Sycamore Hills Distribution Center Project
Final Environmental Impact Report (FEIR)
Appendix O – Floor Plans for Buildings A and B
Overall Floor Plan
A2.1
Owner:Project:Consultants:
Project Number:Revision:Date:Drawn by:Title:
Sheet:
C I V I LSTRUCTURALMECHANICALPLUMBINGELECTRICALLANDSCAPESOILS ENGINEERFIRE PROTECTION 13332M.L.08/15/19
Riverside, CA.
fax: 949 863 0851tel: 949 863 1770email: [email protected], ca18831 bardeen avenue, - ste. #100hpa, inc.
MATERIAL HANDLING
tel: (949) 632-9892Suite 116
SDH
3176 Pullman St.
Sycamore HillsDistribution Center
---VALS ELECTRICHUNTER---
Costa Mesa, CA. 92626Darrell Butler
FLOOR PLAN KEYNOTES
FLOOR PLAN GENERAL NOTES
FLOOR SLAB & POUR STRIPS REQ.
Overall Floor Plan
A2.2
Owner:Project:Consultants:
Project Number:Revision:Date:Drawn by:Title:
Sheet:
C I V I LSTRUCTURALMECHANICALPLUMBINGELECTRICALLANDSCAPESOILS ENGINEERFIRE PROTECTION 13332M.L.08/15/19
Riverside, CA.
fax: 949 863 0851tel: 949 863 1770email: [email protected], ca18831 bardeen avenue, - ste. #100hpa, inc.
MATERIAL HANDLING
tel: (949) 632-9892Suite 116
SDH
3176 Pullman St.
Sycamore HillsDistribution Center
---VALS ELECTRICHUNTER---
Costa Mesa, CA. 92626Darrell Butler
FLOOR PLAN KEYNOTES
FLOOR PLAN GENERAL NOTES
FLOOR SLAB & POUR STRIPS REQ.