MEASURE Z – BID 7908
FY 2021/22 ARTERIAL AND MINOR STREET
MAINTENANCE, PHASE 2
City Council
May 2, 2023
Public Works Department
RiversideCA.gov
2 1. The Public Works Department utilizes a Pavement
Management Program and receives service requests
from residents to plan various maintenance
improvements throughout the City.

2. Every fiscal year, the Public Works Department budgets a portion of State Gas Tax, County Measure A, and City
Measure Z revenues for street rehabilitation of City
arterial and minor streets. This project will focus on
rehabilitation of streets in poor condition.

BACKGROUND
1 2
4/10/2023
2 RiversideCA.gov
3 3. On November 16, 2021, the City Council received a
list of proposed maintenance locations to be
completed with the various Fiscal Year 2021/22
funding sources.

4. The maintenance improvements included Bid 7908
were locations included in the complete list provided
in the report from November 2021. The remaining
locations outlined in that list are included in other
projects.

BACKGROUND
RiversideCA.gov
4 1. Resurface 0.6 miles on one Arterial street including:
• Westbound Alessandro Boulevard from Mission Grove
Parkway to Communications Center Drive.

2. Resurface 10.9 miles of local and collector streets within nine different neighborhoods and provide slurry
preservation on one street. Resurfacing on collector streets include:
• Grove Community Drive from Plainview Street to
Gardenia Vista Drive (0.7 Miles)
• Seventh St from Kansas to Chicago (0.5 miles)

CURRENT PROJECT
3 4
4/10/2023
3 RiversideCA.gov
5 3. Reconstruct damaged concrete curbs, gutters,
sidewalks, driveways, and non-compliant pedestrian
ramps within all rehabilitation locations.

4. Install new signing and striping throughout as
necessary.

5. Construct a missing segment of new sidewalk on
Mountain View Avenue easterly of Sheppard Street.

6. Replace 670 feet of existing chain link fence with a new 7-foot high wrought iron fence on Motor Circle.

CURRENT PROJECT
RiversideCA.gov
6 LOCATION MAP
5 6
4/10/2023
4 RiversideCA.gov
7 EXISTING CONDITIONS

SEVENTH STREET STRAWBERRY STREET
RiversideCA.gov
8 EXISTING CONDITIONS

FENCING AT MOTOR CIRCLE MOUNTAIN VIEW AVENUE SIDEWALK
7 8
4/10/2023
5 RiversideCA.gov
9 Strategic Priority 6 - Infrastructure, Mobility and Connectivity Goal No. 6.2 – Maintain, protect, and improve assets and infrastructure within the City’s built environment to ensure and enhance reliability, resiliency, sustainability, and facilitate connectivity.

Cross-Cutting Threads

STRATEGIC PLAN ALIGNMENT
RiversideCA.gov
10 That the City Council:

1. Award Bid. No. 7908 for a construction contract for
Fiscal Year 2021/22 Arterial and Minor Streets
Maintenance, Phase 2 to R.J. Noble Company of
Orange, California, in the amount of $10,272,720; and

2. Authorize the City Manager, or designee, to execute
the construction contract, including making minor and
non-substantive changes.