11/30/2023
1 RiversideCA.gov
1 RiversideCA.gov
Bid 2309 – Pavement Cut Fee Study
City Council
December 12, 2023
Public Works Department
RiversideCA.gov
2 1. Paving Moratorium extended from
three to five years.
2. GIS Paving Map implement for better
coordination.
3. Pavement Management Program
incorporated regular street surveys.
4. Increased roadway investment
significantly in the past several years.
5. Assess truck volumes, cut-through
traffic concerns, & restrictions
PAVEMENT PROGRAM OVERVIEW
1 2
11/30/2023
2 RiversideCA.gov
3 6. Partnered with RPU to recommend on-call contractors to repair roads and sidewalks damaged by water line
repairs.
7. Continue to pursue best practices to help preserve
streets.
8. Trench Cut Fees have already been implemented by
many Cities and many more agencies have conducted
similar studies.
9. On May 11, 2023, the Mobility and Infrastructure
Committee recommended that the City Council
approve a Pavement Cut Fee Study to assess damages
caused by development and utility work.
PAVEMENT PROGRAM OVERVIEW
RiversideCA.gov
4 BACKGROUNDROAD DAMAGE BY TRENCHING OPERATIONS
1. Water Intrusion places load
pressure on pavement
causing some of the gravel
to become unstable –
leads to cracking
2. Zone of Influence – lateral
support becomes weak
and unstable, can unravel
toward the trench opening
(caving in)
3. 90% compaction isn’t
always achieved which
leads to failing patches
and rough roads
3 4
11/30/2023
3 RiversideCA.gov
5 BACKGROUNDCOMMITTEE RECOMMENDATION
• On May 11, 2023, the Mobility and
Infrastructure Committee reviewed the
matter and recommended that the City
Council approve a Pavement Cut Fee
Study to assess damages caused by
trenching associated with development
and utility work and to consider adopting
a fee schedule to recover street
degradation costs for those damages.
RiversideCA.gov
6 Tasks Include:
a. Preliminary Pavement Cut Fee Analysis
b. Pavement Cut Fee Study Workshop
c. Pavement Cut Fee Study Report
d. Public Outreach
e. Pavement Cores / Geotechnical Exploration
PROPOSED PAVEMENT CUT FEE STUDY
5 6
11/30/2023
4 RiversideCA.gov
7 Optional Tasks (Can be Negotiated at a later date)
a. Alternate Forms of Revenue
b. Implementation of the City’s Cut Fee Schedule
PROPOSED PAVEMENT CUT FEE STUDY
RiversideCA.gov
8 1. The project is anticipated to be
completed in the first half of 2024
2. Staff plan to provide regular
updates to the Mobility and
Infrastructure Committee
FEE STUDY TIMELINE
7 8
11/30/2023
5 RiversideCA.gov
9 • Strategic Priority No. 6 Infrastructure, Mobility and Connectivity and Goal No. 6.2 – Maintain, protect, and improve assets and infrastructure within the City’s built environment to ensure and enhance reliability, resiliency, sustainability, and facilitate connectivity.
• This item aligns with each thread for Community Trust, Equity, Fiscal Responsibility, Innovation, and Sustainability & Resiliency.
Cross-Cutting Threads
STRATEGIC PLAN ALIGNMENT
RiversideCA.gov
10 That the City Council:
1. Award a Service Agreement for RFP No. 2309 to
complete a Pavement Cut Fee Study to Nichols
Consulting Engineers of Fountain Valley, California, in the amount of $190,600; and
2. Authorize the City Manager, or designee, to execute the Service Agreement with Nichols Consulting
Engineers, including making minor non-substantial
changes.
RECOMMENDATIONS