Cities Index.
Electric Schedule NEM redlined and proposed

Riverside City Council
May 10, 2022

Document
Electric Schedule NEM redlined and proposed
Meeting
May 10, 2022
Body
Riverside City Council
Original file
233 KB
Text extracted from the city's file for reading and search. Open the original on riversideca.legistar1.com. That file is the official record.

City of Riverside
Public Utilities Department

Adopted by Board of Public Utilities:  February 15, 2013   Board Resolution No. 2013‐1 Approved by City Council:  March 26, 2013   Council Resolution No.:  22513 Effective Date:  March 26, 2013
SCHEDULE NEM
NET ENERGY METERING FOR
RENEWABLE ELECTRICAL GENERATION FACILITIES
(This rate schedule is closed to new Customers as of November 1, 2022.  Customers must receive Permit Completion for their Renewable Electrical Generation Facility no later than October 31, 2022 to be eligible for Schedule NEM.)

Applicability:

Applicable to all end‐use Eligible Customer‐Generators who execute the applicable Standard Contract‐NEM.

An Eligible Customer Generator is a residential, commercial, industrial or agricultural Customer who uses a Renewable Electrical Generation Facility, or a combination of those facilities, with a capacity of not more than 1,000 kilowatts, that
is located on the Customer’s owned, leased, or rented premises, and is interconnected and operates in parallel with the Utility’s transmission and distribution facilities, and is intended primarily to offset part or all of the Customer’s own electrical requirements on the premises.

Territory:

Within the service area of the City
of Riverside

Rates:

All rates charged under this schedule will be in accordance with the Eligible Customer‐Generator’s otherwise applicable tariff  (OAT)  or  rate  schedule,  in  effect  from  time  to  time,  on  a  Net  Energy  Metering  basis.   An  Eligible  Customer‐ Generator served under this schedule is responsible for all charges in its OAT including the monthly or annual minimum
charges (including service, customer, reliability, network access, and demand charges, when applicable), regardless of the Customer’s monthly or annual net generation.

Eligible Customer‐Generators under this schedule are subject to any new or additional charge(s) that may be imposed by the Utility on the other customers in the rate class to which Customer would otherwise be assigned.

Special Conditions:

1.  Availability:

A Customer shall be eligible for this Schedule NEM provided the Customer has received final approval of all required  building  permit  applications  from  the  City’s  Building  and  Safety  Division,  or  authority  having jurisdiction, and the Utility’s requirements (“Permit Completion”) for their Renewable Electrical Generation Facility no later than October 31, 2022 (“Schedule NEM Deadline”). Any Customer who is eligible for Schedule NEM, shall remain on the Schedule NEM until either the Customer ceases to receive electric service at the Premises  where  the  Renewable  Electrical  Generation  Facility  is  located,  increases  the  original  Renewable Electrical Generation Facility capacity by more than twenty‐five percent (25%), or installs a new Renewable Electrical  Generation  Facility,  whichever  is  earlier.  In  addition,  a  Schedule  NEM  Customer  may  elect  to permanently switch to the Schedule Self‐Gen “Self‐Generation Program for Renewable Electrical Generation Facilities” (Schedule Self‐Gen), or available rate for Renewable Electrical Generation Facilities, at any time.

New customers establishing service at an existing Premise with a Renewable Generation Electrical Facility are not eligible for this Schedule NEM.

Customers who receive Final Permit Approval for their Renewable Electrical Generation Facility subsequent to the Schedule NEM Deadline, shall not be eligible for Schedule NEM; however, these Customers shall be eligible for Schedule Self‐Gen, subject to the terms and conditions of Schedule Self‐Gen.

2.  Agreement:

In order for this schedule to apply, Customer must sign the Utility’s Standard Contract – NEM.  The Standard Contract – NEM shall contain additional terms and conditions, including without limitation, indemnification, insurance, and access to Customer’s premises and Generating Facilities requirements.

City of Riverside
Public Utilities Department

Schedule NEM – Net Energy Metering For Renewable Electric Generation Facilities      ‐ 2‐

Adopted by Board of Public Utilities:  February 15, 2013   Board Resolution No. 2013‐1 Approved by City Council:  March 26, 2013   Council Resolution No.:  22513 Effective Date:  March 26, 2013

32.  Billing:

a.  Residential and Small Commercial (Schedule A Flat Rate) Customers:

(1)  The  annualized  Net  Energy  Metering  calculation  shall  be  made  by  measuring  the difference between the energy supplied to the Customer and the energy generated by the Customer and fed back to the Utility’s grid over a Twelve‐Month Period.  At the end of each Twelve‐Month Period, and at each anniversary date thereafter, the Utility shall determine if the Customer was a net consumer or a net generator of energy during the Twelve‐Month Period.  In the event the energy supplied by the Utility during the Twelve‐ Month Period exceeds the energy generated by the Customer during that same period, the Customer is a net energy consumer.

(2)  If the Customer is a net energy consumer, the Utility will bill the Customer for the net energy  consumed  during  the  Twelve‐Month  Period  based  on  Customer’s  OAT  and Customer shall
pay for such net energy consumed annually.

(3)  The Customer may elect to be billed monthly for net energy consumed upon initiation of service  under  this  Schedule  or  upon  proper  written  notice  to  the  Utility  no  later  than thirty‐days prior to the Customer’s regularly scheduled meter read date in January of each
year.  Such change shall be made by the Utility at the beginning of a new Twelve‐Month Period  coinciding  with  the  Customer’s  regularly  scheduled  meter  read  date  in  January following receipt of Customer’s proper written notice.

b.  Commercial (Schedule A Demand Rate), Industrial or Agricultural Rate Customers:

(1) The  annualized  Net  Energy  Metering  calculation  shall  be  made  by  measuring  the difference between the energy supplied to the Customer and the energy generated by the Customer and fed back to the Utility’s grid over a Twelve‐Month Period. Additionally, at the end of each billing period, the Utility shall determine if the Customer was a net consumer or a net generator of energy. In the event the energy supplied by the Utility to the Customer during the preceding billing period exceeds the energy generated by the Customer during that same billing period, the Customer is a net energy consumer.

(2)  If the Customer is a net energy consumer, the Utility will bill the Customer for the net energy consumed during such billing period based on Customer’s OAT and Customer shall pay for such net energy consumed monthly in accordance with the Customer’s monthly billing statement and the Electric Rules.

c.  All Eligible Customer – Generators:

(1)  If the Customer’s OAT employs “time of use” rates, any net energy consumed monthly shall  be  calculated  according  to  the  terms  of  the  OAT.   When  the  Customer  is  a  net generator during any discrete time of use period over a billing period, the net kilowatt‐ hours generated shall be valued at the same price per kilowatt‐hour as the Utility would charge for retail kilowatt‐hour sales during that same time of use period.

(2)  If the Customer’s OAT employs “tiered” rates, any net energy consumed monthly shall be calculated according to the terms of the OAT.  When the Customer is a net generator over a billing period, the net kilowatt‐hours generated shall be valued at the same price per kilowatt‐hour as the Utility would charge for the same tiered quantity of energy during that billing period.

(3)  The  Utility  shall
provide  all  customers  with  Net  Energy  Metering  consumption  and generation  information  on  a  monthly  basis.   Such  monthly  update  shall  include  the City of Riverside
Public Utilities Department

Schedule NEM – Net Energy Metering For Renewable Electric Generation Facilities      ‐ 3‐

Adopted by Board of Public Utilities:  February 15, 2013   Board Resolution No. 2013‐1 Approved by City Council:  March 26, 2013   Council Resolution No.:  22513 Effective Date:  March 26, 2013
current accrued balance owed to the Utility for Net Energy Metering charges, or current accrued credits for Net Energy Metering generation, whichever applies.

(4)  If the energy generated exceeds the energy consumed by the Customer, the Customer is a net energy generator. If the Customer is a net generator of energy over a normal billing
period,  any  excess  kilowatt‐hours  generated  during  the  billing  period  shall  be  carried forward  as  a  monetary  value  to  the  following  billing  period  (until  the  end  of  the Customer’s Twelve‐Month Period).

(5)   At the end of each Twelve‐Month Period, the Utility shall retain any Net Surplus Energy
generated  by  the  Net  Surplus  Customer  Generator,  including  any  associated environmental attributes or renewable energy credits (REC), and Customer’s monetary value  shall  be  reset  to  zero  for  the  subsequent  Twelve‐Month  Period.   In  addition,  no payment will be made to any Customer for the excess energy delivered to the Utility’s grid,  unless  the  Customer  elects  to  receive  Net  Surplus  Energy  Compensation  for  that excess energy by electing a compensation option, as set forth in Subsection 2.c.6 herein.

(6)  Customer  may,  upon  the  Utility’s  timely  receipt  of  Customer’s  written  affirmative election, be eligible for Net Surplus Energy Compensation. The Customer’s Net Surplus Energy Compensation shall be calculated over a Twelve‐Month Period beginning with the Customer’s regularly scheduled meter read date in January following receipt of a timely filed affirmative election and conclude as of the Customer’s regularly scheduled meter read date the following December.

Customers may receive Net Surplus Energy Compensation for Net Surplus Energy at the end of a Twelve‐Month Period by affirmatively electing one of the following methods:

i. Receive  compensation  based  on  an  annual  time‐differentiated  per kilowatt‐hour rate for Net Surplus Energy generated during the prior Twelve‐Month Period. The rate will be posted on the Utility’s website (RiversidePublicUtilities.com/ElectricRates) on January 1 of each year and will be effective from January 1 through December 31.  The rate shall be established annually by the Public Utilities General Manager based upon the average hourly cost of renewable energy purchased by the Utility and reported in the most recently audited fiscal year; or

ii. Receive the Net Surplus Energy as a kilowatt‐hour credit calculated using the Net Surplus Energy Compensation rate and applied against future billing periods.

(7)  Affirmative  elections  remain  effective  for  each  Twelve‐Month  Period  following  the execution  of  such  election.  Customers
are  eligible  to  revise  their  Net  Surplus  Energy
Compensation elections by giving written notice to the Utility at least thirty days prior to the beginning of each succeeding Twelve‐Month Period.

(8)  If any Customer terminates service under this Schedule prior to the end of any Twelve‐ Month Period, the Utility
shall reconcile the Customer’s energy consumed and generated following the last reconciliation, according to the requirements set forth in this schedule, except  that  those  requirements  shall  apply  only  to  the  months  since  the  most  recent twelve‐month bill.

43.  Metering:

Net  Energy  Metering  shall  be  accomplished  using  a  Required  Meter.   The  Utility  shall  own,  operate  and maintain the Required Meter on the Customer’s premises.   If the existing meter at Customer’s premises is not capable of measuring the flow of energy in two directions, Customer shall be responsible for all expenses City of Riverside
Public Utilities Department

Schedule NEM – Net Energy Metering For Renewable Electric Generation Facilities      ‐ 4‐

Adopted by Board of Public Utilities:  February 15, 2013   Board Resolution No. 2013‐1 Approved by City Council:  March 26, 2013   Council Resolution No.:  22513 Effective Date:  March 26, 2013
involved  in  the  Utility’s  purchase  and  installation  of  the  Required  Meter.   The  Utility,  at  its  expense,  may purchase and install additional meters with the consent of the Customer to provide the information necessary to accurately credit or bill the Customer or to collect generating system performance information for research purposes.  If  an  additional  meter  or  meters  are  installed,  the  net  metering  calculation  shall  yield  a  result identical to that of a single meter.

54.  Definitions:

a.  “Renewable  Electrical  Generation  Facility”  means  a  facility  that  generates  electricity  from  a renewable source listed in paragraph (1) of subdivision (a) of Section 25741 of the California Public Resources Code including biomass, solar thermal, photovoltaic, wind, geothermal, fuel cells using renewable  fuels,  small  hydroelectric  generation,  digester  gas,  municipal  solid  waste  conversion, landfill gas, ocean wave, ocean thermal, or tidal current, and any additions or enhancements to the facility using that technology.

b.  “Net Energy Metering” means measuring the difference between the energy supplied through the electric grid to the Customer and the energy generated by an Eligible Customer‐Generator and fed
back to the electric grid over a Twelve‐Month Period, as described in California Public Utilities Code Section 2827 (c) and (h).

c.  “Net  Surplus  Customer  Generator”  means  an  Eligible  Customer‐Generator  that  generates  more energy in a Twelve‐Month Period than is supplied by the Utility to the Eligible Customer‐Generator during the same Twelve‐Month Period.

d.  “Net Surplus Energy” means all energy generated by an Eligible Customer‐Generator measured in kilowatt‐hours over a Twelve‐Month Period that exceeds the amount of energy consumed by that Eligible Customer‐Generator.

e.  “Net Surplus Energy Compensation” means compensation, either monetary or as a billing credit, at
a  per  kilowatt‐hour  rate,  established  by  Riverside’s  Board  of  Public  Utilities  and  adopted  by Riverside’s  City  Council,  offered  by  the  Utility  to  the  Net  Surplus  Customer  Generator  for  Net Surplus Energy.

f.  “Required Meter” means a single meter capable of registering the flow of energy in two directions.

g.  “Small Commercial Customer” means a customer that has a maximum peak demand of less than 20 kilowatts, as defined in subdivision (h) of Section 331 of the California Public Utilities Code.

h.  “Standard  Contract  –  NEM”  means  that  standard  contract  entitled  “Net  Energy Metering
Interconnection  Agreement  for  Solar  or  Wind  Turbine  Electric  Generating  Facilities”  available  to Eligible Customer Generator, as established by Riverside’s Board of Public Utilities and adopted by Riverside’s City Council from time to time, and offered in accordance with California Public Utilities Code Section 2827.

i.  “Twelve‐Month  Period”  means
the  Twelve‐Month  Period  commencing  with  the  Customer’s regularly  scheduled  meter  read  date  in  January  and  concluding  as  of  the  Customer’s  regularly scheduled  meter  read  date  the  following  December.  The  Customer’s  first  such  period  will commence as of the date of interconnection and conclude as of the regularly scheduled meter read date the following December, and may be less than 12 months.

65.  State Mandated Public Benefits Charge:

The  rates  in  Eligible  Customer‐Generator’s  OAT  are  subject  to  a  surcharge  as  adopted  by  City  Council Resolution No. 19203, and such surcharge as in effect from time to time. The applicable Public Benefits Charge will be applied in accordance with the Customer’s OAT. The Public Benefits Charge that is applicable to the Customer  under  the  Customer’s  OAT  shall  be  calculated  based  upon  the  Customer’s  total  energy  usage City of Riverside
Public Utilities Department

Schedule NEM – Net Energy Metering For Renewable Electric Generation Facilities      ‐ 5‐

Adopted by Board of Public Utilities:  February 15, 2013   Board Resolution No. 2013‐1 Approved by City Council:  March 26, 2013   Council Resolution No.:  22513 Effective Date:  March 26, 2013
charges including net energy consumed, monthly or annual minimum charges (including service, customer, reliability, and demand charges, when applicable), for the applicable billing period.

76.  Miscellaneous Fees and Charges:

Rates charged pursuant to this Schedule shall be subject to any Energy Users Taxes, Utility Users Taxes and any other governmental taxes, duties, or fees which are applicable to Electric Service provided to Customer by the Utility. Rates are also subject to adjustment, as established by Riverside’s Board of Public Utilities and adopted by Riverside’s City Council in response to federal or state climate change laws, renewable portfolio standard or other mandated legislation.   These adjustments may include but are not limited to charges to mitigate the impacts of greenhouse gas emissions or “green power” premiums.

87.  Power Cost Adjustment Factor
(“PCAF”):

The “PCAF”, as provided in Part C of the General Provisions, shall apply to Customer’s net energy consumed and such other charges as indicated by Customer’s OAT.

98.  Environmental Attributes and Renewable Energy Credits (“REC”):

Customers  electing  service  under  this  Schedule  must  certify  that  they  have  sole  ownership  of  the environmental attributes and RECs. For Customers who elect to receive Net Surplus Energy Compensation, any environmental attributes and RECs associated with such compensation shall be the property of the Utility.

Customers who elect to receive net surplus energy as a kilowatt‐hour credit calculated using the Net Surplus Energy  Compensation  rate  and  applied  against  future  billing  periods  may  transfer  ownership  of  any environmental attributes and RECs to the Utility.

109.  Program Cap:

The total contract generating capacity for qualifying customers of this Schedule shall collectively not exceed the required total rated generating capacity percentage of the Utility’s aggregate peak customer demand as required by California Public Utilities Code section 2827 (c)(1).

Until the program cap is reached, the Schedule shall be open to eligible customers on a first‐come‐first‐served basis. Once the program cap is reached, the Schedule will be closed to any new customers, until such time as qualified customers included within the program cap, with an executed Standard Contract – NEM, no longer receives service under this Schedule, thus allowing participation by additional eligible customers until a new program cap is reached.

1110.  Applicable Rate Schedule:

a. Applicable Rate Schedule

For Customers applying for service at an existing service address, the Utility will assign the electric rate schedule based on the characteristics of the service address. The Utility will presume that any electric rate previously assigned to that service address is the appropriate schedule, unless Customer requests a review  for  another  applicable  rate  schedule,  rate,  or  optional  provision.  In  certain  situations  when  a Customer does not qualify for an electric rate previously assigned to that service address, the Utility will assign  the  applicable  rate  to  the  Customer.  The  Utility  assumes  no  responsibility  for  advising  the Customer of lower optional rates under existing schedules available as a result of the Customer’s changes to the characteristics of the service address.
b. Change of Rate Schedule

A change to the applicable rate schedule may be made if the Utility determines that the Customer no longer qualifies for the assigned rate schedule. Subject to meter availability, the change will become effective for service rendered after the next regular meter reading following verification and approval City of Riverside
Public Utilities Department

Schedule NEM – Net Energy Metering For Renewable Electric Generation Facilities      ‐ 6‐

Adopted by Board of Public Utilities:  February 15, 2013   Board Resolution No. 2013‐1 Approved by City Council:  March 26, 2013   Council Resolution No.:  22513 Effective Date:  March 26, 2013
by the Utility of such eligibility.   Any change in rate schedules pursuant to this section shall be made prospectively.

City of Riverside
Public Utilities Department

Adopted by Board of Public Utilities:      Board Resolution No.

Approved by City Council:      Council Resolution No.

Effective Date:

SCHEDULE NEM
NET ENERGY METERING FOR
RENEWABLE ELECTRICAL GENERATION FACILITIES
(This rate schedule is closed to new Customers as of November 1, 2022.  Customers must receive Permit Completion for their Renewable Electrical Generation Facility no later than October 31, 2022 to be eligible for Schedule NEM.)

Applicability:

Applicable to all end
‐use Eligible Customer‐Generators who execute the applicable Standard Contract‐NEM.

An Eligible Customer Generator is a residential, commercial, industrial or agricultural Customer who uses a Renewable Electrical Generation Facility, or a combination of those facilities, with a capacity of not more than 1,000 kilowatts, that is located on the
Customer’s owned, leased, or rented premises, and is interconnected and operates in parallel with the Utility’s transmission and distribution facilities, and is intended primarily to offset part or all of the Customer’s own electrical requirements on the premises.

Territory:

Within the service area of the City of Riverside

Rates:

All rates
charged under this schedule will be in accordance with the Eligible Customer‐Generator’s otherwise applicable tariff  (OAT)  or  rate  schedule,  in  effect  from  time  to  time,  on  a  Net  Energy  Metering  basis.   An  Eligible  Customer‐ Generator served under this schedule is responsible for all charges in its OAT including the monthly or annual minimum charges (including service, customer, reliability, network access, and demand charges, when applicable), regardless of the Customer’s monthly or annual net generation.

Eligible Customer‐Generators under this schedule are subject to any new or additional charge(s) that may be imposed by the Utility on the other customers in
the rate class to which Customer would otherwise be assigned.

Special Conditions:

1.  Availability:

A Customer shall be eligible for this Schedule NEM provided the Customer has received final approval of all required  building  permit  applications  from  the  City’s  Building  and  Safety  Division,  or  authority  having jurisdiction, and the
Utility’s requirements (“Permit Completion”) for their Renewable Electrical Generation Facility no later than October 31, 2022 (“Schedule NEM Deadline”). Any Customer who is eligible for Schedule NEM, shall remain on the Schedule NEM until either the Customer ceases to receive electric service at the Premises  where  the  Renewable  Electrical  Generation  Facility  is  located,  increases  the  original  Renewable Electrical Generation Facility capacity by more than twenty‐five percent (25%), or installs a new Renewable Electrical  Generation  Facility,  whichever  is  earlier.  In  addition,  a  Schedule  NEM  Customer  may  elect  to permanently switch to the Schedule Self‐Gen “Self‐Generation Program for Renewable Electrical Generation Facilities” (Schedule Self‐Gen), or available rate for Renewable Electrical Generation Facilities, at any time.

New customers establishing service at an existing Premise with a Renewable Generation Electrical Facility are not eligible for this Schedule NEM.

Customers who receive Final Permit Approval for their Renewable Electrical Generation Facility subsequent to the Schedule NEM Deadline, shall not be eligible for Schedule NEM; however, these Customers shall be eligible for Schedule Self‐Gen, subject to the terms and conditions of Schedule Self‐Gen.

2.  Agreement:

In order for this schedule to apply, Customer must sign the Utility’s Standard Contract – NEM.  The Standard Contract – NEM shall contain additional terms and conditions, including without limitation, indemnification, insurance, and access to Customer’s premises and Generating Facilities requirements.

City of Riverside
Public Utilities Department

Schedule NEM – Net Energy Metering For Renewable Electric Generation Facilities      ‐ 2‐

Adopted by Board of Public Utilities:      Board Resolution No.

Approved by City Council:     Council Resolution No.

Effective Date:

3.  Billing:

a.  Residential and Small Commercial (Schedule A Flat Rate) Customers:

(1)  The  annualized  Net  Energy  Metering  calculation  shall  be  made  by  measuring  the difference between the energy supplied to
the Customer and the energy generated by
the Customer and fed back to the Utility’s grid over a Twelve‐Month Period.  At the end of each Twelve‐Month Period, and at each anniversary date thereafter, the Utility shall determine if the Customer was a net consumer or a net generator of energy during the Twelve‐Month Period.  In the event the energy supplied by the Utility during the Twelve‐ Month Period exceeds the energy generated by the Customer during that same period, the Customer is a net energy consumer.

(2)  If the Customer is a net energy consumer, the Utility will bill the Customer for the net
energy  consumed  during  the  Twelve‐Month  Period  based  on  Customer’s  OAT  and Customer shall pay for such net energy consumed annually.

(3)  The Customer may elect to be billed monthly for net energy consumed upon initiation of service  under  this  Schedule  or  upon  proper  written notice  to  the  Utility  no  later  than
thirty‐days prior to the Customer’s regularly scheduled meter read date in January of each year.  Such change shall be made by the Utility at the beginning of a new Twelve‐Month Period  coinciding  with  the  Customer’s  regularly  scheduled  meter  read  date  in  January following receipt of Customer’s proper written notice.

b.  Commercial (Schedule A Demand Rate), Industrial or Agricultural Rate Customers:

(1) The  annualized  Net  Energy  Metering  calculation  shall  be  made  by  measuring  the difference between the energy supplied to the Customer and the energy generated by the Customer and fed back
to the Utility’s grid over a Twelve‐Month Period. Additionally, at the end of each billing period, the Utility shall determine if the Customer was a net consumer or a net generator of energy. In the event the energy supplied by the Utility to the Customer during the preceding billing period exceeds the energy generated by the Customer during that same billing period, the Customer is a net energy consumer.

(2)  If the Customer is a net energy consumer, the Utility will bill the Customer for the net energy consumed during such billing period based on Customer’s OAT and Customer shall

pay for such net energy consumed monthly in accordance with the Customer’s monthly billing statement and the Electric Rules.

c.  All Eligible Customer – Generators:

(1)  If the Customer’s OAT employs “time of use” rates, any net energy consumed monthly shall  be  calculated  according  to  the  terms  of  the  OAT.   When  the  Customer  is  a  net generator during any discrete time of use period over a billing period, the net kilowatt‐ hours generated shall be valued at the same price per kilowatt‐hour as the Utility would charge for retail kilowatt‐hour sales during that same time of use period.

(2)  If the Customer’s OAT employs “tiered” rates, any net energy consumed monthly shall be calculated according to the terms of the OAT.  When the Customer is a net generator over a billing period, the net kilowatt‐hours generated shall be valued at the same price per kilowatt‐hour as the Utility would charge for the same tiered quantity of energy during that billing period.

(3)  The  Utility  shall  provide  all  customers  with  Net  Energy  Metering  consumption  and generation  information  on  a  monthly  basis.   Such  monthly  update  shall  include  the City of Riverside
Public Utilities Department

Schedule NEM – Net Energy Metering For Renewable Electric Generation Facilities      ‐ 3‐

Adopted by Board of Public Utilities:      Board Resolution No.

Approved by City Council:     Council Resolution No.

Effective Date:
current accrued balance owed to the Utility for Net Energy Metering charges, or current accrued credits for Net Energy Metering generation, whichever applies.

(4)  If the energy generated exceeds the energy consumed by the Customer, the Customer is
a net energy generator. If the Customer is a net generator of energy over a normal billing period,  any  excess  kilowatt‐hours  generated  during  the  billing  period  shall  be  carried forward  as  a  monetary  value  to  the  following  billing  period  (until  the  end  of  the Customer’s Twelve‐Month Period).

(5)   At the end of each Twelve‐Month Period, the Utility shall retain any Net Surplus Energy generated  by  the  Net  Surplus  Customer  Generator,  including  any  associated environmental attributes or renewable energy credits (REC), and Customer’s monetary value  shall  be  reset  to  zero  for  the  subsequent  Twelve ‐Month  Period.   In  addition,  no
payment will be made to any Customer for the excess energy delivered to the Utility’s grid,  unless  the  Customer  elects  to  receive  Net  Surplus  Energy  Compensation  for  that excess energy by electing a compensation option, as set forth in Subsection 2.c.6 herein.

(6)  Customer  may,  upon  the  Utility’s  timely  receipt  of  Customer’s  written  affirmative election, be eligible for Net Surplus Energy Compensation. The Customer’s Net Surplus Energy Compensation shall be calculated over a Twelve‐Month Period beginning with the Customer’s regularly scheduled meter read date in January following receipt of a timely filed affirmative election and conclude as of the Customer’s regularly scheduled meter read date the following December.

Customers may receive Net Surplus Energy Compensation for Net Surplus Energy at the end of a Twelve‐Month Period by affirmatively electing one of the following methods:

i. Receive  compensation  based  on  an  annual  time‐differentiated  per kilowatt‐hour rate for Net Surplus Energy generated during the prior Twelve‐Month Period. The rate will be posted on the Utility’s website (RiversidePublicUtilities.com/ElectricRates) on January 1 of each year and will be effective from January 1 through December 31.  The rate shall be established annually by the Public Utilities General Manager based upon the average hourly cost of renewable energy purchased by the Utility and reported in the most recently audited fiscal year; or

ii. Receive the Net Surplus Energy as a kilowatt‐hour credit calculated using the Net Surplus Energy Compensation rate and applied against future billing periods.

(7)  Affirmative  elections  remain  effective  for  each  Twelve‐Month  Period  following  the execution  of  such  election.  Customers  are  eligible  to  revise  their  Net  Surplus  Energy Compensation elections by giving written notice to the Utility at least thirty days prior to the beginning of each succeeding Twelve‐Month Period.

(8)  If
any Customer terminates service under this Schedule prior to the end of any Twelve‐ Month Period, the Utility shall reconcile the Customer’s energy consumed and generated following the last reconciliation, according to the requirements set forth in this schedule, except  that  those  requirements  shall  apply  only  to  the  months  since  the  most  recent twelve‐month bill.

4.  Metering:

Net  Energy  Metering  shall  be  accomplished  using  a  Required  Meter.   The  Utility  shall  own,  operate  and maintain the Required Meter on the Customer’s premises.   If the existing meter at Customer’s premises is not capable of measuring the flow of energy in two
directions, Customer shall be responsible for all expenses City of Riverside
Public Utilities Department

Schedule NEM – Net Energy Metering For Renewable Electric Generation Facilities      ‐ 4‐

Adopted by Board of Public Utilities:      Board Resolution No.

Approved by City Council:     Council Resolution No.

Effective Date:
involved  in  the  Utility’s  purchase  and  installation  of  the  Required  Meter.   The  Utility,  at  its  expense,  may purchase and install additional meters with the consent of the Customer to provide the information necessary to accurately credit or bill the Customer or to collect generating system performance information for research purposes.  If  an  additional  meter  or  meters  are  installed,  the  net  metering  calculation  shall  yield  a  result identical to that of a single meter.

5.  Definitions:

a.  “Renewable  Electrical  Generation  Facility”  means  a  facility that  generates  electricity  from  a
renewable source listed in paragraph (1) of subdivision (a) of Section 25741 of the California Public Resources Code including biomass, solar thermal, photovoltaic, wind, geothermal, fuel cells using renewable  fuels,  small  hydroelectric  generation,  digester  gas,  municipal  solid  waste  conversion, landfill gas, ocean wave, ocean thermal, or tidal current, and any additions or enhancements to the facility using that technology.

b.  “Net Energy Metering” means measuring the difference between the energy supplied through the electric grid to the Customer and the energy generated by an Eligible Customer‐Generator and fed back to the electric grid over a
Twelve‐Month Period, as described in California Public Utilities Code Section 2827 (c) and (h).

c.  “Net  Surplus  Customer  Generator”  means  an  Eligible  Customer‐Generator  that  generates  more energy in a Twelve‐Month Period than is supplied by the Utility to the Eligible Customer‐Generator during the same Twelve‐Month Period.

d.  “Net Surplus Energy” means all energy generated by an Eligible Customer‐Generator measured in kilowatt‐hours over a Twelve‐Month Period that exceeds the amount of energy consumed by that Eligible Customer‐Generator.

e.  “Net Surplus Energy Compensation” means compensation, either monetary or as a billing credit, at a  per  kilowatt‐hour  rate,  established  by  Riverside’s  Board  of  Public  Utilities  and  adopted  by Riverside’s  City  Council,  offered  by  the  Utility  to  the  Net  Surplus  Customer  Generator  for  Net Surplus Energy.

f.  “Required Meter” means a single meter capable of registering the flow of energy in two directions.

g.  “Small
Commercial Customer” means a customer that has a maximum peak demand of less than 20 kilowatts, as defined in subdivision (h) of Section 331 of the California Public Utilities Code.

h.  “Standard  Contract  –  NEM”  means  that  standard  contract  entitled  “Net  Energy  Metering Interconnection  Agreement  for  Solar  or  Wind  Turbine  Electric  Generating  Facilities”  available  to Eligible Customer Generator, as established by Riverside’s Board of Public Utilities and adopted by Riverside’s City Council from time to time, and offered in accordance with California Public Utilities Code Section 2827.

i.  “Twelve‐Month  Period”  means  the  Twelve‐Month  Period  commencing  with  the  Customer’s regularly  scheduled  meter  read  date  in  January  and  concluding  as  of  the  Customer’s  regularly scheduled  meter  read  date  the  following  December.  The  Customer’s  first  such  period  will commence as of the date of interconnection and conclude as of the regularly scheduled meter read date the following December, and may be less than 12 months.

6.  State Mandated Public Benefits Charge:

The  rates  in  Eligible  Customer‐Generator’s  OAT  are  subject  to  a  surcharge  as  adopted  by  City  Council Resolution No. 19203, and such surcharge as in effect from time to time. The applicable Public Benefits Charge will be applied in accordance with
the Customer’s OAT. The Public Benefits Charge that is applicable to the Customer  under  the  Customer’s  OAT  shall  be  calculated  based  upon  the  Customer’s  total  energy  usage City of Riverside
Public Utilities Department

Schedule NEM – Net Energy Metering For Renewable Electric Generation Facilities      ‐ 5‐

Adopted by Board of Public Utilities:      Board Resolution No.

Approved by City Council:     Council Resolution No.

Effective Date:
charges including net energy consumed, monthly or annual minimum charges (including service, customer, reliability, and demand charges, when applicable), for the applicable billing period.

7.  Miscellaneous Fees and Charges:

Rates charged pursuant
to this Schedule shall be subject to any Energy Users Taxes, Utility Users Taxes and any other governmental taxes, duties, or fees which are applicable to Electric Service provided to Customer by the Utility. Rates are also subject to adjustment, as established by Riverside’s Board of Public Utilities and adopted by Riverside’s City Council in response to federal or state climate change laws, renewable portfolio standard or other mandated legislation.   These adjustments may include but are not limited to charges to mitigate the impacts of greenhouse gas emissions or “green power” premiums.

8.  Power Cost Adjustment Factor (“PCAF”):

The “PCAF”,
as provided in Part C of the General Provisions, shall apply to Customer’s net energy consumed and such other charges as indicated by Customer’s OAT.

9.  Environmental Attributes and Renewable Energy Credits (“REC”):

Customers  electing  service  under  this  Schedule  must  certify  that  they  have  sole  ownership  of  the environmental attributes
and RECs. For Customers who elect to receive Net Surplus Energy Compensation, any environmental attributes and RECs associated with such compensation shall be the property of the Utility.

Customers who elect to receive net surplus energy as a kilowatt‐hour credit calculated using the Net Surplus Energy  Compensation  rate  and  applied  against  future  billing  periods  may  transfer  ownership  of  any environmental attributes and RECs to the Utility.

10.  Program Cap:

The total contract generating capacity for qualifying customers of this Schedule shall collectively not exceed the required total rated generating capacity percentage of the Utility’s aggregate peak customer demand as required
by California Public Utilities Code section 2827 (c)(1).

Until the program cap is reached, the Schedule shall be open to eligible customers on a first‐come‐first‐served basis. Once the program cap is reached, the Schedule will be closed to any new customers, until such time as qualified customers included within the program cap, with an executed Standard Contract – NEM, no longer receives service under this Schedule, thus allowing participation by additional eligible customers until a new program cap is reached.

11.  Applicable Rate Schedule:

a. Applicable Rate Schedule

For Customers applying for service at an existing service address, the Utility will assign the electric rate schedule based on the characteristics of the service address. The Utility will presume that any electric rate previously assigned to that service address is the appropriate schedule, unless Customer requests a review  for  another  applicable  rate  schedule,  rate,  or  optional  provision.  In  certain  situations  when  a Customer does not qualify for an electric rate previously assigned to that service address, the Utility will assign  the  applicable  rate  to  the  Customer.  The  Utility  assumes  no  responsibility  for  advising  the Customer of lower optional rates under existing schedules available as a result of the Customer’s changes to the characteristics of the service address.
b. Change of Rate Schedule

A change to the applicable rate schedule may be made if the Utility determines that the Customer no longer qualifies for the assigned rate schedule. Subject to meter availability, the change will become effective for service rendered after the next regular meter reading following verification and approval City of Riverside
Public Utilities Department

Schedule NEM – Net Energy Metering For Renewable Electric Generation Facilities      ‐ 6‐

Adopted by Board of Public Utilities:      Board Resolution No.

Approved by City Council:     Council Resolution No.

Effective Date:
by the Utility of such eligibility.   Any change in rate schedules pursuant to this section shall be made prospectively.

← All documents from this meeting