Draft Environmental Impact Report
SCH#2020079023
prepared for
City of Riverside
Community Economic Development Department, Planning Division 3900 Main Street, 3rd Floor
Riverside, California 92522
Contact: Veronica Hernandez, Senior Planner
prepared by
Ruth Villalobos & Associates, Inc.
3602 Inland Empire Blvd., Suite C310
Ontario, CA 91764
May 2021
SYCAMORE HILLS DISTRIBUTION CENTER
Draft Environmental Impact Report
SCH#2020079023
prepared for
City of Riverside
Community Economic Development Department, Planning Division 3900 Main Street, 3rd Floor
Riverside, California 92522
Contact: Veronica Hernandez, Senior Planner
prepared by
Ruth Villalobos & Associates, Inc.
3602 Inland Empire Blvd., Suite C310
Ontario, CA 91764
May 2021
SYCAMORE HILLS DISTRIBUTION CENTER
City of Riverside Table of Contents
Sycamore Hills Distribution Center Project
i
TABLE OF CONTENTS AND ACRONYMS
The Table of Contents for the Draft EIR including the list of tables, figures, and appendices is presented below. The acronyms, units of measurement, and chemical symbols used throughout the Draft EIR are identified immediately following the Table of Contents.
Table of Contents
1.0 Executive Summary ..........................................................................................1.0-1
1.1. Project Applicant ..........................................................................................1.0-1
1.2. Lead Agency ................................................................................................1.0-1
1.3. Project Description .......................................................................................1.0-1
1.4. Alternatives ..................................................................................................1.0-5
1.5. Areas of Known Controversy........................................................................1.0-6
1.6. Issues Not Studied in Detail in the DIER ......................................................1.0-7
1.7. Summary of Impacts and Mitigation Measures.............................................1.0-8
2.0 Introduction .......................................................................................................2.0-1
2.1. Purpose and Scope......................................................................................2.0-1
2.2. Authorization ................................................................................................2.0-1
2.3. Lead and Responsible Agencies ..................................................................2.0-1
2.4. Project Applicant ..........................................................................................2.0-2
2.5. Compliance with CEQA................................................................................2.0-2
2.6. Documents Incorporated by Reference ......................................................2.0-14
3.0 Project Description ...........................................................................................3.0-1
3.1. Project Location ...........................................................................................3.0-1
3.1.1 Project Site – Existing Conditions .........................................................3.0-5
3.1.2 Project Site Background .....................................................................3.0-11
3.1.3 Land Use and Zoning .........................................................................3.0-13
3.1.4 Surrounding Land Use and Zoning .....................................................3.0-14
3.2 Project Characteristics ............................................................................…3.0-19
3.2.1 Project Entitlements............................................................................3.0-19
3.2.2 Design and Appearance .....................................................................3.0-27
3.2.3 Infrastructure and Utilities...................................................................3. 0-36
3.2.4 Sustainability Features .......................................................................3.0-38
3.2.5 Operations and Employment ..............................................................3.0-40
3.2.6 Construction and Operation ................................................................3.0-41
3.3 Project Objectives.......................................................................................3.0-41
3.4 Discretionary Actions and Approvals ........................................................3.0-42
4.0 Environmental Setting ......................................................................................4.0-1
4.1 Regional Se tting..........................................................................................4.0-1
4.2 Project Site Setting .....................................................................................4.0-1 Table of Contents City of Riverside
Sycamore Hills Distribution Center Project
ii
4.3 Developments Considered in Cumulative Impact Analysis..........................4.0-2
5.0 Potentially Significant Environmental Effects.................................................5.0-1
5.0.1 Technical Studies .............................................................................5.0-1
5.0.2 Project Site Setting .....................................................................................5.0-2
5.1 Aesthetics ..............................................................................................................5.1-1
5.1.1 Setting ...........................................................................................................5.1-1
5.1.2 Related Regulations ...................................................................................5.1-3
5.1.2.1 Federal Regulations............................................................................5.1-3
5.1.2.2 State Regulations ................................................................................5.1-3
5.1.1.4 Regional Regulations..........................................................................5.1-3
5.1.1.5 Local Regulations................................................................................5.1-4
5.1.3 Project Design Considerations .................................................................5.1-7
5.1.4 Threshold of Significance ........................................................................5.1-15
5.1.5 Environmental Impacts ............................................................................5.1-15
5.1.6 Proposed Mitigation Measures ...............................................................5.1-25
5.1.7 Cumulative Environmental Effects .........................................................5.1-25
5.1.8 References .................................................................................................5.1-26
5.2 Air Quality..................................................................................................5.2-1
5.2.1 Setting ..............................................................................................5.2-1
5.2.2 Related Regulat ions .......................................................................5.2-10
5.2.2.1 Federal Regul ations ................................................................5.2-10
5.2.2.2 State Regulat ions....................................................................5.2-14
5.2.2.3 Regional Regul ations ..............................................................5.2-15
5.2.2.4 Local Regulat ions....................................................................5.2-17
5.2.3 Project Design Considerations........................................................5.2-21
5.2.4 Thresholds of Significance..............................................................5.2-24
5.2.5 Environmental Impacts ...................................................................5.2-24
5.2.6 Proposed Mitigati on Measures........................................................5. 2-36
5.2.7 Cumulative Environmental Effects .................................................. 5.2-37
5.2.8 References .....................................................................................5.2-37
5.3 Biological Resources................................................................................5.3-1
5.3.1 Setting..............................................................................................5.3-1
5.3.2 Related Regulations .................................................................................5.3-16
5.3.2.1 Federal Regul ation..................................................................5.3-16
5.3.2.2 State Regul ations....................................................................5.3-18
5.3.2.3 Regional Regul ations ..............................................................5.3-20
5.3.2.4 Local Regul ations....................................................................5.3-21
5.3.3 Project Design Considerations........................................................5.3-25
5.3.4 Thresholds of Significance..............................................................5.3-27
5.3.5 Environmental Impacts ...................................................................5.3-27
5.3.6 Proposed Mitigati on Measures .......................................................5.3-50 City of Riverside Table of Contents
Sycamore Hills Distribution Center Project
iii
5.3.7 Cumulative Environmental Effects.................................................. 5.3-56
5.3.8 References.....................................................................................5.3-57
5.4 Cultural Resources ...................................................................................5.4-1
5.4.1 Setting ..............................................................................................5.4-1
5.4.2 Related R egulations .......................................................................5.4-16
5.4.2.1 Federal Regulations .................................................................5.4-16
5.4.2.2 State Regulations.............. .......................................................5.4-17
5.4.2.3 Local Regulations.............. .......................................................5.4-20
5.4.3 Project Design Considerations .......................................................5.4-24
5.4.4 Thresholds of Significance..............................................................5.4-25
5.4.5 Environmental Impacts ...................................................................5.4-26
5.4.6 Proposed Mitigation Measures .......................................................5.4-32
5.4.7 Cumulative Environmental Effects.................................................. 5.4-37
5.4.8 References.....................................................................................5.4-38
5.5 Energy .......................................................................................................5.5-1
5.5.1 Setting ..............................................................................................5.5-1
5.5.2 Related Regulat ions .........................................................................5.5-7
5.5.2.1 Federal Regulations ...................................................................5.5-7
5.5.2.2 State Regulations.......................................................................5.5-8
5.5.2.3 Local Regulations.....................................................................5.5-13
5.5.3 Project Design Considerations ................................................……5.5-15
5.5.4 Thresholds of Significance..............................................................5.5-17
5.5.5 Environmental Impacts ...................................................................5.5-18
5.5.6 Proposed Mitigation Measures .......................................................5.5-33
5.5.7 Cumulative Environmental Effects.................................................. 5.5-33
5.5.8 References.....................................................................................5.5-33
5.6 Geology and Soils.....................................................................................5.6-1
5.6.1 Setting ..............................................................................................5.6-1
5.6.2 Related R egulations .......................................................................5.6-13
5.6.2.1 Federal Regulations .................................................................5.6-13
5.6.2.2 State Regulations.................................................................... .5.6-13
5.6.2.3 Local Regulations.....................................................................5.6-15
5.6.3 Project Design Considerations........................................................5.6-17
5.6.4 Thresholds of Significance..............................................................5.6-24
5.6.5 Environmental Impacts ...................................................................5.6-24
5.6.6 Proposed Mitigation Measures........................................................5.6-32
5.6.7 Cumulative Environmental Effects .................................................. 5.6-33
5.6.8 References .....................................................................................5.6-33
5.7 Greenhouse Gas Emis sions ....................................................................5.7-1
5.7.1 Setting..............................................................................................5.7-1
5.7.2 Related Regulat ions .........................................................................5.7-4
5.7.2.1 International Regulations............................................................5.7-5 Table of Contents City of Riverside
Sycamore Hills Distribution Center Project
iv
5.7.2.2 Federal Regulations ...................................................................5.7-6
5.7.2.3 State Regulations................................................................... ....5.7-8
5.7.2.4 Regional Regulations ...............................................................5.7-13
5.7.2.5 Local Regulations.....................................................................5.7-15
5.7.3 Project Design Considerations .......................................................5.7-18
5.7.4 Thresholds of Significance..............................................................5.7-20
5.7.5 Environmental Impacts ...................................................................5.7-21
5.7.6 Proposed Mitigati on Measures .......................................................5.7-40
5.7.7 Cumulative Environmental Effects.................................................. 5.7-41
5.7.8 References.....................................................................................5.7-41
5.8 Hazards & Hazardous Materials...............................................................5.8-1
5.8.1 Setting ..............................................................................................5.8-1
5.8.2 Related Regulat ions .......................................................................5.8-13
5.8.2.1 Federal Regul ations ................................................................5.8-13
5.8.2.2 State Regulat ions....................................................................5.8-14
5.8.2.3 Regional Regulat ions ..............................................................5.8-17
5.8.2.4 Local Regulat ions....................................................................5.8-17
5.8.3 Project Design Considerations........................................................5.8-19
5.8.4 Thresholds of Significance..............................................................5.8-21
5.8.5 Environmental Impacts ...................................................................5.8-21
5.8.6 Proposed Mitigatio n Measures........................................................5.8-29
5.8.7 Cumulative Environmental Effects .................................................. 5.8-29
5.8.8 References .....................................................................................5.8-31
5.9 Hydrology and Water Quality ..................................................................5.9-1
5.9.1 Setting ...............................................................................................5.9-1
5.9.2 Related R egulations...........................................................................5.9-9
5.9.2.1 Federal Regulations.....................................................................5.9-9
5.9.2.2 State Regulations.......................................................................5.9-10
5.9.2.3 Local Regulations.......................................................................5.9-13
5.9.3 Project Design Considerations.........................................................5.9-14
5.9.4 Thresholds of Significance ...............................................................5.9-23
5.9.5 Environmental Impacts.....................................................................5.9-23
5.9.6 Proposed Mitigatio n Measures.........................................................5.9-28
5.9.7 Cumulative Environmental Effects ...................................................5.9-28
5.9.8 References ......................................................................................5.9-29
5.10 Land Use and Planning .........................................................................5.10-1
5.10.1 Setting ............................................................................................5.10-1
5.10.2 Related Regulat ions .......................................................................5.10-3
5.10.2.1 Federal Regulations................................................................5. 10-3
5.10.2.2 State Regulations ...................................................................5. 10-3
5.10.2.3 Regional Regulations.............................................................. 5.10.3
5.10.2.4 Local Regulations ...................................................................5 .10-3 City of Riverside Table of Contents
Sycamore Hills Distribution Center Project
v
5.10.3 Project Design Considerations...................................................... 5.10-18
5.10.4 Thresholds of Significance ............................................................ 5.10-19
5.10.5 Environmental Impacts ................................................................. 5.10-19
5.10.6 Proposed Mitigati on Measures ..................................................... 5.10-32
5.10.7 Cumulative Environmental Effects................................................ 5.10-32
5.10.8 References...................................................................................5.10-32
5.11 Noise.......................................................................................................5.11-1
5.11.1 Setting ............................................................................................5.11-1
5.11.2 Related R egulations ..................................................................... 5.11-10
5.11.2.1 Federal Regulations............................................................... 5.11-10
5.11.2.2 State Regulations................................................................... 5.11-10
5.11.2.3 Regional Regulations............................................................. 5. 11-12
5.11.2.4 Local Regulations .................................................................. 5. 11-12
5.11.3 Project Design Considerations ..................................................... 5.11-18
5.11.4 Thresholds of Significance............................................................ 5.11-19
5.11.5 Environmental Impacts ................................................................. 5.11-19
5.11.6 Proposed Mitigati on Measures ..................................................... 5.11-39
5.11.7 Cumulative Environmental Effects................................................ 5.11-41
5.11.8 References...................................................................................5.11-41
5.12 Transportation........................................................................................5.12-1
5.12.1 Setting ............................................................................................5.12-1
5.12.2 Methodol ogy.................................................................................5.12-17
5.12.3 Existing Conditi ons..................................................................... .. 5.12-24
5.12.4 Related R egulations ..................................................................... 5.12-29
5.12.4.1 Federal Regulations ................................................................ 5.12-29
5.12.4.2 State Regulations ................................................................... 5.12-30
5.12.4.3 Regional Regulations.............................................................. 5.12-30
5.12.4.4 Local Regulations................................................................... 5.12-33
5.12.5 Project Design Considerations...................................................... 5.12-35
5.12.6 Thresholds of Significance............................................................ 5.12-37
5.12.7 Environmental Impacts ................................................................. 5.12-37
5.12.8 Proposed Mitigation Measures ..................................................... 5.12-57
5.12.9 Cumulative Environmental Effects................................................ 5.12-58
5.12.10 References .................................................................................. 5.12-67
5.13 Tribal Cultural Resources......................................................................5.13-1
5.13.1 Setting ............................................................................................5.13-1
5.13.2 Related R egulations ................................................................... ....5.13-6
5.13.2.1 Federal Regulations................................................................5.13-6
5.13.2.2 State Regulations ................................................................. 5.13-10
5.13.2.3 Local Regulations ................................................................. 5.13-13
5.13.3 Project Design Considerations ..................................................... 5.13-17
5.13.4 Methodol ogy................................................................................. 5.13-18 Table of Contents City of Riverside
Sycamore Hills Distribution Center Project
vi
5.13.5 Thresholds of Significance............................................................ 5.13-20
5.13.6 Environmental Impacts ................................................................. 5.13-21
5.13.7 Proposed Mitigati on Measures ..................................................... 5.13-24
5.13.8 Cumulative Environmental Effects................................................ 5.13-29
5.13.9 References...................................................................................5.13-31
5.14 Utilities and Service Systems ...............................................................5.14-1
5.14.1 Setting ............................................................................................5.14-1
5.14.2 Related Regulat ions ....................................................................... 5.14-9
5.14.2.1 Federal Regulations.................................................................5.14-9
5.14.2.2 State Regulations.....................................................................5.14-9
5.14.2.3 Regional Regulations................................ ............................. 5.14-11
5.14.2.4 Local Regulations .................................................................. 5. 14-11
5.14.3 Project Design Considerations...................................................... 5.14-14
5.14.4 Thresholds of Significance............................................................ 5.14-15
5.14.5 Environmental Impacts ................................................................. 5.14-15
5.14.6 Proposed Mitigation Measures...................................................... 5.14-24
5.14.7 Cumulative Environmental Effects ................................................ 5.14-24
5.14.8 References ...................................................................................5.14-26
5.15 Wildfire ....................................................................................................5.15-1
5.15.1 Setting ............................................................................................5.15-1
5.15.2 Related R egulations .......................................................................5.15-6
5.15.2.1 Federal Regulations.................................................................5.15-6
5.15.2.2 State Regulations.....................................................................5.15-6
5.15.2.3 Local Regulations ....................................................................5.15-8
5.15.3 Project Design Considerations...................................................... 5.15-10
5.15.4 Thresholds of Significance............................................................ 5.15-11
5.15.5 Environmental Impacts ................................................................. 5.15-11
5.15.6 Proposed Mitigation Measures...................................................... 5.15-16
5.15.7 Cumulative Environmental Effects ................................................ 5.15-16
5.15.8 References ...................................................................................5.15-17
6.0 Other CEQA Topics...........................................................................................6.0-1
6.1 Significant Unavoidable Adverse Impacts......................................................6.0-1
6.2 Consistency with Regional Plans...................................................................6.0-1
6.3 Significant Irreversible Environmental Changes.............................................6.0-4
6.3.1 Use of Non-Renewabl e Resources………………………………………6.0-4
6.3.2 Commitment of Future Generations……………………………………...6.0-5
6.4 Growth Inducing Impacts...............................................................................6.0-5
6.4.1 Population Growth .............................................................................6.0-5
6.4.2 Economic Grow th...............................................................................6.0-6
6.5 References....................................................................................................6.0-7 City of Riverside Table of Contents
Sycamore Hills Distribution Center Project
vii
7.0 Environmental Effects Found Not to be Significant .......................................7.0-1
7.1 Effects Found Not to be Significant During the Preparation of the NOP ....................................................................................................7.0-1
7.1.1 Agriculture and Forestry Resources...................................................7.0-1
7.1.2 Hazards & Hazardous Materials.........................................................7.0-3
7.1.3 Hydrology/Water Quality ....................................................................7.0-3
7.1.4 Land Use and Planni ng......................................................................7.0-3
7.1.5 Mineral Resources.............................................................................7.0-4
7.1.6 Noise .................................................................................................7.0-4
7.1.7 Population and Hous ing.....................................................................7.0-5
7.1.8 Public Services ..................................................................................7.0-6
7.1.9 Recreation .........................................................................................7.0-9
7.2 Effects Found to be Less than Significant with Mitigation as Part of the EIR Analysis ................................................................................7.0-9
8.0 Alternatives to the Proposed Project...............................................................8.0-1
8.1 Project Objectives .........................................................................................8.0-1
8.2 Summary of the Project’s Significant Unavoidable Impacts ...........................8.0-2
8.3 Rationale for Alternative Selection.................................................................8.0-2
8.4 Alternatives Rejected from Further Consideration .........................................8.0-3
8.5 Description of Alternatives Evaluated in the EIR............................................8.0-8
8.5.1 Alternative 1 – No Project/No Development .......................................8.0-8
8.5.1.1 Impact Analysis of Alternative 1 – No Project/No Development.... 8.0-8
8.5.2 Alternative 2 – Ot her Permitted Use/ Manufacturing ........................ 8.0-13
8.5.2.1 Impact Analysis of Alternative 2 – Other Permitted Use/Manufacturing.....................................................................8.0-14
8.5.3 Alternative 3 – Reduced Development............................................. 8.0-20
8.5.3.1 Impact Analysis of Alternative 3 – Reduced Development.......... 8.0-22
8.6 Environmentally Superior Alternative...........................................................8.0-27
8.7 Comparison of Alternatives..........................................................................8.0-28
9.0 References.........................................................................................................9.0-1
9.1 DEIR References..........................................................................................9.0-1
9.2 Document Preparation Staff........................................................................9.0-14 Table of Contents City of Riverside
Sycamore Hills Distribution Center Project
viii
Appendices
A. Initial Study & NOP
B. Consistency with General Plan and Specific Plan Policies C. Air Quality Impact Analysis, Health Risk Assessments D. Biological Resources and MSHCP Consistency Report, Jurisdictional Delineation, Riparian/Riverine DBESP Report, Burrowing Owl Focused Survey, and LBV-SWF-YBC Survey
E. Phase I and Phase II Cultural Resource Investigations F. Energy Analysis
G. Geotechnical Engineering Investigation, Site Grading Memo, Paleontological Resources Assessment
H. Greenhouse Gas Analysis
I. Phase I Environmental Site Assessment (ESA)
J. Drainage Study, Water Quality Management Plan (WQMP) K. Noise Impact Analysis
L. Traffic Impact Analysis, Vehicl e Miles Traveled (VMT) Analysis List of Figures
Figure 3.0-1: Regional Map.......................................................................................3.0-2 Figure 3.0-2: Vicinity Map .........................................................................................3.0-3 Figure 3.0-3: Project Location Map ...........................................................................3.0-4 Figure 3.0-4A: Photo Locations Map.........................................................................3.0-6 Figure 3.0-4B: Site Photos ........................................................................................3.0-7 Figure 3.0-4C: Site Photos........................................................................................3.0-8 Figure 3.0-4D: Site Photos........................................................................................3.0-9 Figure 3.0-4E: Site Photos ......................................................................................3.0-10 Figure 3.0-5: Land Use and Designation Map .........................................................3.0-16 Figure 3.0-6: Zoning Map........................................................................................3.0-17 Figure 3.0-7: Sycamore Canyon Business Park SP Land Use ................................ 3.0-18 Figure 3.0-8: Tentative Parcel Map .........................................................................3.0-24 Figure 3.0-9: Site Plan ............................................................................................3.0-25 Figure 3.0-10: Grading Exception & Wall Variance ................................................. 3.0-26 Figure 3.0-11: Fencing Plan....................................................................................3.0-30 Figure 3.0-12A: Landscape Design......................................................................... 3.0-31 City of Riverside Table of Contents
Sycamore Hills Distribution Center Project
ix
Figure 3.0-12B: Landscape Design................................................................ .........3.0-32 Figure 3.0-13: Material Board..................................................................................3.0-23 Figure 3.0-14A: Elevations Building A .....................................................................3.0-34 Figure 3.0-14B: Elevation Building B.......................................................................3.0-35 Figure 4.0-1: Cumulative Development Location Map...............................................4.0-6 Figure 5.1-1: Elevation Renderings Key Map ..........................................................5.1-10 Figure 5.1-2: Elevation Rendering View A...............................................................5.1-11 Figure 5.1-3: Elevation Rendering View B...............................................................5.1-12 Figure 5.1-4: Elevation Rendering View C...............................................................5.1-13 Figure 5.1-5: Elevation Rendering View D...............................................................5.1-14 Figure 5.3-1: Vegetation Communities ...................................................................... 5.3-4 Figure 5.3-2: CNDDB Occurrences...........................................................................5.3-9 Figure 5.3-3: Least Bell’s Vireo Location Map .........................................................5.3-10 Figure 5.3-4: CNDDB BUOW Observations............................................................5.3-11 Figure 5.3-5: Drainages Map...................................................................................5.3-15 Figure 5.3-6: Western Riverside County MSHCP Conservation Lands ................... 5.3-34 Figure 5.3-7: Mitigation Plan ...................................................................................5.3-37 Figure 5.6-1: Soils Map.............................................................................................5.6-4 Figure 5.6-2: Faultline Map .......................................................................................5.6-7 Figure 5.6-3: Geologic Units in Project Area ...........................................................5.6-12 Figure 5.6-4: Exploratory Borehole and Percolation Test Location Map .................. 5.6-31 Figure 5.8-1: EDR 1-Mile Radius from Project Site Map............................................5.8-5 Figure 5.8-2: EDR ¼- Mile Radius from Project Site Map..........................................5.8-6 Figure 5.8-3: Surrounding Topography: Elevation Profiles ........................................ 5.8-8 Figure 5.8-4: MARB/IPA LUCP ...............................................................................5.8-11 Figure 5.9-1: Santa Ana River Watershed.................................................................5.9-3 Figure 5.9-2: Project Connectivity to Santa Ana River...............................................5.9-4 Figure 5.9-3A: Existing Condition Hydrology Map .....................................................5.9-5 Figure 5.9-3B: Existing Condition Hydrology Map .....................................................5.9-6 Figure 5.9-4A: Project Site & Proposed Hydrology.................................................. 5.9-17 Figure 5.9-4B: Project Site & Proposed Hydrology.................................................. 5.9-18 Figure 5.11-1: Existing Vehicle Traffic Noise Contours............................................ 5.11-6 Figure 5.11-2: Noise Measurement Locations.........................................................5.11-8 Figure 5.11-3: Noise/Land Use Noise Compatibility Criteria.................................. 5.11-13 Figure 5.11-4: Construction Noise Contours ......................................................... 5.11-22 Figure 5.11-5: Construction Barriers ..................................................................... 5.11-26 Table of Contents City of Riverside
Sycamore Hills Distribution Center Project
x
Figure 5.11-6: Vehicle Traffic Noise Contours....................................................... 5.11-28 Figure 5.11-7A: Daytime On-Site Generated Noise Contours without 4-Foot Barrier .................................................................. 5.11-33 Figure 5.11-7B: Daytime On-Site Generated Noise Contours with 4-Foot Barrier....................................................................... 5.11-34 Figure 5.11-8A: Nighttime On-Site Generated Noise Contours without 4-Foot Barrier .................................................................. 5.11-35 Figure 5.11-8B: Nighttime On-Site Generated Noise Contours with 4-Foot Barrier......................................................................... 5.11-36 Figure 5.12-1: Location Map ...................................................................................5.12-2 Figure 5.12-2: Existing Number of Through Lanes and Intersection Controls.......... 5.12-3 Figure 5.12-3: City of Riverside General Plan Circulation Element.......................... 5.12-6 Figure 5.12-4: City of Riverside General Plan Roadway Cross-Sections................. 5.12-7 Figure 5.12-5: County of Riverside General Plan Circulation Element..................... 5.12-8 Figure 5.12-6: County of Riverside General Plan Roadway Cross-Sections............ 5.12-9 Figure 5.12-7: March JPA General Plan Circulation Element ................................ 5.12-10 Figure 5.12-8: March JPA General Plan Roadway Cross-Sections ....................... 5.12-11 Figure 5.12-9: City of Moreno Valley General Plan Circulation Element................ 5.12-12 Figure 5.12-10: City of Moreno Valley General Plan Roadway Cross-Sections..... 5.12-13 Figure 5.12-11: March JPA Truck Routes ............................................................. 5.12-14 Figure 5.12-12: Existing Transit Routes ................................................................ 5.12-15 Figure 5.12-13: Existing Pedestrian Facilities........................................................ 5.12-16 Figure 5.12-14: Existing Traffic Volumes (In PCE) ................................................ 5.12-26 Figure 5.12-15: Existing Summary of LOS ........................................................... .5.12-28 Figure 5.12-16: Site Adjacent Roadway and Site Access Recommendations ....... 5.12-36 Figure 5.12-17: Opening Year Cumulative with Project Summary of LOS............. 5.12-46 Figure 5.12-18: Horizon Year without Project Traffic Volumes (In PCE)................ 5.12-59 Figure 5.12-19: Horizon Year with Project Traffic Volumes (In PCE)..................... 5.12-60 Figure 5.12-20: Horizon Year without Project Summary of LOS............................ 5.12-61 Figure 5.12-21: Horizon Year with Project Summary of LOS................................. 5.12-63 Figure 5.15-1: Fire Hazard Areas............................................................................5.15-5 Figure 8.0-1: Original Project Conceptual Site Plan ..................................................8.0-6 Figure 8.0-2: SCBPSP Industrial Undeveloped Land ................................................8.0-7 Figure 8.0-3: Reduced Development Site Plan........................................................ 8.0-21 City of Riverside Table of Contents
Sycamore Hills Distribution Center Project
xi
List of Tables
Table 1.0-1: Summary of Environmental Impacts, Mitigation Measures, and Residual Impacts............................................................................1.0-9 Table 2.0-1: Summary of Written Comments Received in Response to the NOP...... 2.0-3 Table 2.0-2: Summary of Comments Received at the August 12, 2020 Virtual Scoping Meeting.......................................................................2.0-12 Table 3.0-1: Site and Surrounding Land Use/Zoning Designations ......................... 3.0-15 Table 3.0-2: Parcel Lot Characteristics ...................................................................3.0-19 Table 3.0-3: Building A............................................................................................3.0-22 Table 3.0-4: Building B............................................................................................3.0-23 Table 4.0-1: Summary of Cumulative Development Projects.....................................4.0-4 Table 5.2-1: Summary of Air Quality Measurements Recorded at Rubidoux – Mission Boulevard Monitoring Station.................................5.2-3 Table 5.2-2: TAC Concentration Levels and Associated Health Risks....................... 5.2-8 Table 5.2-3: Basin Attainment Status........................................................................5.2-9 Table 5.2-4: Ambient Air Quality Standards ............................................................5.2-11 Table 5.2-5: General Conformity de Minimis Limits ................................................. 5.2-14 Table 5.2-6: Total Annual Construction Emissions Comparison to General Conformity de Minimis Levels ............................................... 5.2-26 Table 5.2-7: Maximum Daily Construction Emissions Comparison to SCAQMD Significance Thresholds......................................................................5.2-26 Table 5.2-8: Summary of Project Operational Emissions ........................................ 5.2-31 Table 5.2-9: Localized Construction Emissions.......................................................5.2-32 Table 5.2-10: Localized Operational Emissions.......................................................5.2-32 Table 5.3-1: Summary of Jurisdictional Areas.........................................................5. 3-12 Table 5.3-2: Impacts to Jurisdictional Areas............................................................ 5.3-36 Table 5.3-3: Project Compliance with MSHCP Urban/Wildlands Interface Guidelines...........................................................................................5.3-42 Table 5.4-1: Cultural Resources Occurring on the Project Site................................ 5.4-12 Table 5.5-1: Total Electricity System Power (California 2018)...................................5.5-2 Table 5.5-2: RPU 2019 Power Content Mix...............................................................5.5-4 Table 5.5-3: Construction Equipment Fuel Consumption Estimates........................ 5.5-19 Table 5.5-4: Construction Worker Fuel Consumption Estimates ............................. 5.5-20 Table 5.5-5: Construction Vendor Fuel Consumption Estimates – MHDT ............... 5.5-20 Table 5.5-6: Construction Vendor Fuel Consumption Estimates – HHDT................ 5.5-20 Table 5.5-7: Project-Generated LDA Vehicle Traffic Annual Fuel Consumption ...... 5.5-21 Table of Contents City of Riverside
Sycamore Hills Distribution Center Project
xii
Table 5.5-8: Project-Generated LHDT1 Traffic Annual Fuel Consumption .............. 5.5-22 Table 5.5-9: Project-Generated LHDT2 Traffic Annual Fuel Consumption .............. 5.5-22 Table 5.5-10: Project-Generated MHDT Traffic Annual Fuel Consumption ............. 5.5-22 Table 5.5-11: Project-Generated HHDT Traffic Annual Fuel Consumption.............. 5.5-22 Table 5.5-12: Total Project-Generated Traffic Annual Fuel Consumption (All Vehicles).......................................................................................5.5-22 Table 5.5-13: Project Annual Operational Natural Gas Demand Summary ............. 5.5-23 Table 5.5-14: Project Annual Operational Electricity Demand Summary .................5.5-23 Table 5.5-15: Project Consistency with RRG-CAP GHG Reduction Measures........ 5.5-25 Table 5.6-1: Instrumental Intensity Scale ..................................................................5.6-8 Table 5.6-2: Expansion Test ...................................................................................5.6-29 Table 5.6-3: Actual and Recommended Percolation Rates ..................................... 5.6-30 Table 5.7-1: Global Warming Potentials and Atmospheric Lifetimes ......................... 5.7-3 Table 5.7-2: California GHG Emissions by Sector in 1990, 2010, and 2017.............. 5.7-4 Table 5.7-3: City of Riverside GHG Emissions in 2010 .............................................5.7-4 Table 5.7-4: Construction Phases and Equipment .................................................. 5.7-22 Table 5.7-5: Project Trip Generation and Trip Length.............................................. 5.7-23 Table 5.7-6: Riverside Public Utilities Intensity Factors ........................................... 5.7-25 Table 5.7-7: Summary of Project GHG Emissions (metric tons per year) ................ 5.7-26 Table 5.7-8: Project Consistency with RRG-CAP GHG Reduction Measures.......... 5.7-34 Table 5.8-1: Surrounding Sites Search Results Locations.........................................5.8-4 Table 5.8-2: LUCP Compatibility Criteria for Zone C1............................................. 5.8-12 Table 5.8-3: Proposed Project ALUC Occupancy Level Calculations...................... 5.8-27 Table 5.8-4: MARB/IPA Compatibility Zone Factors for Zone C1 ............................ 5.8-27 Table 5.9-1: Constituents and Beneficial Uses for Receiving Waters ...................... 5.9-11 Table 5.9-2: Numeric Water Quality Objectives for Receiving Waters..................... 5.9-12 Table 5.9-3: Summary of DMAs ..............................................................................5.9-16 Table 5.9-4: Area Comparison Per POD .................................................................5.9-19 Table 5.9-5: Existing and Proposed Conditions Peak Flows.................................... 5.9-20 Table 5.9-6: Design and Proposed Volume for BMPs ............................................. 5.9-26 Table 5.10-1: Project Site & Surrounding Land Uses .............................................. 5.10-1 Table 5.10-2: Proposed Project ALUC Occupancy Calculations ........................... 5.10-24 Table 5.11-1: Representative Environmental Noise Levels ..................................... 5.11-2 Table 5.11-2: Existing Alessandro Boulevard Noise Contours (CNEL).................... 5.11-5 Table 5.11-3: Noise Measurements ........................................................................5.11-9 Table 5.11-4: 15-Minute Traffic Count for Noise Measurement Locations Where Traffic is the Main Noise Source.......................................... 5.11-10 City of Riverside Table of Contents
Sycamore Hills Distribution Center Project
xiii
Table 5.11-5: Riverside Municipal Code – Title 7 Interior and Exterior Noise Standards............................................................................. 5.11-16 Table 5.11-6: Construction Noise Levels............................................................... 5.11-21 Table 5.11-7: Traffic Noise Levels with and without Project and Ambient Noise Increase (CNEL)................................................................... 5.11-29 Table 5.11-8: Noise Levels Due to Project On-Site Operational Noise Sources .... 5.11-37 Table 5.11-9: Typical Construction Equipment Vibration Levels............................ 5.11-39 Table 5.12-1: Location of the Intersection Analysis ................................................. 5.12-4 Table 5.12-2: Signalized Intersection LOS Thresholds.......................................... 5.12-18 Table 5.12-3: Unsignalized Intersection LOS Thresholds...................................... 5.12-19 Table 5.12-4: Roadway Segment Capacity LOS Thresholds................................. 5.12-20 Table 5.12-5: Traffic Signal Warrant Analysis Location ......................................... 5.12-21 Table 5.12-6: Intersection Analysis for Existing Conditions ................................... 5.12-27 Table 5.12-7: Roadway Segment Analysis for Existing Conditions........................ 5.12-29 Table 5.12-8: Trip Generation Summary (Actual Vehicles).................................... 5.12-39 Table 5.12-9: Trip Generation Summary (Actual PCE)................................ .......... 5.12-40 Table 5.12-10: Intersection Analysis for E+P Conditions....................................... 5.12-42 Table 5.12-11: Deficient Intersection Summary for E+P Conditions ...................... 5.12-43 Table 5.12-12: Roadway Segment Analysis for E+P Conditions ........................... 5.12-44 Table 5.12-13: Intersection Analysis for Opening Year Cumulative Conditions ..... 5.12-45 Table 5.12-14: Deficient Intersection Summary for Opening Year Cumulative Conditions...................................................................... 5.12-47 Table 5.12-15: Roadway Segment Analysis for Opening Year Cumulative Conditions...................................................................... 5.12-48 Table 5.12-16: Peak Hour Freeway Off-Ramp Queuing Summary for Opening Year Cumulative Conditions .......................................... 5.12-49 Table 5.12-17: Intersection Analysis for Opening Year Cumulative Conditions with Project Design Improvements .................................. 5.12-50 Table 5.12-18: Employment Density Factors......................................................... 5.12-53 Table 5.12-19: Project VMT Per Employee ........................................................... 5.12-53 Table 5.12-20: VMT Per Employee Comparison ................................................... 5.12-53 Table 5.12-21: Project’s Effect on City VMT.......................................................... 5.12-54 Table 5.12-22: Intersection Analysis for Horizon Year Conditions ......................... 5.12-62 Table 5.12-23: Deficient Intersection Summary for Horizon Year Conditions ........ 5.12-64 Table 5.12-24: Roadway Segment Analysis for Horizon Year Conditions.............. 5.12-65 Table 5.12-25: Peak Hour Freeway Off-Ramp Queuing Summary for Horizon year Conditions............................................................... 5.12-66 Table 5.13-1: AB 52 Response Log ...................................................................... 5.13-12 Table 5.14-1: Retail Supply and Demand Comparison for a Normal Year............... 5.14-3 Table 5.14-2: Wholesale Supply and Demand Comparison for a Normal Year........ 5.14-3 Table of Contents City of Riverside
Sycamore Hills Distribution Center Project
xiv
Table 5.14-3: Retail Single-Dry Year Supply and Demand Comparison.................. 5.14-3 Table 5.14-4: Wholesale Single-Dry Year Supply and Demand Comparison .......... 5.14-4 Table 5.14-5: Retail Supply and Demand Comparison in Multiple-Dry Years .......... 5.14-4 Table 5.14-6: Wholesale Supply and Demand Comparison in Multiple-Dry Years... 5.14-4 Table 5.14-7: Existing Landfills ...............................................................................5.14-8 Table 5.14-8: Metropolitan Regional Water Demands Single Dry-Year .................5.14-18 Table 5.14-9: Metropolitan Regional Water Demands Multiple Dry-Years............. 5.14-19 Table 5.14-10: Metropolitan Regional Water Demands Average Year .................. 5.14-20 Table 5.14-11: Estimated Project Construction-Related Solid Waste Generation.. 5.14-22 Table 5.14-12: Estimated Operational Project-Related Solid Waste Disposal ....... 5.14-23 Table 5.15-1: RFD Fire and Rescue Stations..........................................................5.15-3 Table 8.0-1: Alternative 1 (No Project/No Development Alternative) Ability to Meet Project Objectives.......................................................................8.0-12 Table 8.0-2: Alternative 2 (Other Permitted Use/Manufacturing Alternative) Ability to Meet Project Objectives ........................................................ 8.0-19 Table 8.0-3: Alternative 3 (Reduced Development) Ability to Meet Project Objectives ...........................................................................................8.0-26 Table 8.0-4: Comparison of Alternatives Matrix.......................................................8.0-28 Acronyms, Units of Measurement, Chemical Symbols
Acronyms, units of measurement and chemical symbols used throughout the Draft EIR are identified in this section.
Acronyms
AAQS Ambient Air Quality Standards
AB
ACHP
A.D.
Assembly Bill
Advisory Council on Historic Preservation
Anno Domini
ADA Americans with Disabilities Act
ADT
AFB
AGL
AGR
ALUC
AMSL
APE
Average Daily Traffic
Sycamore Canyon-March Air Force Base
Above Ground Level
Agricultural Supply
Riverside County Airport Land Use Commission
Above Mean Sea Level
Area of Potential Effects
AQMP Air Quality Management Plan
ASTM American Society for Testing and Materials
City of Riverside Table of Contents
Sycamore Hills Distribution Center Project
xv
Acronyms
BDCP Bay Delta Conservation Plan
BCC
BDCP
United States Fish and Wildlife Service Birds of Conservation Concern Bay Delta Conservation Plan
BMPs Best Management Practices
BMP-SP
B/OP
B.P.
Business and Manufacturing Park and Specific Plan
Business Office Park
Before Present
BSA
BTU
Biological Study Area
British Thermal Units
BUOW
C
Burrowing Owl
Commercial
CAA
CA FID UST
CA MUTCD
Cal/ARP
Clean Air Act
Facility Inventory Database
Caltrans California Manual on Uniform Traffic Control Devices California Emergency Management Agency’s Accidental Release Prevention
CAL/EPA
Cal OES
California Environmental Protection Agency
Governor’s Office of Emergency Service
CalEEMod California Emissions Estimator Model
Caltrans
CAPCOA
California Department of Transportation
California Air Pollution Control Officers Association
CARB
CASSA
California Air Resources Board
Criteria Area Species Survey Area
CBC California Building Code
CCAA California Clean Air Act
CCR
CDC
California Code of Regulations
Center for Disease Control and Prevention
CDFW California Department of Fish and Wildlife
CDSG Citywide Design Guidelines and Sign Guidelines
CEC California Energy Commission
CEQA
CERCIS
CERCLA
California Environmental Quality Act
Compensation and Liability Information System
Comprehensive Environmental Response, Compensation, and Liability Act CESA
CFC
California Endangered Species Act
California Fire Code
CFR
CGS
CHMIRS
Code of Federal Regulations
California Geological Survey
California Hazardous Material Incident Report System
CHRIS
CHSC
CHWMP
California Historical Resources Information System
California Heath and Safety Code
County Hazardous Waste Management Plan
Table of Contents City of Riverside
Sycamore Hills Distribution Center Project
xvi
Acronyms
CLUP
CMA
Comprehensive Land Use Plans
Congestion Management Agency
CMP Congestion Management Plan
CNDDB
CNEL
California Native Diversity Database
Community Noise Equivalent Level
CNPS
COG
California Native Plant Society
Council of Governments
CPF
CPUC
CR
CRA
Cancer Potency Factor
California Public Utilities Commission
Commercial Retail Zone
Colorado River
CRHR California Register of Historic Resources
CRPR
CSS
CTC
California Rare Plant Rank
Cross-Street Stop
County Transportation Commissions
CWA
DAMP
DAP
Clean Water Act
Riverside County Drainage Area Management Plan
Drought Allocation Plan
DBESP
DCV
Determination of Biologically Equivalent or Superior Preservation Design Capture Volume
DEIR Draft Environmental Impact Report
DIF
DMA
Development Impact Fee
Drainage Management Area
DMV
DNL
Department of Motor Vehicles
Day-Night Level
DOD Department of Defense Sites
DPM Diesel Particulate Matter
DTSC
DWR
Department of Toxic Substance Control
Department of Water Resources
EDR Environmental Data Resources, Inc.
EHS Extremely Hazardous Substance
EIA Energy Information Administration
EIC Eastern Information Center
EIR
EMI
Environmental Impact Report
Emissions Inventory Data
EMFAC
EMO
EMS
Emission Factor
Emergency Management Office
Emergency Medical Services
EO
EOC
Executive Order
Emergency Operations Center
EPA Environmental Protection Agency
City of Riverside Table of Contents
Sycamore Hills Distribution Center Project
xvii
Acronyms
EMR
EMS
ESA
ESRP
EV
FAA
FAR
Electromagnetic Radiation
Emergency Medical Services
Endangered Species Act
Eastside Reservoir Project
Electric vehicle
Federal Aviation Administration
Federal Aviation Regulations
FE
FEMA
Federally Endangered
Federal Emergency Management Agency
FERC Federal Energy Regulatory Commission
FESA
FHWA
FPEIR
Federal Endangered Species Act
Federal Highway Administration
Final Program Environmental Impact Report
FTA
GAP
Federal Transit Administration
Green Accountability Performance
GHG Greenhouse Gas
GP 2025 City of Riverside General Plan 2025
GP 2025 FPEIR City of Riverside General Plan 2025 Final Program Environmental Impact Report
GWMP Groundwater Management Plan
GWP
GWR
Global Warming Potential
Groundwater Recharge
HBW
HCOC
HCM
Home-Based Work
Hydrologic Conditions of Concern
Highway Capacity Manual
HCP
HERO
HHDT
HIST UST
HMBP
HMMA
HMTA
Habitat Conservation Plan
Home Energy Renovation Opportunity
Heavy-Heavy-Duty Trucks
Hazardous Substance Storage Container Database
Hazardous Materials Business Plan
California Hazardous Material Management Act
Hazardous Materials Transportation Act
HPS High Pressure Sodium
HRA
HSC
Health Risk Assessment
Public Health and Safety Code
HVAC
HWCL
IEPC
IEPR
IPA
IPM
Heating, ventilating, and air-conditioning
California Hazardous Waste Control Law
International Electric Propulsion Conference
Integrated Energy Policy Report
Inland Port Airport
Integrated Pest Management
Table of Contents City of Riverside
Sycamore Hills Distribution Center Project
xviii
Acronyms
IS/NOP Initial Study/Notice of Preparation
ISTEA
ITE
Intermodal Surface Transportation Efficiency Act of 1991 Institute of Transportation Engineers
LBVI
LDA
LDMF
Least Bell’s Vireo
Light Duty Autos
Local Development Mitigation Fee
LED
LHDT
LHMP
LID
LOS
Light-Emitting Diode
Light-Heavy-Duty-Trucks
Local Hazard Mitigation Plan
Low-Impact Development
Level of Service
LPS Low Pressure Sodium
LQG Large Quantity Generators
LST
LUCP
LUST
MARB
Localized Significance Thresholds
Land Use Compatibility Plan
Leaking Underground Storage Tank
March Air Reserve Base
MATES
MAWA
Multiple Air Toxics Exposure Study
Maximum Applied Water Allowance
MBTA Migratory Bird Treaty Act
MDR Medium Density Residential
MEIR Maximally Exposed Individual Receptor
MEISC Maximum Exposed Individual School Child
MEIW
MGD
MHDTs
Maximally Exposed Individual Worker
Maximum Extend Practicable
Medium-Heavy-Duty-Trucks
MJPA
MLD
March Joint Powers Authority
Most Likely Descendant(s)
MMT CO
2E
MOE
MOU
Million metric tons of carbon dioxide equivalent
Measures of Effectiveness
Memorandum of Understanding
mph Miles per hour
MPO
MS4
Metropolitan Planning Organization
Municipal Separate Storm Sewer System
MSHCP
MUN
Western Riverside County Multiple Species Habitat Conservation Plan Municipal and Domestic Supply
MWD
MWP
Metropolitan Water District
Medieval Warm Period
NAAQS
NAHC
National Ambient Air Quality Standards
Native American Heritage Commission
NAHC Native American Heritage Commission
City of Riverside Table of Contents
Sycamore Hills Distribution Center Project
xix
Acronyms
NCCP Natural Communities Conservation Plan
NHMLAC
NIMS
National History Museum of Los Angeles County
National Incident Management System
NOP
NPL
NRC
NRCS
Notice of Preparation
National Priority List
Nuclear Regulatory Commission
Natural Resources Conservation Service
NPDES National Pollutant Discharge Elimination System
NRHP National Register of Historic Places
OEHHA
OEM
Office of Environmental Health Hazard Assessment
Office of Emergency Management
OHP Office of Historic Preservation
OHWM Ordinary high water mark
OPR Governor’s Office of Planning and Research
OSHA
P
PCBs
PCE
PCL
PF
PF-SP
PG&E
PHF
POD
PPV
Occupational Safety and Health Administration
Public Park
Polychlorinated Biphenyls
Passenger Car Equivalents
Power Content Label
Public Facilities
Public Facilities and Specific Plant
Pacific Gas and Electric
Peak Hour Factor
Point of discharge
Peak Particle Velocity
PQP Public Quasi Public
PRC
PRP
PV
PVC
Public Resources Code
Potentially Responsible Parties
Photovoltaic systems
Polyvinyl chloride
PWQMP Preliminary Water Quality Management Plan
R4SBW
RARE
RCA
Riverine, Intermittent, Streambed, Intermittently Flooded/Temporary Threatened or Endangered Species
Western Riverside County Regional Conservation Authority
RCFCWCD
RCHCA
Riverside County Flood Control and Water Conservation District Riverside County Habitat Conservation Agency
RCIP Riverside County Integrated Plan
RCTC
RCRA LQG
RCWRD
RDEIR/SDEIS
Riverside County Transportation Commission
Resource Conservation and Recovery Act – Large Quantity Generators Riverside County Waste Resources Department
Recirculated Draft Environmental Impact Report/Supplemental Draft Table of Contents City of Riverside
Sycamore Hills Distribution Center Project
xx
Acronyms
REC
REC1
REC2
Environmental Impact Statement
Recognized Environmental Conditions
Water Contact Recreation
Non-Contact Recreation
REL
REMAP
RFD
RGNG
RIVTAM
Reference Exposure Level
Riverside Extended Mountain Area Plan
Riverside Fire Department
City of Riverside Good Neighbor Guidelines for Siting New and/or Modified Warehouse Distribution Facilities
Riverside Transportation Analysis Model
RLC Rivers and Lands Conservancy
RMC
ROD
Riverside Municipal Code
Records of Decisions
ROW
RP
RPS
RPU
Right-of-way or rights-of-way
Restricted Property
Renewable Portfolio Standard
Riverside Public Utilities
RRG-CAP
RRWQMP
RSHA
Restorative Growthprint Climate Action Plan
Riverside Regional Water Quality Control Plant
Regional System of Highways and Arterials
RTA Riverside Transit Authority
RTPA
RUWMP
Regional Transportation Plan Agency
Metropolitan Urban Water Management Plan
RWQCB
RWQCP
Regional Water Quality Control Board
Regional Water Quality Control Plant
S
SAF
SAR-DAMP
SARA
United States Fish and Wildlife Service Sensitive
State Alternative Fuels Plan
Santa Ana Regional Drainage Area Management Plan
Superfund Amendments and Reauthorization Act
SB Senate Bill
SCAG Southern California Association of Governments
SCAQMD South Coast Air Quality Management District
SCBPSP Sycamore Canyon Business Park Specific Plan
SCH
SCS
SCWP SKRMP
SDG&E
SE
State Clearinghouse
Sustainable Communities Strategy
Sycamore Canyon Wilderness Park Stephens’ Kangaroo Rat Management Plan and Updated Conceptual Development Plan
San Diego Gas & Electric
Site Elevation
SE
SED
California State Endangered
Socio-Economic Data
City of Riverside Table of Contents
Sycamore Hills Distribution Center Project
xxi
Acronyms
SEMS Standardized Emergency Management System
SHPO State Historic Preservation Officer
SIP State Implementation Plan
SKR Stephen’s kangaroo rat
SKRHCP Stephen’s Kangaroo Rat Habitat Conservation Plan SOON
SPS
SPWN
Surplus Off-Road Opt-in for NO
x
Sustainability Policy Statement
Spawning Reproduction and Development
SRR Semi Rural Residential
SSC CDFW Species of Special Concern
ST
SVP
California State Threatened
Society of Vertebrate Paleontology
SWANCC
SWEEPS UST
SWP
Solid Waste Agency of Northern Cook County
Statewide Environmental Evaluation and Planning System
State Water Project
SWPPP Storm Water Pollution Prevention Plan
SWRCB State Water Resources Control Board
TAC
TAZ
Toxic Air Contaminant
Traffic Analysis Zones
T-BACT
TCR/TCP
TDM
TEA-21
TMDL
Best Available Control Technology for Toxics
Tribal Cultural Resource/Traditional Cultural Property
Transportation Demand Management
Transportation Equity Act of the 21
st Century
Total Maximum Daily Load
TOD
TPA
TPQ
TRI
Transit-Oriented Development
Transit Priority Area
Threshold Planning Quantity
Toxics Release Inventory
TRUs
TS
TUMF
Transport Refrigeration Units
Traffic Signal
Transportation Uniform Mitigation Fee
UBC Uniform Building Code
URBEMIS Urban Emissions Model
USACE U.S. Army Corps of Engineers
USC
USDA
USDOT
US ENG
USEPA
United States Code
U.S. Department of Agriculture
United States Department of Transportation
Engineering Controls Sites List
United States Environmental Protection Agency
USFWS United States Fish and Wildlife Service
USGS United States Geological Survey
Table of Contents City of Riverside
Sycamore Hills Distribution Center Project
xxii
Acronyms
UST
UWMP
VHFHSZ
Underground Storage Tank
Urban Water Management Plant
Very High Fire Hazard Severity Zone
VMT
WARM
WCSSP
WILD
Vehicle Miles Traveled
Warm Freshwater Habitat
Water Conservation and Supply Shortage Program
Wildlife Habitat
WoS
WoUS
WMWD
Waters of the State
Waters of the U.S.
Western Municipal Water District
WQMP
WRCOG
WRP
WSA
WSAP
Water Quality Management Plan
Western Riverside Council of Governments
Waste Recycling Plan
Water Supply Assessment
Water Supply Allocation Plan
WSC
WSDM
WUEMP
Waters of the State
Water Surplus and Demand Management Plan
Water Use Efficiency Master Plan
WUS
WWRF
Waters of the United States
Western Water Recycling Facility
Units of Measurement and Chemical Symbols
AFY
AnC
Acre-feet per year
Arlington fine sandy loam (soil)
dB(a) Leq Decibels equivalent continuous sound level
CH4 Methane
ChF2 Cieneba sandy loam, eroded (soil)
CkF2 Cieneba rocky sandy loam, eroded (soil)
CO Carbon monoxide
CO
2 Carbon dioxide
CY
dB
ETo
Cubic yards
Decibels
Reference evapotranspiration
°F Degrees in Fahrenheit
FaD2 Fallbrook sandy loam, eroded (soil)
FbC2 Fallbrook sandy loam, shallow, eroded (soil)
FkD2
GPM
Fallbrook fine sandy loam, shallow, eroded (soil)
Gallons per minute
GWh Gigawatt hours
City of Riverside Table of Contents
Sycamore Hills Distribution Center Project
xxiii
Units of Measurement and Chemical Symbols
HC Hydrocarbons
HFC Hydroflourocarbons
MGD
mpg
Million gallons per day
Miles per gallon
Mt
MUs
Metric ton
Management Units
N
2O Nitrous oxide
NH4N03 Ammonium nitrate
NO Nitric oxide
NO
2 Nitrogen dioxide
NOX Oxides of nitrogen
O3 Ozone
Pb Lead
PCF
pCi/L
Pounds per cubic foot
Picocuries per liter
pH Potential of hydrogen
PM Atmospheric Particulate Matter
PM
10 Particulate matter 2.5 to 10 microns in diameter
PM2.5 Particulate matter 2.5 microns or less in diameter Ppm
RMS
Parts per million
Root Mean Square
ROG Reactive organic gases
SF
6 Sulfur hexaflouride
SO2 Sulfur dioxide
SOX Oxides of sulfur
VdB Decibel Notation
VOC Volatile organic compounds
VsD2 Vista coarse sandy loam, eroded (soil)
ȝJP
3 Micrograms per cubic meter
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project Executive Summary
1.0-1
1.0 Executive Summary
The purpose of this Environmental Impact Report (EIR) is to evaluate and disclose potential environmental impacts resulting from the implementation of Sycamore Hills Distribution Center Project (Project). This section summarizes the characteristics of the Project, alternatives to the proposed Project, and the environmental impacts and mitigation measures associated with the proposed Project.
1.1 Project Applicant
Darrell A. Butler and Khosro Khaloghli
3241 Alta Laguna Boulevard
Laguna Beach, CA 92651
Contact: Darrell A. Butler
1.2 Lead Agency
Veronica Hernandez, Senior Planner
City of Riverside
Community & Economic Development Department – Planning Division 3900 Main Street, 3
rd floor
Riverside, California 92522
1.3 Project Description
Project Location
This EIR has been prepared to examine the potential environmental effects of the Sycamore Hills Distribution Center Project. The following is a summary of the full Project description provided in Section 3.0, Project Description. The approximately 48.64 gross acre Project site is located in the eastern portion of the City of Riverside, east of Barton Street, west of Sycamore Canyon Boulevard, and north of Alessandro Boulevard, within the Sycamore Canyon Business Park Specific Plan. The Project site is within the southwestern quarter of Section 9, Township 3 South, Range 4 West, as shown on the Riverside East, California, United States Geological Survey (USGS) 7.5-minute quadrangle. The Project site includes the following Assessor’s Parcel Numbers (APNs):
• APN: 263-060-022
• APN: 263-060-024
• APN: 263-060-026
The Project site is bordered on the north by the Sycamore Canyon Wilderness Park, vacant property to the east, Barton Street and a wastewater treatment plant to the west, and the Citywide Self Storage facility and Alessandro Boulevard to the south. Commercial and residential uses are Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-2
located further south (across Alessandro Boul evard), within the City and County of Riverside jurisdiction.
Existing Site Conditions
The City of Riverside General Plan 2025 (GP 2025) land use designation for the Project site is Business/Office Park (B/OP). The Project site is zoned BMP-SP – Business and Manufacturing Park and Specific Plan (Sycamore Canyon Business Park) Overlay Zones. The Project site is within the Sycamore Canyon Business Park Specific Plan (SCBPSP), which is considered a “Major Business Park” as shown on Figure LU-4 of the GP 2025. The SCBPSP designation for the Project site is Industrial.
The Project site is currently undeveloped and vacant. The topography consists of natural rolling terrain descending gradually from a west to east direction. The Project site contains two drainages, that cross the site from the southwest and south to the north. The Project site contains low to moderate vegetation primarily consisting of non-native grasslands and patches of sparse Riversidean sage scrub in the upland areas, with some riparian woodland associated with the drainages. The Project site contains an existing area of approximately 11.6 acres legally designated as “Restricted Property” (see Figure 3.0-3). The Restricted Property area supports a jurisdictional drainage and associated riparian habitat and was required as a condition of the Clean Water Act Section 404 permit from the U.S. Army Corps of Engineers for construction of the Grove Community Church at an off-site location, approximately one mile southwest. The Restricted Property is intended for preservation in a natural condition.
Discretionary Actions and Other Agency Approvals
The proposed Project would include site grading, construction, and operation of two warehouse buildings and associated improvements including parking, fire lanes, fencing and walls (including retaining walls), landscaping, and water quality treatment areas. The proposed Project will include the following actions and approvals by the City of Riverside and other agencies1:
x Tentative Parcel Map No. 36734 (P20-0025) – A Tentative Parcel Map is required to subdivide the Project site into two parcels (Parcels 1 and 2) and three lettered parcels (Parcels A, B, and C).
x Design Review (P19-0627) – Implementation of the proposed Project consists of the grading, construction, and operation of two warehouse buildings and associated improvements including parking, fire lanes, fencing and walls (including retaining walls), landscaping, and water quality treatment areas as shown on Figure 3.0-9 – Site Plan. 1 The City of Riverside actions/approvals are based on the requirements of the Riverside Municipal Code (RMC) at the time the Project was deemed substantially complete (November 2020).
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project Executive Summary
1.0-3
Tables 3.0-2 and 3.0-3 provide a summary of the proposed Project and consistency with the City’s Site Development Standards.
x Minor Conditional Use Permit (MCUP) – A MCUP is required to allow for warehouses greater than 400,000 square feet pursuant to City of Riverside Municipal Code (RMC), Title 19 – Zoning Code, Chapter 19.150 – Base Zones Permitted Land Uses. This requirement is intended to ensure land use compatibility in terms of traffic characteristics, noise, circulation, operation, building design, and site design. x Wall Variance for Parcel 1 – A Variance is requested for Parcel 1 to allow the installation of two combination retaining/ freestanding walls to the side of the property wherein the retaining portion exceeds the maximum allowable height of 4 feet and to allow combination retaining/ freestanding walls wherein the overall height exceeds the maximum allowable height of 10 feet, in accordance with Chapter 19.550 of Title 19 – Zoning Code.
x Parking Variance for Building A - A Variance is requested for Building A to allow 388 parking spaces, where 430 parking spaces are required by the City’s Municipal Code. x Grading Exception for Building B - A Grading Exception is needed for Building B on Parcel 2 to allow installation of three retaining walls to exceed 6 feet in vertical height, in accordance with Chapter 17.28 of Title 17 - Grading.
x Environmental Impact Report (P20-0024) for the preparation of an Environmental Impact Report for the proposed Project.
x Lake or Streambed Alteration Agreement from California Department of Fish and Wildlife per Section 1602 of the Fish and Game Code.
x National Pollutant Discharge Elimination System’s California General Permit for Stormwater Discharges Associated with Construction Activity from the State Water Resources Control Board.
x Water Quality Certification from the Santa Ana Regional Water Quality Control Board per Clean Water Act Section 401.
x Section 404 Permit from the US Army Corps of Engineers, Los Angeles District for Disposal of Dredge or Fill Material per the Clean Water Act.
Construction and Grading
Construction will occur in accordance with both the City’s Noise Ordinance and County’s Noise Ordinance, during the hours of 7 am to 6 pm Monday through Friday, 8 am to 5 pm on Saturdays, and not on Sundays or federal holidays. Overall construction is anticipated to last approximately 15 months. Grading and preliminary road construction is the first phase and is expected to last approximately 3 months. After grading, building construction will last approximately 12 months and includes slab and wall framing, concrete pouring, roof installation building interiors, Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-4
architectural coatings, parking lots, roadway improvements, landscaping, storm drains and water quality basins, etc.
The Project will involve grading and earthwork within the site in order to accommodate the proposed structures, associated parking lots, drive lanes, water quality basins and landscaped areas. It is anticipated that excavation of decomposed granite may be performed utilizing conventional earthmoving equipment. Blasting will not be required and is not proposed as part of the Project site preparation activities. During the grading phase, soil quantities within the overall site will balance and no export or import of fill from the site will be needed.
Operations and Employment
The Project is a speculative development, and the tenants are unknown at this time, so the number of employees, shifts, days and hours of oper ation are not known at this time. However, for the purposes of the analysis in the Environmental Impact Report (EIR), the estimated number of employees, using the County of Riverside Ge neral Plan Appendix E-2: Socioeconomic Build- Out Assumptions and Methodology
2, which uses a factor of 1,030 SF per employee, would be 388.3 employees for Building A and 197.2 employees for Building B, for a total of 586 (rounded to the nearest whole number) for both buildings.
Project Objectives
The proposed Project intends to achieve the following objectives:
x Develop the site with two warehouse buildings with a total of 603,100 square feet of building space, a conservation easement, and trailhead improvements. x Modify the Restrictive Covenant (RC) to allow access to Parcel 1, which is currently landlocked by the RC.
x Provide trailhead improvements consistent with the Sycamore Canyon Wilderness Park Stephen’s Kangaroo Rat Management Plan and Updated Conceptual Development Plan including:
o a parking lot,
o sidewalk,
o shade structure with benches,
o bike rack,
o drinking fountains,
o fencing, gates, signage, and a fire department access gate. 2 County of Riverside General Plan Square Feet/Employee Factor of 1,030 SF per employee for Light Industrial land use, Appendix E-2: Socioeconomic Build-Out Assumptions and Methodology, April 11, 2017, https://planning.rctlma.org/General-Plan-Zoning/General-Plan City of Riverside Section 1.0
Sycamore Hills Distribution Center Project Executive Summary
1.0-5
x Develop and operate warehouse buildings that:
o Take advantage of existing City infrastructure.
o Are adjacent to similar industrial logistics and distribution centers. o Are in close proximity to March Inland Port, State Route 60/Interstate 215, and Interstate 10 to support the distribution of goods throughout the region, while limiting traffic truck disruption to residential areas within the City and neighboring jurisdictions.
o Will attract quality tenants and will be competitive with other similar facilities in the region.
o Meet industry standards for operational design criteria. x Implement the Sycamore Canyon Business Park Specific Plan through development of a land use allowed by the industrial l and use designation and consistent with the development standards and criteria relevant to the site and proposed use. x Facilitate the development of underutilized land currently planned for industrial uses that maximizes the use of the site and responds to market demand within the Sycamore Canyon Business Park Specific Plan area for warehouse buildings. x Provide and expand on-site conservation to mitigate for the loss of riparian/riverine resources.
x Positively contribute to the economy of the City through new capital investment, creation of new employment opportunities, including opportunities for highly trained workers, and expansion of the tax base.
1.4 Alternatives
As required by the California Environmental Quality Act (CEQA), this DEIR examines alternatives to the proposed Project. Studied alternatives include the following three alternatives. Based on the alternatives analyses, Alternative 1 was determined to be the environmentally superior alternative.
x Alternative 1: No Project/No Development Alternative
x Alternative 2: Other Permitted Use/ Manufacturing
x Alternative 3: Reduced Development Alternative
Alternative 1 (No Project/ No Development):
As the Project is consistent with designated land use and zoning and the Sycamore Canyon Business Park Specific Plan, the “no project” alternative is no project development or no change from the existing use (vacant land). This alternative was selected based on CEQA requirements (Section 15126.6(e)).
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-6
Alternative 2 (Other Permitted Use/ Manufacturing):
Manufacturing is also a permitted use within the BMP-SP – Business Manufacturing Park and Specific Plan (Sycamore Canyon Business Park) Overlay Zone. Alternative 2 consists of the same Project design, with manufacturing instead of warehousing as the use for the site. This alternative was selected as it is an allowable use under the existing land use, zoning, specific plan, and was anticipated to reduce potential impacts associated with trucks, including trip generation and VMT, and also associated air quality and greenhouse gas emissions. Other types of uses such as institutional (educational or religious), retail/ commercial, or residential would not meet the density/intensity standards of the compatibility Zone C1 of the MARB/IPA LUCP, resulting in an increase in potential impacts related to hazards, safety, and land use compatibility, as compared to the proposed Project.
Alternative 3 (Reduced Development Alternative):
The third alternative is a reduced development consisting only of the development of Parcel 1/Building A. Alternative 3 was identified and evaluated based on its the potential to reduce or avoid significant impacts related to VMT. In addition, as there are fewer physical cultural resources/tribal cultural resources in the eastern portion of the Project site, Alternative 3 would also reduce impacts to these individual resources as well as the larger TCL and TCP/TCR.
Refer to Section 8.0, Alternatives, for the complete alternatives analyses.
1.5 Areas of Known Controversy
The City of Riverside circulated an Initial Study and a Notice of Preparation (NOP) of the EIR for a 30-day agency and public review period st arting on July 28, 2020 and ending on August 27, 2020 at 5:00 p.m. The City distributed the NOP to the State Clearinghouse, responsible agencies, and other interested parties. Due to COVID-19 restrictions, the City held a virtual EIR Public Scoping Meeting on August 12, 2020, aimed at providing information about the proposed Project and the CEQA process to members of public agencies, interested stakeholders, and residents/community members.
In addition to verbal comments from members of the public during the virtual Public Scoping Meeting, the City received letters from public ag encies, and emails/letters from members of the public. Appendix A of this EIR contains the Initial Study, the NOP, and all comments received during the 30-day review period. Responses to the Notice of a Preparation of a Draft EIR and input received during the virtual EIR scoping meeting held by the City are summarized in Section
2.0, Introduction.
Primary areas of concern include the following:
x Air pollution health impacts to the community
x Potential need for applicable regulatory permits from resource agencies x Potential impacts to drainage patterns, water quality, water supply City of Riverside Section 1.0
Sycamore Hills Distribution Center Project Executive Summary
1.0-7
x Assessment of biological resources including direct, indirect and cumulative impacts, and consistency with the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP)
x Analysis of potential air quality impacts incorporating recommended South Coast Air Quality Management District (SCAQMD) methodology
x Potential impacts to Metropolitan properties and operations nearby x Recommendation for City to require local hires and paying prevailing wages and exceed the current California Green Building code and 2020 County of Los Angeles Green Building Standards
x Potential substantial effects on human beings due to the COVID-19 crisis x Justification in the traffic reports/documents for elimination of the existing traffic signal (at the intersection of private driveway south of project & Alessandro Boulevard) and proposed additional traffic signal (at the intersection of Vista Grande Drive & Alessandro Boulevard)
x Project’s proximity to the nearby Sycamore Canyon Wilderness Park and its role in recreation, and preservation of the endangered Stephens’ kangaroo rat x Urban/ Wildlands interface impacts including light and noise impacts to the park x Potential impacts to other undeveloped properties
x Analysis of all potential project impacts
x Increased traffic congestion and changes to circulation patterns, especially with truck routes
x Potential impacts to wildlife, habitat, natural drainages, and existing views x Project in the context of other development in the area (cumulative development impacts) x Air quality and greenhouse gas emissions impacts
Written and verbal comments from agencies and interested parties in response to the NOP are summarized in Table 2.0-1 Summary of Written Comments Received in Response to the Notice of Preparation, which also details where each is addressed in the EIR. Comments received at the scoping meeting are summarized in Table 2.0-2 Summary of Comments Received at the August 12, 2020, Virtual Scoping Meeting.
1.6 Issues Not Studied in Detail in the DEIR
The Initial Study (Appendix A) determined no substantial evidence exists that significant impacts would occur with one or more of the thresholds contained in the environmental checklist/ Initial Study for the following issue areas: Agriculture and Forestry Resources, Hazards and Hazardous Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-8
Materials, Hydrology and Water Quality, Lan d Use and Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, and Transportation. Section 7.0 Environmental Effects Found not to be Significant, summarizes the issues determined to have no impact and issues from the environmental checklist determined to be less than significant.
1.7 Summary of Impacts and Mitigation Measures
Table ES-1 summarizes the environmental impacts of the proposed Project, proposed mitigation measures, and residual impacts (the impact after application of mitigation, if required). Impacts are categorized as follows:
x Significant and Unavoidable: An impact that cannot be reduced to below the threshold level given reasonably available and feasible mitigation measures. Such an impact requires a Statement of Overriding Considerations to be issued if the project is approved per §15093 of the CEQA Guidelines.
x Less than Significant with Mitigation Incorporated: An impact that can be reduced to below the threshold level given reasonably available and feasible mitigation measures. x Less than Significant: An impact that may be adverse but does not exceed the threshold levels and does not require mitigation measures. However, mitigation measures that could further lessen the environmental effect may be suggested if readily available and easily achievable.
x No Impact: The proposed Project would have no effect on environmental conditions or would reduce existing environmental problems or hazards.
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-9
Table 1.0-1 – Summary of Environmental Impacts, Mitigation Measures, and Residual Impacts Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
Aesthetics
Threshold A: Would the Project have a
substantial adverse effect on a scenic vista?
Less than significant None required Less than
significant
Threshold B: Would the Project substantially
damage scenic resources, including, but not
limited to, trees, rock outcroppings, and historic
buildings within a State scenic highway?
Significant without mitigation MM BIO-6: Prior to issuance of occupancy permit, in order to reduce
impacts to on-site Riparian/Riverine areas
and suitable habitat for least Bell’s vireo
(an endangered bird), on- site mitigation
shall include:
1. Enhancement of a total of 1.58
acres of riparian habitat: 0.01
acres in Drainage A, 1.34 acres in
Drainage B, and 0.23 acre in Area
C.
2. Create (establish) 0.61 acre of in-
kind riparian woodland in Area C.
3. Restoration of 0.02 acre of
riparian habitat in Drainage B.
4. The non-jurisdictional, non-
riparian/riverine upland areas of
slopes associated with the access
road will be restored/replanted
with native seed mix.
5. The roadway/access to
Parcel1/Building A shall include
culverts to provide a hydrological
connection to the riparian habitat
on the east side of the roadway
and a corridor for small wildlife
species.
Less than
significant
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-10
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
6. Revise the existing Restricted
Property to include Parcel A (7.19
acres) and Parcel B (5.04 acres),
with a combined total area of
12.23 acres. The revise d 12.23
Restricted Property shall be
managed in perpetuity by a
CDFW approved 3 rd party (such
as Rivers and Lands
Conservancy “RLC”).
Threshold C: In non-urbanized areas, would the
Project substantially degrade the existing visual
character or quality of public views of the site and
its surroundings? (Public views are those that are
experienced from a publicly accessible vantage
point). If the project is in an urbanized area, would
the Project conflict with applicable zoning and
other regulations governing scenic quality?
Less than significant None required Less than
significant
Threshold D: Would the Project create a new
source of substantial light or glare which would
adversely affect day or nighttime views in the
area?
Significant without mitigation MM AES-1: To further reduce impacts related to light pollution, the Project’s night
lighting shall be directed away from
natural open space areas within and
adjacent to the Project site and directed
downward and towards the center of the
development. Energy efficient Low
Pressure Sodium (LPS) or High Pressure
Sodium (HPS) lamps shall be used
exclusively to dampen glare.
MM AES-2: Prior to the issuance of
building permits, the applicant shall
submit a photometric (lighting) plan for
approval by the Community & Economic
Development Department, Planning
Division. The approved light design
Less than
significant
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-11
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
requirements shall be included on the final
building plan sheets. The lighting plan
shall incorporate the following
requirements and shall show that there is
no light spillage into the Sycamore
Canyon Wilderness Park:
x The project shall be designed in
such a manner as to prevent light
spillage from the project to the
adjacent and nearby open space
areas
x Project lighting shall not exceed
an intensity of one foot-candle
x Shielding shall be employed,
where feasible
x Any night lighting shall be
directed away from natural open
space areas and directed
downward and towards the center
of the development
x No project lights shall blink, flash,
oscillate, or be of unusually high
intensity or brightness
x Energy-efficient LPS or HPS
lamps shall be used exclusively
throughout the project site to
dampen glare
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-12
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
x Exterior lights shall be only
“warm” LED lights (<3000K color
temperature)
Air Quality
Threshold A: Would the Project conflict with or
obstruct implementation of the applicable air
quality plan?
Significant without Mitigation MM AIR-1: The project applicant is required to record a covenant on the
property (Parcels 1 and 2) that prohibit
manufacturing use. Proof of the record of
covenant shall be submitted to the City of
Riverside Planning Division prior to
issuance of Building Permits.
Less than
significant
Threshold B: Would the Project result in a
cumulatively considerable net increase of any
criteria pollutant for which the project region is
nonattainment under an applicable federal or state
ambient air quality standard?
Significant without Mitigation MM AIR-1 (above) Less than significant
Threshold C: Would the Project expose sensitive
receptors to substantial pollutant concentrations?
Significant without Mitigation MM AIR-1 (above) Less than significant
Threshold D: Would the Project result in
emissions (such as those leading to odors)
adversely affecting a substantial number of
people?
Less than significant None required Less than
significant
Biological Resources
Threshold A: Would the Project have a
substantial adverse effect, either directly or
through habitat modifications, on any species
identified as a candidate, sensitive, or special
status species in local or regional plans, policies,
or regulations, or by the California Department of
Fish and Game or U. S. Wildlife Service?
Significant without mitigation MM BIO-1: Prior to issuance of a grading permit, a qualified biologist shall collect
seed for paniculate tarplant and
Robinson’s pepper-grass throughout the
proposed development f ootprint of the
project. The seeds shall be stored in
accordance with the biologist’s
recommendations until restoration efforts
are commenced within the existing and
additional Restricted Property/
conservation area. If seed is not collected
prior to grading permit issuance then
Less than
significant
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-13
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
topsoil, where identified by the qualified
biologist, shall be salvaged and
temporarily stored in accordance with the
qualified biologists’ recommendations
until restoration efforts are commenced.
On site restoration efforts shall
incorporate the collected seed or salvaged
topsoil.
MM NOI-1: Prior to issuance of grading
and construction activities, should least
Bell’s vireo be present in the Sycamore
Canyon Wilderness Park within 300 feet
of the Project site, in Parcel A on-site
conservation area, or within Parcel B on-
site conservation area within 100 feet of
the development footprint, construction
noise impacts shall be minimized through
implementation of the following measure:
x A 12-foot high temporary noise
barrier shall be installed at the
perimeter of the limits of
disturbance between the
construction activities and the
adjacent Sycamore Canyon
Wilderness Park to the north and
east, and the on-site conservation
areas as shown in Figure 5.11-5 –
Construction Barrier. The barrier
shall be continuous without
openings, holes, or cracks, and
shall reach the ground. The
barrier may be constructed with 1-
inch plywood and provide a
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-14
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
reduction of at least 10 dB(A) to
ensure noise levels do not exceed
65 dB(A) L eq at the Sycamore
Canyon Wilderness Park and on-
site conservation areas. Other
barrier materials providing the
same reduction shall also be
permitted.
x Heavy grade rubber mats/pads
shall be used within the bed of the
trucks. These mats will help
attenuate initial impact noise
generated when an excavator
drops rock and debris into the bed
of the truck. These mats must be
maintained and/or replaced as
necessary.
x During all Project site excavation
and grading on-site, construction
contractors shall equip all
construction equipment, fixed or
mobile, with properly operating
and maintained mufflers,
consistent with manufacturer
standards.
x The contractor shall place all
stationary construction
equipment so that emitted noise
is directed away from the noise
sensitive receptors nearest the
Project site.
x Equipment shall be shut off and
not left to idle when not in use.
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-15
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
x The contractor shall locate
equipment staging in areas that
will create the greatest distance
between construction-related
noise/vibration sources and
sensitive receptors nearest the
Project site during all Project
construction.
x The Project proponent shall
mandate that the construction
contractor prohibit the use of
music or sound amplification on
the Project site during
construction.
x The construction contractor shall
limit haul truck deliveries to the
same hours specified for
construction equipment (7:00
a.m. to 6:00 p.m. on weekdays,
and 8:00 a.m. to 5:00 p.m. on
Saturdays).
x The use of heavy equipment or
vibratory rollers and soil
compressors shall be limited
along the Project boundaries to
the greatest degree possible. It is
acknowledged that some soil
compression may be necessary
along the Project boundaries.
x Any jackhammers, pneumatic
equipment and all other portable
stationary noise sources shall be
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-16
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
shielded, and noise shall be
directed away from sensitive
receptors.
x For the duration of construction
activities, the construction
manager shall serve as the
contact person should noise
levels become disruptive to local
residents. A sign should be
posted at the Project site with the
contact phone number. This sign
shall be posted at the Alessandro
Boulevard frontage as well as the
Barton Street frontage.
MM BIO-2: The Project has been
designed to avoid direct construction
impacts to riparian plant communities to
the greatest extent feasible. Avoidance
and minimization measures shall be
included in the Project specifications for
implementation during construction to
further reduce the potential for any
temporary, indirect impacts to occur to
these areas during construction activities,
including the following:
x Trash and other debris shall be
properly disposed of and not left
on-site in areas where it could fall
into protected habitat.
x Project boundaries shall be
clearly marked with fencing, or
other suitable type of marking
material as directed by a qualified
biologist. Vehicles and other
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-17
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
Project construction personnel
shall stay within these delineated
Project boundaries.
x Sensitive areas (i.e., jurisdictional
drainage features, riparian
habitats, and MSHCP
Conservation Areas) in proximity
to the construction footprint shall
be clearly marked, with fencing or
other suitable type of marking
material as directed by a qualified
biologist, for awareness and
avoidance.
x Refueling, washing, or other
vehicular maintenance activities
shall occur a minimum of 100 feet
away from riparian areas,
including the conserved riparian
habitat.
x Equipment would be maintained
and checked at least on a daily
basis for leaks.
x All vehicle leaks or other
hazardous material leaks shall be
contained and cleaned up
immediately. All contaminated
soil shall be removed from the site
and disposed of properly.
MM BIO-3: During soil excavation,
grading, or other subsurface disturbances,
the construction contractor shall supervise
provision and maintenance of all standard
dust control BMPs to reduce fugitive dust
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-18
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
emissions, including but not limited to the
following actions:
x Water any exposed soil areas
a minimum of twice per day,
or as allowed under any
imposed drought restrictions.
On windy days or when
fugitive dust can be observed
leaving the construction site,
additional water shall be
applied at a frequency to be
determined by the on-site
construction superintendent.
x Pave, periodically water, or
apply chemical stabilizer to
construction access/egress
points.
x Minimize the amount of area
disturbed by clearing,
grading, earthmoving, or
excavation operations at all
times.
x Operate all vehicles on
graded areas at speeds less
than 15 miles per hour.
x Cover all stockpiles that
would not be utilized within
three days with plastic or
equivalent material, to be
determined by the on-site
construction superintendent,
or spray them with a non-toxic
chemical stabilizer.
MM BIO-4: During construction, to
address potential short-term impacts to
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-19
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
water quality within the on-site drainages
from construction runoff that may carry
storm water pollutants, a SWPPP shall be
implemented by the construction
contractor as required by the California
General Construction Storm Water Permit
pursuant the Regional Board regulations.
The SWPPP shall identify BMPs related to
the control of toxic substances, including
construction fuels, oils, and other liquids.
These BMPs would be implemented by
the construction contractor prior to the
start of any ground clearing activity, shall
be subject to periodic inspections by the
City and the Project’s hydrological
consultant, shall be maintained
throughout the construction period and
remain in place until all landscape and
permanent BMPs are in place. BMPs shall
be monitored and repaired if necessary, to
ensure maximum erosion, sediment, and
pollution control.
x The use of erosion control
materials potentially harmful
to fish and wildlife species,
such as mono-filament
netting (erosion control
matting) or similar material,
within and adjacent to
conserved riparian habitat
shall be prohibited.
x All fiber roles, straw waddles,
and/or hay bales utilized
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-20
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
within and adjacent to the
Project site shall be free of
non-native plant materials.
x Construction contractor shall
comply with all litter and
pollution laws. All contractors,
subcontractors, and
employees shall also obey
these laws.
x Water containing mud, silt, or
other pollutants from grading,
aggregate washing, or other
activities shall not be allowed
to enter the conserved
riparian habitat or be placed
in locations that may be
subjected to high storm flows.
x Spoil sites shall not be
located within jurisdictional
areas and MSHCP
Conservation Areas or
locations that may be
subjected to high storm flows,
where spoil shall be washed
back into the conserved
riparian habitat where it would
impact streambed habitat and
aquatic or riparian vegetation.
x Raw cement/concrete or
washings thereof, asphalt,
paint, or other coating
material, oil or other
petroleum products, or any
other substances which could
be hazardous to fish and
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-21
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
wildlife resources resulting
from Project related activities
shall be prevented from
contaminating the soil and/or
entering the conserved
riparian habitat. These
materials, placed within or
where they may enter the
conserved riparian habitat or
any party working under
contract to the construction
contractor, shall be removed
immediately.
x No equipment maintenance
shall be done within or near
the conserved riparian habitat
where petroleum products or
other pollu tants from the
equipment may enter these
areas under any flow.
x No broken concrete, cement,
debris, soil, silt, sand, bark,
slash, sawdust, rubbish, or
washings thereof, oil or
petroleum products, or other
organic or earthen material
from any construction or
associated activity of
whatever nature shall be
allowed to enter into or be
placed where it may be
washed by rainfall or runoff
into the conserved riparian
habitat. When operations are
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-22
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
completed, any excess
materials or debris shall be
removed from the work area.
No rubbish shall be deposited
within 150 feet of the
conserved riparian habitat.
MM BIO-5: Prior to issuance of grading
permit, the following measures shall be
incorporated into the construction
documents and specifications, and
implemented by the contractor, to avoid
potential construction- related impacts to
the conserved riparian habitat outside of
the approved disturbance limits:
x Construction worker training
shall be provided by a
qualified biologist at the first
on-site construction meeting;
x Project boundaries shall be
clearly marked and or signs
shall be erected near the top
of slope adjacent to the
conserved riparian habitat to
prevent
accidental/unauthorized
intrusions during
construction; and
x Staging areas for storage of
materials and heavy
equipment, and for fueling,
cleaning, or maintenance of
construction vehicles or
equipment, shall be
prohibited within 20 feet from
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-23
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
the top of slope adjacent to
the conserved riparian
habitat.
MM BIO-6: (above)
MM BIO-7: In order to reduce potential
impacts to MSHCP covered species,
payment of the MSHCP mitigation fee
shall be provided to the City of Riverside
prior to issuance of a grading permit for
the project.
MM BIO-8: Payment of the SKRHCP fee
shall be provided to the City of Riverside
prior to issuance of a grading permit for
the Project.
MM BIO-9: If construction activity is
conducted between September 1
st and
January 31st, then this mitigation measure
is required prior to issuance of a grading
permit. Federal Migratory Bird Treaty Act
(MBTA) and/or state code protect all
native bird species - both common and
special status. In most scenarios, MSHCP
coverage does not override the nesting
bird protections provided by these.
Impacts to nesting birds, both direct and
indirect, can be minimized or eliminated
by conducting work activities outside of
the local breeding season. Although
nesting can occur in any month in
southern California for some species,
breeding in the study area, given the
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-24
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
habitat, would primarily be expected from
about 1 February through 31 August.
Work from about 1 September through 31
January would avoid most negative
affects to birds and nesting activity. If work
must be done during the breeding season,
surveys for nesting birds should occur no
more than three (3) days prior to all
vegetation clearing and ground
disturbance. If active nests are found, they
should be avoided until young have
fledged. While there is no established
protocol for nest avoidance, when
consulted the CDFW generally
recommends avoidance buffers of about
500 feet for raptors and
threatened/endangered species and 100
– 300 feet for non-raptors. Adherence to
these nesting bird recommendations will
also avoid and/or mitigate impact s to
special status bird species known from the
project site which are not covered by the
MSHCP.
MM BIO-10: A focused BUOW survey
must be conducted during the breeding
season (four visits between 1 March - 31
August). Regardless of the result of those
surveys, because of the presence of
suitable habitat that could be occupied at
any time, a one- day preconstruction
survey must also be conducted 30 days or
less before groundbreaking.
Threshold B: Would the Project have a
substantial adverse effect on any riparian habitat
Significant without mitigation MM BIO-2 through MM BIO-7 (above) Less than significant
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-25
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
or other sensitive natural community identified in
local or regional plans, policies, regulations, or by
the California Department of Fish and Game or
U.S. Fish and Wildlife Service?
Threshold C: Would the Project have a
substantial adverse effect on Federally-protected
wetlands as defined by Section 404 of the Clean
Water Act (including, but not limited to, marsh,
vernal pool, coastal, etc.) through direct removal,
filling, hydrological interruption, or other means?
Significant without mitigation MM BIO-2 through MM BIO-7 (above) Less than significant
Threshold D: Would the Project interfere
substantially with the movement of any native
resident or migratory fish or wildlife species or with
established native resident or migratory wildlife
corridors or impede the use of native wildlife
nursery sites?
Less than significant None required Less than
significant
Threshold E: Would the Project conflict with any
local policies or ordinances protecting biological
resources, such as a tree preservation policy or
ordinance?
Less than significant None required Less than
significant
Threshold F: Would the Project conflict with the
provisions of an adopted Habitat Conservation
Plan, Natural Community Conservation Plan, or
other approved local, regional, or state habitat
conservation plan?
Significant without mitigation MM BIO-6, MM AES-1 , MM AES-2 , MM NOI-1, MM BIO-10 (all listed above) and
MM BIO-11.
MM BIO-11: During construction standard
BMPs from Volume I, Appendix C of the
MSHCP shall be implemented to avoid
impacts to biological resources of the
MSHCP. The following standard BMPs
shall be included as Environmental
Requirement Notes on the final grading
plans to be reviewed and approved by
Less than
significant
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-26
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
City Staff prior to issuance of a grading
permit. The measures are as follows:
x A condition shall be placed on
grading permits requiring a
qualified biologist to conduct
a training session for project
personnel prior to grading.
The training shall include a
description of the species of
concern and its habitats, the
general provisions of the
Endangered Species Act
(Act) and the MSHCP, the
need to adhere to the
provisions of the Act and the
MSHCP, the penalties
associated with violating the
provisions of the Act, the
general measures that are
being implemented to
conserve the species of
concern as they relate to the
project, and the access
routes to and project site
boundaries within which the
project activities must be
accomplished.
x Water pollution and erosion
control plans shall be
developed and implemented
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-27
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
in accordance with RWQCB
requirements.
x The footprint of disturbance
shall be minimized to the
maximum extent feasible.
Access to sites shall be via
pre-existing access routes to
the greatest extent possible.
x The upstream and
downstream limits of projects
disturbance plus lateral limits
of disturbance on either side
of the stream shall be clearly
defined and marked in the
field and reviewed by the
biologist prior to initiation of
work.
x Projects should be designed
to avoid the placement of
equipment and personnel
within the stream channel or
on sand and gravel bars,
banks, and adjacent upland
habitats used by target
species of concern.
x Projects that cannot be
conducted without placing
equipment or personnel in
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-28
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
sensitive habitats should be
timed to avoid the breeding
season of riparian species
identified in MSHCP Global
Species Objective No. 7.
x When stream flows must be
diverted, the diversions shall
be conducted using
sandbags or other methods
requiring minimal instream
impacts. Silt fencing or other
sediment trapping materials
shall be installed at the
downstream end of
construction activity to
minimize the transport of
sediments offsite. Settling
ponds where sediment is
collected shall be cleaned out
in a manner that prevents the
sediment from reentering the
stream. Care shall be
exercised when removing silt
fences, as feasible, to prevent
debris or sediment from
returning to the stream.
x Equipment storage, fueling,
and staging areas shall be
located on upland sites with
minimal risks of direct
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-29
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
drainage into riparian areas
or other sensitive habitats.
These designated areas shall
be located in such a manner
as to prevent any runoff from
entering sensitive habitat.
Necessary precautions shall
be taken to prevent the
release of cement or other
toxic substances into surface
waters. Project related spills
of hazardous materials shall
be reported to appropriate
entities including but not
limited to applicable
jurisdictional city, USFWS,
and CDFW, RWQCB and
shall be cleaned up
immediately and
contaminated soils removed
to approved disposal areas.
x Erodible fill material shall not
be deposited into water
courses. Brush, loose soils,
or other similar debris
material shall not be
stockpiled within the stream
channel or on its banks.
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-30
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
x The qualified project biologist
shall monitor construction
activities for the duration of
the project to ensure that
practicable measures are
being employed to avoid
incidental disturbance of
habitat and species of
concern outside the project
footprint.
x The removal of native
vegetation shall be avoided
and minimized to the
maximum extent practicable.
Temporary impacts shall be
returned to pre-existing
contours and revegetated
with appropriate native
species.
x Exotic species that prey upon
or displace target species of
concern should be
permanently removed from
the site to the extent feasible.
x To avoid attracting predators
of the species of concern, the
project site shall be kept as
clean of debris as possible.
All food related trash items
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-31
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
shall be enclosed in sealed
containers and regularly
removed from the site(s).
x Construction employees shall
strictly limit their activities,
vehicles, equipment, and
construction materials to the
proposed project footprint
and designated staging areas
and routes o f travel. The
construction area(s) shall be
the minimal area necessary
to complete the project and
shall be specified in the
construction plans.
Construction limits will be
fenced with orange snow
screen. Exclusion fencing
should be maintained until the
completion of all construction
activities. Employees shall be
instructed that their activities
are restricted to the
construction areas.
Cultural Resources
Threshold A: Would the Project cause a
substantial adverse change in the significance of
a historical resource pursuant to § 15064.5 of the
CEQA Guidelines?
Less than Significant None required Less than
significant
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-32
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
Threshold B: Would the Project cause a
substantial adverse change in the significance of
an archaeological resource pursuant to § 15064.5
of the CEQA Guidelines?
Less than Significant MM CUL-1 : Prior to grading permit issuance, if there are any changes to
Project site design and/or proposed
grades, the Applicant and the City shall
contact consulting tribes to provide an
electronic copy of the revised plans for
review. Additional consultation shall occur
between the City, developer/applicant,
and consulting tribes to discuss any
proposed changes and review any new
impacts and/or potential
avoidance/preservation of the cultural
resources on the Project site. The City
and the developer/applicant shall make all
attempts to avoid and/or preserve in place
as many cultural and paleontological
resources as possible that are located on
the project site if the site design and/or
proposed grades should be revised. In the
event of inadvertent discoveries of
archaeological resources, work shall
temporarily halt until agreements are
executed with consulting tribe, to provide
tribal monitoring for ground disturbing
activities.
MM CUL-2: Archaeological Monitoring :
At least 30 days prior to application for a
grading permit and before any grading,
excavation and/or ground disturbing
activities take place, the
developer/applicant shall retain a
Secretary of Interior Standards qualified
archaeological monitor to monitor all
ground-disturbing activities in an effort to
Less than
significant.
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-33
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
identify any unknown archaeological
resources.
1.The Project Archaeologist, in
consultation with consulting tribes, the
Developer, and the City, shall develop
an Archaeological Monitoring Plan to
address the details, timing, and
responsibility of all archaeological and
cultural activities that will occur on the
project site. Details in the plan shall
include:
a) Project grading and development
scheduling;
b) The development of a schedule in
coordination with the
developer/applicant, the project
archaeologist, and for designated
Native American Tribal Monitors from
the consulting tribes for grading,
excavation, and ground-disturbing
activities on the site, incl uding the
scheduling, safety requirements,
duties, scope of work, and Project
Archeologist and Native American
Tribal Monitors’ authority to stop and
redirect grading activities;
c) The protocols and stipulations that
the Applicant, tribes, and Project
Archaeologist/Paleontologist will
follow in the event of inadvertent
cultural resources discoveries,
including any newly discovered
cultural resource deposits, or
nonrenewable paleontological
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-34
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
resources that shall be subject to a
cultural resources evaluation;
d) In conjunction with the Archeological
Monitor(s), the Native American
Monitor(s) shall have the authority to
temporarily divert, redirect or halt the
ground disturbance activities to allow
identification, evaluation, and
potential recovery of cultural
resources.
e) Treatment and final disposition of
any cultural and paleontological
resources, sacred sites, and human
remains if discovered on the project
site; and
f) The scheduling and timing of the
Cultural Sensitivity Training noted in
mitigation measure MM-CUL-5.
MM CUL-3: Native American Monitor:
Prior to issuance of grading permit, the
developer/permit applicant shall engage
each of the consulting tribe(s) regarding
Native American Monitoring. The
developer/permit applicant shall provide
evidence to the City that they have
reached an agreement with each of the
consulting tribe(s) regarding the following:
a) The treatment of known cultural
resources;
b) The treatment and final disposition of
any tribal cultural resources, sacred
sites, human remains or
archaeological and cultural
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-35
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
resources inadvertently discovered
on the Project site;
c) Project grading, ground disturbance
(including but not limited to
excavation, trenching, cleaning,
grubbing, tree removals, grading and
trenching) and development
scheduling; and
d) The designation, responsibilities,
and participation of professional
Tribal Monitor(s) during grading,
excavation and ground disturbing
activities.
If the developer/permit applicant and the
consulting tribe(s) are unable to reach an
agreement, the mitigation measure shall
be considered satisfied if the
developer/permit applicant provides
sufficient documented evidence that they
have made a reasonable good faith effort,
as determined by the City to reach an
agreement with the consulting tribes with
regards to items a-d, as listed above).
MM CUL-4: Treatment and Disposition
of Cultural Resources: In the event
Native American cultural resources are
inadvertently discovered during the
course of grading for this Project, the
following procedures will be carried out for
treatment and disposition of the
discoveries:
1. Consulting Tribes Notified: within 24
hours of discovery, the consulting
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-36
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
tribe(s) shall be notified via email and
phone. The developer shall provide the
City evidence of notification to
consulting tribes. Consulting tribe(s)
will be allowed access to the discovery,
in order to assist with the significance
evaluation.
2. Temporary Curation and Storage:
During the course of construction, all
discovered resources shall be
temporarily curated in a secure location
on site. The removal of any artifacts
from the Project site shall require the
approval of the Consulting Tribes and
all resources subject to such removal
must be thoroughly inventoried with a
tribal monitor from each consulting
tribe to oversee of the process; and
3. Treatment and Final Disposition:
The landowner(s) shall relinquish
ownership of all cultural resources,
including sacred items, burial goods,
and all archaeological artifacts and
non-human remains as part of the
required mitigation for impacts to
cultural resources. The Applicant shall
relinquish the artifacts through one or
more of the following methods and
provide the City of Riverside
Community and Economic
Development Department with
evidence of same:
a) Preservation-In-Place of the cultural
resources, if feasible as determined
through coordination between the
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-37
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
project archeologist, developer/
applicant, and consulting tribal
monitor(s). Preservation in place
means avoiding the resources,
leaving them in the place where they
were found w ith no development
affecting the integrity of the
resources in perpetuity;
b) Accommodate the process for on-
site reburial of the discovered items
with the consulting Native American
tribes or bands. This shall include
measures and provisions to protect
the f uture reburial area from any
future impacts. Reburial shall not
occur until all cataloguing and basic
recordation have been completed,
with an exception that sacred items,
burial goods and Native American
human remains are excluded. No
cataloguing, analysis, or other
studies may occur on sacred items,
human remains, and grave goods.
Any reburial process shall be
culturally appropriate. List of
contents and location of the reburial
shall be included in the confidential
Phase IV Report. The Phase IV
report shall be prepared by the
project archeologist and shall be filed
with the City under a confidential
cover and not subject to a Public
Records Request. The Tribe(s)
should be able to access these areas
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-38
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
in the future through enforceable
agreement;
c) If reburial is not feasible, a curation
agreement with an appropriate
qualified repository within Riverside
County that meets federal standards
per 36 CFR Part 79 and therefore will
be professionally curated and made
available to other archaeologists/
researchers for further study. The
collections and associated records
shall be transferred, including title, to
an appropriate curation facility within
Riverside County, to be
accompanied by payment of the fees
necessary for permanent curation;
d) At the completion of grading,
excavation, and ground-disturbing
activities on the site, a Phase IV
Monitoring Report shall be submitted
to the City documenting monitoring
activities conducted by the project
archaeologist and Native Tribal
Monitors within 60 days of
completion of grading. This report
shall document the impacts to the
known resources on the property;
describe how each mitigation
measure was fulfilled; document the
type of cultural resources recovered
and the disposition of such
resources; provide evidence of the
required cultural sensitivity training
for the construction staff held during
the required pre-grade meeting; and,
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-39
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
in a confidential appendix, include
the daily/weekly monitoring notes
from the archaeologist. All reports
produced will be submitted to the City
of Riverside, Eastern Information
Center, and consulting tribes.
MM CUL-5: Cultural Sensitivity
Training: The Secretary of Interior
Standards County certified archaeologist
and Native American monitors shall
attend the pre-grading meeting with the
developer/permit holder’s contractors to
provide Cultural Sensitivity Training for all
construction personnel. This shall include
the procedures to be followed during
ground disturbance in sensitive areas and
protocols that apply in the event that
unanticipated resources are discovered.
Only construction personnel who have
received this training can conduct
construction and disturbance activities in
sensitive areas. A sign- in sheet for
attendees of this training shall be included
in the Phase IV Monitoring Report.
MM CUL-6 Fencing of the Avoided
Sites: Prior to any earthmoving activities,
the current boundaries of the avoided
sites (CA-RIV-11770, CA-RIV-11772, CA-
RIV-2486, two milling slicks within CA-
RIV-2488, and CA-RIV- 2489) will be
fenced and identified as an Environmental
Sensitive Area (ESA). The project
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-40
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
applicant will ensure that appropriate
temporary fencing is installed i.e., orange
fabric/barrier fencing) to prevent any
unintentional disturbances to CA-RIV-
11770, CA-RIV-11772, CA-RIV-2486, two
milling slicks within CA-RIV- 2488, and
CA-RIV-2489 during any earthmoving
activities on the project site. The fencing
will be installed before clearing and
grubbing and will not be removed until all
earthmoving activities have been
completed and the wall in Parcel 4 has
been constructed. The project
archaeologist and Tribal Monitor(s) will be
on site to monitor the fence installation
and removal and will conduct daily
inspections of the fencing to make sure
that it is intact and has not been breached.
If the project archaeologist and/or Tribal
Monitor(s) identify a breach of the fence,
i.e., removal, cut, depressed, driven over
or intentionally breached in any way, all
work within a 25 -foot buffer shall cease
and the Project Applicant, City, project
archaeologist and the Monitoring Tribe(s)
shall meet and confer as to the best
method to repair the fencing. The
person(s) responsible for the breach and
the Construction Supervisor (or
appropriate supervisory personnel) shall
be required to retake the sensitivity
training provided at the beginning of
construction, in addition to any other
remedies considered appropriate.
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-41
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
MM CUL-7 Relocation of Impacted
Sites: Prior to any grading in the
associated areas, the Project Applicant
shall meet with the Project Archaeologist
and the Consulting Tribe(s) in order to
assess CA-RIV-11769, CA-RIV-2487,
and two milling slicks within CA-RIV-2488
to determine the suitability for relocation to
a permanent open space area. The
Consulting Tribe(s) shall work with the
Project Archaeologist, Project Applicant,
and the grading contractor or appropriate
personnel to ensure that every effort is
made to relocate the Features safely and
to discuss the most appropriate methods
for relocation. Using professional
archaeological methods, the milling slicks
associated with Sites CA-RIV-11769, CA-
RIV-2487, and CA-RIV- 2488 shall be
relocated to the planned open space area
in the northern portion of the Project site.
The Tribe(s) should be able to access
these areas in the future through
enforceable agreement. Before
construction activities may resume in the
affected area, any visible artifacts shall be
recovered and recorded, and the features
recorded using professional
archaeological methods. The current
Department of Parks and Recreation
forms for the sites shall be updated,
detailing which features were relocated,
the process taken, and updated maps
using sub meter GIS technology to
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-42
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
document the new location of each
feature. The relocation information shall
be included in a Phase IV Monitoring
Report. The site record should clearly
indicate that the Features are not in their
original location and why they were
relocated.
MM CUL-8 Long-Term Preservation
Plan: Prior to occupancy, a Long-Term
Preservation Plan (LTPP) shall be
prepared among the City, Land Owner,
and Consulting Tribe(s). The LTPP should
include the following:
a) Description of archaeological
resources
b) Documentation of resources of
concern, such as high-resolution
photographs or similar
c) Listing of Preservation Actions to
Date
d) The determination of responsibility
for care, maintenance, and guidance
in the event preserved resources
[CA-RIV-11770, CA-RIV-11772, CA-
RIV-2486, two milling slicks within
CA-RIV-2488, and CA-RIV-2489]
should be vandalized or damaged.
This section should also address
responsibility for regular site
condition assessments to determine
if resources are being affected by
project construction and later
operations.
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-43
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
MM CUL-9 Controlled Grade: Sites CA-
RIV-11769, CA-RIV-11770, CA-RIV-
11772, CA-RIV-2486, CA-RIV-2487, CA-
RIV-2488, and CA-RIV- 2489 will be
impacted during grading and construction
activities and the soils surrounding them
will be disturbed. Prior to any grading in
the associated areas, the Project
Applicant, the Consulting Tribes, and the
City will formalize a written agreement to
identify the area that will be subject to
“Controlled Grading” during construction
of the Project. The Pechanga Tribe, the
Project Applicant, and the City will
develop an exhibit that outlines the area
subject to controlled gradi ng, and that
area will be highlighted on the rough
grading plans, precise grading plans or
other off-site improvement plans that may
impact this site. “Controlled Grading” shall
include, without limitation, the slow and
deliberate excavation and removal of soils
employing the smallest reasonable cuts in
certain areas using light scrapers (for
example Caterpillar 623 or 627), dozers
(for example D6- D8), front end loaders,
excavators, skip loaders, dump trucks,
and motor graders. A controlled grading
plan wi ll be monitored by the Project
Archeologist and Tribal Monitor(s) to
ensure the systematic removal of the
ground surface surrounding these
features are monitored to allow for the
identification of resources. Results of all
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-44
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
controlled grading activities shall be
included in the Phase IV monitoring
report.
Consistent with State Law the Project
will be required to comply with the
following standard condition of
approval:
Discovery of Human Remains: In the
event that human remains (or remains that
may be human) are discovered at the
Project site during grading or
earthmoving, the construction contractors,
Project Archaeologist, and/or designated
Native American Monitor shall
immediately stop all activities within 100
feet of the find. The Project proponent
shall then inform the Riverside County
Coroner and the City of Riverside
Community & Economic Development
Department immediately, and the coroner
shall be permitted to examine the remains
as required by California Health and
Safety Code Section 7050.5(b) unless
more current State law requirements are
in effect at the time of the discovery.
Section 7050.5 requires that excavation
be stopped in the vicinity of discovered
human remains until the coroner can
determine whether the remains are those
of a Native American. If human remains
are determined as those of Native
American origin, the Applicant shall
comply with the state relating to the
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-45
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
disposition of Native American burials that
fall within the jurisdiction of the NAHC
(PRC Section 5097). The coroner shall
contact the NAHC to determine the most
likely descendant(s). The MLD shall
complete his or her inspection and make
recommendations or preferences for
treatment within 48 hours of being granted
access to the site. The Disposition of the
remains shall be overseen by the most
likely descendant(s) to determine the most
appropriate means of treating the human
remains and any associated grave
artifacts.
The specific locations of Native American
burials a nd reburials will be proprietary
and not disclosed to the general public.
The County Coroner will notify the Native
American Heritage Commission in
accordance with California Public
Resources Code 5097.98.
According to California Health and Safety
Code, six or more human burials at one
location constitute a cemetery (Section
8100), and disturbance of Native
American cemeteries is a felony (Section
7052). The disposition of the remains
shall be determined in consultation
between the Project proponent and the
MLD. In the event that the Project
proponent and the MLD are in
disagreement regarding the disposition of
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-46
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
the remains, State law will apply and the
median and decision process will occur
with the NAHC (see Public Resources
Code Section 5097.98(e) and
5097.94(k)).
Threshold C: Would the Project disturb any
human remains, including those interred outside of
formal cemeteries?
Less than significant None required Less than
significant
Energy
Threshold A: Would the Project result in
potentially significant environmental impact due to
wasteful, inefficient, unnecessary consumption of
energy resources, during project construction or
operation?
Less than significant None required Less than
significant
Threshold B: Would the Project conflict with or
obstruct a state or local plan for renewable energy
or energy efficiency?
Less than significant None required Less than
significant
Threshold C: Would the Project achieve the goal
of energy conservation by the following?
Decreasing overall per capita energy
consumption;
Decreasing reliance on fossil fuels such as
coal, natural gas and oil; and
Increasing reliance on renewable energy
sources.
Less than significant None required Less than
significant
Geology and Soils
Threshold A: Would the Project directly or
indirectly cause potential substantial adverse
effects, including the risk of loss, injury, or death
involving: i) rupture of a known earthquake fault,
as delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the State
Geologist for the area or based on other
substantial evidence of a known fault? Refer to
Less than significant None required Less than
significant
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-47
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
Division of Mines and Geology Special Publication
42; ii) strong seismic ground shaking; iii) seismic-
related ground failure, including liquefaction;
and/or iv) landslides?
Threshold B: Would the Project result in
substantial soil erosion or the loss of topsoil?
Less than significant None required Less than
significant
Threshold C: Would the Project be located on a
geologic unit or soil that is unstable, or that would
become unstable as a result of the Project, and
potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse?
Less than significant None required Less than
significant
Threshold D: Would the Project be located on
expansive soil, as defined in Table 18-1-B of the
Uniform Building Code (1994), creating
substantial direct or indirect risks to life or
property?
Less than significant None required
Less than
significant
Threshold E: Would the Project have soils
incapable of adequately supporting the use of
septic tanks or alternative wastewater disposal
systems where sewers are not available for the
disposal of wastewater?
Less than significant None required Less than
significant
Threshold F: Will the Project directly or indirectly
destroy a unique paleontological resource or site
or unique geologic feature?
Significant without mitigation MM GEO-1: If one or more fossils are discovered during construction, all ground
disturbing activities within 50 feet of the
area of the find shall be ceased and the
applicant shall retain a paleontologist who
meets the Societ y of Vertebrate
Paleontology (SVP) qualifications
standards for Project Paleontologist to
oversee the documentation of the extent
and potential significance of the finds as
well as recovery efforts. Ground-
disturbing activities may resume in the
area of the finds at the discretion of the
Less than
significant
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-48
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
Project Paleontologist. If the fossils are
significant per the SVP’s 2010 criteria,
then paleontological monitoring shall be
conducted on an as- needed basis for
further ground-disturbing activities in the
Project Area.
Greenhouse Gas Emissions
Threshold A: Would the Project generate
greenhouse gas emissions, either directly or
indirectly, that may have a significant impact on
the environment?
Significant without mitigation MM AIR-1 (previously described above) is required to ensure that the actual use of
the site is consistent with the use
described in the Project Description and
analyzed in the Project-specific
greenhouse gas analysis.
MM BIO-6 (previously described above)
would also reduce the Project’s overall
GHG impacts.
Less than
significant
Threshold B: Would the Project conflict with an
applicable plan, policy, or regulation adopted for
the purpose of reducing the emissions of
greenhouse gases?
Significant without mitigation MM AIR-1 (previously described above) is required to ensure that the actual use of
the site is consistent with the use
described in the Project Description and
analyzed in the Project-specific
greenhouse gas analysis.
Less than
significant
Hazards & Hazardous Materials
Threshold A: Would the Project create a
significant hazard to the public or the environment
through the routine transport, use, or disposal of
hazardous materials?
Significant without mitigation MM AIR-1 (previously described above). Less than significant
Threshold B: Would the Project create a
significant hazard to the public or the environment
through reasonably foreseeable upset and
accident conditions involving the release of
hazardous materials into the environment?
Less than significant None required Less than
significant
Threshold C: Would the Project emit hazardous
emissions or handle hazardous or acutely
Less than significant None required Less than
significant
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-49
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
hazardous materials, substances, or waste within
one-quarter mile of an existing or proposed
school?
Threshold D: Would the Project be located on a
site which is included on a list of hazardous
materials sites compiled pursuant to Government
Code Section 65962.5 and, as a result, would
create a significant hazard to the public or the
environment?
Less than significant None required Less than
significant
Threshold E: For a project located within an
airport land use plan or, where such a plan has
not been adopted, within two miles of a public
airport or public use airport, would the project
result in a safety hazard or excessive noise for
people residing or working in the project area?
Less than significant None required Less than
significant
Threshold F: Would the Project expose people or
structures, either directly or indirectly, to a
significant risk of loss, injury or death involving
wildland fires?
Less than significant None required Less than
significant
Hydrology and Water Quality
Threshold A: Would the Project violate any water
quality standards or waste discharge
requirements or otherwise substantially degrade
surface or groundwater quality?
Less than significant None required Less than
significant
Threshold B: Would the Project substantially
decrease groundwater supplies or interfere
substantially with groundwater recharge such that
the project may impede sustainable groundwater
management of the basin?
Less than significant None required Less than
significant
Threshold C: Would the Project substantially
alter the existing drainage pattern of the site or
area, including through the alteration of the course
of a stream or river or through the addition of
impervious surfaces, in a manner which would: i)
Less than significant None required Less than
significant
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-50
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
result in substantial erosion or siltation on-or off-
site; ii) substantially increase the rate or amount
of surface runoff in a manner which would result
in flooding on-or off site; iii) create or contribute
runoff water which would exceed the capacity of
existing or planned stormwater drainage systems
or provide substantial additional sources of
polluted runoff; or; iv) impede or redirect flood
flows?
Threshold D: Would the Project conflict with or
obstruct implementation of a water quality control
plan or sustainable groundwater management
plan?
Less than significant None required Less than
significant
Land Use and Planning
Threshold A: Would the Project cause a
significant environmental impact due to a conflict
with any land use plan, policy, or regulation
adopted for the purpose of avoiding or mitigating
an environmental effect?
Less than significant None required Less than
significant
Noise
Threshold A: Would the Project result in the
generation of a substantial temporary or
permanent increase in ambient noise levels in the
vicinity of the project in excess of standards
established in the local general plan or noise
ordinance, or applicable standards of other
agencies?
Significant without mitigation MM NOI-1 (above) Less than significant
Threshold B: Would the Project result in the
generation of excessive groundborne vibration or
groundborne noise levels?
None required None required Less than
significant
Transportation
Threshold A: Would the Project conflict with a
program, plan, ordinance or policy addressing the
circulation system, including transit, roadway,
bicycle, and pedestrian facilities?
Less than significant None required Less than
significant
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-51
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
Threshold B: Would the Project conflict or be
inconsistent with CEQA Guidelines section
15064.3, subdivision (b)?
Significant and unavoidable No feasible mitigation available. Even with implementation of feasible TDM
measures, Project VMT cannot be
reduced to less than significant levels and
thus, the Project’s VMT would still
contribute to cumulative impacts and are
considered significant and unavoidable.
Significant
and
unavoidable
Threshold C: Would the Project result in a
change in air traffic patterns, including either an
increase in traffic levels or a change in location
that results in substantial safety risks?
Less than significant None required Less than
significant
Threshold D: Would the Project substantially
increase hazards due to a geometric design
feature (e.g., sharp curves or dangerous
intersections) or incompatible uses (e.g., farm
equipment)?
Less than significant None required Less than
significant
Tribal Cultural Resources
Would the Project cause a substantial adverse
change in the significance of a tribal cultural
resource, defined in Public Resources Code
section 21074 as either a site, feature, place,
cultural landscape that is geographically defined
in terms of the size and scope of the landscape,
sacred place, or object with cultural value to a
California Native American tribe that is:
x (Threshold A) listed or eligible for listing in the
California Register of Historical Resources, or
in a local register of historical resources as
defined in Public Resources Code section
5020.1(k)?
x (Threshold B) a resource determined by the
lead agency, in its discretion and supported
Less than significant MM CUL-1 through MM CUL-9 as
previously discussed above in Cultural
Resources.
Less than
significant
Section 1.0 City of Riverside
Executive Summary Sycamore Hills Distribution Center Project
1.0-52
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
by substantial evidence, to be significant
pursuant to criteria set forth in subdivision (c)
of Public Resources Code Section 5024.1. In
applying the criteria set forth in subdivision (c)
of Public Resources Code Section 5024.1,
would the lead agency consider the
significance of the resource to a California
Native American tribe?
Utilities
Threshold A: Would the Project require or result
in the relocation or construction of new or
expanded water, wastewater treatment or storm
water drainage, electric power, natural gas, or
telecommunications facilities, the construction or
relocation of which could cause significant
environmental effects?
Less than significant None required Less than
significant
Threshold B: Would the Project have sufficient
water supplies available to serve the project and
reasonably foreseeable future development
during normal, dry and multiple dry years?
Less than significant None required Less than
significant
Threshold C: Would the Project result in a
determination by the wastewater treatment
provider which serves or may serve the project
that it has adequate capacity to serve the project’s
projected demand in addition to the provider’s
existing commitments?
Less than significant None required Less than
significant
Threshold D: Would the Project generate solid
waste in excess of State or local standards, or in
excess of the capacity of local infrastructure, or
otherwise impair the attainment of solid waste
reduction goals?
Less than significant None required Less than
significant
Threshold E: Would the Project comply with
federal, state, and local management and
reduction statutes and regulations related to solid
waste?
Less than significant None required Less than
significant
City of Riverside Section 1.0
Sycamore Hills Distribution Center Project DEIR Executive Summary
1.0-53
Impact Significance Pre-mitigation Mitigation Measure(s) Residual Impact
Wildfire
Threshold A: Would the Project Substantially
impair an adopted emergency response plan or
emergency evacuation plan?
Less than significant None required Less than
significant
Threshold B: Would the Project result in
substantial adverse physical impacts associated
with the provision of new or physically altered
governmental facilities, need for new or physically
altered governmental facilities, the construction of
which could cause significant environmental
impacts, in order to maintain acceptable service
ratios, response times or other performance
objectives for Fire Protection Public Services?
Less than significant None required Less than
Significant
Threshold C: Due to slope, prevailing winds, and
other factors, would the Project exacerbate wildfire
risks, and thereby expose Project occupants to
pollutant concentrations from a wildfire or the
uncontrolled spread of a wildfire?
Less than Significant None required Less than
Significant
Threshold D: Would the Project require the
installation or maintenance of associated
infrastructure (such as roads, fuel breaks,
emergency water sources, power lines, or other
utilities) that may exacerbate fire risk or that may
result in temporary or ongoing impacts to the
environment?
Less than significant None required Less than
Significant
Threshold E: Would the Project expose people or
structures to significant risks, including downslope
or downstream flooding or landslides, as a result
of runoff, post-fire slope instability, or drainage
changes?
Less than significant None required Less than
Significant
Threshold F: Would the Project expose people or
structures, either directly or indirectly, to a
significant risk of loss, injury or death involving
wildland fires?
Less than significant None required Less than
Significant
City of Riverside Section 2.0
Sycamore Hills Distribution Center Project DEIR Introduction
2.0-1
2.0 Introduction
2.1 Purpose and Scope
The purpose of this Environmental Impact Report (EIR) is to evaluate and disclose potential environmental impacts resulting from the implementation of the Sycamore Hills Distribution Center Project located north of Alessandro Boulevard directly east of Barton Street and west of San Gorgonio Drive. The EIR will also evaluate potential environmental impacts along associated streets and utility improvements (hereinafter referred to as the Project), as further described in Section 3.0 – Project Description of this DEIR.
This EIR is to serve as an informational document for the public and City of Riverside (City) decision makers. The process to finalize the EIR includes public hearings before the Planning Commission and City Council to consider certification of a Final EIR and approval of the Project.
2.2 Authorization
The EIR has been prepared by the City as the “Lead Agency” in accordance with the Guidelines for the Implementation of the California Environmental Quality Act (State CEQA Guidelines), (Sections 15000-15387 of the California Code of Regulations), and the City’s CEQA Guidelines.
The Project considered in this DEIR is a “project,” as defined by Section 15378 of the State CEQA Guidelines, which states that an EIR must be prepared for any project that may have a significant impact on the environment. The City, as Lead Agency, has determined that the Project may have a significant adverse impact on the environment; therefore, preparation of an EIR was required.
2.3 Lead and Responsible Agencies
CEQA defines a “Lead Agency” as the public agency that has the principal responsibility for carrying out or approving a project which may have a significant effect upon the environment.
Other agencies, e.g., Western Municipal Water District, California Department of Fish and Wildlife (CDFW), the Santa Ana Regional Water Quality Control Board (RWQCB), the U.S. Army Corps of Engineers (USACE) and the South Coast Air Quality Management District (SCAQMD) which also have some authority or responsibility to issue permits for project implementation, are designated as “responsible agencies.” Both the Lead Agency and responsible agencies must consider the information contained in the EIR prior to acting upon or approving a project. The City, as the Lead Agency, has determined the Project may have a significant adverse impact on the environment, and, therefore, preparation of an EIR is required. The City’s address is:
City of Riverside
Community & Economic Development Department
Planning Division
3900 Main Street, 3
rd Floor
Riverside, CA 92522
Contact: Veronica Hernandez, Senior Planner
Section 2.0 Cit y of Riverside
Introduction Sycamore Hills Distribution Center Project DEIR
2.0-2
Responsible agencies for the Project include:
x Santa Ana Regional Water Quality Control Board: Issuance of a Notice of Intent prior to construction operations related to National Pollutant Discharge Elimination System (NPDES) Construction Permits, issuance of a water quality certification pursuant to Section 401 of the Clean Water Act in connection with issuance of a Section 404 Clean Water Act permit.
x California Department of Fish and Wildlife: Issuance of agreements under Section 1601-1602 of the Fish and Game Code related to streambed alterations and review of the Determination of Biologically Equivalent or Superior Preservation (DBESP) for impacts to riparian/riverine resources protected under the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP).
x US Army Corps of Engineers: Issuance of a Section 404 permit under the Clean Water Act.
x US Fish and Wildlife Service: Review of the Determination of Biologically Equivalent or Superior Preservation (DBESP) for impacts to riparian/riverine resources protected under the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP) and Endangered Species Act Section 7 Consultation with US Army Corps of Engineers. x Western Municipal Water District: Approval and construction of water improvements. x South Coast Air Quality Management District: Review air quality modeling used to support the EIR analysis and findings.
2.4 Project Applicant
The Project Applicant is:
Darrell A. Butler and Khosro Khaloghli
3241 Alta Laguna Boulevard
Laguna Beach, CA 92651
Contact: Darrell A. Butler
2.5 Compliance with CEQA
The basic purposes of CEQA are to:
1. Inform governmental decision makers and the public about the potential significant environmental effects of proposed activities;
2. Identify the ways that environmental dam age can be avoided or significantly reduced;
3. Prevent significant, avoidable damage to the environment by requiring changes in projects through the use of alternatives or mitigation measures when the governmental agency finds the changes to be feasible; and
4. Disclose to the public the reasons why a gov ernmental agency approved the project in the manner the agency chose if significant environmental effects are involved. (State CEQA Guidelines, Section 15002).
City of Riverside Section 2.0
Sycamore Hills Distribution Center Project DEIR Introduction
2.0-3
The EIR process typically consists of three (3) parts—the Notice of Preparation (NOP), DEIR, and Final EIR. Pursuant to Section 15082 of the State CEQA Guidelines, the City initiated the environmental process with a NOP. The NOP was distributed to the State Clearinghouse, responsible agencies, and other interested parties, on July 28, 2020. Pursuant to Section 15082 of the Sate CEQA Guidelines, recipients of the NOP were requested to provide responses within 30 days after their receipt of the NOP. A scoping meeting was held on August 12, 2020; the scoping meeting was held virtually due to the Covid-19 pandemic.
Agencies and interested parties that submitted written comments in response to the NOP are identified in Table 2.0-1 – Summary of Written Comments Received in Response to the Notice of Preparation and copies of the letters received are included in Appendix A of this DEIR.
Table 2.0-1 – Summary of Written Comments Received
in Response to the Notice of Preparation
Commenting
Party
(Date of
Letter/email)
Summary of Comment
Addressed in
Section(s) of the
DEIR
Diane
Dosserich –
Metropolitan
Water District
of Southern
California
(Metropolitan)
(August 17,
2020)
1. Metropolitan indicates it owns property and
owns and operates facilities adjacent to the
Project site (Box Springs Feeder and Mill’s
Treatment Plant located north and west of
the Project, respectively; and Perris Valley
Pipeline along the boundary of the south
side of the Project beneath Alessandro
Boulevard). Metropolitan expresses its
concern of potential impacts to its
properties, the pipeline, and associated
facilities resulting from construction of the
Project, and states Metropolitan must be
allowed to maintain its rights-of-way and
unobstructed access to its facilities.
2. Metropolitan also states it will not allow any
structures within its Property or easements.
Development associated with the proposed
Project must not restrict any of
Metropolitan’s day-to-day operations and/or
access to its facilities. Metropolitan will not
permit activities that could subject the
pipeline to excessive vehicle, impact, or
vibratory loads. Structures within its
properties or easement will also not be
allowed.
3. Metropolitan requires detailed design plans
for any activities within the vicinity of its
facilities, properties, or rights-of way be
Comments have
been noted and
are addressed in
Section 5.14 –
Utilities.
Vibration impacts
from construction
activities are
discussed in
Section 5.11 –
Noise.
Section 2.0 Cit y of Riverside
Introduction Sycamore Hills Distribution Center Project DEIR
2.0-4
Commenting
Party
(Date of
Letter/email)
Summary of Comment
Addressed in
Section(s) of the
DEIR
submitted prior to construction for review
and approval.
Jeffrey Smith –
March JPA
(August 20,
2020)
This comment letter notes that while the Project is
not adjacent to the March JPA jurisdictional
boundary, the traffic analysis and Draft EIR should
consider:
1. City/County designated truck routes on
Alessandro Boulevard between State Route
91 and Interstate 215;
2. Intersections at Alessandro
Boulevard/Meridian Parkway; Meridian
Parkway/Cactus Avenue; Meridian
Parkway/Van Buren Boulevard; and
3. Interstate 215 On/Off Ramps at Van Buren
Boulevard, Cactus Avenue, Alessandro
Boulevard, and Eastridge Avenue.
Section 5.12 –
Transportation
Deborah De
Chambeau –
Riverside
County Flood
Control District
(District)
(August 20,
2020)
1. The District’s letter indicates that the Project
would not be impacted by District Master
Drainage Plan facilities, nor are any facilities
of regional interest proposed.
2. The Project may require a National Pollutant
Discharge Elimination System (NPDES)
permit from the State Water Resources
Control Board
3. If the Project involves a Federal Emergency
Management Agency (FEMA) mapped
floodplain, the City should require the
Applicant to provide all information required
to meet FEMA requirements and that the
Applicant should obtain a Conditional Letter
of Map Revision (CLOMR) and Letter of
Map Revision (LOMR)
4. The Project may require the Applicant to
obtain a Section 1602 Agreement, a Clean
Water Act Section 404 Permit, and a Clean
Water Act Section 401 Water Quality
Certification
Comments have
been noted and are
addressed in Section
5.9 – Hydrology and
Water Quality
Mauricio
Alvarez –
Riverside
Transit
Authority
(RTA)
(August 21,
2020)
RTA comments they are requesting a sidewalk on
Alessandro Blvd that is Americans with Disabilities
Act (ADA) compliant with capacity to install a bus
sign pole and bench in the future. RTA will install
these improvements when appropriate.
Section 5.12 –
Transportation
City of Riverside Section 2.0
Sycamore Hills Distribution Center Project DEIR Introduction
2.0-5
Commenting
Party
(Date of
Letter/email)
Summary of Comment
Addressed in
Section(s) of the
DEIR
Lijin Sun –
South Coast
Air Quality
Management
District
(SCAQMD)
(August 25,
2020)
1. SCAQMD recommends that the SCAQMD’s
CEQA Air Quality Handbook and website be
used as guidance in preparing the air quality
and greenhouse gas analyses. SCAQMD
additionally recommends the CalEEMod
land use emissions software be used as
well, and further notes the California Air
Resource Board’s (CARB) Air Quality and
Land Use Handbook: A Community Health
Perspective as a general reference guide for
evaluating and reducing air pollution
impacts.
2. SCAQMD recommends the Project’s air
quality impacts be determined by comparing
Project criteria pollutant emissions to
SCAQMD’s CEQA regional pollutant
emissions significance thresholds and
localized significance thresholds. It is also
noted that potential adverse air quality
impacts from all phases of the Project
should be identified, and that air quality
impacts from construction and operation
should be calculated. It is additionally
recommended that a mobile source health
risk assessment be performed if the Project
generates diesel emissions.
3. The comment letter indicates that SCAQMD
should be identified as a Responsible
Agency should the Project require a permit
from SCAQMD.
4. SCAQMD expresses its staff’s concerns
about potential public health impacts of
siting warehouses within close proximity of
sensitive land uses and cites its Multiple Air
Toxics Exposure Study (MATES IV, May
2015).
5. SCAQMD provides a number of mitigation
measures it recommends the City consider
in the event the Project results in significant
adverse air quality impacts, including
measures for operational air quality impacts
from mobile sources and other area
sources.
Section 5.2 – Air
Quality
Section 5.7 –
Greenhouse Gases
The Air Quality
Impact Analysis and
Health Risk
Assessment are
contained in
Appendix C.
Section 2.0 Cit y of Riverside
Introduction Sycamore Hills Distribution Center Project DEIR
2.0-6
Commenting
Party
(Date of
Letter/email)
Summary of Comment
Addressed in
Section(s) of the
DEIR
6. SCAQMD additionally recommends design
considerations to further reduce potential air
quality and health risk impacts.
Scott Wilson-
CDFW
(August 25,
2020)
Assessment of Biological Resources
1. An assessment of various habitat types and
a map that identifies the location of each
habitat.
2. A biological inventory of species present or
have the potential to be present.
3. A complete recent inventory of rare,
threatened, endangered, and other sensitive
species located within the Project footprint.
4. A thorough, recent, floristic-based
assessment of special status plants and
natural communities.
5. Information on the regional setting that is
critical to an assessment of environmental
impacts.
6. A full accounting of all
mitigation/conversation lands within and
adjacent to the Project. Include impacts to
the existing restricted covenant.
Analysis of Direct, indirect, and cumulative
impacts to Biological resources
1. A discussion of potential impacts from
lighting, noise, human activity, defensible
space, and wildlife-human interaction etc.
Changes to drainage patterns should also
be discussed (water quality, volume,
velocity, etc.).
a. DEIR should fully describe and
identify the location, acreage, and
composition of defensible space.
b. Defensible space should be provided
and accounted for within proposed
development area and not
transferred to adjacent open space
2. A discussion on potential indirect Project
impacts on biological resources, including
areas adjacent.
3. An evaluation of impacts to adjacent and
onsite open space/conserved lands from
both the Project and long-term
operational/maintenance needs.
Section 5.3 –
Biological Resources,
Section 5.9 –
Hydrology and Water
Quality, and Section
5.15 – Wildfire.
The Biological
Resources Report
and MSHCP
Consistency Report
is contained in
Appendix D.
City of Riverside Section 2.0
Sycamore Hills Distribution Center Project DEIR Introduction
2.0-7
Commenting
Party
(Date of
Letter/email)
Summary of Comment
Addressed in
Section(s) of the
DEIR
a. DEIR should include an evaluation of
all potential Project-related impacts
to the restricted covenant and the
Wilderness Park.
4. Cumulative effects analysis which includes
potential direct and indirect impacts to
riparian areas, wetlands, vernal pools,
wildlife corridors or wildlife movement areas,
aquatic habitats, sensitive species and other
sensitive habitats, open lands etc.
Alternatives Analysis
CDFW recommends the DEIR describes and
analyzes a range of alternatives for the Project
Mitigation Measures for Project Impacts to
Biological Resources
CDFW recommends the DEIR identify mitigation
measures for the following topics;
1. Fully Protected Species: may not be taken
or possessed at any time. CDFW
recommends that the DEIR analyzes
potential adverse impacts to fully protected
species and that the City include in the
analysis how appropriate avoidance,
minimization, and mitigation measures will
reduce indirect impacts to fully protected
species.
2. Sensitive Plant Communities: the DEIR
should include measures to fully avoid and
otherwise protect sensitive plant
communities from Project-related direct and
indirect impacts.
3. California Species of Special Concern
(CSSC): CSSCs should be considered
during the environmental review process.
4. Mitigation: the DEIR should include
mitigation measures for adverse Project-
related impacts to sensitive species and
habitats. Mitigation measures should
emphasize avoidance and reduction of
Project impacts. For unavoidable impacts,
habitat restoration and/or enhancement, and
preservation should be evaluated and
discussed in detail.
Section 2.0 Cit y of Riverside
Introduction Sycamore Hills Distribution Center Project DEIR
2.0-8
Commenting
Party
(Date of
Letter/email)
Summary of Comment
Addressed in
Section(s) of the
DEIR
a. The DEIR should include measures
to perpetually protect the targeted
habitat values within mitigation area
from direct and indirect adverse
impacts. Specific issues are
restrictions on access, proposed
land dedications, long-term
monitoring and management
programs, control of illegal dumping,
water pollution, increased human
intrusion, etc.
b. If sensitive species and/or their
habitat may be impacted from the
Project, CDFW recommends the
inclusion of specific mitigation in the
DEIR.
c. CDFW recommends that the DEIR
specify mitigation that is roughly
proportional to the level of impacts,
in accordance with the provisions of
CEQA.
d. CDFW is concerned of the
construction of an access road over
approximately 0.67 acres of lands
conserved under a restricted
covenant. CDFW recommends that
the City conduct a thorough analysis
of this proposal and include in the
DEIR an in-depth discussion
demonstrating that this proposal
represents an appropriate and
defensible mitigation strategy.
CDFW recommends that the City
include in the DEIR a discussion of
onsite habitat values and habitat
management activities conducted
pursuant to the Restoration Plan.
The DEIR should specifically
address how the mitigation proposal
will provide superior conservation
values. Copies of the Restoration
Plan and associated annual reports
should be included as an appendix.
5. Habitat Revegetation/Restoration Plans:
Plans should be prepared b
y persons with
City of Riverside Section 2.0
Sycamore Hills Distribution Center Project DEIR Introduction
2.0-9
Commenting
Party
(Date of
Letter/email)
Summary of Comment
Addressed in
Section(s) of the
DEIR
expertise in southern California ecosystems.
Each plan should include the following;
a. The location of restoration sites and
assessment of appropriate reference
sites;
b. The plant species to be used,
sources of local propagules,
container sizes, and seeding rates;
c. A schematic depicting the mitigation
area;
d. A local seed and cuttings and
planting schedule;
e. A description of the irrigation
methodology;
f. Measures to control exotic
vegetation on site;
g. Specific success criteria;
h. A detailed monitoring program;
i. Contingency measures should the
success criteria not be met; and
j. Identification of the party responsible
for meeting the success criteria and
providing for conservation of the
party responsible for meeting the
success criteria and providing for
conservation of the mitigation site.
CDFW recommends that local onsite
propagules from the Project area and
nearby vicinity be collected and used for
restoration purposed. Onsite seed
collection should be initiated.
Restoration objectives should include
protecting special habitat elements or
recreating them.
6. Nesting Birds and Migratory Bird Treaty Act:
CDFW recommends that the DEIR include
specific avoidance and minimization
measures to ensure that impacts to nesting
birds do not occur and measures should a
nest be location. If pre-construction surveys
are proposed, CDFW recommends no more
than three (3) days prior to vegetation
clearing or ground disturbance activities.
Section 2.0 Cit y of Riverside
Introduction Sycamore Hills Distribution Center Project DEIR
2.0-10
Commenting
Party
(Date of
Letter/email)
Summary of Comment
Addressed in
Section(s) of the
DEIR
California Endangered Species Act
CDFW recommends early consultation and
recommends the DEIR addresses all Project
impacts to listed species and specifies a mitigation
monitoring and reporting program.
Western Riverside County Multiple Species
Habitat Conservation Plan
1. An assessment of the impacts to the
MSHCP as a result to this Project is
necessary to address CEQA requirements.
2. The permittees need to demonstrate that
proposed actions are consistent with the
MSHCP. The DEIR needs to address how
the proposed Project will affect the policies
and procedures of the MSHCP. All surveys
and results shall be included in the DEIR.
Mitchell M.
Tsai –
Attorneys for
Southwest
Regional
Council of
Carpenters
(SWRCC)
(August 26,
2020)
The commenter states the following:
1. The commenter provided comments that are
more administrative, not related to the EIR
or project, and these comments are noted.
2. The City should require the Applicant to
provide additional community benefits such
as requiring local hires and paying prevailing
wages to benefit the City – comment noted.
3. It would be beneficial for the City to require
the Applicant to hire workers who
a. have graduated from a Joint Labor
Management apprenticeship training
program approved by the State, or
b. have as many hours of on-the-job
experience as would be required to
graduate from such a program;
c. are registered apprentices in an
apprenticeship training program
approved by the State
4. The City should require the Project to be
built to standards exceeding the current
2019 California Green Building code and
2020 County of Los Angeles Green Building
Standards Code to both mitigate
environmental impacts and advance
progress toward the State’s environmental
goals
Items #1-5 do not
relate to the content
or analysis contained
in the DEIR.
The Project’s
compliance with the
California Building
Code is addressed in
Sections 5.2 – Air
Quality, 5.5 – Energy,
5.7 – Greenhouse
Gases, and 5.10
Land Use.
The Air Quality
Impact Analysis and
Health Risk
Assessment are
contained in
Appendix C.
City of Riverside Section 2.0
Sycamore Hills Distribution Center Project DEIR Introduction
2.0-11
Commenting
Party
(Date of
Letter/email)
Summary of Comment
Addressed in
Section(s) of the
DEIR
The commenter additionally provides the following
regarding COVID-19:
5. Due to the COVID-19 Crisis, the City must
adopt a mandatory finding of significance
that the Project may cause a substantial
adverse effect on human beings
a. The commenter recommends the
Lead Agency adopt additional CEQA
mitigation measures to mitigate
public health risks from Project
construction activities
b. The commenter recommends
several work practices regarding
construction site design, testing
procedures, and planning as it
relates to disease preparedness and
response
Nick
Tavaglione –
NL Tavaglione
Consulting
(NLTC)
(August 26,
2020)
The commenter indicates NLTC’s services have
been retained by a party whose property may be
impacted by the Project with regards to ingress and
egress, existing traffic signal(s) elimination, and
additional traffic signal(s) and requests traffic
reports/documents that justify the changes
mentioned.
Section 5.12 –
Transportation and
the Traffic Operations
Analysis is included
as Appendix L
Len Nunney -
Friends of
Riverside’s
Hills
(August 27,
2020)
The Friends of Riverside’s Hills comments that the
following should be addressed in the DEIR:
1. All phases of development as well as
developments in the area
2. Construction traffic impacts
3. Biological resource impacts, including the
Project’s proximity to the nearby Sycamore
Canyon Wilderness Park (Park) and the role
of the Park in the preservation of the
endangered Stephens’ kangaroo rat and as
a core area in the Western Riverside County
Multiple Species Habitat Conservation Plan
(MSHCP)
4. Urban/wildlands interface impacts, including
issues outlined in the MSHCP
5. Aesthetic and view impacts, including the
Project’s proximity to the Park
6. Cultural Resource impacts
7. Energy impacts, including mitigation options
such as solar panel generation
Section 3 – Project
Description
Section 4 –
Environmental
Setting
Section 5.1 –
Aesthetics
Section 5.2 – Air
Quality
Section 5.3 –
Biological Resources
Section 5.4 – Cultural
Resources
Section 5.5 – Energy
Section 5.6 –
Geology and Soils
Section 2.0 Cit y of Riverside
Introduction Sycamore Hills Distribution Center Project DEIR
2.0-12
Commenting
Party
(Date of
Letter/email)
Summary of Comment
Addressed in
Section(s) of the
DEIR
8. Geology and soils impacts, including the
amount of grading involved in the Project
9. Land use and planning impacts
10. Recreation impacts, including the Project’s
proximity to the Park and the need to
maintain access to the Park
11. Traffic impacts, including nearby streets and
intersection impacts
12. Noise impacts, including impacts to the Park
13. Light impacts, including impacts to the Park
14. Water quality impacts, including impacts to
on-site riparian areas and plans for their
future management
15. Air quality impacts
16. Water supply impacts
Section 5.9 –
Hydrology and Water
Quality
Section 5.10 – Land
Use and Planning
Section 5.11 – Noise
Section 5.12 –
Transportation/Traffic
Section 5.14 –
Wildfire
Section 7 –
Environmental
Effects Found not to
be Significant
Comments received at the scoping meeting are summarized in Table 2.0-2-Summary of Comments Received at the August 12, 2020, Virtual Scoping Meeting.
Table 2.0-2 – Summary of Comments Received
At the August 12, 2020, Virtual Scoping Meeting
Commenting Party Summary of Comments Location in DEIR in which Comment is Addressed
Bill Quisenberry – Labor
Relations Representative,
Laborers’ International Union
of North America (LiUNA!)
Commenter expressed
interest in possible
contracting with the Project
applicant and requested
contact information.
Section 2 – Introduction
provides Project Applicant
information; comment was
also noted and addressed by
the City.
Copies of the NOP, Initial Study, and copies of written comments received by the City in response to the NOP are included in Appendix A.
An EIR is an informational document intended to inform decisions makers and the general public of potentially significant environmental impacts of a project. An EIR also identifies possible ways to minimize these potentially significant impacts (referred to as a mitigation) and describes alternatives to a project that may also reduce its significant impacts. Having the authority to take action on the proposed Project, the City Planning Commission and the City Council will consider the information in this EIR in their evaluations of the Project. The findings and conclusions presented in the EIR regarding environmental impacts do not control the City’s discretion to approve, deny, or modify the Project, but instead are presented as information to aid the decision- making process.
City of Riverside Section 2.0
Sycamore Hills Distribution Center Project DEIR Introduction
2.0-13
As set forth in Section 15021 of the State CEQA Guidelines, as Lead Agency, the City has the duty to avoid or minimize environmental damage where feasible. Furthermore, Section 15021(d) of the State CEQA Guidelines states that, “CEQA recognizes that in determining whether and how a project should be approved, a public agency has an obligation to balance a variety of public objectives, including economic, environmental, and social factors, and in particular the goal of providing a decent home and satisfying living environment for every Californian.” Other public agencies (i.e., Responsible and Trustee Agencies) that may use this EIR in their decision-making or permit processes will consider the information in this EIR along with other information that may be presented during the CEQA process. In accordance with CEQA, the public agencies will be required to make findings for each environmental impact of the Project that cannot be mitigated to below a level of significance. If the Lead Agency determines that the benefits of the proposed Project outweigh significant environmental effect s, the Lead Agency will be required to adopt a Statement of Overriding Considerations stating the reasons supporting its action notwithstanding the Project’s significant environmental effects.
Potentially Significant Environmental Effects
CEQA requires consideration and discussion of significant environmental effects. Section 15126 of the State CEQA Guidelines state that, “All phases of a project must be considered when evaluating its impact on the environment: planning, acquisition, development, and operation.” Section 5 of this DEIR will address each environmental effect that was determined to be potentially significant in the NOP (Appendix A). Each effect is organized into an issue area; those that will be analyzed (and the section of the DEIR in which the analysis is contained) are listed below:
Aesthetics (Section 5.1)
Air Quality (Section 5.2)
Biological Resources (Section 5.3)
Cultural Resources (Section 5.4)
Energy (Section 5.5)
Geology and Soils (Section 5.6)
Greenhouse Gas Emissions (Section 5.7)
Hazards and Hazardous Materials (Section 5.8)
Hydrology and Water Quality (Section 5.9)
Land Use and Planning (Section 5.10)
Noise (Section 5.11)
Transportation (Section 5.12)
Tribal Cultural Resources (Section 5.13)
Utilities (Section 5.14)
Wildfire (Section 5.15)
Section 2.0 Cit y of Riverside
Introduction Sycamore Hills Distribution Center Project DEIR
2.0-14
Format
This DEIR has been organized in sections as follows:
Table of Contents to assist readers in locating the analysis of different subjects and issues as required by Section 15122 of the State CEQA Guidelines. A list of acronyms used in the EIR is included in the table of contents.
Section 1 – Executive Summary covers the summary requirements of CEQA as required by Section 15123 of the State CEQA Guidelinesand includes: the Project location, a brief description of the Project, a matrix containing a summary of environmental impacts and mitigation measures, Project objectives, approvals related to the Project, areas of controversy, and a brief description of the Project alternatives.
Section 2 – Introduction describes the scope and purpose of the DEIR, identifies the Project Applicant and Lead Agency, provides a brief summary of the CEQA process to date, summarizes and identifies the documents incorporated by reference in the DEIR.
Section 3 – Project Description contains the information required by Section 15124 of the State CEQA Guidelines including: a detailed description of the Project, the Project objectives, a general description of the Project’s environmental setting, the approvals needed to implement the Project, and a list of agencies expected to use the DEIR.
Section 4 – Environmental Setting provides a general overview of the environmental setting for the proposed Project and the developments considered in the cumulative impact analysis in Section 5.
Section 5 – Environmental Impact Analysis satisfies the requirements of Sections 15125, 15126, 15126.2, and 15126.4 of the State CEQA Guidelines by including an analysis of each environmental issue area determined to have potentially significant impacts in the NOP or as a result of comments received in response to the NOP. For each issue area analyzed, this section includes a discussion of the setting to which ea ch issue area is analyzed against, defines the related regulations affecting the proposed Project, identifies the thresholds used to determine significance, describes any Project design fe atures that would reduce impacts, analyzes the Project’s impacts, provides a description of the mitigation measures used to reduce or lessen potential impacts, discusses the Project’s impacts, if mitigation is required, and analyzes the Project’s potential cumulative impacts.
Section 6 – Other CEQA Topics includes the Project’s consistency with regional plans, significant irreversible impacts, and growth inducing impact discussion.
Section 7 – Environmental Effects Found Not Significant includes the topics and thresholds in which the Project would not have significant impacts.
Section 8 – Alternatives satisfies the requirements of Section 15126.6 of the State CEQA Guidelines by identifying and discussing the no Project alternative in addition to alternatives to the Project that lessen the severity of significant impacts and identifying the environmentally superior alternative.
City of Riverside Section 2.0
Sycamore Hills Distribution Center Project DEIR Introduction
2.0-15
Section 9 – References includes a listing of all reference materials, the organizations and persons contacted in preparing the EIR, and a list of preparers as required by Section 15129 of the State CEQA Guidelines.
2.6 Documents Incorporated by Reference
Section 15150 of the State CEQA Guidelines permits and encourages an environmental document to incorporate, by reference, other documents that provide relevant data. The documents summarized below are incorporated by reference, and the pertinent material is summarized throughout this EIR, where that inform ation is relevant to the analysis of potential impacts of the Project. All documents incorporated by reference are available for review at, or can be obtained through, the City of Riverside, Community & Economic Development Department, Planning Division. Technical studies cited below were specifically developed in connection with the Project. Where noted as appendices, the reports are included in their entirety.
City of Riverside General Plan 2025 Final Program Environmental Impact Report The City of Riverside General Plan 2025 Final Program Environmental Impact Report (GP 2025 FPEIR) was certified in 2007. The GP 2025 FPEIR provided a first tier analysis of the potential environmental effects of the adoption and implementation of the proposed General Plan, adoption and implementation of the comprehensive update of the Zoning Code and Subdivision Code, an amendment to the Noise Code, and adoption and implementation of the Magnolia Avenue Specific Plan as well as the adoption and implementation of the Citywide Design and Sign Guidelines. The GP 2025 FPEIR contains information regarding the environmental setting within the City and is available online at http://www.riversideca.gov/planning/gp2025program.
City of Riverside General Plan 2025
The City of Riverside General Plan 2025(GP 2025) was adopted in 2007. The GP 2025 is a long- range plan designed to control and regulate the growth in the City and to maintain the quality of the human and natural environment. The GP 2025 is the City’s planning “constitution,” or a blueprint for development, and is the single-most important policy document in guiding land use and development decisions within the City (GP 2025 FPEIR, p. 2-5). To that end, the GP2025 contains goals and policies that serve as the planning framework for the City in addition to providing direction for City operations and programs and serves as a guide to public and private decision making. The GP 2025 includes the following elements: Land Use and Urban Design, Circulation and Community Mobility, Housing, Arts and Culture, Education, Public Safety, Noise, Open Space and Conservation, Air Quality, Public Facilities, and Park and Recreation Elements.
The GP 2025 is available online at http://www.riversideca.gov/planning/gp2025program.
City of Riverside Municipal Code
The City’s Municipal Code complements the GP 2025. The Municipal Code, which contains among other ordinances, the City’s Zoning Code, is a mechanism to implement and enforce the goals, objectives, policies and programs articulated in the GP 2025. Many of the potential environmental concerns considered in this DEIR are adequately addressed through application Section 2.0 Cit y of Riverside
Introduction Sycamore Hills Distribution Center Project DEIR
2.0-16
of regulations contained in the Municipal Co de. The Municipal Code is available online at http://www.riversideca.gov/municode.
Sycamore Canyon Business Park Specific Plan and EIR
Originally known as the Box Springs Industrial Park Specific Plan, the Sycamore Canyon Business Park Specific Plan (SCBPSP) was originally adopted April 10, 1984 and has been amended 14 times. The SCBPSP describes a planned industrial park consisting of approximately 920 acres of industrial and commercial uses and a 480-acre wilderness park (Sycamore Canyon Wilderness Park) within an approximately 1,500-acre area. The purpose of the SCBPSP is to assure efficient, orderly, and attractive devel opment. To provide for orderly development, the SCBPSP was coordinated with the Sycamore Canyon Specific Plan and the General Development Plan for the Sycamore Canyon Park. The SCBPSP is available online at https://riversideca.gov/cedd/sites/riversideca.gov.cedd/files/pdf/planning/spec-plans/syc-bus- park/plan_doc.pdf.
The SCBPSP was the result of a complex series of circumstances. As the only large, undeveloped area of land not previously subject to detailed planning analysis, the site had been identified as a potential significant opportunity in economic re vitalization studies conducted in 1978. A number of studies covering the area occurred between when the Specific Plan was adopted. Important factors in these studies were preserving the land now known as Sycamore Canyon Wilderness Park and establishing land uses that would be compatible with what is now known as the March Air Reserve Base Airport Compatibility Plan available at http://www.rcaluc.org/Portals/13/17%20- %20Vol.%201%20March%20Air%20Reserve%20Base%20Final.pdf?ver=2016-08-15-145812- 700. A good portion of the property within the SCBPSP is impacted by the C1 – Primary Approach/Departure Zone and D – Flight Corridor Buffer Compatibly Criteria that limits other uses, such as residential uses, in this area.
Sycamore Canyon Wilderness Park Stephen’s Kangaroo Rat Management Plan and Updated Conceptual Development Plan.
The Sycamore Canyon Wilderness Park Stephens’ Kangaroo Rat Management Plan and Updated Conceptual Development Plan was prepared with two purposes: update the park’s conceptual development plan and provide a coordinated Maintenance/Management Plan for the endangered Stephens’ kangaroo rat (SKR). Because the Sycamore Canyon Wilderness Park was designated as a core reserve in the Habitat Conservation Plan (HCP) for the SKR, the City was required to prepare a Maintenance/Management Plan for the core reserve. The plan is available online at the City’s website:
https://riversideca.gov/cedd/sites/riversideca.gov.cedd/files/pdf/planning/spec- plans/SycCynMnmgtPlan_UpdatedConceptualPlan.pdf
City of Riverside Section 3.0
Sycamore Hills Distribution Center Project Project Description
3.0-1
3.0 Project Description
This section describes the Project, identifies the Project location, the Project site and surrounding land uses, project characteristics, objectives, and discretionary actions needed for approval. This DEIR analyzes the potential environmental effects of the construction and operation of the proposed Sycamore Hills Distribution Center Project, and all associated on-and off-site supporting improvements, which herein collectively are referred to as the “Project.”
3.1 Project Location
The regional setting of the Project is shown on Figure 3.0-1 – Regional Map. The Project is located approximately 10 miles south of Downtown Riverside. The Project site is within the southwestern quarter of Section 9, Township 3 South, Range 4 West, as shown on the Riverside East, California, United States Geological Survey (USGS) 7.5-minute quadrangle. (Figure 3.0-2 – Vicinity Map). The Project site is located in th e eastern portion of the City of Riverside, east of Barton Street, west of Sycamore Canyon Boulevar d, and north of Alessandro Boulevard, within the Sycamore Canyon Business Park Specific Plan. (Figure 3.0-3 – Project Location Map). The Project site is approximately 48.64 gross acres and includes the following Assessor’s Parcel Numbers (APNs):
x APN: 263-060-022
x APN: 263-060-024
x APN: 263-060-026
Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
SYCAMORE HILLS DISTRIBUTION CENTER
Regional Map
Figure 3.0-1
¯
01 0 2 0 5
Miles
^
Project Location
Copyright:© 2013 National Geographic Society, i-cubed
SYCAMORE HILLS DISTRIBUTION CENTER
Vicinity Map
Figure 3.0-2
¯
0 2,000 4,0001,000
Feet
Project Location
USGS 7.5 minute Quadrangle: Riverside East, Range: 4W, Section: 8, 9, Township: 3S
SYCAMORE HILLS DISTRIBUTION CENTER
Project /RFDWLRQ Map
Figure 3.0-3
Source: Bing Aerial Microsoft Corporation 2020, Datum: NAD 83, Coordinate Sytem: State Plane 6 Date: G:\Projects\2020-0007SycamoreDist\GIS\2020-0007ProjectSiteProposed.mxd 0 225 450112.5
Feet
¯
Legend
Existing Restricted Property
Property Boundary
Site Plan
Proposed Restricted Property
Riverside City Boundary
East Allesandro Boulevard
Barton Street
Avendida Hacienda
Vista Grande Drive
Sycamore Canyon Wildernes Park
Riverside County
City of Riverside Section 3.0
Sycamore Hills Distribution Center Project Project Description
3.0-5
3.1.1 Project Site – Existing Conditions
The Project site is currently undeveloped and vacant but has been used historically as open space. The topography consists of natural rolling terrain descending gradually from a west to east direction. There are granitic rock outcroppings throughout the property (see Figures 3.0-4A-E).
The Project site contains two drainages, Drainage A and Drainage B. Drainage A enters the site near the northern portion of the western boundary and flows for approximately 1,183 feet before exiting the site near the middle of the norther n boundary. Drainage B enters the site near the middle of the southern boundary and flows for approximately 981 feet before exiting the site near the middle of the northern boundary.
The Project site contains low to moderate vegetation primarily consisting of non-native grasslands and weeds as well as some riparian woodland. The non-native grasslands and weeds make up approximately 41 acres of the Project site and the riparian woodland makes up approximately 5 acres. Patches of sparse Riversidean sage scrub are present in the upland areas and make up a total of approximately 2 acres. The rest of the Project site is disturbed with no vegetation or exposed rock.
Several unpaved trails cross through the Project site and the drainages. The trails are not vegetated and are used by both people and animals. Several trails lead into the Sycamore Canyon Wilderness Park just north of the Project site and a couple trails lead into the private property to the east. These on-site trails are not identified as designated trails in the Sycamore Canyon Wilderness Park Stephens’ Kangaroo Rat Management Plan and Updated Conceptual Development Plan.
The Project site contains an existing area of approximately 11.6 acres legally designated as “Restricted Property” (see Figure 3.0-3). The Restricted Property area supports a jurisdictional drainage and associated riparian habitat and was required as a condition of the Clean Water Act Section 404 permit from the U.S. Army Corps of Engineers for construction of the Grove Community Church at an off-site location, approximately one mile southwest. The Restricted Property is intended for preservation in a natural condition.
SYCAMORE HILLS DISTRIBUTION CENTER
Photo Location Map
Figure 3.0-4$
Source: Bing Aerial Microsoft Corporation 2020, Datum: NAD 83, Coordinate Sytem: State Plane 6 Date: G:\Projects\2020-0007SycamoreDist\PhotoLocation\2020-0007PhotoLocations.mxd 0 225 450112.5
Feet
¯
Legend
Property Boundary
!( Photo Location13
East Allesandro Boulevard
Barton Street
Avendida Hacienda
Vista Grande Drive
Sycamore Canyon Wildernes Park
Sycamore Hills Distribution Center
Site Photos
Figure 3.0-4B
View 1 View 2
View 3 View 4
Sycamore Hills Distribution Center
Site Photos
Figure 3.0-4C
View 5 View 6
View 7
View 8
Sycamore Hills Distribution Center
Site Photos
Figure 3.0-4D
View 9 View 10
View 11 View 12
Sycamore Hills Distribution Center
Site Photos
Figure 3.0-4E
View 13
City of Riverside Section 3.0
Sycamore Hills Distribution Center Project Project Description
3.0-11
3.1.2 Project Site Background
The Project site was formerly owned by the Grove Community Church where a new church was planned to be constructed in the future. However, as the site is located within the C-1 Primary Approach/Departure Zone of the March Air Reserve Base/ Inland Port Airport Land Use Compatibility Plan, and due to restrictions regarding the height of the building and the maximum number of people allowed to congregate at any time, it was not conducive to the church’s plans.
March Joint Powers Authority (MJPA) assisted the church in finding a new location for the church, approximately one mile to the southwest at 19900 Grove Community Drive, Riverside.
Construction of the Grove Community Church at the off-site 19900 Grove Community Drive, location had impacts to a jurisdictional drainage and associated riparian habitat at that location.
To mitigate for impacts from construction of the church at the off-site location, the U.S. Army Corps of Engineers required that the on-site jurisdictional drainage and riparian habitat along Alessandro Boulevard be set aside and preserved in a legally designated “Restricted Property,” as a condition of the Clean Water Act Section 404 permit that was issued for the construction of the church. The “Restricted Property” was recorded in 2009.
MJPA purchased the Project site property from the church with the intent to sell and to convey title of the “Restricted Property” area to the City of Riverside. However, a parcel map was not created, and the title transfer did not take place. MJPA is still the owner of the entire Project site property. The Project applicant intends to purchase the property from MJPA upon project entitlement approvals.
The Project site and surrounding area has been the subject of City planning efforts since the early 1980s. To place the Project site and surrounding land uses into context, these efforts are described below.
Amended 1979 – Air Installation Compatible Use Zones
As amended in October of 1979, the Air Installation Compatible Use Zones (AICUZ) report for March Air Force Base, identifies aircraft noise and accident potential effects of the mission at March AFB. It also recommends land use plans, policies, and ordinances which are intended to ensure compatible relationships in the local environments of the base.
The bulk of property within the Sycamore Canyon Business Park is described as impacted by aircraft noise contours of 80 CNEL or above. In addition, a large area of land along the Atchison, Topeka and Santa Fe Railway (AT&SF) railroad is exposed to accident potential resulting from aircraft operations.
April 1984 – Sycamore Canyon Business Park Specific Plan and EIR Originally known as the Box Springs Industrial Park Specific Plan, the Sycamore Canyon Business Park Specific Plan (SCBPSP) was adopted April 10, 1984 and has been amended several times since its adoption. The SCBPSP encompasses approximately 1,500 acres, consisting of a 920-acre planned industrial park with industrial and commercial uses, and a 480- acre wilderness park (Sycamore Canyon Wilderness Park). The purpose of the SCBPSP is to Section 3.0 City of Riverside
Project Description Sycamore Hills Distribution Center Project
3.0-12
assure efficient, orderly, and attractive develop ment. To provide for orderly development, the SCBPSP was coordinated with the Sycamore Canyon Specific Plan and the General Development Plan for the Sycamore Canyon Park.
The SCBPSP was the result of a complex series of circumstances including: (i) the SCBPSP was the only large, undeveloped area of land not previously subject to detailed planning analysis; (ii) the SCBPSP area had been identified as a potenti ally significant development opportunity for economic revitalization; (iii) the adoption of the Arlington Heights Plan in 1979; (iv) the Southeast Study Area report adopted in 1980; and (v) the Air Installation Compatible Use Zones (AICUZ) (amended in 1979) for March Air Force Base. Important factors in these studies included preservation of the land now known as Sycamore Canyon Wilderness Park and establishment of land uses that would be compatible with what is now known as the March Air Reserve Base (MARB) Airport Compatibility Plan. Under the MA RB Compatibility Plan, a good portion of the property within the SCBPSP is impacted by the C1 – Primary Approach/Departure Zone and D – Flight Corridor Buffer Compatibly Criteria that limits other uses, such as residential uses, in this area.
April 1984 – Sycamore Canyon Specific Plan (SCSP) and EIR The Sycamore Canyon Specific Plan(SCSP) was adopted on April 10, 1984, to further the voter's intent shown by the passage of Proposition R with regard to protecting natural hillside and arroyo areas. Overall development levels established by Proposition R are the basis of the SCSP; however, the location and density of development was shifted within the SCSP area. This shift was made in order to protect Sycamore Canyon as a complete ecosystem, to the extent possible, within the limitations of the SCSP area and adjacent lands. The major thrust of the SCSP was to identify the area most appropriately preserved as open space in order to protect the various natural resources in and around Sycamore Canyon. The SCSP called for preservation of over 920 acres of land, of which about 450 acres are involved in the main canyon or its tributaries and the steep surrounding slopes. The remaining 470 acres to be preserved includes sensitive wildlife areas, archaeological areas, and linking areas, many of which have other special features such as rock outcroppings.
The SCSP provides for the development of perimeter portions of the site with residential and some commercial uses while protecting areas in and around Sycamore Canyon for open space.
The proposed residential uses allowed under the SCSP were broken out of the SCSP and were instead covered by the Lusk Highlander Specific Plan (now known as the Sycamore Highlands Specific Plan).
April 1984 – Air Installation Compatible Use Zones
An updated Air Installation Compatible Use Zones (AICUZ) report for the March ARB March Air Force Base Riverside County Comprehensive Land Use Plan (CLUP) was adopted on April 26, 1984. The CLUP placed the newly created SCBPSP into Area II. Area II was defined to be those areas of significant safety concerns due to aircraft maneuvering, ascending, descending, turning, and changing power settings when landing or taking off from the airport. Due to safety concerns, the City chose industrial use for Area II because it would potentially expose fewer people.
City of Riverside Section 3.0
Sycamore Hills Distribution Center Project Project Description
3.0-13
The AICUZ study has been updated a number of times since its 1984 adoption, with an updated study released in 2005 and the most recent released in 2018. The March Air Reserve Base/Inland Port Airport Land Use Compatibility Plan (discussed further below) is primarily based on the 2005 AICUZ study.
March 1999 – Sycamore Canyon Wilderness Park Stephens’ Kangaroo Rat Management Plan and Updated Conceptual Development Plan
The Sycamore Canyon Wilderness Park Stephens’ Kangaroo Rat Management Plan and Updated Conceptual Development Plan was prepared with two purposes: update the Sycamore Canyon Wilderness Park’s (Park) conceptual development plan and provide a coordinated Maintenance/Management Plan for the endangered Stephens’ kangaroo rat (SKR). The City was required to prepare a Maintenance/Management Plan because the Park was designated as a core reserve in the Habitat Conservation Plan for the Stephen’s Kangaroo Rat (SKR HCP) in Western Riverside County.
Adopted November 2014 – March Air Reserve Base /Inland Port Airport Land Use Compatibility Plan
The March Air Reserve Base/Inland Port Airport Land Use Compatibility Plan (March ARB/IPA ALUCP) was prepared for and adopted by the Riverside County Airport Land Use Commission (RCALUC). In accordance with provisions of the California State Aeronautics Act (Public Utilities Code Section 21670 et seq.), the RCALUC has been assigned the lead responsibility for airport land use compatibility planning around each of the pu blic-use and military airports in Riverside County, including the preparation of an ALUCP for eac h airport. With regard to military airports, Public Utilities Code Section 21675(b) states that Airport Land Use Commissions (ALUCs) must prepare a compatibility plan and that such plans “shall be consistent with the safety and noise standards in the Air Installations Compatible Use Zones plan prepared for that military airport” (RCALUC 2014). Accordingly, as previously me ntioned, the 2014 ALUCP is based primarily on the 2005 AICUZ study.
As noted on Map MA-1 of the March ARB/IPA ALUCP, the Project site is located in Compatibility Zone C1. Per Table MA-2 – Basic Compatibility, Zone C1, the Primary Approach/Departure Zone, permits most uses, including industrial but limit s the density/intensity of industrial uses and includes development conditions, such as discouraging aboveground bulk storage of hazardous materials and requiring airspace review for objects greater than 70 feet tall (MARB/IPA ALUCP, Table MA-2).
3.1.3 Land Use and Zoning
The City of Riverside General Plan 2025 (GP 2025) land use designation for the Project site is Business/Office Park (B/OP), Figure 3.0-5 Land Use Designation Map. The Project site is zoned BMP-SP – Business and Manufacturing Park and Specific Plan (Sycamore Canyon Business Park) Overlay Zones, Figure 3.0-6 – Zoning Map. The Project site is within the Sycamore Canyon Business Park Specific Plan (SCBPSP), which is considered a “Major Business Park” as shown Section 3.0 City of Riverside
Project Description Sycamore Hills Distribution Center Project
3.0-14
on Figure LU-4 of the GP 2025. The SCBPSP designation for the Project site is Industrial, Figure
3.0-7.
3.1.4 Surrounding Land Use and Zoning
The Project site is bordered on the north by the Sycamore Canyon Wilderness Park, vacant property to the east, Barton Street and a wastewater treatment plant to the west, and the Citywide Self Storage facility and Alessandro Boulevard to the south. Commercial and residential uses are located further south (across Alessandro Boul evard), within the City and County of Riverside jurisdictions. Table 3.0-1 details the land use and zoning of the Project site and surrounding areas.
City of Riverside Section 3.0
Sycamore Hills Distribution Center Project Project Description
3.0-15
Table 3.0-1 – Site and Surrounding Land Use/Zoning Designations Existing Land Use General Plan
Designation Zoning Designation
Project Site Vacant
B/OP – Business/Office
Park
BPM-SP – Business and
Manufacturing Park and
Specific Plan (Sycamore
Canyon Business Park)
Overlay Zones
North
Sycamore Canyon
Wilderness Park
P – Public Park PF-SP – Public Facilities and
Specific Plan (Sycamore
Canyon Business Park)
Overlay Zones
East
Vacant and Citywide Self-
Storage
B/OP – Business/Office
Park, and
P – Public Park
BPM-SP – Business and
Manufacturing Park and
Specific Plan (Sycamore
Canyon Business Park)
Overlay Zones, and
PF-SP – Public Facilities and
Specific Plan (Sycamore
Canyon Business Park)
Overlay Zones
South
Citywide Self-Storage
Across Alessandro Blvd.
commercial and residential
(in County of Riverside)
C – Commercial
CG-X-20 – Commercial
General, Building Setback (20
feet from Barton Street)
Overlay Zones, and
CR – Commercial Retail Zone
West
Wastewater Treatment Plant PF – Public
Facilities/Institutions and
C – Commercial
PF – Public Facilities Zone,
CG-X-20 – Commercial
General, Building Setback (20
feet from Barton Street)
Overlay Zones, and
CR-X-50/20 – Commercial
Retail and Building Setback
(50 feet from Alessandro Blvd.
and 20 feet from other streets)
Overlay Zones
SYCAMORE HILLS DISTRIBUTION CENTER
Land Use Designation Map
Figure 3.0-5
Source: Bing Aerial Microsoft Corporation 2020, Datum: NAD 83, Coordinate Sytem: State Plane 6 Date: 11/04/2020 G:\Projects\2020-0007SycamoreDist\GIS\Landuse\2020-0007Landuse.mxd 0 225 450112.5
Feet
¯
East Allesandro Boulevard
Barton S
tre
et
Avendida Hacienda
Vi
sta Grande Dri
ve
Sycamore Canyon Wildernes Park
Legend
Property Boundary
Riverside City Boundary
B/OP - Business/Office Park
C - Commercial
Roads
HDR - High Density Residential
MDR - Medium Density Residential
P - Public Park
PF - Public Facilities/Institutional
SRR - Semi Rural Residential
Riverside County
Property Boundary
SYCAMORE HILLS DISTRIBUTION CENTER
Zoning Map
Figure 3.0-
Source: Bing Aerial Microsoft Corporation 2020, Datum: NAD 83, Coordinate Sytem: State Plane 6 Date: G:\Projects\2020-0007SycamoreDist\GIS\Landuse\2020-0007Zoning.mxd 0 225 450112.5
Feet
¯
East Allesandro Boulevard
Barton Street
Avendida Hacienda
Vista Grande Drive
Sycamore Canyon Wildernes Park
Legend
Property Boundary
Riverside City Boundary
BMP-SP - Business & Manufacturing Park & Specific Plan
(Sycamore Canyon Business Park) Overlay
CG - Commercial General Zone
CR - Commercial Retail Zone
PF - Public Facilities Zone
R-1-1/2 Acre Single Family Residential
R3-2000 - Multiple-Family Residential Zones
Riverside County