INVOICE
J D E Engineering, Inc
1490 Boulder Creek Ct
Manteca, CA 95336-9109
[email protected]
+1 (209) 328-1124
www.jde-eng.com
City of Ripon:25-001 City of Ripon Inspection Services
Bill to
Attn: Carla Rodriguez
City of Ripon
259 N Wilma Avenue
Ripon, CA 95366
Invoice details
Invoice no.: 1062
Terms: Net 30
Invoice date: 02/10/2026
Due date: 03/12/2026
Product/service Description Quantity Rate ($/hour) Amount City of Ripon Inspection Services
For work performed thru 01/31/2026
Construction Inspection Provided Construction inspection services for the following: inspected manhole frames
installation, water valve boxes, paver
installation, tie-in adjustments, pot-hole of
SSJID line, and review construction
schedule with the contractor, and review
offsite plans. See attached inspection
breakdown.
13 $150.00 $1,950.00
Total $1,950.00
to k e n = c 8 2 7 2 6 5 8 fc 8 0 4 8 6 fb c 2 b 2 7 7 6 e 6 2 4 0 b 6 d e 8 c c 2 f1 8 6 c 5 0 4 5 2 2 8 c 9 e d fd 4 3 9 4 2 0 c 7 b 3 8 e 7 8 f4 a 6 7 7 3 4 4 a 0 9 9 f9 5 6 c 5 a 2 a fc 5 e 6 City of Ripon Inspection Services
Meadowood Subdivision
January 2026
DATE HOURS CONTRACTOR DESCRIPTION OF WORK INSPECTED
1/9/2026
3 TEICHERT Meet with contractor and city staff regarding project status. Review and inspect installation of manhole frames and water valve boxes in pavers.
ESD Install pavers on Mangelos Circle west from Mangelos Court north toward paver starting point at Dexter Drive. Reviewed tie-in adjustment and temporary tie-in at starting point.
1/12/2026
2 ESD Install pavers on Mangelos Circle west to paver starting point. Install paver soldier course on Mangelow Circle west and pave edge at Dexter Way driveway.
1/13/2026
2 TEICHERT Expose and excavate water valves and manholes on Mangelos Circle west and Mangelos Court
ESD Install paver soldier course at cuts at Mangelos Circle west at tie-in and edge.
Install AB and steel plates for temporary access at Dexter Way driveway. 1/29/2026 2 LENNAR Off-site plan review
1/30/2026
3 TEICHERT Pot-hole SSJID line and power line in Fulton Avenue. Place fill from roadway cut in landscape area west of Fulton Avenue that was used as borrow area for pad grading. Engeo on site for compaction testing. Grade and compact native material at Dexter Way driveway at Mangelow Circle east. 1 LENNAR Off-site plan reivew with contractor at the site.
TOTAL 13