Memorandum
Economics | Strategy | Stakeholders | Sustainability www.newgenstrategies.net
225 Union Boulevard
Suite 305
Lakewood, CO 80228
Phone: (720) 633-9514

To:  City of Riverside Public Utilities
From:  NewGen Strategies and Solutions, LLC
Date:  February 8, 2022
Re:  Review of Riverside Public Utilities’ Self‐Generation Program

The City of Riverside (City) and Riverside Public Utilities (Utility) have retained NewGen Strategies and Solutions, LLC (NewGen) to assist in a review of proposed changes to its Self‐Generation Program (referred to  as  Net  Energy  Metering  [NEM]  by  other  utilities).   The  proposed  Self‐Generation  Program  includes characteristics that are similar to rates offered or being proposed by other large utilities in California in that they compensate new solar customers according to the time they generate and provide excess power to RPU’s electric system.  This excess power is proposed to be credited at RPU’s avoided cost of energy, which will ensure greater equity across the RPU service territory.

NewGen was retained to perform the following tasks:

1. Review the proposed rate structure and billing method applicable under the Self‐Generation Program and provide an opinion as to the overall proposal, the assumptions within, and the application of the billing methods.

2. Evaluate two alternative rate structures which could be applicable under the Self‐Generation Program for all rate schedules and provide an opinion as to the practicality and assumptions associated with these alternatives.

3. Review the avoided cost of energy calculation for accuracy and thoroughness.  Provide guidance and pros and cons regarding components that may be included or excluded from the calculation.  Provide guidance on how the avoided cost of energy calculation can be periodically updated.

4. Verify the bill impacts of the proposed Self‐Generation Program billing method versus the current net energy metering program and customers without solar for 3 examples within each of the residential, commercial flat, commercial demand, and industrial classes.   For each example, include 2 installed solar capacity scenarios.

5. Survey 10 utilities in California including the 3 large California investor‐owned utilities and 7 similar publicly owned utilities regarding current and future net energy  metering  programs.   Additionally, survey 5 public utilities in states other than California that have successfully implemented new and progressive net energy metering programs.  Compare the results of the survey with the RPU proposal.

6. Review and comment on the overall Self‐Generation Program components.  Include comparisons to the results of the survey.

Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 2 ends

RPU Self‐Generation Review_DRAFT_020822

7. Assist  RPU  staff  with  developing  customer  outreach  and  education  including  but  not  limited  to materials explaining the program, presentations, and website development.

Task 1 – Review Rate Structure/Billing Method
For  Task  1,  NewGen  provided  a  review  of  the  rate  structure  and  billing  method  applicable  under  the proposed Self‐Generation Program.  A review of the rate components for the excess generation payment, referred to as the Avoided Cost of Energy (ACOE), provided to customers in the Self‐Generation Program is summarized in Task 3.  RPU proposes several structural changes to its existing Net Metering Program to be  incorporated  into  its  proposed  Self‐Generation  Program.   These  include  changes  to  the  timing  for settlement for individual accounts, utilizing hourly bidirectional meter data as the basis for determining excess generation, and moving Self‐Generation to a time of use (TOU) rate schedule.  Other changes to the  program  include  administrative,  technical,  and/or  operational  considerations,  such  as  no  longer requiring  a  Utility  Solar  Agreement,  eliminating  the  requirement  for  customer  to  install  a  production meter  on  their  Distributed  Energy  Resource  (DER)  system,  and  an  increase  in  the  allowable  size  of  PV (photovoltaic) system. DER is a collective term for all distributed energy systems, however, the primary focus of RPU’s proposed Self‐Generation program is on distributed PV systems. These non‐billing related program changes were not reviewed for this task; however, they appear to be reasonable changes based on feedback from existing NEM customers and appropriately designed to address those concerns.

RPU uses bidirectional meters that measure the electricity utilized by a customer to determine the bill for the month.  When a customer’s PV system is generating electricity, the customer’s consumption of RPU provided electricity is reduced.  When a customer generates more from its PV system than it purchases from RPU in an hour, the bi‐direction meter measures the “excess” generation that is sent back to RPU from that customer.  Currently, RPU determines the “net” electricity purchased by the customer over the month to determine the bill for its NEM customers.   This allows current NEM customers to effectively “bank” excess generation in any hour during the month to apply to consumption during non‐solar hours during that month.  Excess generation produced by the customer can be “carried” over to the next month, and if applicable the account is settled at the end of the fiscal year (any excess generation is paid out at RPU’s published renewable cost of energy rate).

RPU  proposes  to  change  its  monthly  billing  process  for  its  Self‐Generation  Program  customers.   RPU proposes to bill the customer for each hour the customer consumes energy and credit the customer for each hour (at the ACOE) the customer has excess generation.  The customer’s monthly bill will be the total of the hourly consumption times the applicable published tariff rate, less the total of the hourly excess generation reads times the applicable ACOE rate.  In this manner, the customer will be compensated for excess electricity at the time it is generated, and the account is settled at the end of the month.   Any excess credit will be applied to other elements of the customer bill, which may include services provided by  RPU  or  the  City  for  electricity,  water,  wastewater,  and  solid  waste  (garbage  pickup).   Additionally, because the Self‐Generation customer will be on a TOU rate, this provides a more effective price signal for  both  consumption  and  excess  generation  at  the  customer  level.   This  change  in  settlement methodology is a fair and equitable manner to address the timing of a customer’s load and PV generation profile.  Further, this proposed methodology reduces the subsidy to other non‐PV customers caused by the current settlement approach which allows for excess generation to be applied to consumption during hours of low or non‐solar production.

Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 3 ends

RPU Self‐Generation Review_DRAFT_020822
Figure 1 provides an illustrative example of an hourly load profile for a hypothetical residential customer with solar generation.  As indicated, each hour represents the total energy utilized (each hour is measured in kW, which summed for all hours is kWh).  For example, in hour 1 (which represents hour ending at 1:00 AM),  the  customer’s  load  is  at  approximately  0.6  kW,  and  their  solar  generation  is  not  producing  any energy.  When the solar system begins to generate electricity, the electricity is initially consumed by the customer.  In this example, hour ending 7:00 AM, the solar electricity is displacing a very small amount of the customer’s load.  However, as the sun begins rising and the solar irradiance increases, the amount of the customer’s load that is offset becomes greater.   In this example, at 10:00 AM, the entirety of the customer’s load is offset by solar generation.  From 11:00 AM to 4:00 PM (Hour 16), the solar generation exceeds the customer’s load, resulting in excess energy sent back to the utility (RPU).  As the sun begins to set, the generation reduces, but the load increases as the customer begins to utilize more electricity in the evening hours.  By 8:00 PM, the solar system is no longer generating electricity, and the customer is purchasing all its load from RPU.

Figure 1. Illustrative PV Residential Customer Hourly Load Profile The  solar  energy  that  is  consumed  on  site  reduces  the  amount  of  energy  purchased  from  RPU  and  is effectively valued at the retail rate (under whichever applicable tariff the customer is being charged).  This is shown in the light blue shaded bars in Figure 1.  More importantly, this method will not change under the Self‐Generation program.  Under the current NEM program the Solar Energy – Received by RPU (the tan bars in Figure 1) is allowed to roll “forward” as an energy credit to offset or reduce the total energy purchased  from  RPU  for  the  billing  month,  as  indicated  above.   This  means  that  the  Solar  Energy  – Received  by  RPU  is  also  effectively  valued  at  the  RPU  retail  rate.   However,  under  the  proposed  Self‐ Generation program, the Solar Energy – Received by RPU will be valued at the ACOE rate, as described herein.

Currently, RPU allows for PV systems to be installed on a customer’s premise after completion of NEM an interconnection  agreement  and  extensive  review  by  the  City’s  permitting  department.  PV  system ‐1
‐0.5
0 0.5
1 1.5
2 1 2 3 4 5 6 7 8 9 1 01 11 21 31 41 51 61 71 81 92 02 12 22 32 4 kW
Illustrative PV Residential Customer Hourly Load Profile Energy Purchased from RPU Solar Energy ‐ Received by RPU Solar Energy ‐ Consumed On  Site Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 4 ends

RPU Self‐Generation Review_DRAFT_020822
installations are limited in size to part, or all, of the customer’s own electrical requirements over the most recent twelve‐month period on the premises or 1 megawatt (MW), whichever is less.  The NEM program has  no  exceptions  if  a  customer  wishes  to  install  a  PV  system  that  exceeds  current  capacity  (size) limitations.  One  reason  for  the  current  capacity  limitation  is  to  reduce  the  subsidy  provided  to  the customer in the billing process (as discussed).

The Self‐Generation Program proposal includes a change in the allowed size limitation to 5 MW or 150% of  the  electrical  requirements  at  the  premise  over  the  most  recent  twelve‐month  period.  RPU  is considering a limit on export capacity to be 1 MW of instantaneous energy supplied to the utility.   RPU proposes to offer a variance program for increased PV system capacity under the Self‐Generation program with proof from the customer of future electric requirements.  The customer will be able to install a PV system  within  a  reasonable  size  limitation  and  the  PV  system  is  intended  to  offset  future  electrical requirements  at  the  premise.  NewGen  supports  the  revised  approach  proposed  by  RPU  to  allow  for increased capacity at the customer premise.

As proposed, upon the effective date approved by the Board of Public Utilities and City Council, the Self‐ Generation program changes described herein would apply to customers installing new or updated PV systems, or to new customers who request service at a premise with an existing PV system.  Any existing NEM  customer  who  is  eligible  for  Schedule  NEM,  shall  remain  on  the  Schedule  NEM  until  either  the Customer ceases to receive electric service at the premises where the PV system is located, increases the original  PV  system  capacity  by  more  than  twenty‐five  percent  (25%),  or  installs  a  new  PV  system, whichever is earlier.  At that time, the customer would transition to the Self‐Generation Program.  RPU is not considering moving existing NEM customers to the proposed Self‐Generation program.  This approach is similar to how Anaheim is implementing its NEM 2.0 program with regard to its existing and future NEM customers.

Task 2 – Evaluate Two Alternative Rate Structures
NewGen  reviewed  two  alternative  rate  structures  in  comparison  to  RPU’s  Self‐Generation  proposal.

These included Anaheim Public Utilities’ (Anaheim) NEM 2.0 offering and the proposed changes issued by the  California  Public  Utilities  Commission  (CPUC)  for  the  investor‐owned  utilities  in  the  state.   A description  of  the  alternative  rate  program  and  a  comparison  to  RPU’s  Self‐Generation  proposal  on  a representative month is provided below.   A comparison of estimated bills (excluding any taxes, fees, or other charges) suggests that for a representative month (an average month of the year), the consumer would  be  expected  to  purchase  approximately  750  kilowatt  hours  (kWh)  during  the  month  and  have approximately 48 kWh of excess energy.   This example assumes an hourly true‐up methodology with a bidirectional meter, as proposed by RPU (see discussion below).

Anaheim Public Utility
Anaheim’s NEM 2.0 customers may choose to be on Schedule D (Domestic Service) or the Developmental Schedule  D‐TOU‐2  rate  (Developmental  Domestic  TOU).   NEM  2.0  customers  are  not  allowed  to  bank excess energy (although excess credits can be carried forward).  Anaheim’s NEM 2.0 rates are published in  their  D‐NEM  tariff.   NEM  2.0  customers  are  paid  for  excess  energy  at  the  Anaheim  Annual  Cash Compensation (ACC) rate which is multiplied by a time of delivery (TOD) factor (for D‐TOU‐2 customers).

The  components  that  make  up  the  ACC  rate  include  avoided  energy  charges,  avoided  transmission Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 5 ends

RPU Self‐Generation Review_DRAFT_020822
charges, and renewable energy adder.  The TOD factor is a value dependent upon the period in which the renewable energy is supplied to the utility.  Excess energy credits remaining at the end of a billing cycle are carried over to the succeeding bills until the end of the fiscal year.  If energy credits remain at the end of  the  fiscal  year,  Anaheim  pays  the  customer  the  value  of  the  energy  credits  by  check  and  has  also proposed the option of rolling over the remaining credits (pending City Council approval on February 16, 2022).

CPUC Proposed NEM Reform/Net Billing Tariff
In December 2021, the CPUC issued its proposed decision for what has become known as its Net Billing Tariff (this is the third iteration of NEM reform in California).  This includes several significant changes that impact future PV customers in the state, as well as existing PV customers over time.

The proposed CPUC Net Billing Tariff, if approved, will apply to the investor‐owned utilities (IOUs) in the state, primarily Pacific Gas and Electric (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric  (SDG&E).   However,  the  Net  Billing  Tariff  will  provide  guidance  for  municipally  owned  utilities (MOUs) in the state as they approach the regulatory threshold that will allow them to enact NEM rate reform.   At a high level, the Net Billing Tariff is based on an avoided cost concept that sets an average monthly value for each hour.  These include generation capacity, energy, transmission, and distribution, as well as a component for ancillary services, greenhouse gas (GHG) value, GHG emissions, and high global warming  potential  (GWP)  gas  emissions.   The  energy  component  is  based  on  energy  future  pricing reflected in the CAISO market.  Generation capacity is based on estimates of battery storage costs.  The transmission and distribution components are based on marginal cost filings by the three investor‐owned utilities in the state.  Ancillary services costs are defined as a percentage of energy costs.  The collective environmental avoided costs are based on cap‐and‐trade pricing for GHG allowances, short‐run marginal GHG emissions, and methane and refrigerant leakage modeling for GWP gasses.

One of the more contentious elements of the proposed Net Billing Tariff is a proposed Grid Participation Charge.   This  is  proposed  to  be  a  fixed  monthly  charge  based  on  the  nameplate  capacity  (kW)  of  a residential customer’s PV system.  Non‐residential customers already have fixed and demand charges in their rate structures and will not be required to pay the Grid Participation Charge.   The proposed Grid Participation Charge as adopted is $8.00/kW per month for all residential PV customers served by the IOUs in the state.  The CPUC has also developed a transition plan for existing customers that is designed to reduce the impact of the proposed changes in the Net Billing Tariff.  This transition plan is to cover a 15‐year period, by the end of which all existing NEM 1.0 and NEM 2.0 customers will have been moved to the Net Billing Tariff rate.  The transition plan is a gradual adjustment over this period to reduce the “rate shock” or sudden financial impact to those customers that have already invested in DER systems from the changes included in the Net Billing Tariff.

Structural Comparison of RPU, Anaheim, and CPUC NEM Rate Changes A comparison of the structure of the Self‐Generation rate proposed by RPU, the Anaheim NEM 2.0 rate currently in effect, and the proposed CPUC Net Billing Tarff rate is provided in Table 1.  It should be noted that Anaheim’s on‐peak period is from 4:00 to 9:00 PM, whereas RPU’s on‐peak period is from 2:00 PM to 7:00 PM, and slight differences exist between their off‐peak periods (Anaheim does not offer a mid‐ peak period, but rather an on‐peak and off‐peak and super off‐peak, which is only applicable during the Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 6 ends

RPU Self‐Generation Review_DRAFT_020822
winter season).  Additionally, the IOUs regulated by CPUC have an on‐peak period from 4:00 to 9:00 PM as well.

All three utilities have a TOU element that is applicable to their NEM customers, which is either a delivered energy charge or a generated energy credit.  This approach is a reasonable method to reflect the value of energy based on the time of day when it is generated or consumed.   The basis for the energy credit is determined from the utility’s avoided cost.   The CPUC proposal includes an extensive list of individual elements to its avoided cost calculation, whereas RPU proposes a more limited number of elements in its ACOE.  However, Anaheim includes only three elements in its avoided cost calculation.  Additionally, all three utilities include fixed cost recovery mechanisms in the existing or proposed rate structures.   RPU currently has a Network Access Charge (NAC) and a Reliability Charge in its rate schedules, which would apply to all customers (including those in the Self‐Generation program).  Anaheim’s current NEM 2.0 rate includes a Customer Service Charge (which appears to be the same as the Customer Service Charge it applies to non‐NEM customers).   The CPUC proposal includes a TOU Customer Service charge (which is the same as the current Customer Service Charge), as well as a fixed charge based on the size (capacity rating) of the PV system installed, as indicated above.

Table 1
Residential Billing Structure Comparison
RPU Self-Generation Anaheim NE M 2.0 CPUC Proposed for SCE* Metering/
Billing Bi-Directional (hourly) Bi-Direc tional Bi-Directional (hourly) Delivered
Energy
Charge TOU billed on delivered energy TOU or Non-TOU billed on delivered energy TOU billed on delivered energy
Generated
Energy
Credit
Credits on excess energy sent
back to utility with time of day
pricing
Credits on excess energy sent
back to utility with time of day
pricing
Credits on excess energy sent
back to utility with time of day
pricing
Basis for
Energy
Credit
Avoided Cost Avoided Cost Avoided Cost
Other
Charges Customer Charge, Reliability
Charge, and Network Access
Charge
Customer Service Charge
TOU Basic Charge, PV Charge
($8.00/kW for Installed Solar
Capacity), Market Transition
Credit for 4 years ending 2027
*CPUC NEM proposal issued in December 2021.

Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 7 ends

RPU Self‐Generation Review_DRAFT_020822
Task 3 – Review Avoided Cost of Energy Calculation – Overview RPU’s  proposed  Self‐Generation  program  recommends  several  changes  to  its  existing  NEM  program.

These  changes  include  a  revised  calculation  of  RPU’s  Avoided  Cost  of  Energy  (ACOE)  which  applies  to excess energy generated by a Self‐Generation customer, as well as changes to how RPU calculates the monthly  credit  and  other  elements.   This  section  provides  a  review  of  the  proposed  changes  to  the calculation  of  the  ACOE,  which  follows  the  concepts  of  the  CPUC  Distributed  Energy  Resource  (DER) avoided cost tool.

The  CPUC  DER  avoided  cost  tool  proposes  ten  avoided  cost  components that  may be  recognized  and valued when computing the implied value of DERs.   RPU has accurately valued many of these avoided costs categories; however, not all the cost categories apply to RPU’s operations.  Several methodologies exist  for  valuing  specific  benefits  from  customer‐owned  DER  related  to  generation  energy,  generation capacity, transmission costs, environmental/GHG (greenhouse gas) costs, Renewable Portfolio Standard costs, ancillary services, and system losses.  However, RPU is currently unable to identify specific benefits from  customer‐owned  DER  for  renewable  integration,  avoided  societal  cost,  and  avoided  distribution system costs.  The following provides a summary of RPU’s proposed methodology to determine its ACOE based  on  an  average  of  the  three‐year  Study  Period  (2018,  2019,  and  2020),  and  our  findings  and recommendations as appropriate.

Avoided Generation Energy Costs
RPU recognizes that each kWh of energy produced by a customer‐owned DER represents one less kWh of energy that RPU must purchase from the market.  Therefore, RPU proposes to utilize the 3‐year historic average of the hourly locational marginal price (LMP) of energy at the Vista take‐out point as the basis for the avoided generation energy cost.   The Vista take‐out point is the node at which RPU interfaces with the California Independent System Operator (CAISO).

Further, RPU proposes to utilize the day‐ahead (DA) market prices at this location, given that it operates in the DA market for most hours in the year and implements a strategy to avoid making purchases within the Real Time (RT) market.  Specifically, RPU indicated that it operated in the DA market approximately 97% of the time over the Study Period.  RPU’s proposal is to overlay the market pricing data with the hours of  solar  irradiance  utilizing  historic  production  data  to  derive  a  weighted  average  avoided  generation energy cost for its calculation of the ACOE.

NewGen agrees with the proposed methodology to utilize the DA LMP prices at the Vista take‐out point to determine the avoided generation energy costs for RPU’s ACOE.  Utilizing solar irradiance data provided by the National Renewable Energy Laboratory (NREL) and available on its website, NewGen was able to independently estimate the avoided generation energy costs.   While the source of the solar irradiance data was slightly different between NewGen and RPU, the resulting avoided generation energy costs were very similar (within $0.01/kWh).

NewGen conducted a review of the impacts of utilizing a combination of DA and RT market energy price data (97% and 3%, respectively) for the Study Period and determined there was an insignificant impact to the overall calculation of the avoided generation energy costs from the influence of the RT market prices.

NewGen compared the RT and DA prices for the historic period of 2019–2020 and found that including RT prices with a 3% weighting insignificantly impacted the weighted average market price.

Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 8 ends

RPU Self‐Generation Review_DRAFT_020822
Further, based on our experience with other wholesale power markets, NewGen reviewed the potential impacts  to  the  DA  and  the  ACOE  resulting  from  excluding  market  energy  costs  during  periods  of emergency  declarations  by  the  CAISO,  as  provided  in  the  AWE  Grid  History  Report  (dated  9/15/2021, provided by RPU).   Specifically, NewGen reviewed the impacts of the increases in hourly market prices coincident  with  solar  irradiance  (from  NREL)  for  Stage  1,  2,  or  3  Emergencies,  or  Transmission Emergencies, as defined by CAISO, which occurred during the Study Period.

Table 2 provides a summary of emergency events that have occurred since 2018 that were included in our analysis of market prices.  It should be noted that the AWE Grid History report includes events referred to as “Flex Alerts,” “Restricted Maintenance Operations,” “Alerts” and “Warnings,” and “1‐Hour Probable Load Interruptions,” all of which were excluded from our analysis for this Study.

Table 2
CAISO Grid History Report Summary (2018–2021) Events Included in this Study 2018 2019 2020 2021 Total
Transmission Emergency 2 3 2 0 7
Stage 1 Emergency 0 0 0 0 0
Stage 2 Emergency 0 0 6 1 7
Stage 3 Emergency 0 0 2 0 2

Table  3  shows  the  remaining  types  of  events  and  the  average  market  price  for  energy  during  those periods.   As indicated, the majority of the price increase during these emergency declarations occurred during the system peak hours, during which time the solar irradiance is either low or zero (depending on the hour and the time of year).   NewGen calculated the impact from these emergency declarations for the avoided generation energy costs to be approximately $0.0011/kWh over the Study Period.

Table 3
Average Market Prices during CAISO Events ($/MWh)
Emergency Type 2018 2019 2020 2021
Transmission Emergency $67.20 $53.77 $41.95 N/A
Stage 1 Emergency N/A N/A N/A N/A
Stage 2 Emergency N/A N/A $728.38 $177.32
Stage 3 Emergency N/A N/A $889.84 N/A
All Other Hours $41.05 $38.24 $32.70 $47.34

Figure 2 provides a graphic representation of the average market energy prices (LMP) at the Vista take out point for the DA market for a selected period during September 2020.  During this period the CAISO called two Stage 3 Emergencies, which resulted in energy prices that exceeded $800/MWh at those times.

Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 9 ends

RPU Self‐Generation Review_DRAFT_020822

Figure 2. Average Market Prices for CAISO during Grid Emergencies in September 2020 ($/MWh) NewGen recommends RPU consider including language in its proposed ACOE calculations to potentially exclude market pricing data from the calculation of its avoided generation energy costs during periods of emergency declarations by the CAISO.  NewGen did not review local solar generation data coincident with the hours of emergency declaration to determine if the cause of the emergency impacted the ability of the  DER  to  produce  energy.   Potentially,  if  the  cause  of  the  emergency  declaration  was  related  to  an exogenous event (e.g., wildfires) or a meteorological phenomenon that could reduce solar production, RPU may want to consider excluding those hours from the calculation of its avoided generation energy costs.

Avoided Generation Capacity Costs
If a customer‐sited DER generates energy during peak load, the resulting decrease during the peak period can result in savings in RPU’s system Resource Adequacy (RA) costs.  The impact to RPU’s system RA costs form the basis for its proposed avoided generation capacity costs.  In addition to its system RA cost, RPU proposes to include the impact from DER on its local RA requirement.  The system and local RA costs are defined on a monthly capacity basis ($ per kilowatt [kw]) which is applied to the capacity rating of the total installed DER at the time of RPU’s system peak averaged over a three‐year historic period.  The value for this reduction is estimated as the ratio of RPU’s share of the Transmission Access Charge (TAC) related peak demand to RPU’s status quo share of the TAC related peak multiplied by the marginal local RA value (provided by staff).

NewGen agrees with the proposed methodology to include both the system and local RA requirements at the time of the RPU system peak in the calculation of the avoided generation capacity costs applicable to DER.   NewGen was able to replicate the avoided generation capacity costs developed by RPU using the RA cost data, system peak hours, and the capacity credit applied to the collective DER.

Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 10 ends

RPU Self‐Generation Review_DRAFT_020822
Avoided Ancillary Services Costs
RPU  reviewed  the  ancillary  service  benefits  associated  with  the  installed DERs  within  its  service territory.  In  general,  RPU  receives  minimal  ancillary  service  revenues  from  the  CAISO  for  its  internal generation assets and pays very minimal CAISO ancillary service uplift costs.  However, RPU did find that the ancillary service uplift costs paid to the CAISO are impacted by the amount of energy it purchases, and therefore  a  reduction  in  overall  load  as  a  result  of  the  DER  did  provide  a  benefit  to  the  RPU  system.

Therefore, RPU proposes to include the historic savings in avoided ancillary services costs in its calculation of the ACOE.

NewGen reviewed the ancillary services calculation proposed by RPU for its ACOE and agrees with the methodology.   Further, NewGen was able to reproduce the ancillary services portion of the ACOE rate with the data provided by RPU for the Study Period.

Avoided Transmission Costs
RPU pays a TAC to the CAISO based on the energy used to serve its load.  Therefore, reductions in system load from customer‐sited DER reduce RPU’s transmission costs in direct proportion to the CAISO TAC rate.

RPU proposes to use the monthly TAC rate applied to the total modeled DER energy production as the value to be assigned to the avoided transmission costs component of its ACOE.

NewGen agrees with the methodology proposed by RPU for the calculation of its avoided transmission costs in the calculation of its ACOE.  Further, NewGen was able to replicate the avoided transmission costs based on the monthly TAC rate and estimated monthly generation of the DER installed in the RPU service territory for the Study Period.

Avoided Distribution Costs
RPU does not propose to include an avoided distribution cost component in its ACOE at this time.  Impacts to  the  distribution  system  from  customer‐sited  DER  are  specific  to  the  local  circuit  where  they  exist.

Because  RPU  does  not  dictate  or  encourage  installation  of  DER  based  on  the  needs  of  its  distribution system, it is difficult to determine if any incremental benefit or cost exists with the addition of customer‐ sited DER.  It is the opinion of the RPU distribution engineering staff that as additional DERs impact specific circuits,  RPU  will  most  likely  incur  additional  distribution  upgrade  costs,  rather  than  realizing  any  cost savings as a result.  Additionally, RPU indicates that it does not currently possess the ability to accurately quantify these potential costs on a systemwide basis.  Therefore, RPU proposed to assign no value (either positive or negative) for avoided distribution in its ACOE.

NewGen agrees with the methodology proposed by RPU.

Avoided Environmental/GHG Costs
Under California’s Cap‐and‐Trade program, RPU must tender its carbon emission credits to the California Air Resources Board (CARB) to offset its greenhouse gas emissions.  RPU suggests that the zero emission DER energy “replaces” the non‐zero emission system energy from its carbon producing resources.  As a result,  RPU would need  to  tender  fewer  carbon  credits  to CARB  with  the  additional  DER  on  its system.  Therefore, RPU suggests that the value of the “avoided” carbon credits represents an additional avoided cost that can be directly attributed to the DER energy production.  This argument assumes that Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 11 ends

RPU Self‐Generation Review_DRAFT_020822
RPU would have met the extra (DER avoided) load serving needs using generation assets which have a carbon emission factor equal to or greater than that of its resource portfolio.  RPU has based its calculation of  the  value  of  the  avoided  environmental/GHG  costs  on  this  assumption  for  the  purposes  of  this component to its ACOE.

NewGen agrees with the  methodology proposed by RPU for the  purposes of  determining  the avoided environmental/GHG costs.  NewGen reviewed RPU’s calculations for this avoided component of the ACOE and was able to recreate the value from the data provided by RPU.  It should be noted that over time, the carbon emission factor of RPU’s resource portfolio will likely decrease as additional utility scale carbon‐ free resources are developed in the state and become a greater part of the CAISO market.  Therefore, RPU may need to reevaluate the calculation of the avoided environmental/GHG costs over time to ensure that its assumptions for this calculation remain valid.

Avoided RPS Costs
Due to the California Renewable Portfolio Standard (RPS) legislative paradigm, RPU must acquire enough qualified renewable energy to meet specific percentages of its retail sales each year (for example, 33% in 2020).    Therefore, as additional renewable DER comes online, RPU will need to acquire proportionally less  wholesale  renewable  energy.     The  value  of  this  “avoided”  wholesale  renewable energy represents another avoided cost that can be directly attributed to the DER energy production.

RPU proposes to utilize the market‐based value of Renewable Energy Credits (RECs) as the proxy value for this avoided wholesale renewable energy.   RPU suggests that REC values are equal to the value of the “green energy attributes,” in comparison to non‐renewable market power.

NewGen agrees with RPU’s methodology proposed to determine its avoided RPS costs assigned to the ACOE.  NewGen has reviewed RPU’s calculations and REC pricing utilized to determine these avoided costs and was able to recreate the proposed value based on data provided by RPU for the Study Period.

Avoided Renewable Integration Costs
RPU indicates that it is currently unable to identify any avoided renewable integration costs associated with increasing DER penetration on its system.  Therefore, RPU recommends that a zero value be assigned to this avoided cost component.  Integration impacts from DER can be associated with distribution system impacts (as discussed above) as well as the broader impacts from management of the electrical system to integrate  the  solar  output  on  the  grid  as  a  whole.   NewGen  reviewed  a  report  developed  by  Synapse Energy Economics, Inc. (Synapse Study) which included a review of eight net metering studies regarding the  benefit  and  costs  of  DER.1   The  Synapse  Study  indicated  that  “…costs   associated  with  integration, administration,  and  interconnection  of  net  energy  metered  (NEM)  systems  will  increase  revenue requirements, and thus are considered a cost.”  The eight studies reviewed by Synapse were from 2012– 2014 and included analyses from NEM programs offered in Arizona, Colorado, Hawaii, Maine, Mississippi, Nevada, New Jersey, Pennsylvania, and North Carolina.  The Synapse Study suggests that these individual state  studies  resulted  in  an  average  benefit  that  exceeded  costs  for  the  NEM  programs  reviewed.

However,  it  also  suggested  that  these  studies  revealed  that  integration  costs  do  have  an  impact  on

1 “Caught in a Fix ‐ The Problem with Fixed Charges for Electricity,” Prepared for Consumers Union by Melissa Whited, Tim Woolf, Joseph Daniel with Synapse Energy Economics, Inc. February 9, 2016.

Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 12 ends

RPU Self‐Generation Review_DRAFT_020822
revenue requirement, which ranged from approximately $2/MWh to $23/MWh.  Therefore, based on our experience and the Synapse Study, we agree with RPU’s approach to not assign a benefit or value to the DER integration costs.

System Losses
System losses impact nearly all the applicable cost components in RPU’s proposed ACOE, as energy from customer‐sited  DER  energy flows  directly  into  its  secondary distribution  system.   System  losses  are  a common element utilized when valuing DER.   RPU proposes that the values associated with these cost components be adjusted (i.e., scaled up) in its avoided cost calculation to account for such losses.

NewGen agrees with RPU’s methodology.

Avoided Societal Costs
Various  state  utility  commissions  across  the  country  have  assigned  specific  $/kWh  values  to  avoided societal costs.   It is generally recognized that this category of avoided costs represents a subsidy that is designed to further incentivize the installation of DERs (typically solar facilities) within a utility’s service area.  Many arguments against including collective societal costs in the avoided cost calculation are that they extend beyond the reach of the utility operations and are difficult to quantify.  RPU is not proposing to include an avoided societal cost component to its ACOE as it violates cost‐based rate setting principles.

NewGen agrees with RPU’s proposal to exclude avoided societal costs in its avoided cost calculations.

TOU Structure
As indicated, RPU proposes to include a TOU structure to its ACOE rate to compensate Self‐Generation customers for their excess generation if the customer is currently on a TOU rate structure.   If applicable, the TOU structure is proposed to be seasonally adjusted for winter and summer periods.  The TOU rates differences (the $/kWh difference between the TOU periods) are proposed to be identical to those for the Domestic  TOU  (DTOU)  and  Large  General  and  Industrial  TOU  Service  rate  structures  RPU  has  already adopted.  The seasonal and time‐based rates are designed to appropriately value the ACOE and encourage customers to provide excess energy when it is most valuable to RPU by sending a proper price signal (i.e., rate).  A summary of the proposed seasonal TOU ACOE values is provided in Table 4.

Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 13 ends

RPU Self‐Generation Review_DRAFT_020822
Table 4
Domestic TOU Seasonal and TOU ACOE Rates Proposed ($/kWh) Season TOU TOU Period* Rate ($/kWh)
Summer (June–September) On Peak 2:00 PM–7:00 PM $0.1030 Mid Peak 6:00 AM–2:00 PM; 7:00 PM–11:00
PM
$0.0689
Off Peak 11:00 PM–6:00 AM $0.0577
Winter (October–May) On Peak 4:00 PM–9:00 PM $0.0795
Mid Peak 6:00 AM–4:00 PM; 9:00 PM–11:00
PM
$0.0636
Off Peak 11:00 PM–6:00 AM $0.0577
*TOU Periods apply every day.

A  summary  of  the  proposed  seasonal  TOU  ACOE  values  for  Large  General  and  Industrial  TOU  rate customers is provided in Table 5.

Table 5
Large General and Industrial TOU Seasonal and TOU ACOE Rates Proposed ($/kWh) Season TOU TOU Period* Rate ($/kWh)
Summer (June–September) On Peak 12:00 PM–6:00 PM $0.0859 Mid Peak 8:00 AM–12:00 PM; 6:00 PM–
11:00 PM
$0.0705
Off Peak 11:00 PM–8:00 AM $0.0602
Winter (October–May) On Peak 5:00 PM–9:00 PM $0.0859
Mid Peak 8:00 AM–5:00 PM $0.0705
Off Peak 9:00 PM–8:00 AM $0.0602
*TOU on and mid peak periods apply weekdays except holidays.

Updates to the ACOE
As indicated, RPU proposes to utilize a three‐year rolling average for its calculation of the ACOE.  NewGen suggests that RPU conduct an annual update of its ACOE during the first six months of each calendar year that will review the market and utility data as appropriate from the prior year.  This annual data will then be utilized to replace the previous earliest year in the three‐year ACOE average (so data for 2021 would replace data for 2018 for the 2022 Effective ACOE rate).  This six‐month period will allow RPU sufficient time to evaluate market and system data to propose updates to its ACOE and to be approved for Self‐ Generation  bills  beginning  July  1  of  that  year.  This  will  allow  RPU  to  adjust  as  necessary  to  address Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 14 ends

RPU Self‐Generation Review_DRAFT_020822
unforeseen  issues,  such  as  regulatory  mandates  as  well  as  potential  advancements  in  technology  as appropriate.

Task 3 Summary
NewGen has reviewed the seven categories of avoided cost savings proposed by RPU to be included in its ACOE calculation.   In general, we agree with the methodologies developed by RPU to determine these individual  components  to  its  ACOE.   Further,  NewGen  was  able  to  either  replicate  or  produce  similar results with independent analysis given data provided by RPU for each of the proposed ACOE components.

A summary of these components based on the Study Period is provided in Table 6 for the NewGen and RPU calculated values.

Table 6
Comparison of RPU and NewGen ACOE by Component ($/kWh)
ACOE Component RPU Value NewGen Value
Avoided Generation Energy $0.0289 $0.0278*
Avoided System and Local RA Capacity $0.0100 $0.0104
Avoided Ancillary Costs $0.0010 No Change
Avoided Transmission Costs $0.0136 No Change
Avoided Environmental/GHG Costs $0.0076 No Change
Avoided RPS Costs $0.0072 No Change
System Losses (Applied to All) 5.40% No Change
Proposed ACOE $0.0722
*Includes adjustments for market prices during CAISO grid emergency declarations.

Task 4 – Verify Bill Impacts
NewGen reviewed the bill impacts from the proposed changes to the Self‐Generation program developed by  RPU.   NewGen  utilized  the  data  provided  by  RPU  to  recalculate  the  bill  impacts  for  future  Self‐ Generation program customers for two selected months for each customer class (Residential, Residential TOU, Commercial Flat, Commercial Demand, and Industrial TOU).  The two selected months represented a summer (July) and non‐summer (June) customer usage and estimated generation from hypothetical on‐ site solar facility.   A total proposed electric bill was estimated under a condition of a customer without solar,  under  the  existing  NEM  program,  and  under  the  proposed  Self  Generation  program  for  each scenario.  The rates included in RPU’s analysis were consistent throughout the comparison and with RPU’s applicable  published  rate  tariffs.   The  RPU  calculations  for  the  total  electric  bill  matched  with  our independent calculations with the provided data.

Table 7 shows the total electric bill for the month of July for selected RPU customer classes under the current NEM program (NEM 1.0) and the proposed Self‐Generation program as calculated by RPU and NewGen.   This  analysis  is  for  installed  solar  capacity  that  is  80%–90%  of  the  customer’s  generation Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 15 ends

RPU Self‐Generation Review_DRAFT_020822
(Scenario 1).  The column on the far right provides a check for any differences in the calculation.  For July, no differences were observed.

Table 7
Rate Impact Calculation Comparison – Scenario 1
Month RPU NewGen
July NEM 1.0
Self-
Generation NEM 1.0
Self-
Generation Check
Domestic $53.42 $97.72 $53.42 $97.72 $-
Commercial

Flat $161.04 $174.37 $161.04 $174.37 $-
Demand $850.50 $1,128.66 $850.50 $1,128.66 $-
Industrial TOU $5,491.62 $6,487.39 $5,491.62 $6,487.39 $-

Table 8 shows a similar electric bill comparison as Table 7; however, this is for customers whose solar generation capacity is equal to 40%–50% of their monthly generation (Scenario 2) for the month of June for selected RPU customer classes under the current NEM program (NEM 1.0).  For June, no differences were observed.

Table 8
Rate Impact Calculation Comparison – Scenario 2
Month RPU NewGen
June NEM 1.0
Self-
Generation NEM 1.0
Self-
Generation Check
Domestic $118.44 $133.29 $118.44 $133.29 $-
Commercial

Flat $252.25 $255.78 $252.25 $255.78 $-
Demand $1,656.09 $1,669.99 $1,656.09 $1,669.99 $-
Industrial TOU $9,993.93 $10,018.20 $9,993.93 $10,018.20 $-

Task 5 – Utility Survey
NewGen surveyed 10 utilities in California including the 3 large California investor‐owned utilities and 7 similar publicly owned utilities regarding current and future net energy metering programs.  Additionally, we surveyed 5 public utilities in states other than California that have successfully implemented new and Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 16 ends

RPU Self‐Generation Review_DRAFT_020822
progressive  net  energy  metering  programs,  and  we  compared  the  results  of  the  survey  with  the  RPU proposal.

California Publicly Owned Utilities – NEM Programs
Table 9 provides a summary of current NEM rates for “remaining credits” (excess energy) for 17 California municipal or publicly owned electric utilities.  This table provides a description of the “true‐up” period for the  utility,  which  describes  the  period  for  which  the  utility  will  pay  out  any  applicable  excess  energy credits.   The majority (10 out of 17) utilize a monthly true‐up period.   We have included the remaining credits (excess energy price, which ranges from approximately $0.1078/kWh to $0.0175/kWh).  We have also included the effective date of the utility’s NEM rate, which indicates that approximately half of the utilities have revised or updated their NEM rate within the last two years (since 2019, 9 of the 17).  The majority of the municipal utilities surveyed (11 of 17) utilized an avoided cost basis for their NEM credit.

Table 9
Review of Publicly Owned California Electric Utilities NEM Programs Utility
True-Up
Period TOU Bidirectional
Remaining Credits Price
$/kWh
Effective
Date Credit Type
1 Alameda Monthly $0.06968 12/31/2016 Avoided Cost
2 Anaheim Monthly x x =ACC rate *TOD factor 12/31/2020 Avoided Cost 3 Azusa Yearly x x $0.069 7/21/2021 Avoided Cost
4 Burbank Yearly $0.0455 7/1/2021 Retail Rate
6 LADWP N/A Retail Rate 9/1/2008 Retail Rate
7 Palo Alto Monthly x $0.1078 1/1/2018 Retail Rate
8 Pasadena Yearly x Avg. Energy 1/31/2020 Retail Rate
Bimonthly x Avg. Energy + 0.066/kWh 1/31/2020 Retail Rate+ 9 Redding Monthly x $0.0608 1/1/2019 Avoided Cost
10 SMUD Yearly $0.0562 1/1/2021 Avoided Cost
11 Silicon Valley
Power
Yearly x $0.0396 2/1/2021 Avoided Cost
12 Modesto Irrigation
District
Monthly $0.076 7/1/2020 Avoided Cost
13 Turlock Irrigation
District
Monthly x x Monthly Marginal Cost 1/1/2015 Avoided Cost 14 Lodi Monthly x $0.0687 9/1/2017 Avoided Cost
15 Imperial Irrigation
District
Yearly x x $0.0698 1/1/2015 Avoided Cost
16 Shasta Lake Monthly x $0.0175 11/1/2020 Avoided Cost 17 Roseville Monthly x $0.0598 10/1/2018 Avoided Cost

Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 17 ends

RPU Self‐Generation Review_DRAFT_020822
Non-California Publicly Owned Utilities – NEM Programs
NewGen was tasked to survey and compare Non‐California publicly owned utilities’ NEM Programs.  These utilities were selected based on comparable size to RPU and familiarity with their rate structures and NEM rate  programs.   The  utilities  selected  were  Orlando  Utility  Commission,  FL;  Lakeland  Electric,  FL; Jacksonville  Electric  Authority,  FL;  Nashville  Electric  Service,  TN;  and  Fayetteville  Public  Works Commission, NC.

Orlando Utility Commission, FL:

OUC’s net metering program pays their residential customers the retail rate for excess energy to OUC’s grid.   OUC  true  ups  the  outstanding  energy  credits  yearly  and  they  do  not  have  TOU  for  residential customers.  There are no current plans to change to TOU or bidirectional meters.

Lakeland Electric, FL:

Lakeland pays their residential customers the full retail rate for their excess energy.  Lakeland’s true up period for their credits is monthly.  Net metering customers are moved to their Solar Price Plan.  This plan places a demand charge during peak period (based on single highest energy usage during peak period over the billing period) and the energy rate is less than half of the normal energy rate.  There is a transition for customers that interconnected before 1/1/2016.  Grandfathered customers may stay on the original rate until 12/31/2025.   Solar Price Plan Demand Charge is $6/kW and Energy Charge is $0.02427/kWh.

Their  residential  rate  has  no  demand  charge  but  is  tiered  based  on  monthly  usage  (0–1000  kWh  is $0.05085/kWh, 1001–1500 kWh is $0.05805/kWh, and above 1500 kWh is $0.06415/kWh).  Lakeland has no mention of bidirectional meters in its published tariffs.

Jacksonville Electric Authority (JEA), FL:

JEA’s program pays their residential customers an avoided cost of energy rate based on fuel costs.   JEA true ups their outstanding credits yearly.  JEA does not have TOU rates for residential customers.  JEA also has bidirectional meters for their systems.

Nashville Electric Service, TN:

Nashville Electric Service customers can participate in the Dispersed Power Program to sell excess power back to Tennessee Valley Authority (TVA).  TVA pays for the excess energy at TVA’s avoided cost.  TVA’s avoided cost is based on TOU where Super Peak hours are 0600–0800 and 1700–1900; Peak hours are 0500–0600 and 0800–1100 and 1600–1700 and 1900–2200; Off‐Peak hours are all weekends/holidays 0600‐1100 and 1700‐2200, and weekdays 1100–1600; and Super Off‐Peak is weekends/holidays 0000– 0600  and  1100–1700  and  2200–2400,  and  weekdays  0000–0500  and  2200–2400.   Nashville’s  timing classifications are yearlong classifications.

Fayetteville Public Works Commission (FAYPWC), NC:

FAYPWC does not have a standard net metering program.  Their program is based on a “buy all/sell all” structure where the residential customer buys all their energy demand from the utility at the residential retail rate and sells all the produced solar energy back to the utility at a Customer Credit rate.  The retail Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 18 ends

RPU Self‐Generation Review_DRAFT_020822
residential rate includes a TOU structure with an on‐peak rate of $0.1300/kWh and an off‐peak rate of $0.08473/kWh.  The Customer Credit rate for solar energy is $0.0663/kWh.  FAYPWC’s true up period is monthly.  On‐peak hours are Summer (April–October) 1500–1900, and Non‐Summer (November–March) 0600–1000.  Off‐peak hours are all holidays and all other hours.  The Customer Credit is set for the year initially, but the rate can be modified by changing one or more of the components within the year.  The Customer Credit rate formula is as follows:
ሾሺ𝐶𝑃 𝐷𝑒𝑚𝑎𝑛𝑑 𝐶𝑜𝑠𝑡 ൅ 𝐸𝑛𝑒𝑟𝑔𝑦 𝐶𝑜𝑠𝑡 ൅ 𝑇𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛 𝐶𝑜𝑠𝑡 ሺ1 ൅𝑆 𝑦 𝑠 𝑡 𝑒 𝑚 𝐿𝑜𝑠𝑠 𝐹𝑎𝑐𝑡𝑜𝑟ሻሿ െ 𝐴𝑛𝑐𝑖𝑙𝑙𝑎𝑟𝑦 𝐶𝑟𝑒𝑑𝑖𝑡𝑠 𝐸𝑛𝑒𝑟𝑔𝑦 𝐶𝑜𝑛𝑠𝑢𝑚𝑝𝑡𝑖𝑜𝑛

Tiered vs. TOU Rate Design for Self-Generation
RPU currently offers tiered rates as part of its standard rate offering for its residential (Domestic) and commercial  rates.   Currently,  RPU  proposes  to  offer  its  Self‐Generation  ACOE  rate  as  a  seasonally differentiated TOU rate (see above) for the Domestic TOU and Large General and Industrial TOU customer classes and a flat rate for customer classes that do not have a TOU rate structure.  This rate is not proposed to follow a tiered rate structure, which would suggest differing rates for various levels of excess energy produced.  Based on our experience, most avoided energy rates are not tiered because the methods used to calculate the rate are derived from annual or projected average rate components that are not defined by usage levels (not tiered).   Of the 11 municipal or publicly owned utility rates revised in Table 9 that utilized an “avoided cost” approach, none of them were defined or structured to include tiered pricing.

Additionally, the proposed Net Billing Tariff does not propose a tiered structure for its avoided energy costs;  however,  it  does  include  a  TOU  structure.   A  TOU  structure  for  the  avoided  cost  of  energy,  in general, is a more precise method to send a pricing signal reflecting when utility costs are incurred than a tiered method.  Further, a tiered method of avoided cost may incentivize customers to add larger sized PV systems to their load (if it was an inclining block tier, where the more energy the customer sends back, the higher the unit rate ($/kWh)).  This may be difficult to justify from a cost basis and NewGen supports RPU designing its ACOE rate based on a TOU instead of tiered rate structure.

Task 6 – Survey Comparison to RPU Proposed Changes
As indicated by the survey results presented in Task 5, changes to NEM programs are becoming more prevalent in California and other states.  The purpose of this task is to provide a comparison of the recent and  or  proposed  changes  to  NEM  programs  in  California  and  other  states  to  RPU’s  proposed  Self‐ Generation program.

As indicated in Table 9, the majority of California publicly owned utilities surveyed utilize a monthly true‐ up period.  However, it is not clear from the published tariffs if the utilities are using a “hourly settlement” period as proposed by RPU (discussed in Task 2).   NewGen is familiar with other non‐California utilities using an hourly settlement period based on bidirectional meter data.  Further, it appears that the majority of the utilities surveyed utilize an energy‐only or marginal energy rate to apply to excess energy provided by a NEM customer.  Generally, those are energy rates that are lower than the full retail rate.  From the data provided in Table 9, it appears that only Burbank and Los Angeles Department of Water and Power (LADWP) utilize a full retail rate for excess energy payments; however, it is not clear if the LADWP rate is Memorandum
City of Riverside Public Utilities
February 8, 2022

Page 19 ends

RPU Self‐Generation Review_DRAFT_020822
based on its marginal pricing structure recently approved.   As indicated, 11 of the 17 utilities surveyed utilize an avoided cost basis for their NEM credit, which is similar to the approach proposed by RPU’s Self‐ Generation program.

The non‐California utilities review suggests that most, but not all, have either reformed or set up their NEM programs to allow for an increase in fixed cost recovery for the utility.  Most of those reviewed base their excess energy payments on their avoided costs, except for OPUC and Lakeland.  However, Lakeland has  implemented  efforts  to  recover  fixed  cost  through  a  monthly  fee  based  on  the  capacity  of  the customer’s solar facility (similar to what was recently proposed by the CPUC).  Nashville and FAYPWC both implemented TOU rate structures for their NEM customers based on their underlying cost structures.

Task 7 – Public Outreach Material Review
NewGen  was  provided  a  draft  of  a  marketing  outreach  material  (brochure)  developed  by  the  RPU Communications  group  for  review  on  November  4.   NewGen  provided  written  comments  to  RPU  on November 15 via email and reviewed comments with RPU’s working group on November 18, 2021.  We understand these comments were provided to the RPU Communications group for inclusion in a revised draft  of  the  outreach  material.   As  additional  material  is  developed,  NewGen  will  provide  review  and comment as requested.