STEEL 01/11/2022MODIFIED J.BOX SIZE

RAM JPM JPM
POWER: 120VAC, 60HZ
- (54 1/4 [1377])
--3127 3421-
-3/4 [19]
2 1/2 [62]- -- 23 1/2 [597]
Ø1/2 [Ø13] (x4)
-- 13 1/2 [340] ——
IMRU
--3/4 [19] •3 [76]
-3/4 [19]
- 6 (152] -~

SECTION A-A

TOP VIEW
-J.BOX
- MIN 2 1/2 LOOPS FOR ALL CABLES
-OUTLET GROUNDING TARGET [ 1• ISOMETRIC VIEW
-HYPO OUT (1)

FLOW METER (WATER)-

FLOW METER (WATER)- - WATER
SUPPLY (3/4") - 57 1/2 [1460]~

ISOMETRIC VIEW
-44 [1119]
(ROTATED)
SAMPLE
NUlES.
- (29 1/2 [749])- PORT
ALL DIMENSIUNS ARE IN INCHES [MMI
-ACID PORT (1/2") MATERIALS CARBON STERI
— 21 1/2 [548]- 14 1/4 [363]— FINISH : POWDER COATED
• BRINC INLE 1"]
15 1/4 [388]-
• DRAIN (1") *- (13 [330])-

SAMPLE PORT- CLORTEC
-28 [711]- (8 [203]) — -16 1/2 [419]- INLET GROUNDING TARGET- (5 [127])- DE NORA ASSY, RACK, CLORTEC 100-C (100 LBS/DAY) GEN III - 19 1/2 [495]- OSHG, CS POWDER COATED, W/SPLIT FLOW, BRINE PUMP,PLASTIC JBOX,120VAC,60HZ, NSF61
1110 INDUSIKIAL BOULEVARD SUGAR LAND, TEXAS 77478
ICLEPHONE NO. (251) 290-0770 E-MAI: [email protected] FAX No: SAP # 47002922

NOTLCE OF CONFIDENTIALTY

FRONT VIEW BACK VIEW ALL DIMEN - NE AREN ENCHES

SIDE VIEW
FRACTIONS ‡ 1/2" #12.7mm SCALE: PRUJEC NU.

NTS D-31-
UWG NU. SHECT:

TECH LONG EE FUN
C.0100RA1G3-CPBP-120T-GA-0 of

REV DATE DESCRIPTION
0 06/01/2021 INITIAL RELEASE RAM JPM JPM
CLORTEC 75-C/100-C (75/100 LBS/DAY) RACK MOUNTED

ON-SITE SODIUM HYPOCHLORITE GENERATION SYSTEM

PIPING & INSTRUMENTATION DIAGRAM

NOTES (UNLESS OTHERWISE SPECIFIED)

CLORTEC
DE NORA CLORTEC 75-C/100-C (75/100 LBS/DAY

RACK MOUNTED ON-SITE SODIUM

HYPOCHLORITE GENERATION SYSTEM

PIPING & INSTRUMENTATION DIAGRAM
1110 INDUSTRIAL BOULEVARD SUGAR LAND. TEXAS 77478
ELEPHONE No: 281) 240-672 I STE mwdenora.com [email protected] CLORTEC GEN III AX NO

NOTICE OF CONFIDENTIALITY
ONWT PROJECT NO: SIZE: RE

STANDAR
DNWT DWG No: SHEET: -32-
XXX
ANGLES CT0075-0100RA1G3-CPBP-120-1-01-B 1 of

FUNCTIONAL IDENTICATION DESCRIPTION

ABBREVIATIONS FIRST-LETTER SUCCEEDING-LETTERS NO TYPE

INSTRUMENT & FUNCTION SYMBOLS VALVE SYMBOLS INSTRUMENTATION SYMBOLS

EQUIPMEN SYMBOLS COMMON INSTRUMENT I DEVICE INENTIFIERC

MODIFIER MODIFIER CHAGAL ASSOATED

ISA IDENTIFIER INITIATING VARIABLE AND FUNCTION

ACTIVATED CARBON A ANALYSIC ALARM

X BALL VALVE (NORMALLY OPEN) CENTRIFUGAL PUMP
ACTUAIED DIAPHRAGM VALVE BURNER. COMBUSTION CLOSE-STOP DECREASE

INFLINE PRESSURE INDICATOR ANALTOIS CLEMENT

ANALYTICAL ELEMENT
C CONDUCTIVITY, PH (ACIDITY) CONTROL, CLOSE| CONTROL OR CONTROLLER CLOSE/CLOSED DIAO

ANALYTICAL INDICATOR BALL VALVE (NORMALLY CLOSED CONDUCTIVITY SWITCH

DENSITY DIFFERENTIA, OPEN-START-INCREASE

ANALYTICAL INDICATOR TRANSMITTER

FIELD MOUNTED INSTRUMENT VERTICAL PUMP

ALARM LIGHT VENTED BALL VALVE E VOLTAGE SEEMENT RIMARY

BUTTERFLY VALVE VOLTAGE TRANSMITTER F FLOW RATE FAIL

RATIO (FRACTION)

BALL VALVE W/ LOCKING HANDLE PLOW CONTKOLLEH

BLOWER G GAUGE, GAS
BRINE

FLOW INDICATOR H HAND

N BUTTERFLY VALVE

BELLOWS PUMP
= 8-0-

BACK PRESSURE VALVE
BALL VALVE DIAPHRAGM VALVE • CURRENT (ELECTRICAL) INDICATE

CALIBRATION COLUMN POWER SCAN

NEEDLE VALVE
A lIME, HIME SCHeDULE CONTROL STATION DOIAO

CONTROL PANEL N

BALL CHECK VALVE CURRENT TRANSMITTER

CORP STOP L LEVEL LIGHT
-LOW-(ALARM

CHECK VALVE CHECK VALVE (SWING)

SHAD SPAY M MOTOR MOMENTARY ON OR OPERATE

CIT WATER SUPPLY IME INDICATOR

CHECK VALVE (SPRING) SALI LEVEL PROBE N MOISTURE, TORQUE DPS DIFFERENTIAL PRESSURE SWITCH 88
UPSI DIFFERENTIAL PRESSURE SWITCH LOW DIAPHRAGM CHECK VALVE ° UNCLASSIFIED

ACCESSIBLE AUXILIARY LOCATION BEAUPENED

DISCONNECT SWITCH LEVEL TRANSMITTER P PRESSURE, VACUUM PNEUMATIC

MN BACKFLOW PREVENTER

DIAPHRAGM VALVE INTEGRATE, TOTALIZE INTEGRATE OR TOTALIZE DIA)

RE CONTROLLER

ELECTROLYTIC CELL NOT READILY ACCESSIBLE GATE VALVE KI RUN, RADIATION RECORD & STORE REPORT

S SPEED, FREQUENCY, SOLENOID SAFETY SWITCH OR SAFETY

EDUCTOR PRESSURE IRANSMITTER

PRESSURE INDICATING TRANSMITTER TRANSMIT

FLOW ALARM EL PRESSURE REGULATING VALVE

VMULIIVARIABLE MULTIFUNCTION MULTIFUNCTION MULTITOND

FLOW ALARM LOW
L PRESSURE RELIEF VALVE (2-WAY) LOUVE RAMPER

FILTER CARTRIDGE
WI WEIGHT. FORC WELL

FLOW INDICATOR/TOTALIZER SPEED TRANSMITTER

X ON/OFF, FAILURE OR TROUBLE X AXIS UNCLASSIFIED UNCLASSIFIED UNCLASSIFIED DIDO FLOW INDICATOR TRANSMITTER PRESSURE RELIEF VALVE (3-WAY) ICMPERAIURE CONIROLLER RES, %REJ, PH, ETC. PRESENTATE OR IT HAS MPUTE, CONVER
2 25 LOW SWITCH LOW TEMPERATURE INDICATOR

BACK PRESSURE VALVE TEMPERATURE SWITCH

Z POSITION, DIMENSION Z AXIS

HYDROGEN ALARMIFVEI TRICAL CLEMENT

SAMPLE POINT VALVE CARTRIDGE FILTER HOUSING

MULTIVARIABLE RECORDER

VIBRATION TRANSMITTER

HAND OFF AUTO

WEIGHT ELEMENT

HYPOCHLORITE SOLUTION WEIGHT TRANSMITTER GENERAL NOTES

ION DESCRIPTOR UNCLASSIFIED

1. THIS DRAWING IS FOR EQUIPMENT PROCESS FLOW INFORMATION PURPOSES ONLY. ALL EQUIPMENT,

STATE CONTROL

LYTICAL ELEME

STATE ON

DICATOR TRANSMITTEI EVENT RELAY
eVENT SWITCH

LEVEL INDICATOR TRANSMITTER POSITION SWITCH
0593
POSITION TRANSMITTER 2. ALL PIPING FITTINGS & VALVES ARE PVC SCH, 80. ALL TUBING ARE POLYETHYLENE.

LEVEL SWITCH LOV PULSATION DAMPENER

METERING PIMP

3. ELECTRICAL POWER, WATER SUPPLY, POINT OF INJECTION AND SCADA ARE PROVIDED BY OTHERS.

MOTORIZED VALVE

IORMALLY OPEN
BLOWER

4. ALL UNDER GROUND WORK, CONCRETE WORK, WALL AND ROOF PENETRATIONS ARE DONE BY OTHERS.

JORMALLY CLOSE

NON-POTABLE WATER

5. ALL ELECTRICAL CONDUITS, WIRING ,JUNCTION AND PULL BOXES WILL BE PROVIDED BY OTHERS.

OSH ONSITE HYPOCHLORITE GENERATION
CORP STOP 6. ALL PAINTING AND COATING TO BE PROVIDED BY OTHERS.

PULSATION DAMPENER
PRESSURE REGULATING VALVE 7. ALL BACKBOARDS AND SUPPORTS TO BE PROVIDED BY OTHERS.

PRESSURE RELIFE VAIVE →

POWER SUPPLY BOX BLOWER FLEX CONNECTION

8. CUSTOMER TO PROVIDE WATER SUPPLY PRESSURE & TEMPERATURE.

PRESSURE SWITCH LOW

L BLOWER TRANSITION LINE OYMBULS
PRESSURE IRANSMITIER 9. CUSTOMER TO PROVIDE DETAILED DOSING ROUTINE. (WHEN APPLICABLE)

PRESSURE VESSEL
+I UNION 10. CUSTOMER TO PROVIDE HYPOCHLORITE FEEDING SYSTEM PRESSURE (WHEN APPLICABLE).

POLTVINTL CHLORIDE BLOWER BACKDRAFT DAMPENER PROCESS FLOW. MAIN FLOW

INSTRUMENT WITH LONG TAG NUMBER

QUALITY CONTROL
ELECTRICAL SIGNAL 11. ALL ELECTRICAL DISCONNECT SWITCHES ARE PROVIDED BY OTHERS

SOLENOID VALVE
POWER SUPPLY ELECTRICAL CONNECTION 3D 12. POWER TO ELECTRICAL COMPONENTS CAN ALSO BE PROVIDED IN 50Hz.

SAMPLE POINT

INSTRUMENTS SHARING COMMON HOUSINC
POWER SUPPLY ELECTRICAL CONNECTION 1Ø
SOFTENED WATER 13 REFER MAJOR EQUIPMENT SPECIFICATIONS TABLE

EMPERA /URE ALARM HIGH INSTRUMENT SIGNAL ANALOG / DIGITAL

TEMPERATURE INDICATOR TRANSMITTER BING

PILOT LIGHT PNEUMATIC SIGNAL

TEMPERATURE ALARM LOW
TANK + + + HYDRAULIC SIGNAL
TSH TEMPERATURE SWITCH HIGH *** CAPILLARY TUBE
PANEL MOUNTED PATCHBOARD POINT 12 CLORTEC

TEMPERATURE SWITCH LOW ELECTRO MAGNETIC OR SONIC SIGNAL (GUIDED) VFD VARIABLE FREQUENCY DRIVE ELECTRO OR SONIC SIGNAL (NOT GUIDED) CLORTEC 75-C/100-C (75/100 LBS/DAY)

DE NORA RACK MOUNTED ON-SITE SODIUM
WATER CHILLER • PURGE FOR FLUSHING DEVICE

DATA COMMUNICATION HYPOCHLORITE GENERATION

WATER HEATER

WATER SOFTENER PIPING & INSTRUMENTATION DIAGRAM

MECHANICAL LINK
• REST FOR LATCH - TYPE ACTUATOR 1110 INDUSTRIAL BOULEVARD SUGAR LAND. TEXAS 77478

FILED MOUNTED INSTRUMENT
ГЕРНО 2 20-0700 [email protected] CLORTEC GEN III
SOLENOID OPEN/ CLOSE NEB SITE: www.denoro.com

IKANSPURMER LOOP CUSTOMER POINT OF USE
• UNDEFINED INTERLOCK LOGIC YORAN NOTICE OF CONFIDENTIALITY

PAULI ALARM
FRACTIONS SCALE: DNT PROJECT No: SIZE: REV:

Y-STRAINER

ZSO LIMIT SWITCH OPEN LEST ANONO ARE APPROX MATEL (TAG) NTS STANDARD • 02
zSC DNWI DWG No
*.005" +0.127mr -33-
ANGLES 000032-1- 2 of ul
NOTE 4
(CUS OMER PROVIDED,
120/240VAC, 10, 60 HZ, 3 FLA OPEN/CLOSE CP-100

HYPOCHLORITE CONTROL PANEL CONTINUED
* OTHER VOLTAGES ARE ALSO AVAILABLE 1230 *** SHEET 4

TOUCH SCO DISPLAY
-0-0-0-0-0

TO CUSTOVER SCANA

BRINE TANK SIZING/SELECTION TABLE
Densty DAYS OF STORAGE TANK
D POWER CORD 75L SEE"
120VAC. 10, 5A IOTE:

BRINE TANK CAPACTY

GALLON GALLON GALLON GALLON GALLON GALLON
GALLUR
(30 GALLONS)
→ TO ACID PORT: 1346
1795
1/2°- 225 2020
300
1346 2244 2693 10.2
DRAIN

GO CHANG CANT
(OPTIONAL)
***
***

LEVEL SWICH ASSY
--__- NOMINAL PERSO METRIC
(MILLMETERS)
*** 1/4°
ONLY EQUIPMENT MARKED WITH CONSUMABLE 3/8
(BY OTHERS)
! STARS AND WITHIN DASHED BOXES 1/2° 15
ARE PROVIDED BY DNWT. 3/4%
1/2" PVC-
11/2
BV-201
2 1/2°
LE
1-1/22
BV-202 100
1 DRAIN
1/2° DRAIN
1-1/2" 1-1/2° 3/4 PVC-SWA 1 374
CUSTOMER PRO 200
BV-200 78V-20 BV-205 10" 250
FIL -2 *** 300

BY OTHERS
***
1/2" PVC-BR
- L BV-206CV-200

CLORTEC
RECOMMEND 60 PSI (4 BAR) WS-200
WATER SOFTENER NOTES: CLORTEC 75-C/100-C (75/100 LBS/DAY) COMMEND TO SHEET 4 DE NORA RACK MOUNTED ON-SITE SODIUM
*** POMMENDED SYSTEM OPERAT NEGENC EFFICIENCY, SUPPLIED WATER TEMPERATURE IS TER FLOW (TO RUN HYPO DILUTION PANEL): 20 GPM (76 LPN 3/4° PVC-SW. B CT RACK HYPOCHLORITE GENERATION SYSTEM

WATER INLET PRESSURE REQUIREMENT MIGHT HAVE TO BE ADJUSTED DEPENDING ON THE PIPING & INSTRUMENTATION DIAGRAM BECOMINOW HORMAL OPERATION S ORM (19 LPM) 111O INDUSTRIAL BOULEVARD SUGAR LAND, TEXAS 77478 TO SHEET 5 LOCATION/ELEVATION OF THE GENERATOR RATOR ASSEN RELATIVE TO THE CLORTEC GEN III PH LEVEL: 6.5 - 7.5 TELEPHONE ° 281) 240-6772 SITE: www.denoi - C DILUTION PANEL ***• SALT DENSITY WILL VARY DEPENDING ON THE TYPE OF SALT USED - ROCK, SOLAR OR VACUUM EVAPORATED (COARSE OR FINE) NOTICE. OF CONFIDENTIALITY AM] - REFERENCE ONWT PROJECT NO: SIZE:

KEV:

FRACIONS = 1/16* #1.5mm

STANDARD
t2.0mm
tu.olmm
t.0vs tu.1z/mm CTOO-OORAI-CPBP-120-1-01-8301-34

BELLONS

HYDROGEN
CONTINUED CP-100 GLOSE
H-25% LE CUN INUEL
SHEN 3 HYPOCHLORITE

CUN IROL PANE YA SHEE S
2" PVC-HS VENT STACK
SLOPED UP 20VAC, 10, 60 HZ 120VAC, 10, 60 HZ
HORE
***| MAJOR EQUIPMENT SPECIFICATION TABLE

RECTIFIER RECHFIER
NUMBERS OF DABA EON WTE O WH4 2 AMPA O DISSIPATION
75 LBS/DAY .00 UrN 0.36 CPN 936 см 2BVDC, 300A
CLORTEC 75-C 10.23 LPM (1.36 LPM) 3,020 BIUH
***
CLORTEC 100-C 100 LBS/DAY (0027 (PM) 82 LP (.63 (PM) 37VDC, 300A 4.338 BTUH 0-10 -04-105

DC CABLES

SAMPLE/ORAN SUPPLIED BY

ELECTROLYNC CELL NOMINA PERS SIE TO ME TRIC
13 HEATER AND CHILLER SELECTION TABLE
(MILIMETERS)
CLORTEC 75-C CLORTEC-100C

ECTFIER
XVDC, XXXA 13 1/4"

HEATER CHILLER HEATER CHILLER
AT 3/8"

AR CLOM COE MIANIEA KW TON TON
RACK BOUNDRY 1/2"

HEAT DISSIPATION
XXXX BTUH 5° F 0.5 0.2 0.7 0.2 3/4
*** PONE ANG RE
10° F 1.1 1 1/2°
JB-100
JUNCIION BOX 15 F

0.7 CV-100 TERMINATION (BY OTHERS) 2 1/2"
3/4 =0 4BOVAC, 30, 60Hz, XX FLA) 13 20° F 2.8 1.0
1/2°

CUSTOMER PROMDEOT
25° F 0.9 3.5 125
(Fo) 13 30° F 3.2 5 " a c
1' DRAIN, + 250
FROM SHEET 3
BV-100 3/8"

A BRINE TANK
3/8*
13 ECR-100

BACK ASSEMBLY
D ACID SUPPLY LINE *** 3/4-PVC ***
*** ONLY EQUIPMENT MARKED WITH
*** STARS AND WITHIN DASHED BOXES
WATER SU 3/4" PVC-SW ARE PROVIDED BY DNWT.

BV-502 BV-505
NOTE FOR CHILLER SIZING & SELECTION CONSIDERATION:
· X3/4 CHILLER CALCI. CLORTEC
83/4
GAR × 8.33 x AT CLORTEC 75-C/100-C (75/100 LBS/DAY)
IONS = - x 1.2 DE NORA RACK MOUNTED ON-SITE SODIUM
12000 HYPOCHLORITE GENERATION
A) CHILLER CAPACITY IS NOMINALLY RATED AT 10 °C SYSTEM
WA C CHILER VATER HEATE! (50F) LEAVING GLYCOL TEMPERATURE AND 35°C PIPING & INSTRUMENTATION DIAGRAM 120 VAC, 10, 60HZ) IZU VAU. 10. bUHZ HEATER CALC: 1110 INDUSTRIAL BOULEVARD 14 14 SUGAR LAND, TEXAS 77478
(CUSTOMER PROVIDED) (CUSTOMER PROVIDED) KW= MAL x AT x 0.1465 [email protected] CLORTEC GEN III FEERIOE N (281) 240-5770 M SITE: info.denda.com
CHILER & HEARR CAPACIY. DOL TACE - (OPTIONAL) (OPTONAL)* CHECE HEA TEA CAR RETY.

25.6°F), THE CHILLER CAPACITY SHALL REDUCED LN GMEN ORS ASN G NOTICE OF CONFIDENTIALITY = × 8 36
MM] - REFERENCE SCALE: DNWT PROJECT NO: SIZE: TREV:

RACHONS = 1/16° #1.5mm
DEPEND ON SUPPLIED WATER TEMPERATURE B) THEN OPERA ED AT O SHALL BE REDUCED BY 17% NTS STANDARD t2.0mm
DNWT DWG No:
0012/mm
CT0075-0100RA1G3-CPBP-120-I-01-B 4 or-35-

HYPO LEVEL

HYPOCHLORITE CONTROL PANEL
SHEET 4 ***

VENT STACK

HYPO TANK SIZING/SELECTION TABLE

DAYS OF STORAGE TANK
4" VENT STACK

HYPO TANK CAPACITY
2 PVC-HS

PPD GALLON GALLON
SLOPED UPU°-

1.125
750
- NOTE 2 150 1,123 2,250
200 1,500 3,000
225 1,688 2,0/0 12.8
300 2,250 17.0
***
DP-400

ULK HYPOCHLORITI

ILUTION PANE
ED-400

NOMINAL PERSON TO ME TRIC
19 GPM (40 PSI) - 5917
(MILLETERS)
XXX GALLONS 14
20 DISCHARG (HOR TANK CAPACITY SELECTION
Set TABLe 3/8°

0.2-20 POCH ORI
1/2° 15
- V-A05 ***
FROM SHEET 3 3/4° 20

I WATER SOFTENER
11/2°
PRV- / V-401 CV-400 1BV-40 BV-406
******7
2 1/2"
SEEN ATE SEAT NONS 3'
10-12% BULK / COMMERCIAL 100
HYPOCHLORITE 5' 125
[FROM DELIVERY TRUCK

OR TOTE
200
10" 250
= 12° 300
Did PUMP
8 + BV-507

REDURED

REQUIREI

CLORTEC
DRAIN CLORTEC 75-C/100-C (75/100 LBS/DAY)
NOTES:

DE NORA RACK MOUNTED ON-SITE SODIUM
' THE TOP ONK HYPOCHLORITE GENERATION SYSTEM

PIPING & INSTRUMENTATION DIAGRAM
1710 INDUSTRIAL BOULEVARD SUGAR LAND, TEXAS 77478
*** ГЕНОМЕ ° (21) 240-572 'o.dnwt@denoro./ • CLORTEC GEN III Slit: www.denora

ONLY EQUIPMENT MARKED WITH NOTICE OF CONFIDENTIALITY

FACTORY
SCALE: ONWT PROJECT No: SIZE: REV

STANDARD
01" ·0.51mm
XXX * .005" +0.127mm СТО075-000RA1G3-СРВР-120-1-01-В 5 оf-36-

HYPO PUMP
ages ИP-700 NP-700 MP-700

MANU SH

CUSTOME PAM
XXX VAC, 1Ø, 60HZ
(CUSTOMER PROVIDED) (CUSTOMER PROVIDED)
***

DISCONNECT
SWICH
(BY DIHERS,
BV-713 NOMINAL PERSE TO METRIC
MIR- 710
CV-710 INCHES (MILLIMETERS)
BV-711 BV-712
*** 1/4
BV-710 3/8°
1/2°
3/4"
DISCONCT 11/2°
(BY OTHERS)
*** 21/2°
•CALIBRATION
Y-70! 125
*** MTR- 700
200
BV-701 ore onto do antara 250
*V- *** ***:

MP-700 *** 300
I EV-700 CORPORATION
4Si-700
NUItS:

MEIFRING PUMPS
PUMP SIZING : MGDXB.34XPPM(CHLORINE DOSE)x4993.3 = GPH CLORTEC 3000 PPM CLORTEC 75-C/100-C (75/100 LBS/DAY)
15 DE NORA RACK MOUNTED ON-SITE SODIUM

3. AOR PUMP CAPACTS RECOMMENDED ALLOWANCE FACTOR SYSTEM W/SMALL BRINE TANK

PUMP CAPACITY TABLE PIPING & INSTRUMENTATION DIAGRAM
1710 INDUSTRIAL BOULEVARD SUGAR LAND, TEXAS 77478
*** TELEPHONE 281) 20-572 [email protected] CLORTEC GEN III

ONLY EQUIPMENT MARKED WITH NOTICE OF CONFIDENTIALITY
! STARS AND WITHIN DASHED BOXES ! CLORTEC 75-C 47 1483
I SCALE:
+2.5mm NTS STANDARD
ARE PROVIDED BY DNWT. CLORTEC 100-C 63 1987
ONWT DWG No:
* .005* +0.127mm|

← All documents from this meeting