INVOICE
J D E Engineering, Inc
1490 Boulder Creek Ct
Manteca, CA 95336-9109
[email protected]
+1 (209) 328-1124
www.jde-eng.com
City of Ripon:25-001 City of Ripon Inspection Services
Bill to
Attn: Carla Rodriguez
City of Ripon
259 N Wilma Avenue
Ripon, CA 95366
Invoice details
Invoice no.: 1082
Terms: Net 30
Invoice date: 03/13/2026
Due date: 04/12/2026
Product/service Description Quantity Rate ($/hour) Current amount due
Task 1: Construction Inspection Services
For work performed thru February 28th, 2026
Construction Inspection Provided construction inspection services for the following: onsite electroliers and
electrolier conduit system and driveway at
Dexter Way. Offsite traffic control, storm
drain, and concrete and site SWPPP BMP
review. See attached inspection
breakdown.

12.5 $150.00 $1,875.00
Total $1,875.00
to k e n = a 0 e 1 8 d b c 0 2 2 f4 d 9 a 8 4 7 a a 7 8 0 0 3 d 1 c d d b c c 0 e 7 2 6 6 3 6 c b 4 d 4 5 8 5 6 d 5 7 7 3 d 0 e e 0 e e 8 f1 5 8 f3 0 e 6 f4 e 4 ff 6 8 c e b b fb 1 4 8 f7 6 f8 9 City of Ripon Inspection Services
Meadowood Subdivision
February 2026

DATE HOURS CONTRACTOR DESCRIPTION OF WORK INSPECTED
2/2/2026 3.5 MORENO Install pull ropes for electroliers and stand electroliers in subdivision TEICHERT Pothole utilities on Fulton Avenue, set traffic control signs (Farwest Traffic), and grade driveway on Dexter Way at Mangelos Circle west. 2/3/2026
4 TEICHERT Install storm drain pipe curb inlet runs on Fulton Avenue, pour inlet bases and set inlet riser pipe. Grade driveway and install AB at driveway on Dexter Way at Mangelos Circle west. Set traffic control signs for road closure (Phase 1).

ARNAUDO Begin irrigation box modification on Fulton Avenue MORENO Set electroliers in park areas, adjust roadway electroliers in subdivision, install pull ropes for electroliers, and adjust electolier on Goodwin Drive 2/6/2026
4 TEICHERT Pour 12" concrete bands on Fulton Ave. roundabout at Colony, form driveway at Dexter Way and Mangelos Circle west, set DW and NPW in subdivision.

ARNAUDO Tie rebar and pour new pressure manhole top on SSJID box in Fulton Avenue. 2/13/2026 1 LENNAR Site review for SWPPP BMP's and progress of off-site work.

TOTAL 12.5