PATRIOT
QUOTATION** Q: 0198
03 March 2025 Rev: B
Quotation Valid Until >> 2 April 2025
Bill To: Ship To:
City of Ripon Same Patriot Flagpole
Attn: James Pease PO Box 1154 .
240 Doak Blvd Ripon, CA 95366 .
Ripon, CA 95366 CSLB 1119697
Services and Expenses For:
QUANTITY DETAILS UNIT PRICE LINE TOTAL
Parts and Install Materials:
1 50’ Flagpole Assy INT SS Cable Winch - HTI50 Satin 10" Butt Dia 10,325.00 10,325.00 1 Warehouse Handling and Shipping 280.00 280.00
Optional Rebar reinforcing cage (80" x 6 #4 verts + #3 ties @ 12"OC) 384.00 Forming Matl's for Foundation - 36" Sonotube Client
EST 2.5 cu yd Concrete for foundation Client
1 Sand, grout, sealant, specialty install materials 94.00 94.00 1 15'x25' U.S. Nylon Flag (USA Made - FMAA Certified) 705.00 705.00 2 Flagpole Lighting Kit (2x 5000lm Narrow Beam Spot 110-277v) 243.00 486.00 ** All pricing includes applicable tax
Labor, Soil Removal, Tools and Equipment:
1 Proj Summary: Ground Mount Flagpole in 36" dia x 30" high Pier 1,290.00 1,290.00 Foundation Engineering * Client
Foundation Excavation (Vac Truck) Client
Soil removal and site cleanup Client
Prepare and pour Foundation Client
Erect Flagpole & equip with truck and halyard (Boom Lift rate) Client Equipment Mobilization and Fuel included
* Assumes site free and clear of underground obstructions $1,000.00
$13,180.00
$13,180.00
SIGN AND DATE FOR PROJECT ACCEPTANCE: OTHER NOTES
X
** Quotation is valid for 30 days from Quote Date
*** Deposit Payment should be made by Cash or Check payable to: PATRIOT FLAGPOLE $13,180.00
*** Deposit Due at Order:
Net Total
Other
Project Total:
Patriot Flagpole PO Box 1154, Ripon, CA 95366 m: (209) 988-8464 e: [email protected]