FY 2022-2023 SB-1 LSRP Project List
Start Complete Min Max
Pre- Construction 09/2022 03/2023
Construction 06/2023 11/2023
Street Preservation
Boyd Ct (EOS - Cridge);
Cottage St (Commerce - High);
Cridge St (Commerce - Howard);
Date St (Commerce - Victoria);
Denton St (Commerce - Victoria);
Grove Av ( EOS - Fourteenth);
Howard Av (EOS - Fouteenth);
Iris St (Park - Victoria);
Park Av (EOP - Fourteenth)
Pleasant St (Commerce St - Victoria Av)
Prospect Av (Howard - Victoria)
Woodbine St (Park - Victoria)
Miramonte Pl (Fourteenth St - Allis Pl)
Allis Pl (Miramonte - Glenwood)
Isabella St (Fourteenth - EOS)
Traffic Scrambles

1. Market St / Mission Inn Av

2. Market St / University Av

Traffic Median Modfication

1. Orange Terrace Pkwy / Hillsdale Rd
Traffic Circles

1. Howard St / Cottage St

2. Howard St / Pleasant St

3. Howard St / Prospect Av

4. Howard St / Denton St
Assem Senate
Street Rehabilitation
Glenwood Dr (San Andreas Av - Redwood);
San Andreas Av (Glenwood - Tequesquite);
Atlanta Av (UPRR -Marlborough)
Commerce St (EOS - EOS);
Forest Av (Pleasant - Fourteenth);
Victoria Av (Washtington - Horace)
New Street Construction
Alley - Pine St / Cedar St (Eleventh - Twelfth)
Alley - Tenth St / Eleventh St (Redwood - Pine);
Alley - Brockton Av / Chestnut Dr (First - Houghton);
Alley - Brockton Av / Locust St (First - Houghton);
Alley - Lime St / Mulberry St (Third St - EOS);
Alley - Douglas Av / Dwight Av (Linden - Loma Vista)
Alley - Central Av / Yosemite Wy (Magnolia - De Anza);
Alley - Magnolia Av / Potamac St (Madison - San Rafael); Title Description Location Component
New 22/23 10 15 60, 61
Useful Life
Priority Status
Est. Schedule
31 2022-2023 SB-1
Street Maintenance
and Traffic Safety
Improvements,
Phase 1
This project will include:

Cost Estimating, Document Preparation;
Environmental Study/Documents; Right of Way;
Preliminary Design; Project Scope Development;
ADA Curb Ramp Installation (New);
ADA Curb Ramp Rehab/Repair (Existing);
Paving and/or Striping Rehab/Repair (Existing Safety);
Bicycle Lane Rehab/Repair (Existing);
Sidewalk and/or Crosswalk Rehab/Repair (Existing),
Traffic Signals, Lights, and/or Signage Installation (New Safety)

Page 1 of 2 ends

FY 2022-2023 SB-1 LSRP Project List
Start Complete Min Max Assem SenateTitle Description Location Component Useful Life
Priority Status
Est. Schedule
Pre- Construction 09/2021 03/2022
Construction 06/2022 11/2022
10 15
2022-2023 SB-1
Street Maintenance
Improvements,
Phase 2
This project will include:

Cost Estimating, Document Preparation;
Environmental Study/Documents; Right of Way;
Preliminary Design; Project Scope Development;
ADA Curb Ramp Installation (New);
ADA Curb Ramp Rehab/Repair (Existing);
Paving and/or Striping Rehab/Repair (Existing Safety);
Bicycle Lane Rehab/Repair (Existing);
Sidewalk and/or Crosswalk Rehab/Repair (Existing),
Street Rehabilitation
Madison St (Indiana - Dufferin);
Magnolia Av (Hole - Jackson);
Almside Wy (Cochran - Wayfield);
Middleton Pl (Wayfield - EOS);
New Haven Dr (Wayfield - Ramway);
Ramway Rd (Stratton - New Haven)
Stratton Dr (Cochran - Ramway);
Alta Loma Wy (Ontario - Hershey);
Auld St (Dunn - Idyllwild Ln);
Chula Vista Wy (Crest - EOS);
Cobb St (Jurupa - Dunn);
Crest Av (Jurupa - Julian);
Dunn Ct (Auld - EOS);
Hershey Wy (Alta Loma - Crest);
Idyllwild Ln (Jurupa - Macy);
Jefferson St (Magnolia - Arlington);
Julian Dr (Idyllwild - Crest);
Macy Ct (Auld - EOS);
Ontario St (Idyllwild - Crest); New 22/23 60, 61 31