10/14/2022
1 RiversideCA.gov
1 RiversideCA.gov
BID 7876 – FY 2019/20 SENATE BILL-1

MAINTENANCE AND TRAFFIC
IMPROVEMENTS, PHASE 2
City Council
November 1, 2022
Public Works Department
RiversideCA.gov
2 1. On April 28, 2017, the California Governor signed
Senate Bill-1 (SB-1), known as the Road Repair and
Accountability Act of 2017, to address basic road
maintenance, rehabilitation and critical safety needs.

2. SB-1 increases gas taxes and vehicle registration fees and provides for inflation adjustments to fund these
needs.

BACKGROUND
1 2
10/14/2022
2 RiversideCA.gov
3 3. The California State Controller’s Office deposits various portions of these revenues into the State’s Road
Maintenance and Rehabilitation Account (RMRA). A
percentage of the RMRA funds are apportioned to
eligible cities and counties as part of the SB-1
Local Street and Roads Program (LSRP).

4. On July 16, 2019, the City Council adopted Resolution No. 23477 to approve the FY2019-20 Project List to be
completed utilizing the projected FY2019-20 SB-1
revenue.

BACKGROUND
RiversideCA.gov
4 5. The Public Works Department utilizes a Pavement
Management Program and receives service requests
from residents to plan various maintenance
improvements throughout the City.

6. Every fiscal year, the Public Works Department budgets a portion of State Gas Tax, County Measure A, and
Measure Z revenues for street rehabilitation of City
arterial and minor streets. This project will focus on the rehabilitation of streets in very poor conditions.

BACKGROUND
3 4
10/14/2022
3 RiversideCA.gov
5 7. On November 16, 2021, the City Council received a list of proposed maintenance locations to be completed
from FY 2019/20 through FY 2021/22 with the various
funding sources.

8. The maintenance improvements included in Bid 7876
were locations included in the complete list provided
in the report from November 2021. The remaining
locations outlined in that list are included in other
projects.

BACKGROUND
RiversideCA.gov
6 1. Resurface 1.2 miles on MLK Blvd from Chicago Ave to I- 215 Ramps.

2. Resurface 1.6 miles of Minor streets maintenance in
the Hawarden Hills neighborhood.

3. Reconstruct damaged concrete curbs, gutters,
sidewalks, driveways, and pedestrian ramps
throughout maintenance locations.

4. Install signing and striping throughout as required.

CURRENT PROJECT
5 6
10/14/2022
4 RiversideCA.gov
7 5. New traffic signal at Arlington Ave. and Stover Ave.

6. Traffic signal modifications at:
• Van Buren Blvd. and Victoria Ave.
• MLK Blvd. and Canyon Crest Dr.

7. New HAWK signal at:
• MLK Blvd. at Bordwell Park
• Madison St. at Freda Ave.
• Adams St. north of Brunswick Ave.

CURRENT PROJECT
RiversideCA.gov
8 8. Revised signing and striping:
• Watkins Dr. from Blaine St. to Valencia Hill Dr.
• Jefferson St. from Sycamore Ave. to Garfield St.
• Fairview Ave from Central Ave. to Cornwall Ave.

9. Install Overhead Dynamic Speed Feedback sign and
bollards at Trautwein Rd. at Alessandro Blvd.

10. Install edge lit stop signs at 5 locations

11. Install solar power speed feedback signs at 13 locations.

12. Rectangular Rapid Flashing Beacon on City College Dr. at Saunders St.

CURRENT PROJECT
7 8
10/14/2022
5 RiversideCA.gov
9 MAINTENANCE LOCATION MAP
RiversideCA.gov
10 MARTIN LUTHER KING BLVD. DE GRAZIA ROAD

EXISTING CONDITIONS
9 10
10/14/2022
6 RiversideCA.gov
11 EDGE LIT STOP SIGN

HAWK SIGNAL

SOLAR POWER SPEED

FEEDBACK SIGN

TRAFFIC IMPROVEMENTS
RiversideCA.gov
12 Strategic Priority 6 – Infrastructure, Mobility & Connectivity Goal 6.2 – Maintain, protect and improve assets and
infrastructure within the City’s built environment to ensure and enhance reliability, resiliency, sustainability, and facilitate connectivity.

Cross-Cutting Threads

STRATEGIC PLAN ALIGNMENT
11 12
10/14/2022
7 RiversideCA.gov
13 That the City Council:

1. Award a construction contract for Bid No. 7876 for FY 2019/20 SB-1 Maintenance and Traffic Improvements,
Phase 2 to All American Asphalt of Corona, California, in the amount of $4,311,788; and

2. Authorize the City Manager, or designee, to execute
the construction contract, including making minor and
non-substantive changes.

RECOMMENDATIONS
13