2019 ‐ 2022 Energy Delivery Engineering Consultant Panel
CONSULTANTS
S c o r e 123456789 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 ECORP Consulting 32.78 8
2E N G E O 32.95 19
3 EPS Engineering & Design 33.00 2, 3, 5, 7, 9, 10, 11, 13, 14, 17 4 Geo Tek 32.00 17
5G e o M a t 33.65 19
6 GL Power Solution, Inc. (DNVGL) 35.63 4, 10, 11, 12, 14, 15, 18 7 HDR, Inc. 35.10 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 13, 14, 15, 16, 17, 18, 19 8 Ninyo & Moore 33.60 19
9 NV5, Inc. 35.33 1, 2, 3, 4, 5, 6, 7, 8, 11, 13, 15, 17, 18, 19 10 Power Engineers 33.60 1, 2, 3, 4, 5, 7, 8, 9, 10, 11, 12, 13, 15, 17, 18 11 Power‐Tech 33.55 1, 2, 3, 4, 5, 6, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18 12 Stantec Consulting 33.78 1, 2, 3, 4, 5, 7, 8, 13, 14, 18, 19 13 Terracon Consultants 32.60 19
14 Tetra Tech 32.60 1, 6, 8 , 13, 17
15 TRC Solutions 34.10 1, 2, 3, 4, 5, 7, 8, 9, 10, 11, 12, 15, 16, 17, 18, 19
11. Fiber Optic Communications System Design
performed.
Approved Work Categories
1. Overhead and Underground Transmission
Line Design performed.
2. Overhead and Underground Distribution
Line Design performed.
3. Substation Design & Operating Practices
performed.
4. SCADA Master Station and Remote
Terminal Unit Design performed.
5. Civil Design performed.
6. Mechanical Design performed.
7. Structural Design performed.
8. CEQA Environmental performed.
9. Overhead and Underground Communications
Line Design performed.
10. Wireless Communications System Design
performed.
18. Engineering Studies performed.
19. Geo Tech performed.
Awarded Category List
12. SONET/OTN, SDH, TDM, Next Generation
Transport, DWDM/ROADM, MPLS, Carrier
Ethernet and Network Management System /
Network designs / Network Audit performed.
13. Generation Station Design performed.
14. System Operations procedures to comply with
NERC, CAISO and SCE requirements performed.
15. Physical, Electronic, Cyber Security and
Compliance Risk Management performed.
16. System Maintenance performed.
17. Construction and Project Management
Functions performed.