Cities Index.
Recommended Electric Schedule Self-Gen

Riverside City Council
May 10, 2022

Document
Recommended Electric Schedule Self-Gen
Meeting
May 10, 2022
Body
Riverside City Council
Original file
176 KB
Text extracted from the city's file for reading and search. Open the original on riversideca.legistar1.com. That file is the official record.

City of Riverside
Public Utilities Department

Adopted by Board of Public Utilities:   Board Resolution No:

Approved by City Council:   Council Resolution No:

Effective Date:

SCHEDULE SELF‐GEN
SELF‐GENERATION PROGRAM FOR
RENEWABLE ELECTRICAL GENERATION FACILITIES

Applicability:

Applicable to all end‐use Eligible Customer‐Generators.

An Eligible Customer Generator is a residential, commercial, industrial or agricultural Customer who uses a Renewable Electrical Generation Facility, or a combination of those facilities, with a capacity of not more than 5,000 kilowatts, that
is located on the Customer’s owned, leased, or rented premises, and is interconnected and operates in parallel with the  Utility’s  distribution  facilities,  and  is  intended  primarily  to  offset  part  or  all  of  the  Customer’s  own  electrical requirements on the premises.

Territory:

Within the service area
of the City of Riverside

Rates:

All rates charged under this schedule will be in accordance with the Eligible Customer‐Generator’s otherwise applicable tariff (OAT) or rate schedule, in effect from time to time.  An Eligible Customer‐Generator served under this schedule is responsible for all charges in its OAT including
the monthly or annual minimum charges (including service, customer, reliability, network access, and demand charges, when applicable), regardless of the Customer’s monthly generation.

Eligible Customer‐Generators under this schedule are subject to any new or additional charge(s) that may be imposed by the Utility on the other customers in the rate class to which Customer would otherwise be assigned.

Eligible  Customer‐Generators  under  this  rate  schedule  with  Residential  Service  for  Single‐Family  Dwelling  Units qualifying will be assigned rate Schedule D‐TOU “Domestic Time‐Of‐Use Service” as their OAT.

Special Conditions:

1.  Eligibility:

A customer is eligible for this
schedule after receiving final inspection approval of all required building permit applications  from  the  City’s  Building  and  Safety  Division,  or  authority  having  jurisdiction,  and  the  Utility’s requirements (“Permit Completion”) for final release of the Renewable Electrical Generation Facility to be energized.

2.  Billing:

a. For  each  Billing  Period,  the  Utility  shall  bill  the  Eligible  Customer‐Generator  for  all  (a)  energy delivered to their Premises by the Utility and (b) other charges contained in their OAT.

b. For each Billing Period, an Eligible Customer‐Generator will receive a bill credit for each kilowatt‐ hour of energy supplied by their Renewable Electrical Generating Facility to the Utility. For each supplied kilowatt‐hour of energy, the energy credit shall be calculated by multiplying the Avoided Cost of Energy (ACOE) rate and, if applicable, the time of delivery factor (“Time of Delivery Factor”) for that supplied kilowatt hour. Each Billing Period, the bill credit will be used to offset the utility bill of the Eligible Customer‐Generator and, if there are any remaining energy credits, these energy credits will be applied to subsequent utility bills until the earlier of (1) the exhaustion of the energy credit; or (2) the termination of electric service. If any net energy credits exist at the termination of service,  the  Utility  will  pay  the  Eligible  Customer‐Generator  the  value  of  the  remaining  energy credits.

c. The  Utility  shall  provide  each  Eligible  Customer‐Generator  with  delivered  and  supplied  energy information on each bill.

City of Riverside
Public Utilities Department

Schedule SELF‐GEN – Self‐Generation Program For Renewable Electrical Generation Facilities   ‐ 2‐

Adopted by Board of Public Utilities:      Board Resolution No:

Approved by City Council:      Council Resolution No:

Effective Date:

d. Each  Eligible  Customer‐Generator  shall  comply  with  all  applicable  federal,  state,  and  local  laws, including applicable Rates, Rules and Regulations and the Electric Utility’s current standards and guidelines.

3.  Avoided Cost of Energy (“ACOE”):

a. The  ACOE,  also  referred  to  as  the  buy  back  rate,  represents  the  avoided  Utility  costs  and  is  the amount  the  Utility  will  credit  Eligible  Customer‐Generators  for  energy  supplied  to  the  Utility  by Renewable Electrical Generation Facilities.

b. Components of the ACOE include:
i. Avoided  Generation  Energy  Costs:  Savings  resulting  from  reduced  purchases  from  the California  Independent  Systems  Operator  (CAISO)  valued  at  the  day  ahead  hourly locational marginal price of energy at the Vista take‐out point which is the Utility’s point of connection to the CAISO. The Utility may exclude periods of emergency declarations by the CAISO from the calculation.
ii. Avoided  Generation  Capacity  Costs:  Savings  in  system  and  local  resource  adequacy requirements.
iii. Avoided Ancillary Service Costs: Reduced CAISO energy purchases result in reduced CAISO ancillary service costs.
iv. Avoided  Transmission  Costs:  Reductions  in  the  Utility’s  system  load  reduce  CAISO transmission costs equal to the CAISO transmission access charge. v. Avoided  Environmental/Green  House  Gas  Costs:  The  value  of  avoided  carbon  credits resulting from energy received from the Renewable Electrical Generation Facility. vi. Avoided Renewable Portfolio Standard Costs: The value of avoided wholesale renewable energy determined by the market‐based value of Renewable Energy Credits. vii. Avoided  System  Losses:  The  values  associated  with  the  ACOE  cost  components  are adjusted to account for distribution system losses.

c. Eligible Customer‐Generators whose OAT is a time of use rate schedule will have the ACOE applied by  time  of  use  period  equivalent  to  the  time  of  use  period  and  energy  rates  Eligible  Customer‐ Generator’s  OAT.  If  the  Eligible  Customer‐Generator’s  OAT  is  not  time  based,  the  ACOE  will  be applied equally to all energy supplied to the Utility.

d. The ACOE calculation includes the calendar year 3‐year historical average hourly Utility costs and is effective from July 1 through June 30 of the following year. The AOCE is approved annually by the General Manager and posted on the Utility’s website on July 1 of each year.

4.  Renewable Electrical Generation Facility Capacity and Export Limit:

a. The  capacity  of  a  Renewable  Electrical  Generation  Facility  under  this  schedule  is  limited  to  one hundred fifty percent (150%) of the Customer’s annual energy consumption.   The Customer may submit a request to the Utility to increase the capacity by submitting proof of purchase or a City Building and Safety Division issued permit providing reasonable assurance of increased electrical load.

b. The maximum export of the Renewable Electrical Generation Facility to RPU’s distribution system under this schedule shall not exceed 1,000 kilowatts.

5.  Metering:

A bi‐directional Meter capable of measuring the flow of energy in two directions will be used by an Eligible Customer‐Generator under this Schedule.  The Utility shall own, operate, and maintain the Required Meter
on  the  Eligible  Customer‐Generator’s  premises.   If  the  existing  meter  at  the  premises  is  not  capable  of measuring the flow of energy in two directions, the Eligible Customer‐Generator shall be responsible for all City of Riverside
Public Utilities Department

Schedule SELF‐GEN – Self‐Generation Program For Renewable Electrical Generation Facilities   ‐ 3‐

Adopted by Board of Public Utilities:      Board Resolution No:

Approved by City Council:      Council Resolution No:

Effective Date:
expenses involved in the Utility’s purchase and installation of the Required Meter.  The Utility, at its expense, may purchase and install additional meters with the consent of the Eligible Customer‐Generator to provide the information necessary to accurately credit or bill the Eligible Customer‐Generator or to collect generating system performance information for research purposes. If an additional meter or meters are installed, the metering calculation shall yield a result identical to that of a single meter capable of measuring the flow of energy in two directions.

6.  Electric Rule 22 Distributed Generation Facilities Interconnection

Under  this  Schedule,  eligible  Customer‐Generators  with  Renewable  Electrical  Generation  Facilities  shall comply with all applicable interconnection requirements of Electric Rule 22 “Distributed Generation Facilities Interconnection.”

7.  Renewable Electrical Generation Facility

Defined as a facility that generates
electricity from a renewable source listed in paragraph (1) of subdivision (a) of Section 25741 of the California Public Resources Code including biomass, solar thermal, photovoltaic, wind, geothermal, fuel cells using renewable fuels, small hydroelectric generation, digester gas, municipal solid  waste  conversion,  landfill  gas,  ocean  wave,  ocean  thermal,  or  tidal  current,  and  any  additions  or enhancements to the facility using that technology.

8.  State Mandated Public Benefits Charge:

The  rates  in  Eligible  Customer‐Generator’s  OAT  are  subject  to  a  surcharge  as  adopted  by  City  Council Resolution No. 19203, and such surcharge as in effect from time to time. The applicable Public Benefits Charge
will be applied in accordance with the Customer’s OAT. The Public Benefits Charge that is applicable to the Customer  under  the  Customer’s  OAT  shall  be  calculated  based  upon  the  Customer’s  total  energy  usage charges  including  energy  delivered  to  their  Premises  by  the  Utility,  monthly  or  annual  minimum  charges (including  service,  customer,  reliability,  network  access,  and  demand  charges,  when  applicable),  for  the applicable billing period.

9.  Miscellaneous Fees and Charges:

Rates charged pursuant to this Schedule shall be subject to any Energy Users Taxes, Utility Users Taxes and any other governmental taxes, duties, or fees which are applicable to Electric Service provided to Customer
by the Utility. Rates are also subject to adjustment, as established by Riverside’s Board of Public Utilities and adopted by Riverside’s City Council in response to federal or state climate change laws, renewable portfolio standard or other mandated legislation.   These adjustments may include but are not limited to charges to mitigate the impacts of greenhouse gas emissions or “green power” premiums.

10.  Power Cost Adjustment Factor (“PCAF”):

The “PCAF”, as provided in Part C of the General Provisions, shall apply to Customer’s energy delivered to their Premises by the Utility and such other charges as indicated by Customer’s OAT.

11.  Program Cap:

The program cap under this Schedule is 64 MW and includes existing customers under Schedule NEM. Until the  program  cap  is  reached,  the  Schedule  shall  be  open  to  eligible  customers  on  a  first‐come‐first‐served basis. Once the program cap is reached, the Schedule will be closed to any new customers, until such time as qualified customers included within the program cap no longer receives service under this Schedule, thus allowing participation by additional eligible customers until a new program cap is reached.

12.  Applicable Rate Schedule:

a. Applicable Rate Schedule
City of Riverside
Public Utilities Department

Schedule SELF‐GEN – Self‐Generation Program For Renewable Electrical Generation Facilities   ‐ 4‐

Adopted by Board of Public Utilities:      Board Resolution No:

Approved by City Council:      Council Resolution No:

Effective Date:

For Customers applying for service at an existing service address, the Utility will assign the electric rate schedule based on the characteristics of the service address. The Utility will presume that any electric rate previously assigned to that service address is the appropriate schedule, unless Customer requests a review  for  another  applicable  rate  schedule,  rate,  or  optional  provision.  In  certain  situations  when  a Customer does not qualify for an electric rate previously assigned to that service address, the Utility will assign  the  applicable  rate  to  the  Customer.  The  Utility  assumes  no  responsibility  for  advising  the Customer of lower optional rates under existing schedules available as a result of the Customer’s changes to the characteristics of the service address.

b. Change of Rate Schedule

A change to the applicable rate schedule may be made if the Utility determines that the Customer no longer qualifies for the assigned rate schedule. Subject to meter availability, the change will become effective for service rendered after the next regular meter reading following verification and approval by the Utility of such eligibility.   Any change in rate schedules pursuant to this section shall be made prospectively.

← All documents from this meeting