2 1. Public Works Department
maintains a storm drain
system consisting of over 5,000
catch basins and 190 miles of
pipes
2. Part of a broader stormwater
program required by the
State Water Board
BACKGROUND
1 2
4/28/2022
2 RiversideCA.gov
3 1. Only ≈ 30 days of rainfall per year
2. But there is urban runoff entering
the storm drain system every day
3. Runoff carries with it a variety of
pollutants
BACKGROUND
RiversideCA.gov
4 CATCH BASINS/INLETS
3 4
4/28/2022
3 RiversideCA.gov
5 EQUIPMENT
RiversideCA.gov
6 GIS MAPS
5 6
4/28/2022
4 RiversideCA.gov
7 GIS BASED SURVEY/QUESTIONAIRRE
RiversideCA.gov
8 PROGRAM STATISTICS
7 8
4/28/2022
5 RiversideCA.gov
9 1. Trash : 45,578 lbs
2. Vegetation: 48,454 lbs
3. Sediment: 240,458 lbs
WASTE COLLECTED IN 2021
14%
72%
14%
Trash
Sediment
Vegetation
RiversideCA.gov
10 TRASH
9 10
4/28/2022
6 RiversideCA.gov
11 TRASH/DUMPING
RiversideCA.gov
12 VEGETATION
11 12
4/28/2022
7 RiversideCA.gov
13 SEDIMENT
RiversideCA.gov
14 1. GIS/Mapping Updates
2. Equipment
3. Field Office/Equipment
Storage
4. State Trash Amendments
CHALLENGES/GOALS
13 14
4/28/2022
8 RiversideCA.gov
15 STRATEGIC PLAN ALIGNMENT
UNIVERSITY AVE.
OTTAWA AVE.
Strategic Priority No. 4 – Environmental Stewardship &
Strategic Priority No. 6 – Infrastructure, Mobility, and Connectivity Goal 4.2 - Sustainably manage local water resources to maximize reliability and advance water reuse to ensure safe, reliable and affordable water to our community.
Goal 6.2 - Maintain, protect and improve assets and infrastructure within the City’s built environment to ensure and enhance reliability, resiliency, sustainability, and facilitate connectivity.
Cross-Cutting Threads
RiversideCA.gov
16 That the Mobility & Infrastructure Committee receive an update on the storm drain maintenance program.
RECOMMENDATION
15 16